REPORT ON TRIAL BURN TESTING Performed for: VERTAC SITE CONTRACTORS Conducted at: VERTAC CHEMICAL CORPORATION SUPERFUND SITE JACKSONVILLE, ARKANSAS CAE Project No: 5815-1 December 5,1991 VOLUME V

Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

REPORT ONTRIAL BURN TESTING

Performed for:VERTAC SITE CONTRACTORS

Conducted at:VERTAC CHEMICAL CORPORATION

SUPERFUND SITEJACKSONVILLE, ARKANSAS

CAE Project No: 5815-1December 5,1991

VOLUME V

Page 2: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

REPORT ONPRE-TRIAL BURN TESTING

Performed for:VERTAC SITE CONTRACTORS

Conducted at:VERTAC CHEMICAL CORPORATION

SUPERFUND SITEJACKSONVILLE, ARKANSAS

CAE Project No: 5815/3Decembers, 1991

Page 3: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

VERTAC SITE CONTRACTORSCAE Project No: 5815

CONTENTS

1. SUMMARYINTRODUCTIONSUMMARY OF TEST RESULTS

2. DESCRIPTION OF INSTALLATION

3. SUMMARY OF PROCEDURESSAMPLING PROCEDURESANALYTICAL PROCEDURESQUALITY CONTROL PROCEDURES

4. COMMENTS

5. APPENDIXNOMENCLATURESAMPLE CALCULATIONSPARAMETERSCALIBRATION DATAFIELD DATALABORATORY DATACHAIN OF CUSTODYPROCESS DATA

Page 4: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

VERTAC SITE CONTRACTORSCAE Project No: 5815

SUMMARY

INTRODUCTION

Clean Air Engineering was contracted by Vertac Site Contractors to determinethe level of hexachlorobenzene emissions at the Vertac Chemical Corporationfacility located in Jacksonville, Arkansas for pre-trial burn purposes.

The testing took place at the Unit 1 Stack on September 18 and 1 9 , 1 9 9 1 .Coordinating the field testing were:

P. Teague • Vertac Site ContractorsR. Apa - Vertac Chemical CorporationK. Markuson - Clean Air Engineering

SUMMARY OF TEST RESULTS

The test conditions and results of analysis are presented in Table 1 on page 1-2.

To the best of our knowledge, the data presented in this report are accurate andcomplete.

Respectfully submitted,

CLEAN AIR ENGINEERING

John Chapman Kimberiy KemptV.P. Research & Development Manager, Technical Communications

Page 5: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

VERTAC SITE CONTRACTORSCAE Project No: 5815

Table 1 - Summary of Test Results

EPA Modified Method 5Unit 1 Stack

Run No.

Date (1991)Start Time (approx.)Stop Time (approx.)

Gas ConditionsTemperature (°P)Moisture (volume %)Cfe (dry volume %)OC^ (dry volume %)

Volumetric Flow Rateacfmdscfm

Hexachlorobenzeneug/dscmIb/hr

INLETHexachtorobenzenel

Ib/hr

Average

September 182:40 pm6:45 pm

19842.910.6

7.2

27,5401 2 . 5 1 0

0.00161.07E-04

60,0

September 1911:20 am3:24 pm

19943.210.26.2

26,61012,220

0.00137.32E-05

60.0

1 9 943.11 0 . 4

7.7

2 7 , 1 8 01 2 , 3 7 0

0 . 0 0 1 69 . 0 1 E . 0 5

60.0

Hexachlorobenzene Destruction Removal Efficiencypercent 99.999821 99.999879 99.999850

Page 6: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

VERTAC SITE CONTRACTORSCAE Project No: 5815

DESCRIPTION OF INSTALLATION 2-1

Vertac Site Contractors operates a transportable rotary kiln thermaldestruction unit (TDU) which is used to destroy hazardous wastes. The TDUis custom built specifically to process and destroy 2,4-Dichlorophenoxyaceticacid (2,4-D) still bottom and pesticide waste material located at the VertacChemical Corporation superfund site. The primary components include arotary kiln (primary combustion chamber), a hot cyclone, an after burner(secondary combustion chamber), a spray dryer/quench tower, fourbaghouses, a venturi/baffle plate absorber, an induced draft fan and a stack.

The testing reported in this document was performed at the Unit 1 Stack.

A schematic of the process is shown below.

SMPLIWPCRTS

•a

Page 7: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

VERTAC SITE CONTRACTORSCAE Project No: 5815

SUMMARY OF PROCEDURES

SAMPLING PROCEDURES

The sampling followed procedures as detailed in U.S. Environmental ProtectionAgency (EPA) Methods 1, 2, 3, and 4. These methods are titled:

• Method 1 —• Method 2 —

• Method 3 —

• Method 4 —

"Sample and Velocity Traverses for Stationary Sources;""Determination of Stack Gas Velocity and Volumetric Flow Rate(TypeS Pilot Tube);"

"Gas Analysis for Carbon Dioxide, Oxygen. Excess Air, andDry Molecular Weight;"

"Determination of Moisture Content in Stack Gases;"

These methods appear in detail in Title 40 of the Code of Federal Regulations(CFR), Part 60, Appendix A.

Referenced with the above methods was SW846-M0010 "Modified Method 5Sampling Train."

The sampling apparatus is shown in Fig 1 on pages 3-2. The samplingequipment was designed and manufactured by the Nutech Inc. and Clean AirEngineering to meet U.S. EPA standards. All equipment was calibrated at theClean Air Engineering laboratory prior to shipment to the job site.

Sampling Locations

The Unit 1 Stack has two ports. The sampling time per point was ten minutesfor a total sampling time of 240 minutes. The sampling locations are shown inFig 2 on page 3-3.

Page 8: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

VERTAC SITE CONTRACTORSCAE Project No: 5815

Figure 1

The EPA Modified Method 5 sampling apparatus is shown.

FILTER TEAPERATLRE

NOZZLE FILTER HOLDER>STACK \——'ALL , HEATED AREA\ \ '

\ J^\ ' \\ 1 Doniac' \ \

Impinger Contents1) empty2) 100 ml HPLC water3) 100 ml HPLC water4) 300 g silica gel

TEftPERATLRE

PITOT ftANOftETER'

ORIFICE_____J____r—T—• ^j, ' -hfe-"

® ^

Page 9: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

VERTAC SITE CONTRACTORSCAE Project No: 5815

Figure 2

The cross section of the Unit 1 Stack shows sampling point locations.

42 I N

PORT 2

NORTH

GAS FLGVDUT OF PAGE

PORT 1

Traverse Point123456789

101112

Port to Point Distance (\r\)41.039.237.034.631.527.015.010.57.45.02.81.0

Page 10: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

VERTAC SITE CONTRACTORSCAE Project No: 5815

SUMMARY OF PROCEDURES (Continued)

ANALYTICAL PROCEDURES

Hexachlorobenzene

The Hexachlorobenzene emissions were determined following analyticalprocedures detailed in SW846-8270 "Gas Chromatography/Mass Spectrometryfor Semivolatile Organics: Capillary Column Technique". In this procedure, theprincipal organic hazardous constituents were withdrawn from the stack usinga Modified Method 5 sampling train. The modification consisted of adding asorbent cartridge and a condenser between the filter and the last impinger.The sample was then analyzed for hexachlorobenzene by solvent extractionfollowed by gas chromatography/mass spectroscopy.

QUALITY CONTROL PROCEDURES

Quality control procedures for all aspects of field sampling; samplepreservation and holding time; reagent quality; analytical method; analysttraining and safety; and instrument cleaning, calibration and safety werefollowed. These procedures are generally consistent with EPA guidelinesdocumented in "Quality Assurance Manuals for Air Pollution MeasurementSystems," Vol 3, "Stationary Source Specific Methods" (EPA-600/4-77-027b).

Page 11: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

VERTAC SITE CONTRACTORSCAE Project No: 5815

COMMENTS

No deviations from standard U.S. EPA testing procedures were noted.

Page 12: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

VERTAC SITE CONTRACTORSCAE Project No: 5815

APPENDIX

NOMENCLATURESAMPLE CALCULATIONSPARAMETERSCALIBRATION DATAFIELD DATALABORATORY DATACHAIN OF CUSTODY

Page 13: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

VERTAC SITE CONTRACTORSCAE Project No: 5815

NOMENCLATURE

Page 14: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Nomenclature

absorbancecross sectional area of nozzle (ft2)cross sectional area of stack (ft2)proportion of water vapor in the gas stream by volume (%)proportion of water vapor in the gas stream by volume (%)at saturated conditionspilot tube coefficient (dimensiontess)dilution factorratio of dry gas generated to gross calories (dscf/MBtu)ratio of gas generatedgross calorific value of fuel (Btu/lb) ^average pressure drop across meter box orifice (in. HgO) r-~average square roots of velocity heads of stack gas (- in. HgO ) c\1

meter orifice calibration coefficient (in. HgO) °percent of Isoklnetic sampling (acceptable: 90 ^%1 ^ 110%)pilot tube constant: 85.49 (ft/sec) ^Mb-mole)(ln. Hgf

^(' R)(in. H20)spectrophotometer calibration factordry molecular weight of stack gas (Ib/lb-mole)molecular weight of stack gas. wet basis (Ib/lb-mole)total amount of paniculate matter collected (gm)normality of titrant (meq/ml)barometric pressure (in. Hg)Initial barometric pressure (in. Hg)final barometric pressure (in. Hg)final pressure of flask (relative in. Hg)initial pressure of flask (relative In. Hg)absolute stack gas pressure (in. Hg)volumetric flow rate, actual conditionsvolumetric flow rate, standard conditions, dry basisstandard conditions, 29.92 in. Hg, 68°Ffinal temperature of flask (°F)Initial temperature of flask (°F)

Page 15: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

average dry gas meter temperature (°F)average stack temperature (°F)absolute temperature, standard conditions (528°R)total sampling time (min)volume of aliquot (ml)volume of flask (ml)total volume of liquid collected in impingers and silica gel (ml)volume of gas sample through the dry gas meter at meterconditions (ft3)volume of gas sample through the dry gas meter, standardconditions (ft3)volume of flask sample, standard conditions (ml)total volume of solution (ml)volume oftilrant used to titrate aliquot (ml)volume oftitrant used to titrate blank (ml)volume of water collected, standard conditions (ft3)stack gas velocity (ft/sec)gas meter correction factor (dimenslonless)

Page 16: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

VERTAC SITE CONTRACTORSCAE Project No: 5815

SAMPLE CALCULATIONS

Page 17: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

VERTAC SITE CONTRACTORSCAE Project No: 5815

SAMPLE CALCULATIONS • Unit 1 Stack, Run 1(Note : results are taken from computer analysis)

1. Volume of water collectedVw.a =(0.04707) (Vte)

= (0.04707) (2578.3)=121.36wscf

2. Volume of gas metered, standard conditionsV... J17.64)(V.)(Pb^)

(460 +Tm)J17.64) (164.55) (29.64+^g)

(460+81)=161.35dscf

3. Moisture contentBwo Vwstd

Vmstd + Vwstd121.36

161.35+121.36=0.429=42.9%

4. Molecular weight of dry gas streamMd = 0.44(%C02) + 0.32(%0a) + 0.28(%CO + %N2)

=0.44(7.2)+0.32(10.6)+0.28(82.2)=29.58

5. Molecular weight of stack gasM. =Md(1-Bwo)+18(Bwo)

=29.58 (1-0.429)+18(0.429)=24.61

6. Stack pressure (in. Hg)

p. =P^SIAI!CP13.6

= 29.64+-a5-13.6

=29.68

Page 18: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

VERTAC SITE CONTRACTORSCAE Project No: 5815

SAMPLE CALCULATIONS (Continued)

7. Velocity of stack gas

V. ^KpCp^^Pi/1^-460

V(M.)(P.)

= 85.49 (0.84) (0.700) I/ 198+460"V (24.61) (29.6

=47.71 ft/sec(24.61) (29.68)

8. Total flow of stack gas

Q. =(60)(A.)(V.)=(60) (9.6) (47.71)= 27,540 acfm

,. Q,P.(17.64)(1-Bwo)\J€ltd = ——————————————————————————

T.+460_ (27.540) (29.68) (17.64) (1-0.429)

198+460=12,510dscfm

9. Percent Isokinetic

o/| ^ (0.09450) (T» + 460) VmadP.V.An©(1 -Bwo)

(0.09450) (198+460) (161.35)(29.68) (47.71) (0.000524) (233.2) (1 -0.429)

=101.6%

Page 19: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

VERTAC SITE CONTRACTORSCAE Project No: 5815

SAMPLE CALCULATIONS (Continued)

1 1 . Hexachlorobenzene

Ib/dscf(Vn. (453,590) (1.000)

10.5(161.35)(453,590)(1.000)

=1.43x10'1 0

ug/dscm =-' ^^l)"nutd

.J0^_(35.3i)161.35

=2.298

Ib/hr = (Ib/dscf) (60) (dscfm)=(1.43x10-10)(60)(12,510)=1.07x10"

12. Hexachlorobenzene destruction removal efficiency

DRE% J'b/hrinlet.lb/hroutlet)(Ib/hr inlet)

^(60.0-1.07x10")(60.0)

=99.999821%

(100)

Page 20: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

VERTAC SITE CONTRACTORSCAE Project No: 5815

PARAMETERS

Page 21: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Project No.

MM5 TestingField Parameter Sheet

5815-0

ClientPlantUnit

Test LocationDuct/Stack Dimen/Diam

Project Leader

Run No.

DateStart TimeEnd Time

Meter OperatorProbe Handler

Meter Box No.Delta H@

FilterThimbleBeaker

Run No.

1 Pb inches Kg2 St inches w.c.3 Vie ml4 Mn grams5 0 minutes6 02 percent7 C02 percent8 N2 percent9 Dh inches w.c.lOCp11 Tm degrees F.12SRDp inches w.c.13Ts degrees F.14 Vm cubic feet15 Dn inches16 As square feet17 Yd18 Fd dscf MBtu19 Fc dscf MBtu20 Ps inches Hg

VertacJacksonville

1Stack

42"Markuson

1

9 /18 /9114:4018:45

KWKM

-61.878

NANANA

1

29.640.50

2578.3

233.210.67.2

82.21.880.84

810.700

198164.55

0.3109.62

1.009595701820

29.68

2

9 / 1 9 / 9 11 1 : 2 015:24

KMKW

61-61.878

NANANA

2

29.970.50

2527.0

240.010.28.2

81.61.700.84

790.685

199157.170.310

9.621.0095

95701820

30.01

PagelRaw Data

Page 22: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Project No.

ClientPlantUnit

Test Location

Run No.

DateStart TimeEnd Time

Vmstd dscfVmstd acfVwstd setVwstd acf

Bwo measuredBwo saturated

Fo orsatEA percent

Md Ib/lb-moleMs Ib/lb-mole

Vs ft/secacfm

dscfm% Isokinetic

POHC's. OutletHexachlorobenzene

microgramsug/cu. M

Ib/dscfIb/hr

GREHexachlorobenzene

Inlet, Ib/hrDRE.%

MM5 TestingField Parameter Sheet

5815-0

VertacJacksonville

1Stack

1

9 / 1 8 / 9 114:4018:45

1 6 1 . 3 5202.711 2 1 . 3 6152.470.4290.7561.43195.5

29.5824.6147.71

27,53912,510

1 0 1 . 6

10.52.2869

1.43E-101.07E-04

60.099.999821

2

9 / 1 9 / 9 11 1 : 2 015:24

156.24194.581 1 8 . 9 51 4 8 . 1 30.4320.7721.30589.9

29.7224.6546.43

26.80512.220

97.8

7.01.5797

9.86E-117.23E-05

60.099.999879

Page 2Results

Page 23: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

VERTAC SITE CONTRACTORSCAE Project No: 5815

CALIBRATION DATA

Page 24: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

k » . » - l tl. —C»A . ^1-L . —^l - - -i-l l

Dale: p -2Q-^7 Operator: mojj- ^>^ct; Meter Pox No.: (g \-{p "Meter Box A'H@:' i, 1 ^ | Meter Box Yd: [.QQJ5' Barometric Pressure: -^9,3

Q

.^l-^

.

•^

.^l

,^1

AH

'3.'5'

1,5(^

3.03.0

AP

-M,-?

-•-l.^

-'-(.^^,-7

-5.1-6.t

Yds

I.OCJCO

1.0000

1.0000/,OCOO

t,oax>l.CXOG

Stan

Initial

O.ooc>0,000

0.000

0-000

o.cco

OiOco

clard MeVolume

Final

5\o^5'.0<6>

LC>^1tC.l^

lo^ool^

lo,oo 5

er Gasft3

VdsNet

$'.06'(o

5'.o<0

i . ^10.0^4

\0.00^

\0.<JO$

Meter

Initial

^0,103m HA

^o.a?';9^,3$'?

^KO,^

W.^

Box GasfP

Final

W^^W!

W^^10^.

^.1^1^^50

Voluinc

V<l.sNet

5\<^A5'. o(o*5"

/.O.,^3sJ.^lAk-

VO.^A•YO.^3

S'I'e

In

(^^

fc4

^^

/^

^^-^^

Id. Mnipcr

Out

^

(

^L-'JL

^S(«^

etcrature

TdsAvg

-^4-Je^

<^L

^

^^

IVTc

In

'»4^^

V&

^3

'7A

'Ictcrmper

Out

•?!^-(

S^y2-

•s^T3

boxature

TdsAvg

^^.i,,.?

