Page 1: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

Melbourne 2030planning for sustainable growth

Department of Infrastructure

Green WedgesImplementation Plan 5

DraftOctober 2002

Plan 5 Cover 24/9/02 1:15 PM Page 1

Page 2: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

The implementation plans explained Page 1

Melbourne 2030 in summary Page 2

Green wedges Page 3

What are they? Page 3

Where are they? Page 3

What is their role? Page 4

What are the aims of this plan? Page 7

What does it change? Page 7

What are the implications for local government? Page 7

Actions Page 8

How does this plan relate to Melbourne 2030? Page 8

What are the recommended actions? Page 8

Action 1. Apply the urban growth boundary Page 10

Action 2. Introduce new planning measures Page 10

Action 3. Provide legislation that ensures protection of green wedges Page 11

Action 4. Develop an individual action plan for each green wedge Page 11

Action 5. Manage residential development in green wedges Page 14

Action 6. Maintain access to productive natural resources and an adequate Page 16

supply of well-located land for energy generation and infrastructure

Next steps – what do we need to do? Page 17

Green wedges Page i

Contents

Plan 5 Green Wedges 26/9/02 8:35 AM Page i

Page 3: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

Appendix 1 Page 18

Green wedge attributes Page 18

Appendix 2 Page 19

Overall purpose of green wedges Page 19

Appendix 3 Page 20

Draft Green Wedge and Rural Conservation Zones Page 20

Appendix 4 Page 45

Green wedge legislation Page 45

Page ii Draft Implementation Plan 5

Plan 5 Green Wedges 26/9/02 8:35 AM Page ii

Page 4: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

Six draft Implementation Plans support Melbourne 2030 –planning for sustainable growth.

The plans cover these topics:

• urban growth boundary

• growth areas

• housing

• activity centres

• green wedges

• integrated transport

An advisory note on implementation of Melbourne 2030in the planning system from the date of release will beseparately available.

The draft Implementation Plans have been developed tobuild on sections of Melbourne 2030 where new or differentactions are proposed and to provide further detail on some– but not all – of its initiatives. Despite the 30-year timeframe for Melbourne 2030, many of its most importantinitatives will need to be introduced in the next five years.

The draft Implementation Plans aim to provide localgovernment, the planning profession, the developmentindustry and interested members of the community withguidance and additional information. Presently draftdocuments, they will serve as a basis for dialogue over the consultation period. When finalised, they will be a springboard for action.

Each plan brings together the policies and initiatives fromMelbourne 2030 relevant to its particular topic, andoutlines a preferred approach to implementing them.

Each plan also reinforces the new approach proposed byMelbourne 2030. This far-reaching document examinesurban management issues in metropolitan Melbourne andits surrounding region, and explores the ways in which thenew urban fabric will be laid down for future generations.

You are urged to refer to Melbourne 2030 as the contextfor the draft Implementation Plans. Of general relevance tothe topic of green wedges include:

• managing metropolitan outward growth

• directing growth to areas best able to be supplied withinfrastructure and services

• safeguarding valuable features in rural areas.

These draft Implementation Plans do not cover all actionsproposed in Melbourne 2030. Additional implementationplans will be developed as the need arises.

Green wedges Page 1

The implementationplans explained

Plan 5 Green Wedges 26/9/02 8:35 AM Page 1

Page 5: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

Melbourne 2030 is a strategic plan prepared to managegrowth and change across metropolitan Melbourne and its surrounding region.

Its prime focus is the area covered by the 31 Melbournemetropolitan municipal councils (including the nine‘interface councils’ which cover both urban and rural areasat the fringes of metropolitan Melbourne). It also raisesimportant issues that affect local councils outside themetropolitan area, particularly those astride the regionaltransport corridors between metropolitan Melbourne andthe closest regional cities within current and potentialcommuting range.

In establishing and articulating a long-term vision formetropolitan Melbourne, built up from many contributionsacross the community, Melbourne 2030 provides aframework for governments at all levels to respond to thediverse needs of those who live and work in and nearMelbourne, and who visit it.

The substance of Melbourne 2030 is contained in nine‘directions’ that embody the Government’s aims ofsustainability and of providing a better future for all. They are:

• a more compact city

• better management of metropolitan growth

• networks with the regional cities

• a more prosperous city

• a great place to be

• a fairer city

• a greener city

• better transport links

• better planning decisions, careful management.

Each of these directions is supported by specific policiesthat will be incorporated into the planning system. The policies will be implemented through a range ofinitiatives undertaken through joint action by localgovernment, the Government and the wider community.

As Melbourne 2030 is a statement of government policyintent only, some of the initiatives will be subject to theavailability of budget funding. That is, such initiatives willneed to await assessment and prioritisation through normalState budget processes in future periods. It is not intendedthat all initiatives should begin at once, nor that all shouldbe completed within the five-year time frame. Many willlead to follow-on work. Others may change or be reviewedover the 30-year life of Melbourne 2030.

Page 2 Draft Implementation Plan 5

Melbourne 2030 in summary

VisionIn the next 30 years

Melbourne will grow by up

to one million people and

will consolidate its reputation

as one of the most liveable,

attractive and prosperous

areas in the world for

residents, business

and visitors.

Plan 5 Green Wedges 26/9/02 8:35 AM Page 2

Page 6: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

What are they?Green wedges are the open landscapes that were set aside,more than 30 years ago, to conserve rural activities andsignificant natural features and resources between thegrowth areas of metropolitan Melbourne as they spread out along major road and rail links.

The definition of green wedges has been loose and conceptual.In the context of Melbourne 2030, discussion has encompassedthe wider issue of protecting other non-urban areas aroundmetropolitan Melbourne. Therefore, a wider definition of greenwedges has been adopted for the purposes of Melbourne 2030and this draft Implementation Plan.

Where are they?The green wedges are distributed outside the urban growthboundary in a broad arc around metropolitan Melbourne(see Figure 1). They are listed below, with their boundaries:

• Werribee South – the Port Phillip Bay coastline, the western edge of the City of Wyndham and theMelbourne–Geelong rail line

• Western Plains South – the Melbourne–Geelong railline, the western boundary ofthe City of Wyndham, theWestern Highway west ofMelton, the southern edge ofMelton township and theBallarat rail line

• Western Plains North – the Ballarat rail line, thenorthern edge of Meltontownship, the WesternHighway, the western andnorthern boundaries ofMelton Shire and the Calder freeway

• Sunbury – the Calderfreeway and the northernand eastern boundaries ofthe City of Hume

• Whittlesea – the westernboundary, northern boundaryand eastern boundary of theCity of Whittlesea

• Nillumbik – the western,northern and easternboundaries of the

City of Nillumbik and portions of the City ofManningham near the Yarra River

• Manningham – the Yarra River and the easternboundary of the City of Manningham

• Yarra Valley and Yarra and Dandenong Ranges – thewestern, northern and eastern boundaries of the Shire of Yarra Ranges and the northern boundary of theWesternport catchment

• Southern Ranges – the northern boundary of theWesternport catchment, the eastern boundary of the Shire of Cardinia and the electrical transmissioneasement east of Pakenham

• South East – the area between the Bayside andDandenong/Cranbourne urban areas and the northernboundary of the Westernport catchment

• Westernport – the electrical transmission easement east of Pakenham, the eastern and southern boundariesof the Shire of Cardinia, the western boundary of theCity of Casey and Westernport

• Mornington Peninsula – part of the northern boundaryof the Shire of Mornington Peninsula and the south-eastern boundary of the City of Frankston

Green wedges Page 3

Green wedges

PORTPHILLIP

BAY

WESTERN PORT

0 10 20 kmNORTH

Existing urban areaGreen wedge Growth area

Whittlesea

Western PlainsSouth

Werribee South

SunburyWesternPlains North

Manningham

Nillumbik

Yarra Valley and Yarraand

Dandenong Ranges

South EastWesternport

Southern Ranges

MorningtonPeninsula

Figure 1. Green wedges

Plan 5 Green Wedges 26/9/02 8:35 AM Page 3

Page 7: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

What is their role?The green wedges fulfill a range of specific roles that include:

• providing opportunities for agricultural uses, such asmarket gardening, viticulture and broad hectare farming

• preserving rural and scenic landscapes

• preserving conservation areas close to where people live

• preserving renewable and non-renewable resources andnatural areas (such as water catchments)

• providing and safeguarding sites for infrastructure that supports urban areas (such as airports and sewage plants)

• allowing industries such as sand and stone extraction to operate close to major markets

• enabling the development of networks of open space

• providing opportunities for tourism and recreation.

Page 4 Draft Implementation Plan 5

PORTPHILLIP

BAY

WESTERN PORT

NORTH

0 20 km10

WESTERN PORT

Environmentally significant area

Rural use/landscape values

Existing urban area

Flood-prone land

Ramsar wetlands

Dandenong

Werribee

Greensborough

Ringwood

FrankstonGeelong

Mud Island

Tullamarine

Pakenham

Deer Park

Melton

BacchusMarsh

Sunbury

Mornington

Hastings

Source: Department of Infrastructure, Department of Natural Resources and Environment, 2001

Figure 2. Significant environmental resources and constraints

Plan 5 Green Wedges 26/9/02 8:35 AM Page 4

Page 8: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

These roles and the benefits they bring can be variouslyascribed to natural features, historical urban growthpatterns and the deliberate policies of successivegovernments. They also bring significant economic,environmental and social benefits, and show the advantageof long-term planning policies.

Green wedges have practical as well as intrinsic values. They provide natural resources, such as stone or sand,

and opportunities for agriculture. They provide open spacesfor city-dwellers and a home for those who enjoy living in a more open landscape. They protect natural features thatthe community values, and, by their nature and physicalexistence, they have affected the shape of metropolitanMelbourne by imposing limits to urban development.

Appendix 1 provides an overview of the inherent features andprevailing values of green wedges (see Figures 2, 3 and 4).

