Performance Based Mission Support
Building a Performance Focus for the Warfighter
Lyle EesleyCenter Director for Contracting
CON353 Advanced Business Solutions for Mission Support
Overview
• Where performance is critical
• Alignment of Support and Mission
• Strategic vision for Mission support
Combat Support Joint Task Force Air Operation Center
Determine Strategic
Objectives
Air Tasking Order
Strategic Planning
Commanders
Guidance &
Objectives
Combat Support Joint Task Force Air Operation Center
Mission Planning
Flight Plan
Tactical Planning
Determine Strategic
Objectives
Air Tasking Order
Strategic Planning
Commanders
Guidance &
Objectives
Combat Support Joint Task Force Air Operation Center
Mission Planning
Flight Plan
Bomb Damage
Assessment
Execution & Sensor
Feedback
Tactical Planning
ObserveOrientDecideAct
Determine Strategic
Objectives
Air Tasking Order
Strategic Planning
Commanders
Guidance &
Objectives Launch Sortie
Combat Support Joint Task Force Air Operation Center
• Leadership• Clear command and control• Effective communication & feedback systems
• Common goals• Unified effort
• Teamwork facilitated at all levels
• Mission focused• Objective information
• Effective Planning• Strategic • Tactical• Performance Goals
Keys to Success
Mission Planning
Flight Plan
Bomb Damage
Assessment
Execution & Sensor
Feedback
Tactical Planning
ObserveOrientDecideAct
Determine Strategic
Objectives
Air Tasking Order
Strategic Planning
Commanders
Guidance &
Objectives Launch Sortie
Are our Support services always aligned with our Mission ?
Contracting Community
FunctionalCommunity
Customers
Contractor
Stakeholder
Mission
PBMS Requires Alignment with Mission
Contracting Community
FunctionalCommunity
Customers
Contractor
Stakeholder
Mission
Doing things Right Doing the Right Things
Doing the Right Things – The FAR Part One Challenge• Vision:
– All participants are charged with making decisions that deliver the best value product or service to the customer
• Performance Standards– Satisfy the customer – cost, quality, and timeliness of delivered
product or service– Minimize administrative operations cost– Conduct business with integrity, fairness and openness– Fulfill public policy objectives
• Exercise personal initiative and sound business judgment to provide best value
• In exercising initiative, actions that ensure the best interests of the government are within your authority unless they are specifically prohibited by law or policy
Survival in a Knowledge Economy
“The winners and losers in the information age will be differentiated by brainpower. It takes 2% of Americans to feed us all, and 5% to make everything we need. Everything else will be service and information technology, and in the world humans and brains will be the key variable.”
T.J. RodgersFounder of Cypress Semiconductor
Avoid becoming a turtle
• The currency in today’s economy is knowledge• Developing superior knowledge as a business
advisor requires you know:– How your customer defines mission support value– Best business practices in the commercial marketplace– How to apply best practices in shaping business deals
that will support your customers mission objectives• Requires a Strategic Vision for your customers• Step away from the “inbox”
– Focus on total “enterprise” contract needs
Develop Strategic Mission Support Goals
• Strategic support goals provide:– Overarching foundation for all acquisition efforts – Alignment with stakeholder mission requirements– Communicate and connect with mission and people– Reflect best commercial practices– Measurable to evaluate performance
• Develop implementing strategies to achieve goals– Strategies ensure unity of effort and direction– Alignment of all acquisitions
• Support Goals provide the “commanders guidance” for assessment, planning and execution phases
Stakeholder and Customer inputs help shape performance outcomes
Key Stakeholders:• Commander(s)• Senior leaders• Tenants
Key Customers:• Service
Recipients• CE• Functionals• Operations
Interview Focus:• Strategic Objectives
• Performance priorities
• Mission
• Expectations
• Criteria for Success
Interview Focus• Desired Outcomes
• Performance Objectives
• Expectations
• Criteria for Success
Shape:• Performance
Objectives• Strategies• Metrics
• Performance Outcomes
• Metrics
What’s your customer’s Vision and expectations for contractor support?
• Service Delivery
• Quality Program• Commitment to
Mission• Customer Focus• Process
Improvement• Cost Savings
Government Norm Best-In-Class
Complies with requirement
Acceptable
8 to 5
If it’s in the PWS
Tell me what you want
me to do
Deliver to the letter of
the contract
Delivers innovation and “service with a smile”
Root cause analysis
24/7 if needed
Looks for feedback
Drives new initiatives and best practices
Continually brings cost and performance improvements
Your Vision and Support Goals drive the Performance you get !
