7/31/2019 Ph II Proposal
1/56
Sub:- WLL BSNL telephone connection in different important palces as mentioned below:
1. BTG Control Room (U#1 & 2)- 1 set2. DM Plant (Control /PLC Room)- 1 set3. CWPT ( PLC Control Room)- 1 set
In these three places each 1 no. WLL BSNL Phone is urgently required.
For Control Room- It is essential for connecting DM Plant & CWPT Control room.
For DM Plant- Hazardous materials like Conc. Hydro Chloric Acid, Caustic Soda
Lye is unloaded through pump and it is used for different works. Hence, it is
essential for placing a WLL BSNL Phone in Control Room.For CWPT- CWPT& RWPH area is located in isolated area. Chlorination plant is there.
Number of Chlorine cylinders is stayed here , hence, it is essential for placing a WLL
BSNL Phone in this area i.e. in PLC Control room of CWPT.
Sr. Chemist Gr.-I
Operation Superintendent, MTPS Ph-II
7/31/2019 Ph II Proposal
2/56
Sub : Administrative approval for procurement of 100 MT of
Hydro Chloric Acid for MTPS Phase-II.
M/s L & T has supplied about 28.5 MT of hydrochloric acid for
commissioning of DM plant. Out of which 12 MT of hydrochloric acid has been consumed to
produce 7000 M3
DM water. Balance 16.5 MT of acid will meet up our requirement for
production of about 20000M3
DM water. Our requirement of DM water is about 22000M3
per unit e. g. EDTA cleaning of Boiler, steam blowing for different pipe lines, steam
dumping, Rolling of steam turbine and various consequent activities like Coal
synchronization & Oil synchronization of U# 7 & 8 vis-a-vis stabilization of the units.
Apprehending exigency situation likely to surface during initial operation of units, it will be
a safer proposition to procure 100MT of acid to combat the condition like contamination,
leakages etc., so that delay on account of availability of DM water is avoided. It is feltessential to procure 100 MT of acid in 6 consignments (15 to 18 MT of each consignment).
Total cost involvement will be Rs.3,99,500.00 (Rupees three lac ninety nine
thousand and five hundred) only as per the budgetary offer received from M/s Standard
products Pvt. Ltd., Kolkata, who is DVC authorized vendor. Budget provision exists in BE
2010-11 under the head Capital Budget. Since there is no budget for (O & M), the
procurement is proposed under Capital Budget. Administrative approval for procurement of
100 MT acid through LTE among the following vendors may kindly be accorded.
Name of the Bidders: Regn. No.
1. M/s Standard Products Pvt. Ltd.258/4, Acharya Prafulla Chandra Road, 7253
rdFloor, Kolkata-700006, Mob.-9830112755
2. M/s Surendra Chemicals Ltd.,5/2, Clive row, Room No.64, 327
3rd
Floor, Kolkata-700006, Phone-03322306471
3. M/s Vishnu Trade Centre,5/1, Clive Row, Suite-48, 398
Kolkata-700001,
4. M/s Shakambari Enterprises (India) Pvt. Ltd.1/1 A, Nandalal Mallick Lane,
Kolkata-700006
(K.K.Chatterjee)
Sr. Chemist Gr.-I
MTPS Phase-II
No. MT/Chem Lab/Phase-II/ dated:
SE(M), Commissioning in charge, MTPS, Phase-II
7/31/2019 Ph II Proposal
3/56
Sub : Administrative approval for procurement of 100 MT of
Caustic Soda Lye for MTPS Phase-II.
M/s L & T has supplied about 14.5 MT of Caustic soda Lye for
commissioning of DM plant. Out of which 5 MT of Caustic has been consumed to produce
7000 M3
DM water. Balance 7.5 MT of acid will meet up our requirement for production of
about 20000M3
DM water. Our requirement of DM water is about 22000M3per unit e. g.
EDTA cleaning of Boiler, steam blowing for different pipe lines, steam dumping, Rolling of
steam turbine and various consequent activities like Coal synchronization & Oil
synchronization of U# 7 & 8 vis-a-vis stabilization of the units. Apprehending exigency
situation likely to surface during initial operation of units, it will be a safer proposition to
procure 50MT of caustic to combat the condition like contamination, leakages etc., so that
delay on account of availability of DM water is avoided. It is felt essential to procure 50MT
of caustic in 4 consignments (12 to 13 MT of each consignment).Total cost involvement will be Rs.10,96,750.00 (Rupees ten lac ninety six
thousand seven hundred and fifty) only as per the budgetary offer received from M/s
Standard products Pvt. Ltd., Kolkata, who is DVC authorized vendor. Budget provision exists
in BE 2010-11 under the head Capital Budget. Since there is no budget for (O & M), the
procurement is proposed under Capital Budget. Administrative approval for procurement of
50 MT caustic soda lye through LTE among the following vendors may kindly be accorded.
Name of the Bidders: Regn. No.
1. M/s Standard Products Pvt. Ltd.258/4, Acharya Prafulla Chandra Road, 725
3
rd
Floor, Kolkata-700006, Mob.-98301127552. M/s Surendra Chemicals Ltd.,5/2, Clive row, Room No.64, 327
3rd
Floor, Kolkata-700006, Phone-03322306471
3. M/s Vishnu Trade Centre,5/1, Clive Row, Suite-48, 398
Kolkata-700001,
4. M/s Shakambari Enterprises (India) Pvt. Ltd. 3821/1 A, Nandalal Mallick Lane,
Kolkata-700006
(K.K.Chatterjee)
Sr. Chemist Gr.-I
MTPS Phase-II
No. MT/Chem Lab/Phase-II/ dated:
SE(M), Commissioning in charge, MTPS, Phase-II
7/31/2019 Ph II Proposal
4/56
Sub: -Administrative approval for procurement of 25MT Caustic Soda Lye asrepeat order basis (50%) for DM Plant.
Ref:- Our P.O. No. MT/CE (Const.)/Chem lab/ phase-II/KC/32 dt. 24.06.2010
Present stock of Caustic Soda Lye is 18 MT. With this stock of Caustic it is
possible to cater the demand of U#7&8 for 30 days only. The total supply of materials
against last P.O has already been received. A fresh proposal vide No. MT/CE(Const.)/Chem
Lab Ph-II/KC/113 dated 26.09.10 for procurement of 60 MT Caustic Soda Lye on LTE basis
has been initiated which is in process in technical section. It will take some more time to
finalize the contract.U#1 is under stabilization and U#2 is likely to be oil synchronized in the
month of October. As such huge quantity of DM water will be required to keep thecommissioning activities unabated. Caustic soda lye is required for production of DM water.
In view of the above circumstances and considering procurement lead time
it is felt essential to procure 25MT of Caustic Soda Lye by placing a repeat P.O. on M/s
Shakambari Enterprise (India) Pvt. Ltd. against P.O. No. MT/ CE (Const.)/Chem lab/ phase-
II/KC/32 dt.24.06.2010 which will meet our requirement of another 45 days. Against our
verbal query the party has agreed to supply 25 MT of the Caustic Soda Lye at the same rate,
terms and condition. The party has also confirmed that there is no downward trend in the
price of the Caustic Soda Lye. By this time it is expected that the new contract /P.O. will be
finalized. It may be noted that the original P.O. was finalized through LTE.Total cost for 25
MT Caustic Soda Lye will be Rs.5,72,500.00 (Rupees five lac seventy two thousands and fivehundred) only. Budget provision exists at Sl.No.11 under the head Non EPC vide sanction
order No. EDCON/Mech/MTPS Ph-II/810 dated 03.12.2009.
Hence, it is proposed to arrange for administrative approval from the
competent authority for procurement of 25 MT of Caustic Soda Lye at the same rate, terms
& conditions of the above referred P.O.
Senior Chemist Gr.-I
MTPS, DVC
Enclo:-1. Demand Note2. Xerox copy of last P.O.3. Letter from the Party
No. MT/CE(Const.)/Chem.Lab. Ph-II/ Dated 04th
October10
SE(M),Commissioning, MTPS Ph-II
In view of the essential requirement of caustic for DM water production as stated above,
the subject procurement on repeat order basis is hereby recommended. The proposal
fulfills all the clauses of Sl.No.13 (i) of DFP (GS). The proposal may kindly be approved as
per DFP (GS), Sl.No.13 (i).
SE (M), Commissioning
DCE(M), Construction,MTPS Ph-II
7/31/2019 Ph II Proposal
5/56
Sub: Administrative approval for procurement of 1 no. Godrej make acid alkali proof
table for DM Plant Laboratory for MTPS Ph-II.
DM Plant of MTPS Ph-II has been running since 14.01.10 on regular basis to
meet up huge requirement of DM water in view of commissioning activities of U# 1& 2,
MTPS Ph-II. Testing of different water samples on routine basis is essential for production of
quality DM water and to conduct chemical testing with the help of basic equipments, an
acid alkali proof testing table is required.
As such, it is proposed to procure a laboratory testing table Godrej Make (Picture
enclosed). It will not be out of place to mention that Source Standardization for Godrej
make furniture in DVC exists vide office order No.CMM/Genl./1813 dated 16.12.09. The said
SS may please be extended for the purpose of Lab. testing table as stated above.Total estimated cost involvement will be Rs.2,49,398.00 (Rupees two lakh forty
nine thousand three hundred and ninety eight) only as per the price received from M/s
Godrej Company. Budget provision exists at Sl.No.11 under the head Non EPC vide sanction
order No. EDCON/Mech/MTPS Ph-II/810 dated 03.12.2009. Administrative approval for
procurement of the above mentioned furniture from M/s Godrej Co. Ltd. on source
standardization basis may kindly be accorded.
Enclo:
1. Picture & Price of Lab testing table.2.
Demand Note3. BUSSr. Chemist Gr.-I
MTPS Phase-II
SE(M), Commissioning-in-charge, MTPS, Phase-II
In view of the circumstances stated above for making Chemical laboratory of DM plant
full- fledged functional , the proposal of the Sr. Chemist is recommended and
forwarded for kind approval of Chief Engineer (Const.), MTPS.
SE(M)
Commissioning
DCE(M), Construction MTPS Ph-II
No.MT/SE(Comm.)/Ph-II/05/132 dated 29.09.2010
Recommended for kind approval of the proposal alongwith the names of the
committee member for Source Standarisation for the subject material.
1. Sri S.Haq Khan, SE(M), Commissioning
2. Sri N.C.Mandal, SE(T)3. Sri A.Mitra, JFA
DCE(M), Construction
Chief Engineer (Const.), MTPS
Approved as proposed
Chief Engineer(Const.)