Green wedges Page 5

Melbourne water catchment

Possible water reuse areas

Existing urban area

CALP Act proclaimed water catchment

40 km200

NORTH

Source: Department of Infrastructure, Department of Natural Resources and Environment and Department of Innovation,Industry and Regional Development

Wangaratta

Melbourne

Geelong Traralgon

Ballarat

Shepparton

Bendigo

Pakenham

Woodend

Kyneton

Wallan

Melton

Lara

Castlemaine

Warragul

Seymour

Nagambie

Benalla

Euroa

PORTPHILLIP

BAY

WESTERN PORT

Figure 3. Significant water resources

Plan 5 Green Wedges 26/9/02 8:35 AM Page 5

Page 9: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

Plan 5Page 6 Draft Implementation

Further investigation for water reuse

High-value agricultural land

Existing urban area

Horticulture

Rural use

PORTPHILLIP

BAY

WESTERN PORT

NORTH

0 20 km10

WESTERN PORT

Figure 4. Significant agricultural resources

Dandenong

Werribee

Greensborough

Ringwood

FrankstonGeelong

Tullamarine

Pakenham

Deer Park

Melton

BacchusMarsh

Sunbury

Mornington

Hastings

Source: Department of Infrastructure, Department of Natural Resources and Environment, 2001

Plan 5 Green Wedges 26/9/02 8:35 AM Page 6

Page 10: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

What are the aims ofthis plan?Melbourne 2030 aims to achieve a fundamental change inthe relationship of rural areas to metropolitan Melbourne. It will focus growth in areas best able to be served withtransport and other infrastructure and concentrate newurban development in areas best able to cope with thatchange, to sustain the values of the green wedges outsidethem. Clarifying where urban development will be allowedand where rural activities and environmental values are toprevail will enable landowners in green wedges to plan andinvest with greater certainty.

This plan builds on Melbourne 2030 by explaining howoutside the urban growth boundary (UGB), priority inplanning and development will go to agriculture,conservation, natural resource-based uses, airports andports, tourism, and the protection of important watercatchments.

What does it change?The green wedges will be subject to improved protectionthrough tougher planning controls, legislative change andimproved on-ground action.

The UGB will limit urban development to areas that canbest accommodate growth, keeping development fromlocations that are inappropriate or where other valuesshould prevail.

New zones will tighten the range of uses that are allowedin green wedges so that uses better suited to urban areasare confined to locations inside the UGB.

Legislation will be introduced to underpin the protection of the green wedges.

Action plans will be developed for all green wedges, to complement the plans of individual municipalities.

The Ministerial Direction No. 6 – Rural ResidentialDevelopment will be widened to include larger residentiallots. Future planning for rural residential development willmaintain natural resource attributes and protect existingenvironmental qualities, such as remnant native vegetationand biodiversity, which are declining or threatened in manyareas. Planning provisions will be reviewed to limit housingon isolated lots in rural areas where services are minimal,and to support agriculture and industries based on natural resources.

What are theimplications for localgovernment?Despite much good work at the local government level,there has been some inconsistency in the application ofplanning policies, management measures, priorities andresource allocation in green wedges.

This points to the need for a clearer policy and actionframework for green wedges, linked to positive informationabout where non-urban values will prevail and where urbandevelopment will be encouraged.

Beyond firmer planning policy and regulation there mustalso be active involvement by State and local government in issues such as land management, vegetation restoration,water quality improvement and weed and animal pestcontrol.

Green wedges Page 7

Plan 5 Green Wedges 26/9/02 8:35 AM Page 7

Page 11: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

How does this planrelate to Melbourne2030?The draft Implementation Plan for green wedges reinforcesDirection 2 of Melbourne 2030 – ‘better management ofurban growth’.

This direction aims to protect the green wedges thatsurround metropolitan Melbourne (Policy 2.4). It alsoestablishes a UGB to limit the city’s development (Policy 2.1),and concentrates urban expansion into growth areas thatare served by high-capacity public transport (Policy 2.2).

The draft Implementation Plan is also relevant to Direction 3– ‘networks with the regional cities’ – which aims to controldevelopment in rural areas, to protect agriculture and avoidinappropriate rural residential development (Policy 3.2).

It relates also to several other key directions – ‘a moreprosperous city’ (Policy 4.1, on maintaining access tonatural resources and well-located land), ‘a great place tobe’ (Policies 5.7, 5.8 and 5.9, on providing moremetropolitan open space, protecting the health of the baysand their catchments, and enhancing public access to thebays), and ‘a greener city’ (protecting native habitat andbiodiversity, Policy 7.7).

What are therecommended actions?Actions designed to address the key issues outlined aboveand to achieve the directions of Melbourne 2030 aregrouped as follows:

• apply the UGB

• introduce new planning measures

• provide legislation that ensures protection of greenwedges

• develop an individual action plan for each green wedge

• manage residential development in green wedges

• maintain access to land for special purposes.

These are summarised for easy reference in theaccompanying table.

Page 8 Draft Implementation Plan 5

Actions

Plan 5 Green Wedges 26/9/02 8:35 AM Page 8

Page 12: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

* Short – start within 12 monthsMedium – start in 1–2 yearsLong – start in 2–5 years

Green wedges Page 9

Green wedge actionsRelevant

Time frame initiatives in(short, medium, Melbourne

Action area Task (in sequence) long)* Lead agency Involved 2030

application of UGB to affected in place Department of 2.1.1planning schemes Infrastructure (DOI)

release of Ministerial Direction in place DOI 2.1.1No.10 – Urban Growth Boundary

Establish establish regional working short DOI local 2.4.1regional groups to review Green Wedge government 2.4.1working and Rural Conservation Zones 2.4.3groups and application of zones

Introduce review feedback on Green short DOI local 2.4.1new planning Wedge and Rural Conservation government 2.4.3measures in Zones 3.2.1green wedges 3.2.2

finalise zones and apply to short local government DOIrural areas

Provide undertake legislative changes short DOI 2.4.4legislation to protect green wedges

Develop an finalise terms of reference and short DOI local 2.4.1individual working arrangements for green government 2.4.2action plan wedge working groups and other 2.4.3for each stakeholders 3.1.3.green wedge 4.1.2

4.1.34.1.45.2.15.7.1 - 55.9.1

undertake action plans medium local government DOI and other stakeholders

develop planning directions for short local government DOI 2.4.2towns in green wedges 3.1.3

amend Ministerial Direction No. 6 short DOI 3.2.3– Rural Residential Development to 3.2.5cover lots up to 8 hectares in area

review suitability of isolated lots medium local government DOI 3.2.2for rural living

update regional resource medium Department of 5.8.3mapping Natural Resources

and Environment

assess planning policies and medium DOI local 4.1.4planning provisions to ensure government there is adequate protection for established natural resource-based industries, and energy infrastructure

Maintain access to land for special purposes

Manage residential development

Apply theurban growth boundary

Plan 5 Green Wedges 26/9/02 8:35 AM Page 9

Page 13: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

Action 1Apply the urbangrowth boundary Lead agent: Department of Infrastructure (DOI)

The application of the UGB around metropolitanMelbourne, as provided in Melbourne 2030, will showclearly where metropolitan growth will occur and whereongoing incremental expansion will stop. As the boundarywill be permanent, other than in defined growth areas,there will be greater certainty for green wedges.

Issues affecting the application of the UGB are more fullyexplained in draft Implementation Plan 1, Urban GrowthBoundary.

Action 2Introduce newplanning measuresLead agent: DOI

DOI has developed two new zones, the Green Wedge Zoneand Rural Conservation Zone, that will be applied to ruralareas in green wedges. These have been designed to reflectthe intention of Melbourne 2030 and will be a major toolin safeguarding green wedge objectives. The zones includeprovisions that limit subdivision and the range ofdiscretionary uses. An explanation of the new zones and acopy of the draft provisions are shown at Appendix 3.

In brief, it is intended that the Rural Conservation Zone beapplied to rural land in conservation areas where theidentified environmental, landscape and cultural qualitiesand characteristics of the land are of importance.

It is intended that the Green Wedge Zone be applied toother non-urban land outside the UGB.

It is proposed that the new zones be applied in planningschemes at an early stage.

DOI will undertake further development of the zones,working with affected councils to refine provisions andguidelines for their use and application. The regionalworking groups (see also Action 4) will provide a forum to consider the content of the new zones and theirapplication.

DOI will ensure that the new zones complement theconclusions arising from the review of the rural zones.

Page 10 Draft Implementation Plan 5

Plan 5 Green Wedges 26/9/02 8:35 AM Page 10

Page 14: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

Action 3Provide legislationthat ensuresprotection of green wedgesLead agent: DOI

The Government will introduce legislation to help ensurethe principles underpinning the protection of green wedgesare being fully applied. The intent of the legislation willneed to be reflected in the planning system throughimproved control over land use and subdivision.

Discussion on how this legislation might be applied isincluded at Appendix 4.

This legislation is in addition to the legislative measuresproposed to reinforce the UGB (see draft ImplementationPlan 1, Urban Growth Boundary).

Action 4Develop anindividual actionplan for each green wedge Lead agent: DOI in partnership with localgovernment and key stakeholders

Collectively, green wedges have a broad range of purposes(see Appendix 2). However, each has unique features andvalues, as described in Melbourne 2030, meaning that anindividual, tailored approach will be needed to establish its clear role, purpose and objectives and related actions.

To ensure a metropolitan/regional approach to the planningand management of green wedges, DOI will form regionalworking groups of councils to develop an individual actionplan for each green wedge (see also Action 2).

A suggested grouping of councils is outlined below. A final determination of working groups, which mayinclude contributions from other organisations such as catchment management and natural resource groups,will follow consultation with affected councils.Management arrangements will be refined during theconsultation process.

Green wedges Page 11

Plan 5 Green Wedges 26/9/02 8:35 AM Page 11

Page 15: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

Page 12 Draft Implementation Plan 5

Proposed regional groupings

Green wedges Municipalities

Werribee South Hobsons Bay

Western Plains South Melton

Western Plains North Wyndham

Sunbury Brimbank

Whittlesea Hume

Whittlesea

Nillumbik Cardinia

Manningham Knox

Yarra Valley and Dandenong Ranges Manningham

Maroondah

Nillumbik

Yarra Ranges

Southern Ranges Cardinia

Westernport Casey

Mornington Peninsula Frankston

Greater Dandenong

Knox

Mornington Peninsula

Yarra Ranges

South East Casey

Frankston

Greater Dandenong

Kingston

Plan 5 Green Wedges 26/9/02 8:35 AM Page 12

Page 16: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

The proposed approach to the planning and managementof each green wedge involves close reference to Melbourne2030, and is as follows:

Strategy review• assess the policies that apply to green wedges (see

above, ‘How does this plan relate to Melbourne 2030?’)including those related to biodiversity protection,protection of foreshore environments, support foragriculture and limitations on rural residentialdevelopment

• review areas identified as possible futuredevelopment fronts

• analyse regional and local economic, social andenvironmental values

• identify smaller settlements where further growthshould be either encouraged (through planning) orlimited (see Action 5)

• ratify the boundaries of each green wedge.

Setting a vision, role, objectives andnew zones• develop a vision and role for each green wedge

• develop objectives to guide land use, development andmanagement, and formulate local planning policies

• review existing zoning in rural areas (see Action 2).

