www.pinnaclecad.com BIM Revolutionizing the AEC Industry | | | | | | | | BUILDING INFORMATION MODELING CONSTRUCTABILITY REVIEW & ANALYSIS DESIGN ENGINEERING & OPTIMIZATION COORDINATION & CLASH RESOLUTION CONSTRUCTION DOCUMENT / SHOP DRAWINGS CONSTRUCTION MANAGEMENT QUANTITY TAKE-OFF MARKETING PRESENTATIONS FACILITIES MANAGEMENT |

Pinnacle Infotech - Revolutionizing the AEC Industry

Embed Size (px)

DESCRIPTION

BIM is a coordinated process supported by technology. It adds value to construction project by creating, managing and sharing asset properties throughout its life-cycle. BIM makes quick and accurate comparison of multiple designs.For more http://pinnaclecad.com/files/bimServices.php

Citation preview

Page 1: Pinnacle Infotech - Revolutionizing the AEC Industry

www.pinnaclecad.com

BIMRevolutionizing the AEC Industry

|

|

|

|

|

|

|

|

BUILDING INFORMATION MODELING

CONSTRUCTABILITY REVIEW & ANALYSIS

DESIGN ENGINEERING & OPTIMIZATION

COORDINATION & CLASH RESOLUTION

CONSTRUCTION DOCUMENT / SHOP DRAWINGS

CONSTRUCTION MANAGEMENT

QUANTITY TAKE-OFF

MARKETING PRESENTATIONS

FACILITIES MANAGEMENT|

Page 2: Pinnacle Infotech - Revolutionizing the AEC Industry

INDEX . . . .

Commitment

We are committed to our core values and corporate mission:

| Maximize client value by adopting the latest technologies and innovations.

| Improve project efficiency by streamlining workflow and provide high quality services.

| Save time by using a large globalteam to leverage time zone advantages.

| Reduce client costs up to 30% by harnessing a highly experienced global work force.

3

4

5

5

6

7

7

8

10

11

12

13

14

5

Introduction

Benefits of BIM

Project Visualization & Collabration

Constructability Analysis and Request for Information

Model Validation / Auditing

Design Engineering & Optimization

Model Resolution

Coordination & Clash

Shop/Fabrication Drawings

Quantity Take-Off

Laser Scan to BIM

Marketing Presentations

4D Construction Phasing & Monitoring

Quality Control Process

Work Process

Why Pinnacle?

Testimonials

Project Snap Shots

3

4

9

Page 3: Pinnacle Infotech - Revolutionizing the AEC Industry

Benefits of BIM

What is BIM ?

03

BIM

| K

eep

s y

ou

ah

ead

|

|

|

|

|

Proper planning and coordination are the keys to the successful execution of projects in the construction industry. Advancements in 3D technology and the advent of Building Information Modeling (BIM) have revolutionized the Architectural, Engineering and Construction (AEC) industry.

BIM allows stakeholders to create and examine virtual representations of the architecture model and other utilities of their project. The virtual construction can be used to generate accurate construction drawings and address all constructability issues before construction begins.

Pinnacle Infotech has been acknowledged as the global leader in providing innovative BIM solutions. We have received several awards and recognition from both

Building Information Modeling (BIM) is the creation and use of coordinated 3D model via link to intelligent database for a building project. BIM enables seamless collaboration between Architects, Engineers, Contractors and Sub-Contractors enabling quick decision making, accurate construction documents, better construction management and facilities management.

industry and government. NASSCOM, the leading IT trade association, has named Pinnacle among the Top IT innovators 3 years in a row (2006, 2007, and 2008) and again in 2011.

The successful completion of more than 3000 BIM projects in 18 countries has provided Pinnacle with a deep understanding of international building codes and procedures. Our global delivery system allows us to maintain constant contact with our clients making geographical separation meaningless.

We recognize the importance of effective work process management and regular communication when outsourcing services. We have developed an ideal mix of infrastructure, experience, global presence and commitment to excellence that has led to long-term relationships with more than 950 clients worldwide.