DCE(M), Construction, MTPS Ph-II
7/31/2019 Ph II Proposal
6/56
7/31/2019 Ph II Proposal
7/56
List of Furnitures
Sl.No. Description Model No. To be procured Rate(Rs.)
01 Lab Testing Table Picture
enclosed
2Nos. 249398.00
Total Rs.249398.00
(Rupees two lakh forty nine thousand three hundred and ninety eight) only
Sr. Chemist Gr.-I
MTPS, Phase-II
7/31/2019 Ph II Proposal
8/56
Sub: Proposal for procurement of a) 1 no. Portable pH meter, 1 no.
Portable Conductivity meter, 1 no. Portable Turbidity meter
and 1 no. Portable Silica analyzer on urgent basis for ChemicalLaboratory, DSTPS U#1&2
DSTPS U#1& 2 Chemical Laboratory is now in commissioning stage and no
basic instrument is available in the laboratory till now. An order was placed on M/s BHEL
for supply of some instruments, but no instrument has been supplied till date, which even if
supplied by M/s BHEL, still would not suffice our requirement. We are in need of portable
type instruments to be used at site and in different locations like CWPT, DMPT, DM Plant,
Boiler & Main Steam sample floor instead of within the Laboratory floor. The said
instruments does not come within the purview of M/s BHEL's scope of supply. DMPT & DM
Plant commissioning is completed and PG test is to be done very soon. EDTA cleaning andsteam blowing has been completed successfully. We have managed the situation for testing
during all the activities as mentioned above with the help of our DTPS Chemical Laboratory
&MTPS Chemical Laboratory (Phase-I&II ). Steam dumping, Oil Synchronization and coal
synchronization are the next activities coming up very soon. In 500MW unit steam quality is
to be maintained stringently within the stipulated parameter. So, water conditioning & DM
Plant monitoring is very much essential to get requisite parameter in the boiler water &
steam cycle.
For monitoring this type of parameters sophisticated instrument as
mentioned above are very much essential. The existing O & M plant of MTPS Ph-I&II
(Chemical laboratory) possesses instruments like pH & Conductivity meter (Portable) of M/s
Merck (India) Ltd. make and have shown proven performance over a period of 8 (Eight)
years approximately. Since such type of instruments is normally procured as one time
measure having a life of 10 years. Hence, it is not desirable to go for experimenting with a
different make.
Considering above it is proposed to source standarised on M/s Merck(India)
Ltd. for this instruments only for a period of 2 to 3 years. Total cost involvement was
Rs.367000.00 (Rupees three lac sixty seven thousand) only as per budgetary offer submitted
by M/s Merck India Ltd. Since there is no budget for (O & M), the procurement is proposed
under Capital Budget.
Hence, it is requested to accord administrative approval of the competent
authority for procurement of 1 no. Portable pH meter, 1 no. portable Conductivity meter,1 no. portable turbidity meter & 1 no. portable silica analyzer on single source basis.
Enclo:
1. Budgetory offer of M/s Merck (India) Ltd.Sr. Chemist Gr.-III
DSTPS U#1&2
No. DSTPS/CE(Const.)/Chem Lab/U1&2/12 dated 26.03.10
SE(M), Commissioning in charge, DSTPS U#1&2
7/31/2019 Ph II Proposal
9/56
Sub: Proposal for procurement of 1 no. portable Dissolved
Oxygen Analyser on urgent basis for Chemica Laboratory,MTPS Ph-II
MTPS Phase-II Chemical Laboratory is now in commissioning stage and no basic
instrument is available in the laboratory till now for measuring ppb level dissolved oxygen in
primary water circuit of Generator.
An order was placed on M/s BHEL for supply of some instruments, but no instrument has
been supplied till date, which even if supplied by M/s BHEL, still would not suffice our
requirement for these purpose as this instrument does not come within the purview of M/s
BHEL's scope of supply .We are in need of portable type instruments for measuring Dissolve
Oxygen in Primary Water Circuit as and when required in the spot. We have managed thesituation for measuring dissolve oxygen with the help of our existing Chemical Laboratory
(Phase-I), but it is very tough to measure day to day basis .Coal synchronization are the next
activities coming up very soon. Also it is very important that we have to measure Dissolve
Oxygen in dfferent locations as in Economiser Inlet, Hot well and in many other points.
For monitoring this type of parameters sophisticated instrument as mentioned
above are very much essential. The existing O & M plant of MTPS (Chemical laboratory)
possesses instruments like Dissolved Oxygen meter (Portable) of M/s Hach Company make
and have shown proven performance over a period of 3 (Three) years approximately. Since
such type of instruments is normally procured as one time measure having a life of 10 years
then, it is not desirable to go for experimenting with a different make.
Considering above it is proposed to source standarised on M/s Hach Company for
this instruments only for a period of 2 to 3 years. Total cost involvement was about
Rs.7,00,000.00 (Rupees seven lac) only as per budgetary offer submitted by M/s Hach
Company. Since there is no budget for (O & M), the procurement is proposed under Capital
Budget section NON EPC Sl.No.6 in Contigency expenditure vide sanction order No. EDCON/
Mech/MTPS Ph-II/810 dated 03.12.2009.
Hence, it is requested to accord administrative approval of the competent
authority for procurement of 1 no. portable Dissolved Oxygen Analyser on urgent basis for
Chemica Laboratory, MTPS Phase-II.
Enclo:1. Budgetory offer of M/s Hach Company
Sr. Chemist Gr.-I
MTPS Phase-II
No.MT/CE(Const.)/ChemLab/Ph-II/ dated 26.07.10
SE(M), Commissioning in charge, MTPS Phase-II
7/31/2019 Ph II Proposal
10/56
Sub:- Status of Heavy chemical procurement for use in Water Treatment & DM Plant.
Ref: 1. Contractual Clause no. of M/s L&T and DVC(Clause No.2.08.03)
2.Letters issued by SE(M), Commissioning regarding supply of Chemical
by M/s L&T till PGTR.
3. Letter of M/s L&T in this regard
a) DM Plant of MTPS Ph-II has been producing DM water since 14.01.10 for different
commissioning activities and till date about 30000M3
of DM water produced.
b) Commissioning wing has pointed out defficienciy mentioned in PWS package regading
erection as well as operation of plant.
c) Vide ref. 2 commissiong wing has separately pointed out to M/s L&T to continue supply
of chemicals till PG test, which has not evoked any positive response and M/s L&T hasreplied in that line vide ref: 3.
d) Successful PGTR could not be carried out as M/s L&T has not commissioned the system in
totality and the deficiencies were brought to their notice vide MOM dated 23.06.10 , which
are yet to be rectified fully. DVC has further communicated to M/s L&T that onus for not
conducting successful PGTR lies solely on M/s L&T and as per contaractual clause they are
bound to supply chemicals till successful PGTR, failing which DVC will be compelled to
deduct the cost of chemicals incurred by DVC till PGTR.
e) Since continuity of all the plant activities related to commissioning/ oil
synchronisation/coal synchronisation of U# 1 and other commissioning activities like hydro-
test/Leakage test etc. for U# 2 are dependent on supply of DM water, CW water.Apprehending disruption of all the above activities under letter ref. No.(3) DVC has already
initiated procurement action for chemicals and placed 3 nos. of Purchase Orders for Alum,
Acid & Caustic.
At this point of tune when orders which have already been executed their payments are to
be made, as objections are being issued by the accounts department regarding payment
orders Vis-a-Vis contractual clause ref: 1.
In view of the above your goodself is requested to provide kind guidelines of the subject so
that fate of the existing P.O.,s are not jeoparadised nor it invites criticism. This notesheet is
initiated in view of the fact that delay in procurement / supply of chemicals can hault the
plant activities leading to delay in proposed synchronisation and other commissioning
activities, causing loss of generation.
Sr. Chemist Gr.-I
MTPS Ph-II
No.MT/CE(Const.)/Chem lab/Ph-II/ dated 17th
July2010
SE(M), Commissiong in charge, MTPS Ph-II
7/31/2019 Ph II Proposal
11/56
Sub: Maintainence work of DM Plant till PGTR
It is being observed that a number of problems are being faced by Lab personel in
running the plant on daily basis which requires tit bit maintenance work. As PGTR has not
been conducted till date DVC cannot conduct any maintenance work and thus it is solely
responsibilities of M/s L&T to attend the day to day troubles, so that disruption in work can
be avoided till PGTR.
In view of the above M/s L&T may be requested to arrange for rectifications of the
problems at the earlieast by using the agencies under their control, including attending day
to day trouble.
This may please be treated as most urgent.
Sr. Chemist Gr.-I
MTPS Ph-II
SE(M), Commissiong in Charge, DVC,MTPS Ph-II
7/31/2019 Ph II Proposal
12/56
Sub:- Budget Provision for purchase of Instruments in Chemical laboratory MTPS Ph-II
vide P.O. No. MT/CE(Const.)/Chem lab/Ph-II/KC/31 dated 21.06.10.
Furniture, Instruments, Reagents, Glass Wares etc. that are proposed to be
procured for setting up of the Chemical Laboratory in MTPS Ph-II. It is underlined that the
equipments proposed are not covered in the scope of supply of M/s BHEL. As O&M wing has
not been formally constituted so the Budget provision for O&M has not yet been made thusthe payment of the above referred P.O. may be made in Capital Head, NON EPC Budget
vide sanction order no. EDCON/Mech/MTPS Ph-II/810 dated 03.12.2009 vide Sl.No.6 in the
head Contingency.
Thus it stands and simply clarified that the purchase will not face any problems as
regard to payment.
Sr.Chemist Gr.-I
MTPS Ph-II
SE(M), Commissioning in Charge, DVC, MTPS Ph-II
7/31/2019 Ph II Proposal
13/56
Sub:- On-line Chemical Treatment of CW system for U#1 & 2, MTPS Ph-II
The following points for your information regarding on-line Chemical
Treatment of CW system:
1. The pH of input Raw Water for MTPS Ph-II is around 8.5 and it is notpossible to reduce the ph of CW Make Up water( around 7.6-7.8) only
with alum dosing
2. There is a provision for on-line Chemical Treatment along with Aciddosing of CW water and the work order lies with M/s Ion Exchange(I0Ltd.(order copy enclosed, order awarded by M/s BHEL) but nothing has
been intiated by either M/s BHEL or M/s Ion Exchange.
3. On the above context it is our suggestion from the Chemistry side thatwithout proper Chemical Treatment and acid dosing, CW system should
not run, as it will have a tremendous negative Impact on condenser
tubes in future.
It is our past experience from U# 4 of MTPS Ph-I, the negative
impact of condenser tubes occurs due to the situation as mentioned
above.4. It is hereby requested to consider the above points prior to put service
CW system.