Develop Mission Support Objectives
CostCostPerformancePerformanceGOALS::
Strategies:
• Attract and partner with best-in-class providers• Identify, measure, and manage outcomes• Develop our people and processes to achieve business goals
PerformancePerformance
Support Strategies
GoalCostsCosts
Continuously Maintain Alignment
Customer Support Delivery Requirements
Stakeholder Mission support Expectations
Support Objectives: Foundation for Acquisition Process
Support Objectives
Customer
Support Support ObjectivesObjectives
Cost &Performance
LevelsStrategic
Market Research
Assess The
Opportunity
Form theTeam
Stakeholder
Process steps for delivering PBMS
Strategic Market Research shapes planning• Commercial sector is facing the similar challenges• Successful business advisor must continuously stay
abreast of current thinking & best practices– Dialogue with industry, research trade organizations, etc.– Focus on business principles you can apply – there are no silver
bullets – Strategic direction of the industry– Leading service providers– Develop effective assessment tools to determine cost and
performance levels
• Will present contract performance, structure, etc. meet the organization’s strategic mission support vision, goals & strategies?
Assess
Facility Management Metrics- (Mfg)Q4 FY00 Q1 FY01 Q2 FY01 Q3 FY 01 Q4 FY 01 Q1 FY02 Q2 FY02 Q3 FY02
Building 1 FM Cost 2351000 2042995 1613000 898496 723177 816779 676924 401495
Building 2 FM Cost 1699000 1335050 1268000 1283992 1506671 1511553 1251288 433336
Building 3 FM Cost 2502000 1789029 2072000 2089341 2229025 2321697 2135403 2289992
Central 1292000 1113643 432000 620714 518731 436900 353280 227423
Health & Safety 63070 79000 44111
Total FM Cost $7,844,000.00 $6,343,787.00 $5,464,000.00 $4,936,654.00 $4,977,604.00 $5,086,929.00 $4,416,895.00 $3,352,246.00
Overall Cost per Unit $11.02 $8.60 $8.09 $6.66 $5.25 $5.59 $5.17 $3.66
Cost per Sq.Ft. Gross $6.70 $5.42 $4.67 $4.22 $4.65 $4.75 $4.17 $3.16
Cost per Head $1,285.00 $1,064.00 $971.00 $883.00 $853.00 $883.00 $850.00 $645.00
Total FM Cost
$0.00
$2,000,000.00
$4,000,000.00
$6,000,000.00
$8,000,000.00
$10,000,000.00
1 2 3 4 5 6 7 8
Total FM Cost
$0.00
$2.00
$4.00
$6.00
$8.00
$10.00
$12.00
1 2 3 4 5 6 7 8
Cost per Unit
Cost per Sq.Ft. Gross
Cost per Head
$0.00
$500.00
$1,000.00
$1,500.00
1 2 3 4 5 6 7 8
Cost per Head
Current Facility Cost Trends
Continuous Improvement Process reduce cost while meetingCustomer performance expectations
Q4 FY00 Q1 FY01 Q2 FY01 Q3 FY01 Q4 FY01 Q1 FY02 Q2 FY02 Q3 FY02
Understand Performance Data
Here you are
Understand Performance Data
$ 3.5 $ 3.0 $ 2.5 $ 2.0 $ 1.5 $ 1.0 $ 0.5
Efficiency
Understand Performance Data
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
$ 3.5 $ 3.0 $ 2.5 $ 2.0 $ 1.5 $ 1.0 $ 0.5
Efficiency
Effe
ctive
ness
Essential To Identifying Performance Gaps . . .
