PC-I
Gomal Zam Dam’s Command Area
Development and On-Farm Water
Management for High Value and High
Efficiency Agriculture Project
(GZD-CADP)
Agriculture is defined as an integrated activity comprising of field crops, fruits, vegetables, livestock, farm forestry, and rural poultry as practiced by the farmers in the KPK province of Pakistan and adopted as a definition by the USDA in the USA. Farmer is the integrator of farming system and performs well within envelope of potentials and constraints. The question in front of the expert community is that can we perform better within envelope of potentials and constraints faced by the farmers in KPK and how?
Department of
Agriculture, Livestock and Cooperatives
Government of Khyber Pakhtunkhwa
August 29th
2012
ii
Table of Contents Page
1. Name of the Project 1
2. Location of the Project 1
3. Authorities responsible for 2
4. Plan Provision 3
5. Project objectives and its relationship with sector objectives 4 5.1. Objectives of the Water Sector 4
5.2. Objectives of the Agriculture Sector 6
5.3. Program Outline 7
5.3.1. Phase-I 7
5.3.2. Phase-II 7
6. Description, Justification, Technical Parameters and …….. 8
6.1. Background information of the project Area 8
6.1.1. The Province of Khyber Pakhtunkhwa 8
6.1.2. The Project Area 8
6.1.3. Agriculture and Livestock information regarding the project Area 10
6.1.4. Information on Livestock Sector in the GZD-Project Command Area. 12
6.2. Existing Facilities 13
6.2.1. On-Farm Water Management 13
6.2.2. Agriculture Extension 13
6.2.3. Agricultural Engineering 14
6.2.4. Agriculture Research 14
6.2.5. Livestock Extension and Research Wing 14
6.2.6. USAID Alumni of KPK Experts 16
6.3. Justification of the Project 16
6.4. Strategy for Development of Command Area and Water Productivity 17
6.4.1. Phase-I 17
6.4.2. Phase-II 19
6.5. Proposed Actions and Details for the GZD-CADP 19
6.5.1. Phase – I 19
6.5.2. Phase-II 24
6.6. Activity Matrix 25
6.7. Supervisory Consultants 26
6.8. FOs Supports’ Centres 26
6.9. Field Office and Facility 26
7. Capital Cost Estimates 32
7.1. Indicate Date of Estimation of Project Cost 32
7.2. Basis of Determining the Capital Cost 32
7.3. Annual Component-Wise Estimation of Physical Activities and…….. 36
7.4. Exchange rate used to work out FEC in the PC-I 36
8. Annual Operating and Maintenance Cost after Project Completion 36
iii
9. Demand and Supply Analysis 40
10. Financial Plan and Source of Financing 40 10.1. Equity 40
10.2. Debt 41
10.3. Grants along with sources 41
10.4. Weighted cost of capital 41
11. Project Benefits and Analysis 41 11.1. Financial Benefits 41
11.2. Economic Benefits 41
11.3. Social Benefit with Indicator 42
11.4. Environmental Impacts 42
11.5 Sensitivity Analysis 43
11.6 Employment Generation (Direct and Indirect) 43
12. Implementation Schedule and Monitoring of the Project 43
12.1. Implementation Schedule 43
12.2. Result Based Monitoring (RBM) Indicators 43
13. Management Structure and Manpower Requirements 48 13.1. Administrative Arrangements for Implementation of Project 48
13.2. Manpower Requirements 52
13.3. Job Description and Eligibility of Project Manpower 54
14. Additional projects/decisions required 74
Annexure I. 75
Annexure II 80
Annexure III. 84
Annexure IV. 89
Annexure V. 91
Annexure VI. 93
Annexure VII. 96
Annexure VIII. 97
Annexure IX. 98
Annexure X. 100
iv
Acronyms
acre Acre – a unit of land 43560 square feet
ADP Annual Development Programme
AE Agriculture Extension
AEG Agricultural Engineering
AIC Artificial Insemination Centre
BCR Benefit Cost Ratio
CADP Command Area Development Project
CCA Culturable Command Area
CDS Comprehensive Development Strategy
CLEWs Community Livestock Extension Workers
CVC Civil Veterinary Centre
CVD Civil Veterinary Dispensary
CVH Civil Veterinary Hospital
D. I. Khan Dera Ismail Khan
DCO District Coordination Officer
DLO District Livestock Officer
EDO Executive District Officer of the District Government
EIRR Economic Internal Rate of Return
EM Effective Microorganisms
FEC Foreign Exchange Component
FO Farmers’ Organization
FWUAs Federation of Water Users’ Associations
GCA Gross Command Area
GDP Gross Domestic Product
GoKPK Government of KPK
GZD Gomal Zam Dam
ha Hectare – a unit of land, equal to 2.47 acres or 10000 square meter
HR Human Resources
KPK Khyber Pakhtunkhwa
LDD Livestock and Dairy Development
M&E Monitoring and Evaluation
MOU Memorandum of Understanding
NEC National Economic Council
NIDA NWFP Irrigation and Drainage Authority
O&M Operation and Maintenance
OFWM On-Farm Water Management
PARC Pakistan Agricultural Research Council
PC-I Planning Commission Performa - I
PD Project Director
PIC Project Implementation Committee
PIFRA Project to Improve Financial Reporting and Auditing
PIU Project Implementation Unit
PMU Project Management Unit
PSC Project Steering Committee
PSDP Pakistan Sector Development Programme
PVO Principal Veterinary Officer
QMR Quarterly Monitoring Report
QPRs Quarterly Progress Reports
RBM Result Based Monitoring
RFPs Request for Proposals
SOPs Standard Operating Procedures
v
SVO Senior Veterinary Officer
TA/DA Travel Allowance/Daily Allowance
USA United States of America
USAID United States Agency for International Development
USD United States Dollar
USDA United States Department of Agriculture
VA Veterinary Assistant
VO Veterinary Officer
WAPDA Water and Power Development Authority
WUAs Water Users’ Associations
1
PC-I
1. Name of the Project: Gomal Zam Dam’s Command Area
Development and On-Farm Water
Management for High Value and High
Efficiency Agriculture Project (GZD-
CADP)
2. Location of the Project: Command Area of Gomal Zam Dam’s
Project located at Khajuri Katch on
the Gomal River in the districts of D. I.
Khan and Tank
Figure 1. Schematic of Gomal Zam Dam
Figure 2. Map of the Gomal Zam Dam’s Command Area
2
3. Authorities responsible for:
i. Sponsoring:
Government of Khyber Pakhtunkhwa, Department of Agriculture, Livestock and
Cooperatives
The U.S. Agency for International Development (USAID)
Farmers of the Gomal Zam Dam’s command area to be developed under the
proposed project
ii. Execution:
Government of Khyber Pakhtunkhwa, Department of Agriculture, Livestock, and
Cooperatives through Project Management Unit (PMU) and Project Implementation Unit
(PIU) established under the proposed project and through envisaging partnership with the
private sector and local organizations, in the areas of command area development, on-farm
water management, increase in agriculture production, introducing high value crops, and
processing.
Besides the private sector, the Department of Agriculture, Livestock and Cooperatives will
implement the project in association with the following institutions of the Department:
o Directorate General Agriculture Extension
o Directorate General Agriculture Research
o Directorate General On-Farm Water Management
o Directorate General Livestock and Dairy Development (Research)
o Directorate General Livestock and Dairy Development (Extension)
o Directorate General Agriculture Engineering, and
o Government of KPK official trained under the USAID Training for Pakistan Project
The PIU will implement the project through envisaging partnerships with the private-sector
companies for the delivery of services (physical activities) and supply of inputs (seed, fertilizers, etc.)
so that these services are available to the water users’ and their organizations even after the
completion of the project. The important thing to mention is that project will be completed in a period
of 60 months but irrigated farming in the command area will continue for indefinite period. Therefore,
involvement of private sector is essential right from the beginning and it is also a priority reflected in
the development strategy of national and provincial development frameworks.
iii. Operation and maintenance:
i. Water Users’ Organization at the Dam’s Level
ii. Federation of Water Users’ Associations (FWUAs) at the level of Canal-Command (3 canal-
commands having different level of design cropping intensity of 80, 100 and 120% and
associated levels of water allocations). The FWUAs will be registered as Farmers’
Organization (FOs) under the NIDA Act with the KPK Department of Irrigation and Power.
iii. Water Users’ Associations (WUAs) at the watercourse command registered under the WUAs
Act of the KPK and with the Department of Agriculture, Livestock and Cooperatives – 393
Mogha commands, each having a WUA.
iv. Private-sector and local enterprises.
3
In case of more than one agency, give their component wise responsibility. For provincial
projects, name of the concerned federal ministry be provided:
Directorate General of On-Farm Water Management (OFWM) – Director general, OFWM
will nominate a Focal Person in the Directorate General to work in partnership with the
Component Leader on “Command Area Development and On-Farm Water Management” in
the PIU of the GZD-CADP. He will facilitate to develop and support partnership with the PIU
for the implementation of the project through private sector and users’ institutions.
Directorate General of Agriculture Extension (AE) – Director General, AE will nominate
two Focal Persons in the Directorate General to work in partnership with each of the
Component Leaders on “Productivity Enhancement” and “Marketing of Marketable Products”
in the PIU of the GZD-CADP. He will facilitate to develop and support partnership with the
PIU for the implementation of the project through private sector and users’ institutions.
Directorate General of Agriculture Research– Director General, Research will nominate two
Focal Persons in the Directorate General office to work in partnership with the Component
Leader on “Productivity Enhancement” and “Value Added Agriculture and Livestock” in the
PIU of the GZD-CADP. He will facilitate to develop and support partnership with the PIU for
the implementation of the project through private sector and users’ institutions.
Directorate of Agriculture Engineering: Director, AEG will nominate a Focal Person in the
Directorate to work in partnership with the Component Leader on “Command Area
Development and On-Farm Water Management” especially for land Reclamation and
rough leveling of ravines and gullied lands” in the PIU of the GZD-CADP. He will facilitate
to develop and support partnership with the PIU for the implementation of the project through
private sector and users’ institutions.
Directorate General of Livestock and Dairy Development (LDD): Director General, LDD
will nominate a Focal Person in the Directorate General to work in partnership with the
Component Leader on “Productivity Enhancement” in the PIU of the GZD-CADP. He will
facilitate to develop and support partnership with the PIU for the implementation of the
project through private sector and users’ institutions.
4. Plan Provision
(a) Plan provision:
If the project is included in the medium term/Five Year Plan, specify actual allocation.
Conceptually as part of the medium-term five year plan but no specific allocation is made.
If not included in the current Plan, what warrants its inclusion and how is it now
proposed to be accommodated.
There are directives of President and Prime Minister of Pakistan for the development of command
area and WAPDA has developed PC-Is for the construction of 12 medium dams and development of
command area of these dams in Pakistan. PARC was made responsible for the development of the
command area but due to financial constraints priority was assigned initially for the construction of
12 medium dams.
The Gomal Zam dam is a priority area and falls within the purview of both the federal and provincial
priorities, as of USAID, the donor. “Gomal Zam Dam” is covered in PSDP/ADP projections. It is
also covered by the Planning Commission’s Growth Strategy approved by NEC in 2012 and also
included in Pakistan Water Vision 2025 developed by WAPDA and approved by the federal
4
government. Furthermore, the proposed project will be the first model of integrated and
comprehensive development of command area, water management and productivity enhancement in
the KPK as well as in the country. This will also help to implement Pakistan’s Water Vision 2025 in
letter and spirit.