Revolutionizing the AEC Industry

COORDINATION: Streamline communication with 3D visualization among all stakeholders for quick decision making during design and pre-construction phase.

EFFICIENCY: Eliminate RFI’s, work stoppages and rework by checking the accuracy and completeness of drawings before starting construction on-site/off-site.

QUALITY: Improving Quality by producing accurate Shop Drawings directly from the 3D BIM model which could also be used for pre-fabrication.

SAVINGS: Pre-construction and Pre-fabrication reviews mean better use of manpower, better quality construction and reduced rework and wastage, all of which translate into lower costs.

PROJECT MANAGEMENT: Detailed Material BOQ and Shop Drawings with 3D visualization enable a better look at “The Big Picture” and aid in the review, scheduling and monitoring of each project.

Page 4: Pinnacle Infotech - Revolutionizing the AEC Industry

04

BIM

| C

lash

fre

e co

nst

ruct

ion

dra

win

gs

Project Visualization and Collaboration

The coordinated BIM model helps in visualizing the complete project before construction, thus enabling comparison between different design options leading to development of more efficient, cost-effective and sustainable solution.

Constructability Analysis

Virtual Construction of project in BIM enables Independent Review of the Construction Plans and Specifications. This identifies discrepancies in drawings and all constructability issues at preconstruction stage. During the constructability review, our BIM team generates a series of RFI’s to identify following type of constructability and operational issues:

BIM model is updated based on responses of RFI’s. Status of all RFI’s is maintained in a log and follow-up is done to resolve them at preconstruction stage. This eliminates work stoppages and rework during construction.

Missing information / documents

Input inconsistencies

Conflicting data

Operation clearance and accessibility issues

Maintenance access

Page 5: Pinnacle Infotech - Revolutionizing the AEC Industry

05

BIM

| A

ccu

rate

lis

t o

f q

ua

nti

ties

Model & Clash ResolutionCoordination

We generate a coordinated BIM model after resolving the clashes among all the trades (Architecture, Structure, Concrete, Mechanical, Electrical, Plumbing, Fire Protection, etc.). Clashes are resolved through WebEx meetings/ sharing 3D clash snapshot. Clashes are resolved by re-routing utilities, changing elevation and re-sizing. Value Engineering is also offered to improve system efficiency, reduce costs and easier construction and maintenance.

Before Coordination After Coordination

We also validate the BIM model provided by the Consultants with the latest construction documents, bulletins and RFI responses. Constructability Audit is also done to resolve all issues for seamless construction and future maintenance. Construction risk is minimized by reviewing complex details and procedures before going on site.

Model Validation / Auditing

Design Engineering & Optimization

Revit based heat load calculation and generation of HVAC layouts

Sizing and calculation of HVAC ducts and pipes

Illumination calculation and generation of light and power layout

Calculation and creation of Fire fighting layout based on NFPA standards and hazard classifications

Creation of sanitary and water supply layouts based on fixture unit values and pipe sizing

Validation of equipment capacity for all services

Creation of Technical Schedules and Auto-Updating the same based on design iterations

Pressure loss reports and velocity legend creations

Other analysis reports as required

Our engineering team builds intelligent BIM model to design complex building systems with greater efficiency. This gives all stakeholders a clear idea of design intent enabling them to modify the design to achieve the outcomes they want, minimizing risk of costly changes later on. Different design options are simulated and analyzed to develop more efficient and cost-effective solutions. Some of these are listed below:

Page 6: Pinnacle Infotech - Revolutionizing the AEC Industry

06

BIM

| B

ette

r sc

hed

uli

ng

& c

on

stru

ctio

n

Fabrication/Spool Drawings

Fabrication drawings can be generated from the BIM model for accurate pre-fabrication off-site / on-site. Segmented spool drawings and a spool map with segment locations are generated in accordance with the contractors pre-fabricating standards and preferences. Pre-fabrication significantly improves quality, helps in material handling and reduces cost.