Current Potential
Organization
Processes
Svc Level Standards
Technology
Customer RelationshipManagement
Culture
Skills/Experience
Contract Management
Practices Focus
Best Performers Are Circled
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
$ 3.5 $ 3.0 $ 2.5 $ 2.0 $ 1.5 $ 1.0 $ 0.5
Maintenance Costs
A1
A2
A3
A4
A5
A6
A7
A8
A9
A10A11
A12A13
A14
A15
A16
A17
A18
A19
A20
A21A22
A23
A24
A25
A26
A27
A28
A29
A30
A31
A32
A33
A34
A35
A36A37
A38
A39 A40
A41
A42
A43
A44
A45
A46A47
A48 NB
Best Performers Are Circled
Administrative Facilities - Maintenance Cost/SF Maintained
Unit Cost
Comprehensively Assess Practices That Drive Site Performance
Organization
Practices/Process
Technology Applications
Continuous Improvement
Supplier Management
• Spans of control• Orientation - process/functional,
etc.• Worker to supervisor ration• Lines of accountability• Broad/Narrow role definition• Layers• Other
• Performance measures• Failure analysis ability• Cost control ability• Compliance/safety programs• Incentives• PM basis change management• Performance trending• Performance based contracts• Supplier performance management• Other
Investment Strategy
Asset Profile/Standards
Marine Corps Air Station, Miramar
Cost and Performance Management Practical Application
Strategic Planning
• An overarching strategic plan was developed for the organization.– Addressed all issues facing the Miramar
– Incorporated high level goals and objectives
• Tactical or operational plans were developed.– Linked to the strategic plan
– Translated strategic initiatives into actionable plans
© 2000 Grant Thornton LLP
A cost and performance management system creates the linkages
Base-Wide
Process Owner
Vision
Initiatives
MetricsSt
rate
gic
Pla
nSt
rate
gic
Pla
n
Tact
ical
Pla
nsTa
ctic
al P
lans
Tact
ical
Pla
nsTa
ctic
al P
lans
Business ProcessesBusiness ProcessesProcessesProcessesInput Output
ProcessMetrics
AndTargets
ProcessMetrics
AndTargets
ActivityMetrics
AndTargets
ActivityBasedCostingModels
G-6G-6G-5G-5G-4G-4G-3G-3G-1G-1 G-8G-8G-7G-7Function Managers
Targets
Goals
Activity Based Costing/Management
• Modeled the entire organization using ABC– 170 million dollars in resources– Over 2,200 FTEs– 15 separate departments
• Built models around major processes– Flowed resources to the activities– Traced activities to cost objects
Activity Based Costing/Management (Continued)
• Developed performance measures for the processes and outcomes– Process measures were leading indicators
– Outcome measures were lagging indicators
Benchmarked Miramar’s Aircraft Fueling Operations
• The following depicts Miramar’s fueling division:– Provides hot and cold fuel support to operational squadrons
aboard MCAS Miramar– 52 FTEs and an annual operating budget of $2.5 million – Delivers approximately 31 million gallons of fuel per year– Mix of both cold and hot fueling operations– Average fueling response time was 45-60 minutes
Benchmarking Peer Group
• Identified several benchmarking candidates.• Looked at both civilian and military operations.• Evaluated similar processes.• Benchmarking group included:
– Commercial airport, Naval Air Station, Other MCAS
ANN COST
$0
$1,000,000
$2,000,000
$3,000,000
MCAS XXX NAS OTHERMCAS
COMM.AIRPORT
# FTEs
0
20
40
60
MCAS XXX NAS OTHER MCAS COMM.AIRPORT
Benchmark Comparisons
Benchmark Comparisons
GAL/YR
010,000,00020,000,000
30,000,00040,000,000
MCAS XXX NAS OTHERMCAS
COMM.AIRPORT
AVG COST PER GAL
$0.00$0.02$0.04$0.06$0.08$0.10
MCAS XXX NAS OTHER MCAS COMM.AIRPORT
CYCLE TIME (MIN)
01020304050
MCAS XXX NAS OTHER MCAS COMM.AIRPORT
CUSTOMER SATISFACTION
3.54.2
4.7 4.8
0.0
1.3
2.5
3.8
5.0
MCAS XXX NAS OTHER MCAS COMM. AIRPORT
Benchmark Comparisons
Benchmark Results
Organization
Process
Technology
Culture
Performance Drivers
Performance Management
Serv
ice
Leve
l(E
ffect
iven
ess)
High
Avg
Low
Low HighAvg
Cost Level(Efficiency)
Expected Tradeoff
COMMERCIAL AIRPORT
••
•
•
(High Costs) (Low Costs)
MCASXXX
COMMERCIALAIRPORT
Performance
NAS
MCAS XXX
OTHERMCAS
Best in Class Performance
• The response time to begin a fueling operation was under 10 minutes.
• 6 FTEs dispensed over 35 million gallons of fuel per year.
• The average cost of operations was $400K annually.
• A reported high level of customer satisfaction.
• Implemented automated planning and scheduling systems.
• Pre-staged fuel trucks for predicted demand increases.
• Installed electronic metering and record keeping procedures.
• Augmented the workforce with part time employees for surge operations.