The proposed project would serve as a support project to the Gomal Zam Dam’s Project and funded
out of the USAID committed funds. With completion of Gomal Zam Dam’s Project, 77,000 ha
(191000 acres) of land will be irrigated in the command area of Districts of D. I. Khan and Tank,
where command area will be developed for improving existing livelihoods and creation of new
employments through value added farming of high value crops using high-efficiency irrigation
systems and livestock production and products. This is the first project in the KPK where along with
the construction of dam, main canal and distributary canals, command area will also be developed
fully using a comprehensive, integrated and participatory approach. The purpose is to develop whole
of the command area rather than using traditional extension approaches of agriculture and livestock
directorates, which are largely based on the concept of demonstrations and trainings at few selected
locations.
The approach suggested for the implementation of the project is comprehensive and integrated in
nature considering the ground realities – i.e. converting the existing Spate irrigation system (Rod-
Kohi farming) to perennial canal irrigation system which can be managed on demand basis by
managing the releases from the reservoir. However, operating rules have to be defined between
WAPDA and Department of Agriculture for assigning shared and balanced priority for irrigation and
power generation.
If the project is proposed to be financed out of block provision; indicate:
Total Block
Provision.
Amount Already Committed. Amount Proposed for this
Project.
Balance
Available
Not Applicable.
(b). Provision in the current year PSDP/ADP (2011-12).
Not Applicable.
5. Project objectives and its relationship with sector objectives 5.1. Objectives of the Water Sector
The Government of Khyber Pakhtunkhaw has developed a comprehensive development strategy
(CDS) for the period of 2010-17. The goals and priorities of water and agriculture sectors were
reviewed and summarized as under:
The GoKPK's goals in irrigation are to provide adequate water, both through conservation and
development, to meet the food and fiber requirement of the growing population. This is
consistent with the Pakistan Water Vision 2025, which states: that by “By 2025, Pakistan
should have adequate water available, through proper conservation and development. Water
supplies should be of good quality, equitably distributed and meet the needs of all users
through an efficient management, institutional and legal system that would ensure the
sustainable utilization of water resources and support economic and social development with
due consideration to the environment, quality of life, economic value of resources, ability to
pay and participation of all stakeholders.
The CDS further described objectives of various sub-sectors and objectives related to water for
agriculture are reproduced as under:
5
In water resources development: to provide sufficient water supply for all users, and
promote water conservation through effective planning and decision-making; to regulate
groundwater extraction and improve water quality; and to develop an information base and
increased public awareness of the importance of water;
In irrigation and drainage: to increase efficiency from 40% to 45%; to achieve equity in
water distribution; to increase the irrigated area; to achieve financial sustainability; to
promote stakeholder participation; to reduce waterlogging; to improve capacity; and to
introduce an asset management system;
With regard to the environment: to improve the quality of surface and groundwater to
acceptable standards by 2025;
In flood protection: to focus attention on areas of highest population and economic
importance; preparing flood and drought management strategies for major towns and cities;
and clearly delineate risk zones in the water infrastructure; and
In rainwater harvesting and small dams: to harness unused floodwater and runoff from hill
torrents; to conserve rainwater; and to improve watershed management and flood mitigation.
The short-term strategic priorities related to water for agriculture are to:
implement small dams, rainwater harvesting ponds and actions to harness hill torrents, with
appropriate feasibility studies;
rehabilitate and improve existing irrigation schemes;
upgrade the capacity for integrated water resources management and produce a water
resources master plan and management information system;
promote water conservation;
expand large- and medium-scale water storage capacity;
prepare a plan for the financial sustainability of irrigation and drainage;
implement actions to improve farmers’ participation and cost recovery in irrigation and
drainage; and
prepare plan to expand the irrigated area on all scales.
Many of the short-term priorities will need to be sustained into the medium term. Additional
medium-term strategic priorities related to water for agriculture are to:
implement the plan to increase the irrigated area;
improve integration of different aspects of water resources management;
pilot modern irrigation technologies; and
capacity building in GoKPK institutions.
In addition to these short- and medium-term priorities, there are longer-term strategic priorities,
including:
6
improvements in rainfed farming systems; developing new cultivars with greater water
efficiency; and
building capacity to respond to climate change, including the ability to optimize water use
when supplies are variable. Many of these require a significant increase in spending on
research.
There are five major irrigation investment projects in Khyber Pakhtunkhwa. Out of these the Gomal
Zam Dam in South Waziristan, Tank and D. I. Khan is already part of the strategy. Furthermore, the
proposed project is going to address all the four medium-term strategic priorities of the GoKPK and
number of short-Term strategic priorities. Therefore, the proposed project is aimed to implement the
GoKPK’s CDS.
5.2. Objectives of the Agriculture Sector
The goal for agriculture sector including livestock is to “ensure food security by enhancing
agricultural and livestock productivity through improved and integrated public support, public-private
partnership, conservation, tax relief and gender mainstreaming. The target set by the National Task
Force on “Food Security” is to achieve real agricultural growth of at least 4% per year over the next
decade, and Khyber Pakhtunkhwa aims to match this target.
The strategy defines the following short-term priority policies related to the Command Area
Development and On-Farm Water Management for the Gomal Zam dam:
expanded availability of basic seed to the private seed companies that supply most of the
improved seed in Khyber Pakhtunkhwa;
improved efficiency of agricultural markets and maximized incentives for farmers, with
prioritized public-private investment in market, processing and storage facilities;
increased farmer co-operation and participation in government services;
facilitated private investment in livestock, fruit, water management and dairy;
diversification to higher value products, with investment in post-harvest handling, and
diversification into non-farm employment in rural areas to facilitate consolidation of holdings
greater attention to the efficiency of water use; and
Bringing of cultivable wasteland into farming, through provision of irrigation and land
development with the help of earth moving machinery (bulldozers and tractors).
GoKPK recognizes that livestock sector contributes about half of agricultural GDP and will pursue:
private sector and the establishment of milk, meat and egg processing industries through local
and foreign investment, and creation of a Livestock Commercialization Board and Network;
and
Enhancement of livestock productivity through an improved breeding programme and the
conservation of indigenous breeds.
The proposed project fully addresses the short-term strategic priorities for agriculture and livestock
sectors of the GoKPK’s CDS. This makes the proposed project as a comprehensive project addressing
water, agriculture and livestock sectors in an integrated fashion.
7
The specific objectives of the project are:
GZD-CADP (Gomal Zam Dam – Command Area Development and On-Farm Water
Management Project) will provide assistance and funding to the people of Gomal Zam dam
command area in building and operating a modern irrigation system with major considerations for
water productivity (same as the term of ‘water use efficiency’), while providing both food self-
sufficiency and income from high value crops. The development will create jobs, new industries, and
increased opportunity for the people in this fragile ecosystem. These opportunities will provide new
and better livelihoods for all especially women.
The overall expected result is an established on-farm irrigation system that ensures efficient use of
water, achieves enhanced productivity by farmers, improves processing capacity and increases ability
to provide high quality products for markets. These efforts will ultimately lead to increases in income
and employment of the people living in the command area.
The overall objective is that water available for 77000 ha (191,000 acres) of command area of
the Gomal Zam dam is used efficiently through integrated development of command area,
0n-farm water management, productivity enhancement, introduction of high value crops and
livestock breeds, processing and effective marketing.
5.3. Program Outline
The following four Components are suggested for the GZD-CADP.
5.3.1. Phase-I
The following two components will be started during the 1st and 2
nd year of the project and that’s why
are included in Phase-I.
Component #1: Command Area Development and On-Farm Water Management (will be started
in the 1st year)
Component #2: Enhancing productivity of crops, horticulture and livestock (will be started in the 2nd
year)
5.3.2. Phase-II
The value added agriculture and livestock, and marketing components can be undertaken once the
command area is developed fully, that’s why these components are included in Phase-II and will be
initiated in 2nd
year but will gain momentum in the 3rd
year and subsequent years:
Component #3: Value added agriculture and livestock (introduction of high value crops and
highly productive breeds, Feed, and modern management of livestock) Component #4: Marketing of marketable products
The overall objective of the proposed project is in-line with the sectoral objectives as indicated in the
CDS of the GoKPK. The project objectives in reality are drawn from the CDS and cover water for
agriculture, development of command area, on-farm water management, enhancement of productivity
of crops, horticulture and livestock; value added agriculture and livestock, and marketing. A major
part of the funding (i.e. US$ 33 million) is expected from USAID who also provided funding for the
completion of the Gomal Zam dam, which is covered in the CDS and the current project is based on
the concept of efficient and sustainable utilization of stored water in the Gomal Zam dam.
8
6. Description, Justification, Technical Parameters and Technology
Transfer
6.1. Background information of the project Area 6.1.1. The Province of Khyber Pakhtunkhwa
The province of Khyber Pakhtunkhwa is comprised of 25 administrative districts and lies between 31
to 370 N and 70 to 74
0 E. Its geographical area is 10.17 million ha and cultivated area is 1.9 million ha
which is 12.8% and 8.6%, respectively of Pakistan’s geographical and cultivated area. The province is
smallest in terms of geographical area and far behind in terms of cultivated area from that of Punjab
and Sindh provinces. Cultivated or cultivable land is thus limited in the province.
Around 56% of the cultivated area is under rainfed farming and rest is irrigated from perennial and
non-perennial sources of water both from surface and groundwater. In addition to the cultivated areas,
there are around 1.21 million ha, which are classified as culturable waste lands and can be brought
under cultivation, if water is made available.
The province has a highly diversified landscape and environment having five broad physiographic
regions, each having wide variability in climate, soils and topography. The mean annual precipitation
ranging from 250 mm in D. I. Khan to over 1000 mm in Abbottabad. The mean annual temperature
varies from 160 to over 22
0 C. Its diversified climate and microclimatic conditions enable the growth
of large variety of crops, vegetables and fruits in different agro-ecological regions. Food crops (wheat,
maize, sorghum and millets), tobacco, sugarcane, groundnut, fruits (peaches, apples, dates, etc.) and
large variety of vegetables both seasonal and off-season are grown in the province and marketed.
Farming is a small-scale enterprise in the province as 92 % farms are classified as less than 5 ha (12.5
acres) and regarded as subsistence farmers. However, due to specialized ecologies and comparative
advantages in pockets of micro-climatic advantages vegetables and fruits are grown fetching higher
prices in the country’s market. Still there is a wide gap between the current and potential productivity.
The productivity of major crops can be easily doubled if services and supplies are provided effectively
to the farmers along with the credit support.
The topography of the province is highly suitable for the construction of small and medium size dams
with development of irrigated command area along with generation of hydro-power. The Gomal Zam
dam is one of the examples of bringing traditional Spate irrigation area (locally called Rod-Kohi)
under perennial irrigation. The Spate irrigation in the province is the most developed form of
floodwater irrigation in the country.
6.1.2. The Project Area
The project area largely constitutes the command of the Gomal Zam dam located in the districts of D.