Shop Drawings Spool Drawings

Shop Drawings

Shop Drawings are created based on project standards and are useful to contractors, fabricators, suppliers and manufacturers during construction. BIM is highly useful for construction of any irregular or complex structures. We generate accurate sleeves, penetration and hanger locations from the BIM model before start of construction. These drawings can be directly downloaded into GPS instruments for fast and accurate layout at site. These drawings are generated directly from coordinated BIM models and are detailed enough for workshop fabrication and/or on-site construction. Advanced BIM tools help in revisions management.

Page 7: Pinnacle Infotech - Revolutionizing the AEC Industry

4D Construction Phasing & Monitoring

Project construction schedule/sequencing is linked to the BIM model. A real time simulation of the construction sequence is shown in Navisworks Time Line or as an animation video format. During the entire duration of the project, the Planned Vs. Actual construction schedule is compared and presented.

When the project plan is established in visual simulation, users can visually associate model objects and scheduled tasks. Users can click on a building object in the 4D visual environment and can view its associated task highlighted in the Gantt Chart or vice versa.

07

BIM

| P

refa

bri

cate

fo

r Q

ua

lity

Quantity Take-Off

BIM model generates accurate quantity of all materials. These quantities are automatically updated with any changes in the BIM model. Quantity Take-Off (QTO) reports can be formatted in Excel and exported to a database for detailed analysis. Quantities can be generated for a specific time period or project area (4D/5D) to help manage material procurement and save inventory costs.

Structural elements – Concrete, Steel, Rebar’s, CMU Walls, etc.

Architectural elements – Block Work, Ceiling, Doors and Windows, Railings, Finishes, etc.

MEP elements – Ducts, Pipes and Fittings, Accessories, Equipments, Cable Trays, Hangers, etc.

The following elements can be generated from a BIM model:

Page 8: Pinnacle Infotech - Revolutionizing the AEC Industry

08

BIM

| P

ara

met

ric

cha

ng

e fo

r b

ette

r co

ord

ina

tio

n

Laser Scan to BIM

Laser Scan technology gives an accurate and detailed “as-built” drawing with Point Clouds. BIM tool use Point Clouds to create Revit model with automated recognition and placement of architectural, structural and MEP elements. The visual model of existing conditions is used for design and clash detection mainly in retrofit and renovation projects producing a seamless fit between new and existing assets.

Point cloud sample Output (2D drawing) generated from point cloud

Page 9: Pinnacle Infotech - Revolutionizing the AEC Industry

Pre-Processing Co-registration of Scans

09

BIM

| M

inim

ize

coo

rdin

ati

on

tim

e b

etw

een

En

gin

eers

, A

rch

itec

ts a

nd

Co

ntr

act

ors

.

Marketing Presentations

We help our clients secure bids by creating Marketing Presentations of high quality rendered images, Walkthrough Animations, 4D Phasing and Site Logistics.

Page 10: Pinnacle Infotech - Revolutionizing the AEC Industry

10

BIM

| B

ette

r sc

hed

uli

ng

& c

on

stru

ctio

n

Quality Control Process

QC Check Phase III

QC 2

Screen Check

Performed by QC Dept./Team

DELIVERY

TO

CLIENT

100% Quality

QC 1

Plot Check

Performed by Production Team

QC 3

Pre-Shipment Check

Performed by Project Manager

QC Check Phase I

The model is plotted on paper and a preliminary grid by grid check is done comparing it with the original contract documents. Member of the Project Management team assists in this process.

The project team leader sends a status report to the QC Department to begin QC Phase II.

QC Check Phase II

The QC Team performs a more detailed comparison of the Contract Documents against the 3D BIM model. Specific Checklist is prepared to review/check the deliverables. Their main objective is to review, identify and address the following:

The QA/QC Team continuously interacts with the Project Lead and other team members to resolve all technical issues related to the project.

The Project Manager conducts the pre-shipment check before sending them to the client.

Our QC process is ISO 9001:2008 certified and managed by an independent QC team. The main objective of the quality control (QC) process is to detect errors and rectify it.

Ensuring quality is a group effort and our dedicated QC team is led by a highly qualified and experienced Manager in MEP Coordination and Quality Control.