S5"^5~

'^5

in. s-

Time0

1^^^I^.S ?

/5,3>^/^3^

/6^5-/0,5^

Yd

I.O/o^'} ,6<0 '7

/..6./?6

/ .O l ; ^

^60^//.Oo5^

All((()

1,-?•?-'/;. '/''!'->'

]^ 22/ .^^^

/, '/.?V1 , ^ ( 7

Nomenclature Calculntions Vacuum Gauge Ciilibrntlon Tlicnnomctcr CnlibralionPb

'OI AHi A PIVtlI VdsYdYds

;AH@

Barometric PressureFlow Rate (cfni)Orince Pressure Differential ("IhO)Inlet Pressure Diffcrcnii.il ("IhO)Volume Dry Gas Meter (ft3)Volume Dry Standard (ft )Meter Correction Factor (unitlcss)Standard Meter Correction Factor (uni(lcss)Orifice Pressure Differential that Rave 0.75 cfnof air at 70°F and 29.92 "Hg ("HiO)

Yd " (Yds| Vds | |Td + '160

Vd 1 |'l'd.s •I- '161)PI) + AP/13.6

I'b I Al 1/13.6

All® =0.0317A1I (•rds h '160)0

0

Pb(Td + '160) [(Vds)(Yds)

17.64 (Vds)(Pl))(•1'ds l- '160)0

Slandard.(IJKl5.3i t i , Ii^^

•Z'-f.^^y\o.'<

VacuumCiniiKc

6',o;0- 0)5',o•^0.6^5. o^

Standard

^01 6013.01^0

Inlet

^0'.

1 6 11^01^0

Oullct

^-L\ C I1 ^ 1i^

0 0 2 7 4 1

Page 25: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Critical Orifice Calibration Data Sheet

Meter # 61

Meter Yd 1'-

Meter DH@ i

Volume

w -^rr^n^.sr%^

- ^>oo^r^

ElapsedTime

•**«•**

/ ^

<^

)r

Full Tes

Critical

Orifice

A

Tmi Tmo

^'3 ^^ 1^?^ ^^^ 7?

t Cal. Date

Qrfice Cal

Pbar c^f.^

Used (circl

0.61570.82130.42440.2941

Tamb

•••»•»«•

75-

1<-7-r

-7e)

» »

1

/

/

Z'2c,-^/

Date ^//^^

DH Vacuum

»•*•« »•»»««»

.or ^r-'^r ^?,r-^r ^5'.r-

C\]•:^r-C\l00

Calibrated by

Page 26: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Critical Orifice Calibration Data Sheet

Meter j|

Meter \

Meter E

Run

*i

1 6]

'.d

)H@

f

k*

1

2

3

L - 6

1.0095

1.878

Volume

952.50

958.17

963.85

966.68

Run f

1

2

3

avg

C

0

ElapsedTime

*****

10.0

20.0

25.0

Vm std

5.56

5.57

2.78

Full TO!

ritical 0:

rifice Usi

Tmi

83

82

82

81

Vcr std

5.55

5.55

2.78

st Cal. E

rfice Cal

Pbar

ed ?

Tmo

80

79

79

79

Y

0.9992

0.9966

0.9996

0.9985

>ate - - 0

.. Date 0

29.97

C-3

Tamb

***

75

75

75

Yd

1.0095

1.0095

1.0095

1.0095

2/20/

9/19/

0.42

DH

***

1.

1.

1.

Di

-1.

-1.

-0.

-1.

91

91

84mj-

r--(M0

Vacuum o

** *****

05 23.5

05 23.5

05 23.5

ff

03%

30%

99%

10%

Page 27: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Nozzle Calibration Data Sheet

Client- ^^___________ Date: ^- ^?f

Plant: 3^^-^ Calibrated Bv: l(. t\^V-J^\

Unit Number:

Runs:

NozzleIdentification

^^

D1(inches)

-z^

.

D2(inches)

.^do

.^l1!

D3(inches)

.y.^^

D4(inches)

.'5d&

.^1')

AD(inches)

.00 '

.00^.

ADavg(inches)

^o<6

•^

• -'

CM0D

Where:

D1 ,D2,D3,D4 = four nozzle diameter measurements

AD = maximum difference between anytwo diameters AD 0.004 inches

ADavg = average of D1 ,D2,D3,D4

Page 28: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

VERTAC SITE CONTRACTORSCAE Project No: 5815

FIELD DATA

Page 29: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Orsat Readings Page of

Client \j^u^c^Plant Jprc^5o<sJiALL<^Date ^-/y- Orsat ID ^ - /

Project Number ^^/ r'UnitFuel TypeLeak Check?

20.9 - %02Fo = ———————

%C02

Fo = 1.083 to 1.230(for bituminous coal)

RunNumber

/

S^PD:\vpfon

Location

51%^—

verl.0ms\oisat

BagID Trial

1

23

Avg.123

Avg.123

Avg.123

Avg.123

Avg.123

Avg.123

Avg.123

Avg.

PercentC02

^

^

-7^-7.r^^>^

.^

PercentC02+02

^.iH\^>ifr.3Wl^\f.4l^^

Percent02

.^.-^

I ^ . ' S

/o .>

Fo Sample Time

lfu-\-/!".itr

^-C^^^r*.

//^-^54»

^^

Analysis Time

^..,o^

^» ft-UlD-S

l i ' - f r

"LJIa^

Analyst

c\.-^

^ \Ut^r^-

r- q0

-.

Page 30: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

\i\n^^Paniculate TestingField Data SheerLocation: 'S-tcc^ Run: / Page \ of ^

Client UftE,-Plant 'y^<^V<D.te ^Meter OperateProbe Operate

Sample BoiNi-- . n 1M

Meter AH@K FactorPitotLcakChcLeak Rate BefLeak Rate Aft<Static Pretture

;:;•;;•: TuBiwtCTC:'/;;;:;;:ill^tNHnitNEr

A ^

-z.

.1

Total

Average

TTA-C-^ftyiLLi/-?/ .>r N^>r Yon

limber 2'mber fc f—fc

r.y-wa:fc Bcfonore 0.0er ^r. .<>-l(inchct H20)

MiB^pti D''11:Clock time

^\<toz<

. '»(>-><^fN<Sb5^^0

(. ftH\<' Inlet/oil

Ur t \ i ^W\(V<

PyTO

MetPitCT

e &<.!(• CFM^ CFM(+/-)

Vwup ,<Vaeuutt(m.H()

"I

^

-7'77>^

<?'g-%1^1^\ ^ ,

PiqectNu, Vnit; \

i»tlet(6tKk^

sV^ •uSiiA

xneter Numb

erYd LO«Cp :^\

After '@ (fc® <?•»'-»-0.<=,

- •suck .-.^ 'nwip.'.^:<::•;:,::::1,1r:k'[•:^1:,(OF):•:;]:

w(/

1^(9

\ ^ nTyc>I.Q\' ] , { ) »T-.o^\^<i' L t ) 0

^T>

(o.n^t)^^T^)

mberSft^•'

.

>er

ot r,.'.-.. • •L-^

•Ht•Hg

VekxatyHeadAft

^<

-to-"So•^^

•^-^-^^-^7--{-)

ia>^

. fc-I

(^^

-l.-<(.<«

<^^

^TO

OnSetl

A(tlL»

\-1

1-

t -

^ • l

V.'\ - '\ - ^\ ^T.

'Z^

z.^,6

•<T/.fr

nicetinxJH120)

I

1

\•\^

0

^

31-(t

^L.

^

Schematic of Te

/^A 1 <mt Sr• *—————^,Area (ft2) PorTi

Q , <•f - <^»

rilter Number ••—'Thimble Number —Beaker Number •

Inituil Volume

^^.00Gw Sample yoluincy^

G^Z.4-1L?'b^- <L^

^ ^ ^ . 0 ^

' ^1) ^MC^t^.-TS^s"7- oo

C,M^.%^C.^.^G < s ^ ^ <G^^ ^LL.^.6<L,(.^ z8

^

<?^??^

»sting Lo<^,p/ ^1

!)UT Meth

z-

Gu Simple•tDiyO

InletTmtn(°F)

1^

~7")n-i-?</-7^

^

•K^^(^^^?'ny ^

»'a^ft

:^f l i

«^iication

"i r>rr\,s jG"^"^IN <)Un

' —^

TemperatureUt Meter

OutletTill outC^)

-)\

7-^-7^--1^-13-7-^^^S-^L,'7^-7^-TS

^ 2 7 /

AmbientAssume<

Heater BProbe LeProbe MiNozzle D

IGSBag%02H20(mlTotal Vie

Start Tim

Cond,Temp.

(°F)

^^

^-^

^Y^

^•U

M^

M (

'-(0

^(-L

^ f ^

^t/

^<

^ 8

i 7

Temp. (°F)Moixtuie (9

kw Settingogthalerial oiameter (in.^

ID Number/O.^

) ^3?~LSTi

' c^Mft

FilterTemp.

TT(^

7.^L>ZS^

^

•^^^

^S)2SS^^-c<^-7<^1

25^

^-^

z^

-)0 E6) 4/»

'Z-^b^'^^c,»5,'i'o

1u5.3

AM /PM

PiobeTemp.(°pr

zsn^0(<Z-1&-Z.l^

7.^i(^

^(.Z^^1^0

-7 '-f<

?-H

^r

T-^ro

3ar. Presf. (in

Probe He*Probe NunAcetoneNNozzle Nu

%C02Silica Gel (

Stop Tune

YA<)^-}

^<rt<n<D

5s

(-^-(<?

C.6fco

^z-C^

^jjjgg^ 'g—

.a

•Hg) z^.^y

ter Setting ^-SC>nbcr "'umbermbcr

75gm) ZJ-Tv..^^

lf:4T AM/PMJ

Note*

(»-•!>

S^l

^^n^^i^z^<?,3

(.tfl

( n'&

?^U<?^

•SOo

CAE P2 ver. 1.0D:\vpforms\mSdata-lCAE P2

Page 31: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Particulate TestingField Data SheetLocation: "StcoVl Run: \ Page

Client\ £Plant \&C¥:Date q.,1Meter OpemteProbe Operato

Sample Box N1Meter Bex Nur

K FactorPilot Leak CheLeak Rate BefLeak Rate Aft<Static Prefture

^'Twww^Point Nttipwy

^ ^

5'

6?

Total

Average

^cS/l(\'M^^i

>» ^>r Y^

limber

xk: Befonoreer(inches H20)

.lYNin t ',

ISl

Clock time

W.

IP

-is*&>^^0

^\0n

\^

\ \b

\^

VLO

ftTL\C| Inlet/on

^)a\\A\\fl\o.^^

Pyro

MetPito

eCFMCFM

(+/-)

. Pugip ..

Vacuum(NWt)

^

•sIL.\^1^n.1 ^^

<»^

Pro(ect NuUnit I

itlet/ k

^V\tt»\

Mnctcr Numb

erYd«Cp

After

®<&

-• .••v-'.SMCJiS. ..,:•.,•' '•'' ir*^—...' • " ' ' • 'l.CnIp* '

'.<'.--I*,..,;.^W^\^^\QU>m

^-Qi,

\^^

\^1

\^(ff

1^

•\^

1 9 1tUt (^"s^

«»ber^»<

>er

•H»•Hg

VekxiHead

::?:11^1.,

.' ^

.'»(?

.L.-1n'L-n b.~U.^0

.7Z. ^0

--u• ^^t

10.0<-%

S - o

SettingAH

(fatH20

^

7-^Z <T- L1- •^

t\,^.^/L-b1^Z-t-

1 b

t.L>

^A

^

)

'

Schematic of Te

\

Area (ft2) Port

Riter NumberThimble NumberBeaker Number

Initial Volume

Ga» Simple Volumevm(<n

<o}Z.^(^n-7.-n(^.•Z-L

Cr^ '^^ -z<Z(0'7V ^IT

6'?'>;l^-7^7-. '?> 0-?o^. -L^-) 1 0. -n^< • t -^1^.^</

V3i Q < /

^•O-'

?sting Lo<

OUT| McthcLeo. (in.) (

Gi Sample•tDiyO

tolelTininCT)

5<ri^3<^")^-^^n^^^^•8"s^y^^<?

i^?/?0

--cation

od

Gas nowN OUT

Temperatureit Meter

OutletTmout

CT)

-7fc7^nn

l~i~i^•n^^-T1-7'»

^-?^-7^

0 ? 7

AmbientAssumed

Heater BProbe LeProbe M<NoateD

IGSBag%02H20(mlTotal Vie

Start Tirr

Cond.Temp.

A^

50^ <^^^^^s^<;^ST-VbS-LS(-

4 8

Temp. (°P)Moisture (

lax Settingngthaterialiameter (m.'

ID Number

)

DC

RiterTemp.

(%

zs^>z^--?y<"l(o£>

7.< iZ^^-^'7Z^n•z^^-^^•7

-z^f-?^^

E

«•)

AM /PM

ProbeTemp.(

z^Z^-f-L

7^0

^-1

-z<bZ-^Z^

"Z^y^^-2^

Z,7S'o

lar. Press. (

Probe HeProbe NuAcetoneNozzle N

%C02Silica Ge

Stop Tun

teoGfG^

^C-L

0^

^^

^1

^

S'71'7^^ 1T^

v^^

m.Hg)

Jter SettingmberSumberumber

(gm)

if AM /PMJ

Note*

^ t,^

f,«

' -• ^1

V v W^

! B£^S—BBB^^^^^^^^^»^

- - ,r. 1.0fornis\in5<lala-lD:\vpforms\i

Page 32: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Location: VocAl Run; \client X^AttcPlant -^-(»L\<S^v/(\WDate C ' 1 - \ S ^ 1Mclcr Operator ^e , VProbe Operator </o^

^wInlct/ou

Jn\i^/VW

Project Number <^C\<v ftUnit \

laet/sfQ.

^CuStrs

Particulate TestingField Data Sheer Page •3 of ^

Schematic of Testing LocationAmbient Temp. (°F) Bar. Press, (in. Hg)Assumed Moisture (%)

Heater Box SettingProbe LengthProbe Material

Probe Heater SettingProbe NumberAcetone Number

•~"' M^tPlant '^"(»LDate <^-\tMeter OperateProbe Operate

Sample BaiNMeter Box NuMeter AH@K FactorPilot Leak OicLeak Rate BcfLeak Rate AftStatic Preuu re

^•'^''^^"'i^illi::

•^'Tw'iw^ffPoint Number

^\

-2-

3

TotalAverage

' "-\<\^\n\\A\i.......» Y.^umber

t>»

ECk: Bcfonoreer(inchc«H20)

',^Wpt^

^w'Oocktiint

\z<no\v:\ M O

^<

^

^

^0

^y^

\-10^1^Vy&

^LO^^-Inlct/ou

Un\ i^^Ct^

PytO

MetPita

CFMCFM

(+/-)

PumpVacuum(w. H»)

8

7

7-70%^

<?'/o/&/Ofo

• "T~' "•Unit \

itlct^t^

SY^CuStrs

)mctcr Numb

<CnAfter

@@

;:• «UCK•-"^Tfnn.^'

(0^

\f\1r1%/fy^/f7/^/^^7/^/<?^lie/n

2^(0^

•"•"• •>M

wr

•H«•Ht

VelocityHeMiAp..•ho^•^•^•^

• ^ l

.^•^•yo,yo.HO•^

6.y6C-

^- L>

— ^

OrificeSettinf

AH(iiU<20)

1 * 1

,-&/

.S5-'7STU( 1/^L2.

1 ' 5 'l-S-l.5~i ,riw

Schematic of Te

\MFirst point all the way INArea (ft2) Port

Filter NumberThimble NumberBeaker Number

L^i^^\f^l^.aa/ Cia» Sample yolume/ Vm(ft3)

^3>.^3

1^-^7Z7CX,-rz? 3-<?'733 W73^^75^ U7Y/. oo-m./y

T^7-C<&

7^C'-J'J~"7^.7^2,M.7fc

»sting Lot

OUT Mcth<Leo. (in.)

Gas SampleatDiyO

InletTin InCf)y^%9'BYe^65-%&•&G^(oefeS(o

Sfcefc

/ ^

——e

cation

odGas FlowN OUT

Temperature<ac Meter

OutletTmout

(°P)

s-o80<^0

?7(•of^(

^^k•^^

s/'B^<^

?(..

n ^ 7

Assumet

Heater BProbe LeProbeMNozzle D

IGSBag%02H20 (mlTotal Vie

Start Tin

Cond.Tempi.