Action plans• develop plans for each green wedge that may include:

- a range of management techniques, for example,land capability mapping, landscape assessments, land-use guidelines, siting and design guidelines,environmental rebates and other incentive programs

- investment priorities to implement the agreedpurpose and objectives, for example, revegetationand planting programs

- identification of land for metropolitan parks or openspace links (see Policy 5.7 within Melbourne 2030)and protection of coastal environments (see Policy 5.9)

- identification of areas for potential supply of recycledwater (see Policy 7.1)

- protection of significant vegetation identified inregional vegetation plans

- measures to facilitate continued agriculturalproduction

- engagement of local communities, special interestgroups and other stakeholders in agreedmanagement programs

- community education programs on landmanagement and other issues

- land management plans, for example, weedmanagement, pest and vermin control, waterwayprotection.

Monitoring and management• develop indicators to ascertain adherence to the

purpose and objectives for the green wedge orconservation area

• as appropriate, develop coordination and managementmechanisms within each regional grouping to monitorprogress of the action plan and of planning objectives –these should also involve agencies or special interestgroups with responsibilities or interests in planning andland management.

An integrated approachIt is recognised that tools such as planning policies,regulation and environmental rebates will not be acomplete solution for green wedges. As with urban areas,an integrated and holistic approach, with coordination ofexisting and future funding programs across a range ofagencies, can achieve desirable short-term and long-termresults by combining economic imperatives, environmentalprotection and good social outcomes. Public spaces such as road verges might be landscaped, or Landcare programsdesigned to encourage landholders to work together tosolve land degradation problems.

Place management techniques, already useful in urbanareas, can be adapted to rural areas with a wide range of potential benefits ranging from improved amenity toincreased property values.

Green wedges Page 13

Plan 5 Green Wedges 26/9/02 8:35 AM Page 13

Page 17: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

Action 5Manage residentialdevelopment ingreen wedges Lead agent: Local government in conjunction with DOI

Development of small townsGreen wedges are home to small towns and settlementsthat provide services for surrounding areas, tourismdestinations and the opportunity for a different lifestyle.Many of these towns have existing or planned physical andsocial infrastructure that can support a growing population,and a surrounding environment capable of absorbingadditional development.

In some instances, expansion of an existing settlementwould contravene the intended purpose of a green wedge.The character of some towns in green wedges reliessubstantially on their limited size. This may be restrictednaturally by topography, the lack of services or by firmpolicies administered through planning schemes.

In the Dandenong Ranges, the Regional Strategy Plan,backed by legislation, limits the expansion of small towns,and, in areas such as the Mornington Peninsula andWesternport, planning policies curtail expansion of coastaland other settlements.

New urban development will be focused on areas whereservices are currently available or planned. The values ofgreen wedges identified in Melbourne 2030 and throughthe UGB (see Action 1) will help determine where additionalmeasures are required to limit or encourage urbandevelopment.

Local councils will be encouraged to work with DOI tosupport consolidation of new residential development inexisting settlements. This work will need to reflect the levelof services planned for these towns and the values ofsurrounding green wedge areas.

In suitable cases, councils will be encouraged to considerthe possibilities for urban intensification within the existingurban areas subject to environmental and servicingconstraints.

Amend Ministerial Direction No. 6– Rural Residential Development

Lead agent: DOI in conjunction with localgovernment

While living in rural areas remains a popular alternative toliving in cities or towns, this form of development can havenegative consequences. There may be conflicts betweenagricultural activities and the expectations of rural dwellers,claims on local authorities to extend uneconomiccommunity services and infrastructure, and demands on the local environment and landscape to absorb moreintensive development.

Ministerial Direction No. 6 – Rural Residential Developmentguides how new rural living proposals are considered andhow they apply to an amendment to a planning scheme to allow:

• the subdivision of land into lots between 0.4 and 2.0 hectares

• the construction of a house on lots between 0.4 and 2.0 hectares.

The central principle of these guidelines is that ruralresidential use is essentially an urban use, requiring accessto all the normal social services and most of the physicalinfrastructure provided in an urban centre.

Subdivisions that provide for lots larger than two hectares are not affected by the direction and may still be usedprincipally for rural living. To ensure that this wider range of lot sizes is also considered, the direction will be extendedto ensure compliance for all proposals for rezoning of landthat would create lot sizes between 0.4 hectares and eight hectares.

The performance guidelines will be reviewed to includereference to other relevant issues, including protection forwater catchments. The revision will be undertaken inconsultation with councils and appropriate stakeholders.

Changes to the direction will apply throughout Victoria and will be drafted accordingly.

Page 14 Draft Implementation Plan 5

Plan 5 Green Wedges 26/9/02 8:35 AM Page 14

Page 18: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

Limit isolated rural developmentand encourage lot consolidationSome of the many rural living lots now available forhousing development, both within and surroundingmetropolitan Melbourne, are in locations that may notsatisfy the guidelines for rural residential development asoutlined in Ministerial Direction No. 6. They may have highenvironmental values, or have a significant impact on waterquality or agricultural production. The suitability for ruralliving purposes of areas with these qualities will bereassessed.

To ensure that rural living and its consequences do not haveundesirable impacts, councils, in consultation with DOI, willbe asked to review existing isolated small lots in rural areaswhich have significant constraints or bring the likelihood ofundesirable off-site effects. DOI will help councils determinethe best way to discourage development of these lots,including restructure plans, to encourage or requireconsolidation.

Green wedges Page 15

Plan 5 Green Wedges 26/9/02 8:35 AM Page 15

Page 19: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

Action 6Maintain access toproductive naturalresources and anadequate supply of well-located land for energygeneration andinfrastructureFarmland and natural resources such as sand, minerals andstone are important assets for the future development ofmetropolitan Melbourne and beyond.

The sustainable use and development of these resources isin everyone’s long-term interest, as is the development ofappropriate infrastructure to meet community demand forenergy services. Electricity demand and consumptioncontinues to grow across Victoria due to the increased useof air-conditioning, the rising population, and economicgrowth. While Victoria’s main sources of energy are browncoal for electricity generation and natural gas, emergingtechnologies such as wind power and the construction of more localised generation plants raise questions aboutcommunity health, safety and environmental impacts. Any new facilities must consider the important issues ofadequate separation from residential areas and the off-siteeffects of infrastructure.

Melbourne 2030 aims to protect those natural resources,energy production facilities and related infrastructurelocated in rural areas from displacement and encroachmentby incompatible uses.

Update resource mapping

Lead agent: Department of Natural Resources and Environment

Much is already known about the region’s resources, soil types, rainfall, forests and agricultural land, but moreresearch is needed. The Department of Natural Resourcesand Environment will continue its program of identifyingareas within the region where updated mapping of currentand potential productivity of land resources is required.

Protect natural resource-basedindustries and energyinfrastructure

Lead agent: DOI

The Port Phillip region ranks second highest in the State in terms of the value of agricultural production. Thisadvantage embraces a variety of intensive and broadscalefarming enterprises including market gardening, viticulture,beef and dairying. Victoria already has an impressive exportrecord for many of its clean and green products that areprocessed in regional cities or Melbourne.

Timber production also makes up part of the region’soutput, either through logging of State forests orplantations.

Ensuring that our energy infrastructure is not compromisedis essential to the success of industry and our way of life. As new methods of producing energy are developed, suchas wind farms, or new energy infrastructure is establishednear to urban areas, including gas-fired generators, therewill be corresponding concern in the community about the impact of these developments.

To ensure the long-term capability of resources andinfrastructure, DOI will undertake an assessment ofplanning policies and planning provisions to ensure thatthere is adequate protection for established naturalresource-based industries and energy infrastructure againstcompeting and incompatible uses.

Page 16 Draft Implementation Plan 5

Plan 5 Green Wedges 26/9/02 8:35 AM Page 16

Page 20: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

The Government is releasing Melbourne 2030 and the draftImplementation Plans for a period of public review andcomment. The initial comment period, up to 14 February2003, is to give all interested parties the chance tocomment on how Melbourne 2030 works overall, whetherthe draft Implementation Plans are workable, and whetherthere are any unforeseen issues that need furtherconsideration.

Public information sessions will be held at various venuesaround the metropolitan area following the release. Publicdisplays will be held at the Melbourne Museum in Carltonand at other venues. Workshops will be held with keystakeholder groups about particular topics. They will focuson what needs to be done, and when.

General comments on Melbourne 2030 and specificfeedback on its implementation should be submitted by 14 February 2003 to:

Metropolitan Strategy ProjectDepartment of InfrastructureGPO Box 2797YMelbourne VIC 3001

or

[email protected]

Information is available by calling 1300 366 356

Details of our consultation process will be advertised widely and will be available on DOI's web site. We value your comments and involvement.

For further information on the Melbourne MetropolitanStrategy process and Melbourne 2030, go towww.melbourne2030.vic.gov.au

Submissions

In order to ensure the integrity of the consultation process,you are asked to provide your name and address with yoursubmission. Unfortunately we will not be able to acceptsubmissions which do not include this information.However, all personal identifying information could be removed after it is received if that is your request. If this is the case, or there are any other parts of yoursubmission that you wish treated confidentially, pleasemake this clear in your submission.

Green wedges Page 17

Next steps – what dowe need to do?

Plan 5 Green Wedges 26/9/02 8:35 AM Page 17

Page 21: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

These features typify land in green wedges.

Environment/conservationfeatures• areas used and suited to parks and conservation

(national, State and local)

• areas of flora and fauna significance

• areas with native vegetation cover

• wetlands

• rivers and streams and their environmental buffers

• significant geographic features (ridge lines, river valleys,mountains, plains)

• heritage areas – natural/indigenous/European

Natural resource features• areas with potential for extractive industries

(stone, sand, clay, soil)

• areas of productive agricultural land (existing orpotential)

• timber reserves

• water-supply catchments

• areas considered suited to waste-water reuse

Community value features• areas of recognised landscape value

• areas used or suited for recreation – public and private

• open landscapes separating and distinguishing differenturban communities

Existing policy features• areas identified at State level as off-limits to urban

development, for example, Mornington Peninsula, Yarra Valley, Dandenong Ranges, Macedon Ranges

• land identified in local policy instruments as preferrednon-urban areas

Physical/safety features• areas of flooding and drainage difficulty

• areas of high fire hazard

• steep land subject to erosion and/or subsidence

• coastal land subject to erosion

• land with effluent absorption constraints (septic systems)

• areas of contaminated land

Trunk servicing features • areas remote from public transport corridors

• areas with constraints in providing physical and socialservices

• areas near high-voltage transmission lines and major gas pipelines

Major facility features• locations used for or suited to airports and airfields

• locations used for sewage treatment

• locations used for or suited to waste disposal and recycling

• locations used for prisons and other institutional uses

Potential land use conflict features• buffer areas required around uses with off-site effects,

for example, Environment Protection Authority buffersand airport buffers

Page 18 Draft Implementation Plan 5

Appendix 1 Green wedge attributes

Plan 5 Green Wedges 26/9/02 8:35 AM Page 18

Page 22: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

The following broad purposes apply to all green wedges.Melbourne 2030 outlines the key features and values ofindividual green wedges around metropolitan Melbourneand the Mornington Peninsula.