The entire QC process is handled in three phases:

Missing dataMismatches with the contract documentsClashes (Old/New), Elevation, Routing, Fittings, etc.Construction point of view.No-Fly-Zones.Attribute Checking (Pressure class, Pipe material, etc.)Location of Equipment such as VAV, Sleeves, Hangers, Valves.Equipment Connection details as per Schematic Drawings.Equipment Models as per Technical Submittals.Annotations & Dimensions, Aesthetic View.Miscellaneous issues

Page 11: Pinnacle Infotech - Revolutionizing the AEC Industry

Work Process

11

BIM

| M

inim

ise

tim

e co

nsu

min

g e

rro

rs b

etw

een

ME

P e

ng

inee

rs

PINNACLE MARKETING

TEAM

ESTIMATES

`

CLIENT Architects / Engineers / General Contractors / MEP Contractors

ARCHITECTURAL TEAM

# RFI's Generation

# 3D Model Creation

# Constructability Review & Value Engineering

# Quality Control (QC)

STRUCTURALTEAM

MEP TEAM

BIM COORDINATION

RF

I / C

larifications

BIM PINNACLE

PROJECTMANAGER

Deliv

era

ble

s

DELIVERABLES

ARCHITECTURAL TEAM

4D Quantity Take-OffConstruction DocumentsCo-ordination Drawings

Phasing

STRUCTURALTEAM

4D PhasingQuantity Take-OffConcrete Lift DrawingSteel Shop DrawingErection PlanCoordination Drawings

MEP TEAM

4D PhasingQuantity Take-OffShop DrawingsHanger & Inserts Spool & Fabrication DrawingsSleeve & Block-out DrawingsEquipment Pad LayoutCoordination Drawings

COORDINATION & QUALITY CHECK

# RFI's Generation

# 3D Model Creation

# Constructability Review & Value Engineering

# Quality Control (QC)

# RFI's Generation

# 3D Model Creation

# Constructability Review & Value Engineering

# Quality Control (QC)

Combining of all the various trades/discipline

Performing clash detection

Coordination meetings to discuss unresolved clashes

Updating the model to resolve clashes

Page 12: Pinnacle Infotech - Revolutionizing the AEC Industry

12

BIM

| P

ara

met

ric

cha

ng

e fo

r b

ette

r co

ord

ina

tio

n

Why Pinnacle? Multi disciplinary Team

Pinnacle is global leader in providing innovative BIM services. Our in-house team of more than 650 experienced Architects, Engineers and BIM professionals helps us provide end-to-end solution to discerning clients around the world.

Our 3,50,000 sq.ft., world-class production facility is equipped with high-end workstations, advanced servers with real time backup and a high speed data and voice network. It is all protected with an uninterrupted power supply with a 24 x 7 security system.

Fast Turnaround

Our skilled team of professionals can provide quick turnarounds on complex projects. Pinnacle has successfully completed several large-scale projects across multiple verticals including Health Care, Hospitality, Airports, University Centers, Data Centers, Retail Centers, Convention Centers, Commercial, Industrial and Residential Projects.

Global Presence

Pinnacle has offices around the world (USA, India-Durgapur & Kolkata, UAE and Italy) enabling us to serve our clients around the clock.

Experienced in BIM Domain

We have global experience of 16 years and have successfully collaborated with several leading contractors on BIM projects for specialty hospitals, stadiums, universities, dams, apartment complexes, hotels, casinos, large retail center, high school, airport, commercial buildings, convention center, high rise tower and industrial projects.

Communication

Pinnacle’s Project Management team is available to clients through a number of communication channels including:

1. Global telephone network for instant communication.2. FTP over a secured network for file transfers.3. Email for reports and interactions.

Technical Strengths

Pinnacle engineers have a deep understanding of global and regional codes and standards. Our Quality Management System is as per ISO 9001:2008.

4. Video and teleconferencing for presentations and conversations.5. WebEx conferences with US-based phone systems.

Pinnacle engineers specialize in the latest BIM software: Revit Software Suite (Revit, Revit MEP, Revit Architecture and Revit Structure), Microstation, Ecotect Analysis,

NavisWorks, Inventor, Civil 3D, Plant Design Suite, Pro/Engineer, Tekla Structure, SolidWorks, Autodesk Fabrication Suite, Quickpen, Cadpipe etc.