Tc(°F)

S<

^9

^

yo90

^^-%^^/^^7^^

d 0

Moisture (9

lox Settingngthaterialiameter (in/

ID Number

)

He

FilterTemp.H(°F)

<3^^^'yfc7-50zy^Z-37

^72</.r^5^^2y/

Z^r

<•)

AM /PM

ProbeTemp.^

^0

'iG'^.^ZVfc

z</7^/^^-z^J2^

i.W^z^

—.. . .v.. ^.u. ..B/

Probe Heater SettingProbe NumberAcetone NumberNozzle Number

%C02Silica Gel (an)

Stop Time AM/PMJ

YA^ NotCT

^T(-(\UL- CI-K-,C^^ i5< T"-><c-<^ e^i^rs

so^^\———S-<L?f^^J57—L-——————

s - ^ '^^^^^^^^^^~

CAE P2 vcr. 1.0D:\vpforms\in5data-l

Page 33: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Y o.^Partlculate TestingField Data SheetLocation; "S^cV- Run: \ Page,ClieitVfcA"•m '^r)<Date C ^ . \ < iMeter OpentoProbe Opento

Sample BonNMeter Box NuMeter AH@K FactorPitotLcakChtLeak Rate BefLeak Rate AftStatic Pressure

^'[.w^Sfi^w,

::;;: :::T(«W(» |I;Point Number

^ ^

S

^

w^-Total

Average

•RC^<iA/vJ'i\\^^7-» V<0^« y^limbermber

;ck: Befonorett(inches H20)

'•S^^MiH/pt:;:::-,

Ifel^Oll:

Clock time

\^

^0

^<>

'LCD

7^^ t0

•US-T-ZO

xv<»-L^o

^-fe^-

1 0

AK.^| Inlet/oi

vJoV^s^(?rV

ry»

Pitoe

CFMCPM

(+/-)

:PmBp :•'VacuumOfcHt)

/^

/^

^

/7/7isn/•^zo

<93'?-^

ProjeaNuUnit^\

iitfet/c^cy

<A\Af>^

xneter Numb

erYd«Co

After@@

••••:-;'.:a»i-<ac ,.'::;^"•/TtttBp.i'^':! ^ ^

/?&/nwl^f^

Zo|

/^/?-?/n/^fcm

i«bcrC^\

>er

•Hg•H«

VelocityHe«dAP.

.6r•C5',^5-

MM

.^2,( - lcr^

,<5-,^

S-o

unSetl

A(tn^

Z,

-7.

2-

7Z/.I

t?ci^

ricetint,H120

4

9^^-3Co

-5^00

3

i

)

i IWVB h^aii*

Schematic of T€

rMArea (ft2) Port

Filter NumberThimble NumberBeaker Number

Initial Volume

-"

Ga» Sample VolumeVm(ft3)

^ 757.^

1C.! -5^

76S:78

7C.9.5-t>

1-)^^^

7-n. i^78o•<&0•7%>9-60

•'»^.^r-^t.^7^.'7o

El «JII^

)stingLo<

OUT MethLen. (in.)

GM SampleatDiyG

loletTmin(°F)

%£,&-7%7<ofc

65-

%5-

8fc

0fc

<fc(o

yfS3

n

^•ication

odGas FlowN OUT

Temperatureiac Meter

OutletTin out?P)

%^

-61%/t>»BO'CO

'&1•of

<o(^^

n ? 7 E:

AmbientAssumed

Heater BProbe LcProbcMNonlcD

IGSBag%02H20 (mlTotal Vk

Start Tin]

Cond,Temp.

("F)

^T^JLy^J^^^5-57yr^0^^

=> n

Temp. (°F)Moisture (9

kw Settingngth

aterialiameter (in.

)

1C

FilterTemp.

(°n

Z«5-(L

2-^

^^

z^i5-

25'/

ifk

wZS>1

3.^

EV)

AM /PM

ProbeTemp.("n^297-237

z5^-z-^y25-/

Z50

Z.Y?'ZS13

^S-Q

-zr0

tar.Presf.(

Probe HeProbe NuAcetoneNonteN

%C02Silica Ge

Stop Tin*

^T^p-$y^rb^y

f<o6

ss

^7yv'^^

^sssr '

>n-Hg)

Jitcr Settingmber'lumberumber

(e")

< AM /PMJ

Note*

^T^PrfcO

JH?^(r<,.l

.—L. sSS?8 ^

CAE P2 ver. 1.0D:\vpforms\m5data-l

Page 34: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

( f l^ \0

Paniculate TestingField Data SheerLocation: 'S-V^cY- Run:. "Z^Client

Page of -7Client \/e//Plant -Vc,cDate C^. \Meter OperateProbe Operate

Sample BotNMeter Box NuMeter AH@K Factor '^."Pilot Leak OMLeak Rate BedLeak Rate AftStatic Prenu re

:::? !:Tt w! c»i|;i:?i^JftQlvit^NMIttlMap;

I

z-

-3

TotalAverage

^cc/¥,iun^^^^\

w Ktt^* l^a^.

umber ^mber (^\ L

,Wl"i'becfc -^Befonore .0»fcer ^. C(LC(inches H20X

•.-i:;:•M" il

SIfflll

:'Clock time'

s\o^•LO

1<

->0

-^

MO

^ss:os-s<o0

l( fV^GInlet/oi

r^o./Y- ^rA»

Py"

MetPito

eCFM

3 CFM

C(^

:i:;;;::P««»pi.;:Vacuum

^H.fe

-s"•70ID

/ /1^/5/3/3i3i^^

PKgectNiiUnit V

utiet/xt^V>tr>^^^"

xnelerNumt

erYd \.<.XCp .

After@ ZJG@ z-s-5-

-;;::;;siaoE;,;.!;::s^wTcrnp.^SIIII^^i^^(^iimmZoozooZOO

/^/^w200

70 |

Zo(

7co^,^/a^^•xl

ftV

.mber ^y^

l>er —

c>oq<«H

> •Hg•Ht

Is Velocity1

-si^Htati)::: '::IIIIPAF,^11

.-

.2fi•^y^%>.3^.3e>W

•3?>.-,5^-YO.yo

6-<??»

,^<

<-o ,-

OrificeSetting

AH(<«J«20)

-<^

1.0

.^

\-0^I - Hf^^^^

- -.1.1

'•T.CO

1^^

i IGIU va*.Schematic of T(

^

\ tN—————i^-Fiict point all the way \yArea (ft2) Port

Q . I Q^ Vo fc-

Filter NumberThimble Number —Beaker Number

Initial Volume \

W ^:,,,(iwSu^le Volume

Vm<(t3)

7fd?z79?,57%OA^&>60^.7^€o7€5-<2,/o.%o•B^?/%/7CA.^0.1.1

%^ a ) . /76%>.^7%2T ^^

^t/7-7•J 1- ( /

i^-m

a <JIIGasting La^

;^PUT MethLen. (in.)

da* Sampleat DiyG

Inlet

^

•7(7^75-777&eo©&&»^% <S(©A

/s^^

d

cation

o<i'v»/v»5^

Y^

TempeTaturcIt Meter

OutletTin out

CT)

^

^

7/7-73737Y75-7J"

VGf^

0 ? 7

AmbicnAssumet

Heater EProbe L<Probe MNozzle E

IGSBag%02H20(mToflVh

Start Tin

Cond,Tempi.:

Tc(°P)

^0

5&

^%

^7^^^5-

^f5fc

53-

^0

^3

5-1——

Temp. (°F)1 Moutuie (9

hxx Settingengthaterial>iameter (in.

ID Number

/^ ^) -Z-^^

C ^-5-2-

ne 11^0

RItCTTemp.

•rt<°P)TLS^t

isrw/7S5~^5-5-

•LS^~i5^

WWy/^Z5fc

no iX>) L/o

2^s'

9^/>r ^»n

^--?^sr

CA^/PM

PiobcTemp.(t^

Z-^

z^/75-/

-Z^-L25-/

^$c>t^yo2?uZJO

^•/t^y

Bar.Pre».(in.Hg) ?9. J^/TT

Probe Heater Setting L-p)Probe NumberAcetone NumberNozzle Number

%C02 '& 3^Silica Gel (gm) Q'-f -

Slop Tune / <f'^ 4 AM /PMJ

^ \ No^W I

^0

^/^

^J- C[^ It- %<^ -to

^0^6

52-^C</5?"^<^

CAE P2 ver. 1.0D:\vpfonns\m5daita-1

Page 35: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Partlculate TestingField Data SheetLocation: '5-Vpo^ Run: Page ^ of ^

CAE P2CAE P2 ver. 1.00:\vpfornit\m5d»r-l

Client Me^Plant -\o>cD«te q - 1Meter OperateProbe Operato

Sample Box NiMeter Box NuMeter AH@K FactorPitot Leak CheLeak Rate BefLeak Rate AftStatic Pressure

iS-iiTlwwfrSis|;p6tnt^?teirtNGr^

———^r-

^

(^

TotalAverage

VccJ^S^n^il^•^

Kc.>r \<&

limbermber '"»

scfc Befon(MCer(inches H20)

SIIIIMM^^K

Ill^^llli

lloock^awtl:

(10^ZS^^\ O D

^

\ » l >

\^\T-b

/^ ^V-| Inkt/oi

A f>r\a<^ Uo\

Pyre

XJf^*

Pitae

CFMCFM

(+/-)

'•;.•',:': ruAlp:^:

^^3

^^^^T-3

^3'2.3>

^^Z3"2-5z3

Project NuUnit

iitlet/st^,Y<J^b^

l^S\CA

xneterNumb

erYd«Co

After@@

. • . : . ••aUCK-:::.; :••' iTMBp; ;?

l''* -!:! 1

'^''.•^(Mai:ZOIZc o

^/^/?7/^

/^^/%'^B2^

•mbcr^^x1

icr

"Ht•H»

IVetod^He«d

^I^Arki?:'.

.7^-70.7o7o

.70r70.7o.70

-.10^

-6CT.(^r

T-.TC^

v0 Schematic of Tc

tNFirst point all the way IN

——— Area (ft2) Port

Filter NumberThimble NumberBeaker Number

initial Volume

' Orifice ——.——————————Senim Ga* Sample Volume

AH Vm(ft3)(htH20)

2-G ^sz.^y'Z-ST ^^S/2.5- <B^oy<»?.-5' SVY.^75- -syy-'oT25' g57 /&Z-5' <£>^(/%l?^ £56.5-^2.5' 8(-^c^?-5 &5--&3Z-.3 b^.Z??-3 6'73.^?

2'?'.

?sting Lo<

OUT Meth

CM Sample«tDiyC

IntetTin InC'F)

^% l

•ac?7'?T?^<o0

6/^^&/

(7'

————Q\H/

^•i

cation

ody.

LyAi rlOwIN OUT

TemperatureJM> Meter

OutletTin out

(°P)

7^7r7 '7^7J-75-7^7^1^777777?)

J 0 2 71

AmbientAssume*

Heater BProbe LcProbe MiNozzle D

IGSBag%02H20 (mlTotal Vk

Start Tin

Cond.Temp.

(°F)

^/^

-70c//

7^^^5^/

(S^^7^^C.O

^ 2 '

Temp. (°P)Moitture(91

tot Settingngthaterialiameter (in.

ID Number

)

lie

FilterTerop.

(%zS5>-^SJ-.

2 32S-/

32 ^

- 37^Az^3

? 3?5yz /

i6)

AM /PM

ProbeTemp.C?)

1^72?i£Z^5-Z^

/^^5-Z5'/

z.9^7Y^2^7

Bar-Picsx.

Probe IProbe NAcciontNozzle t

%C02Silic* Cx

StopTu

KftO

-r<t<»5'

9 -^^^^7^5

<./

^rr

^

(in-Hg)

{eater Settingumber

e Number'lumber

el(em)

ine AM /PM|

Notes

MmMS^^^SSS^SSff^"""^^

Page 36: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Partlculate TestingField Data SheerLocation: ccV- Run: "7- Page -> of^Y

aieot Veyn«nt TcDate 0\.\<S^Meter OperateProbe Opento

Sample Bat N1Meter Box NuMeter AH@K FactorPitot Leak CheLeak Rate BefLeak Rate AftStatic Pre—u re

;iBI::iT>•«wM ie:;i•i]::PW».NMBt|r

\

-z-

3

TotalAverage

\c.^cY-wis/iA•^

x Ka"- ^ 8umber

sdc Bcfonoreer(inche»H20)

;:::::|;MN[!*;||

:.?..: !!1:

I'aoelttaw;

n.<\^>\^\^b

\MS\<3>

\^

\<o0

^<\1o\-1S\<&

. qn-[ Inlet/ox. Y^t^ ^6

py»

kirt

Pitoc

CFMCFM

(+/-)

l tipttBqtII:Vacuwoi;IN ,\^11-\^\^'11^^.^1^/7/7i7

Project NuUnit ^

itlet/xBl cyVCuShA

\\OS^A

xneterNumb

erYd<Co

After@@

^.Stock:11

i^^^^TBmpdK'

S.^S

wM\^(i

1 ^ 1\^1\^1zo^'u >

-LOQ

/^/wzeo^zefe

>mb«^\

wr

•Hg"HI

iVelocity:!f;::.lte»<l.m.^^•^^D.Z^<-2'??-^^--^<;-^^^-^5-

-^

^/^

&-(SfoTl

S-0

unSee

A(iB^

I

\ t

\

\

} • '

\-

\-

\-

| .

/-(

a/.cis-

ricelingLH

120

I

(?

0

"b

1>

-

L>

•Z)

i

)

1 l«flV WU

Schematic of Te

\Area (ft2) Port

Filler NumberThimble NumberBeaker Number

Inurr Volume

7^73.03—V—t.————...(Sta* Sample yofumer Vm(ft3)

V •^

•y-7 ^- (p^' s Y l . 3>?^^^JZ&%n.63^^-^'i^^\0(^

^^•\ 0

^c?./^T02.73w-/oW^r

a %f»i^

»sting LCK

OUT| Meth<Len. (in.) (

I

Gai SampleatDiyO

[oletTipinCT)

•2?0

r^

S'^

^-r^^v-B^^<>^^<2>r

^

fey^<

-0

«rfc

cation

ad3 at FlowN OUT

Temperatureit Meter

OutletTmout(°F)

1^

^

-7^

~)^

^

•S-l

^ (

^ ^

^1

^0

&/

g>o

«

n ?i i s-

AmbientAssumed

Heater BProbe LeProbe MiNozzle D

IGSBag%0zH20(mlTotal Vk

Start Tilt

MMid,Temp.

Tc(°P)

^SO

^

^^

^

\n^-i^y^

7^/J"

^ '2;

Temp. (°F)Moisture (91

lai Settingngthaterialiameter (m.

ID Number

)

1C

FilterTemp.

(

^^O

^^

^

zS^^<" -K.

z<b'z-<n^^Z5-2-

^7

•z- >

I t&)

AM /PM

Piobe'Team.(

-Z,-tX

-z^^^^Yz^'2-^^

Z' - fY"

^•i

z-i?•L^

ZY£,

^7W

3ar.Pre*c.(

PiobeHProbcNAcetoneNozzle

%C02Silica Ge

Stop Tin

^^

^1

^1

1 ^

^s

'-U<^^^si5X^3

^

in.Hg)

c«tcr SettingumberNumber'umber

l(g»")

[»e AM /PMJ

Note*

CAE P2 ver. 1.0D:\vpforins\mSdata-

Page 37: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Paniculate TestingField Data SheetLocation: '5-^oV- Run: ^ Page V of L/

ClieBt '\fiiPlant JcDate c^ \<Meter OperateProbe Operate

Sample BoxNMeter Box NuMeter AH@K FactorPitot Leak CbcLeak Rate BedLeak Rate AftStatic Pr—nue

SlliiillllB

.•i ^ i ' i ^ ;: :;•:-:::: •TCTMWPM?-'^^::: POUXt NlUlotMCT

^

^

[.

TotalAverage

rt-c<-c^Sun^ly^\i \C^» \^

umbermber

scfc Bcfonoreer(iocoeiHiO)

lisMiw si

iliffiis:K;;;;ia;;;ia;!i;;i;

OocktaBe

\^

V^

\°><

-LbU

w.-LVb

-^

'LTQ

z^Z^O

L-

'L--(0

U» P<A-Intet/oi

1 f^ffi^ ^<-

I c

MetPito

eCFMCPM

(+/•)

Illl?:;! : ::;

il iPuiBilllS^Vacuutt

:!i(".;H»):;;h11?>

Z-L

Z^

-Z V-

'ZZ2-L

T-i-

•Z-L

Z-i-

-l-O

Project NuUnit

iittet/t

^<oSof\)\t^\^'

xneterNumI

v^

<CnAfter

@@

^^g.Stack::;::'"•'•TBinp.'1?;J;,.;;. :..,

':.,.<<>r)..:.?30

^Of

z<aoY ^ ^^<2(QI^\^i q ^ }

2^00L-OO

1^

<^0

u»bcr<^»

ler

•Ht•Hg

VelocityHeftU

^AP.',

/y-r•'/^r.6y

•S^^-1-4 ' *-L» \' C (^l-^s•^

•^

S-o

UnSeti

A(toJ

AC,

^

1-

l-

^

\ -

1 -

\ 1

\. ^

\ .

\-

ificelinr.Hi20

?

3

?>

1

^

<)

^

^

t>

^P

^

^>

^

)

1 l«flVI b^dL

Schematic of T(

tNFiret point all the way INArea (ft2) Port

Filter NumberThimble NumberBeaker Number

Initial Volume

Ga* Sample VolumeVm((t3)

^12^y/6.15-^^.^qo.^<^^1^3^3o . -7S^ ^^ ^ o^^•6 00

^^ \ "1-^^ ^ ^ • v ^

T^^.^^

^s-/.^

a WMI«

BSting Lex

OUT MethLea. (in.)