SR. Chemist Gr.-I
MTPS Ph-II
SE(M), Commissioning in Charge, MTPS Ph-II
7/31/2019 Ph II Proposal
14/56
Sub: For smooth running of CWPT, CW Pump House, CWPT, RW Pump House
As DMPT is exclusively for DM Plant, so,to maintain good quality of
DM Feed water it is essential to introduce a ARC/AMC of DMPT on urgent
basis, as we are facing very much problem to run DM Plant smoothly. Proper
dosing of alum and other chemicals is not possible by us for inadequatemanning of MTPS Ph-II Laboratory.
Hence, it is requested to give permission for engagement of an
outside agency who has credential to perform this type of job on urgent basis
vide DFP 5.5 (i) for 3 months from 01.09.10 and later on the work can be given
through LTE basis.
Sr. Chemist Gr.-I
MTPS Ph-II
SE(M), Commissioning in Charge, MTPS Ph-II
7/31/2019 Ph II Proposal
15/56
Sub :- Administrative approval for procurement of 2000Kg of
Hydrazine Hydrate-80%, conforming to IS: 12086(1987)Hydrazine Hydrate-80% is used as a oxygen scavenger for maintaining the good
health of Boiler. Present stock of Hydrazine Hydrate-80% is Nil. Presently M/s BHEL has
been supplying hydrazine hydrate for commissioning of the units. COD of U#1 MTPS Ph-II is
expected shortly. So, after COD there is a daily requirement of Hydrazine Hydrate for
keeping good health of the boiler. Hence, it is proposed to procure 2000Kg. of Hydrazine
Hydrate which will cater the requirement of approximately 1(One) year.The strength & thequality of the said chemical will not deteriorate during the period of 1(One) year. Total cost
involvement will be around Rs.2,43,000.00 (Rupees two lac forty three thousand) only. Price
has been evaluated on the basis of price from the last P.O. dated 17.07.09 of MTPS Ph-I.
Therefore, it is proposed to arrange for obtaining administrative approval from
the competent authority for procurement of 2000Kg Hydrazine Hydrate-80% through LTE
basis among the following bidders. Budget provision exists in NON EPC Sl.No.6 in
Contingency expenditure vide sanction order No. EDCON/ Mech/MTPS Ph-II/810 dated
03.12.2009.
1. M/S Everlight International, 4, Synagogue Street, Room no.-9059-th Floor, Kolkata-700001, Regn. No.47
2. M/S Surendra chemicals & Industries,5,Clive row, Room No.-64 (3-rd Floor),
Kolkata-700001,Regn. No.327
3. M/S Vishnu Trade Centre ,5/1, Clive Row, 2-nd Floor, Kolkata-700001, Regn. No.398
4. M/S Standard Products Pvt.Ltd. ,258/4, Acharya Prafulla Chandra Road,
3-rd Floor, Kolkata-700006, Regn.No.7255. M/s Sunil Chemicals,9, India Exchange Place, 4th Floor, Room No 4/4D,
Kolkata-700001, Regn. No.12
6. M/S Shakambari Enterprise(India) Pvt.Ltd., 1/1/A, Nanda Mallick Lane,
Kolkata-700006, Regn. No.382
Sr. Chemist Gr.-IMTPSPh-II
Enclo:-
1. BUS2. Demand Note
MT/CE(Const.)/Chem. Lab. Ph-II/KC/78 dated 21stAugust2010
SE(M),Commissioning in Charge, MTPSPh-IIRecommended & forwarded in view of the above circumstances stated above and
procurement lead time. Administrative approval may kindly be accorded along withapproval of names of the bidder.
SE(M), Commissioning
DCE(M), Construction, MTPS Ph-II
7/31/2019 Ph II Proposal
16/56
Sub :- Administrative approval for procurement of 2000Litre of
Liquor Ammonia(25%),AR/LR conforming to IS:799-1985,2
ndRevision
Liquor ammonia is used for chemical conditioning of boiler water. Present stock
of Liquor ammonia is Nil. Presently M/s BHEL has been supplying Liquor ammonia during
commissioning of the units. COD of U#1 MTPS Ph-II is expected shortly. So, after COD, there
is a daily requirement of Liquor ammonia for keeping good health of the boiler. Hence, it is
proposed to procure 2000 lt Liquor ammonia which will cater the requirement of
approximately 1(One) year. The strength & the quality of the said chemical will not
deteriorate during the period of 1(One) year. Total cost involvement will be around
Rs.30,000.00 (Rupees thirty thousand) only. Price has been evaluated on the basis of pricefrom the last P.O. dated 09.11.09 of MTPS Ph-I.
Therefore, it is proposed to arrange for obtaining administrative approval from
the competent authority for procurement of 2000 lt Liquor ammonia (25%) on LTE basis
among the following 2 manufacturers. Budget provision exists in NON EPC Sl.No.6 in
Contingency expenditure vide sanction order No. EDCON/ Mech/MTPS Ph-II/810 dated
03.12.2009.
i) M/s Merck Specialities Pvt. Ltd.
P-48, Transport Depot Road,
Kolkata- 700088.
ii) M/s Thermo Electron LLS.Pvt Ltd.
129 Shyamnagar Road,
Kolkata:700055.
Sr. Chemist Gr.-I
MTPSPh-IIEnclo:-
1. BUS2. Demand Note
MT/CE(Const.)/Chem. Lab. Ph-II/KC/80 dated 21stAugust2010
SE(M),Commissioning in Charge, MTPSPh-II
The proposal is recommended in view of the requirement for chemical conditioning of
Boiler water. Administrative approval for L.T.E may kindly be arranged from the Chief
Engineer (Construction) as the number of proposed bidders is two only ( i.e. less than four),
for this special nature of Chemicals. No manufacturer is known to us except this and this
LTE may be published through DVC web side.
SE (M), Commissioning in charge
MTPS Ph-II
DCE(M), Construction, MTPS Ph-II
7/31/2019 Ph II Proposal
17/56
Sub :- Administrative approval for procurement of 1MT ofDi Sodium Phosphate (Di Hydrate) Purified
Di Sodium Phosphate is used to maintain Boiler water pH. Present stock of Di
Sodium Phosphate is Nil. COD of U#1 MTPS Ph-II is expected shortly. So, after COD, there is
a daily requirement of Di sodium Phosphate for keeping good health of the boiler. Hence, it
is proposed to procure 1.0 MT Di Sodium Phosphate which will cater the requirement of
approximately 1(One) year. The strength & the quality of the said chemical will not
deteriorate during the period of 1(One) year. Total cost involvement will be around
Rs.1,67,600.00 (Rupees one lac sixty seven thousand and six hundred) only. Price has been
evaluated on the basis of price from the last P.O. in the year 2004 of MTPS Ph-ITherefore, it is proposed to arrange for obtaining administrative approval from
the competent authority for procurement of 1.0 MT Di Sodium Phosphate on LTE basis
among only 2 manufacturers. Budget provision exists in NON EPC Sl.No.6 in Contingency
expenditure vide sanction order No. EDCON/ Mech/MTPS Ph-II/810 dated 03.12.2009.The
names of manufacturers is given below.
i) M/s Merck Specialities Pvt. Ltd.
P-48, Transport Depot Road,
Kolkata- 700088.
ii) M/s Thermo Fisher Scientific (India) Pvt. Ltd.Manmet House, 6
thFloor,
10/B, O.C.Ganguli Sarani,
Kolkata:700020.
Sr. Chemist Gr.-I
MTPSPh-IIEnclo:-
1. Demand NoteMT/CE(Const.)/Chem. Lab. Ph-II/KC/110 dated 24
thSeptember2010
SE(M),Commissioning in Charge, MTPSPh-II
The proposal is recommended in view of the requirement for chemical conditioning of
Boiler water. Administrative approval for L.T.E may kindly be arranged from the Chief
Engineer (Construction) as the number of proposed bidders is two only ( i.e. less than four),
for this special nature of Chemicals. No manufacturer is known to us except this and this
LTE may be published through DVC web side.
SE (M), Commissioning in chargeMTPS Ph-II
DCE(M), Construction, MTPS, Ph-II
7/31/2019 Ph II Proposal
18/56
Sub:- Administrative approval for procurement of Glass Wares
for use in Chemical Laboratory MTPS Ph-II.
To continue day to day testing in Chemical Laboratory and preparation of
Reagents Glassware are needed to be procured. The list of glass apparatus are enclosed in
the demand note along with BUS. Approximate cost involvement as per the current Price
list of M/s Borosil is Rs.35594/- (Rupees thirty five thousand five hundred and ninety four)
only. Budget provision exists in proposed B.E.10-11 under the Capital Budget Head NON
EPC vide sanction order no. EDCON/Mech/MTPS Ph-II/810 dated 03.12.2009 vide Sl.No.6 in
Contingency.
.
Hence, it is requested to accord administrative approval of the competentauthority for procurement ofGlassware for testing in Chemical Laboratory as mentioned in
the attached demand note. The items may please be procured on L.T.E. basis among the
two manufacturers as noted bellow. As the bidders are less than 4 (Four) the approval for
floating LTE may be accorded from Chief Engineer, Construction.
1. M/s E.Merck (India) Ltd.
P-48, Transport Depot Road,
Kolkata- 700088
2. M/s BorosilGlass Works Ltd,
Dabriwala House, 4th
Floor,
10 Middleton Row,
Kolkata: 700071.
Sr.Chemist Gr.-I
MTPS Ph-II.
Enclo :-
1. BUS
2. Demand Note
3. Xerox copy of Price list book of M/s Borosil
No. MT/CE(Const.)Chem Lab Ph-II /KC/ dated 26th
July, 2010
SE(M),Commissioning in Charge, MTPS Ph-II
The proposal is recommended in view of the requirement for chemical laboratory day to
day work. Administrative approval for L.T.E may kindly be arranged from the Chief Engineer
(Construction) as the number of proposed bidders is two only ( i.e. less than four), for this
special nature of glassware. No other manufacturer is known to us and this LTE may be
published through DVC web side.
SE(M), Commissioning
DCE(M), Construction, MTPS Ph-II
7/31/2019 Ph II Proposal
19/56
Sub: Proposal for procurement of 1 no. portable Coulumetric KF tritrator/
Titroline KF Tritrator on urgent basis for Chemica Laboratory, MTPS Ph-II
MTPS Phase-II Chemical Laboratory is now in commissioning stage and no basic
instrument is available in the laboratory till now for measuring low level moisture content in
different oil samples which is very essential to measure frequently.