Economic • provide opportunities for special uses including airfields,

sewage works and other infrastructure that supportsurban areas

• safeguard the opportunity for productive agriculturaluses

• provide for tourism and other businesses based on the natural and cultural heritage of the region

• protect and conserve the opportunity to use non-renewable resources such as sand and stone

• encourage the development of a more compact city

Social • preserve the enriching and cultural significance of open

rural and scenic landscapes, green spaces and non-urbanland

• provide recreation development opportunities

• provide a physically separate identity for towns andcommunities near the metropolitan boundary

Environmental • protect natural areas which contribute to biodiversity

and the environmental health of the city

• provide opportunities for developing a network of parksand open spaces based on the natural and culturalheritage of the region

Green wedges Page 19

Appendix 2Overall purpose of green wedges

Plan 5 Green Wedges 26/9/02 8:35 AM Page 19

Page 23: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

This appendix is in three parts:

Part 1. A discussion paper explaining the draft GreenWedge and Rural Conservation Zones

Part 2. A table setting out comparisons between the draftGreen Wedge, Rural Conservation, EnvironmentalRural and Rural Zones

Part 3. The proposed Green Wedge and Rural Zoneprovisions

Part 1. Discussion paper

IntroductionA key strategic direction of Melbourne 2030 is to protectgreen wedges and conservation areas of metropolitanMelbourne from inappropriate development.

To implement this strategic direction, we need a differentapproach to the use, development and protection of land in green wedges.

The approach in green wedges is to:

• clearly identify the location and boundaries of these areas

• provide certainty to landowners and the communityabout land use and development

• recognise and respond to unique features and values

• provide appropriate mechanisms for councils to managethe effects of land use and development

• ensure consistency in planning policies and controlsacross municipal boundaries.

An approach that integrates planning policy and control inplanning schemes is preferred. This would be consistentwith the key principles underpinning the format andcontent of planning schemes.

Proposed new Green Wedge Zoneand Rural Conservation ZonePlanning controls are essential tools for realising strategicdirections. This paper discusses the option of introducingspecific zones to facilitate appropriate development ingreen wedges. However, it is recognised that additionaltools and other actions may also be needed to achieve the desired outcome.

Government is not yet fixed on the final provisions for thezones. Accordingly it is seeking comments on the intentand detail of each zone.

The zones in detail The proposed Green Wedge Zone and Rural ConservationZone are the two main zones to be applied to rural land ingreen wedges. The specific features and values of the land,and each local council’s strategic objectives for the area, willdetermine which zone should be applied to specific land.

The provisions of the two new zones are standard, whichmeans that the land use, buildings and works, andsubdivision controls cannot be locally changed.

Rural Conservation ZoneThis zone aims to protect and conserve the naturalenvironment and natural processes for their historic,scientific, landscape, habitat, or cultural values. A schedule to the zone allows specific conservation values of the land to be listed.

This will be the main zone applied to land withconservation values, however, other zones may also be appropriate in some circumstances. It is also possible that a combination of rural zones may be applied within a conservation area if it is intended that different parts of the area will be used for different purposes.

Initially, it is expected that the zone would only be applied to areas with conservation value in metropolitanMelbourne. However, it could be applied in other parts of Victoria.

The Rural Conservation Zone is the most restrictive zone.Small-lot excisions and most non-rural uses are prohibited.The minimum lot size for subdivision is 40 hectares, whichis based on the minimum lot size in the Rural Zone and theEnvironmental Rural Zone. If a different lot size is proposed,this should be determined following an analysis of theexisting lot sizes that apply to land in conservation areas.

The conservation value of areas will vary. A schedule tothe zone also allows the council to set out any specificconservation values for an area. Councils should alsoconsider the use of the Local Planning Policy Framework(LPPF) of their planning scheme to articulate the qualitiesand features of conservation areas and the strategies fortheir protection.

Page 20 Draft Implementation Plan 5

Appendix 3Draft Green Wedge and RuralConservation Zones

Plan 5 Green Wedges 26/9/02 8:35 AM Page 20

Page 24: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

Green Wedge ZoneThis is the main zone to be applied to rural land outside the UGB.

This zone aims to recognise and protect land that isadjacent to urban areas for its agricultural, environmental,historic, landscape or recreational values, or mineral andstone resources.

The Green Wedge Zone would initially be applied to ruralland in metropolitan Melbourne. However, it could also beapplied to rural areas adjacent to regional cities and towns.

This Green Wedge Zone is less restrictive than the RuralConservation Zone but more restrictive than other ruralzones (except in relation to agriculture). Some non-ruraluses may be permitted. However, these are generally limitedto uses that either support agriculture or tourism, or thatare essential for urban development but cannot locate inurban areas for amenity and other reasons (such as airports,waste treatment plants, landfills and reservoirs). The zoneprohibits some non-rural uses that have been able toestablish in the past, such as schools, churches,convenience restaurants, service stations, landscapesupplies, motels and second dwellings. Most small-lotexcisions are also prohibited.

The default minimum lot size for subdivision is 40 hectares,which is based on the minimum lot size in the Rural Zoneand the Environmental Rural Zone.

Councils can use the LPPF of their planning scheme toarticulate the qualities and features of different areas, to guide the application of the zones and to guide theexercise of discretion in relation to permit applications for non-rural uses.

Relationship to the other rural zonesWe propose to add the two new zones to the current suite of rural zones, which comprises the Rural Zone,Environmental Rural Zone and Rural Living Zone. These zones are to be generally applied as follows:

Rural Zone – applied to farming land, including broadhectare farming, irrigation, dairying, intensive horticultureor intensive animal husbandry, outside metropolitanMelbourne.

Green Wedge Zone – applied to rural land within theMelbourne metropolitan area and (if required) rural landadjacent to regional cities and towns.

Rural Living Zone – applied to rural residential or hobbyfarm areas.

Environmental Rural Zone – applied to rural areas wherethe protection of environmental qualities and characteristicsis of high importance.

Rural Conservation Zone – applied to rural land in areaswhere the identified environmental, landscape and culturalqualities and characteristics of the land are of importance.

The main differences between the Green Wedge Zone andthe Rural Zone are:

• in the Green Wedge Zone, the range of permitted non-rural uses is limited to those that support agriculture ortourism, or that provide essential services to adjacenturban areas but cannot locate in those areas for amenityor other reasons. In contrast, the Rural Zone allows a muchwider range of non-rural uses to cater for communityneeds in the more remote rural parts of Victoria.

• in the Green Wedge Zone the small-lot excisionprovisions are much more restrictive than in the Rural Zone.

The main differences between the Rural Conservation Zoneand the Environmental Rural Zone are:

• in the Rural Conservation Zone, the range of uses ismuch more restrictive than in the Environmental RuralZone and there are no small-lot excision provisions

• in the Rural Conservation Zone, the minimum lot size is 40 hectares, whereas in the Environmental Rural Zone,the minimum lot size is determined by the local councilbased on the environmental outcome to be achieved.

When introduced, the Environmental Rural Zone wasintended to operate like a conservation zone, being appliedto areas where the environmental value of the land is ofprime importance (Final Report New Format PlanningSchemes, April 1999). The introduction of a RuralConservation Zone could compete with this role unlessthere is a clear distinction between the purposes of the twozones. The Rural Conservation Zone has been distinguishedfrom the Environmental Rural Zone by also including thecapacity to recognise landscape and cultural values.

Green wedges Page 21

Plan 5 Green Wedges 26/9/02 8:35 AM Page 21

Page 25: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

Page 22 Draft Implementation Plan 5

Part 2. Comparison of zone provisions

Purp

ose

Ru

ral C

on

serv

atio

n Z

on

eG

reen

Wed

ge

Zon

eEn

viro

nmen

tal R

ural

Zon

eR

ura

l Zo

ne

Zone

pur

pose

To p

rote

ct a

nd c

onse

rve

the

To p

rote

ct la

nd t

hat

is

To c

onse

rve

and

perm

anen

tly

To p

rovi

de f

or t

he

natu

ral e

nviro

nmen

t an

d ad

jace

nt t

o ur

ban

area

s fo

r its

m

aint

ain

flora

and

fau

na,

sust

aina

ble

use

of la

nd f

or

natu

ral p

roce

sses

for

the

ir ag

ricul

tura

l, en

viro

nmen

tal,

soil

and

wat

er q

ualit

y,

exte

nsiv

e an

imal

hus

band

ry

hist

oric

, sci

entif

ic, l

ands

cape

, hi

stor

ic, l

ands

cape

or

cultu

ral a

reas

, are

as o

f an

d cr

op r

aisi

ng, a

nd

habi

tat,

or

cultu

ral v

alue

sre

crea

tiona

l val

ues,

or

min

eral

scen

ic v

alue

so

the

viab

ility

of

enco

urag

e ap

prop

riate

land

an

d st

one

reso

urce

s, a

nd

natu

ral e

cosy

stem

s an

d th

e m

anag

emen

t, a

gric

ultu

ral

to a

ccom

mod

ate

uses

tha

t en

viro

nmen

t is

enh

ance

d.in

vest

men

t, v

alue

-add

ing

are

esse

ntia

l to

urba

n an

d ne

w r

ural

ent

erpr

ise.