Gu SimpleatDiyC

InletT«nlnC'D%S-

8^s^r

s<^^t?LX^-^>^^(YL'S'1)

0

««ication

odGas FlowIN OUT

Tempetaturciat Meter

OutletTin out("P)

80

60^^

<Konl^^-7^1 ^^^^

-?^

O ? 7

c

5

AmbientAssumed

Heater EProbe LcProbeMNoalcB

IGSBag%02H20(mTotal Vh

StanTm

Lond.TcBp.

A

^5-

^

^T

^1 (

^-L

^t^^rs^•50

,'7'

^3

-

Temp. (°F)1 Moisture (9

tox Settingength•lerial'iameter (in.

ID Number

)

nc

Filteriemp.

AZJ7

Z57

2-yf-?-S^^-Sl^^

•^S^-z^z^\-L^

'?vu-2-^n

i»)

AM /PM

ProbeTeam.(W

7^&

z^r2^

t^?^'Y

^<

^^^

T-r^T-1C

7-^

-^.^0

T^-^

Bar.Presc.(

ProbeHProbe NAcetoneNozzle N

%C02Silica Gc

Stop Tin

IYft!> \T^,

^•r^y/^s>5l-f^^5t^^<)^

^ '

in.Hg)

eater SettingumberNumberumber

l(g»)

ic AM /PM

Note*

''scsssSSSZIZ^

. .E P2 ver. 1.0:\vpfomis\m5data-l

Page 38: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

VERTAC SITE CONTRACTORSCAE Project No: 5815

LABORATORY DATA

Page 39: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

DEC-06-1991 18-.51 FROM TRIWGLE LftBS TO CLEflN PtIR ENG. P.02

TKZMIQLI UUOMTORia, INC.•01 CAP1W Orlv DATA FILE:FEUO MMPLI ID: M« MM 1DurtW, M.C. 27718 RF FXUEt FER4C DZLM FMHOIIt 1TBicphorw: (»1() S44-»72> DKTel 0»^M/»1 Ttl 9HHU »< 4^t0^1*-10

TLX nweCT mJNBCTi 1«6UANALYU9 OKTCt 0»/X1/9t

Q U f t N T Z T A T I O N R £ > 0 « TSSg8S88S8SSS»«SC»aSg8agSg8»S888Sg8« LSI.K g»a88«saSgK«»«——e»C«»«t»»«S8»»ggBg«»»

ME* Up MM 1*10 JMOUNT,U| COK «MN LXMn

1 i,«-t>1chforob»»u»n»-fl4 2272 2»4 1 ZB

14 Nw>ntl»1«n«-d« U21 4 — 1 4 »

47 ptwn««thr«w-dlo MO? •tt 47 n$1 H«xft6h1orob*n»r« 441 .1174 •7« 47 10.41 0 10

57 Chr)rWW-d12 11134 1821 17 19

• U R R O O A T E S U M M A R Y••——•aa»nfiEU«zB»unncn««ccs5«scnefSse«scseefSssanec»BBX8Bzscs)iu—e«ccas«K«—c«««a—w

MtEA RF •CJW M» MOUNT OOOE « RECOVERY

74 TTphMVl-014 1—4 .t7»7 1179 57 •4.91 D •4.9•I 1,4-0(br«Mb««flMr-d4 2122 .9011 47« 1 •2.11 D M.I•2 1,»,5-Tr1cti1orflt»«nzfw-<tt 19W .2(M 41ft 14 2S.7« D ».•

COOtt! H& - Hot Dfcf4: 0 B Ot*etwt; E > EwtlwtMl; 18 « XntoHrl StwMtent

Page 40: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

DEC

-06-

1991

10

:51

FROM

TR

IflNG

LE L

PBS

TO

CLE

W R

IR E

NG.

P.0

3

e9/z

v,f

9 f

Page 41: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

DEC-06-1991 10; 52 PROM TRIPNGLE LF1BS TO CLEFIN P»1R ENG. P. 04

^ <»y»<-/>'( JAN

No.

12345A789

101 1121314151617

DB ;

MAT

1000

10010010010010010010010010098

10093

09792

FEE

FOR

780

7480898185798870818584B20

7568

358

REV

990

9796979898979696949893920

9279

Delta

L00

-1-10

-1-1-10

-12020

-10

U

Are*

2272000

3993208520804288505126205755101722S0900680

440801393400199640013513001891100

0212190139940

^B-BASE

P.Flags

bb

bbbbbvvbbbbbbvbbvbvbbvvb

bbbb

BUftN

Scan

2940

263468371720633834932676

1321117915371135

0476418

QM

1521 1 299

13682

16417233018828424024426421218Q2401B5

22-Sep-91

Name

1 ji4-Dic:hlorobenzene~d2-Pluoropht»nolPhenol-dSNaphthalene~d8Ni, troben2ene-d5Acenaphthene-dl02-F lu.orobi pheny 12»4,6-TribromophenolPhenanthrenB-d10HexachlorobenzeneChrysene-dl2Terphenyl-dl4Perylene-dl2Pyrene-dl0Anthracene-d 10 fo^ f^1 »4--Dibromobenzene-d41fS.S-Trichlorobenzen

12i04

4

COur\

^^f^-C\J

e-d3 Q

0

Page 42: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

DEC

-06-

1991

10

=52

FROM

TR

IPNG

LE L

flBS

TO

CLEW

PIR

ENG

.

A^-

^(tt

.(7f

0 0 1\3 -1 U1 •0

.\ JS- U) s Ed B> S g.

9 u D (0 u- 6 g A Ot-

B

,

u\ §

M »-

adD

^ 8

0-ift

s-'3

(B

^

SW

«W

g-

^

CD

^^

09

X>-

xN

0

-5

| §• |N

§

-s

8w

=-»f

r•

«J)EO « ^N

^=—

\io

*0 a

.^

»— »

-<gg

^ «»-

l-k D CO £ M CB

.0 b» B U •n- B •fl- U D-

S

Km

U

t

kJ"1

w

nl

D

vi

5 U

——

——

«——

——

. m

A

a5

^

1 0

s

:s s

^s

st*

Mk

c"

r^

«

-'^

M|——

«—^H

| "m

--

ft rt h4 •*1

^

§§

SD N~

Jk (0—

— A

=~s

t6 « ^

Na—

—^

A

flO 00

K "s» 1

N8 i MJ •^i f tja. <ii CD N S •

(0 u (D

'

U § •

d> U- s * s * (A-

9 (J| S-

s< >•

a3

^ 8

1£-"

s ""

L"

OS

^

3-

4

Cfi

%

?;"

(?

^ 1

e4-

•CB

W

•- K

I-' «

L. t0 » M

— A

=^

M ^W

(0-

»» s

00«

h» •J

|CO N

N-

O(9

•C

z^ 5 h*

gB cz "

*2

t^ -3»-» •-* (A CD S

!? 1'

1 <Q »— 0 & y n ta ? <- U3ku4

kdk

^^

^

^

a?

yD

u

<w>

?2

C

Jk3

•fr

S »

n

•fl

SO

Page 43: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

DEC-06-1991 10:52 FROM TRIF1NGLE LflBS TO CLEflN flIR ENG. P.06

TRZMMLK LAWMTOAin, ZMC.•01 Cwltola OrlvOurhWl, N.C. »T71»TwiBphwri (•1») •44-tTM

DATA PZLE.-PUSI MMPU' XOt MKI RUM 2HP rlUi PW DILN PaCTOR! 1W(TI l M/22/fl TLX •IMPU XO: «^207>1A-r

TLI PMMeCT NUMBER) IWMJUUU.YBI* Will: WWW

e P O ft T

MEA RF 9WM »U lUCUHT.^ CCOK «N« LOOT

1 1,4-BICh'

14 Nwhthali

47 Phwwnth«•I HwwcniOl

loro6wzw»-«4

rwm-410^ottffffr

1114

7M»

•4B7XT* .r74

4W

•32•7«

1

14

4747

n

t9

«.— I 1«

57 Ohry—W-412 19W1 1U1 •7 t»

• U R R O O A T C • UN M « R Y——————••———••aBBW

W aC«N I8ID ««XMT OOOE I RECOVERY

74 T»i-ph»ny^14•I 1,4-0«brMNbfiwn«-d4U 1,3,«-Tr1onloro6i

MM7 .«7«7 1171 •7 •2.«1 9tSU ••Oil 47« 1 n.M 01W .2860 41« 14 —.21 D

99.979.9—.2

OOO—t NO • Hofc 0»t»et»d. D « Owteotwd; E • Eti—t-d; Z» • Zntwnal t«Mkr«

TOTFL P. 06

Page 44: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

( )AN

No.

123456789

191 1121314151617

DEC-)

DB l

MAT

1000

10010010010010010010098

10099

10094

09993

36-19'

! FEE

FOR

740

77829080B28087628386B4820

7969

31 K

351

REV

990

9796979898999794949893930

9179

3;54 FRO

Delta

100-l-10

-10-l0-l2020

-10

1 TRIPNGLE

U

Area

211440B

440820796820S3267048557062864019928084866027796

1309100206670013299002049900

0252800183920

; LflBS

^B-BASE

P.Flags

bb

bbbbbvvbbbbbbvbbvbvbbvvb

bbbb

- oy/i

QUAN

Scan

2940

263468371720633835932876

1321117915371 1 3 5

0476418

TO

•I/?*

QM

1521 1 299

13662

164172330188284240244264212180240185

CLEW ftIR ENG. P.02

22-Seo-91 12:06

Name

1,4-Dichloroben2ene-d42-FluorophenolPhenol-dSNaphthalene-d8Nitroben2»n»-d5Acenaphthene-dlB2-Fluorobiphenyl2,4,6-Tribromopheno1Phenanthrene-dl0HexachlorobenzeneChrysene-dl2Terphenyl-dl4Perylene-dl2 . ^Pyrene-dl0 \0

AttthracenB-dKB r'--1,4-Dibromobenzene-d4 C\J1,3,5-Trichlorobeneene-d3 ^

0

Page 45: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

u u»- 0 & 8 6- 6 M §-•

>-

1-4

«z

w u- 6 8. « (At- h* ff» §

U 01-

<D ft;

U §

h* 6> U tr» GO

SO—

• t-k

(M

3

U3«

<^

^0

? en

r^

>q ^

o

Page 46: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

DEC-C6-1991 10; 55 FROM TRIftNGLE LABS TO CLEflN MR ENQ. P.03

TRIANQLI LMOMITOIUa, INC.•oi capitoi* DMWOUChC, N.C. K7Tt3T»W<»ri»: (•11) 944-97X*

Q U A M T I T A T X O Messssz=fscs——aa«z««x«es3

MtA rZLE:FE*URP KUli FEM90»T(; Ot/HC/11

TU mOJBCT NUMALYKf MTK:

« I P 0 R T

WWPLE 10: Mm KJMKOXUI FACTOR: 1TU $JmE XD; 4»-ao7'»-te

EX: 1MUWWW

MMM (IF •CM zsxa J«ourr,u» CODE «MM IXMXT

1 1,4'Dfoh1orobWU»M-d«

14 ltaphthRl«M-«

47 Pr»n«nthrw«-d1091 HlxtGhlorobwtXWW

97 ChryiM-d12

to«r

7939

MM0

neeo

2U 1

4— 14

•tt 47e 47

18X0 «7

.» NO 10

• U R R O O A T E « U N H A ft Y=«•=•••—ZBSSXS EXffSSf———K!!

AREA W»«»«MMggJ»gg

KMI ZUD (MOUNT COOC 9 WWOtt

74 TTphfiyl-^14•I 1,4-01branbM«xww-44•2 1,»,S-Tr1ch1i»rab»n2»n»-d»

WW .9797 IITfl S7 M.«Trro .•on 47B i M.T»19M .2550 417 14 Z«.«7

n.75».7M.I

COOE8: NO - Hat Dfcftf; 0 « (Mwtwf; « = Ctllifd; Z» s Internal Standard

Page 47: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Dec

-06-

1991

10

:55

FROM

TR

IflNG

LE L

flBS

TO o9f^

ff 1

CLE

W M

R E

NG.

P.0

4

0 0 f\)

-^ 0^ -^

Page 48: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

. z

^.l

_l-

>l-

i|->

l->

h->

-*

03

&^

(hO

l.tt

MN

t-S

'OC

Ds

iCh

Ul.

bM

N'-

* •

2

30

0

J> to

rnoo

s s

o s

o'o

s

a s

ea s

s

s

;r> 00

N S

8 C

D S

M •s

i 5 5

IS S

S (9

S S

S S

-I

M

Tl

&• •

< <0

(0

CD 0

) 00

0

'O-f

l'0

CD

CD

CD

0

T?<

UH

S <

0 0

'•0

(D Q

'-IS

M »

• N

0> •

»» (

S 01

30

m co

aa?

m

^•^

I'o^o

-^'o

-o-o

-o

o

<i •«

•« 'o

<o

m

M

^iC

Dcr

-.tt

MC

Di/

iQO

-Qm

cao-

n^is

'o

< ? a

i i

11

i+»

-S S

N —

MN

S S

0 S

»-*

-S S

Q S

Hi

»-^

-®0

<^

CD

^-

CO

^A

M^

M

h3</

i 0-

-0

01 U

l Ul

17-

S

»0 ^

> -ft

Cf

CD

SQ

Ch

^-M

^O

&-

"M

^C

OO

M'O

O-

CO

O*

>"

<^

SS

M

'O

^N

Ch

'O

"4S

C0

8C

9S

5S

0-

01

CD

C/J Q

-sl

MC

9S

SC

9S

(9

SC

3S

8S

SS

OS

CB

Sa

-o-<

<o

r<o

- tr

a'0-

cra'

ar

o-o

'o-o

'tr<

<o

' <

orcr

cro'

lT

o"

.t»

.»k

.flt

-UI>

-M

'0

(f^

O^

-frM

M

^-^

^M

M^

tN

M

M

•s

J 0

(

•<'s

lOS

^-^

-OS

SM

Q'/

l-^

'-'O

OM

QC

-i

2> ^ > r i>

-0

BD (T

l 00

•-

l>»

(0

«3 m

^en

c3 ^

n i>

ft

Z

„3

^

^--

3>

-U-0

-»n

X"

ON

2Z

-ON

« -

<IB

fl3

TiD

3'«

I

nh

»-.0

<3-

I'M

-t»c

+^ -

iiix

«o

.(»

'nB

i+x»

<o

•n-»

X"

ON

2 .

i»3r

iD3'

- in

»«-.

a<3-

iix«

o.(»

'nB

i+x»

<o

•n-»k

'• 1

3-

10

-<

0'<

!ll

3-

>-

31

3-

3^

-l

cn

oia

^-a

rwn

&th

c »»

0rt-

occ»

1>

--0

»IO

IOB

IB3

'3

IC'O

O'a

't-O

*--

-icr

n l3

33

^^l•

-^^3

•<r!

l^

i-in

^-l

Hla

lD'<

l»0

3•

^G

^I•

3—

0.0

3'

t-

-0

3^

1

»-

I •1

1>

--0

"3

"N

HO

t'0

»-

n3

C9

0.1

Q.O

I»O

-IB

«D

3 3

-03

-0

1 »

-0.»

-a'3

-l-0

33

JB

m

-1i-

tTQ

. M

t-

IB0

3-

IOID

I 3

00

<B

- -&

3

I

3 f

B I

I Q

. 0

0-

"13

8 N

a o

3 a

a a

) •

IDO

H

®>

-T»

'<»

-M

30

"0

3tS

3't

-'S

N

ID 3

«

(D3

ID

3

3N

I o

niH

O.

»-

I3

4» >

>

a(B

^

<k

a.

i^M

5.y

0

"«•»

3

*2

^

ft n

N N

£.L

S•o <0

-D 8!i-t M •« 8 00

00

27

65

Page 49: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

DEC-06-1991 10:56 FROM TRIWGLE LflBS TO CLEflN flIR ENG. P. 06

TRUNQLE UWWmcm, INC.•01 «0»1«»1« Drfv DATA FILE:FW MNP&C XOt MLK 9M091OurtW, N.C. t7»1» IIP FILEt PBMe DZUI PJICTOftt 1TtHplwmi (tit) <44-S7» MTE: Ot/K/91 TU UNPLK ZO:

TU HKMECT IHtUt 1MUMMLYUS MTe> M/21/B1

Q U A M T X T A T X O M R K P O R T«««»ge——»»«——-fgg_MlllLMJ»J«»»»^B«»«Ba»S»f»»T-TB11TT»»"^fTTT"'l' L"L- " -••••-••• 1 | nai.L • I II H •H

NM« AREA KP KNI m0 «NOUn- « COK •MN LZNn

1 1,4-01ati1orob«UM»-d4 t93» ttC 1 2»

14 ltaphth»1ww-<C N77 4 — 1 4 »

^04» nwMnthrw io wa m 47 a91 HlwehlorobMUfM 0 .1T4 0 47 .4« MP 10 \£)

r~-»7 Chrywr-OIZ ItTW 1MO 17 » C\J

00• U R R O O A T E S U N H A R Y

ffssssfsssBssczz——KfiieBieeeCBfBsssBSSXBUWftexseecMU RF 9CM ZaiD MKMNT CODE « RECOVERY

74 TTp»wny1-tf14 1M55 .OT»7 117» 87 •2.04 D ».<Bl 1,4-011>roMbM»«i»^4 2001 .9011 47« 1 58.•4 D W.tOX 1,9,S-TMeh1oralMncMW-«» 1«4t .Z99C 417 14 •1.22 0 •1.<

ooproi W s Hot Dfct»d; D • Drt«^MJ; E « Crtl—twl: n » Infrfl.l •tendapd

Page 50: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

DEC

-06-

1991

10

;56

FROM

TR

IflNG

LE L

PIBS

TO

CL

EflN

PlIR

ENG

.

z 5'< B y. e 10 6. 9 10 tfl.