An order was placed on M/s BHEL for supply of some instruments, but 3 (Three)
instruments have been supplied till date against the ordered quantity, rest which even if
supplied by M/s BHEL, still would not suffice our requirement for these purpose as this
instrument does not come within the purview of M/s BHEL's scope of supply .We have
managed the situation for measuring low moisture content in oil sample with the help of
our existing Chemical Laboratory (Phase-I), but it is very tough to measure day to day basis.Continuous running of the unit is the next activities coming up very soon.
For monitoring this type of parameters sophisticated instrument as mentioned
above are very much essential. The existing O & M plant of MTPS (Chemical laboratory)
possesses instruments like this have shown proven performance over a period of 3 (Three)
years approximately. M/s NTPC Sripath was purchased this instrument from M/s Merck
Specialities Pvt Ltd vide P.O. No. 4200032000-M26-10-09 dated 12.01.2010 (P.O. copy
enclosed). Since such type of instruments is normally procured as one time measure having
a life of 7 years then, it is not desirable to go for experimenting with a different make.
Considering above it is proposed to source standarised on M/s s Merck Specialities
Pvt Ltd for this instruments only for a period of 2 to 3 years. Total cost involvement was
about Rs.4,10, 000/- (Rupees four lac ten thousand) only as per budgetary offer submitted
by M/s Merck . Since there is no budget for (O & M), the procurement is proposed under
NON EPC Sl.No.6 in Contigency budget expenditure vide sanction order No. EDCON/
Mech/MTPS Ph-II/810 dated 03.12.2009.
Hence, it is requested to accord administrative approval of the competent
authority for procurement of 1 no. portable Coulumetric KF tritrator/ Titroline KF Tritrator
on source standardisation basis for Chemica Laboratory, MTPS Phase-II.
Enclo:
1. Budgetory offer of M/s Merck Specialities Pvt. Ltd.2. Fax Copy of P.O. of M/s NTPC( Sripath Super Thermal Power Project)3. Xerox Copy of P.O. of MTPS Ph-I
Sr. Chemist Gr.-I
MTPS Phase-II
No.MT/CE (Const.)/ChemLab/Ph-II/ dated 08.11.10
Operation Superintendent, MTPS Phase-II
7/31/2019 Ph II Proposal
20/56
Sub:-Administrative approval for engaging an outside agency for carrying outmiscellaneous chemical laboratory works on rate Contract basis.
Chemical Laboratory, MTPS Ph-II has been functioning since 14.01.10. The jobs
associated with DM Plant are being carried out by the contractors worker. PGTR of DM Plant has
been carried out. Now the contractor is gradually withdrawing their work force deployed. The
existing departmental work force is inadequate for carrying out total laboratory works. So
outsourcing of the following jobs of Chemical Laboratory MTPS Ph-II has become necessary:
1. Round the clock (Including Sunday and holiday) collection of different water,Steam & Coal samples.
2. Preparation of Coal samples round the clock (Including Sunday & Holiday).3. Preparation of conditioning Chemicals for Boiler & Feed water round the
Clock(Including Sunday & Holiday)
4. Collection of Fly Ash & Bottom Ash samples(Including Sunday and Holiday)5. Dosing of Sodium Hypo Chlorite in CW system as and when required.6. Different type of Laboratory miscellaneous work.
It is therefore, felt necessary to engage an external agency for doing these jobs on RC basis
through LTE for 4 (Four) months with a provision of extension for another 4 (Four) months at the
same rate, terms and conditions. The total estimated cost will be Rs.2, 11,560.00 (Rupees two Lac
eleven thousand five hundred and sixty)) only as per Technical Estimate for 4(four) months.
Necessary administrative approval to engage an outside agency for the above jobs may
kindly be accorded. Budget provision for the said expenditure exists against Sl. No. 6 of
contingency on Non EPC cost under non EPC budget of MTPS Ph-II vide CE (GPE)s
letter no. EDCON/MONIT/AP&B/164 Dt 15-07-10 till the proposed budget under
chargeable head of RE:10-11 and BE: 11-12 can be utilised after its approval andCOD of the units .
The names of the prospective bidders given below are collected from MTPS Ph-I. However,
Technical Section may please add any other names of bidder known to them.
1. M/s. B.K.Construction, Durlavpur, Bankura2. M/s. R.G.Enterprise, G.Ghanti,Bankura3. M/s. Bamapada Chatterjee, Ghatakgram,Durlavpur, Bankura4. M/s. T.P.Banerjee, Durlavpur, Bankura5. M/s. Pinaki Sengupta, Durlavpur, Bankura
Senior Chemist Gr.-I
MTPS Ph-IINo. MT/O&M/Chem Lab./ dated 29 .09.10
SE(M), Commissioning in Charge,MTPS Ph-II
In view of the circumstances as stated above, the sanction is hereby accorded against DFP 3.1 of
DFP(G.S.) along with the approval of the 5(Five) vendors mentioned so that essential work of
chemical laboratory is being continued. Submitted for kind intimation to CE (Constn.), MTPS II
through DCE(M) as per provision of DFP(GS).
Operation Superintendnt
MTPS Ph-II
DCE(M),Construction, MTPS Ph-II
7/31/2019 Ph II Proposal
21/56
Sub: Proposal for extra space for Chemical Laboratory, MTPS Ph-II
The present space provided for Chemical Laboratory, MTPS Ph-II isonly 10mtr. X 10 mtr as per drawing.
In this space 1 no. room for use of Sr. Chemist in charge, and the
balance space is proposed to be used as follows:
a) 1 no. room for housing instruments like 2 nos. pH meter, 2 nos.
conductivity meter,1 no. balance, 2 nos. turbidity meter, 1 no. jar test
apparatus and different water testing apparatus will be placed.
b) 1 no. room for lab testing. These can be made functional after
erection of partition wall.
No further space is presently available but for conducting tests asdetailed bellow the following are the requirements.
1) For Coal testing purpose 1 room (16 ft. X 20 Ft.) is required housing
TGA, CV apparatus & its accessories.
2) 1 room (20ft. X 30 ft.) is required for preparation of coal samples
housing 2 nos. Coffee mill, 2 nos. Raymond Mill, 2 Nos. HGI apparatus, 2 Nos.
Shieveshakers, 1 No. weight machine, 1 no. balance and free space 10ft. X 8 ft.
is required for sample preparation and Total Moisture rack placement.
3) 1 no. room (20ft. X 15ft.) is required for purpose of oil testing purpose
which will house 2 nos. oil centrifuges, 2 nos kinematic viscosity meter, 1 no.Karl fisher low moisture apparatus to be installed.
Thus, it is felt essential that extra space for the laboratory is very much
required and space adjacent to the same (shown in the enclosed drawing)
towards road which is available may kindly be allocated to the laboratory and
necessary brick wall/partition wall and working rack may be erected so that
the whole of the laboratory can function in a cohesive way adjacent to the
power house.
SE (M), Commissioning
MTPS Ph-II
DCE(Civil), MTPS Ph-II
No. MT/SE(Comm.)/Ph-II/20/109 dated 26.08.2010
7/31/2019 Ph II Proposal
22/56
Proposal for Annual Maintenance Contract for servicing of T.G.A.
One Thermo Gravimetric Analyser was procured for testing of Coal samples in
the month of Feb04. Now it is running smoothly and it is under annual
maintenance contract with the original equipment supplier M/s. I.R.Technology services for 1(One) year from 31.01.08. This contract period will
expire on 30.1.08. The cost involvement in this contract is Rs.27,000.00(Twenty
seven Thousand) only without service charge as per last contract.
Hence, it is proposed to arrange for obtaining administrative approval from
the competent authority for the said job for next 1(One) year.
Sr. Chemist Gr.-I
MTPS
Enclo :- 1.Last W.O.
No. MT/O&M/Chem.Lab./ dated 02.12.08
Operation Superintendent-I, MTPS
The proposal is hereby approved on OES basis as per DFP (G.S.): 5.3.
O.S.-I
7/31/2019 Ph II Proposal
23/56
Sub :-Administrative approval for Manual transportation for alum slab from site storeto Water Treatment Plant U# 1,2,3,4 and Effluent treatment Plant U# 1,2 &3.
Manual lifting of alum slabs from WTP site U# 1,2&3 to Aerator. Annual ratecontract for preparation of alum solution in tanks. Alum tank cleaning one by one,
5(Five) nos in every month .Bleaching Powder bags transportation from site
store, of DM Plant and preparation of Bleaching solution in WTP of U#1,2,3,4.
Caustic Soda Bags transportation from site stores of DM Plant and preparation of
Caustic solution in DM Plant U#1,2,3,4,5&6. Bleaching Tank of WTP U# 1,2,3,4
cleaning in every week.The existing Annual rate contract for transportation of Alum slabs from site stores to WTP site store& ETP
U#1,2&3 exists up to 13.4.09, Preparation of Alum solution after lifting of alum slab from WTP site to solution
preparation floor expired on 25.9.08, Preparation of caustic Soda solution after lifting& transportation of
caustic soda bags from DM plant side store to DM plant alkali solution preparation floor& 5&6 DM Plant ,
Manual alum slab feeding from DM Plant site to Aerator for better quality of Coagulated water will expire
on31.12.08 respectively. Total nos of Alum slab transported will be around 90,000(Ninety thousand) in a year,
total no. of Alum solution to be prepared 3000(Three thousand)in a year , Total no. of Alkali solution to be
prepare is about 200(Two hundred) tanks for U#1,2&3 DM Plant with 30 bags caustic in each tank & 250(Two
hundred fifty) tanks for U# 5 & 6 DM Plant with 5 bags caustic in each tank. Total no. of alum slab to be lifted
manually in aerator is about 25,500(Twenty five thousand five hundred)in a year. In other side 120 nos alum
tank to be cleaned in a year for smooth alum feeding, 1100 bags bleaching solution to be prepared in a year
(1Bag per shift in U#1,2&3 ) and Bleaching tank to be cleaned in every week for better quality of Drinking
Water. After preparation of Caustic solution in each DM Plant and Bleaching solution in U# 1,2&3 Water
Treatment Plant all the empty bags to be kept in a well. The well has to be constructed by cutting earth by
the party. It will be responsibility of the contractor that no empty bags should be found nearest to the both
DM Plant & Water Treatment Plant. The location of the well with size (length-5ft.,breadth-5ft. & height-6ft.)
will be selected by the officers in charge of the job. Total work may be done by engaging an outside agency
due to non-availability of adequate infrastructure.Departmental Technical estimate along with scope of work is enclosed and approximate annual cost
involvement for the above work comes around Rs.5,74,124.00(Rupees Five Lac seventy Four Thousand One
Hundred Twenty Four) only.
