API 607 Testing United Valve Page 1 API 607 Testing Teadit 2000 IC Packing Performed for Teadit NA, Inc. June 12, 2014 Performed by United Valve 9916 Gulf Freeway Houston, TX 77034 Phone: 7139449852 Fax: 7139445964 www.unitedvalve.com

Performed for - TEADIT · 2018. 12. 3. · API 607 Testing Summary Customer: Teadit NA, Inc. Customer PO: 7576 UV Work order: 89901 Date of Test: 06/11/2014 Date of Report: 06/12/2014

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Performed for - TEADIT · 2018. 12. 3. · API 607 Testing Summary Customer: Teadit NA, Inc. Customer PO: 7576 UV Work order: 89901 Date of Test: 06/11/2014 Date of Report: 06/12/2014

API607Testing UnitedValve Page1 

API 607 Testing 

Teadit 2000 IC Packing 

 

 

Performed for 

Teadit NA, Inc. 

June 12, 2014 

 

 

 

 

Performed by 

United Valve 

9916 Gulf Freeway 

Houston, TX 77034 

 

Phone: 713‐944‐9852 

Fax: 713‐944‐5964 

www.unitedvalve.com 

 

 

 

 

 

Page 2: Performed for - TEADIT · 2018. 12. 3. · API 607 Testing Summary Customer: Teadit NA, Inc. Customer PO: 7576 UV Work order: 89901 Date of Test: 06/11/2014 Date of Report: 06/12/2014

API607Testing UnitedValve Page2 

 

API 607 Testing Summary 

Customer:     Teadit NA, Inc.   

Customer PO:    7576 

UV Work order:   89901 

Date of Test:    06/11/2014 

Date of Report:    06/12/2014 

Packing Tested:   Teadit 2000 IC Packing   

Valve Tested:    4” Class 300 Velan Gate Valve  

Scope:  Fire testing valve to API 607 6th Edition, September 2010. 

Summary:  The test was completed within the guidelines set forth in API 607 6th Edition, 

September 2010.  The test was performed  with a Velan 4”300 class gate valve 

in the horizontal position as per the standard. The test was conducted as a 

modified procedure of API 607 in order to test the packing of the valve. During 

the burn, cool‐down, and repressurization portions of the test, the valve was in 

the half open position. This was done in order to evaluate the test pressure on 

the packing throughout the duration of the test. The valve packing had leaked   

5 mL/min after cool down during the operational test. This leakage did not 

exceed the maximum allowed leakage rates set forth in API 607 standard.     

 

 

 

_____________________________________________________________________________________ 

 Testing Supervisor:   

Jim Nelson 

Engineer  

      United Valve, LP 

Page 3: Performed for - TEADIT · 2018. 12. 3. · API 607 Testing Summary Customer: Teadit NA, Inc. Customer PO: 7576 UV Work order: 89901 Date of Test: 06/11/2014 Date of Report: 06/12/2014

API607Testing UnitedValve Page3 

 

Valve in test stand prior to burn 

 

 

Valve in test stand during burn 

Page 4: Performed for - TEADIT · 2018. 12. 3. · API 607 Testing Summary Customer: Teadit NA, Inc. Customer PO: 7576 UV Work order: 89901 Date of Test: 06/11/2014 Date of Report: 06/12/2014

API607Testing UnitedValve Page4 

 

Water Storage Tank 

 

 

 

 

 

 

 

 

   

Page 5: Performed for - TEADIT · 2018. 12. 3. · API 607 Testing Summary Customer: Teadit NA, Inc. Customer PO: 7576 UV Work order: 89901 Date of Test: 06/11/2014 Date of Report: 06/12/2014

API607Testing UnitedValve Page5 

Leakage Collection During Test 

 

Through Seat Leakage (555 PSI) During Burn ‐ 30 Min. 

Time    Start Tank Level       End Tank Level      Total Leakage  Allowable 

0:00‐30:00  23”  23”  N/A  N/A 

 

Through Seat Leakage (555 PSI) During Cooldown ‐ 10 Min. 

Time    Start Tank Level       End Tank Level      Total Leakage  Allowable 

30:00‐40:00  23”  23”  N/A  N/A 

 

External Leakage (555 PSI) During Burn ‐ 30 Min. 

Time    Start Tank Level       End Tank Level    Total Leakage    Allowable 

        0:00‐30:00  23””  23””  0 ml/min  400 ml/min 

 

External Leakage (555 PSI) During Cooldown 10 Min. 

Time    Start Tank Level       End Tank Level    Total Leakage    Allowable 

30:00‐40:00  23”  23”  0 ml/min   400 ml/min. 

 

External Leakage (555 PSI) After Cooldown, Operational Test  

Time    Start Tank Level       End Tank Level    Total Leakage    Allowable 

40:00‐45:00  23”  22 7/8”  5 ml/min   100 ml/min. 

 

 

Page 6: Performed for - TEADIT · 2018. 12. 3. · API 607 Testing Summary Customer: Teadit NA, Inc. Customer PO: 7576 UV Work order: 89901 Date of Test: 06/11/2014 Date of Report: 06/12/2014

API607Testing UnitedValve Page6 

 

Burn Data 

  Required Temperature 

Actual Time (mins) 

Max Allowable 

Time (mins) 

Flames  1400 F  1:14  2:00 

Cal Cubes  1200 F  12:57  15:00 

 

Cool Data 

  Required Temperature 

Actual Time (mins) 

Max Allowable 

Time (mins) 

Flames  212 F  4:02  10:00 

Cal Cubes  212 F  7:50  10:00 

 

0

200

400

600

800

1000

1200

1400

1600

1800

2000

00:00 07:12 14:24 21:36 28:48 36:00 43:12

Temperature (F)

Time

Temperature Vs. Time

Flame 1

Flame 2

Cal 1

Cal 2

Page 7: Performed for - TEADIT · 2018. 12. 3. · API 607 Testing Summary Customer: Teadit NA, Inc. Customer PO: 7576 UV Work order: 89901 Date of Test: 06/11/2014 Date of Report: 06/12/2014

API607Testing UnitedValve Page7 

 

 

 

Valve After Test 

 

 

 

Conclusion 

The external leakage during the operational test after cool down was 5 ml/min which is lower than the 

allowable 100 ml/min. Actual leakage rates meet requirements of API 607 6th edition.