Short Circuit CalculationsIIEE Presentation

SHORT CIRCUIT CALCULATIONSREVISITED

FORTUNATO C. LEYNESFORTUNATO C. LEYNESFORTUNATO C. LEYNESFORTUNATO C. LEYNESChairman

Professional Regulatory

Board of Electrical Engineering

Professional Regulation Commission

Page 2: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Short Circuit (Fault) Analysis

FAULT-PROOF SYSTEM not practical neither economical faults or failures occur in any power system

In the various parts of the electrical network under short circuit or unbalanced condition, the determination of the magnitudes and phase angles Currents Voltages Impedances

Page 3: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Application of Fault Analysis

1. The determination of the required mechanical strength of electrical equipment to withstand the stresses brought about by the flow of high short circuit currents

2. The selection of circuit breakers and switch ratings

3. The selection of protective relay and fuse ratings

Page 4: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

4. The setting and coordination of protective devices

5. The selection of surge arresters and insulation ratings of electrical equipment

6. The determination of fault impedances for use in stability studies

7. The calculation of voltage sags caused resulting from short circuits

Application of Fault Analysis

Page 5: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

8. The sizing of series reactors to limit the short circuit current to a desired value

9. To determine the short circuit capability of series capacitors used in series compensation of long transmission lines

10. To determine the size of grounding transformers, resistances, or reactors

Application of Fault Analysis

Page 6: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Per Unit Calculations

Page 7: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Three-phase Systems

Φ

Φ

=

×=

3

2

3

2

),(

1000),(

MVAbase

kVvoltagebaseZ

kVAbase

kVvoltagebaseZ

LLB

LLB

Page 8: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Per Unit Quantities

)(

)(

)(

)(

B

pu

B

pu

B

pu

ZimpedanceBase

impedanceactualZ

kVVoltageBase

kVvoltageactualV

ICurrentBase

currentactualI

=

=

=

Page 9: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Changing the Base of Per Unit Quantities

( )

( )

( )

][

][

][

2

][

][

][

2

][][

][

2

][

][

)(

1000

1000)(

1000

)(,

newB

newpu

new

new

newB

old

oldoldpu

old

old

oldpu

Z

ZZ

kVAbase

kVbaseZ

kVAbase

kVbaseZZ

kVAbase

kVbase

ZimpedanceactualZ

Ω=

×=

×=Ω

×

Ω=

Page 10: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Changing the Base of Per Unit Quantities

( )

( )

( )

][

][

][

2

][

][

][

2

][][

][

2

][

][

)(

1000

1000)(

1000

)(,

newB

newpu

new

new

newB

old

oldoldpu

old

old

oldpu

Z

ZZ

kVAbase

kVbaseZ

kVAbase

kVbaseZZ

kVAbase

kVbase

ZimpedanceactualZ

Ω=

×=

×=Ω

×

Ω=

Page 11: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

kVA Base for Motors

Induction < 100 hp1.00

Synchronous 1.0 pf0.80

Induction > 1000 hp0.90

Induction 100 < 999 hp0.95

Synchronous 0.8 pf1.00

hp ratingkVA/hp

Page 12: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

SYMMETRICAL COMPONENTS

Page 13: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

1cV 1aV

1bV

Positive Sequence

2aV

2cV

2bV

Negative Sequence

Unbalanced PhasorsZero Sequence

000 cbaVVV ==

cV

aV

bV

0cV

1cV

2cV

0bV

2bV

1bV

1aV

2aV

0aV

Page 14: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Symmetrical Components of Unbalanced Three-phase Phasor

( )

( )

( )cbaa

cbaa

cbaa

aVVaVV

VaaVVV

VVVV

++=

++=

++=

2

2

2

1

0

3

1

3

1

3

1

2

2

10

21

2

0

210

aaac

aaab

aaaa

VaaVVV

aVVaVV

VVVV

++=

++=

++=

Page 15: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

In matrix form:

Symmetrical Components of Unbalanced Three-phase Phasor

=

2

1

0

2

2

1

1

111

a

a

a

c

b

a

V

V

V

aa

aa

V

V

V

=

c

b

a

a

a

a

V

V

V

aa

aa

V

V

V

2

2

2

1

0

1

1

111

3

1

Page 16: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Sequence Networks

Power System Short Circuit Calculations

Page 17: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Fault Point

The fault point of a system is that point to which the unbalanced connection is attached to an otherwise balanced system.