Page 13: Pinnacle Infotech - Revolutionizing the AEC Industry

13

BIM

| D

esig

n .

An

aly

se .

Op

tim

ise

. V

isu

ali

se .

Co

mm

un

ica

te

Testimonial

Nicholas Zent

C.W. Driver

“Pinnacle had revolutionized the BIM elements of our company. They are extremely professional and skilled at what they do and develop a personal relationship with ease. Since our first project, we have used Pinnacle for over a dozen and will continue to do so consistently in the future.”

Mr. Bobby Mayfield

MCC group

“We are thrilled to have found a group like yours that service all of our MEP drafting needs, and at record response. We truly feel like you have met and exceeded every thing we could have asked of your group. We look forward to a long and bright future together.”

David Brandt

McKinstry Company

"We have been using Pinnacle Infotech since November,2004 and have been very satisfied with the quality and speed of their services. On the first project we used Pinnacle Infotech, we reduced our outsourced CAD expenses from $30,000 to $10,000 and shortened our timeline by two weeks. Project Management was impressed. I gladly recommend Pinnacle Infotech to those who benefit from outsourcing CAD drafting.”

Michael Cowling

Northern Engineering Pvt Ltd.

“3D BIM services have enabled us to review constructability of drawings before construction. Pinnacle has always provided accurate drawings and fast turnaround saving us costs and meeting tight schedule. Keep up good work.”

“The project manager and his team did an excellent job to deliver a high quality model within the time frame expected.”

Michael Daneshvar

Turner Construction Company

“Pinnacle provided a high quality model with an extremely quick turn-around. We will definitely keep you guys in mind for our future projects. Thanks for all the hard work.”

Dustin Hartsuiker

Swinerton Builders

"Pinnacle has been a pleasure to work with on this project. Pinnacle is always willing to do what it takes to get a job done. Even though the proposals have been pushed out, Pinnacle met all deliverable dates and provided a quality product for the proposal phase of this project. I look forward to more projects working with the pinnacle staff.”

Neil Umpstead

Harper Construction Company, Inc

“Overall, this was a great experience with Pinnacle. They were very responsive, asked questions when needed and met the schedule as discussed. We had to push back the schedule for the first building due to numerous RFI's, but they keptto the final schedule that we discussed.”

Andrew Poling

Wohlsen Construction Company

“Pinnacle delivers a great deal of value for a very reasonable price. They consistently deliver my expectations on-time.”

Ryan Tingey

Turner Construction Company

Page 14: Pinnacle Infotech - Revolutionizing the AEC Industry

14

BIM

| P

refa

bri

cate

fo

r Q

ua

lity

Delivered a 3D BIM Model of Architecture, Structure, Mechanical, Electrical, Plumbing and Fire Protection services after a complete coordination among all the trades. Clash reports were also generated from the model.

Residential

FloridaUSA

Contractor Vintage Park Apartments November2013

425,754 Sq.Ft.

5 Engineers

LOCATIONTIME LINE

PROJECT AREAMANPOWER

PROJECT NAMEDETAILS

CLIENTSECTOR

Project Snap Shots

BIM & MEP Services

Commercial

BengaluruIndia

Owner

Creation of meticulous model for the construction project - 3 main Blocks comprising of IT & non-IT offices (ITC Tower) + 2 Ancillary Buildings (Security Block & Multipurpose Hall, both single storey) on a four level common basement. Immaculate use of 3D BIM model for MEP design coordination, generation of constructability report & Quantity Take-Off, creation of 3D Mock up along with 4D Phasing/Scheduling.

ITC Green Center May2013

1,345,488 Sq.Ft.

15 MEP Engineers, 8 Architectural and Structural Engineers

Generaland MEPContractors Scope for this project was to create Architectural and Structural 3D Modeling,

MEP-FP (Mechanical, Electrical, Plumbing, Fire Protection) Modeling;Along with Coordination services, Shop Drawings creation, Constructability Report generation, Quantity Take-Off, creating 3D Mock up and 4D Phasing/Scheduling.

