NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO. DATE: 01/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT 06457 WESLEYAN U N I V E R S I T Y P-7-1 327 HIGH STREET DAVISON HEALTH CENTER SOLARIUM WINDOW REPLACEMENT PROJECT SECTION 00020 - EXISTING CONDITION PHOTOS EAST ELEVATION MAJOR MAINTENANCE FY 15 2 ND FLOOR SOLARIUM WINDOWS TO BE REPLACED (EAST ELEVATION)

PHOTO. NO

  • Upload
    lita

  • View
    31

  • Download
    0

Embed Size (px)

DESCRIPTION

2 ND FLOOR SOLARIUM WINDOWS TO BE REPLACED (EAST ELEVATION). EAST ELEVATION. NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). 327 HIGH STREET DAVISON HEALTH CENTER - PowerPoint PPT Presentation

Citation preview

Page 1: PHOTO. NO

NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS).

PHOTO. NO.DATE: 01/20/14REVISIONSConstruction Services

170 Long LaneMiddletown, CT 06457

WESLEYAN U N I V E R S I T Y P-7-1

327 HIGH STREETDAVISON HEALTH CENTER

SOLARIUM WINDOW REPLACEMENT PROJECTSECTION 00020 - EXISTING CONDITION PHOTOS

EAST ELEVATION

MAJOR MAINTENANCE FY 15

2ND FLOOR SOLARIUM WINDOWS TO BE

REPLACED (EAST ELEVATION)

Page 2: PHOTO. NO

PHOTO. NO.DATE: 01/20/14REVISIONSConstruction Services

170 Long LaneMiddletown, CT 06457

WESLEYAN U N I V E R S I T Y P-7-2

327 HIGH STREETDAVISON HEALTH CENTER

SOLARIUM WINDOW REPLACEMENT PROJECTSECTION 00020 - EXISTING CONDITION PHOTOS

2ND FLOOR SOLARIUM WINDOWS TO BE

REPLACED (SOUTH ELEVATION)

SOUTH ELEVATION

Page 3: PHOTO. NO

PHOTO. NO.DATE: 01/20/14REVISIONSConstruction Services

170 Long LaneMiddletown, CT 06457

WESLEYAN U N I V E R S I T Y P-7-3

327 HIGH STREETDAVISON HEALTH CENTER

SOLARIUM WINDOW REPLACEMENT PROJECTSECTION 00020 - EXISTING CONDITION PHOTOS

MAJOR MAINTENANCE FY 15 WEST ELEVATION

2ND FLOOR SOLARIUM WINDOWS TO BE

REPLACED (WEST ELEVATION)

Page 4: PHOTO. NO

PHOTO. NO.DATE: 01/20/14REVISIONSConstruction Services

170 Long LaneMiddletown, CT 06457

WESLEYAN U N I V E R S I T Y P-7-4

327 HIGH STREETDAVISON HEALTH CENTER

SOLARIUM WINDOW REPLACEMENT PROJECTSECTION 00020 - EXISTING CONDITION PHOTOS

INTERIOR – 2ND FLOOR SOLARIUM

Page 5: PHOTO. NO

PHOTO. NO.DATE: 01/20/14REVISIONSConstruction Services

170 Long LaneMiddletown, CT 06457

WESLEYAN U N I V E R S I T Y P-7-5

327 HIGH STREETDAVISON HEALTH CENTER

SOLARIUM WINDOW REPLACEMENT PROJECTSECTION 00020 - EXISTING CONDITION PHOTOS

INTERIOR – 2ND FLOOR SOLARIUM

SCOPE OF WORK:

NOTE: THE INTERIOR SOLARIUM SPACE IS FULLY FURNISHED. CONTRACTOR IS RESPONSIBLE TO MOVE, COVER, PROTECT AND CLEAN ALL FURNISHINGS.

HAZARDOUS MATERIAL COORDINATION

1. ALL CONTRACTOR PERSONNEL WORKING ON THE PROJECT SHALL BE CERTIFIED BY THE U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA) FOR LEAD BASED PAINT ACTIVITIES.

2. ALL CONTRACTOR PERSONNEL SHALL PERFORM CONSTRUCTION ACTIVITIES AND WORK IN ACCORDANCE WITH ALL CITY, STATE AND FEDERAL BUILDING/FIRE CODES AND REGULATIONS.

WINDOW REPLACEMENT

3. REMOVE ALL SOLARIUM WINDOWS AS IDENTIFIED ON THE PHOTO SHEETS. RECYCLE ALL METAL COMPONENTS AND DELIVER TO JUKONSKI RECYCLING ON BUTTERNUT STREET IN MIDDLETOWN. HOURS OF OPERATION: 1:00 PM – 6:00 PM. RECYLCING CREDIT TO BE PLACED ON OWNER'S ACCOUNT - ATTENTION: ROSEANN.

4. NEW WINDOWS SHALL BE MARVIN CLAD ULTIMATE REPLACEMENT CASEMENT SYSTEM, WAUSAU WINDOW AND WALL SYSTEMS INVENT METAL CASEMENT WINDOWS OR APPROVED EQUAL. SASH CONFIGURATION TO BE TOP CUT 2W1H - BOTTOM CUT 2W4H. SIMULATED RAIL TO BE INSTALLED BETWEEN TOP CUT AND BOTTOM CUT.

5. PROVIDE WINDOW SCHEDULE AND SHOP DRAWING ELEVATIONS TO OWNER FOR APPROVAL PRIOR TO ORDERING.

6. REPLACE INTERIOR TRIM AS REQUIRED; PAINT TO MATCH EXISTING.

7. FILL SASH POCKETS WITH NON-FIBERGLASS BATT INSULATION, APPLY SEALANT TO HEAD AND JAMBS OF EXISTING SASH STOPS AND THEN INSTALL NEW WINDOW(S). FILL VOIDS BETWEEN OLD AND NEW WITH GREAT STUFF WINDOW & DOOR INSULATING FOAM SEALANT, TRIM INTERIOR WITH NEW TRIM PIECES AS REQUIRED AND SEAL PERIMETER INTERIOR WITH CLEAR CAULK TO ELIMINATE THE POTENTIAL FOR ANY AIR INFILTRATION. CAULK EXTERIOR TO MATCH WINDOW TRIM PAINT COLOR.

8. PROVIDE STEEL REINFORCEMENTS, PRE-ASSEMBLED EXTRUDED ALUMINUM PANNING-BACKSEAL JOINERY PRIOR TO INSTALLATION, RECEPTORS AS REQUIRED, CONCEALED HINGES, LIMITED OPENING DEVICE ON OPERABLE SASHES, OPERATING HARDWARE, LOCKS, WEATHERSTRIPPING, INSECT SCREENS .

9. MATCH INTERIOR TRIM/FRAME/STOP CONFIGURATION/COLOR/FINISH. TOUCH-UP PAINT ON INTERIOR WINDOW TRIM, FRAME, STOPS AND APRON. PRODUCT TO BE SHERWIN WILLIAMS PROMAR 200; SEMI-GLOSS - MATCH EXISTING.

9. PROVIDE NEW WINDOW TREATMENT HARDWARE AS REQUIRED FOR PROPER REINSTALLATION.

11. CAULK EXTERIOR OF ALL WINDOWS TO MATCH WINDOW TRIM PAINT COLOR.