Page 18: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Definition of Sequence Networks

Positive-sequence Network

Ea1 = Thevenin’s equivalent voltage as seen at the fault point

Z1 = Thevenin’s equivalent impedance as seen from the fault point

1111 ZIEV aaa −=

Z1

Ea1

Ia1

Va1

+

-

Page 19: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Negative-sequence Network

Z2 = Thevenin’s equivalent negative-sequence impedance as seen at the fault point

Definition of Sequence Networks

222 ZIV aa −=Z

2

Ia2

Va2

+

-

Page 20: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Zero-sequence Network

Z0 = Thevenin’s equivalent zero-sequence impedance as seen at the fault point

Definition of Sequence Networks

000 ZIV aa −= Z0

Ia0

Va0

+

-

Page 21: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Sequence Network Models ofPower System Components

Power System Short Circuit Calculations

Page 22: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Synchronous Machines(Positive Sequence Network)

djxZ ''1 =

Page 23: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Synchronous Machines(Negative Sequence Network)

2

''''2

qd xxjZ

+=

Where:

Z2

Ia2

Va2

+

-

x”d = direct-axis sub-transient reactance

x”q = quadrature-axis sub-transient reactance

Page 24: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Synchronous Machines(Zero Sequence Network)

Solidly-Grounded Neutral

jX0

I0

n

ground

Page 25: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Impedance-Grounded Neutral

Synchronous Machines(Zero Sequence Network)

jX0

I0

n

3Zg

ground

Page 26: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Ungrounded-Wye or Delta Connected Generators

Synchronous Machines(Zero Sequence Network)

jX0

I0

n

ground

Page 27: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Two-Winding Transformers(Positive Sequence Network)

Standard

Symbol

P S

ZPS

Equivalent

Positive-seq. Network

P S

Page 28: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Three-Winding Transformers(Positive Sequence Network)

tsst

tppt

spps

ZZZ

ZZZ

ZZZ

+=

+=

+= ( )

( )

( )psstptt

ptstpss

stptpsp

ZZZZ

ZZZZ

ZZZZ

−+=

−+=

−+=

2

1

2

1

2

1

PT

Standard

Symbol

Zp

P

ZS

S

Zt

T

Equivalent Positive-Sequence

Network

S

Page 29: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Transformers(Negative Sequence Network)

The negative-sequence network of two-winding and three-winding transformers are modeled in the same way as the positive-sequence network since the positive-sequence and negative-sequence impedances of transformers are equal.

Page 30: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Simplified Derivation of Transformer Zero-Sequence Circuit Modeling

P Q

S1 = 1 and S3 = 0or

S2 = 1 or S4 = 0

Grounded wye

S1 = 0 and S3 = 0or

S2 = 0 and S4 = 0

Ungrounded wye

S1 = 0 and S3 = 1or

S2 = 0 and S4 = 1

Delta

(Thanks to Engr. Antonio C. Coronel, Retired VP, Meralco, and former member, Board of Electrical Engineering)

Page 31: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Simplified Derivation of Transformer Zero-Sequence Circuit Modeling

S1 = 1S2 = 1S3 = 0S4 = 0

P Q

Z

S1

S3 S4

S2

Grounded wye – Grounded wye

Page 32: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Simplified Derivation of Transformer Zero-Sequence Circuit Modeling

S1 = 1S2 = 0S3 = 0S4 = 0

P Q

Grounded wye – Ungrounded wye

Page 33: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Simplified Derivation of Transformer Zero-Sequence Circuit Modeling

S1 = 1S2 = 0S3 = 0S4 = 1

P Q

Grounded wye – Delta

Page 34: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Simplified Derivation of Transformer Zero-Sequence Circuit Modeling

S1 = 0S2 = 0S3 = 0S4 = 0

P Q

Delta – Delta

Page 35: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Transformers(Zero-Sequence Circuit Model)

TransformerConnection

Zero-SequenceCircuit Equivalent

P Q ZPQ

P Q

P Q ZPQ

P Q

Page 36: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

TransformerConnection

QP ZPQ

P Q

P Q ZPQ

P Q

Transformers(Zero-Sequence Circuit Model)