Best in Class Practices
Miramar’s Fueling Operations
• Fuel pits were manned during all hours of airfield operations regardless of demand requirements.
• There was no established communication link between the tower and the fuel center.
• Flight schedules were not maintained in the fuel division.– Resulted in inadequate planning and scheduling– Sub-optimized the workforce
• Improper mix of truck and pit fueling operations.
Initiatives
• Developed a web based planning and scheduling system.
• Established a direct radio link between the fuel division and the tower.
• Pre-staged fuel trucks and equipment for surge operations.
• Established night shift to fuel all aircraft for following day’s mission.
Results
• Reduced the response time down from 45-60 minutes to 25 minutes.
• Decreased the annual cost of operations by $527K or 22%.
• Increased customer satisfaction; or the number of complaints decreased significantly.
Customer
SupportSupportObjectivesObjectives
Cost &Performance
LevelsStrategic
Market Research
Assess The
Opportunity
Form theTeam
MissionArea Support
Strategies
ValueBased Performance
Requirements
Stakeholder
Process steps for delivering PBMS
Mission Area Support StrategiesOne Size Doesn’t Fit All
Mission Support Strategy
Mission Area Support Strategies
• Develop support strategies for specific mission areas– Your value add is superior market knowledge
– Mission areas should be defined in commercial terms
– Align Stakeholders’ mission needs and Business Goals
• Expand mission area cross-functional teams – Adapt best commercial principles & practices
– Dialogue with service providers & like organizations
– Assess potential impacts - both internal and external
• Mission area strategy drives specific Value-Based Performance Requirements (VBPR) packages
Plan
Value Based Performance Requirements (VBPR)
• VBPRs integrate all elements of an acquisition into unified package– Performance-based or SOO-based requirements focused on
outcomes – Acquisition approach and type of contract – Performance incentives – Source Selection approach and evaluation criteria– Performance Management Plan
• Must align with Support Goals and Mission Area Support Strategy
Plan
Value Based Performance Requirements
Stakeholders
Mission Needs Expectations Success CriteriaCustomers Performance Needs Expectations Success CriteriaMarket Research Commercial Practices Public Sector BestPolicy and Regulations
Past PWS or SOW
The following should be cast together from inputs received:1. Statement of Work Focused on Mission outcomes Uses commercial practices Does not say “HOW” Sets Expectations clearly2. Acquisition Strategy Type of Selection process Type of contract & Incentives Evaluation Criteria3. Performance Management Approach Part of the team or supplier Performance metrics Contractor QA Requirements Government QA approach
Support Strategies
Goal
Customer
Assess &Manage
Performance
Support Support ObjectivesObjectives
Cost &Performance
LevelsStrategic
Market Research
Assess The
Opportunity
ConsistentSource
Selections
Form theTeam
MissionArea Support
Strategies
ValueBased Performance
Requirements
Stakeholder
Process steps for delivering PBMS
Execute and Manage Performance• Source Selection process
– Driven by Support Goals – Selection team must be familiar with Support Goals
• Performance Management– Partnership driven - Contractor(s) and in-house team– Track contracts and orders with outside agencies – Validate performance received against Support Goals and
provide feedback– Insure performance aligns with Stakeholder mission
performance needs
Execute
TANSTAAFL – Principle
Key Principle in building effective partnerships
TANSTAAFLThere
Ain’tNo
SuchThing
AsA
FreeLunch
Key Principle in building effective partnerships
Conclusion - PBMS
• Team Effort
• Requires a Culture Shift
• Strategic focus and alignment
• Tailored to support mission outcomes
• Linkage of requirement, incentives, contract and performance assessment ensures that performance aligns with Mission objectives
Balanced Scorecard
Technical Performance
Customer Satisfaction
Cost Control
Other Objectives
Client Objective
s & Strategy
Characteristics of a Scorecard
• Balanced between External and Internal Measures
• Balanced between Outcome Measures(Lag) and Performance Drivers (Lead)
• Balanced between Objective Measures and Subjective Measures
• Translates Mission and Strategy into Actions and Measures
Balanced Scorecard approach to SDS
Performance Objectives
Transportation 3
Financial
Customer Learning & Growth
Internal Business Process
Readiness
Supply Management 4
Support Services 5
Flight Line Support 6
Aircraft Maintenance 7
M
ERUSAE
S
Facility Management 1
Information Technology 2
Overall Assessment
Performance Objectives
Balanced Scorecard approach to SDS
Transport people 3
Financial
Customer Learning & Growth
Internal Business Process
Readiness
Transport cargo 4
M
ERUSAE
S
Fleet Maintenance 1
Fleet Administration 2
Function: Transportation
Building the Balanced Scorecard
Define the performance objectives for Fleet Maintenance:Internal Business Process Deliver a fully operational fleet of vehicles, professional in appearance and maintenance, that meet our customer’s mission needs.