• u D. 6

s is

J—

ft* o» u

;

•"—

——

^1

" ft

^•^

*^

8<u

tB

flTt

«»-

o

s U•d so

f w ^ f

r so

6K

t-

—s 6

1^^

^^ g

>- »* -<»^

w

> ,

, t-

u » K

h*„„

^ Sl

SO w «A WNK

d

sa

MN

»5

hA

^ A

^« o

c» -a

| £is»

^^

• ^ •*»

3 en

8' '"*

»-» i B? M

'f» s 5* g: 8* » 0 ^% •J

)5'

S8.-

•< in

f^ •

M ^s

Page 51: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

DEC-06-1991 10:56 FROM TRIfiNGLE LABS TO

ft^ O^t-l/?^

CLEAN AIR ENG. P.08

( JAN DB : FE848No. MAT FOR REV Delta

LAB-BASE QUAN 22-Seo-91 12:03Area P.Flags Scan QM Name

1234S6789

112111121314IS1617

1000

1001001001001000

100097921008710010084

39085899396930

91087898785899670

990979497999909&094989291969875

-1001

-1-10000-231301

-1

2336800

3140209277003885105240205773904100

8922000

127590&1995500129860020030001158700200130184640

bbbbbbbbbbbbAbv«bbvbbvvbvbbbbb

1111

2920

2614683717196338359320

32017953713.S940476417

1521129913682164172330188284240244264212188240185

1,4-Dichlorobenzene-d42-FluorophenolPhenol-d5Naphtha 1ene-dSNitrob®na»nB-d5Acan«phth«ne~dl02-Fluorobiphenyl2,4,6-Tribromopheno1P hen an thren»—d1BHexachlorob&nzBneChrysenB-dl2Terphenyl-dl4Perylene-dIZPyren«-dl0Ar»thracene-dl0I <4-Dibro»nobensene-d41,3,5-Trichlorobenzene~d3

00<0r--C\l00

TOTflL P. 08

Page 52: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

VERTAC SITE CONTRACTORSCAE Project No: 5815

CHAIN OF CUSTODY

Page 53: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack
Page 54: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

VERTAC SITE CONTRACTORSCAE Project No: 5815

PROCESS DATA

Page 55: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Test #1 — 9/18/91

Kiln Organics

Time

14:40:0014:42:001 4:44:001 4:46:0014:48:0014:50:0014:52:0014:54:0014:56:0014:58:0015:00:0015:02:0015:04:0015:06:001 5:08:0015:10:0015:12:0015:14:0015:16:0015:18:0015:20:0015:22:0015:24:0015:26:0015:28:0015:30:0015:32:0015:34:0015:36:0015:38:0015:40:0015:42:0015:44:0015:46:0015:48:0015:50:0015:52:0015:54:00

Date

18-Sep-911 a-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-911 8-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-91

VERTACFT-106OUT

454.00477.00456.50459.75455.75465.25457.00469.00235.75247.00251.00244.25502.75472.75308.00298.00313.75235.75245.75295.50329.75334.75517.75497,00531.25525.75515.00522.00516.75513.50535.25538.00547.75537.75577.75549.00550.75572.00

Page 56: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time

15:56:0015:58:0016:00:0016:02:0016:04:0016:06:0016:08:0016:10:0016:12:0016:14:0016:16:0016:18:0016:20:0016:22:0016:24:0018:26:00

16:28:0016:30:0016:32:0016:34:0016:36:0016:38:0016:40:0016:42:0016:44:0016:46:0016:48:001 6:50:0016:52:0016:54:0016:56:0016:58:0017:00:0017:02:001 7:04:001 7:06:0017:08:0017:10:00

Date

18-S9P-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-911 8-8ep-91

18-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-91

VERTACFT-106OUT

570.75546,25577.00577.00581,25581,25580,25552.00584.50561.50537.75547.25521.25489.00485.00603.75

459.50488.00465.50454.75423.25437.25492.25497.00507.00512.75506.75481.00459.75516.00457.75478.00500.75449.00464.25486.75454.00458.00

Page 57: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time

17:12:0017:14:0017:16:0017:18:0017:20:0017:22:0017:24:0017:26:0017:28:0017:30:0017:32:0017:34:0017:36:0017:38:0017:40:0017:42:0017:44:001 7:46:0017:48:0017:50:001 7:52:0017:54:001 7:56:001 7:58:0018:00:0018:02:0018:04:0018:06:0018:08:0018:10:0018:12:0018:14:0018:16:0018:18:001 8:20:0018:22:001 8:24:0018:26:00

Date

18-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9l18-Sep-9l18-Sep-9118-Sep-9118-Sep-9118-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-S9p-9118-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l

VERTACFT-106OUT

465.00580.00557.25568.25581.00510.50617.75604.25560.25596.25489.75614.75597.75658.50543.00505.25570.00475.50448.50380.75693.25687.25589.75558.50318.00353.25

0.0059.0014.50

950.25648.25582.00851.75

0.000.005.500.000.00

Page 58: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time Date VERTACFT-106OUT

18:28:00 18-Sep-91 0.0018:30:00 18-Sep-91 0.0018:32:00 18-8ep-91 0.0018:34:00 18-Sep-91 0.0018:36:00 18-Sep-91 0.0018:38:00 18-Sep-91 0.0018:40:00 18-Sep-91 0,0018:42:00 18-Sep-91 0.0018:44:00 18-Sep-91 0.00

avg431.19

Page 59: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Test #1 — 9/18/91SCC Out Temp

Time

14:40:0014:42:0014:44:0014:46:0014:48:0014:50:0014:52:0014:54:0014:56:0014:58:0015:00:0015:02:0015:04:00i tvrw-nn1 *^.\7V.\^V

1 5:08:0015:10:0015:12:0015:14:0015:16:0015:18:001 5:20:0015:22:0015:24:001 5:26:001 5:28:001 5:30:001 5:32:001 5:34:001 5:36:001 5:38:001 5:40:001 5:42:001 5:44:001 5:46:001 5:48:001 5:50:001 5:52:001 5:54:00

Date

18-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-911 a-Cort.O)1 U V\^^» ^ 1

18-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-91

VERTACTT-220OUT

2255.002247.352244.202244.202238.352248.252237.452236.102240.602225.302240.152246.452251.40O-MQlt;t-t--r^. i 2267.152278.852262.202281.552250.952233.852233.402234.302237.452228.002231.152235.202243.302240.152235.202237.452233.852234,752233.852233.852225.752234.302235.202241.05

Page 60: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time

15:56:0015:58:0016:00:0016:02:0016:04:0016:06:0016:08:0016:10:0016:12:0016:14:0016:16:0016:18:0016:20:0016:22:0016:24:0016:26:0016:28:0016:30:0016:32:0016:34:0016:36:0016:38:0016:40:0016:42:0016:44:0016:46:0016:48:0016:50:0016:52:0016:54:0016:56:0016:58:0017:00:0017:02:0017:04:0017:06:0017:08:0017:10:00

Date

18-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-91

VERTACTT-220OUT

2241.052238.802243.752247.802238.352240.152235.202236.552243.302238.352237.002228,902221.252228.452229.802227.102232.502230.252226.652239.252241.052238.802235.202241.052244.202245.552243.302240.602238.352249.602255.452251.852261.302268.052272.102263.102262.652258.15

Page 61: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time

17:12:0017:14:0017:16:0017:18:0017:20:0017:22:0017:24:0017:26:0017:28:0017:30:0017:32:0017:34:001 7:36:0017:38:0017:40:0017:42:0017:44:0017:46:0017:48:0017:50:0017:52:0017:54:0017:56:0017:58:0018:00:0018:02:0018:04:0018:06:0018:08:0018:10:0018:12:0018:14:0018:16:0018:18:0018:20:0018:22:0018:24:0018:26:00

Date

18-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-91

VERTACTT-220OUT

2258.152258.152254.102255.452257.702254.102271.652259.502257.252266.702261.752260,402250,052244.652243.752244.652239.252237.902235.652223.952232.502248.702242.852237.902244.652238.352241.502242.852234.752254.552239.252253.652280.202281.552228.902257.702229.352228.45

Page 62: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time Date VERTACTT-220OUT

18:28:00 18-Sep-91 2245.1018:30:00 18-Sep-91 2239.2518:32:00 18-Sep-91 2250.9518:34:00 18-Sep-91 2256.8018:36:00 18-Sep-91 2256.3518:38:00 18-Sep-91 2253.2018:40:00 18-Sep-91 2264.0018:42:00 18-Sep-91 2281.5518:44:00 18-Sep-91 2291.00

avg2245.63

Page 63: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Test #1 — 9/18/91

Solids Weigh Hopper

Time

14:40:0014:42:0014:44:0014:46:0014:48:0014:50:0014:52:0014:54:0014:56:0014:58:0015:00:0015:02:0015:04:0015:06:0015:08:0015:10:0015:12:0015:14:0015:16:0015:18:0015:20:001 5:22:0015:24:0015:26:0015:28:0015:30:0015:32:001 5:34:0015:36:0015:38:001 5:40:001 5:42:001 5:44:001 5:46:001 5:48:001 5:50:001 5:52:001 5:54:00

Date

18-Sep-9118-Sep-9118-8ep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-0118-Sep-9118-Sep-9118-Sep-9118-Sep-91

VERTACWIT-135M

OUT

21106.2521065.0021013.7520963.7520892.5020802.5020740.0020638.7520563.7520536.2520531.2520523.7520523.75205125020463.7520378.7520286.2520230.0020131.2520045.0019951.2519848.7519767.50196562519563.7519475.0019367.5019263.7519162.5019060.0018945.0018841.2518717.5018612.5018537.5018458.7518352.5018251.25

Page 64: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time

15:56:0015:58:0016:00:0016:02:0016:04:0016:06:0016:08:0016:10:0016:12:0016:14:0016:16:0016:18:0016:20:0016:22:0016:24:0016:26:0016:28:0016:30:0016:32:0016:34:0016:36:0016:38:0016:40:0016:42:0016:44:0016:46:0016:48:0016:50:0016:52:0016:54:0016:56:0016:58:0017:00:0017:02:0017:04:0017:06:0017:08:0017:10:00

Date

18-Sep-9118-Sep-9118-8ep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-91

VERTACW1T-135M

OUT

18166.2518082.5017965.0017902.5017775.0017677.5017582.5017496.2517403.7517401.2517395.0017320.0017208.751 7140.0017022.5016938.7516847.5016786.2516706.2516621.2516535.0016427.5016313.7516216.2516120.0016021.2515942.5015833.7515748.7515653.7515557.501551 0.0015455.0015388.751 5348.7515293.7515231.2515125.00

Page 65: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time

17:12:0017:14:0017:16:0017:18:0017:20:0017:22:0017:24:0017:26:0017:28:0017:30:0017:32:0017:34:0017:36:0017:38:0017:40:001 7:42:0017:44:001 7:46:0017:48:0017:50:0017:52:0017:54:0017:56:0017:58:0018:00:0018:02:0018:04:0018:06:0018:08:0018:10:0018:12:0018:14:0018:16:0018:18:0018:20:0018:22:0018:24:0018:26:00

Date

18-Sep-9118-8ep-9118-8ep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-8ep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-91

VERTACWIT-135M

OUT

15027.501492&0014792.5014696.2514586.2514508.7514435.0014346.2514266.2514190.0014088.7514032.5013921.2513847.5013781.2513682.5013597.5013511.2513421.2513327.5013242.5013221.2513193.75131 46.2513070.0012958.7512863.7512748.7512632.5012492.5012397.5012352,5012267.5012206.0012158.7512127.5012105.0012092.50

Page 66: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time Date VERTACWIT-135M

OUT

18:28:00 18-Sep-91 12078.7518:30:00 18-Sep-91 12047.5018:32:00 18-Sep-91 11940.0018:34:00 18-Sep-91 11838,7518:36:00 18-Sep-91 11661.2518:38:00 18-Sep-91 11480.0018:40:00 18-Sep-91 11266.2518:42:00 18-Sep-91 11063.7518:44:00 18-Sep-91 10883.75

av16272.06

Page 67: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Test #1 — 9/18/91Organics Tank Level

Time Date

14:40:00 18-Sep-9114:42:00 18-Sep-9114:44:00 18-Sep-9114:46:00 18-Sep-9114:48:00 18-Sep-9114:50:00 18-Sep-9114:52:00 18-Sep-9114:54:00 18-Sep-9114:56:00 18-Sep-9114:58:00 18-Sep-9115:00:00 18-Sep-9115:02:00 18-Sep-9115:04:00 18-Sep-9115:06:00 18-Sep-9115:08:00 18-Sep-9115:10:00 18-Sep-9115:12:00 18-Sep-9115:14:00 18-Sep-9115:16:00 18-Sep-9115:18:00 18-Sep-9115:20:00 18-Sep-9115:22:00 18-Sep-9115:24:00 18-Sep-9115:26:00 18-Sep-9115:28:00 18-Sep-9115:30:00 18-Sep-9115:32:00 18-Sep-9115:34:00 18-Sep-9115:36:00 18-Sep-9115:38:00 18-Sep-9115:40:00 18-Sep-9115:42:00 18-Sep-9115:44:00 18-Sep-9115:46:00 18-Sep-9115:48:00 18-Sep-9115:50:00 18-Sep-9115:52:00 18-Sep-9115:54:00 18-Sep-91

\/ERTACLJT-402

OUT

51.3351.3351.3351.3351.3351.3351.3351.3351.3351.3351.3351.3351.3351.3351.3351.3351.3351,3351.3351.3350.2450.2450.2450.2450.2450,2450.2450.2450.2450.2450.2450.2450.2450.2450.2450.2450.2450.24

Page 68: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time

15:56:0015:58:0016:00:0016:02:0016:04:0016:06:0016:08:0016:10:0016:12:001 6:14:0016:16:0016:18:0016:20:0016:22:0016:24:0016:26:0016:28:0016:30:0016:32:0016:34:001 6:36:0016:38:0016:40:0016:42:0016:44:0016:46:001 6:48:0016:50:001 6:52:001 6:54:001 6:56:0016:58:0017:00:0017:02:0017:04:001 7:06:0017:08:0017:10:00

Date

18-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-91

VERTACUT-402

OUT

50.2450.2450.2450.2449,1349.1349,1349.1349.1349.1349.1349,1349.1349.1349.1349.1349.1349.1349.1349.1349.1349.1349.1349.1349.1349.1349.1349.1349.1349.1348.1348,1348.1348.1348.1348.1348.1348.13

Page 69: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time

17:12:0017:14:0017:16:0017:18:0017:20:0017:22:0017:24:0017:26:0017:28:0017:30:0017:32:0017:34:0017:36:0017:38:0017:40:0017:42:0017:44:0017:46:0017:48:001 7:50:001 7:52:0017:54:0017:56:001 7:58:001 8:00:0018:02:001 8:04:0018:06:0018:08:0018:10:0018:12:0018:1 4:001 8:1 6:0018:18:0018:20:0018:22:0018:24:001 8:26:00

11111111111111111111111111111111111111

Date

8-Sep-918-Sep-918-Sep-918-Sep-918-Sep-918-Sep-918-Sep-918-Sep-918-Sep-918-Sep-918-Sep-918-Sep-918-Sep-918-Sep-918-Sep-918-Sep-918-Sep-918-Sep-918-Sep-918-Sep-918-Sep-918-Sep-918-Sep-918-Sep-918-Sep-918-Sep-918-Sep-918-Sep-918-Sep-918-Sep-918-Sep-918-Sep-918-Sep-918-8ep-9l8-Sep-918-Sep-918-Sep-918-Sep-91

VERTACUT-402

OUT

48.1348.1348.1348.1348.1348.1348.1348.1348.1347.0647.0647.0647.0647.0647.0647.0647.0646.0046.0046.0046.0046.0046.0046.0046.0046.0046.0046.0046.0046.0044.9244,9244.9244.9244.9244.9244.9244.92

Page 70: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time

18:28:0018:30:0018:32:0018:34:0018:36:0018:38:0018:40:0018:42:0018:44:00

Date

18-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-91

VERTACUT-402

OUT

44.9244.9244.9244.9244.9244.9244.9244.9244.92

avg 48.50

Page 71: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Test #1 — 9/18/91

STK CO

Time Date VERTACAT-305D

OUT

14:40:0014:42:0014:44:0014:46:0014:48:0014:50:0014:52:001 4:54:0014:56:0014:58:0015:00:0015:02:0015:04:0015:06:0015:08:0015:10:0015:12:0015:1 4:0015:16:0015:18:0015:20:0015:22:0015:24:0015:26:0015:28:0015:30:0015:32:0015:34:0015:36:001 5:38:0015:40:0015:42:0015:44:0015:46:0015:48:0015:50:0015:52:0015:54:00

18-Sep-91l8-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-911 8-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-91

3.473.573.783.723.383.533.324.35

102.135.324.084,533.053.724.703.633.303.923.072.852.902.953.002.832.833.033.283.323.283.423.253,603.854.285.005.074.053.90