Budget provision exists under chargeable expenditure has been kept in RE 08-09 and BE 09-10. Necessary
administrative approval may please be accorded for the above mentioned scope of work by engaging an
outside agency through LTE by Technical section.
The names of probable bidders available with us are as follows:
1.M/s. B.K,Construction, Durlavpur
2.M/s. R.G.Enterprise, G.Ghanti
3.M/s. Bamapada Chatterjee, Ghatakgram
4.M/s. T.P.Banerjee, Durlavpur
5.M/s. Pinaki Sengupta, Durlavpur
6. M/s. Subhadra Construction, Durlavpur
7. M/s. Shib Shakti Engineering Works, Amdanga, Bankura.
8. M/s. Anup Goswami, Durlavpur
Sr. Chemist Gr.-I
MTPS
No. MT/O&M/Chem. Lab./ Dated 01.12.08
Operation superintendent-I
7/31/2019 Ph II Proposal
24/56
Sub: Administrative approval for procurement of Bitters and Knife type
Liners for Raymond Mill (RM-20) for Chemical Lab.
Due to regular basis preparation of different coal sample by
Raymond Mill (Grinder) it is essential to procure Bitters and Knife type
Liners for the said Raymond Mill (RM-20) urgently. A purchase order for
the same was awarded on M/s Sadhu Machinery & Equipment (India) Pvt.
Ltd. on 13.09.06 on OEM basis and material was used and the life of the
same has already been exhausted.
Hence, it is proposed to obtain administrative approval from competent
authority for procurement of 4(Four) sets Bitters and 2(Two) sets Knife typeLiner on single tender OEM basis from M/s Sadhu machinery Co., Kolkata,
the manufacturer. Total cost involvement will be Rs.69, 600.00 (Rupees
sixty nine thousand six hundred) only including fitting and commissioning
charge as per their budgetary offer dated 30.06.09. Budget provision exists
in BE 09-10 under the head OS, U# 1-4, Consumable stores, Sl.No.6, as the
materials to be procured are spares in nature.
Sr. Chemist Gr.-IMTPS
Enclo:
1. Budgetary offer of the Manufacturer2. OEM Certificate3. B.U.S.4. Demand Note
No. MT/O&M/Chem.Lab./495 Dated 01st
July09
Operation superintendent-I
Administrative approval accorded as per DFP (G.S.) 9.3(ii), as proposed above.
The format for OEM certificate duly filled in has been placed at Page-
O.S.-I
DCE(O), MTPS
7/31/2019 Ph II Proposal
25/56
Adm. Approval for procurement of 48 MT Sodium hypochlorite to
be used for dosing in cooling water of # 5 & 6 for 6 months.Dozing of sodium hypo chlorite in # 5 & 6 cooling water system is on progress
since26.11.08 as dedicated chlorination plant could not be commissioned. The
commissioning of the same will take around 6(Six) months time as communicated by
D.C.E.(M) construction vide letter dated 20.11.09. Present stock of the material is 4MT and
a repeat order for procuring 12MT of Sodium Hypo chlorite going to be placed on M/s
shakambai Enterprise (India) Pvt. Ltd., with this it will cater the requirement of chlorination
of CW system of Units # 5 & 6 for another 60 days. In order to avoid discontinuation of
Chlorination and subsequent severe growth of algae and fungi along with micro-organism
in the condenser tubes of both the units resulting fall in condenser vacuum dozing of
Sodium Hypo Chlorite is essentially required without any termination. Present moving
average has increased from the moving average furnished in the BUS as this is procured 1st
time in the month of November2008. Quantity in excess than moving average may kindly
be recommended for approval of the competent authority. Hence it is proposed to procure
48MT of sodium hypo chlorite to be consumed in next 6(Six) months on LTE basis among the
following bidders. However Technical section may also include other names of Vendors if
available with them. Approximate cost involvement for 48MT of sodium hypo chlorite will
be around Rs.4,51,200.00 (Rupees four lac fifty one thousand and two hundred) only(Price
evaluated as per last P.O.). Necessary terms and conditions have been indicated on Demand
Note. Commercial terms and conditions may kindly be taken care of by the Technical
Section. Budget provision exists in RE-2009-10 under the head OS (U# 5&6) against Liquid
Chlorine Sl. No. 12 of Page No.45.1. M/s SENARES, 3B, Surendra Lal Pyne Lane, Kolkata-700012.2. M/s TIDE Sales Corporation ,4,Ganesh Chandra Avenue, 5th Floor, Kolkata-700013.3. M/s Shakambari Enterprise(India) Pvt.Ltd.,1/1A, Nanda Mallick Lane, Kolkata-
700006
4. M/s Global Adsorbents Pvt. Ltd. , 216-Acharya Jagadish Chandra Bose Road,Kolkata-700017
Sr.Chemist Gr.-I
MTPS.DVC.
Enclo:- 1. Back up Sheet2. Demand Note
3. Letter of D.C.E.(M), Construction
4. Xerox copy of Last P.O.
Operation Superintendent-II, MTPS.
7/31/2019 Ph II Proposal
26/56
Sub : Administrative approval for procurement of Inhibited Sulphamic
Acid to be used for on-line condenser cleaning of unit #4,MTPS.
Unit # 4 is running with high differential pressure of cooling water of condenser.
Back pressure of condenser is 0.13kg/cm2
at full load. The value is high with respect to this
winter season. We have physically checked the condition of condenser tubes along with the
maintenance people during last shut down of the unit. The scale thickness was found to be
about 1.0 mm particularly in the upper part of the condenser. But there was no appreciable
scale in the lower half of the condenser. In the coming summer, back pressure is expected to
reach the limiting value for which load of unit #4 may be affected. In this situation, it is
preferable to go for off-load acid cleaning of condenser tubes which are deposited with
some scales. Since, there is no programme of long shut down of the unit in near future it isnot possible to go for off-load acid cleaning of this unit which requires about one months
time for completion. Now, only way left is on-load acid cleaning for which no shut down of
the unit is required. It will not be out of place to mention that it has already been decided
in the daily morning meeting on 24.11.08 to go for on-line acid cleaning of condenser
tubes using M/s DMCC make inhibited Sulphamic acid.(Copy enclosed)
Hence, it is proposed to go for on-line acid cleaning of condenser tubes using
Inhibited Sulphamic acid of M/s Dharamsi Morarjee make as it has a proven performance
of yielding better results in previous occasions on various units of MTPS . In addition to this
the acid is available in inhibited condition ie homogeneity of acid solution with inhibitor can
easily be maintained and inhibitor will protect the parent metal from acid corrosion. Total
materials (Inhibited Sulphamic acid, G.P.Grade) to be required is about 40 MT. Estimated
price for 40 MT of acid is Rs 20.0 Lacs (Budgetary offer for 40MT of sulphamic acid is
enclosed ) excluding excise duty & CST.
Hence , it is proposed to arrange for obtaining necessary approval from the
competent authority for procurement of 40MT of Inhibited Sulphamic acid of M/s Dharamsi
Morarji make for on- line acid cleaning of condenser tubes of unit #4, MTPS.
( S.K.Vyas ) ( G.D.Mandal)
S.D.E. (Mech) Sr. Chemist
Operation Suptd.-II
40 MT of Inhibited Sulphamic acid, G.P.Grade (Make M/s Dharamsi Morarji) may be
procured for on-line acid cleaning of Unit #4, MTPS as proposed. Necessary administrative
approval may kindly be accorded as per DFP-10.3( PH ). BUS is enclosed herewith. Other
terms and conditions will be as per P.O. No- MT/CE/(O&M)/T-57/SKG/OS/2783 dt 17.05.07
( copy enclosed )placed on M/s The Dharamsi Morarji Chemical Co. Ltd.
(S.Haque Khan)
Operation Supdt.II, MTPS
D.C.E.(Opn),MTPS DVC
MT/O&M/OS-II /24/ dt
7/31/2019 Ph II Proposal
27/56
Sub:- Drawing of recoupable Imprest amount (Rs.1000.00)
A Permanent recoupable imprest amount of Rs.1000.00(One Thousand only)
has been sanctioned by the Chief Engineer (O&M) & Project Head and an
office order has been issued vide no. MT/CE(O&M)/16/8651 dated 15.02.10
( Xerox Copy enclosed). Now, the undersigned intends to draw the amount of
Rs.1000.00(One Thousand only) for the 1st
time. So, you are requested to
arrange for making the payment.
(KALYAN CHATTERJEE)
Senior Chemist Gr.-I
DVC.MTPS Phase-II
The Sr. Addl. Chief Accounts Officer,DVC,MTPS
7/31/2019 Ph II Proposal
28/56
Sub :- Administrative approval for procurement of 2000Kg of
Hydrazine Hydrate-80%, conforming to IS: 12086(1987)
Present stock of Hydrazine Hydrate-80% is Nil. Now it is proposed to procure
2000 kg of Hydrazine Hydrate-80% as a oxygen scavenger for maintaining the good health
of the units which is required for a period for next 1 (One) year.The Unit is expected to run
continuously from October2010. In this period of run M/s BHEL has supplied Hydrazine
Hydrate from their end. Total cost involvement will be around Rs.2,43,000.00 (Rupees two
lac forty three thousand) only. Price has been evaluated on the basis of price from the last
P.O. dated 17.07.09.
Therefore, it is proposed to arrange for obtaining administrative approval from
the competent authority for procurement of 2000Kg Hydrazine Hydrate-80% on LTE basis
among enclosed bidders list. Budget provision exists in NON EPC Sl.No.6 in Contigency
expenditure vide sanction order No. EDCON/ Mech/MTPS Ph-II/810 dated 03.12.2009.The
names of bidders is given below.
