Pennington WTW Review Meeting SWS, Crawley 8 April 1997

Pennington WTW Review Meeting SWS, Crawley 8 April 1997

Embed Size (px)

Citation preview

Page 1: Pennington WTW Review Meeting SWS, Crawley 8 April 1997

Pennington WTWPennington WTW

Review MeetingSWS, Crawley

8 April 1997

Page 2: Pennington WTW Review Meeting SWS, Crawley 8 April 1997

Ground RulesGround Rules

• We must stay for the whole meeting - no interruptions!

• Please, no telephones!• We are a Team - everyone is equal• Everyone has an opportunity to speak• No hidden agendas - no point scoring• Constructive contributions only• Don’t go away with any garbage at the end of the

day!

Page 3: Pennington WTW Review Meeting SWS, Crawley 8 April 1997

AgendaAgendaPerformance of the Team

Design ResourcesConstruction ResourcesInterfacing (Designer / Contractor)Interfacing (Civil / M&E)Duplication / Gaps

Use and management of external bodies / agenciesDrawings / change control /technical informationPlanning ApplicationSite visits - Civil / M&EDesigner matters:

Control BuildingGeotechnical contributionAs built drawings

CommissioningProject phasing - roles and responsibilitiesTeam Building

Page 4: Pennington WTW Review Meeting SWS, Crawley 8 April 1997

OutputsOutputs

• For each item on the Agenda:– Sponsor to explain– Discuss how it could have been better– Record conclusion.