Page 72: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time Date VERTACAT-3050

OUT

15:56:0015:58:0016:00:0016:02:0016:04:0016:06:0016:08:0016:10:0016:12:0016:14:0016:16:0016:18:0016:20:0016:22:0016:24:0016:26:0016:28:0016:30:0016:32:0016:34:0016:36:001 6:38:0016:40:0016:42:0016:44:0016:46:0016:48:0016:50:001 6:52:0016:54:0016:56:001 6:58:001 7:00:001 7:02:001 7:04:0017:06:0017:08:0017:10:00

18-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-91

3.703.323.333.133.173.323.333.333.383.133.253.133.103,103.083.173.133.003.053.253.433.433.403.173.273.133.223.003.023.153.253,033.353.453.403.283.233.03

Page 73: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time Date VERTACAT-305D

OUT

17:12:0017:14:0017:16:0017:18:0017:20:0017:22:0017:24:0017:26:0017:28:0017:30:0017:32:0017:34:0017:36:0017:38:0017:40:0017:42:0017:44:0017:46:0017:48:0017:50:0017:52:0017:54:0017:56:0017:58:0018:00:0018:02:0018:04:0018:06:0018:08:0018:10:0018:12:0018:14:0018:16:0018:18:0018:20:001 8:22:0018:24:0018:26:00

18-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-91

3.203.053.033.103.152.903.583.002.973.283.172.973.273.173.173.282953.223.203.153.383.633.633.573.723.383.303.453.133.826.353.483.97

326.805.65

334.601 1 0.45

6.42

Page 74: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time Date VERTACAT-305D

OUT

18:28:00 18-Sep-91 5.3318:30:00 18-Sep-91 3.9318:32:00 18-Sep-91 3.7518:34:00 18-Sep-91 2.7018:36:00 18-Sep-91 3.3818:38:00 18-Sep-91 3.3518:40:00 18-Sep-91 3.2818:42:00 18-Sep-91 3.4518:44:00 18-Sep-91 3.65

avg 10.48

Page 75: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Ttest #1 — 9/18/91

STK COn

Time Date VERTACAT-305C

OUT

14:40:0014:42:0014:44:0014:46:0014:48:0014:50:0014:52:0014:54:0014:56:0014:58:0015:00:0015:02:0015:04:0015:06:0015:08:0015:10:0015:12:0015:14:0015:16:0015:18:0015:20:001 5:22:0015:24:001 5:26:0015:28:0015:30:0015:32:0015:34:0015:36:0015:38:0015:40:0015:42:0015:44:0015:46:0015:48:0015:50:0015:52:0015:54:00

18-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-91

6.907.788.608.537.93B957.987.739.55&457.605.955.478.73

10.5510.088.32

10.277.707.588.02&438.077.508,689.028,808.438.208.408.038.828.908.558.258.988.839.30

Page 76: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time Date VERTACAT-305C

OUT

15:56:0015:58:0016:00:0016:02:0016:04:0016:06:001 6:08:0016:10:0016:12:0016:14:0016:16:0016:18:0016:20:0016:22:0016:24:0016:26:001 6:28:0016:30:0016:32:0016:34:0016:36:0016:38:0016:40:0016:42:0016:44:001 6:46:0016:48:0016:50:0016:52:0016:54:001 6:56:0016:58:0017:00:0017:02:0017:04:001 7:06:001 7:08:0017:10:00

18-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-8ep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-911 8-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-91

9.008.679,138.388,358.938,638.829.07&528.358.138.528.958.638.688.808.258,459.028.658.608.488.908.678.608.758.558.509.108.888.428.838.809.108.428.708.35

Page 77: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time Date '/

17:12:00 18-Sep-9117:14:00 18-Sep-9117:16:00 18-Sep-9117:18:00 18-Sep-9117:20:00 18-Sep-9117:22:00 18-Sep-9117:24:00 18-Sep-9117:26:00 18-Sep-9117:28:00 18-Sep-9117:30:00 18-Sep-9117:32:00 18-Sep-9117:34:00 18-Sep-9117:36:00 18-Sep-9117:38:00 18-Sep-9117:40:00 18-Sep-9117:42:00 18-Sep-9117:44:00 18-Sep-9117:46:00 18-Sep-9117:48:00 18-Sep-9117:50:00 18-Sep-9117:52:00 18-Sep-9117:54:00 18-Sep-9117:56:00 18-Sep-9117:58:00 18-Sep-9118:00:00 18-Sep-9118:02:00 18-Sep-9118:04:00 18-Sep-9118:06:00 18-Sep-9118:08:00 18-Sep-9118:10:00 18-Sep-9118:12:00 18-Sep-9118:14:00 18-Sep-9118:16:00 18-Sep-9118:18:00 18-Sep-9118:20:00 18-Sep-9118:22:00 18-Sep-9118:24:00 18-Sep-9118:26:00 18-Sep-91

^ERTAC\T-305C

OUT

8.52B438.328.578.708.239.708.308.439.028.708.578.088.278.778.508.158.858.488.138.929.408.558.109.158.658.758.758.159.428.238.579.82

10.036.009.888.035.47

Page 78: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time Date VERTACAT-305C

OUT

18:28:00 18-Sep-91 9.5018:30:00 18-Sep-91 9.0018:32:00 18-8ep-91 9.3818:34:00 18-Sep-91 9.4718:36:00 18-Sep-91 9.1718:38:00 18-Sep-91 8.7818:40:00 18-Sep-91 9.4218:42:00 18-Sep-91 9.6518:44:00 18-Sep-91 9.88

avg. 8.57

Page 79: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Test #1 — 9/18/91

STK COgW

Time

14:40:001 4:42:0014:44:0014:46:0014:48:0014:50:0014:52:0014:54:001 4:56:0014:58:0015:00:001 5:02:0015:04:0015:06:001 5:08:0015:10:0015:12:0015:14:0015:16:0015:18:0015:20:0015:22:0015:24:0015:26:0015:28:0015:30:0015:32:0015:34:0015:36:0015:38:0015:40:0015:42:0015:44:0015:46:0015:48:0015:50:0015:52:001 5:54:00

Date

18-Sep-QI18-Sep-9l18-Sep-9118-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9118-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l

VERTACC0@7%

OUT

5.485.134.814.634.654.244.565.76

126.317.894.926.454.644.715.234.214.564.384.384.013.723.703.974.073.583.654.094.404.464.564.544,504.785.456.556.155,094.70

Page 80: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time

15:56:0015:58:0016:00:0016:02:0016:04:0016:06:0016:08:0016:10:0016:12:0016:14:0016:16:0016:18:0016:20:0016:22:0016:24:0016:26:0016:28:0016:30:0016:32:0016:34:0016:36:0016:38:0016:40:0016:42:0016:44:0016:46:0016:48:0016:50:0016:52:0016:54:0016:56:0016:58:0017:00:0017:02:0017:04:0017:06:0017:08:0017:10:00

Date \C

18-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-91

/ERTAC;0@7%OUT

4.534.214.064.174.224.124.364.134.104.194.334.353.983.803.874.003.893.994.013.914.434.344.373.914.183.934.013.913.943.774.054,024.264.384.224.434.104.10

Page 81: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time Date VERTACC0@7%

OUT

17:12:0017:14:0017:16:0017:18:0017:20:0017:22:0017:24:0017:26:0017:28:0017:30:0017:32:0017:34:0017:36:0017:38:0017:40:0017:42:0017:44:0017:46:0017:48:0017:50:0017:52:0017:54:0017:56:0017:58:0018:00:0018:02:0018:04:0018:06:0018:08:0018:10:0018:12:0018:14:0018:16:0018:18:0018:20:0018:22:0018:24:0018:26:00

l8-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-91

4.174.044.094.023.973.964.134.154.003.994.054,004.564.283.964.304.074.064.154.434.204.224.854.934.484.274.164.314.174.338.704,514.39

349.899.59

346.86155.85

10.89

Page 82: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time Date VERTACC0@7%

OUT

18:28:00 18-Sep-91 6.0018:30:00 18-Sep-91 5.2918:32:00 18-Sep-91 4.8418:34:00 18-Sep-91 4.6918:36:00 18-Sep-91 4.3318:38:00 18-Sep-91 4.4518:40:00 18-Sep-91 4.1418:42:00 18-Sep-91 4.2118:44:00 18-Sep-91 4.36

avg 12.35

Page 83: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Test #1 — 9/18/91

STK ()„

Time

14:40:0014:42:0014:44:0014:46:0014:48:0014:50:001 4:52:0014:54:001 4:56:0014:58:0015:00:0015:02:0015:04:0015:06:0015:08:0015:10:0015:12:0015:14:0015:16:0015:18:001 5:20:001 5:22:001 5:24:0015:26:001 5:28:0015:30:001 5:32:0015:34:0015:36:0015:38:0015:40:001 5:42:0015:44:0015:46:0015:48:0015:50:001 5:52:001 5:54:00

Date;

18-Sep-9118-Sep-9l18-Sep-9118-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l18-Sep-9l

\/ERTAC^T-3058

OUT

12.1111.2210.029.75

10.849.37

10.7910.629.70

11.339.39

1 1 . 1 511.809.938.448.94

10.878.47

1 1 . 1 811.0210.099.80

10.4211.289.949.399,80

10.4210.7010.4910.98

9.819.72

10.0110.319.459,869.38

Page 84: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time Date VERTACAT-305B

OUT

15:56:0015:58:0016:00:0016:02:0016:04:0016:06:0016:08:0016:10:0016:12:0016:14:0016:16:0016:18:0016:20:0016:22:0016:24:0016:26:0016:28:0016:30:0016:32:0016:34:0016:36:0016:38:0016:40:0016:42:0016:44:0016:46:0016:48:0016:50:0016:52:0016:54:0016:56:0016:58:001 7:00:001 7:02:001 7:04:0017:06:0017:08:0017:10:00

18-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-91

9.559,949.53

10.5010.469.70

10.319.729.46

10.5610.4810.9010.109.539.869.909.74

10.4410.349.34

10.189.96

10.129.63

10.029.869.74

10.2710.26

9.319.74

10.489.989.989.72

10.649.99

10.66

Page 85: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time Date VERTACAT-305B

OUT

17:12:0017:14:0017:16:0017:18:0017:20:0017:22:0017:24:0017:26:001 7:28:0017:30:001 7:32:0017:34:0017:36:001 7:38:0017:40:0017:42:0017:44:0017:46:0017:48:0017:50:0017:52:0017:54:001 7:56:0017:58:0018:00:0018:02:0018:04:0018:06:0018:08:0018:10:0018:12:0018:14:0018:16:0018:18:0018:20:001 8:22:0018:24:0018:26:00

18-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-91

10.2510.4210.6510.179.90

10.748.91

10.8910.58

9.5110.0210.5910.951 0.599.77

10.3510.859.88

10.2011.029.738.97

10.5310.849.379.949,909.79

10.508.63

10.9410.168.348.55

12.808.42

1 1 . 1 912.56

Page 86: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time Date VERTACAT-305B

OUT

18:28:00 18-Sep-91 8.5718:30:00 18-Sep-91 10.6018:32:00 18-8ep-91 10.1518:34:00 18-Sep-91 9.9618:36:00 18-Sep-91 10.0818:38:00 18-Sep-91 10.4618:40:00 18-Sep-91 9.9118:42:00 18-Sep-91 9.5218:44:00 18-Sep-91 9.28

avg10.13

Page 87: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

•Itest #1 — 9/18/91

STK Air Flow

Time

14:40:0014:42:0014:44:0014:46:0014:48:0014:50:0014:52:0014:54:0014:56:0014:58:0015:00:0015:02:0015:04:0015:06:001 5:08:0015:10:0015:12:0015:14:0015:16:0015:18:001 5:20:0015:22:0015:24:0015:26:0015:28:0015:30:0015:32:0015:34:001 5:36:001 5:38:0015:40:0015:42:0015:44:0015:46:0015:48:0015:50:0015:52:0015:54:00

Date

18-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-3ep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-91i o-sep-91

VERTACFT-304OUT

28344.8228313.1028277.3627851.0427904.4627018.9228301.7728377.5628280.8327892.0928311.0628050.2227809.5027665.3329209.1829487.2429340.5028993.5829045.9429001.8028751.0428467.3728566.1 428970.9429425.5529117.4929221.3329271.1528765.0328824.9628645.0129375,1928562.0728760.5229140.2828108.4128417.4120707.03

Page 88: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time Date VERTACFT-304OUT

15:56:00 18-Sep-9115:58:00 18-Sep-9116:00:00 18-Sep-9116:02:00 18-Sep-9116:04:00 18-Sep-9116:06:00 18-Sep-9116:08:00 18-Sep-9116:10:00 18-Sep-9116:12:00 18-Sep-9116:14:00 18-Sep-9116:16:00 18-Sep-9116:18:00 18-Sep-9116:20:00 18-Sep-9116:22:00 18-Sep-9116:24:00 18-Sep-9116:26:00 18-Sep-9116:28:00 18-Sep-9116:30:00 18-Sep-9116:32:00 18-Sep-9116:34:00 18-Sep-9116:36:00 18-Sep-9116:38:00 18-Sep-9116:40:00 18-Sep-9116:42:00 18-Sep-9116:44:00 18-Sep-9116:46:00 18-Sep-9116:48:00 18-Sep-9116:50:00 18-Sep-9116:52:00 18-Sep-9116:54:00 18-Sep-9116:56:00 1 8-Sep-9116:58:00 18-Sep-9117:00:00 18-Sep-9117:02:00 18-Sep-9117:04:00 18-Sep-9117:06:00 18-Sep-9117:08:00 18-Sep-9117:10:00 18-Sep-91

28771.1928888.8929007.7630085.7628497.6329419.2629130.1529173.9728780.7628949.7228310.4428885.6028936.7928779.5828709.6528404.5228809.6528899.9528573.6129091.2028674.2228928.2528271.2228225.0428133.0127457.7927669.94276225727962372781 9.4227822.4227863.3627727.8627502.6727378.732811 26628082.982808259

Page 89: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time

17:12:0017:14:0017:16:0017:18:0017:20:0017:22:0017:24:0017:26:0017:28:0017:30:0017:32:0017:34:0017:36:0017:38:001 7:40:001 7:42:001 7:44:001 7:46:0017:48:0017:50:001 7:52:0017:54:0017:56:0017:58:0018:00:0018:02:0018:04:0018:06:0018:08:0018:10:0018:12:0018:14:0018:16:0018:18:0018:20:0018:22:0018:24:0018:26:00

Date

18-Sep-Ql18-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-91

VERTACFT-304OUT

27420.6427409.2027135.3128081.2027712.4127906.8128047.7927732.8128632.8128405.7928464.5228305.4929021.0028407.6328129.5427933.4828195.3327684.2528416.7629115.9428971.6628707.2328991.7028803.5728820.0528542.6228481.5328660.1828556.9228487.7428379.3828463,9228334.0328494.1428470.8128091.9028756.3827942-16

Page 90: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time

18:28:0018:30:0018:32:0018:34:001 8:36:0018:38:001 8:40:0018:42:001 8:44:00

Date

18-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-9118-Sep-91

VERTACFT-304OUT

27690.6227240.4628457.1627969.2228148.4427838.3028186.9028961.2928797.30

av28434.31

Page 91: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Test #2 — 9/19/91

Kiln Organics

Tims

11:20:0011:22:0011:24:0011:26:0011:28:0011:30:0011:32:0011:34:0011:36:0011:38:0011:40;0011:42:0011:44:0011:46:0011:48:0011:50;0011:52:0011:54:0011:56:0011:58:0012:00:0012:02:0012:04:0012:06:0012:08:0012:10:0012:12:0012:14:0012:16:0012:18:0012:20:0012:22:0012:24:0012:26:0012:28:0012:30:0012:32:0012:34:00

Date

1 9-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l

VERTACFT-106OUT

523.75337.50393.25438.50440.00442.75461.75451.00429.00243.0027.25

826.00195.75901.5052a50193.0013200338.25

0.000.000.00

525.00583.75601.25878.50

0.000.000.000.00

741.75441.00331.75388.50470.00538.75

0.000.000.00

VERTACFEEDRAT

OUT

967.832178.553389.272889.493017,212546.67271 &802886.94

661.971105.004097.364852.805608.246407.143306.69294.69

1939.143583.595380.714772.89

414.741642.112869.491561.614249.01447.76231.18

14.5962.81

340.021152.272305.453458.636257.198132.139316.236016.012715.80

Page 92: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time

12:36:0012:38:0012:40:0012:42:0012:44:0012:46:0012:48:0012:50:0012:52:0012:54:0012:56:0012:58:0013:00:0013:02:0013:04:0013:06:0013:08:0013:10:0013:12:0013:14:0013:16:0013:18:0013:20:0013:22:0013:24:0013:26:0013:28:0013:30:0013:32:0013:34:0013:36:0013:38:0013:40:00i^-40-nn

13:44:0013:46:0013:48:0013:50:00

Date

19-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-911 Q-Qon-QI

19-Sep-9119-Sep-9119-Sep-9119-Sep-91

VERTACFT-106OUT

0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00nnnVl \/

0.000.000.000.00

VERTACFEEDRAT

OUT

57.70989.33

4684.572960.111235.651532.944672.922016,731948.551880.372352301932.662224.232417.472610,712695.372829.833096.472936.292776.102569.522449.073785.883662.383538.892962.093171.863199.663230.093260.523007.552663,66