I. Khan and Tank. The list of villages of the three Tehsils (Tank, D. I. Khan and Kulachi) is presented
in Table 1. The command area is currently being used as Spate irrigation locally named as Rod-Kohi
farming. Land and ecology is suitable to raise high value crops like fruits and vegetables along with
field crops if perennial irrigation is provided from the stored water in the Gomal Zam dam’s
reservoir.
The command area is divided into three canal-commands and different levels of cropping intensity is
used by WAPDA in the preparation of the detailed designs for the canals – 80, 100 and 120%
cropping intensity; and for the construction of the storage capacity of the dam. More than half of the
command area is placed under cropping intensity of 80%. This shows that irrigation is designed using
the concept of deficit irrigation and therefore high efficiency irrigation systems have to be used
ultimately as farmers are normally interested to have cropping intensity of 200%.
9
This design criterion used for the dam poses physical limitations for the implementation of the
proposed project, where high efficiency irrigation (furrow irrigation on laser leveled fields and two
demonstration farms including drip irrigation on 5 acres each in all of the 393 Mogha commands and
area of Waran canal) is an essential element of the strategy for the development of the command area.
Table 1. List of villages of Tank, D. I. Khan and Kulachi Tehsils having command area of
Gomal Zam Dam
Tank District D. I. Khan District
Tank Tehsil Kulachi Tehsil
1. Kot Murtaza/Kot Nawaz 1. Kot Zafar Baladasti
2. Gomal 2. Naskor Nahura
3. Ghasha 3. Rori
4. Gorazai 4. Mohabat
5. Dabara 5. Kanori
6. Shiekh Sultan 6. Hathala
7. Toran Tattor 7. Gara Hayat
8. Kalu Prangi 8. Kot Daulat
9. Pathar 9. Gara Guldad
10. Uttar 10. Gara Sardar
11. Fateh Chadhrar 11. Looni
12. Shada 12. Kulachi Gharbi
13. Mutta 13. Kulachi Sharqi
14. Mian Khan 14. Gara Jana
15. Jamal Korai 15. Kot Attal
16. Jamal Awan 16. Gara Ibrahim
17. Diyal 17. Gara Nadar Badar
18. Daulat Khan 18. Maddi
19. Mamrez Baloch 19. Kot Zafar Firodasti
20. Mamrez Pathan 20. Saggu Gandapuri
21. Khair Awan 21. Gara Gul Mohd
22. Rakh Ranwal 22. Rakh Ranwal
DIKhan Tehsil
23. Ranwal 1. Isa Khan
24. Murma 2. Yara Manjhi Khel
25. Bara Khel 3. Potah
26. Kot Allah Dad 4. Sikander Shumali
27. Habib Wattoo 5. Chadhrar
28. Manjhi khel 6. Hassani
29. Mashooqa 7. Hawasi
30. Tei Malook 8. Hatu
31. Azami 9. Teli
32. Nadir Ali Shah 10. Faqira
33. Safdar Ali Shah 11. Budh
34. Bhagwal
35. Kahu
36. Daggar Khan
The weather of the project area is hot in summer and moderately cold in winter. Two crops can be
grown each in Rabi and Kharif seasons and there is potential to grow three crops by adopting short-
duration varieties of crops especially vegetables, if water is not a limiting factor. Otherwise, it is
10
adequate for raising one crop as cropping intensity ranges from 80 to 120% under traditional concept
of surface irrigation. But up to three crops can be grown using high efficiency irrigation systems i.e.
furrow irrigation on laser leveled fields in whole of the command area along with 2 demonstrations of
drip irrigation in each Mogha command.
Gross Command Area (GCA) of the project is 109,732 ha comprising of 51,506 ha in Tank, 44,922
ha in Kulachi and 13,304 ha in D. I. Khan. Culturable Command Area (CCA) is 77,353 ha
comprising of 38077 ha in Tank, 35318 ha in Kulachi and 3958 ha in D. I. Khan.
Presently, the command area is irrigated by Spate irrigation. The Spate flows are largely originated
from the Gomal Zam catchment area where floodwater is generated from the hill torrents. There are
two peaks of floods – one in the summer season and other in the winter season. These floods are non-
perennial. However, there are some perennial flows which are basically from groundwater, which
oasis out from the mountains and locally termed as Kalapani.
The floodwater flows are controlled through a diversion weir at the Gomal River locally named as
Zam. The floodwater from the Gomal Zam is diverted into main canals, distributary and minors.
Temporary earthen bunds are constructed to divert water to the farms until irrigation is completed and
then breached so that lower riparian can have his turn. The water rights are well defined in the
Rawajat-a-Rod-Kohi. Bulldozers, tractors and bullocks are used to construct diversion bunds
depending on the size of the flow and the level of diversion of water. Finally, the un-utilized Spate
flows entered in to the Indus River.
The Spate irrigation in Gomal Zam is old as Rod-Kohi farming is being practiced since millenniums.
The floods and droughts are common phenomena in Spate irrigation and due to Spate irrigation since
millenniums, the sediment deposition in the channels and fields have restricted Spate flows to the
areas having hydrological equilibrium. However, the earthen bunds are the best practice followed
since centuries have created hydrological balance in major part of the potential area. The construction
of Pacca controlled structures constructed in the last many decades failed because hydrological
equilibrium in terms of sedimentation could not be maintained. Thus any infrastructure development
in Spate irrigation area has to be properly and effectively designed and constructed.
The Gomal Zam dam will provide a perennial source of water under a well-controlled system of
water releases and will reduce the chances of floods and droughts for farming through provision of
perennial irrigation. Therefore, the command area can be developed for canal irrigation system. The
current landscape of the command area is in eroded and undulating form therefore, innovative options
have to be developed for the development of the command area. The traditional concept of providing
bulldozers for leveling of land will not work as efficient irrigation in situation of water scarcity would
require precision land leveling using laser levelers. Precision land leveling must be seen in the
context of essentiality for high efficiency in surface irrigation including furrow irrigation on laser
leveled fields.
Farmers have been practicing Spate irrigation in difficult environment of too much or too little water
which is a gamble in having efficient irrigation. Once the canal irrigation supplies are available on
perennial basis the Spate farmers will adopt the perennial system easily. The challenge is how to
improve water productivity in the command area of Gomal Zam dam? What is the best cropping
pattern to be adopted by farmers? What is possible level of productivity on sustainable basis? How
water can be used efficiently?
6.1.3. Agriculture and Livestock information regarding the project Area
The current economy of the Gomal Zam dam’s command area is largely based on agriculture. The
agriculture production and productivity is dependent on the availability of Spate water so that crops
can be grown at optimal time and then 1-2 Spates during the crop growing season can provide higher
yields of crops without application of fertilizers. For example, in a wet or average year farmers can
11
harvest up to 4 tons/ha of organic wheat. But productivity reduces significantly, if Spates are not in
line with crop planting and growth requirement or frequency of Spates is reduced. One-out-of-four
years there are chances of either crop failure or extremely reduced productivity. Sometime grain
formation is affected and farmers have to harvest the crop for fodders.
The head farmers are getting water in almost every year. The tail farmers are not receiving any water
during the dry years. Therefore, equity in distribution of water is a major challenge faced by the Spate
farmers.
The un-predictability and un-reliability of Spate flows affect the watered area and productivity
considerably. The GoKPK has assigned low priority to Spate irrigation and the most prominent
investment in the past was in the form of bulldozers which are not easily available to the farming
community primarily due to higher demand and politicization of allocation of bulldozer hours.
Government is providing subsidy on bulldozers but it costs high to the GoKPK because of the
inefficiency in the public-sector institution. Only a fraction of farmers get benefit of this facility.
No engineering or knowledge support is provided in developing topographic maps, cut-fill maps, etc.
It is the judgment of the driver regarding bulldozer operations and cut-fill. The bulldozers are suitable
only for reclamation and rough leveling and not for precision leveling. Rather private sector tractor
rental companies in the KPK using Belarus tractors (52 hp or more) provides even cost effective way
of rough leveling.
The farm size in the Spate irrigation area is large. The average field size vary from 2-3 ha. Farmers
apply heavy pre-sowing irrigation of 500-1500 mm in depth and an additional irrigation during crop
growth can mature the crop. Water rights are well established and it is based on the principle of Head
to Tail. The head farmer has first right and the moment he completes irrigation the next farmer gets
his turn.
The soils of the command area are largely classified as alluvial layered soils formed through the
process of sedimentation. The Spate flows are having large amount of sediments having all the major
nutrients. Therefore, most of the farmers are not using any fertilizer.
The major crops grown in the area are: wheat, gram, sorghum, millets, oilseeds and melons. Farmers
can’t grow fruits and vegetables because water reliability and predictability is a major concern.
However, in the perennial Spate flows farmers are growing fruits and vegetables.
The available data indicated that currently wheat is grown on 36.5% area, gram on 2.8%, sugarcane
on 2.8%, fodders on 2.5%, maize 1.6% and rice on 1% of the perennial irrigated area constituting
overall cultivation intensity of 52.7% per annum. The present crop yields and production in the Spate
irrigation area (perennial and non-perennial) are given in Table 2.
Table 2. Productivity of crops grown under non-perennial and perennial Spate irrigation in D.
I. Khan and Tank districts of KPK (Agriculture Census 2006)1
Crop Yield (Kg/ha) Production
(Tons) Non-Perennial
Spate Irrigation
Perennial Spate
Irrigation
Wheat 905 1600 9915
Gram 500 710 632
Berseem -- 6400 2560
Oil seed 497 705 240
Millet & sorghum 610 1050 306
Kharif Pulses 405 -- 8.1
1 Data is taken from Agriculture Census 2006. Census is conducted after every 10 years and next data will be available in
2016. Agricultural Statistics do not provide data for Spate irrigation areas.
12
Melons 4080 5200 1257
Rice -- 2010 321
Maize -- 1190 297
Sugarcane -- 24700 10868
6.1.4. Information on Livestock Sector in the GZD-Project Command Area.
The GZD Project command area comprises of D. I. Khan and Tank districts, which are the south most
districts in Khyber Pakhtunkhwa province. Both the districts are famous for Spate irrigation since
unknown times and have almost 50% of all cultivated lands in the province.
Livestock is an integral component, like as in any other rural economy, providing livelihood and
income support for most of the households. Keeping livestock also serves as a buffer in times of
hardship. If crop fails, animals can be slaughtered and consumed or sold in the market to generate
revenue.
Cattle and buffalo are mainly used for milk. Camels and non-milch cattle are used for ploughing,
bund making and transportation besides contributing to meet the meat requirement. Sheep and goat
are used for meat, milk, wool and hides.
Like all Spate irrigation areas, the project command area has considerable number of livestock but
due to indiscriminate breeding practices, most of the herd is “non-descript”. The average milk
production is less than 4 liters/animal/day. All livestock animals mostly depend (in terms of feed)
upon fodders, crop residuals, stalks, shrubs and bushes. There is no trend of growing fodders, since
farmers prefer to cultivate wheat, sugarcane and other high value crops. Statistics show that fodder is
grown only on 2.5% of the total cultivated area in the region which is not enough to meet the
nutritional requirements of livestock. Moreover, there is no awareness regarding the use of non-
conventional feeding resources.