deve

lopm

ent

but

cann

ot

loca

te in

urb

an a

reas

Loca

l obj

ectiv

esLP

PF a

nd a

sch

edul

e to

LP

PFLP

PF a

nd a

sch

edul

e to

LP

PFth

e zo

neth

e zo

ne

Lan

d u

se c

on

tro

lsR

ura

l Co

nse

rvat

ion

Zo

ne

Gre

en W

edg

e Zo

ne

Envi

ronm

enta

l Rur

al Z

one

Ru

ral Z

on

e

Land

use

gro

upLa

nd

use

Acc

omm

odat

ion

Bed

and

brea

kfas

tSe

ctio

n 1

– m

ust

not

Sect

ion

1 –

mus

t no

t Se

ctio

n 1

– m

ust

not

Sect

ion

1 –

mus

t no

t ac

com

mod

ate

mor

e th

an

acco

mm

odat

e m

ore

than

ac

com

mod

ate

mor

e th

an

acco

mm

odat

e m

ore

than

si

x pe

rson

s an

d at

leas

t on

e si

x pe

rson

s an

d at

leas

t on

e si

x pe

rson

s an

d at

leas

t on

e si

x pe

rson

s an

d at

leas

t on

e ca

r sp

ace

per

two

pers

ons

car

spac

e pe

r tw

o pe

rson

s ca

r sp

ace

per

two

pers

ons

car

spac

e pe

r tw

o pe

rson

s to

be

prov

ided

to b

e pr

ovid

edto

be

prov

ided

to b

e pr

ovid

ed

Cam

ping

and

Se

ctio

n 3

Sect

ion

2Se

ctio

n 2

Sect

ion

2ca

rava

n pa

rk

Dep

ende

nt

Sect

ion

2Se

ctio

n 2

Sect

ion

1 –

one

per

lot

Sect

ion

1 –

one

per

lot

pers

on’s

uni

t

Dw

ellin

gSe

ctio

n 2

– on

e pe

r lo

tSe

ctio

n 2

– on

e pe

r lo

tSe

ctio

n 2

Sect

ion

1 –

one

per

lot

Hos

t fa

rmSe

ctio

n 2

Sect

ion

2Se

ctio

n 2

Sect

ion

2

Resi

dent

ial h

otel

Sect

ion

2 –

mus

t be

use

d in

Se

ctio

n 2

– m

ust

be u

sed

in

Sect

ion

2Se

ctio

n 2

asso

ciat

ion

with

agr

icul

ture

as

soci

atio

n w

ith a

gric

ultu

re

and

mus

t no

t ac

com

mod

ate

and

mus

t no

t ac

com

mod

ate

mor

e th

an 2

0 pe

rson

sm

ore

than

20

pers

ons

Oth

er u

ses

Sect

ion

3Se

ctio

n 3

Sect

ion

2Se

ctio

n 2

and

lot

mus

t be

the

min

imum

lo

t si

ze in

the

sch

edul

e,

or 4

0 he

ctar

es

Plan 5 Green Wedges 26/9/02 8:35 AM Page 22

Page 26: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

Green wedges Page 23

Lan

d u

se c

on

tro

lsR

ura

l Co

nse

rvat

ion

Zo

ne

Gre

en W

edg

e Zo

ne

Envi

ronm

enta

l Rur

al Z

one

Ru

ral Z

on

e

Land

use

gro

upLa

nd

use

Agr

icul

ture

Ani

mal

kee

ping

Sect

ion

1 –

no m

ore

than

Se

ctio

n 1

– no

mor

e th

an

Sect

ion

1 –

no m

ore

than

Se

ctio

n 1

– no

mor

e th

an

two

anim

als

five

anim

als

two

anim

als

five

anim

als

Ani

mal

boa

rdin

gSe

ctio

n 3

Sect

ion

2Se

ctio

n 3

Sect

ion

2

Api

cultu

reSe

ctio

n 1

– if

Code

of

Sect

ion

1 –

if Co

de o

f Se

ctio

n 1

– if

Code

of

Sect

ion

1 –

if Co

de o

f Pr

actic

e is

met

Prac

tice

is m

etPr

actic

e is

met

Prac

tice

is m

et

Crop

rai

sing

Sect

ion

2Se

ctio

n 1

Sect

ion

2Se

ctio

n 1

Exte

nsiv

e an

imal

Se

ctio

n 2

Sect

ion

1Se

ctio

n 2

Sect

ion

1hu

sban

dry

Inte

nsiv

e an

imal

Se

ctio

n 3

Sect

ion

3Se

ctio

n 3

Sect

ion

2hu

sban

dry

Rice

gro

win

gSe

ctio

n 2

Sect

ion

2Se

ctio

n 2

Sect

ion

2

Tim

ber

prod

uctio

nSe

ctio

n 2

– if

Clau

se

Sect

ion

2 –

if Cl

ause

Se

ctio

n 2

– if

Clau

se

Sect

ion

2 –

if Cl

ause

52

.18

is m

et52

.18

is m

et52

.18

is m

et52

.18

is m

et

Oth

er u

ses

Sect

ion

2Se

ctio

n 2

Sect

ion

2Se

ctio

n 2

Child

car

e ce

ntre

Child

car

e ce

ntre

Sect

ion

3Se

ctio

n 3

Sect

ion

2Se

ctio

n 2

Educ

atio

n Ed

ucat

ion

cent

reSe

ctio

n 3

Sect

ion

2 –

mus

t be

use

d in

Se

ctio

n 2

Sect

ion

2as

soci

atio

n w

ith A

gric

ultu

rean

d m

ust

not

acco

mm

odat

e m

ore

than

100

per

sons

at

a t

ime

Indu

stry

Aba

ttoi

rSe

ctio

n 3

Sect

ion

3Se

ctio

n 3

Sect

ion

2

Car

was

hSe

ctio

n 3

Sect

ion

3Se

ctio

n 2

Sect

ion

2

Refu

se d

ispo

sal

Sect

ion

3Se

ctio

n 2

Sect

ion

3Se

ctio

n 2

Refu

se t

rans

fer

Sect

ion

3Se

ctio

n 2

Sect

ion

3Se

ctio

n 2

stat

ion

Rese

arch

and

Se

ctio

n 3

Sect

ion

2 –

mus

t be

in

Sect

ion

3Se

ctio

n 2

deve

lopm

ent

asso

ciat

ion

with

Agr

icul

ture

ce

ntre

on t

he lo

t

Rura

l ind

ustr

ySe

ctio

n 2

Sect

ion

2Se

ctio

n 2

Sect

ion

2

Saw

mill

Sect

ion

3Se

ctio

n 3

Sect

ion

3Se

ctio

n 2

Oth

er u

ses

Sect

ion

3Se

ctio

n 3

Sect

ion

3Se

ctio

n 2

Plan 5 Green Wedges 26/9/02 8:35 AM Page 23

Page 27: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

Page 24 Draft Implementation Plan 5

Lan

d u

se c

on

tro

lsR

ura

l Co

nse

rvat

ion

Zo

ne

Gre

en W

edg

e Zo

ne

Envi

ronm

enta

l Rur

al Z

one

Ru

ral Z

on

e

Land

use

gro

upLa

nd

use

Leis

ure

and

Indo

or r

ecre

atio

n Se

ctio

n 3

Sect

ion

3Se

ctio

n 2

Sect

ion

2re

crea

tion

faci

lity

Info

rmal

out

door

Se

ctio

n 1

Sect

ion

1Se

ctio

n 1

Sect

ion

1re

crea

tion

Maj

or s

port

s an

d Se

ctio

n 3

Sect

ion

2Se

ctio

n 2

Sect

ion

2re

crea

tion

faci

lity

Min

or s

port

s an

d Se

ctio

n 3

Sect

ion

2Se

ctio

n 2

Sect

ion

2re

crea

tion

faci

lity

Mot

or-r

acin

g tr

ack

Sect

ion

3Se

ctio

n 3

Sect

ion

3Se

ctio

n 2

Oth

er u

ses

Sect

ion

3Se

ctio

n 2

Sect

ion

2Se

ctio

n 2

Plac

e of

Ca

rniv

alSe

ctio

n 1

– m

ust

mee

t Se

ctio

n 1

– m

ust

mee

t Se

ctio

n 1

– m

ust

mee

t Se

ctio

n 1

– m

ust

mee

t as

sem

bly

Code

of

Prac

tice

Code

of

Prac

tice

Code

of

Prac

tice

Code

of

Prac

tice

Circ

usSe

ctio

n 1

– m

ust

mee

t Se

ctio

n 1

– m

ust

mee

t Se

ctio

n 1

– m

ust

mee

t Se

ctio

n 1

– m

ust

mee

t Co

de o

f Pr

actic

eCo

de o

f Pr

actic

eCo

de o

f Pr

actic

eCo

de o

f Pr

actic

e

Exhi

bitio

n ce

ntre

Sect

ion

3Se

ctio

n 2

Sect

ion

2Se

ctio

n 2

Func

tion

cent

reSe

ctio

n 3

Sect

ion

2 –

mus

t be

use

d in

Se

ctio

n 2

Sect

ion

2as

soci

atio

n w

ith A

gric

ultu

re a

nd

mus

t no

t ac

com

mod

ate

mor

e th

an 1

00 p

erso

ns a

t a

time

Hal

lSe

ctio

n 3

Sect

ion

2Se

ctio

n 2

Sect

ion

2

Rest

ricte

d pl

ace

Sect

ion

3Se

ctio

n 2

– m

ust

not

be u

sed

Sect

ion

2Se

ctio

n 2

of a

ssem

bly

for

mor

e th

an 1

4 da

ys

Oth

er u

ses

Sect

ion

3Se

ctio

n 3

Sect

ion

2Se

ctio

n 2

Plea

sure

boa

t Pl

easu

re b

oat

Sect

ion

2Se

ctio

n 2

Sect

ion

2Se

ctio

n 2

faci

lity

faci

lity

Reta

il pr

emis

esCo

mm

unity

mar

ket

Sect

ion

2Se

ctio

n 2

Sect

ion

2Se

ctio

n 2

Eque

stria

n su

pplie

sSe

ctio

n 3

Sect

ion

3Se

ctio

n 3

Sect

ion

2

Plan 5 Green Wedges 26/9/02 8:35 AM Page 24

Page 28: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

Green wedges Page 25

Lan

d u

se c

on

tro

lsR

ura

l Co

nse

rvat

ion

Zo

ne

Gre

en W

edg

e Zo

ne

Envi

ronm

enta

l Rur

al Z

one

Ru

ral Z

on

e

Land

use

gro

upLa

nd

use

Reta

il pr

emis

esFo

od a

nd d

rink

Sect

ion

3Se

ctio

n 3

Sect

ion

3Se

ctio

n 3

(con

td.)

prem

ises

Man

ufac

turin

g Se

ctio

n 3

Sect

ion

3Se

ctio

n 3

Sect

ion

2sa

les

Mar

ket

Sect

ion

3Se

ctio

n 2

Sect

ion

3Se

ctio

n 2

Plan

t nu

rser

ySe

ctio

n 3

Sect

ion

2Se

ctio

n 2

Sect

ion

2

Post

al a

genc

ySe

ctio

n 3

Sect

ion

2Se

ctio

n 2

Sect

ion

2

Prim

ary

prod

uce

Sect

ion

2Se

ctio

n 2

Sect

ion

2Se

ctio

n 2

sale

s

Rest

aura

ntSe

ctio

n 2

– m

ust

be u

sed

in

Sect

ion

2 –

mus

t be

use

d in

Se

ctio

n 2

Sect

ion

2as

soci

atio

n w

ith A

gric

ultu

re

asso

ciat

ion

with

Agr

icul

ture

an

d th

e nu

mbe

r of

pat

rons

an

d th

e nu

mbe

r of

pat

rons

pr

esen

t at

any

tim

e m

ust

pres

ent

at a

ny t

ime

mus

t no

t ex

ceed

100

not

exce

ed 1

00. I

f us

ed in

co

njun

ctio

n w

ith F

unct

ion

cent

re, t

he c

ombi

ned

num

ber

of p

atro

ns p

rese

nt o

n th

e pr

emis

es a

t an

y tim

e m

ust

not

exce

ed 1

00

Shop

Sect

ion

3Se

ctio

n 3

Sect

ion

3Se

ctio

n 3

Tave

rnSe

ctio

n 3

Sect

ion

3 Se

ctio

n 2

Sect

ion

2

Oth

er u

ses

Sect

ion

3Se

ctio

n 3

Sect

ion

3Se

ctio

n 2

Tran

spor

t Tr

ansp

ort

Sect

ion

3Se

ctio

n 2

Sect

ion

3Se

ctio

n 2

term

inal

term

inal

Util

ity

Min

or u

tility

Se

ctio

n 1

Sect

ion

1Se

ctio

n 1

Sect

ion

1in

stal

latio

nin

stal

latio

n

Tele

com

mun

icatio

ns S

ectio

n 1

– Se

ctio

n 1

– Se

ctio

n 1

– Se

ctio

n 1

– fa

cilit

ym

ust

mee

t Cl

ause

52.