943.01ii nn ^At i vw.^-r

1258.072367.553087.59271 9.96

Page 93: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time

13:52:0013:54:0013:56:0013:58:0014:00:0014:02:0014:04:0014:06:0014:08:0014:10:0014:12:0014:14:0014:16:0014:18:0014:20:0014:22:0014:24:0014:26:0014:28:001 4:30:0014:32:0014:34:0014:36:0014:38:0014:40:0014:42:0014:44:0014:46:0014:48:0014:50:001 4:52:0014:54:001 4:56:001 4:58:001 5:00:0015:02:0015:04:0015:06:00

Date

lQ-Sep-9119-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l

VERTACFT-106OUT

0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00

VERTACFEEDRAT

OUT

2789.142858.322266.172928.771351.542063.332775.123116.21314&732369.052336.472303.882172.421390.751626.901885.462144.022663.503668.573739.163676.443613.72

611.861892.572275.412861.133446.852897.443038.943494.52301 7.692540.862539.361930.501546.862247.552948.242849.63

Page 94: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time

15:08:0015:10:0015:12:0015:14:0015:16:0015:18:0015:20:00

Date

19-S8P-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-91

VERTACFT-106OUT

0.000.000.000.000.000.000.00

avg105.77

VERTACFEEDRAT

OUT

3510.762439.481834.451229.43268.91

1456.701081.66

avg2640.20

Page 95: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Test #2 — 9/19/91

SCC Out Temp

Tim@

11:20:0011:22:0011:24:0011:26:0011:28:0011:30:0011:32:0011:34:0011:36:0011:38:0011:40:0011:42:0011:44:0011:46:0011:48:0011:50:0011:52:0011:54:0011:56:0011:56:0012:00:0012:02:0012:04:0012:06:0012:08:0012:10:0012:12:0012:14:0012:16:0012:18:0012:20:0012:22:001 2:24:001 2:26:0012:28:0012:30:0012:32:0012:34:00

Date

19-Sep-Qll9-Sep-9l19-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-91

VERTACTT-220OUT

2234.752238.352220.002220.352219.902219.9022ia602215.402223.502241.952255.002284.702267.152250.952250.952264.902261.752276.602283.352241.952235.652235.652232.952237.002228.452221.252216.752215.402220.352213.152219.902224.402220.352206.402208.652216.302211.802211.60

Page 96: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time

12:36:0012:38:0012:40:0012:42:0012:44:0012:46:0012:48:0012:50:0012:52:0012:54:0012:56:0012:58:0013:00:0013:02:0013:04:0013:06:0013:08:0013:10:0013:12:0013:14:0013:16:0013:18:001 3:20:001 3:22:001 3:24:0013:26:001 3:28:001 3:30:0013:32:0013:34:0013:36:0013:38:0013:40:001^-A-a-nn

13:44:0013:46:0013:48:0013:50:00

Date

19-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-911 Q-CSon-Q-l

19-Sep-9119-Sep-9119-Sep-9119-Sep-91

VERTACTT-220OUT

2218.552234.302211.352214.052210.002206.85221 aio2220.352223.052228.452230.702235.652223.952230-25223&552233.852237.902245.102243.302245.552243.752235.202241.952244.652251.852247.802238,352242.85222B902257.702232.052245.102219.90wysRH

2225.302220.652208,202208.20

Page 97: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time

13:52:0013:54:0013:56:0013:58:0014:00:0014:02:0014:04:0014:06:001 4:08:0014:10:0014:12:0014:1 4:0014:16:0014:18:001 4:20:0014:22:0014:24:0014:26:001 4:28:0014:30:0014:32:0014:34:0014:36:0014:38:0014:40:001 4:42:001 4:44:0014:46:001 4:48:0014:50:0014:52:0014:54:001 4:56:001 4:58:0015:00:0015:02:001 5:04:001 5:08:00

Date

1 9-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-8ep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-91

VERTACTT-220OUT

2208.202210.902211.802222.152216.302217.652212.702219.902221.252223.052219.452223.052225.752227.552232.952237.002232.952238.352236.552235.202229.802237,452239.702236.552241,502240,602237,902242.852234.302229.352222.602228.452232.502227,552231.602232.952235.202228.00

Page 98: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time Date VERTACTT-220OUT

15:08:00 19-Sep-91 2238.8015:10:00 19-Sep-91 2245.5515:12:00 19-Sep-91 2235.2015:14:00 19-Sep-91 2227.1015:16:00 19-Sep-91 2229.3515:18:00 19-Sep-91 2228.9015:20:00 19-Sep-91 2237.9015:22:00 19-Sep-91 2235.2015:24:00 19-Sep-91 2233.85

av2231.15

Page 99: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Test #2 — 9/19/91

Solids Weigh Hopper

Time

11:20:0011:22:0011:24:0011:26:0011:28:001 1 ;30;0011:32:0011:34:0011:36:0011:38:0011:40;0011:42:0011:44:0011:46:0011:48:0011:50:0011:52:0011:54:0011:56:0011:58:0012:00:0012:02:0012:04:0012:06:0012:08:0012:10:0012:12:0012:14:0012:16:0012:18:0012:20:0012:22:0012:24:0012:26:0012:28:0012:30:0012:32:0012:34:00

Date

1 9-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-911 9-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-91

VERTACWIT-135M

OUT

29657.5029536,2529463.7529350,0029270.0029176.2529108.7529091.2529051.2528916.2528741.2528532.5028330.0028250.0028235.0028155.0027995.0027800.0027660.0027651.2527622.5027497.5027418.7527281.2527273.7527270.0027270,0027270.0027256.2527221.2527138.7526960.0026727.5026441.2526111.2525968.7525967,5025972.50

Page 100: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time

12:36:0012:38:0012:40:0012:42:0012:44:0012:46:0012:48:0012:50:0012:52:0012:54:0012:56:0012:58:0013:00:0013:02:0013:04:0013:06:0013:08:0013:10:0013:12:0013:14:0013:16:0013:18:0013:20:0013:22:0013:24:0013:26:0013:28:0013:30:0013:32:0013:34:0013:36:0013:38:0013:40:00i-^-do-nn

1 S i ~T^. •i W

13:44:0013:46:0013:48:0013:50:00

Date

19-8ep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-911 Q-fton-Q-l* w w^fr^ ^ i

19-Sep-9119-9ep-9119-Sep-9119-Sep-91

VERTACWIT-135M

OUT

25935.0025761.2525696.2525686.2525576.2525422.5025347.5025308.7525226.2525165.0025085.0025017.5024930.0024846.2524743.7524655.0024551.2524451.2524368.7524268.7524205.0024068.7523946.2523862.5023732.5023637.5023530.0023422.5023306.2523220.0023133.7523102.5023076.25•3-3QCW OnC«&.WWVt VW

22933.7522616.2522726,2522631.25

Page 101: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time

13:52:0013:54:0013:56:0013:58:0014:00:0014:02:0014:04:0014:06:0014:08:0014:10:0014:12:0014:14:0014:16:0014:18:0014:20:0014:22:0014:24:0014:26:0014:28:0014:30:0014:32:0014:34:0014:36:0014:38:0014:40:0014:42:0014:44:0014:46:0014:48:0014:50:0014:52:0014:54:0014:56:001 4:58:0015:00:0015:02:0015:04:0015:06:00

Date

l9-Sep-9l19-Sep-9119-8ep-9119-Sep-9119-Sep-91l9-Sep-9l19-Sep-9119-Sep-9119-Sep-91l9-Sep-9l19-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-91

VERTACWIT-135M

OUT

22546.2522461.2522367.50-22335.0022253.7522130.0022053.7521928,7521856.2521782.5021706,2521645,0021593.7521541.2521483.7521388.7521295.00211 67.5021048.7520918.7520852.5020838.7520766.2520686.2520583.75204825020372.5020276.2520161.2520063.7520001.2519897.5019841.2519796.2519702.5019598.7519506.2519365.00

Page 102: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time Date VERTACWIT-135M

OUT

15:08:00 19-8ep-91 19305.0015:10:00 19-Sep-91 19247.5015:12:00 19-8ep-91 19247.5015:14:00 19-8ep-91 19217.5015:16:00 19-8ep-91 19171.2515:18:00 19-8ep-91 19145.0015:20:00 19-8ep-91 19011.2515:22:00 19-8ep-91 18883.7515:24:00 19-8ep-91 18717.50

av23994,24

Page 103: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Test #2 — 9/19/91Stack CO (Not Corrected)

Time

11:20:0011:22:0011:24:0011:26:0011:28:0011:30:0011:32:0011:34:0011:36:0011:38:0011:40:0011:42;0011:44:0011:46:0011:48:0011:50:0011:52:0011:54:0011:56:0011:58:0012:00:0012:02:0012:04:0012:06:0012:08:0012:10:0012:12:0012:14:0012:16:0012:18:0012:20:0012:22:0012:24:0012:26:0012:28:001 2:30:001 2:32:001 2:34:00

Date

19-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-91

VERTACAT-305D

OUT

2973.052.952.882.852.973.002.883.173.333.584,283.933.573.55

28.983.783.47

216.1 51 1 . 1 03.753.233.603.477.509.972.952.552.722.654.753.082.902.723.05

139.1522.573.88

Page 104: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time

12:36:0012:38:0012:40:0012:42:0012:44:0012:46:0012:48:0012:50:0012:52:0012:54:0012:56:0012:58:0013:00:0013:02:0013:04:0013:06:0013:08:0013:10:0013:12:0013:14:0013:16:0013:18:0013:20:0013:22:0013:24:0013:26:0013:28:0013:30:0013:32:0013:34:0013:36:0013:38:0013:40:0013:42:0013:44:0013:46:0013:48:0013:50:00

Date

19-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-91

VERTACAT-305D

OUT

3.53113.03

3.65B103.073.053.133.052.883.133.132.972.882.972.973.003.003.082.903.172.973.003.073.103.133.124,38

212.974.333.80

245.456,934.633.973.90

34.573.633.38

Page 105: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time Date VERTACAT-305D

OUT

13:52:00 19-Sep-9113:54:00 19-Sep-9113:56:00 19-Sep-9113:58:00 19-Sep-9114:00:00 19-Sep-9114:02:00 19-Sep-9114:04:00 19-Sep-9114:06:00 19-Sep-9114:08:00 19-Sep-9114:10:00 19-Sep-9114:12:00 19-Sep-9114:14:00 19-Sep-9114:16:00 19-Sep-9114:18:00 19-Sep-9114:20:00 19-Sep-9114:22:00 19-Sep-9114:24:00 19-Sep-9114:26:00 19-Sep-9114:28:00 19-Sep-9114:30:00 19-Sep-9114:32:00 19-Sep-9114:34:00 19-Sep-9114:36:00 19-Sep-9114:38:00 19-Sep-9114:40:00 19-Sep-9114:42:00 19-Sep-9114:44:00 19-Sep-9114:46:00 19-Sep-9114:48:00 19-Sep-9114:50:00 19-Sep-9114:52:00 19-Sep-9114:54:00 19-Sep-9114:56:00 19-Sep-9114:58:00 19-Sep-9115:00:00 19-Sep-9115:02:00 19-Sep-9115:04:00 19-Sep-9115:06:00 19-Sep-91

3.20252.2724.25

4.403.433.253.553.283.173.133.203.082802.882.802.882.672.903.033.053.17B253.453.433.473.503.473.383.183.153.223.453.533.533.573.633.503.58

Page 106: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time Date VERTACAT-305D

OUT

15:08:00 19-Sep-91 3.6015:10:00 19-Sep-91 3.7815:12:00 19-Sep-91 3.5515:14:00 19-Sep-91 3.6515:16:00 19-Sep-91 3.4515:18:00 19-Sep-91 3.3015:20:00 19-Sep-91 3.2015:22:00 19-Sep-91 3.0315:24:00 19-Sep-91 3.03

avg 13.69

Page 107: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Test #2 — 9/19/91

Organics Tank Level

Time Date VERTACLIT-402

OUT

11:20:0011:22:0011:24:0011:26:0011:28:0011:30:0011:32:0011:34:0011:36:0011:38:0011:40:0011:42:0011:44:0011:46:0011:48:0011:50:0011:52:0011:54:0011:56:0011:58:0012:00:0012:02:0012:04:0012:06:0012:08:0012:10:0012:12:0012:14:0012:16:001 2:1 8:001 2:20:0012:22:0012:24:001 2:26:0012:28:0012:30:0012:32:001 2:34:00

19-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-91

51.5451.5451.5451.5451.5451.5451,5451.5451.5450.3950.3950.3950.3950.3950,3950,3950.3950.3950.3950.3950.3950.3950.3950.3949.3749.3749.3749.3749.3749.3749.3749,3749,3749.3749.3749.3749.3749.37

Page 108: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time Date VERTACLIT-402

OUT

12:36:0012:38:0012:40:0012:42:0012:44:0012:46:001 2:48:0012:50:0012:52:0012:54:0012:56:0012:58:0013:00:0013:02:001 3:04:0013:06:0013:08:0013:10:0013:12:0013:14:0013:16:0013:18:0013:20:0013:22:0013:24:0013:26:0013:28:0013:30:0013:32:0013:34:0013:36:0013:38:0013:40:0013:42:0013:44:0013:46:0013:48:0013:50:00

1 9-Sep-9119-9ep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-911 9-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-91

49.3749,3749.3749.3749.3749.3749.3749.3749.3749.3749.3749.3749.3749.3749.3749.3749.3749.3749.3749.3749.3749.3749.3749.3749.3749.3749.3749.3749.3749.3749.3749,3749.3749.3749.3749.3749.3749.37

Page 109: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time Date VERTACLIT-402

OUT

13:52:0013:54:0013:56:0013:58:0014:00:0014:02:0014:04:0014:06:0014:08:0014:10:0014:12:0014:14:0014:1 6:0014:18:0014:20:0014:22:0014:24:0014:26:00

, 14:28:0014:30:0014:32:0014:34:0014:36:0014:38:0014:40:0014:42:0014:44:0014:46:0014:48:0014:50:0014:52:0014:54:0014:56:001 4:58:0015:00:0015:02:0015:04:0015:06:00

19-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-911 9-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-91

49.3749.3749.3749.3749.3749.3749,3749.3749.3749.3749.3749.3749.3749.3749.3749.3749.3749.3749.3749.3749.3749.3749.3749.3749.3749.3749.3749.3749.3749.3749.3749.3749.3749.3749.3749.3749.3749.37

Page 110: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time Date VERTACUT-402

OUT

15:08:00 19-Sep-91 49.3715:10:00 19-Sep-91 49.3715:12:00 19-Sep-91 49.3715:14:00 19-Sep-91 49.3715:16:00 19-Sep-91 49.3715:18:00 19-Sep-91 49.3715:20:00 19-Sep-91 49.3715:22:00 19-Sep-91 49.3715:24:00 19-Sep-91 49.37

avg 49,65

Page 111: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Test #2 — 9/19/91

STK CO,

Time Date VERTACAT-305C

OUT

11:20:0011:22:0011:24:0011:26:0011:28:0011:30:0011:32:0011:34:0011:36:0011:38:0011:40:0011:42:0011:44:0011:46:0011:48:0011:50:0011:52:0011:54:0011:56:0011:58:001 2:00:001 2:02:0012:04:0012:06:0012:08:0012:10:0012:12:0012:14:0012:16:0012:18:001 2:20:0012:22:0012:24:001 2:26:001 2:28:0012:30:0012:32:001 2:34:00

l9-Sep-91l9-Sep-91l9-Sep-91l9-Sep-9119-Sep-9l19-Sep-9ll9-Sep-9119-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l1 9-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l19-Sep-9l

7.888.558.278.158.208.658.337.139.00

10.5510.2510.708.778.439.079.579.179.60

10 .106.327.758.488.889.158.028.137.807.888.278.308.729.008.807.258.809.007.587.77

Page 112: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time Date VERTACAT-305C

OUT

13:52:0013:54:0013:56:0013:58:0014:00:0014:02:0014:04:0014:06:0014:08:0014:10:0014:12:0014:14:0014:16:0014:18:0014:20:001 4:22:0014:24:001 4:26:001 4:28:001 4:30:001 4:32:001 4:34:001 4:36:0014:38:001 4:40:001 4:42:0014:44:001 4:46:001 4:48:0014:50:0014:52:001 4:54:0014:56:0014:58:0015:00:0015:02:001 5:04:0015:06:00

19-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-91

8.808,837.477.188.058.258.778.608.078.658.438.578.508.458.938.808.258.758.908.758.308.609.028.508.528.408.738.938.027.988.109,008.458.138.388.608.327.72

Page 113: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time Date VERTACAT-305C

OUT

15:08:00 19-Sep-91 8.3015:10:00 19-Sep-91 9.2015:12:00 19-Sep-91 8.0015:14:00 19-Sep-91 7.7015:16:00 19-Sep-91 8.3815:18:00 19-Sep-91 8.6715:20:00 19-Sep-91 8.8515:22:00 19-Sep-91 8.1015:24:00 19-Sep-91 8.05

avg8.52

Page 114: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time Date VERTACC0@7%