Mixed Use

DohaQatar

Msheireb Downtown Doha July2013

374,541 Sq.M.

45 MEP Engineers16 Architectural and Structural Engineers

VirginiaUSA

756,990 Sq.Ft.Main Contractor

Rosslyn Central Place

A 3D BIM Model of Architectural and Structural elements of the entire building were provided and also executed constructability review and analysis.

May2014

7 Engineers

Residential

JeddahSaudi Arabia

457,840 Sq.M.MEPContractor

Kingdom Tower

This is one of the tallest building structure, with more than 150 levels;Scope included 3D Modeling, Coordination and Shop Drawing creationservices under MEP trade.

May2014

40 Engineers

Mixed Use

Scope included creation of Architectural & Structural 3D Model (LOD 350), and Coordination.

Residential

FloridaUSA

General Contractor

8th Avenue Residences December2013

381,000 Sq.Ft.

10 Engineers

Scope included 3D Modeling and Clash Coordination; (AR model-Ext. wall, Int. wall, partition wall, door, window, roof, ceiling. ST Model-Base Plate, Pier, Grout, Footing, Step Footing, Column, Beam, Slab, Concrete Wall, Bracing.)

Residential

FloridaUSA

General Contractor

Bel Air Doral Apartments November2013

57,222 Sq.Ft.

7 Engineers

Provided full Tekla model, capturing all information/objects from the Civil 3D file as provided by the client; Provided clear distinction between3 systems; Sanitary Sewer, Water and Storm according to the input Drawing; Completed the client provided attribute fields for all objects; Created 3D Model of CMU wall and fire rated wall; 2D drawings for CMU Walls, Plan and Elevation were also provided.

Infrastructure

FloridaUSA

General Contractor

Daytona International Speedway August2013

86,111 Sq.Ft.

3 Engineers

It was a coordination project. Structural model was provided by the client. Scope included creation of wall, door, window, casework, exterior features, finishing etc.

Residential

FloridaUSA

General Contractor

Paseo Del Mar August2013

467,000 Sq.Ft.

10 Engineers

Airport

DubaiUAE

MEPContractor

Scope included, creation of 3D Modeling, Coordination with modular concept and Shop Drawings creation for MEP services.

Dubai International Airport Concourse-4 March2013

167,748 Sq.M.

64 MEP Engineers7 Architectural and Structural Engineers

Page 15: Pinnacle Infotech - Revolutionizing the AEC Industry

15

BIM

| C

ost

est

ima

tio

n a

ccu

racy

wit

hin

3%

Project Snap Shots

BIM & MEP Services

LOCATIONTIME LINE

PROJECT AREAMANPOWER

PROJECT NAMEDETAILS

CLIENTSECTOR

Airport GeneralContractor

New Delhi International Airport

New DelhiINDIA

May2010

5,920,151 Sq.Ft.

20 MEP Engineers40 Architects

Entire designing of BIM for Terminal 3 and runways for this large International Airport; Complete BIM for Passenger Terminal Building and Domestic and International PIER; Sight line report for Air Traffic Control; Simulated structures of Raft Foundation and Column along with Arrival; Mezzanine level Concrete Structure; Clash detection between all services; Quantity Estimation and Construction Phasing done as per PERT chart of the project.

Provided a complete 3D BIM Model of cast-in-place, precast Concrete and MEP Services. MEP cut-outs and Steel Embedment. Generation of Quantity Take-Off for form work, cast-in-place and precast concrete; Also delivered 1365 Lift Drawings as per pour sequence time line.

Hydro Electric Facility

Kentucky USA

Concrete Contractor

Meldahl Hydro Electric Facility June 2010

20,557 Sq.Ft.

15 Structural Engineers.

Water Treatment Plant

GeneralContractor

Robert B. Diemer Water Treatment Plant

Yorba LindaUSA

July2008

9,234,712 Sq.Ft.

