10
PBN and the Cockpit Workshop Regulatory and Certification Forum EASA Guidance Material Bryan Jolly ATM Rulemaking Officer/PBN Project manager, 18 th October 2012

PBN and the Cockpit Workshop - International Civil … ·  · 2012-10-24PBN and the Cockpit Workshop ... EASA Guidance Material ... AMC 20- material 6 1. Purpose . 2. Background

Embed Size (px)

Citation preview

Page 1: PBN and the Cockpit Workshop - International Civil … ·  · 2012-10-24PBN and the Cockpit Workshop ... EASA Guidance Material ... AMC 20- material 6 1. Purpose . 2. Background

PBN and the Cockpit Workshop

Regulatory and Certification Forum

EASA Guidance Material

Bryan Jolly ATM Rulemaking Officer/PBN Project manager,

18th October 2012

Page 2: PBN and the Cockpit Workshop - International Civil … ·  · 2012-10-24PBN and the Cockpit Workshop ... EASA Guidance Material ... AMC 20- material 6 1. Purpose . 2. Background

Content

Current Regulations

Next Steps in Regulation development Air OPS

Airworthiness

Page 3: PBN and the Cockpit Workshop - International Civil … ·  · 2012-10-24PBN and the Cockpit Workshop ... EASA Guidance Material ... AMC 20- material 6 1. Purpose . 2. Background

Currently Applicable Regulations

• Annex III to Council Regulation (EEC) No 3922/91 (EU-OPS)

3

http://eur-lex.europa.eu/en/index.htm

Page 4: PBN and the Cockpit Workshop - International Civil … ·  · 2012-10-24PBN and the Cockpit Workshop ... EASA Guidance Material ... AMC 20- material 6 1. Purpose . 2. Background

Operational Approval

• An operator shall ensure that an aeroplane operated in areas, or through portions of airspace, or on routes where navigation performance requirements have been specified, is certified according to these requirements, and, if required, that the Authority has granted the relevant operational approval.

4

EU-OPS 1.243(a)

Operational Approvals Required from NAA !

Page 5: PBN and the Cockpit Workshop - International Civil … ·  · 2012-10-24PBN and the Cockpit Workshop ... EASA Guidance Material ... AMC 20- material 6 1. Purpose . 2. Background

EASA requirements

PBN operations

EASA / JAA

RNAV 10 AMC 20-12

RNAV 5 (B-RNAV)

AMC 20-4

RNAV 1 (P-RNAV)

JAA TGL 10

RNP APCH (LNAV) AMC 20-27

RNP APCH (LNAV/VNAV) AMC 20-27

RNP APCH (LPV) AMC 20-28

RNP AR AMC 20-26

http://easa.europa.eu/agency-measures/certification-specifications.php

Page 6: PBN and the Cockpit Workshop - International Civil … ·  · 2012-10-24PBN and the Cockpit Workshop ... EASA Guidance Material ... AMC 20- material 6 1. Purpose . 2. Background

AMC 20- material

6

1. Purpose

2. Background

3. Scope

4. Reference Documents

5. Assumptions

6. RNP-APCH Airworthiness Criteria

7. Functional Criteria

8. Airworthiness Compliance

9. AFM/POH

10. RNP-APCH Operational Criteria incl. appendices 2, 3, 4 and 5

11. Availability of Documents

• Contents of AMC 20-27:

General information.

General information.

Airworthiness Criteria.

Operational Criteria.

Page 7: PBN and the Cockpit Workshop - International Civil … ·  · 2012-10-24PBN and the Cockpit Workshop ... EASA Guidance Material ... AMC 20- material 6 1. Purpose . 2. Background

Issues

•Note the number of PBN applications is increasing, •Requesting and obtaining a SPA constitutes an additional administrative task, especially for non-commercial operators

What are the Safety gains?

7

Future PBN Operational Approvals

Page 8: PBN and the Cockpit Workshop - International Civil … ·  · 2012-10-24PBN and the Cockpit Workshop ... EASA Guidance Material ... AMC 20- material 6 1. Purpose . 2. Background

PBN Approvals

Objectives

Transpose the operational criteria

from AMC 20-4, AMC 20-5, AMC 20-12,

AMC 20-27 AMC 20-28 into Part-SPA;

8

Page 9: PBN and the Cockpit Workshop - International Civil … ·  · 2012-10-24PBN and the Cockpit Workshop ... EASA Guidance Material ... AMC 20- material 6 1. Purpose . 2. Background

9

• interoperability requirements, resulting from the SES implementing rules

• Safety requirements deemed necessary to ensure the safe operation of the aircraft in the given volume of airspace.

• Will replace the AMC 20 series • Developed to included required Nav

Spec’s for worldwide operations

Develop applicable

Certification Specifications

(CS-ACNS)

What Next - Airworthiness

Page 10: PBN and the Cockpit Workshop - International Civil … ·  · 2012-10-24PBN and the Cockpit Workshop ... EASA Guidance Material ... AMC 20- material 6 1. Purpose . 2. Background

10