OUT

11:20:0011:22;0011:24:0011:26:001 1 ;28:0011:30:0011:32;001 1 -.34:0011:36:0011:38:0011:40:0011:42:0011:44:0011:46:0011:48:0011:50:0011:52:0011:54:0011:56:0011:58:0012:00:0012:02:0012:04:001 2:06:001 2:08:0012:10:0012:12:001 2:1 4:0012:16:0012:18:001 2:20:0012:22:0012:24:0012:26:001 2:28:0012:30:0012:32:0012:34:00

19-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-911 9-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-91

4.023.763.853.613.593.563,843.773.793.834.244.805.094.744.48

32.724.724,22

230.3917.304.633.994.554.149.97

13.203.593.083.153.266.093.783.663.693.54

171.6530.86

4.59

Page 115: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time

1 3:52:0013:54:0013:56:0013:58:001 4:00:001 4:02:0014:04:0014:06:0014:08:0014:10:0014:12:0014:14:0014:16:0014:18:0014:20:0014:22:0014:24:0014:26:0014:28:0014:30:0014:32:0014:34:0014:36:0014:38:001 4:40:0014:42:0014:44:0014:46:001 4:48:0014:50:0014:52:0014:54:0014:56:0014:58:001 5:00:001 5:02:0015:04:001 5:06:00

Date

19-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-91

VERTACC0@7%

OUT

3.83252.74

31.355.284.404.134,253.914.173.764.033,683.383.553.343.513,413.513.613.613.893.894.064.274.294.374.314.074.294.164,324,064.364.614.474.444.394.97

Page 116: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time Date VERTACC0@7%

OUT

15:08:00 19-Sep-91 4.5015:10:00 19-Sep-91 4.4715:12:00 19-Sep-91 4.7515:14:00 19-Sep-91 4.9315:16:00 19-Sep-91 4.2915:18:00 19-Sep-91 4.1015:20:00 19-Sep-91 3.8315:22:00 19-Sep-91 3.8415:24:00 19-Sep-91 3.87

avg15.75

Page 117: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Test #2 — 9/19/91

STK 0

Time

11:20:0011:22:0011:24:001 1 ;26:0011:28:0011:30:0011:32:0011:34:0011:36:0011:38:0011:40:0011:42:0011:44:0011:46:0011:48:0011:50:0011:52:0011:54:0011:56:0011:58:0012:00:0012:02:0012:04.0012:06:0012:08:0012:10:0012:12:0012:14:0012:16:0012:18:0012:20:0012:22:001 2:24:0012:26:001 2:28:001 2:30:0012:32:001 2:34:00

Date1

19-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-5ep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-91

VERTACAT-305B

OUT

10.649.65

10.289.839.889.30

10.0610.339.278.849.21 .8.53

10.1910.449.909.179.799.478.87

11.969.679.689.919.23

10.6810.519.469.418.899.57

10.059.599,90

10.668.959.93

10.639.18

Page 118: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time Date VERTACAT-305B

OUT

13:52:00 19-Sep-9113:54:00 19-Sep-9113:56:00 19-Sep-9113:58:00 19-Sep-9114:00:00 19-Sep-9114:02:00 19-Sep-9114:04:00 19-Sep-9114:06:00 19-Sep-9114:08:00 19-Sep-9114:10:00 19-Sep-9114:12:00 19-Sep-9114:14:00 19-Sep-9114:16:00 19-Sep-9114:18:00 19-Sep-9114:20:00 19-Sep-9114:22:00 19-Sep-9114:24:00 19-Sep-9114:26:00 19-Sep-9114:28:00 19-Sep-9114:30:00 19-Sep-9114:32:00 19-Sep-9114:34:00 19-Sep-9114:36:00 19-Sep-9114:38:00 19-Sep-9114:40:00 19-Sep-9114:42:00 19-Sep-9114:44:00 19-Sep-9114:46:00 19-Sep-9114:48:00 19-Sep-9114:50:00 19-Sep-9114:52:00 19-Sep-9114:54:00 19-Sep-9114:56:00 19-Sep-9114:58:00 19-Sep-9115:00:00 19-Sep-9115:02:00 19-Sep-9115:04:00 19-Sep-9115:06:00 19-Sep-91

9.288.749.929.34

10.099.979.269.24

10.349.359.889.319.399.689.259.53

10,019.459.259.179.599.309.129.769.669.779.709.38

10.6110.3910.529,079.68

10.309.799.589,82

10.92

Page 119: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time Date VERTACAT-305B

OUT

15:08:00 19-Sep-91 9.8015:10:00 19-Sep-91 9.1815:12:00 19-Sep-91 10.4815:14:00 19-Sep-91 10.6215:16:00 19-Sep-91 9.7415:18:00 19-Sep-91 9.7115:20:00 19-Sep-91 9.3015:22:00 19-Sep-91 9.9815:24:00 19-Sep-91 10.05

avg 9.74

Page 120: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Test #2 — 9/19/91

STK Air Flow

Time Date VERTACFT-304OUT

11:20:00 19-Sep-91 26884.0911:22:00 19-Sep-91 27241,1411:24:00 19-Sep-91 27164,8811:26:00 19-Sep-91 27356,0011:28:00 19-Sep-91 26997.2711:30:00 19-Sep-91 26794.9611:32:00 19-Sep-91 27093.0411:34:00 19-Sep-91 27156.1111:36:00 19-Sep-91 27327.8711:38:00 19-Sep-91 28056.7811:40:00 19-Sep-91 28038.5411:42:00 19-Sep-91 29410.4911:44:00 19-Sep-91 29724.0811:46:00 19-Sep-91 29349.7111:48:00 19-Sep-91 29447.1011:50:00 19-Sep-91 29820.0911:52:00 19-Sep-91 29642.4611:54:00 19-Sep-91 29361.8311:56:00 19-Sep-91 29847.9611:58:00 19-Sep-91 29410.7512:00:00 19-Sep-91 28089.5712:02:00 19-Sep-91 27898.3412:04:00 19-Sep-91 28382.6212:06:00 19-Sep-91 28159.0812:08:00 19-Sep-91 28438.5312:10:00 19-Sep-91 27926.5212:12:00 19-Sep-91 28516.3112:14:00 19-Sep-91 28125.1612:16:00 19-Sep-91 28647.3112:18:00 19-Sep-91 28483.3612:20:00 19-Sep-91 29305.8412:22:00 19-Sep-91 28940.2212:24:00 19-Sep-91 29335.5912:26:00 19-Sep-91 29385.9212:28:00 19-Sep-91 28799.8912:30:00 19-Sep-91 28948.7712:32:00 19-Sep-91 28864,8112:34:00 19-Sep-91 29154.11

Page 121: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time Date VERTACFT-304OUT

12:36:00 19-Sep-91 28683.9312:38:00 19-Sep-91 28497.6512:40:00 19-Sep-91 28329.3812:42:00 19-Sep-91 28244.5212:44:00 19-Sep-91 28153.9112:46:00 19-Sep-91 28373.4112:48:00 19-Sep-91 28278.1212:50:00 19-Sep-91 28941.7512:52:00 19-Sep-91 28727.4112:54:00 19-Sep-91 28536.8812:56:00 19-Sep-91 28265.4612:58:00 19-Sep-91 28493.9413:00:00 19-Sep-91 28495.0713:02:00 19-Sep-91 28232.5813:04:00 19-Sep-91 28728.3213:06:00 19-Sep-91 28883.8913:08:00 19-Sep-91 28193.1413:10:00 19-Sep-91 28420.4413:12:00 19-Sep-91 28942.8713:14:00 19-Sep-91 28985.3313:16:00 19-Sep-91 28931.6413:18:00 19-Sep-91 28786.6813:20:00 19-Sep-91 28923,4013:22:00 19-Sep-91 28513.7813:24:00 19-Sep-91 28921.2913:26:00 19-Sep-91 28410.7313:28:00 19-Sep-91 28574.7413:30:00 19-Sep-91 28608,5113:32:00 19-Sep-91 29000.6113:34:00 19-Sep-91 28517.6713:36:00 19-Sep-91 28922.7313:38:00 19-Sep-91 28720.6113:40:00 19-Sep-91 28843.931 3:42:00 1 O-Sep-91 28026.1 413:44:00 19-Sep-91 28296.3213:46:00 19-Sep-91 27974.9513:48:00 19-Sep-91 27958.0213:50:00 19-Sep-91 28040.26

Page 122: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time

13:52:001 3:54:0013:56:0013:58:0014:00:0014:02:0014:04:0014:06:001 4:08:0014:10:0014:12:0014:14:0014:16:0014:18:001 4:20:001 4:22:001 4:24:001 4:26:001 4:28:001 4:30:0014:32:0014:34:001 4:36:0014:38:0014:40:0014:42:0014:44:0014:46:0014:48:0014:50:0014:52:0014:54:0014:56:001 4:58:0015:00:0015:02:001 5:04:0015:06:00

Date

19-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-91

VERTACFT-304OUT

28162.0228252.6528619.9628185.3929516.9329096.8828765.3128629.7128816.4428419.1228377.7128785.7628363.8228241.6928562.7729242.5129065.8329113.3229159.9828999.2229078.6829412.1628817.4028624.7228535.0027915.3128251.2128178.0128330.8029224.3829254.3428936.5129437.2828746.7529148.5928423.8127436,8027530.23

Page 123: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

Time

15:08:0015:10:0015:12:0015:14:0015:16:0015:18:001 5:20:0015:22:001 5:24:00

Date

19-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-91

VERTACFT-304OUT

27307.3827457.7327396.1927330.6227323.5027379.8627359.7927307.5427600.25

av28471.77

Page 124: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

VERTAC SITE CONTRACTORS1 Joint Venture

INTER-OFFICE CORRESPONDENCE

TO: Fred Fowler DATE: September 23, 1991LOCATION; Site FROM: Mike Keller ^SUBJECT; BTU/Chloride Results LOCATION: Contract 3810

Jacksonville, AR

^Attached for your information are the BTU/Chloride results for COwaste feed samples collected during the engineering burns on 9-18, (M19-1991. Q

0

cc: Bob ApaDan Fuller

——I

3

Page 125: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

WF09189101WF09189102WF09189103WF09189104WF09189106WF09199101WF09199102WF-9199103

Organic waste collected 9-18-91, 1330 Hrs.Solid waste collected 9-18-91, 1330 Hrs.Organic waste collected 9-18-91, 1515 Hrs.Organic waste collected 9-18-91, 1615 Hrs.Solid waste composite collected 9-18-91Solid waste collected 9-19-91, 1130 Hrs.Organic waste composite collected 9-18-91Solid waste composite collected 9-19-91

Sample No.WF09189101WF09189102WF09189103WF09189104WF09189106WF09199101WF09199102WF09199103

BTWLB

774071307870766065406600

**74307140

% Chloride*

2 9 . 944.746.725.125.242.227.0

* Detected result higher than calculated theoretical value foranalytes of interest

** Organic fraction only, water content was 16.5% by volume.

Page 126: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

CAE Offices CAE Departments

Corporate Office:500 W. Wood St.Palatine, Illinois 60067708-991 -3300800-627-0033

Regional Offices:Colorado6830 N. Broadway, Suite 1Denver, Colorado 80221303-650-9745

CAE Source TestingCAE Analytical ServicesCAE Mobile LaboratoriesCAE CombustionCAE Diagnostic ServicesCAE Instrument RentalCAE ExpressCAE ExemplarCAE SeminarsEnviroTemps

California1017 Mark AvenueCarpinteria, California 93013805-684-0070

7691 Liberty AvenueHuntington Beach, California 92647714-841-1004

PennsylvaniaPittsburgh InternationalIndustrial ParkSuite 301, Route 978Oakdale, Pennsylvania 15071412-695-2950

BelgiumBrusselsesteenweg70A1860 Meise, Belgium

Page 127: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

CAE Combustion CAE DiagnosticServices

CAE InstrumentRental

Because of the regulatoryand operational complexityof incinerators, CAE hasdeveloped this specialtytesting department. Thisgroup provides a wide varietyof engineering consultingservices for municipal incin-erators, hospital wasteincinerators and RCRA/TSCAincinerators. CAE is highlyexperienced in all phases ofcompliance testing forcombustion systems fromdevelopment of the samplingand analytical matrix to per-formance of all data reduction,validation and reporting.

The combustion groupprovides engineeringconsulting services for:

a Trial burn assistance0 ORE determination0 Municipal refuse

incinerator testing0 Boiler efficiency studies0 HVT samplingO Continuous emission

monitoring consulting0 Design calculations0 Air pollution control

permitsO Energy recovery designO Multi-metals sampling0 Volatile/semi-volatile

organics0 RCRA/TSCA incinerator

testingO Air toxic assessmentsO Hospital waste incinera-

tion

CAE Diagnostic Servicesoffers performance diagnosisand troubleshooting servicesfor electrostatic precipitatorsand flow control or directingdevices. This group providescomputer modeling, laboratoryresistivity measurements,physical flow modeling, fieldtesting and particulate char-acterization. Computer mod-eling applications includeresistivity, precipitatorperformance and gas flow.Three-dimensional scalemodels of pollution controlequipment, system duct workor stacks can determine thegas flow distribution, pressuredrop and proper van ing foroverall system efficiency.

Furthermore, the Diagnosticdepartment performs thefollowing:

0 Inspection & evaluationof precipitator charac-teristics

0 Laboratory resistivitystudies

O 3-D gas flow modeling0 Particulate characte-

rization: resistivity,size, density, chemistry

0 Field flow measurementO ESP evaluation &

consulting0 Selection of coals0 Fluid dynamics

CAE Instrument Rental offersa diversified line of gasmonitors for both source andambient air applicationsincluding Oy CO,, CO, NO,,SO,andTHC. A variety ofindustrial hygiene andpersonal survey tools areavailable as well as dataacquisition systems, calibra-tion materials and samplingsupplies.

Our equipment includes:

0 Source gas monitors0 Ambient air monitors0 Source gas sampling

equipment0 Industrial hygiene tools0 Field screening

equipmentn Calibration materials

EnviroTemps

EnviroTemps provide trainedenvironmental professionalsfor temporary assignments.From CEMS specialists,chemists or EPA Method t-25technicians, EnviroTemps can-supply the quality support youneed—(or as long as youneed; A full-service temporarysupport firm, EnviroTempscoordinates alt administrativedetails and monitors person-nel while in the field. Areasof specialization include:

0 Air quality0 Industrial hygiene0 Hazardous waste

management

Page 128: Performed for: VERTAC SITE CONTRACTORS · 2020-06-13 · stack gas velocity (ft/sec) gas meter correction factor (dimenslonless) VERTAC SITE CONTRACTORS CAE Project No: 5815 ... Duct/Stack

CAE Source Testing CAE AnalyticalServices

CAE MobileLaboratories

CAE engineers are profes-sional experts in air pollutionemission measurements.They possess an in-depthunderstanding of both theemission sources as well asthe control equipment beingevaluated. Our engineersselect the significant variablesto be measured during a lestprogram in order to providethe most meaningful data.CAE can help clients developa plan for evaluating andcontrolling emissions to meetlegislative standards. CAEutilizes the most appropriateEPA, ASME or NIOSHMethod depending uponsituational requirements.

These services include:

0 Compliance planning &status determination

O Pollution control deviceperformance evaluation

0 Emission inventories(Oy CO, CO;, SO,, SOg,N0 , TRS, multi-metals,and particulates)

D Visual emissionsmonitoring

0 Velocity & temperaturetraversing

0 CEMS PST auditsO In situ resistivity & particle

sizing measurements0 Total hydrocarbon

determination

CAE's in-house laboratoryprovides technically accurateand timely chemical analysis.We can perform analyses fora variety of organics andinorganfcs including NO , SO/SO,, H;S, VOCs and chlo-rides. Our comprehensivequality control programguarantees the accuracy ofany analysis. CAE Analyticalprides itself on providingclients with the most modern,accurate and cost-effectivesample preparation andanalysis available. We offera full range of qualitative andquantitative analytical servicesincluding:

0 Air qualityO Water quality0 Toxic & hazardous waste

identification0 Occupational safety &

health

The staff uses a variety ofinstrumental and wet chemicalmethods including:

0 Chemical spectroscopy0 Gas chromatography of

air, liquids, soil & watersamples.

D Atomic absorptionspectroscopy of watersoluble analytes

0 EPA Method 25

CAE has developed mobileanalytical laboratories inresponse to an increasingcustomer demand for fasterturnaround of test results.CAE's mobile laboratories areequipped with state-of-the-artinstrumentation, and arestaffed with experiencedchemists. On-site analysisLOalso results in significant <-<-reduction in analytical costs.

COOur services include: CM

O Portable gas chromatog'raphy 0

0 Identification & characteri-zation of VOCs

0 Analysis o( unstablecompounds

0 Soil & water screeningO Total reducedsulfur

characterization (TRS) &EPA Methods 15 & 16

0 Ambient emissionstesting for OStiA*NIOSH compliance

0 Well monitoring samplescreening.

0 Fugitive emissions

CAE Express CAE IndustrialHygiene

CAE Express providesemergency equipment sales.Delivery is guaranteed within24-hoursfor:

0 Source samplingequipment

0 Source sampling suppliesO CEM system hardware

CAE's industrial hygieneservices include:

D OSHA compliance audits("I. EPA compliance audits0 Hazardou& waste manage-

ment0 Medical waste management0 SARA Title 313 reporting