Customer Objective: Delight our warfighters, other clients and Stakeholders through integrated client focus, flexibility, innovation and teamwork.
Financial Deliver the service within budget targets
Learning and Growth Enhance and develop your staff to deliver safe, superior support to our client base
Readiness Meet all mobility taskings to ensure there are no transportations delays and ensure all priority 1 vehicles are fully mission ready
Define key measures
Internal Business Process Vehicle availability rate
Customer Objective: Customer satisfaction data on monthly trend chart
Financial Actual expenses vs budget
Learning and Growth % of certified maintenance personnel
Readiness Deployment delays attributable to vehicle malfunctions
Performance Objectives
Balanced Scorecard SDS
Fleet Maintenance: Includes all activities associated with Preventive and Corrective Maintenance programs and Accident Repairs. Objective is to ensure a robust vehicle maintenance program using current and applicable T.Os and manufactures instructions. Vehicles should always be professional in appearance and available in sufficient quantities to meet Wing Mission needs for daily operations, exercises and deployments. Special focus on critical, priority 1 vehicles.
Performance Measures (Metrics):
Vehicle Availability Rate
Average customer satisfaction survey results (monthly data)
Budget Dollars vs Actual Expenses
% of Mechanics certified
Exercise or deployment delays attributed vehicle availability
Priority 1 Vehicle Availability Rate
Internal Business Process
Customer Financial Learning/ Growing
Readiness
> 80%
Std
86%
> 97% 100%
> 80% 90%
+-02%+10%
> 50% 35%
< 1 0
Measure and Manage Performance
Metrics by Function and SubfunctionFleet Maintenance
Vehicle availability rate% Scheduled vs unscheduled maintenance Average maintenance cycle timePerformance against approved individual development plansSafety % of lost time hours to total hours workedCritical or Major incidents% of maintenance delays due to parts availability
Preventive Maintenance% of vehicles exceeding service intervalsAverage maintenance cycle time
Corrective Maintenance% of repaired vehicles returned within 5 days for reworkAverage maintenance cycle time
Accident RepairRecovery(towing) response timeAverage accident repair cycle time
Effic
ienc
y
Effectiveness
©2000 UMS Group Inc., All Rights Reserved
Combat CapabilityCosts Down
Foster ExcellencePerformance UP
Wing CC
Group CC
Squadron CC
Flight
Shop
KPIs
Sub-ProcessMeasures
Individual & Productivity Measures
ProcessMeasures
Functional Asset Group Measures
Work Completion Measures
Asset Measures
Program Measure
Performance measure information identified at all work strata and ensures alignment of effort on mission results
Combat Capability
% of Launch Capable LCCs
Equipment Failure Rates
Asset Improvement Project Schedule
Adherence
Problems Identified Before Critical
Failure Rate by
Equipment Type Asset Inspection Replacement Rate, Reinforcement Rate
Preventative Maintenance Plan
Completion
KPIs
Sub-ProcessMeasures
Individual & Productivity Measures
ProcessMeasures
Functional Asset Group Measures
Work Completion Measures
Asset Measures
Program Measure
KPIs
Sub-ProcessMeasures
Individual & Productivity Measures
ProcessMeasures
Functional Asset Group Measures
Work Completion Measures
Asset Measures
Program Measure
Align detail measures with higher level measures and drive down to work activities
Balance Scorecard SDS QASP
Method of Surveillance
QASP
Objectives
Transportation
Financial
Customer Learning & Growth
Internal Business Process Readiness
Maintenance
Environmental
Utilities
FE&AS
Information Technology
Comptroller
B
senisu
s
Lines
Measures
Objectives
Transportation
Financial
Customer Learning & Growth
Internal Business Process Readiness
MaintenanceMaintenance
EnvironmentalEnvironmental
Utilities
FE&AS
Information Technology
Comptroller
B
senisu
s
B
senisu
s
Lines
Lines
Measures
Measures
MHHHH
MHHHH
HHHHH
HHHHH
LHHHH
LHHHH
LHHHH
High Impact (H)Medium Impact (M)Low Impact (L)