Transformers(Zero-Sequence Circuit Model)

Zero-SequenceCircuit Equivalent

Page 37: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

TransformerConnection

Zero-SequenceCircuit Equivalent

P Q

R

ZP

ZQ

ZR

P

R

Q

P Q ZPQ

P Q

Transformers(Zero-Sequence Circuit Model)

Transformers(Zero-Sequence Circuit Model)

Page 38: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

TransformerConnection

Zero-SequenceCircuit Equivalent

ZP ZQ

ZR

P

R

Q

P Q

R

QP

R

ZP

ZQ

ZR

P

R

Q

Transformers(Zero-Sequence Circuit Model)

Transformers(Zero-Sequence Circuit Model)

Page 39: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Transmission Lines(Positive Sequence Network)

ra jXL

Z1

Page 40: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Transmission Lines(Negative Sequence Network)

The same model as the positive-sequence network is used for transmission lines inasmuch as the positive-sequence and negative-sequence impedances of transmission lines are the same

Page 41: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Transmission Lines(Zero Sequence Network)

The zero-sequence network model for a transmission line is the same as that of the positive- and negative-sequence networks. The sequence impedance of the model is of course the zero-sequence impedance of the line. This is normally higher than the positive- and negative-sequence impedances because of the influence of the earth’s resistivity and the ground wire/s.

Page 42: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Power System Short Circuit Calculations

Classification of Power SystemShort Circuits

Page 43: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Shunt Faults

Single line-to-ground faults

Double line-to-ground faults

Line-to-line faults

Three-phase faults

Page 44: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Series Faults

One-line open faults

Two-line open faults

Page 45: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Combination of Shunt andSeries Faults

Single line-to-ground and one-line open

Double line-to-ground and one-line open faults

Line-to-line and one-line open faults

Three-phase and one-line open faults

Page 46: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Single line-to-ground and two-line open faults

Double line-to-ground and two-line open faults

Line-to-line and two-line open faults

Three-phase and two-line open faults

Combination of Shunt andSeries Faults

Page 47: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Balanced Faults

Symmetrical or

Three-Phase Faults

Page 48: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Derivation of Sequence Network Interconnections

Boundary conditions:

fccfbbfaaF

cba

ZIVZIVZIVV

III

−=−=−=

=++ 0 Eq’n (1)

Eq’n (2)

Zf

Zf

Vf

System A System B

A

B

C

Va

Vb

Vc

Ia

Ib

Ic

Zf

Page 49: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Z0

Ia0

Va0

+

-

Z1

Ea1

Ia1

Va1

+

-

Zf

Z2

Ia2

Va2

+

-

Zf

1

11

1

11

210

1

11

,0

Z

EII

Z

ZZ

EII

IIII

ZZ

EI

aaf

f

aaf

aaaf

f

aa

f

==

=

+==

++=

+=

Page 50: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Unbalanced Faults

Single Line-to-Ground Faults

Page 51: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

0

0

==

==

faa

cb

ZIV

II

Zf

System A System B

A

B

C

Va

Vb

Vc

Ia

Ib

Ic

Derivation of Sequence Network Interconnections

Boundary conditions:

Page 52: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

f

aaaa

ZZZZ

EIII

3210

1210 +++===

Z1

Ea1

Ia1

Va1

+

-

Z2

Ia2

Va2

+

-

Z0

Ia0

Va0

+

-

3Zf

10

1

21

01210

10

1210

21

210

1

210

2

3

0

33

2

0

ZZ

EII

ZZandZIf

IIIIIII

ZZ

EIII

ZZ

ZZZ

EIII

ZIf

aaf

f

aaaaaaf

aaaa

a

aaa

f

+==

==

==++==

+===

=

++===

=

Page 53: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Unbalanced Faults

Line-to-Line Faults

Page 54: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

fbcbcfbb

cb

a

ZIVVVZIV

II

I

=−=−

−=

=

or ;

0

Zf

System A System B

A

B

C

Va Vb Vc

Ia

Ib

Ic

Derivation of Sequence Network Interconnections

Boundary conditions:

Page 55: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

1

11

21

21

11

2

0

Z

EI

ZZandZIf

ZZZ

EI

aa

f

f

aa

=

==

++=

( ) 11

2

21

21

2

0

3

;0

aaf

aaao

aaacbf

IjIaaI

III

aIIaIIII

currentfaultThe

−=−=

−==

++=−==

Z1

Ea1

Ia1

Va1

+

-

Zf

Z2

Ia2

Va2

+

-

Z0

Ia0

Va0

+

-

Page 56: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

]3[][

1

1]3[

1

1

1

1

1

1

21

2

3

2

3

2

3

0 if

23

with ,thus

φ

φ

fLLf

af

aaf

f

f

af

II

Z

EI

Z

E

Z

EjI

Z

ZZ

EjI

ZZ

=

=

=−=

=

+−=

=

Page 57: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Unbalanced Faults

Double-to-line Ground Fault

Page 58: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

( )( ) gcbfcc

gcbfbb

a

ZIIZIV

ZIIZIV

I

++=

++=

= 0 Eq’n BC-1

Eq’n BC-2

Eq’n BC-3

Zf

System A System B

A

B

C

Va

Vb

Vc

Ia

Ib

Ic

Zf

Vf

Zg (I

b+I

c)

Derivation of Sequence Network Interconnections

Boundary conditions:

Page 59: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

( )( )gf

gff

f

aa

ZZZZ

ZZZZZZZ

EI

32

3

02

02

1

11

+++

+++++

=

Z0

Ia0

Va0

+

-

Z2

Ia2

Va2

+

-

Zf

Zf

Zf+3Z

g

Z1

Ea1

Ia1

Va1

+

-

Page 60: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Negative-sequence Component:

+++

++−=

gf

gf

aaZZZZ

ZZZII

32

3

02

0

12

Zero-sequence Component:

The fault current( ) ( )

( ) ( )( ) ( ) ( )

( )0

210210

210210

2

2

1

2

0

2

2

1021

2

0

3 thus,

or ;0but

2112

2

af

aaaaaa

aaaaaaf

aaaf

aaaaaacbf

II

IIIIII

IIIIIII

IaaIaaII

IaaIIaIIaIIII

=

+−==++

+−=−+−+=

++++=

+++++=+=

+++

+−=

gf

f

aaZZZZ

ZZII

3202

2

10

Page 61: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

( )

01

2

1

10

01

0

01

011

1

01

012

01

2

1

101

01

011

11

21

2

2

0

ZZZ

EZ

ZZ

Z

ZZ

ZZZ

E

ZZ

ZII

ZZZ

EZZ

ZZ

ZZZ

EI

ZZandZZIf

a

aaa

aaa

gf

+−

=

+

++

−=

+−=

++

=

++

=

===

Page 62: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

01

10

01

1

01

2

1

11

01

1

01

011

1

01

110

2

33

22

ZZ

EII

ZZ

E

ZZZ

EZ

ZZ

Z

ZZ

ZZZ

E

ZZ

ZII

aaf

aa

aaa

+==

+=

+=

+

++

=

+−=

( )

01

2

1

10

01

0

01

011

1

01

012

01

2

1

101

01

011

1

1

21

2

2

0

ZZZ

EZ

ZZ

Z

ZZ

ZZZ

E

ZZ

ZII

ZZZ

EZZ

ZZ

ZZZ

EI

ZZandZZIf

a

aaa

aa

a

gf

+−

=

+

++

−=

+−=

++

=

++

=

===

Page 63: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Voltage Rise Phenomenon

Single-to-line Ground Fault

Page 64: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Unfaulted Phase B Voltage During Single Line-to-Ground Faults

Unfaulted Phase B Voltage During Single Line-to-Ground Faults

+

−−=

+

−=

+

−=

+

−−=

+−

+−+

+−=

++=

1

0

1

0

2

1

01

1

0

1

0

2

1

1

0

1

0

1

12

1

01

102

1

1

01

1

1

01

1

1

2

0

01

1

21

2

0

2

1

;R and R s,resistance neglecting

2

1

2

1

2

222

X

X

X

X

aEV

Z

Z

Z

Z

aEV

Z

Z

Z

Z

Z

ZaE

ZZ

ZZaEV

ZZZ

EaZ

ZZ

EEaZ

ZZ

EV

aVVaVV

ab

ab

aab

aa

a

a

b

aaab

Page 65: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Unfaulted Phase B Voltage During Single Line-to-Ground Faults

Neglecting resistances R0 & R1

0

5

10

15

20

25

30

35

40

45

50

-10 -6 -3 -2.8 -2.6 -2.4 -2.2 -2 -1.8 -1.6 -1.4 -1.2 -1 0 1 2 5 9 25 45 65 85

X0/X1

Phase B

Voltage (p.u

.)