19m

ust

mee

t Cl

ause

52.

19m

ust

mee

t Cl

ause

52.

19m

ust

mee

t Cl

ause

52.

19

Oth

er u

ses

Sect

ion

3Se

ctio

n 2

Sect

ion

2Se

ctio

n 2

War

ehou

seLi

quid

fue

l dep

otSe

ctio

n 3

Sect

ion

2Se

ctio

n 3

Sect

ion

2

Solid

fue

l dep

otSe

ctio

n 3

Sect

ion

2Se

ctio

n 3

Sect

ion

2

Milk

dep

otSe

ctio

n 3

Sect

ion

2Se

ctio

n 3

Sect

ion

2

Plan 5 Green Wedges 26/9/02 8:35 AM Page 25

Page 29: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

Page 26 Draft Implementation Plan 5

Lan

d u

se c

on

tro

lsR

ura

l Co

nse

rvat

ion

Zo

ne

Gre

en W

edg

e Zo

ne

Envi

ronm

enta

l Rur

al Z

one

Ru

ral Z

on

e

Land

use

gro

upLa

nd

use

War

ehou

seFr

eezi

ng a

nd

Sect

ion

2 –

mus

t be

Se

ctio

n 2

– m

ust

be

Sect

ion

2 –

mus

t be

Se

ctio

n 2

(con

td.)

cool

sto

rage

unpr

oces

sed

agric

ultu

ral

unpr

oces

sed

agric

ultu

ral

unpr

oces

sed

agric

ultu

ral

prod

uce,

or

prod

ucts

use

d pr

oduc

e, o

r pr

oduc

ts u

sed

prod

uce,

or

prod

ucts

use

d in

agr

icul

ture

in a

gric

ultu

rein

agr

icul

ture

Rura

l sto

reSe

ctio

n 2

Sect

ion

2Se

ctio

n 2

– m

ust

be u

sed

Sect

ion

2 in

con

junc

tion

with

a d

wel

ling

Vehi

cle

stor

eSe

ctio

n 2

– m

ust

be u

sed

Sect

ion

2 –

mus

t be

use

d Se

ctio

n 2

– m

ust

be u

sed

Sect

ion

2 in

con

junc

tion

with

a d

wel

ling

in c

onju

nctio

n w

ith a

dw

ellin

gin

con

junc

tion

with

a d

wel

ling

Un-

nest

ed u

ses

Art

and

cra

ft

Sect

ion

2Se

ctio

n 2

Sect

ion

2Se

ctio

n 2

cent

re

Car

park

Sect

ion

2 –

mus

t be

use

d in

Se

ctio

n 2

– m

ust

be u

sed

in

Sect

ion

2 –

mus

t be

use

d in

Se

ctio

n 2

conj

unct

ion

with

a S

ectio

n 1

conj

unct

ion

with

a S

ectio

n 1

conj

unct

ion

with

a S

ectio

n 1

or 2

use

or 2

use

or 2

use

Cem

eter

ySe

ctio

n 3

Sect

ion

2Se

ctio

n 2

Sect

ion

2

Cine

ma

Sect

ion

3Se

ctio

n 2

Sect

ion

2Se

ctio

n 2

Cine

ma-

base

d Se

ctio

n 3

Sect

ion

3Se

ctio

n 3

Sect

ion

3en

tert

ainm

ent

faci

lity

Crem

ator

ium

Sect

ion

3Se

ctio

n 2

Sect

ion

2Se

ctio

n 2

Dis

play

hom

eSe

ctio

n 3

Sect

ion

3Se

ctio

n 2

Sect

ion

2

Free

way

ser

vice

Se

ctio

n 3

Sect

ion

2Se

ctio

n 2

Sect

ion

2ce

ntre

Fune

ral p

arlo

urSe

ctio

n 3

Sect

ion

3Se

ctio

n 2

Sect

ion

2

Hom

e oc

cupa

tion

Sect

ion

1Se

ctio

n 1

Sect

ion

1Se

ctio

n 1

Hos

pita

lSe

ctio

n 3

Sect

ion

3Se

ctio

n 2

Sect

ion

2

Nat

ural

sys

tem

sSe

ctio

n 1

Sect

ion

1Se

ctio

n 1

Sect

ion

1

Rese

arch

cen

tre

Sect

ion

3Se

ctio

n 2

– m

ust

be in

Se

ctio

n 2

Sect

ion

2as

soci

atio

n w

ith A

gric

ultu

re

on t

he lo

t.

Plan 5 Green Wedges 26/9/02 8:35 AM Page 26

Page 30: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

Green wedges Page 27

Lan

d u

se c

on

tro

lsR

ura

l Co

nse

rvat

ion

Zo

ne

Gre

en W

edg

e Zo

ne

Envi

ronm

enta

l Rur

al Z

one

Ru

ral Z

on

e

Land

use

gro

upLa

nd

use

Un-

nest

ed u

ses

Sale

yard

Sect

ion

3Se

ctio

n 2

Sect

ion

3Se

ctio

n 2

(con

td.)

Serv

ice

stat

ion

Sect

ion

3Se

ctio

n 3

Sect

ion

2Se

ctio

n 2

Vete

rinar

y ce

ntre

Sect

ion

3Se

ctio

n 2

Sect

ion

2Se

ctio

n 2

Win

ery

Sect

ion

2Se

ctio

n 2

Sect

ion

2Se

ctio

n 2

Sub

div

isio

n c

on

tro

lsR

ura

l Co

nse

rvat

ion

Zo

ne

Gre

en W

edg

e Zo

ne

Envi

ronm

enta

l Rur

al Z

one

Ru

ral Z

on

e

Min

imum

lot

size

40 h

ecta

res

Min

imum

lot

size

spe

cifie

d in

Min

imum

lot

size

spe

cifie

d M

inim

um lo

t si

ze s

peci

fied

in

sche

dule

or,

if no

min

imum

isin

sch

edul

esc

hedu

le o

r, if

no m

inim

um is

sp

ecifi

ed, 4

0 he

ctar

essp

ecifi

ed, 4

0 he

ctar

es

Smal

l-lot

exc

isio

nN

oYe

s, f

or a

util

ity in

stal

latio

nYe

s, p

rovi

ded

one

of t

hree

Yes,

pro

vide

d on

e of

fou

r sc

enar

ios

appl

ies

scen

ario

s ap

plie

s

Re-s

ubdi

visi

onN

oN

oYe

s, p

rovi

ded

num

ber

of lo

ts

Yes,

pro

vide

d nu

mbe

r of

lots

do

es n

ot in

crea

se a

nd lo

ts

does

not

incr

ease

and

lots

are

at le

ast

0.4

hect

ares

are

at le

ast

0.4

hect

ares

Plan 5 Green Wedges 26/9/02 8:35 AM Page 27

Page 31: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

Page 28 Draft Implementation Plan 5

Plan 5 Green Wedges 26/9/02 8:35 AM Page 28

Page 32: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

Part 3. Zone provisions

Green wedges Page 29

Plan 5 Green Wedges 26/9/02 8:35 AM Page 29

Page 33: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

Page 30 Draft Implementation Plan 5

Plan 5 Green Wedges 26/9/02 8:35 AM Page 30

Page 34: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

RURAL CONSERVATION ZONE PAGE 1 OF 5 [DATE]

35.04 RURAL CONSERVATION ZONE

Shown on the planning scheme map as RCZ (show number if more than one schedule).

Purpose

To implement the State Planning Policy Framework and the LPPF, including the Municipal Strategic Statement and local planning policies.

To conserve the values specified in the schedule to this zone.

To protect and conserve the natural environment and natural processes for their historic, scientific, landscape, habitat or cultural values.

To encourage development and the use of the land that is consistent with sound land management and land capability practices, and which takes into account the conservation values and environmental sensitivity of the locality.

35.04-1 Table of uses

Section 1 - Permit not required

USE CONDITION

Animal keeping (other than Animal boarding)

Must be no more than two animals.

Apiculture Must meet the requirements of the Apiary Code of Practice, May 1997.

Bed and breakfast No more than six persons may be accommodated away from their normal place of residence.

At least one car-parking space must be provided for each two persons able to be accommodated away from their normal place of residence.

Carnival Circus

Must meet the requirements of A ‘Good Neighbour’ Code of Practice for a Circus or Carnival, October 1997.

Home occupation Informal outdoor recreation Mineral exploration

Mining Must meet the requirements of Clause 52.08-2.

Minor utility installation Natural systems Railway Road

Search for stone Must not be costeaning or bulk sampling.

Tramway

Page 35: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

RURAL CONSERVATION ZONE PAGE 2 OF 5 [DATE]

Section 2 - Permit required

USE CONDITION

Agriculture (other than Animal keeping, Apiculture, Intensive animal husbandry and Timber production)

Animal boarding Art and craft centre

Car park Must be used in conjunction with another use in Section 1 or 2.

Community market

Dependent person’s unit Must meet the requirements of Clause 35.04-2.

Dwelling (other than Bed and breakfast)

Must be the only dwelling on the lot.

Must meet the requirements of Clause 35.04-2.

Freezing and cool storage The goods stored must be agricultural produce, or products used in agriculture.

Host farm Interpretation centre Mineral, stone, or soil extraction (other

than Mineral exploration, Mining, and Search for stone)

Pleasure boat facility Primary produce sales

Residential hotel

Must be used in conjunction with Agriculture.