10 MEP EngineersThis project involved different aspect of BIM services such as; Water Treatment Plant retrofitting; Oxygen/Ozone system, Ozone Generation Building, Ozone Contactors, Influent, Effluent Conduits, Rejection Tunnel, Liquid Oxygen Store, Chemical Feed, Unit Substation, Switchgear Building, Emergency Generator, Yard Conduits & Piping; Grading; Paving; Demolition; modifying Plant Utility; Landscaping; Commissioning; Meter vaults. 3D Modeling, Detailing, Lift Drawing embeds, Penetrations Pre-cast walls, Slabs (primary & secondary), Steel Fabrication.

Hospital

ArkansasUSA

NEA Baptist Center for Cancer Care

Meticulously coordinating BIM Model, Fabrication Drawing, Sleeve and Hangers Drawing for sheet metal, Mechanical Piping and Plumbing services, Generation of coordinated drawings from the clash free 3D BIM model and also based on client’s manufacturing work process and special fabrication processes.

May 2011

729,524 Sq.Ft.

15 MEP Engineers

Contractors

USAColorado Scope included, building an exhaustive coordinated BIM Model, Fabrication,

Sleeve and Hanger Drawing creation for sheet metal, Mechanical Piping and Plumbing services, Evolving coordinated shop drawings from the clash free 3D BIM model.

Hotel MEPContractor

Stonebridge Dual Brand Hotel February2012

322,672 Sq.Ft.

10 MEP Engineers

Scope included robust determination of Process Piping-3D Model, Coordination, Shop Drawing, Hanger BOQ, Spool and Hanger-LOD-500Drawing creation.

Industrial Plant

South CarolinaUSA

MEPContractor

Bridgestone Aiken ORR Plant September2012

1,320,000 Sq.Ft.

8 MEP Engineers

Scope included Architectural and Structural BIM modeling, MEP Modeling, 4D (Model W/Schedule) and Site Logistics, Constructibilty Report generation, Clash Detection.

College

CaliforniaUSA

GeneralContractor

East Los Angeles College (Math & Science Complex) November 2012

100,730 Sq.Ft.

8 Engineers

Entire project executed in three phases; Phase1: 3D Model creation per project Specification, Zoning & Service type determination using customized CAD Map database. Phase2: Embedded data model incorporation, Clash Coordination, Hanger & Trimble Drawings creation, Checklist incorporation.Phase3: Shop Drawing information issued for construction drawings, CAM file for Pre-fabrication, Trimble layout for Hangers & Inserts, Spool drawings, Sq.Ft calculation for duct and isometric, piping drawing for leak testing & engineer's approval.

Medical Center

Los AngelesUSA

GeneralContractor

University Medical Center (Diagnostic & Treatment Building) March2012

1,025,500 Sq.Ft.

20 Engineers

Page 16: Pinnacle Infotech - Revolutionizing the AEC Industry

Texas, USADubai, UAE

Durgapur, India

Kolkata, India

www.pinnaclecad.com

Lecco, Italy

Pinnacle Infotech Solutions

S.S.B. Sarani, Bidhannagar, DurgapurWest Bengal, India - 713212Phone : +91 343 6602222 / 6602231 – 35Fax : +91 343 6602230Email : [email protected]

International Production Center

Bimal PatwariPresident Cell : 713 589 9125

Kolkata Office

Suite 530, SDF Building.Salt Lake Sector V, Kolkata - 700091 Phone : +91 33 23576195 Email : [email protected]

Pinnacle Infotech Solutions

Pinnacle Infotech Inc.

6161 Savoy Drive #1125,Houston, TX 77036Phone : 713 780 2135Fax : 713 780 8784Email : [email protected]

USA Office and Production Center

Biswanath TodiOperations ManagerCell : 832 283 6628

ITALY Office

Phone : + 39 0341630070Email : [email protected]

Nunki di M.Brossa,Via Calvi, 10 - 23801Calolziocorte, LC - Italy

UAE Office

Office No – 307, 3rd Floor, Building No. 7PO Box - 345869, Dubai Outsource ZoneDubai, UAE

Bimal PatwariManager

Phone : +971504965954Email : [email protected]

Pinnacle Infotech Technologies FZ-LLC