Page 66: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Fault MVA

10

)(

1

)3(

2

3

1

:p.u.in fault ground-to-line singefor

:p.u.in fault phasefor three

p.u.; 1.01

for where,

ZZI

ZI

MVAIMVA

SLGF

F

baseFF

aE

+=

=

×=

=

φ

Page 67: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Fault MVA

( ) ( )

( )

( ) ( )

( )

( )10

01

3

1

33

23

..3

2

.).(

:

..1

.).(

:

ZI

Z

upI

ZZ

MVAupIMVA

MVAfaultgroundtolineSingle

upI

Z

MVAupIMVA

MVAfaultphaseThree

SLGF

SLGF

baseSLGFSLGF

F

baseFF

−=

=+

×=

−−

=

×=

φ

φφ

Page 68: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Assumptions Made to SimplifyFault Calculations

1. Pre-fault load currents are neglected.

2. Pre-fault voltages are assumed equal to 1.0 per unit.

3. Resistances are neglected (only for 115kV & up).

4. Mutual impedances, when not appreciable are neglected.

5. Off-nominal transformer taps are equal to 1.0 per unit.

6. Positive- and negative-sequence impedances are equal.

Page 69: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Outline of Procedures for Short Circuit Calculations

1 Setup the network impedances expressed in per unit on a common MVA base in the form of a single-line diagram

2 Determine the single equivalent (Thevenin’s) impedance of each sequence network.

3 Determine the distribution factor giving the current in the individual branches for unit total sequence current.

Page 70: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Outline of Procedures for Short Circuit Calculations

4 Interconnect the three sequence networks for the type of fault under considerations and calculate the sequence currents at the fault point.

5 Determine the sequence current distribution by the application of the distribution factors to the sequence currents at the fault point

6 Synthesize the phase currents from the sequence currents.

Page 71: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Outline of Procedures for Short Circuit Calculations

7 Determine the sequence voltages throughout the networks from the sequence current distribution and branch impedances

8 Synthesize the phase voltages from the sequence voltage components

9 Convert the pre unit currents and voltages to actual physical units

Page 72: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

CIRCUIT BREAKING SIZING(Asymmetrical Rating Factors)

Momentary Rating

Multiplying Factor = 1.6

Interrupting Rating

Multiplying Factor8 cycles = 1.0

5 cycles = 1.1

3 cycles = 1.2

1 ½ cycles = 1.5

Page 73: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

EXAMPLE PROBLEM

In the power system shown, determine the momentary and interrupting ratings for primary and secondary circuit breakers of transformer T2.

Page 74: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Solution:

pux

pux

puI

puI

SLGF

F

05.0125.0210

3

125.08

1

10100

1000

8100

800

:100MVA system@ 69kV Equivalent

0

1

)(

)3(

=×−=

==

=

=

=

pux

pux

pux

pux

pux

3333.35.4

10015.0

4.5MVAor

450050000.9kVA :M2 M1,

80.075

10006.0

:T3 T3, T2,

24.025

10006.0

40.025

10010.0"

:G1

2667.030

10008.0

:T1

B

B

0

=

=

=

=×=

=

=

=

=

=

=

=

=

Page 75: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Solution:Positive sequence network:

Page 76: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Solution:

Zero sequence network:

Page 77: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Improper Sequence Network Models

Page 78: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Improper Sequence Network Models

Page 79: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Improper Sequence Network Models

Page 80: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

Incorrect Sequence Network Models

Page 81: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation

QUESTIONS?

Page 82: SHORT CIRCUIT CALCULATIONS REVISITEDiiee.org.ph/wp-content/uploads/2014/10/Short-Circuit-Calculations.pdfSHORT CIRCUIT CALCULATIONS REVISITED FORTUNATO C. LEYNES Chairman Professional

Short Circuit CalculationsIIEE Presentation