Production History
• New production impact
11 wells added 2013
5 wells added 2014
1 well added 2015
• 24.5% decline in gathered volumes
5
PEP & PES History
• PEP 2002
• 10 new compressors, 18 mmcfd capacity
• $10.9 M investment
• PES 2005
• Installation on new water vapor treatment facilities at
compressors
• Participating producers have new standards for water vapor saturation
• PRC committee was formed
• PES 2010 • Interstate pipeline capacity for off-system deliveries
6
Compression • 14 Compressor Stations
• 23 Compressor Engines
• 14,175 Installed HP
• 50 MMcfd into Equitrans ACV
• 15 MMcfd into Peoples Transmission/Distribution
• 11 Engines are 1963 or older. 40 MMcfd Capacity
Dehydration • 9 Glycol Dehy’s
• 3 Gas Chillers
7
Maximum Allowable Water Vapor Level
9
For all Production Enhancement Fee Paying Volumes
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
180
190
200
210
220
230
5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 200 300 400
Pipeline Pressure
Maximum Allowable Water Vapor Content
#/mmscf
PES Off System Activity
Annual
4,254,222 4,250,933
7,712,355
3,106,174
2,152,016 1,966,905
-
1,000,000
2,000,000
3,000,000
4,000,000
5,000,000
6,000,000
7,000,000
8,000,000
9,000,000
2010 2011 2012 2013 2014 2015
Monthly
-
200,000
400,000
600,000
800,000
1,000,000
1,200,000
1,400,000
Jan-1
0
Jun-1
0
No
v-1
0
Apr-
11
Sep-1
1
Feb
-12
Jul-1
2
De
c-1
2
Ma
y-1
3
Oct-
13
Ma
r-1
4
Aug-1
4
Jan-1
5
Jun-1
5
10
Peoples Update • In 2015 Peoples filed with PUC for combined gas cost for Peoples Gas
and Equitable
• This will permit the construction of interconnections to increase the flow of gas from Peoples to Equitable
• PUC approved combined gas cost effective October 2015
• In 2015 Peoples filed with the PUC for combined transportation program for Peoples Gas and Equitable
• PUC approved combined transportation program effective April 2016
• In late 2015, Peoples will file with PUC for combined gas cost for Peoples Gas and Peoples TWP
• This will permit the construction of interconnections to increase the flow of gas from Peoples to Peoples TWP
• In late 2015, Peoples will file with PUC for combined transportation program for Peoples Gas and Peoples TWP
• By October 2016, producer gas behind Peoples can be used to serve customers of Peoples, Equitable an Peoples TWP
11
PES Project Review Committee
13
PRC Project Delivery Reciept Volume Description
Miller Interconnect PNG EGC 2 mmcfd Increase efficiency at Limstone DTI Off-System
Spruce Interconnect PNG EGC 5 mmcfd
Village Interconnect EGC PNG 2 mmcfd
Fisher Interconnect EGC PNG 5 mmcfd
Swank Control Valve PNG PNG Minimize EQT volumes delivered to PNG
Turtle Creek Interconnnect PNG EGC 40 mmcfd Optimize local production to EGC market
Egry Interconnect PNG PTWP 4 mmcfd Increase efficiency of gathering compressor
Hill Interconnnect EGC PNG 2 mmcfd Outlet for trapped local production
Patton Regulator PNG PNG Outlet for trapped local production
Shoemaker Interconnect PNG EGC 2 mmcfd Outlet for trapped local production
Valley #3 Temp Compressor PNG PNG 10 mmcfd 6 month temporary compressor
Arnold Interconnect PTWP PNG 10 mmcfd Balance deliveries from PNG to PTWP
Kittanning Interconnect PNG EGC 10 mmcfd Outlet for trapped local production
Girty Interconnect PNG PTWP 10 mmcfd Alternative outlet for production
Coxcomb Interconnect PNG EGC 40 mmcfd Optimize local production to EGC market
Blairsville Interconnect PNG PTWP 4 mmcfd Outlet for trapped local production
$4.5 Million Investment
PES Potential Capital Projects
• Replacing aging compressor facilities
• Upgrading compression to meet RACT 2
emission standards
• Redeploying compressors to match production
needs
• Replacing aging dehydration facilities
• Optimizing gathering through interconnects to
bring Peoples local supply to market across all
three utilities
14
PES Current Rates
15
• Gathering - $0.32 / Mcf
• Transmission - $0.17 / Mcf
• Compression Operations & Maintenance
• Dehydration Operations & Maintenance
• Gathering Pipeline Operations & Maintenance
• MOA Audits
• Gathering UFG
• Compressor & Dehydration Fuel
• PES is a Negotiated Rate below Cost of Service Rate
• Interstate Pipeline Capacity Charge - $0.1659 / Mcf
• Off-System Transportation 35,000 Mcf/Day Rural Valley or Truittsburg
• $500,000 per month or $6,000,000 per year
PES Proposed Rates
16
• Gathering - $0.32 / Mcf
• Transmission - $0.17 / Mcf
• Compression Operations & Maintenance
• Dehydration Operations & Maintenance
• Gathering Pipeline Operations & Maintenance
• MOA Audits
• Gathering UFG
• Compressor & Dehydration Fuel
• PES is a Negotiated Rate below Cost of Service Rate
• Interstate Pipeline Capacity Charge - $0.1659 / Mcf
• Off-System Transportation 35,000 Mcf/Day Rural Valley or Truittsburg
• $500,000 per month or $6,000,000 per year
PES Benefits
• PES rates are lower than the cost of service • Compressor and dehydration operations and maintenance
• est. $9 million annually or $0.30
• Compressor and dehydration fuel • est. 0.65 bcf or 2.2%
• Gathering pipeline operations and maintenance • est. $12 million annually or $0.40
• Gathering unaccounted for gas • est. 1.75 bcf or 5.8%
• Transmission pipeline operations and maintenance • est. 2.5 million annually or $0.08
• Equitrans AVC Capacity • $0.317 / dth plus 2.42% retainage
17
PES Enrollment Process
• Peoples distributed enrollment forms at this meeting
• Peoples is mailing enrollment forms to every producer
• Peoples will post enrollment forms on Peoples website.
• Peoples requests completed enrollment forms by November 1, 2015.
• Agreement goes into effect April 1, 2016.
18
PES Amendment Agreement
• Extends the PES 2005 agreement until the
effective date of Peoples’ next PUC Base Rate
Case (No sooner than January 1, 2018)
• Removes the off-system pipeline capacity fee and
the gas retainage charge for off-system deliveries
(currently $0.1658/mcf and 0.23%)
• Current rates are frozen ($0.32 gathering $0.17
transmission)
• Requires 80% producer participation by volume