Poultry rearing for egg and meat purposes is also a common practice in the rural areas. The
indigenous poultry breeds, usually referred to as “desi” are the ones mainly reared in these areas.
Their egg production per annum is quite low, around 80 eggs per annum, in comparison to the
commercial layer breeds that produce more than 120 eggs per annum.
Maintenance of livestock and poultry is mainly the responsibility of women in the rural households.
Milk, meat and eggs produced are consumed at the household level to meet the daily requirement. In
the absence of proper milk storage facilities and dairy value chain, the surplus milk is used to make
yogurt, lassi, cottage cheese and traditional sweets. Despite being considered the backbone of the
Spate farming system, livestock is still an underdeveloped sector in the project area.
According to the livestock census 2006, the livestock population in the two districts is 1.81 million,
whereas population of the poultry birds is 1.489 million (Table 3).
Table 3. Livestock Population of Project Area (Livestock Census 20062)
Species Districts Total
D. I. Khan Tank
Cattle 411432 67104 478536
Buffaloes 205634 17975 223609
Sheep 248491 77952 326443
Goat 583923 120668 704591
Camels 12930 3814 16744
Horses 4998 876 5874
2 The Livestock and Agriculture Census are being conducted after every 10 years. Next Census data will be available in
2016.
13
Mules 519 110 629
Asses 43254 10464 53718
Sub Total - Livestock 1511181 298963 1810144
Poultry 1280079 209768 1489847
Livestock is an integral part of the farming system in the command area districts of D. I. Khan and
Tank and contribute significantly in the livelihood of Spate farmers.
6.2. Existing Facilities
The agriculture, livestock and on-farm water management departments have been devolved at the
district level. The EDO (Agriculture) is responsible for agriculture, livestock, on-farm water
management and other related departments. Thus, coordinated mechanism is already being used by
the district government with the administrative support of DCO. However, the Gomal Zam dam’s
command area is distributed largely in the two districts of Tanks and D. I. Khan. A separate PIU will
be developed to implement the project through envisaging partnership with the private sector.
However, existing facilities of district governments will be used for the implementation of the
project. The existing facilities relevant to the implementation of the Command Area Development
and On-Farm Water Management project are presented in the following sections.
6.2.1. On-Farm Water Management
On-Farm Water Management (OFWM) Directorate General was also devolved and now their staff is
part of the two districts of D. I. Khan and Tank. In addition to this, the OFWM has established
Training Centre to provide training to the staff of the OFWM and farmers in southern region of KPK.
The OFWM is basically involved in the canal command area where their staff has developed capacity
for improving already constructed watercourses, land leveling and high efficiency irrigation systems
through partnership with the private sector.
The OFWM has developed capacity to work with the private-sector under the National Project on
“High Efficiency Irrigation System” and they are relatively ahead of other Directorates of Agriculture
and Livestock. However, the capacity of OFWM for developing command area is limited. Therefore,
they have to adopt the model of private sector already implemented under the federally financed
“High Efficiency Irrigation Systems” Project. The GZD-CAD Project is first of its kind and there is a
need for innovations and adaptations through seeking active partnership of the private sector.
6.2.2. Agriculture Extension
Agriculture Extension services are available in the districts of D. I. Khan and Tank. In addition to
support the extension services, Farm Services Centers are also operational in these districts, where
farmers meet, plan programs and make arrangement for supply of inputs and machinery to the
members not organized based on watercourse command. Moreover, for catering seed requirement of
the area, the department maintains 6 seed farms in D. I. Khan. The seed facility available is hardly
adequate for fraction of farmers in the two districts. Most of the farmers are using their produce as
seed and this is one of the reasons for having low productivity.
The enlightened farmers of the command area are using seed from the private sector companies. The
examples available in other parts of the country provide an insight for analyzing the existing facilities
of seed in KPK. The hybrid maize seed from the private sector companies are now extensively used in
central Punjab (Okara, Sahiwal, Burewala and Arifwala, etc.) by the farmers and getting productivity
of 9-12 tons/ha. Therefore, the existing productivity of the command area can be tripled for maize,
sorghum and millets.
14
6.2.3. Agricultural Engineering
Agricultural Engineering Directorate provides bulldozers on rent to the farmers without any technical
support for land reclamation, land forming and rough land leveling of ravines and gullied lands. They
do not have any capacity in provision of services for land development and the Directorate is
generally regarded as an agency providing bulldozers on rent. The indication of demand for
bulldozers is basically due to the subsidy provided by the GoKPK. Furthermore, they do not have any
capacity for the design of the command area and land development.
The department maintains ten bulldozers but these have completed their life service and through
regular repair these have been made functional. Similarly rigs and power winches are also being
provided to the farmers on rent basis. A well-equipped workshop is also functioning in D. I. Khan by
providing repairing services to the department machinery.
The cost-effectivity of the services is extremely low and GoKPK has to put lot of resources to
maintain such a small fleet of bulldozers. In future, it will be difficult to continue subsidy on
bulldozers rather services from the private sector will be cost-effective to the GoKPK. The private
sector services will be available to all especially the small-holders who do not have access to the
political leadership or the notables of the area. The private sector companies who have established
facilities for earth moving machinery will be encouraged to participate in the development of the
command area. The project will develop incentives and regulatory framework for the strengthening of
existing companies having capacity in earth moving machinery (Large tractors, etc.).
6.2.4. Agriculture Research
The Agriculture Department of GoKPK has established Agricultural Research Institute at D. I. Khan,
mandated for conducting research in crops, fruits and vegetables. Currently, the institute is designed
in a traditional manner having crop improvement programmes. The discipline research is largely
concentrated on crop diseases, crop protection, soils, food technology, etc. They do not have any
capacity in Spate irrigation and currently they do not have any research programme related to Spate
irrigation or Command Area Development or On-Farm Water Management.
PARC has implemented Spate irrigation project during 1995-08 which was largely focused on the
development of secondary-canal supported command area at the pilot scale. The outcome of the
research project is now being used by the donor financed NGOs in the district of D. I. Khan. The
trained team of engineers and scientists of the Spate programme are now absorbed in the regular side
of PARC sponsored Arid Zone Research Institute located at D. I. Khan. This Team can be used as
available resource in the Gomal Zam dam’s command area, if needed.
Pakistan has recently established Pakistan Chapter of the Spate Irrigation Global Network, which is
supported by Meta Meta Netherlands and in Pakistan the collaborators are SPO and PARC.
6.2.5. Livestock Extension and Research Wing
The Livestock and Dairy Development Directorate General of GoKPK has established a network of
more than 34 Veterinary Hospitals/Dispensaries/Centers in the District of Tank and 66 such
institutions in D. I. Khan district, staffed with Veterinary Doctors and Veterinary technicians (Table
4).
Table 4. Technical staff and veterinary institutions in D. I. Khan and Tank districts (KPK
Livestock and Dairy Development Directorate General 2012)
District Technical Staff Veterinary Institutions
PVO DLO SVO VO VA CVH CVD CVC AIC Dev: CVD
D.I.Khan 2 1 03 10 86 8 16 15 14 11
15
Tank 0 1 1 04 36 03 06 10 07 06
Total 2 2 4 14 12
2
11 22 25 21 17
PVO: Principal Veterinary Officer; DLO: District Livestock Officer; SVO: Senior Veterinary Officer; VO: Veterinary Officer; VA:
Veterinary Assistant.
CVH: Civil Veterinary Hospital; CVD: Civil Veterinary Dispensary; CVC: Civil Veterinary Centre; AIC: Artificial Insemination Centre
The number of female Veterinary Doctors and Veterinary Assistants, working with the Livestock and
Dairy Development Directorate General of GoKPK, is 11 and 36, respectively.
The Directorate is dealing largely with animal health and their capacity is reasonable in the area of
providing veterinary services. The Directorate can continue these services from their existing
resources except some strengthening can be made through provision of medicines and vaccines, if and
where required, through an MOU signed with the PIU of the GZD-CADP.
The Directorate General has an established Veterinary Research Center at D. I. Khan which can
support provision of diagnostic services to the Livestock Extension Programme. The GoKPK may
strengthen facilities of the research institute so that better diagnostic facilities can be provided to the
farmers of the command area. A veterinary research center is also being established at Tank, which
will work under the technical and administrative supervision of the Veterinary Research Center
(South), at D. I. Khan.
The capacity of Livestock Directorate General is limited in livestock productivity enhancement and
that can be strengthened as part of the Command Area Development and On-Farm Water
Management programme. There are none or very few progeny tested bulls and bucks available in the
project command area for breed improvement. Artificial Insemination centers are located at minimum
8 kms radius and in some places up to 40 kms in the command area. Farmers have to take their
animals, to AI centers and pay a certain fee for this service. The local breed semen is of extremely
marginal quality and the good quality imported semen from Frisian or jersey cows being prohibitively
expensive and beyond the reach of most of the livestock owners.
By making progeny tested bulls and bucks (from high yielding local breeds) available at community
level, a breed improvement programme can work successfully in the command area that would result
in enhancement of livestock productivity and conservation of the indigenous breeds simultaneously.
AI centers can still render their services to the livestock in the areas close to these centers where
access is not an issue.
Animal nutrition is an underdeveloped and to some extent ignored aspect of livestock sector in the
command area. There is limited availability of fodders that affects the productivity. There is a need to
introduce improved varieties of seeds for fodders, and hybrids of berseem and lucerne, multicut
grasses such as mot grass, to grow fodders in between major crops and silage making. Through proper
awareness, guidance and capacity building, livestock productivity can be doubled in the project
command area.
Efforts will be made to make use of existing infrastructure as well as available transport of Livestock
and Dairy Development Department to the maximum possible extent so as to economize the services
cost. Only operational costs in terms of medicines, and other related interventions can be provided.
There is a potential to develop fisheries, as an enterprise, in the project command area. Freshwater
fisheries, as practiced in other dams, along with cage fisheries and fish ponds can provide livelihood
to significant number of households and help alleviate poverty by generating direct and indirect
employments while contributing in meeting the meat requirement at both provincial and national
level. Agriculture, Livestock and Cooperative Department seems reluctant to enter into reservoir
fisheries even the scope is very high. The basic reason is that reservoir is under the control of
WAPDA and it is located in South Waziristan. However, in future the use of reservoir for aquatic
food resources has to be entrusted to the Dam’s Organization of water users. Thus the options
16
available for the project are limited only to the use of tail and excess water and link it with water
ponds at the tail-end of the watercourse. The target is to use un-utilized tail water at the end of the
watercourse for multiple uses, if feasible and WUAs are willing to construct such a facility. There is a
strong opinion among the experts of the Agriculture Department that water will not be available for
fish production. But in reality the choice of land use is a farmers’ preference.
6.2.6. USAID Alumni of KPK Experts
The KPK Experts (as alumni) who participated in the study tour of the Colorado State in the USA and
in Australia have desired experience to participate in the implementation of the project. But they have
to compete with other candidates for the project positions.
6.3. Justification of the Project
The GoP and GoKPK has invested large resources for the construction of Gomal Zam dam and
allocations made by the GoP will be further strengthened under this project through provision of
financial resources by USAID. The past experience of construction of small and medium dams
indicated that even after 20 years of the construction of the dam, the area commanded by stored water
is less than 50% and thus investments made in the construction of dams were hardly realized. Rather
the gains in benefits after the construction of the reservoir were lost since last many years of
constructing the dams.