No more than 20 persons may be accommodated away from their normal place of residence.

Restaurant Must be used in conjunction with Agriculture.

The number of patrons present on the premises at any time must not exceed 100.

Rice growing Rural industry (other than Abattoir and

Sawmill) Rural store

Store (other than Freezing and cool storage and Rural store)

Must be in a building, not a dwelling, and used to store equipment, goods, or motor vehicles used in conjunction with the occupation of a resident of a dwelling on the lot.

Telecommunications facility Buildings and works must meet the requirements of Clause 52.19.

Timber production Must meet the requirements of Clause 52.18.

Winery

Page 36: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

RURAL CONSERVATION ZONE PAGE 3 OF 5 [DATE]

Section 3 - Prohibited USE

Abattoir Accommodation (other than Dependent person’s unit, Dwelling, Host farm and

Residential hotel) Animal boarding Industry (other than Rural industry) Intensive animal husbandry Leisure and recreation (other than Informal outdoor recreation) Place of assembly (other than Carnival and Circus) Retail premises (other than Community market, Primary produce sales and

Restaurant) Sawmill Utility installation (other than Minor utility installation and Telecommunications

facility) Warehouse (other than Store)

Any other use not in Section 1 or 2

35.04-2 Dwelling

A lot may be used for a dwelling provided the following requirements are met:

Access to a dwelling must be provided via an all-weather road with dimensions adequate to accommodate emergency vehicles to the satisfaction of the responsible authority.

The dwelling must be connected to a reticulated sewerage system or if not available, the waste water must be treated and retained on-site in accordance with the State Environment Protection Policy (Waters of Victoria) under the Environment Protection Act 1970.

The dwelling must be connected to a reticulated potable water supply or have an alternative potable water supply with adequate storage for domestic use as well as for fire fighting purposes to the satisfaction of the responsible authority.

The dwelling must be connected to a reticulated electricity supply or have an alternative energy source to the satisfaction of the responsible authority.

These requirements also apply to a dependent person’s unit.

35.04-3 Buildings and works

A permit is required to construct or carry out any of the following:

A building or works associated with a use in Section 2 of Clause 35.04-1. Earthworks specified in a schedule to this zone, if on land specified in a schedule. A building which is within any of the following setbacks:

100 metres from a Road Zone Category 1 or land in a Public Acquisition Overlay to be acquired for a road, Category 1

40 metres from a Road Zone Category 2 or land in a Public Acquisition Overlay to be acquired for a road, Category 2

20 metres from any other road five metres from any other boundary 100 metres from a dwelling not in the same ownership 100 metres from a waterway, wetlands or designated flood plain.

An outbuilding which has dimensions greater than those specified in the schedule to this zone.

Page 37: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

RURAL CONSERVATION ZONE PAGE 4 OF 5 [DATE]

35.04-4 Subdivision

A permit is required to subdivide land.

Each lot must be at least 40 hectares.

35.04-5 Application requirements

An application to subdivide land must be accompanied by a report which explains how the proposed subdivision:

promotes the purposes of this zone responds to the decision guidelines for this zone responds to any additional objectives and performance requirements set out in any

relevant Local Planning Policy in this scheme.

35.04-6 Decision guidelines

Before deciding on an application to use or subdivide land, construct a building or construct or carry out works, in addition to the decision guidelines in Clause 65, the responsible authority must consider, as appropriate:

General issues

The State Planning Policy Framework and the LPPF, including the Municipal Strategic Statement and local planning policies.

Any Catchment and Land Protection Strategy and policies applying to the land. The capability of the land to accommodate the proposed use or development,

addressing site quality attributes including soil type, soil fertility, soil structure, soil permeability, aspect, contour and drainage patterns.

How the use or development relates to natural resource management. Whether the dwelling is reasonably required for the operation of the rural activity

conducted on the land.

Environmental issues

An assessment of the likely environmental impact on the conservation values of the area.

The impact of the use or development on the flora, fauna and landscape features of the locality.

The protection and enhancement of the natural environment and the character of the area, including the retention of vegetation and fauna habitat and the need to revegetate land including riparian buffers along waterways, gullies, ridge lines, property boundaries, discharge areas and recharge areas.

The impact on the character and appearance of the area or features of environmental significance or of natural scenic beauty or importance.

Design and siting issues

The design, colours and materials to be used and the siting, including the provision of development and effluent envelopes for any building or works.

The impact of the use or development on the existing and surrounding rural uses. The location of any building or works with respect to the natural environment, major

roads, vistas and water features and the measures to be undertaken to minimise any adverse impacts.

The location and design of existing and proposed roads and their impact on the landscape and whether the use or development will cause significant traffic generation which will require additional traffic management programs to be initiated.

The location and design of existing and proposed infrastructure services including gas, water, drainage, telecommunications and sewerage facilities.

Page 38: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

RURAL CONSERVATION ZONE PAGE 5 OF 5 [DATE]

Rural issues

Whether the site is suitable for the use or development and the compatibility of the proposal with adjoining and nearby land uses.

The farm size and the productive capacity of the site to sustain the rural enterprise and whether the use or development will have an adverse impact on the conservation values.

The need to prepare an integrated land management plan. The impact on the existing and proposed infrastructure.

35.04-7 Advertising signs

Advertising sign requirements are at Clause 52.05. This zone is in Category 4.

Notes: Refer to the State Planning Policy Framework and the Local Planning Policy Framework, including the Municipal Strategic Statement, for strategies and policies which may affect the use and development of land.

Check whether an overlay also applies to the land.

Other requirements may also apply. These can be found at Particular Provisions.

Page 39: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

RURAL CONSERVATION ZONE – SCHEDULE PAGE 1 OF 1 [DATE]

SCHEDULE TO THE RURAL CONSERVATION ZONE

Shown on the planning scheme map as RCZ (show number if more than one schedule).

Values to be conserved

State any specific conservation values of the land in the zone.

Land Area/Dimensions

Outbuildings (dimensions).

Permit requirement for earthworks

Land

Earthworks which change the rate of flow or the discharge point of water across a property boundary

Earthworks which increase the discharge of saline groundwater

Page 40: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

GREEN WEDGE ZONE - SCHEDULE PAGE 1 OF 1 [DATE]

SCHEDULE TO THE GREEN WEDGE ZONE

Shown on the planning scheme map as GWZ (show number if more than one schedule).

Land Area/Dimensions

Minimum subdivision area (hectares).

Outbuildings (dimensions).

Permit requirement for earthworks

Land

Earthworks which change the rate of flow or the discharge point of water across a property boundary.

Earthworks which increase the discharge of saline groundwater.

Page 41: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

GREEN WEDGE ZONE PAGE 1 OF 6 [DATE]

35.05 GREEN WEDGE ZONE

Shown on the planning scheme map as GWZ with a number (if shown).

Purpose

To implement the State Planning Policy Framework and the LPPF, including the Municipal Strategic Statement and local planning policies.

To recognise, protect and conserve land that is adjacent to urban areas for its agricultural, environmental, historic, landscape or recreational values or mineral and stone resources.

To permanently maintain the agricultural productivity, biodiversity and liveability of land.

To encourage use and development of land that is consistent with sound land management practices.

35.05-1 Table of uses

Section 1 - Permit not required

USE CONDITION

Animal keeping (other than Animal boarding)

Must be no more than five animals.

Apiculture Must meet the requirements of the Apiary Code of Practice, May 1997.

Bed and breakfast No more than six persons may be accommodated away from their normal place of residence. At least one car parking space must be provided for each two persons able to be accommodated away from their normal place of residence.

Carnival Circus

Must meet the requirements of A ‘Good Neighbour’ Code of Practice for a Circus or Carnival, October 1997.

Crop raising (other than Rice growing and Timber production)

Extensive animal husbandry Home occupation Informal outdoor recreation Mineral exploration

Mining Must meet the requirements of Clause 52.08-2.

Minor utility installation Natural systems Railway Road

Page 42: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

GREEN WEDGE ZONE PAGE 2 OF 6 [DATE]

Section 1 - Permit not required (continued) USE CONDITION

Search for stone Must not be costeaning or bulk sampling.

Telecommunications facility Buildings and works must meet the requirements of Clause 52.19.

Tramway

Section 2 - Permit required

USE CONDITION

Agriculture (other than Animal keeping,

Apiculture, Crop raising and Extensive animal husbandry)

Animal boarding Camping and caravan park

Car park Must be used in conjunction with another use in Section 1 or 2.

Dependent person’s unit Must meet the requirements of Clause 35.05-2.

Dwelling (other than Bed and breakfast)

Must be the only dwelling on the lot.

Must meet the requirements of Clause 35.05-2.

Education centre Must be used in conjunction with Agriculture. The number of patrons present on the premises at any time must not exceed 100.

Exhibition centre

Freeway service centre Must meet the requirements of Clause 52.30.

Freezing and cool storage The goods stored must be agricultural produce, or products used in agriculture.

Fuel depot

Function centre Must be used in conjunction with Agriculture. The number of patrons present on the premises at any time must not exceed 100.

Page 43: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

GREEN WEDGE ZONE PAGE 3 OF 6 [DATE]

Section 2 - Permit required (continued) USE CONDITION

Hall Host farm Leisure and recreation (other than

Informal outdoor recreation, Indoor recreation facility, Major sports and recreation facility, and Motor racing track)

Market Milk depot Mineral, stone, or soil extraction (other

than Mineral exploration, Mining, and Search for stone)

Primary produce sales Refuse disposal Refuse transfer station

Research centre Research and development centre

Must be used in conjunction with Agriculture.

Residential hotel

Must be used in conjunction with Agriculture. No more than 20 persons may be accommodated away from their normal place of residence.

Restaurant Must be used in conjunction with Agriculture. The number of patrons present on the premises at any time must not exceed 100. If used in conjunction with Function centre, the combined number of patrons present on the premises at any time must not exceed 100.

Restricted place of assembly Must not be used for more than 14 days.

Rice growing Rural industry (other than Abattoir and

Sawmill) Rural store

Store (other than Freezing and cool storage and Rural store)

Must be in a building, not a dwelling, and used to store equipment, goods, or motor vehicles used in conjunction with the occupation of a resident of a dwelling on the lot.

Timber production Must meet the requirements of Clause 52.18.