1. M/S Everlight International, 4, Synagogue Street, Room no.-905
9-th Floor, Kolkata-700001, Regn. No.47
2. M/S Surendra chemicals & Industries,5,Clive row, Room No.-64 (3-rd Floor),
Kolkata-700001,Regn. No.327
3. M/S Vishnu Trade Centre ,5/1, Clive Row, 2-nd Floor, Kolkata-700001, Regn. No.398
4. M/S Standard Products Pvt.Ltd. ,258/4, Acharya Prafulla Chandra Road,
3-rd Floor, Kolkata-700006, Regn.No.725
5. M/s Sunil Chemicals,9, India Exchange Place, 4th Floor, Room No 4/4D,Kolkata-700001, Regn. No.12
6. M/S Shakambari Enterprise(India) Pvt.Ltd., 1/1/A, Nanda Mallick Lane,
Kolkata-700006, Regn. No.382
Sr. Chemist Gr.-I
MTPSPh-II
Enclo:-
3. BUS2. Demand Note
MT/CE(Const.)/Chem. Lab. Ph-II/KC/78 dated 21stAugust2010
SE(M),Commissioning in Charge, MTPSPh-II
7/31/2019 Ph II Proposal
29/56
Sub :- Administrative approval for procurement of 2MT of
Tri Sodium Phosphate(Dodeca Hydrate) AR/LR Grade
Present stock of Tri Sosium Phosphate (Dodeca Hydrate) Ar/LR grade is Nil. Now
it is proposed to procure 2.0 MT of Tri Sodium Phosphate for maintaining the good health of
the boilers which is required for a period for next 1 (One) year.The Unit is expected to run
continuously from October2010. In this period of run M/s BHEL has supplied Tri Sodium
Phosphate from their end and from MTPS Ph-I 200 kg of the material is taken as loan. Total
cost involvement will be around Rs.1,67,600.00 (Rupees one lac sixty seven thousand and
six hundred) only. Price has been evaluated on the basis of price from the last P.O. dated
30.03.09 of MTPS Ph-I
Therefore, it is proposed to arrange for obtaining administrative approval from
the competent authority for procurement of 2.0 MT Tri Sodium Phosphate on LTE basis
among only 2 manufacturers. Budget provision exists in NON EPC Sl.No.6 in Contigency
expenditure vide sanction order No. EDCON/ Mech/MTPS Ph-II/810 dated 03.12.2009.The
names of manufacturers is given below.
i) M/s Merck Specialities Pvt. Ltd.
P-48, Transport Depot Road,
Kolkata- 700088.
ii) M/s ThermoElectron LLS.Pvt Ltd.
129 Shyamnagar Road,
Kolkata:700055.
Sr. Chemist Gr.-I
MTPSPh-IIEnclo:-
4. BUS3. Demand Note
MT/CE(Const.)/Chem. Lab. Ph-II/KC/79 dated 21stAugust2010
SE(M),Commissioning in Charge, MTPSPh-II
The proposal is recommended in view of the requirement for chemical conditioning of
Boiler water. Administrative approval for L.T.E may kindly be arranged from the Chief
Engineer (Construction) as the number of proposed bidders is two only ( i.e. less than four),
for this special nature of Chemicals.
SE (M), Commissioning in cahrge
MTPS Ph-II
7/31/2019 Ph II Proposal
30/56
Sub :- Administrative approval for procurement of 2000Litre of
Liquor Ammonia(25%),AR/LR conforming to IS:799-1985,
2nd
Revesion
Present stock of Liquor ammonia is Nil. Now it is proposed to procure 2000 litre
of Liquor Ammonia-25% for maintaining the good health of the units which is required for a
period for next 1 (One) year.The Unit is expected to run continuously from October2010. In
this period of run M/s BHEL has supplied Liquid Ammonia from their end. Total cost
involvement will be around Rs.30,000.00 (Rupees thirty thousand) only. Price has been
evaluated on the basis of price from the last P.O. dated 09.11.09 on MTPS Ph-I.
Therefore, it is proposed to arrange for obtaining administrative approval from
the competent authority for procurement of 2000Litre Liquor ammonia-25% on LTE basis
among manufacturers. Budget provision exists in NON EPC Sl.No.6 in Contigencyexpenditure vide sanction order No. EDCON/ Mech/MTPS Ph-II/810 dated 03.12.2009.The
names of bidders is given below.
Names of the manufacturerss:
i) M/s Merck Specialities Pvt. Ltd.
P-48, Transport Depot Road,
Kolkata- 700088.
ii) M/s ThermoElectron LLS.Pvt Ltd.
129 Shyamnagar Road,
Kolkata:700055.
Sr. Chemist Gr.-I
MTPSPh-II
Enclo:-
5. BUS4. Demand Note
MT/CE(Const.)/Chem. Lab. Ph-II/KC/80 dated 21stAugust2010
SE(M),Commissioning in Charge, MTPSPh-II
The proposal is recommended in view of the requirement for chemical conditioning of
Boiler water. Administrative approval for L.T.E may kindly be arranged from the Chief
Engineer (Construction) as the number of proposed bidders is two only ( i.e. less than four),
for this special nature of Chemicals.
SE(M)
Commissioning in Charge
MTPS Ph-II
7/31/2019 Ph II Proposal
31/56
Sub:- Administrative approval for purchase of Cartridge against rate contract
In chemical laboratory we have a printer HP Inkjet 1200 whose black cartridge has already
been exhausted. Necessary administrative approval for purchase of 1 (One) no. HP Black
C-4844 Cartridge against rate contract vide no. CP/2C/HQ/72/2007-08/522024 dated
29.09.08 may please be accorded. Total cost involvement for 1(One) no. HP cartridge will
be Rs.1494.00 (Rupees one thousand four hundred and ninety four) only as per the above
mentioned rate contract.
Budget provision exists in BE 09-10 and proposed RE-09-10 in the head Consumable
Stores for misc. against Sl.No.8.
Sr.Chemist Gr.-I
MTPS
No. MT/O&M/Chem Lab/524 dated 8th
September2009
Operation superintendent-1,MTPS
7/31/2019 Ph II Proposal
32/56
Sub : Administrative approval for procurement 150 MT of Liquid
Chlorine, Minimum Purity-99.5% for U #1 to 6 of MTPS.
Present stock of Liquid Chlorine is only 2.7 MT and ordered quantity is 26 MT, It
will be possible to cater the need of the station with the existing stock for next 3 to 4
months. The subject item is used for shock-chlorination in CW system to kill algae, fungi
growth as well as to destroy the micro-organism in CW basin water and also for pre-
chlorination and post-chlorination of Raw water & Filter paper. Present moving average has
increased from the moving average furnished in the BUS as for U# 1,2&3 because
chlorination is presently done on round the clock basis in Unit # 1,2,3 &4. Moreover,
chlorination plant of U# 5&6 are expected to commissioned shortly. The future consumption
of U# 5&6 has also been considered while finalising the annual indented quantity. Quantity
in excess of moving average may kindly be recommended for approval of the competent
authority. Total expenditure involved is around Rs.9, 90,000.00 (Rupees Nine Lac ninety
Thousand) only. Price has been evaluated as per last P.O. Budget provision exists in BE 09-
10 under the head consumable stores.
Hence, it is proposed to arrange for obtaining administrative approval from the
competent authority for procurement of 150 MT of Liquid Chlorine through LTE for 1(One)
year. The vendors for LTE are as follows. No more name of the party for the item is available
with us. So far, this item has been procured from these two sources only. Hosting the
vendor in website earlier did not yield any response from any other vendor.
1) M/S Durgapur Chemicals
6,Little Russel Street,Kolkata-700001
2) M/s Hindushtan Heavy chemicals, Vendor Reg. No. 16219, B.T.Road, Kharda,
P.O.-Balaram Dharna Sopan , Kolkata-700116.
Sr. Chemist Gr.-IMTPS
Enclo:- 1. Back-up sheet
2. Demand Note
3. Xerox copy of last P.O.
No.- MT/O&M/Chem.Lab./ dated 2nd
April09
Operation Superintendent-I, MTPS
Considering the essential requirement of Liquid Chlorine for water conditioning of C.W.
system and W.T.P., the above proposal is hereby recommended. The quantity indented in
excess of M.A. may kindly be got approved from the competent authority on the basis of
justification furnished in the proposal. The proposal needs to be approved by the
C.E.(O&M) & Project Head as the number of prospective bidders are less than four.
O.S.-I
MTPS
Dy.C.E.(O), MTPS
7/31/2019 Ph II Proposal
33/56
Sub:- Administrative approval for Annual Operation & Maintenance
Contract of Chlorination Plant of U# 1, 2 & 3 C.W. system and
U# 1, 2 &3 water treatment plant at MTPS (round the clock).
Round the clock chlorination is very much essential to arrest
biological growth as well as to kill micro-organism in the C.W. basin water &
also in filter water for achieving a high level of plant performance i.e.
condenser vacuum and as well as filter water for drinking purpose. The
existing contract for chlorination of CW system & Water Treatment Plant for
U# 1 to 3 of MTPS is due to expire on 31.07.09. Existing departmental man
power is inadequate for chlorination in C.W. pump house & Water Treatment
Plant of U# 1, 2 &3 round the clock. The on-going contract is being executed byM/s Tara Construction Company whose name was recommended by M/s
BANACO, the OEM & OES of the chlorination plant of U#1,2&3 C.W. Pump
House. We do not have knowledge of any vendor other than M/s Tara
Construction Company who can execute the subject job. In view of the above,
the similar job at Water Treatment Plant has been awarded on them for a
short period as they are readily available at site, carrying out similar job. Now,
it is proposed to go for tendering through website for finalizing the fresh
contract including direct mailing of the enquiry to the known vendor as per
provision of work and procurement manual as the value of the proposedcontract is well within Rs.25 lacs. In this process, if there is any new capable
vendor, they can participate also in the bidding fulfilling our Q.R. Total
estimated cost for the job is Rs.10,46,600.00 (Rupees ten lakh forty six
thousand six hundred) only.. Budget provision exists in BE 09-10 under the
head Chargeable Expenditure.
Hence, it is proposed to arrange for obtaining administrative
approval from the competent authority for inviting the offer through Website.
Sr. Chemist Gr.-I
MTPS. DVC.
MT/CE(O&M)/Chem Lab/ Dated 29th
May09
OS-1, MTPS
In absence of vendor base it is not possible to float LTE for the job. We have only one
vendor known to us who is the existing contractor, M/s Tara Construction Company. Inview of the above, administrative approval is hereby accorded as per DFP(GS): 3.1 to float
the NIT in website including direct mailing to the known vendor with a suitable Q.R. The
prospective vendors fulfilling the Q.R. may participate the bidding. Placed for DCE(Opn.) for
according approval towards invitation of bids as per DFP(GS):4.2
O.S.-1
DCE(Opn.)
7/31/2019 Ph II Proposal
34/56
Sub:- Administrative approval for Annual operation & maintenance
contract of Chlorination Plant of U# 1,2&3 in Water TreatmentPlant, MTPS (round the clock).
Round the clock chlorination is very much essential to arrest biological
growth as well as to kill micro-organism in the drinking water. The existing
system is to feed bleaching powder round the clock i.e. 3 bags per day (1 bag
in each shift). But, there was no scope for pre-chlorination which is very much
essential for the better health of coagulated water& drinking water. A
proposal was moved through MS-III for Pre & post-chlorination in raw water &
filter water respectively through chlorinator and a new chlorination plant hasalready been commissioned at water treatment plant on 16.04.09 against the
above proposal. The said chlorinator has been commissioned successfully by
M/s Perfect Engineering and they handed over the system. Existing man power
is inadequate to run for round the clock chlorination in raw water & filter
water and there is no departmental infrastructure at MTPS for execution of
the job on continuous basis. M/s Tara construction Company who is presently
executing a contract for chlorination of C.W. water for U# 1,2&3 since
01.08.08 may be considered for the above mentioned job as the jobs are
similar and there is no other party known to us for doing this type ofspecialized job in this zone.