Without a scientifically formulated and effectively implemented command area development, on-
farm water management, productivity enhancement, value addition and marketing, the investments
already made in the construction of the Gomal Zam dam will be rendered pointless in terms of value
added inputs to the provincial and national economies. Therefore, the strategy of “High Value and
High Efficiency Irrigated Agriculture” is at the central stage of the proposed project.
The command area of the Gomal Zam dam is around 77000 ha (191,000 acres), which is quite large.
The command area was initially being used for Rod-Kohi farming using Spate irrigation. The
perennial water to be provided to the farmers of the command area demands that all the 77000 ha
(191,000 acres) have to be reclaimed, formed and precisely leveled so that higher productivity can be
achieved. Unless and until the command area is developed nothing can be done for agricultural crops
or for improving productivity.
There are three canal-commands designed with different cropping intensities. The largest area of
more than half of the total command is designed at cropping intensity of 80%, followed by 100% and
rest at 120% cropping intensity. This shows that water is going to be scarce and farmers will be
interested to achieve cropping intensity of 200%. Thus, the most critical factor is shortage of water.
The system is designed on the concept of water deficit irrigation so that benefit goes to many instead
of few. Therefore, high efficiency irrigation systems i.e. furrow irrigation on laser leveled fields or
drip irrigation are the options to achieve cropping intensity of over 200%.
The proposed project is fully justified because without the command area development and on-farm
water management it is not possible to use stored water for irrigated agriculture. Higher productivity
can be achieved through provision of quality inputs by the private sector through developing
partnerships with FOs. The past experience has shown that without the development of command
area the designed objective could not be achieved even after a period of 20 years. The Tanda dam in
the district of Kohat is an excellent example but the situation in Gomal is rather complex because the
command area needs reclamation, forming and leveling. It is not possible for the farmers to design
the command area for higher productivity without the support of the project.
The investments made in the Command Area Development and On-Farm Water Management can be recovered in a period of 3-5 years. Furthermore, the internal rate of return for the construction
17
of the dam both in economic and financial terms can be accomplished until and unless command area
is precisely developed and made functional. Different designed cropping intensities for the three
canal-commands were used to define water allocations.
6.4. Strategy for Development of Command Area and Water Productivity
The strategy for the development of the command area and productivity enhancement has to be
developed in two phases considering the four components of the proposed project.
6.4.1. Phase-I
Component #1: Command Area Development and On-Farm Water Management
Command area development and on-farm water management component covers aspects of: a)
Feasibility and Master Plan for the GZD-CADP and Mapping and Layout of Rural Katcha Link
Roads and Watercourses for the three canal-commands; and b) Detailed Designs and Estimation of
Quantities of Materials for the Award of Contracts for Implementation of Command Area
Development and On-Farm Water Management Interventions; and c) Supervisory Consultants to
support quality control in construction of various physical interventions and verify quantity of
materials used to authorize payments to the contractors. The priority action areas include: a)
construction of rural Katcha link roads and link these with the existing metaled road to provide access
of every farm to the nearby market; b) land reclamation, forming and land leveling in ravines and
gullied lands; c) field layout; d) construction of watercourses, Pacca Naccas and culverts; e) tail water
ponds for multiple uses; f) sand-filters for provision of clean water for multiple uses; g) furrow
irrigation on precision leveled fields using laser land levelers.
WUAs at the Mogha command will be formed and registered through the process of social
organization under the Act of WUAs of the KPK with the Department of Agriculture, Livestock and
Cooperatives and then federating these WUAs into FWUAs at the canal command and registered as
FO under the NIDA Act of the KPK with the Department of Irrigation and Power. After the
completion of watercourse and related physical infrastructure, test run of the watercourse will be
arranged to ensure effective delivery of water at each Nacca serving the farm command. Trainings
will be organized for the WUAs for the O&M of the watercourse to the men and women for multiple
uses of water (i.e. stockwater, etc.).
The strategy recommended that initially earthen watercourses would be constructed as per
engineering design instead of following the current practice of OFWM where hardly 10-15% length
of the watercourse is lined and rest is kept as earthen. As the water will be having higher levels of
sediments even after having retention in the dam, therefore initially earthen watercourses will be
constructed as per engineering design, which will be more feasible. Therefore, all the Naccas can be
lined using pre-cast Pacca Naccas. Construction of culverts, tail water ponds for multiple uses at the
tail-end of the watercourse and sand filters for multiple water use will be provided in the
watercourses, wherever feasible and WUAs are willing for such a facility to use excess or drainage
water. PE black carbon plastic film of 500 microns can be used to line the pond to eliminate seepage
and also for the sections of the watercourses at critical areas i.e. sandy reaches of the watercourse or
in fill sections. Earthen watercourses will be constructed considering the allocated discharge.
However, in the sandy or light textured soils, the whole length of the channel should be lined using
PE Plastic film so that water reaches to the tail-end without taking much time and losses are
reasonable during delivery. This strategy is also essential as the past experience shows that existing
watercourses lined by the OFWM has serious limitations for effective delivery of water and these
limitations would increase in case of construction of new watercourses. Therefore, any discrepancy in
the Katcha watercourse can be taken care easily.
Once the Katcha watercourses are adjusted to meet the farmers requirement of irrigating whole of the
Mogha command, 10-20% lining of watercourses can be made using brick masonry or pre-cast slabs,
18
whichever feasible. The private sector will be given the responsibility of construction of most of the
interventions in partnership with the FOs and WUAs. The detailed SOPs and technical manuals for
the physical interventions will be prepared in the project, and resources are allocated for this under
the head of technical assistance.
Component #2: Productivity Enhancement of Crops, Horticulture and Livestock
Crops and Horticulture
The productivity enhancement for crops and horticulture includes orientation and training of the
WUAs, as a basic unit of community organization of the Mogha command, in field and horticultural
crops. Furthermore, Interest Groups will be organized for specified commodities in collaboration with
USAID Agribusiness Project. Farmers Field School (FFS) will be used to provide hands on training to
interested farmers in each Mogha.
After providing orientation and training in basic areas of production technology and productivity
demonstrations for high efficiency irrigation systems (furrow irrigation on laser leveled fields,
sprinkler, drip, etc.) will be arranged for field crops, fruits, melons and vegetables considering farm as
a unit. Two demonstrations each of 5 acres for sprinkler and/or drip irrigation will be organized in the
Mogha command and rest of the farm will be designed for furrow irrigation on laser leveled fields,
where planting will be made either on ridges or broad beds. Farm as a whole will be treated as a unit
for developing high efficiency irrigation demonstrations.
Productivity enhancement will be achieved through provision of services from private sector for
inputs like seed, fertilizers, machinery, etc. The objective should be to double the productivity of
major crops from 1.6 tons/ha (in an average year) to 4 tons/ha through adoption of hybrid seeds of
maize, sorghum and millets and improved varieties of wheat and chickpea. Crops like rice and
sugarcane are not recommended. Cropping pattern has to be designed considering the designed
cropping intensity availability of water and type of irrigation systems used in the three canal
commands.
Livestock
The productivity enhancement for livestock includes orientation and training of the WUAs, as a basic
unit of community organization of the Mogha command, in small and large ruminants. Furthermore,
Interest Groups will be organized for specified commodities in collaboration with the USAID Agri
Business Project. The on-job training approach at the farm level of each Mogha command will be
adopted in close partnership with the WUAs and FOs. The major topics of trainings are: a)
improvement of breeds for cattle and small ruminants; b) improving nutrition for cattle and small
ruminants; c) cost-effective livestock housing and management; d) stock water management – quality
and quantity; and e) improved veterinary care.
After providing orientation and training in basic areas of production technology and productivity
demonstrations for livestock, the interventions to be introduced in the command area are: a)
improvement of breeds for cattle and small ruminants through provision of services for artificial
insemination, provision of progeny bulls, rams and bucks; b) demonstration of fodders, silage and
feeds through provision of improved hybrid seeds of fodders and preparation of silage. In addition,
balance feeds for fattening of small and large ruminants and dairy animals for enhanced milk yield
will also be demonstrated; c) demonstrations will be organized for cost-effective and improved
housing for livestock including the provision of quality stock water; e) veterinary care camps will be
arranged in the Mogha commands to provide effective health cover services to the livestock farmers.
Enhancing productivity of livestock and products through provision of services for livestock
production, breed improvement, forage and fodder production, silage, housing and management of
livestock, early disease diagnosis and prevention, small scale enterprise developments and disposal of
19
marketable value added products. The objective should be to double or even triple overall livestock
productivity in terms of milk and meat production through breed improvement programmes by
encouraging farmers to use progeny tested bulls and bucks for breeding, enhanced fodders production
through adoption of hybrid seeds of maize, sorghum and millets and improved varieties of berseem
and multicut grasses such as mot grass and sadabahar. Efforts will also be made to introduce short
season fodders, such as susbania, in between the period of harvesting Rabi crops and plantation of
Kharif crops. Fodders have to be adjusted in the cropping pattern considering the designed cropping
intensity and availability of water to the three canal-commands. Efforts will be made towards
capacity building of livestock owners, primarily females, by providing information, training and
technical support regarding proper animal housing and management. Livestock productivity
enhancement activities have to be designed, developed and adjusted considering the needs and
conditions in the three canal-commands.
6.4.2. Phase-II
Component #3: Value added agriculture and livestock (introduction of high value crops and
highly productive breeds, Feed, and modern management of livestock)
Under this component, the activities will include:
o Introduction of high value crops and livestock breeds in order to improve crop per drop of
water and milk and meat production
o Grading, sorting, packing, packaging, and
o Small scale processing of the surplus produce in order to add further value.’
.
Component #4: Marketing of Marketable Products
This component will focus on:
o Establishment of market linkages,
o Construction of farm to market roads
o Training of producers in marketing, and
o Study tours of the stakeholders to development national and international markets
6.5. Proposed Actions and Details for the GZD-CADP 6.5.1. Phase – I
Component #1: Command Area Development and On-Farm Water Management3
Action Area #1: Feasibility and Formulation of Master Plan for the development of
command area of the three canal-commands with an objective to develop 77000 ha (191,000
acres) of land for canal irrigated agriculture with irrigation facility for the use of perennial
water, Katcha rural link roads, land forming and other related works. Feasibility Consultants
will be hired through quality and cost based bidding. The outline for developing complete
RFP (Request for Proposals) is presented in Annexure I. This would include outline of
context, objectives, activities, scope of the work and manpower requirement. Also identified
the support staff requirement and estimated total cost.
Action Area #2: Mapping and Layout of Katcha link roads and watercourses, where
each of the Mogha will require a watercourse to provide water equitably to the farmers of the
watercourse command and Katcha link roads connected to the metaled road. Consultants will
3 Most of the command area and water management interventions will be introduced by the private sector – land reclamation, forming and rough levelling of ravines and gullied lands, rural Katcha link roads, watercourse, furrow
irrigation on precision levelled fields using laser land levellers, field layout, etc.
20
be hired through quality and cost based bidding. The outline for developing the complete
RFP (Request for Proposals) is presented in Annexure I. This would include an outline of
context, objectives, activities, scope of the work and manpower requirement. Also identified
the support staff requirement and estimated total cost.