Transport terminal Utility installation (other than Minor

utility installation and Telecommunications facility)

Any other use not in Section 1 or 3

Page 44: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

GREEN WEDGE ZONE PAGE 4 OF 6 [DATE]

Section 3 - Prohibited USE

Abattoir Accommodation (other than Camping and caravan park, Dependent person’s unit, Dwelling, Host farm and Residential hotel) Brothel Child care centre Cinema based entertainment facility Display home Equestrian supplies Funeral parlour Hospital Indoor recreation facility Industry (other than Refuse disposal, Refuse transfer station, Research and

development centre and Rural industry) Intensive animal husbandry Major sports and recreation facility Motor racing track Office Place of assembly (other than Carnival, Circus, Exhibition centre, Function centre,

Hall and Restricted place of assembly) Retail premises (other than Market, Plant nursery, Primary produce sales and

Restaurant) Sawmill Service station Warehouse (other than Fuel depot, Milk depot and Store)

35.05-2 Dwelling

A lot may be used for a dwelling provided the following requirements are met:

Access to a dwelling must be provided via an all-weather road with dimensions adequate to accommodate emergency vehicles to the satisfaction of the responsible authority.

The dwelling must be connected to a reticulated sewerage system or if not available, the waste water must be treated and retained on-site in accordance with the State Environment Protection Policy (Waters of Victoria) under the Environment Protection Act 1970.

The dwelling must be connected to a reticulated potable water supply or have an alternative potable water supply with adequate storage for domestic use as well as for fire fighting purposes to the satisfaction of the responsible authority.

The dwelling must be connected to a reticulated electricity supply or have an alternative energy source to the satisfaction of the responsible authority.

These requirements also apply to a dependent person’s unit.

35.05-3 Buildings and works

A permit is required to construct or carry out any of the following:

A building or works associated with a use in Section 2 of Clause 35.05-1. Earthworks specified in a schedule to this zone, if on land specified in a schedule. A building which is within any of the following setbacks:

100 metres from a Road Zone Category 1 or land in a Public Acquisition Overlay to be acquired for a road, Category 1

40 metres from a Road Zone Category 2 or land in a Public Acquisition Overlay to be acquired for a road, Category 2

20 metres from any other road

Page 45: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

GREEN WEDGE ZONE PAGE 5 OF 6 [DATE]

five metres from any other boundary 100 metres from a dwelling not in the same ownership 100 metres from a waterway, wetlands or designated flood plain.

An outbuilding which has dimensions greater than those specified in the schedule to this zone.

35.05-4 Subdivision

A permit is required to subdivide land.

Each lot must be at least the area specified for the land in a schedule to this zone. If no area is specified, each lot must be at least 40 hectares.

A permit may be granted to create smaller lots if the subdivision is by a public authority or utility service provider to create a lot for a utility installation.

35.05-5 Application requirements

An application to subdivide land must be accompanied by a report which explains how the proposed subdivision:

promotes the purposes of this zone responds to the decision guidelines for this zone responds to any additional objectives and performance requirements set out in any

relevant Local Planning Policy in this scheme.

35.05-6 Decision guidelines

Before deciding on an application to use or subdivide land, construct a building or construct or carry out works, in addition to the decision guidelines in Clause 65, the responsible authority must consider, as appropriate:

General issues

The State Planning Policy Framework and the Local Planning Policy Framework, including the Municipal Strategic Statement and local planning policies.

Any Catchment and Land Protection Strategy and policies applying to the land. The capability of the land to accommodate the proposed use or development,

addressing site quality attributes including soil type, soil fertility, soil structure, soil permeability, aspect, contour and drainage patterns.

How the use or development relates to rural land use, rural diversification, natural resource management, natural or cultural heritage management, recreation or tourism.

Whether the dwelling is reasonably required for the operation of the rural activity conducted on the land.

Whether the use or development is essential to the health, safety or wellbeing of the State or area but is not appropriate to locate in an urban area because of the effect it may have on existing or proposed urban areas or the effect that existing or proposed urban areas may have on the proposed use or development.

Rural issues

The maintenance of farm production and the impact on the rural economy. Whether the site is suitable for the use or development and the compatibility of the

proposal with adjoining and nearby farming and other land uses. The farm size and the productive capacity of the site to sustain the rural enterprise

and whether the use or development will have an adverse impact on surrounding land uses.

The need to prepare an integrated land management plan. The requirements of any existing or proposed rural industry. The impact on the existing and proposed rural infrastructure.

Page 46: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

GREEN WEDGE ZONE PAGE 6 OF 6 [DATE]

An assessment of industry requirements, growth expectations, staging of the development and investment requirements.

Environmental issues

An assessment of the likely environmental impact on the natural physical features and resources of the area and in particular any impact caused by the proposal on soil and water quality and by the emission of noise, dust and odours.

The impact of the use or development on the flora, fauna and landscape features of the locality.

The protection and enhancement of the natural environment and the character of the area, including the retention of vegetation and fauna habitat and the need to revegetate land including riparian buffers along waterways, gullies, ridge lines, property boundaries, discharge and recharge areas.

The impact on the character and appearance of the area or features of architectural, historic or scientific significance or of natural scenic beauty or importance.

Design and siting issues

The design, colours and materials to be used and the siting, including the provision of development and effluent envelopes for any building or works.

The impact of the use or development on the key features of the area and on the existing and surrounding land uses.

The location of any building or works with respect to the natural environment, major roads, vistas and water features and the measures to be undertaken to minimise any adverse impacts.

The location and design of existing and proposed infrastructure services including gas, water, drainage, telecommunications and sewerage facilities.

35.05-7 Advertising signs

Advertising sign requirements are at Clause 52.05. This zone is in Category 3.

Notes: Refer to the State Planning Policy Framework and the LPPF, including the Municipal Strategic Statement, for strategies and policies which may affect the use and development of land.

Check whether an overlay also applies to the land.

Other requirements may also apply. These can be found at Particular Provisions.

Page 47: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

Greater certainty must be provided about the long-termfuture of green wedges. This message was clearly receivedduring the public consultation period for Melbourne 2030.Concerns were expressed about a reduction of green wedgevalues through rezonings for urban developments, ad hocsubdivision and the incursion of urban uses into rural areas.There were concerns that, collectively, these activities hadwatered down the planning principles that should apply togreen wedges. In turn, this had led to an increase inspeculation and uncertainty for landowners and thecommunity generally.

To gain a better understanding of possible planning andlegislative responses to these issues, the Governmentestablished a small working party to recommend changesto planning controls for green wedge areas and to adviseon related legislative action. This comprised an academicfrom RMIT University, a representative of the Upper Yarraand Dandenongs Environmental Council, and officers fromthe Yarra Ranges Council and the DOI.

Changes to planningcontrolsThe working party recognised the Government's existingcommitment to introducing effective legislation to controlad hoc subdivision and inappropriate development of greenwedges. Accordingly, it recommended that a list of corerequirements should be specified for consistent applicationin green wedge areas. These included two topics:prohibited uses and limits on subdivision. The workingparty's suggested list of prohibited uses is as follows:

UsesThese uses would be prohibited in green wedges:

• Accommodation other than:

• camping and caravan park

• dependent person's unit

• dwelling (must be the only dwelling on the lot)

• host farm

• residential hotel (must be used in conjunction withagriculture and no more than 20 persons may beaccommodated away from their normal place ofresidence).

• Brothel

• Child-care centre

• Cinema-based entertainment facility

• Display home

• Education centre, except if used in conjunction with eitheragriculture or natural systems and the number of patronspresent on the premises at any time does not exceed 100

• Funeral parlour

• Hospital

• Indoor recreation facility

• Major sports and recreation facility

• Office

• Place of assembly other than:

• carnival

• circus

• exhibition centre

• function centre

• hall

• restricted place of assembly (must not be used formore than 14 days).

• Research centre (must be used in conjunction withagriculture)

• Retail premises other than:

• market

• plant nursery

• primary produce sales

• restaurant, except if used in conjunction withagriculture and the number of patrons present on thepremises at any time does not exceed 100. If used inconjunction with a function centre, the combinednumber of patrons present on the premises at anytime must not exceed 100.

• Service station

• Warehouse other than:

• freezing and cool storage (the goods stored must beagricultural produce, or products used in agriculture)

• milk depot

• rural store

• solid fuel depot

• vehicle store.

Green wedges Page 45

Appendix 4Green wedge legislation

Plan 5 Green Wedges 26/9/02 8:35 AM Page 31

Page 48: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

SubdivisionEach lot must be at least the area specified for the land inthe schedule to the zone on a date fixed by legislation. Ifno area is specified, each lot must be at least 40 hectares.

After the fixed date, the minimum lot size specified in theschedule to the zone may only be changed by legislation.

Smaller lots may be created if any of the following apply:

• the subdivision is the re-subdivision of existing lots

• the subdivision is by a public authority or utility serviceprovider to create a lot for a utility installation

The proposed Green Wedge and Rural Conservation Zonesreferred to in Action 2 and shown in Appendix 3 have beenmade consistent with the proposed core requirements. Ifendorsed, the core requirements will also need to betranslated into other zones such as the Environmental RuralZone.

Related legislativeactionThere are a number of options for translating the corerequirements into legislative action.

The favoured option is to provide for an amendment of thePlanning and Environment Act 1987 to include provisionsthat enable the green wedge area to be defined, and thatspecify core provisions (as above) with which planningschemes in the defined green wedge area must beconsistent.

This would mean that the core requirements applicable to all zones in the defined green wedge area could bechanged only by legislation. Because the new Green WedgeZone, the Rural Conservation Zone, and any other zonemade consistent with the core requirements would be consistent with the legislation, the normal amendmentprocess could be used to enable their flexible applicationwithin the green wedge area.

Other legislative options have been examined but each hasdrawbacks. For instance, legislation could give the Ministerfor Planning powers to develop strategic policy statementsfor compulsory consideration by planning authorities inpreparing amendments to planning schemes. Suchstatements could give clearer directions to planningauthorities about planning aims in different areas or fordifferent issues. However, this option does not directlyrestrain land uses and subdivision, and closely replicateswhat could now be included in the State Planning PolicyFramework or the LPPF.

Another option could require the preparation and approvalof planning scheme amendments in a defined green wedgearea to be approved by resolution of both Houses ofParliament. While this method would prevent planningauthorities beginning work on amendments inconsistentwith Melbourne 2030, it is administratively burdensomeand does not respond to the core requirementsrecommended above.

The Government seeks public comment on a final model forthe legislation, and on the proposed list of corerequirements.

Page 46 Draft Implementation Plan 5

Plan 5 Green Wedges 26/9/02 8:35 AM Page 32

Page 49: Plan 5 Green Wedges - Planning · wedges has been adopted for the purposes of Melbourne 2030 and this draft Implementation Plan. Where are they? The green wedges are distributed outside

Melbourne 2030planning for sustainable growth

Department of Infrastructure

Green WedgesImplementation Plan 5

DraftOctober 2002

Plan 5 Cover 24/9/02 1:15 PM Page 1