Hence, it is proposed to arrange for obtaining administrative approval
from the competent authority for awarding the job on single tender basis to
M/s Tara Construction Company by inclusion of the subject job on the existing
contract vide order no.MT/CE-1(O&M)/T-57/OS/RP/2792 dated 30.07.2008. The
contract will valid up to 31.07.09.Total cost involvement is Rs.61,625.00 (Rupees
sixty one thousand six hundred twenty five) only for 3(Three) months. Budget
provision exists in BE 09-10 under the head Chargeable Expenditure
Sr. Chemist Gr.-I
MT/CE(O&M)/Chem Lab/475 dated 09th
May2009
Operation Superintendent-I, MTPS
The job is essential for maintaining water quality at Water Treatment plant.. M/s TaraConstruction Company has already been engaged at MTPS for a similar job vide W.O.
No.MT/CE-1(O&M)/T-57/OS/RP/2792dated30.07.2008 for chlorination of cooling water at
CW pump house. No other party is known to us who can execute this type of specialized
job. Approval may kindly be accorded as per Sl. No. 12 of DFP (GS) for inclusion of this
additional scope into the Work Order dated 30.07.08 as the jobs are similar. Total
estimated cost for a period of 3(Three) moths will be Rs.61, 625.00 (Rupees sixty one
thousand six hundred twenty five) only.
Placed for kind approval of D.C.E.(Opn.), MTPS.
O.S.-I
7/31/2019 Ph II Proposal
35/56
D.C.E.(Opn.), MTPS
Sub :-Regarding Analysis report of Drinking Water of MTPS dt. 27.03.09
Analysis report of drinking water has been done by Dy. Director, Public Health
Laboratory, Panchet, DVC in monthly basis. There is some deviations shown in the result as
Residual Chlorine not present in Sl. No.4 & 5 of their result sheet and the above water
sample is bacteriologically unsatisfactory.Now a days Bleaching Powder dosing was done in Filter water tank through day
and night, but the feeding is not responding to the end point of our colony and it is
recorded in Panchet Laboratory results. But within a few days Chlorine gas feeding will be
started very soon in Filter water tank as post chlorination and in Pearsall flume as Pre
chlorination.
Ultimately we hope that after feeding was started the problem in chlorianation
will be solved and we get Residual chlorine at the farthest point of our Colony.
Sr. Chemist Gr.-I
(a) We are having proven performance of Inhibited Sulphamic Acid of M/s
Dharamsi and Morarji Chemical Co. Ltd.make and sulphamic acid of M/s Shree
Sulphamic Chemicals make. During use of Sree Sulphamic Chemicals make
sulphamic acid, performance of Inhibitor of Corroban SSP and Nevamine CAP-
2020 was found satisfactory. Performance of other make sulphamic acid is not
known to us.
(b)Considering the thickness of deposited scale (1.0mm) of the upper part
condenser tube of U # 4, the weight of the scale in terms of the CaCO3 would
be about 11.30 MT. Theoretically about 20.34 MT Sulphamic acid would be
required to remove the said amount of scale and for emergency (Leakage
development during operation and some other reasons) 20% of the total acid
quantity should be kept in hand i.e. 4.07 MT. So, we have to go for purchasing
total quantity of acid i.e. 20.34 + 4.07 = 24.41 MT 25.0 MT of sulphamicacid. [Calculation is given in the Annexure].
(c) Based on our experience and estimation, requirement of inhibited sulphamic
acid/sulphamic acid with inhibitor alongwith specification for conducting the
acid cleaning of condenser tubes ( upper part) of U # 4 are as follows:
Option no. I. - 25 Mt of inhibited sulphamic acid (Purity-97% + 0.5%)
OR
Option no. 2- 25 MT Sulphamic acid (Purity-95% Minimum) + 750Kg.
Nevamine CAP-2020/ 375Kg Coroban SSP (as Inhibitor)
To neutralize the spent acid and wash out the condenser tubes, 2 (Two) other
balance chemicals would be required for complete passivation of the process.
1. Soda Ash- 1.0 MT
7/31/2019 Ph II Proposal
36/56
2. Lime- 2.5 MT
Annexure
Estimation of acid for acid cleaning of upper part of condenser U#4
1. No. of tubes in upper part- 9609 nos.
2. Length of the tubes - 7.6 mtrs. = 7600mm.
3. Outer dia of the tubes - 25.4 mm.
4. Thickness - 1.0 mm.
5. Inner dia - 23.4 mm.
6. Scale thickness - 1.0 mm.
7. Volume of scale of 1(One) tube- 3.14 X (11.7 + 10.7) X (11.7-10.7) X 7600
= 3.14 X 7600 X 22.4 X 1
= 534553.6 mm3
8. Total volume of scale - 9609 X 534553.6
109= 5.136 M
3
9. Weight of Scale (as CaCO3) = 5.136 X 2.2
= 11.299 MT 11.30 MT
10. Amount of acid will be required to remove 11.3 MT of scale = 11.30 X 1.8
= 20.34 MT
11. Amount of acid to be kept in hand in excess 20% of 20.34 MT = 4.07 MT
12. So total amount of acid to be arranged 20.34 + 4.07 = 24.41 MT 25 MT
7/31/2019 Ph II Proposal
37/56
Sub: Annual rate contract for Deck cleaning of cooling tower decks of all the
6 (six) units of DVC,MTPS.The existing annual rate contract for manual cleaning of cooling towerdecks for all the 6 (Six) units of MTPS awarded to M/s Anup Kumar Goswami vide W.O. No.-
MT/CE(O&M)/T-4/OS/SRP/2801 dated 08.09.08 will expire on 07.09.08. As per the terms &
conditions of the said Work Order, the above rate contract is for 100 (One hundred) nos of
cleaning for U#1 to 6 cooling water deck in a year. It is being observe that fungitive dusts,
dirt, mud etc. find their way on the top of the decks of the cooling towers, in the basin &
open canal which gradually deposited on decks over a period causing clogging of nozzles
and ultimately reducing he efficiency of cooling towers. As such, decks require cleaning at
regular interval of 15 days. Hence, it is proposed for total 120 (One hundred twenty) nos of
cleaning for all the cooling tower decks of MTPS U# 1 to 6 in a year after expiry of existing
contract. Due to non-availability of adequate departmental infrastructure collection of this
deposited dirt, dust, mud etc. are to be done by engaging an outside agency.
Departmental technical estimate along with the scope of work is enclosed and
approximate annual cost involved for the above works comes to Rs.1,41,400.00 ( Rupees
one lakh forty one thousand and four hundred) only. Budget provision exists in BE 09-10
under Chargeable expenditure A- 1-AMC( ongoing) Sl. No.-e under head-OS 1-4 & 5-6
Necessary administrative approval may be accorded for awarding the contract
to an outside agency through LTE for 1(One) year from the date of commencement of work
as and when required for removal of dirt, mud, sludge, etc. over the cooling water decks of
U# 1 to 6 of MTPS.
The names of probable bidders is available with us :-1. M/s B.K.Construction, A-10, Subhaspally, Bidhannagar, Durgapur-102. M/s Anup Kumar Goswami, Po.-Durlavpur, Bankura.3. M/s R.G. Enterprise, Po.-Gangalghanti, Bankura.4. M/s T.P.Banerjee, Vill-Paktore, Po.-MTPS, Bankura.5. M/s Bamapada Chatterjee, Vill.-Ghatakgram, Po.-Durlavpur, Bankura.6. M/s Subhadra Construction, Po.-Durlavpur, Bankura.Enclo:-Asstatedabove
Sr. Chemist Gr.-I
DVC.MTPS.
MT/CE(O&M)/Chem Lab/ dated 08th
June2009
Operation Superintendent-I, MTPS
7/31/2019 Ph II Proposal
38/56
Sub :- Administrative approval for executing some jobs as per scope of work at DM Plant of
U#1,2&3 on ground of urgency.
Now, our DM plant is running more than 15(Fifteen) years after
commissioning. The life of the resins in the exchangers is about 8-10 years, the life of the
SAC (Cation) exchangers has heavily decreased due to the following reasons.
1. SAC-B :- At the time of regeneration back-pressure develops and because
of that we do not get appropriate running hour of the exchanger and
running hours also decreased from 35 hrs to 22hrs(average) .
2. SAC-A :- The differential pressure always persists above the limit and its
running hours has also decreased from 35hrs to 25hrs(average).
3. SAC-C- The life of the exchanger has decreased from 35hrs to
27hrs(average)
4. SAC-D- The life of the exchanger between the regeneration is from 35hrsto 28 hrs (average)
Hence, we propose to do the following jobs for betterment of life of the DM Plant of U#
1,2&3 :-
1. SAC-B- Total resins from the shell is to be replaced by new resins.(about
13000Ltrs resins). Total Distributor (both upper & Lower portion of the
shell) including nozzles to be checked and if required damaged portion to
be replaced by new one.
2. SAC-A- Some fines of resins to be replaced by old resins collected from
SAC-B and both upper & lower portion distributor to be checked. If
required the damaged portion to be replaced by new one.3. SAC-C- Some fines of resins to be replaced by old resins collected from SAC-
B.
4. SAC-D- Some fines of resins to be replaced by old resins collected from
SAC-B.
The total job may be awarded to M/s Ajit Chakraborty on single tender basis who has done
similar type of jobs at DM Plant last time vide W.O. No. MT/CE(O&M)/T-29/MS-III/
SKM/Common/06-07/CD/3608 dated 24.6.06. Departmental technical estimate was done
and given. The total cost involvement was Rs. 35000.00 (Thirty five thousand) only. Budget
provision exists in BE 09-10 under Chargeable Expenditure.
Hence, it is proposed to arrange for obtaining administrative approval from thecompetent authority for awarding the job on single tender basis to M/s Ajit Chakrabarty.
Sr. Chemist Gr.-I
DVC.MTPS
MT/CE(O&M)/Chem Lab/ dated 07th
May2009
7/31/2019 Ph II Proposal
39/56
Sub: -Administrative approval for procurement of 24.0MT Sodium Hypo
Chlorite
Present stock of Sodium Hypo chlorite is 800 kg at site and
ordered quantity is 9.6 MT. With this stock of sodium hypo chlorite it is
possible to cater the demand of CW system of U# 5 & 6 for next 45 days only.