Action Area #3a: Organization and registration of Water Users’ Associations (WUAs)
using the process of social organization at each of the watercourse served by the Mogha. The
WUA will be registered under the WUAs Act of the KPK with the Department of
Agriculture, Livestock and Cooperatives. Federating the WUAs at the canal level will
provide an organizational structure as FWUAs. The FWUAs will be registered as FO
under the NIDA Act of the KPK with the Department of Irrigation and Power. Training of the
representatives of the WUAs in areas of construction of watercourses and O&M of the
irrigation scheme and the command area development and on-farm water management will
be arranged. Traditional formation of WUAs by the OFWM without the adoption of the
social organization process will not work considering the past experience that WUAs
becomes ineffective after the improvement of the watercourse because these organizations
are made just to rehabilitate the watercourses and their capacity in O&M of the watercourses
and distributary canal is hardly upgraded. These organizations have to be involved in other
non-water activities in provision of inputs and disposal of the marketable products to make
them sustainable in the longer run.
Action Area #3b: Organization of Women: The cultural norms do not allow having
representation of the women in the WUAs as they are hardly involved in irrigation. However,
they are very much involved in livestock raising and management including the stockwater,
washing of clothes, collection of domestic water, etc. therefore, their organization at the
watercourse command level or at the level of interest groups will be ensured. The Gender
Consultant and Gender expert will develop the detailed framework of “Gender” in the rural
context to open new avenues for “engendering” the development process. The representatives
of Women Organizations can also be given representation in the WUAs and FOs. The
process of translating the prevailing rhetoric on gender will be one of the activities of the
project. The opinion of Women Interest Groups is essential to finalize the layout of the
watercourse so that requirement of women is fully incorporated in the layout and design.
Action Area #4: Formulation of detailed designs and estimation of quantities of
materials are needed for reclamation, forming and leveling of the command area, farm and
field layout, earthen watercourse with Pacca Naccas, culverts, tail water ponds, sand filters,
etc. Important to note that in the command area groundwater at most of the places is saline
and water for stock and domestic uses is still being drawn from the earthen water storage
ponds. The purpose is to provide relatively safe water for stock and other uses. Earthen
watercourses with lined pre-cast control structures (Naccas, culverts, etc.) are recommended.
Farm to market roads connection will be kept as Katcha link roads with drains on either sides
to dispose the excess rainwater or floodwater. The outline for developing the complete RFP
(Request for Proposals) is presented in Annexure II. This would include the outline of
context, objectives, activities, scope of the work and manpower requirement. Also identified
the support staff requirement and estimated total cost.
Action #5: Precision land leveling of fields for efficient irrigation using Laser levelers is
essential for efficient surface irrigation (i.e. furrow irrigation on laser leveled fields). For this
purpose, the locally available tractor rental enterprises in the private sector will be motivated
to build their capacity in Laser land leveling. The knowledge support and training will be
provided by the OFWM Training Institute, Lahore through an MOU signed between the two
institutions. This institution is now providing international training courses and private sector
companies in Punjab are now exporting Laser Leveling Units to many countries including
India. This facility is important to develop in the private sector because Laser land leveling is
not a one-time job and it has to be repeated after every third year. Laser land leveling is a pre-
21
requisite for efficient surface irrigation (i.e. furrow irrigation). Therefore, this facility should
be available to the farmers locally even after the completion of the project. Important to
mention that tillage, planting, harvesting and threshing support is already being provided by
the private sector tractor and equipment renting services at the local level. Even now combine
harvesters are being provided on rent by these concerns. The GoPu has already strengthened
this network by providing Laser levelers at 50% cost sharing basis. Now these machines are
being manufactured in the central Punjab and some of these firms can be pre-qualified for
bidding and also to provide training to local rental companies in the maintenance of the
equipment. Even private sector Laser Land Leveling Companies from Punjab can bid for this
intervention in partnership with the local companies. Such a model exists for bidding in
consultancies where national companies enter into consortium with international companies.
Similarly a consortium of KPK and Punjab companies can be encouraged.
Action #6: Test running of watercourse and field irrigation by farmers to ensure effective
operation of the command area. Test running will be made to ensure availability of water at
each Nacca allocated to each farm, water delivery time and quantity of water. This will help
to identify the losses. The initial losses will be higher and these will reduce with the process
of sedimentation of the fine particles which takes longer time to settle. Fine tuning will be
done after the completion of the test run based on critical observations. Compaction at
desired moisture contents would help to reduce conveyance losses in earthen watercourses.
Once the watercourse is stabilized and WUA signed the completion document indicating the
equitable distribution of water, the process of lining of up to 20% can be initiated. Otherwise
there are chances of wastage of investments. Measurement of water losses in earthen and
lined watercourses is essential for authorizing the payments and to justify the investments.
Merely lining does not mean that losses are reduced and equity in distribution of water is
improved.
Action #7. Fixing the Warabandi and assisting WUAs and FOs to enforce Warabandi for
equitable distribution of water. The OFWM in consultation with WAPDA and KPK
Department of Irrigation and Power will formulate Warabandi with active participation of the
water users. The Warabandi document has to be signed by all the water users so that it
became a formal Warabandi and registered with the KPK Department of Irrigation and Power
through FOs. FOs will be registered with Irrigation and Power Department under the NIDA
Act. Complete consensus of water users is needed to avoid conflicts on Warabandi and to
avoid court cases.
Action #8: Provide trainings to men for O&M of watercourses and women for the multiple
use of water including stockwater. These trainings will be organized in real-life situation
instead of the OFWM Training Institute and actual field work will be done by the men and
women so that they can perform these functions successfully, off-course separately for men
and women looking at the local cultural norms. The women will be provided training in the
area of stockwater including water hygiene and water health. The WUAs and Women Groups
will be asked to provide feedback for any other training needs and/or evaluate the relevance
and quality of the training.
Component #2: Productivity Enhancement
Crops and Horticulture
Action #1: Capacity Building through orientation and training of WUAs in cropping pattern,
cropping intensity, crop production, productivity, water use, water productivity, and
profitability. Similar trainings will be organized for the Interest Groups organized for the
specific commodities to have specialized farming of high value crops at higher level of
productivity and value addition.
22
Action #2: Productivity enhancement interventions for field crops, fruits and vegetables
include:
o Use of certified seed through developing seed multiplication mechanisms at the level of
watercourse command and distribution system among the farmers for synthetic varieties
of wheat, chickpea, oilseeds, sorghum, fodders, pulses, etc. Important to mention that
pulses are now high value crops due to increase in price.
o Linking with private sector for the provision of hybrid seeds of maize, sorghum, cotton,
etc.
o Balance use of fertilizer through linking FO/FWUA with the private sector
o Demonstration of productivity enhancement trials by the WUAs and FOs/FWUAs in
partnership with the private sector and Directorate General of Agriculture Extension
o Demonstration of high efficiency irrigation systems – permanent raised bed and furrow
irrigation on laser leveled fields for whole of the farm except the demonstration of 5 acres
of drip irrigation for orchards and melons
o Improved seed-bed preparation for furrow irrigation and raising of crops on beds
o Design of cropping pattern and cropping intensity and adjustments with availability of
water. Avoid production of rice and sugarcane as ecology is not suitable for higher
productivity of these crops and having higher water requirement instead include crops
like cotton, guar, pulses, etc. Melons of high quality can be grown in this ecology using
furrow irrigation for broad-beds. Dates are other options.
o Water use – crop production technology is essential as water allocation is extremely low
and the system is designed for 80, 100 and 120% cropping intensity for the three canal-
commands. In irrigated areas of KPK farmers are now getting cropping intensity of
200%. In Soan valley of Punjab, farmers are getting cropping intensity of 400% - i.e.
three crops of cauliflower followed by wheat. Farmers of the command area can be taken
on a study tour to the Soan Valley Development Project in Khushab, Okara Potato and
Vegetables Growers’ Association, Patoki Flowers Growers’ Association, Mitchells
Contact Farmers in Renala Khurd, Okara Military Farms and Vehari cotton farmers to
witness high value and high efficiency irrigated agriculture and role of private sector.
Livestock
Action #1: Capacity Building through orientation and training of WUAs, primarily females,
in effective management of livestock for milk, meat and value added products with an
objective to enhance productivity. Training modules will be developed and delivered
following On-Farm training methodology, with the help of technical staff under the
supervision of L&DD Directorate. Trainings will also be provided in the areas of:
o Stock water management to reduce incidence of water borne diseases in humans as well
as livestock as the same source of water is used for multiple purposes.
o Community Livestock Extension Workers (CLEWs) both male and female will be
identified and trained. A total of 393 CLEWs, one for every Mogha Command, will be
trained for a period of three weeks and given first aid kits with necessary medicines and
equipment along with the mastitis field test kits at the end of the training course. These
CLEWs will provide veterinary first aid and carry out routine vaccinations and
deworming and charge fee for their services. It will help improve their livelihood and
reduce poverty including empowerment of women. They will also serve as
communication channels between community members and L&DD Directorate.
o Raising animals for meat purposes using fattening techniques for small scale sheep and
goat farming.
o Construction and management of tail water ponds at the tail-end of the watercourse to use
the excess and tail-water for multiple uses, wherever feasible and WUAs are willing to
construct such a facility. As water is in short supply so introduction of fisheries will not
be encouraged at the farm level where water is in short.
23
All trainings will focus on developing livestock related activities into sustainable enterprises taking
value chain approach.
Action #2: Productivity Enhancement: Interventions for productivity enhancement will be
introduced in the Mogha commands with active participation of WUAs and the Interest
Groups organized for the specific commodities of livestock. The interventions to be
introduced in the project area are:
o Cattle breed improvement activity will be launched in the command area with the help of
L&DD Directorate by improving the existing AI facilities through import of semen from
high quality bulls of elite gene pool and providing progeny tested bulls from high yielding
local breeds such as Nili-Ravi and/or Kundi. Around 40 progeny buffalo bulls will be
provided to the enlightened farmers for providing services to other livestock farmers on
charge basis.
o Sheep and goat breed improvement, Damani sheep and goats of the command area will be
improved through selection within the breed. Around 80 Damani breeding bucks and/or
rams will be distributed in the command area. Beetal buck and goats will also be
introduced for improved milk and meat production. Beetal bucks and goats will be
provided to initiate programme of livestock with the women. Every member of the
Interest Group will return the first infant for further distribution to other members to set
up small scale farms to provide livelihood to the community members.
o Backyard Poultry improvement activity will be introduced with the women, where efforts
will be made to use selected races of desi Chicken for meat and egg production. A
reasonable size poultry set will be introduced with the Women Poultry Groups.
o Hybrid fodders of berseem, millets, sorghum and lucerne will be introduced along with
short duration fodders, like Susbania, and adjust these into the cropping pattern. Multicut
grasses, like mot-grass and Sadabahar will also be introduced to make sure the year round
availability of fodders for enhanced livestock productivity. Fodder demonstration plots
will be established in the Mogha commands through provision of seed and fertilizers.
Fodders’ Production Interest Groups can also enter in to production of fodders at
commercial scale. Private sector will be responsible for these demonstrations and
provision of inputs to the farmers.
o Demonstration for preparation of silage in black plastic bags will be encouraged to
provide quality feed to the livestock in periods of shortage. Additives will be introduced
to enrich the process of fermentation.
o Tail water ponds will be constructed in the Mogha command, wherever feasible and
WUAs are willing to construct such a facility to store excess or drainage water and to
ensure year round availability of clean water for multiple uses. These ponds would
receive excess, drainage and tail-water.
o Farmers will be educated about the importance of trace elements and minerals, especially
during harsh summer weather and will be encouraged to keep mineral blocks in the
feeding stalls.
o Traditional livestock housing system will be evaluated to identify the areas where
improvement can be made considering the local ecology and materials available for
construction. Indigenous knowledge will be used for the development of low-cost
livestock housing and management. The livestock health and hygiene will be the prime
objective and farmers will be trained in management of livestock and removal of wastes.
Farmers will also be trained in the use of urine and dung for the preparation of composts
24
using the fermentation process. EM (effective microorganisms) will be provided to the
farmers for enhancing the fermentation process. MOU may be developed between PIU
and nature Farming Foundation of Faisalabad to seek technical backstop support and
services for enriched feeds and preparation of organic composts using the animal wastes.
o Trainings will be provided to the Livestock Interest Groups in improved veterinary care
including disease diagnostics, early detection and preventive measures. To improve the
reach of veterinary services, 5 mobile clinics will be deployed to provide round the clock
services to the farmers in the remote parts of command area. An efficient disease
surveillance and response mechanism will be established. Field days will be organized for
the awareness of farmers regarding livestock health and care. Additional awareness about
zoonotic diseases and their prevention will be disseminated among the farmers.
The collective result of all productivity enhancement activities will improve quality and quantity of
milk and value added products. With improved breeds, better nutrition and housing, proper veterinary
care and prophylactic measures, milk production is expected to increase against a target of doubling
the productivity.
6.5.2. Phase-II Component #3: Value Added Agriculture and Livestock
Action #1: Introduction of High Value Crops
o Grading of grains of wheat, sorghum, millets, pulses, etc. for seed purposes and rest for
general use as a commodity
o Grading, packing and storage of fruits – melons, mangoes and dates
o Use of lower grade fruits for secondary processing
o Linkages with Processing industry for marketing of secondary processed products and
demand-orientation for production plans
Action #2: Introduction of Highly Productive Breeds, Feeds, and Modern Management
of Livestock
o Storage of milk and preparation of value added products through provision of cost-
effective chillers using indigenous technology. The milk production Interest Groups will
be trained in the use of chillers. Farmers will also be encouraged to convert excess milk
into value added products such as cottage cheese and traditional sweets like “sohan
halwa” for marketing at provincial and national level. Formal trainings on hygienic
handling of the milk will be provided to the producers to maintain quality of milk and
value added products.
o Livestock products like hair, wool and skins/hides are niche products that fetch very good
prices. Awareness, with regard to the market value of good quality skin/hide will be
created among local enterprises and relevant trainings will be provided. Skin/hide
Collection units will be set up in the command area. Similarly, wool is an important
livestock by-product and thus proper shearing techniques will be introduced for sheep and
camel wool. Private sector will be encouraged to provide trainings on proper removal,
collection, storage and transportation of skin/hides and wool to the tanneries and weaving
industry. The missing element is the local small-scale enterprises which will be the
critical intervention in the project.
Component #4: Marketing of Marketable Products
Crops and Horticulture
25
Action # 1: Access to market information, linkages, local marketing platforms for crops,
fruits, vegetables and products covering aspects of:
o Access to market information through linking FOs with the local market, industry and
markets of neighboring countries for crops, vegetables, fruits and associated products in
the local market and in the markets of neighboring countries
o Strengthening of Market in D.I. Khan through the development of local marketing
platforms for the FOs of the command area through envisaging partnership with local
small entrepreneurs
o Revision of Existing Market Act to ensure participation of private sector in establishment
of specialized markets for crops, fruits and vegetables and associated products.
o Linkages with market and industry through Katcha link roads
Livestock
Action #2: Marketing Channels: GOKPK should allow the private sector to develop the
market by investing in dairy and livestock industry. It would attract foreign investors and
results in well-developed livestock and dairy industry with sound marketing channels. The
important actions are:
o For Value Chain, interventions to be carried to develop a dairy value chain include: a)
networking of the milk collection areas to the metaled road through Katcha link tracks
will be done along with provision of basic amenities like power and gas supply; b) milk
collection units will be formed and with the installation of chillers for the farmers to pool
milk twice a day, which will reduce the losses in the form of spillage and sourage; and c)
a market platform will be established in the command area, with focus on major milk
areas, in collaboration with private sector and connection with value added milk
processing plants.
o Small Scale Enterprise will be established with the involvement of private sector –
sheep, goat, poultry and tail-end ponds for multiple uses and cottage industry for
livestock related value added products of milk and meat.
o Linking with Markets and Access to Market Information through envisaging
partnership with the private sector and the L&DD Directorate through a stable and
efficient value chain. Farmers will be provided information about livestock management,
marketing trends and other subjects related to dairy and livestock industry, field days and
on-farm trainings.
Marketing
Action #3: Construction of Katcha link roads, land reclamation, forming and rough leveling
of ravines and gullied lands, construction of earthen watercourses with Pacca Naccas,
culverts, tail water ponds and sand-filters for multiple uses. Katcha roads will be constructed
to have connection of every farm with the metaled road with drains on each side to dispose
the excess water. Drains and side banks of the Katcha road will be sodded to avoid erosion of
soil and plantations to generation additional resources from forage and fuelwood. Farm
layout will be made so that fields can be formed and precisely leveled for furrow and
drip/sprinkler irrigation. Furrow irrigation can be used as a high efficiency irrigation system,
if practiced on laser leveled fields.
6.6. Activity Matrix
The Activity Matrix is given in Table 5. The Activity matrix indicated major action areas and
activities for the four components of the GZD-CAD Project along with the action-wise cost of four
26
components and project cost. The estimated project cost is Rs. 4.301 billion, where USAID will
provide Rs. 3.069 billion and rest will be contributed by the GoKPK and the farmers. The share
between the GoKPK and farmers would depend on the GoKPK considering the situation in the
command area and capacity of farmers. Farmers’ share is kept as 20% of the intervention cost and
12.23% of the project cost amounting to Rs. 526 million. The suggested share of GoKPK comes to
Rs. 705.796 million covering share both in-cash and in-kind (Tables 5 and 6).
6.7. Supervisory Consultants
The scope of work of the Supervisory Consultants is basically a support role to the PIU as a Third
Party to supervise quantity and quality of all the categories of works of the project and monitoring of
the implementation of works on behalf of the project. They will supervise each and every category of
work and will be involved in all the phases of implementation of these works rights from the
beginning to the completion of the project. Although, their major work will start after a period of 6
months of the start of the project but their bidding process will start early so that they are in place
right from the beginning of the implementation of the physical, social and technical interventions.
The Supervisory Consultants will monitor and supervise the quantity and quality of works for each of
the Mogha command and submit the short reports for each of the Mogha command. Their reports and
data in MSWord and MS Excel files will be valuable information for the monitoring and evaluation
of the project activities and the preparation of QPRs.
The private sector will work in close supervision of the Supervisory Consultants and their payments
for each category of works have to be verified by the Supervisory Consultants. In case of any
objections raised by the Supervisory Consultants, the private sector is supposed to have full
compliance. The bill of quantities and quality for each category of works has to be verified by the
Supervisory Consultants.
Along with the monthly, quarterly and annual reports the Supervisory Consultants will give
presentations to the PIU/PMU and the Chief Coordinator whenever required. The QPRs of the
Supervisory Consultants will provide significant information for the Project QPRs, which will be
acceptable to the GoKPK, GoP and USAID.
The work of Supervisory Consultants is comprehensive and covers all the technical, technological,
social, managerial, and organizational aspects. Therefore a Team of Consultants would be required to
accomplish the task.
6.8. FOs Supports’ Centres
FO will be organized at each of the three canal commands. Therefore for the project three FOs will be
organized. These three FOs will be based on the 393 WUAs, where WUA is organized at each of the
watercourses representing the Mogha command. The FO will be registered with the Department of
Irrigation and Power under the KPK Act of Irrigation and Drainage of 1997 and will be responsible to
manage the O&M of the canal. FO is the formal organization and will be having multi-faceted
activities and would require a building support to carry out all the activities related to water,
agriculture, livestock, value addition, processing and marketing.
For this purpose a small building will be constructed which will be constructed within the canal
command but having proximity to the metaled road, the nearby town and market. The land will be
provided by the farmers (FO).
6.9. Field Office and Facility
A Field Office will be established at the dam site just after the initiation of the project in the
temporary structures available with WAPDA and then a contract will be awarded for the construction
27
of a small building for the Field office and facility for the parking of vehicles and other materials with
security system.
After the completion of the project this building will be handed over to the mega organization of the
farmers of the command area as Gomal Zam Dam’s Organization having members of the three FOs in
the Board of this organization. The land will be provided by WAPDA within their complex.
28
Table 5. Component-wise Activity Matrix along with quantities and estimated cost for the interventions proposed for the GZD-CAD Project of KPK
Components Action Areas Units Quantity Unit Price
(million Rs.)
Total
(million Rs.)
Component #1
Command Area
Development
and On-Farm
Water
Management
Feasibility and Master Plan for the GZD Command Area
Development, On-Farm Water Management, Mapping and
Layout of Katcha Link Roads and Watercourses for the Three
canal-commands through a cost and quality based bidding
process for recruiting the pre-qualified Consulting Firms.
Command
Area4
1 50.00 50.00
Organization of Water Users’ Associations5 (WUAs) using
Process of Social Organization for the Mogha command area and
Registration under the KPK WUAs Act with the Department of
Agriculture. Federating WUAs’ into FWUAs and registration of
FWUAs as FOs under the NIDA Act of KPK with the
Department of Irrigation and Power. In addition to the WUAs,
Women Interest Groups will be organized at the Mogha
command to implement the Gender part of the project covering
all the four components of the project.
Mogha6
Command
393 0.025 9.825
Detailed Designs and Estimation of Quantities of Materials
for the Award of Contracts for Implementation of Command
Area Development and On-Farm Water Management
Interventions commands through a cost and quality based
bidding process for recruiting the pre-qualified Consulting Firms.
Mogha
Command
393 0.125 49.125
Construction of Command Area Development and On-Farm
Water Management Interventions:
Katcha Link roads to connect farm to metaled road
Field layout
Construction of earthen watercourses with Pacca Naccas,
culverts, buffalo’s wallows, tail water ponds at the tail-end of
the watercourse and sand-filters for multiple uses of water.
Mogha
Command
393 3.00 1179
4 Command area refers to 77000 ha (190190 acres) under the three canal-commands having cropping intensity of 80, 100 and 120 %, respectively.
5 Water Users’ Association will be organized at the watercourse command level, a basic institution for partnership in implementation of the project. WUAs will be registered
under the Water Users’ Association Act of the KPK with the Department of Agriculture. The WUAs will be federated at the level of canal-command as FWUAs and will be
registered as FO under the NIDA Act of the KPK with the Department of Irrigation and Power. 6 Mogha command refers to the watercourse command – area served by a watercourse named as ‘Sarkari Khal’, farmers’ channels and fields.