Erection of Chlorination plant for U# 5&6 has not yet been completed. It will
take around 2 to 3 months more as per the letter of D.C.E.(Construction),
MTPS.
In the above circumstances it will be prudent to procure 24.0MT
sodium hypo chlorite for 4 (Four) months through LTE. Moving average for
this item as indicated in the BUS is 15.0 MT for one year. Since, first timeprocurement was done on Novenber2008, so the present consumption is more
than the MA. Excess quantity of sodium hypo chlorite has been proposed for
procurement to meet the situation like delay in commissioning of chlorination
plant after 2/3 months or shortage supply of chlorine gas etc. Hence, quantity
in excess of moving average considered justified and may kindly be
recommended for approval of the competent authority. Total cost involvement
is Rs.242400.00 (Rupees two lac forty two thousand and four hundred) only.
Budget provision exists in BE-2009-10 under the head Consumable stores,
section head, OS (U# 5&6) against Liquid Chlorine Sl. No. 12 of Page No.45.Hence, it is proposed to arrange for administrative approval from
the competent authority for procurement of 24.0 MT sodium hypo chlorite on
LTE basis.
Enclo:-
1. B.U.S.
2. Demand Note
3. Letter of D.C.E.(Const.), MTPS
4. Xerox copy of last P.O.
Senior Chemist Gr.-I
MTPS, DVC
No. MT/O&M/Chem.Lab./ Dated 06th
July09
O.S.-II, MTPS
7/31/2019 Ph II Proposal
40/56
Sub:- Administrative approval for procurement of HP Printer cartridge.
As the HP printer cartridge in chemical laboratory has already been exhausted we
are in need of a new one at the earliest. As per the rate contract order No. CP/2C/HQ/
72/2..7-08/522024 dated 29.09.08 the order to be placed on M/s Pinnacle InfoTech (P)
Ltd., Durgapur.
The following cartridge to be procured:
1. C4810 A - HP- Black - Price Rs.1494.00
Total cost involvement will be Rs.1494.00 (Rupees one thousand four hundred and
ninety four) only. Necessary administrative approval for procurement of new HP printer
cartridge (1 No.) may please be accorded.
Sr.Chemist Gr.-1
MTPS
No. MT/CE(O&M)/Chem lab/ 478 dated 02nd
June2009
Operation Superintendent-1
7/31/2019 Ph II Proposal
41/56
Sub: -Administrative approval for procurement of 300MT Ferric Alum
Slab Gr.-1
Ref:- Our P.O. No. MT/CE/T-57/OS/Chem lab/SRP/2008-09/2826dated 26.11.08
Present stock of Ferric alum Slab is 175 MT. With this stock of Alum it is possible to
cater the demand of U# 1 to 6 and ETP for 30 days only. The total supply of materials against last P.O has
already been received. A fresh proposal for procurement of 1000 MT Ferric alum on OTE basis has been
initiated in the month of May09 which is in process in technical section. It will take some more time to finalise
the contract. It is being observed from the consumption pattern that our present stock and the procurement
lead time will not match; especially in view of rainy season, bulk consumption of alum will increase in this
period due to very high turbidity of raw water. Discontinuation of required alum dosing will be a cause of high
boiler water silica.
In the above circumstances it will be prudent to procure 300MT of ferric alum slab by placing a
repeat P.O. on M/s M.S. Chemical Industries against P.O. No. MT/CE/T-57/OS/Chem lab/SRP/2008-09/2826
dated 26.11.08 which will meet our requirement of another 60 days. By this time it is expected that the newcontract /P.O. will be finalized. It may be noted that the original P.O. was finalized through OTE. Total cost for
300 MT Ferric Alum slab will be Rs.15, 45,000.00 (Rupees fifteen lac forty five thousands) only. Budget
provision exists in BE-2009-10 under the head OS (U# 1-4) against Ferric Alum Slab Sl. No. 15 of Page No.64.
Hence, it is proposed to arrange for administrative approval from the competent authority for
inviting a letter from the party (M/s M.S. Chemical Industries) to give their consent for supplying 300 MT
Ferric Alum slab at the same rate, terms & conditions of the P.O. No. MT/CE/T-57/OS/Chem lab/SRP/2008-
09/2826 dated 26.11.08 along with a certificate on no downward trend against the price of alum.
Senior Chemist Gr.-I
MTPS, DVC
Enclo:-1. BUS2. Demand Note3.Xerox copy of last P.O.
No. MT/CE(O&M)/Chem.Lab./484 Dated 09th
June09O.S.-1, MTPS
In view of the essential requirement of alum for water conditioning as stated above, the
subject procurement on repeat order basis is hereby recommended. The proposal fulfills all
the clauses of Sl.No.13 (i) of DFP (GS). The proposal may kindly be approved as per DFP
(GS), Sl.No.13 (i).
O.S.-1
DCE(O), MTPS
7/31/2019 Ph II Proposal
42/56
Sub: Administrative approval for placement of repeat order for next 1(One) year
On M/s Ion Exchange (I) Ltd. for on-line cooling water treatment of Units
# 1 to 6.
Ref. :W.O.No. MT/CE(O&M)/T-57/OS/Chem Lab/2008-09/SRP/2785 dated 07.06.08
The existing annual contract for on-line cooling water treatment of U# 1 to 6 will
expire on 24.06.09. In the same contract a provision has been kept for extension of validity
for next 1(One) year of contract period for a further period of one year.
So, the contract may be extended for next 1(One) year from the date of expiry
of the same i.e. from 24.06.09 at the same rate, terms & conditions of the referred W.O. as
the performance of the treatment of cooling water system is satisfactory. Total cost
involvement for the contract is Rs.30, 22,860.00(Rupees thirty lac twenty two thousand
eight hundred and sixty) only. Budget provision exists in BE 2009-10 under the head OS (U#
1-4 & U# 5-6) Chargeable expenditure C in page no. 40 & 31 respectively.Hence, it is proposed to arrange for administrative approval from the competent
authority for inviting a formal consent from the party M/s Ion Exchange (I) Ltd. to carry out
the job at the same rate, terms & conditions of the W.O. No. MT/CE(O&M)/T-57/OS/Chem
Lab/2008-09/SRP/2785 dated 07.06.08 for next 1(One) year along with a certificate on no
downward trend for the prices of chemicals used in the cooling water treatment.
Sr. Chemist Gr.-1
MTPS
MT/CE(O&M)/Chem Lab/ dated 08th
June09
O.S.-1
As the on-line cooling water treatment is essential for maintaining water quality to arrest
formation of hard scale inside condenser tubes, the proposal is recommended to keep the
condenser back pressure within the permissible limit to run units efficiently and
economically. Necessary approval may kindly be accorded as per Sl.No. 13(ii) of DFP (GS)
O.S.-1
DCE (O)
7/31/2019 Ph II Proposal
43/56
Sub:- Administrative approval for placing a W.O. for Annual Operation &
Maintenance Contract for Chlorination Plant of U# 1, 2 & 3 C.W. system
and U# 1, 2 &3 water treatment plant at MTPS (round the clock) for a period
of 2 (Two) months w.e.f. 01.08.09
Round the clock chlorination is very much essential to arrest biological growth
as well as to kill micro-organism in the C.W. basin water & also in filter water for achieving
a high level of plant performance i.e. condenser vacuum and as well as filter water for
drinking purpose. The existing contract for chlorination of CW system & Water Treatment
Plant for U# 1 to 3 of MTPS is due to expire on 31.07.09. Existing departmental man power
is inadequate for chlorination in C.W. pump house & Water Treatment Plant of U# 1, 2 &3
round the clock. The on-going contract for chlorination plant at CW pump house was
awarded on M/s Tara Construction Co. vide W.O. No. MT/CE-1/(O&M)/T-57/OS/SRP/2792
dated 30.07.08 whose name was recommended by M/s BANACO, the OEM & OES of the
chlorination plant of U#1,2&3 C.W. Pump House. The AMC & AOC for new chlorinationplant at Water Treatment Plant was awarded on the same party for a period of
approximate 2 (Two) months by amending the scope of work of W.O. No. MT/CE-
1/(O&M)/T-57/OS/SRP/2792 dated 30.07.08. A proposal has already been initiated vide No.
MT/CE(O&M)/Chem Lab/477 dated 29.05.09 for a fresh enquiry for the above mentioned
job on OTE basis by hoisting the enquiry in website. The case file is now lying with technical
section for taking further necessary action. But it appears that it will not be concluded
within the validity of the existing contract.
Hence, it is proposed to obtain administrative approval from competent
authority for placing a W.O. on M/s Tara Construction company on single source basis for a
period of two months w.e.f. 01.08.09 to 30.09.09 as no other party is known to us who canexecute this job which involves handling of toxic gas like liquid chlorine. Total estimated
expenditure for two months will be Rs. 1,49,700.00 ( Rupees one lakh forty nine thousand
and seven hundred) only as per the existing contract. Budget provision exists in BE 09-10
under the head Chargeable Expenditure, section head-OS (1-4) Sl.No. A-1(b) page no.-38.
Sr. Chemist Gr.-IMTPS. DVC.
MT/CE(O&M)/Chem Lab/ 5 Dated 07th
July09
OS-1, MTPSIn view of the essential requirement of chlorination at C.W. pump house and W.T.P. to control the growth of
fungi & algae in cooling water as well as to maintain drinking water quality, administrative and technicalapproval of the above proposal is accorded as per DFP (G.S.) 3.1 on the basis of situation explained above. No
other party having credential of executing this type of job is known to us, as such the fresh contract for one
year is being done by floating the NIT in website including direct mailing to the known vendor with a suitable
Q.R. to explore new vendor of appropriate category if available in the market. But for this short period, the
above mode of tendering is not possible to follow due to paucity of time. Hence, approval for invitation of
offer from M/s Tara Construction co. is hereby accorded on single tender, single source basis as per DFP
(G.S.): 4.4 to execute the job for a period of two months as the job can not be discontinued. The proposal is
placed before DCE (O) for kind intimation as per provision made under DFP (G.S.) :3 remark col. (d).
O.S.-1
D.C.E.(O), MTPS
7/31/2019 Ph II Proposal
44/56
Sub: Total Electrical power consumption& Electrical points for newly built
Chemical Laboratory
In addition to the existing points the following electrical points are essential for
newly built chemical laboratory .Necessary action may please be taken at the
earliest .The detail break up is given below
---------------------------------------------------------------------------------------
WATER SECTION
1. 5 &15 amps/220v plug points --- 25 Nos
Break Up
i) 4 No of glass cubical chambers --- 8 Nos
ii)Laboratory Electri