29
Later on after the successful operation of the earthen
watercourse, lining up to 20% of the length of the earthen
watercourse will be undertaken including the sensitive reaches
to avoid excessive losses.
Precision land leveling of fields for efficient surface irrigation
(i.e. furrow irrigation) using Laser levelers
acre7 191000 0.006 978
Test run of watercourse and field irrigation by farmers to
ensure effective operation of the Mogha command and associated
adjustments – one full week to complete a Warabandi schedule
of 7 days rotation
Mogha
Command
393 0.025 9.825
Fixing Watercourse level Warabandi and assisting WUAs and
FO to enforce Warabandi for equitable distribution of water in
collaboration with the KPK Department of Irrigation and Power
Mogha
Command
393 0.010 3.93
Provide trainings to men for O&M of watercourses and women
for the use of tail-water for multiple uses (package of 5 trainings
@ Rs. 0.040 per training)
Mogha
Command
393
0.200
78.6
Component #1 Total Cost 2358.305
Component #2
Productivity
Enhancement of
Crops,
Horticulture,
Livestock
Field Crops and Horticulture
Orientation and training of WUAs in field and horticultural
crops and Organization of Interest Groups for specified
commodities in collaboration with Agri Business Programme of
the USAID (package of 5 trainings @ Rs. 0.040 per training)
Planning of cropping pattern and cropping intensity
Production and productivity of field crops
Production and productivity of horticultural crops
Water use, irrigation scheduling and water productivity at the
field level
Farm profitability and management
Mogha
Command
393
0.200 78.6
Productivity enhancement demonstrations for high efficiency
irrigation systems (furrow irrigation on laser leveled fields,
sprinkler, drip, etc.) for crops, fruit plants, melons and
vegetables considering farm as a whole (two demonstrations
each of 5 acres of sprinkler and drip irrigation @ Rs. 100000 per
Mogha
Command
393 1.200 471.6
7 Land unit used in the allocation of water and estimation of cost estimates. The unit of hectare is not used as it is not understood locally.
30
acre) and rest of the farm on furrow irrigation on laser leveled
fields – whole farm will be treated as a unit for developing
demonstration. The cost of furrow irrigation on laser leveled
fields is kept as Rs. 100000 per farm. The total estimated cost is
Rs. 0.600 million per farm demonstration.
Livestock
Orientation and training of WUAs in management of
livestock (package of 5 trainings @ Rs. 0.040 per training)
Improvement of breeds for cattle and small ruminants
Improving nutrition for cattle and small ruminants
Cost-effective livestock housing and management
Improved veterinary care
Mogha
Command
393
0.200
78.6
Productivity enhancement interventions for livestock
(estimated lump sum cost of a package of Rs. 0.25 million)
Improvement of Breeds for cattle and small ruminants
(estimated costs is based on AI services and provision of
progeny bulls, bucks and rams)
Demonstration of fodders, silage and feeds
Demonstration of livestock housing including stock water
Veterinary care camps
Mogha
Command
393 0.250 98.25
Component #2 Total Cost 727.050
Value Added
Agriculture and
Livestock
Value Addition for Crops, Vegetables and Fruits –
interventions with Interest Groups for specified commodities and
local enterprises; linkages with processing industry
Cluster of
Interest
Groups8
40 2.000 80
Value addition of Livestock Products – interventions with
Interest Groups for specified commodities and local enterprises;
linkages with processing industry
Cluster of
Interest
Groups
40 1.000 40
Component #3 Total Cost 120
Marketing of
Marketable
Products
Marketing Channels for Crops, Vegetables and Fruits – access
to market and market information, linkages, local marketing
platforms, etc.
FWUAs/FO
of three
canal-
3 10 30
8 Cluster of Interest Groups will be organized based on the specified crops, horticultural crops, and livestock.
31
commands
Marketing Channels for Livestock – access to market
information, linkages, local marketing platforms, etc.
FWUAs/FO
of three
canal-
commands
3 5 15
Component #4 Total Cost 45.00
Total Interventions Cost 3250.355
32
7. Capital Cost Estimates
Total estimated cost of the GZD-CAD project is Rs. 4300.796 million. The USAID will contribute
US$ 33.00 million (Rs. 3069 million at current prices using 1$=93 Rs.) as a grant. The 1st tranche of
US$ 5.00 million will be required during 2012-13 followed by US$ 7.00, 10.00, 8.00 and 3.00 million
for the subsequent years. The farmers’ share will be around Rs. 526 million @ 20% of total physical
interventions cost; the cost which provide direct benefit to the farmers. The farmers’ contribution is
kept in line with the current practices followed in the National Projects on “Watercourse
Improvement”, as their share in cost of interventions is essential so that they have the sense of
ownership in implementing these interventions. The rest of Rs. 705.796 million will be provided by
the KPK Government both in-cash (Rs. 484.356 million) and in-kind (Rs. 221.44 million). The share
of various contributors in the GZD-CAD Project is given in Table 6. In case of any variation in the
foreign aid by the USAID, the project cost will be accommodated by adjusting the KPK
Government’s share accordingly.
Table 6. Share of various contributors for cost sharing in the GZD-CAP Project
Cost Sharing
GoKPK Share
Local (Provincial ADP)
- In-Kind Contribution (5.15% of Project Cost)
- In-Cash Contribution (11.26% of Project Cost)
Foreign Aid (USAID) (71.36% of Project Cost)
705.796
221.440
484.356
3069.000
Farmers’ Share (Upfront contribution in-cash of 20% of Intervention
Cost or 12.23% of Project Cost) 526.000
Total 4300.796
The summary of project cost and share of each partner during the project duration is given in Table 7.
The details of the budget break up for the project and components are given in the Annexure IV to
VIII. The contribution of GoKPK to the proposed project is both in-cash and in-kind. The details of
the in-kind contribution of GoKPK are presented in Annexure IX. The in-kind contribution of
GoKPK is over and above the Project Base Cost, and this contribution along with contingencies and
the Project Base Cost provide the estimated total project cost.
7.1. Indicate Date of Estimation of Project Cost
The Project cost estimates are worked out on the basis of prevailing rates in the open market in June,
2012. The inflation rate was quite high in the last few years therefore inflation factor has to be
considered due to expected variations in prices of physical interventions, fuel and increase in salary.
Therefore, the current procedure of permissible increase of 15% over and above the total cost of the
PC-I will take care some of the increases in prices due to inflation and other factors. But there will be
some expected increase in the project cost based on inflation trends in the country.
7.2. Basis of Determining the Capital Cost
Capital cost of project is based on the prevailing market rates of various items available in the open
market. The cost estimates of physical interventions i.e. construction of Katcha link roads, land
reclamation and forming of ravines and gullied lands, watercourse construction, precision laser land
levelling and field layout, tail water ponds and multiple uses of water, value addition and marketing
are based on the current market prices. As the physiography and topography of the command area are
quite variable therefore a programme approach is adopted instead of project approach where cost of
single intervention is estimated. The cost of single intervention was estimated and then packaged so
that a more realistic cost is estimated based on the feasibility and detailed design of each of the
intervention. Such flexibility is essential in implementing an integrated and comprehensive project of
command area development covering water, agriculture and livestock sectors.
33
The command area has to be developed from the scratch as there is not any model available in the
country. The project is completely different than the conventional watercourse improvement and
installation of high efficiency irrigation systems. Because in the command area, there does not exist
any watercourse and fields need major reclamation and levelling. Therefore, the approach of package
of interventions will work effectively. The cost of package of intervention is based on average
estimation and it will vary within the 393 Mogha commands. Specifications and standards will be
developed by the consultants before preparing the detailed designs and estimating quantities of
materials and will be approved by the Steering Committee. Farmers will provide their share upfront in
cash. In-kind support in the form of labour will be additional to the upfront cash support and will be
worked out by the consultants considering the ground realities and purpose of accomplishing the
quality of physical works.
34
Table 7. Summary of the Project Costs S. No. Parameters Y-1 Y-2 Y-3 Y-4 Y-5 Total % Age
1 Administration & Supervision 1.1 Establishment 24.037 30.653 37.393 39.068 40.572 171.723
Technical manpower 13.861 19.968 26.174 27.363 28.407 115.773
Support Staff 10.176 10.685 11.219 11.705 12.165 55.950
1.2 Operational 32.266 42.414 48.585 49.619 48.654 221.538
TA/DA of Officers 3.180 4.350 5.514 5.539 5.566 24.149
TA/DA of Staff 1.086 1.064 1.071 1.080 1.088 5.389
Supplies and Materials including POL 8.000 10.000 12.000 10.000 10.000 50.000
Repair and Maintenance 2.000 3.000 4.000 5.000 6.000 20
Contractual Services 4.000 8.000 10.000 12.000 10.000 44
Miscellaneous 4.000 6.000 6.000 6.000 6.000 28
Support to Line Departments 10 10 10 10 10 50.00
2 Transport – Vehicle and Motorcycles 78.525 14.825 10.000 103.350
3 Office Equipment 10.000 5.000 5.000 - - 20.000
4 Physical Interventions of Command Area Development and On-
Farm Water Management and other Works 334.428 628.856 904.86 720.456 120.000 2708.60
5 Social, Training and Agricultural Activities including Livestock 14.25 59.75 147.18 191.45 110 522.63
6 Consultancy Assignments, Technical Assistance and Research 82.500 76.625 45.000 37.000 20.000 261.125
7 Program Audit - 2.000 3.000 3.000 2.000 10.000
8 Project Review and Impact Evaluation (Mid-Term and Final) - - 10.000 - 10.000 20.000
Base Cost 576.006 860.123 1211.018 1040.593 351.226 4038.966
Physical & Price Contingencies (1.0% of Base Cost) 5.760 8.600 12.110 10.41 3.510 40.390
In-Kind Support of GoKPK over and above of Base Cost 44.288 44.288 44.288 44.288 44.288 221.44
Total Project Cost 626.054 913.011 1267.416 1095.291 399.024 4300.796
Government of KP Share (11.26% of Project Cost) 40.766 104.723 138.128 171.003 29.736 484.356 11.26
In-Kind Support of GoKPK (5.15%) 44.288 44.288 44.288 44.288 44.288 221.44 5.15
Farmers’ Share (upfront cash support of 20% of the
Intervention Cost and 12.23% of the Project Cost) 76.000 113.000 155.000 136.0 46.000 526.000 12.23
USAID Share (67% of Project Cost in million Rs.) 465.000 651.000 930.000 744.000 279.000 3069 71.36
USAID Share (67% of Project Cost in million $) 5.000 7.000 10.000 8.000 3.000 33.000 * Civil works include building for material testing laboratories and office space.
35
The unit cost based on total physical, social, and agricultural interventions’ comes to Rs. 19941/acre
which is highly cost-effective looking at the package of interventions included in the project. The unit
cost based on the total project cost is Rs. 26386/acre, which is also highly cost-effective. The basic
reason for this higher cost-effectivity is that most of the interventions are designed so that benefit goes
to many instead of few i.e. Katcha road tracks, watercourse construction, command area development,
on-farm water management and demonstrations on Mogha command basis. The WUAs and FOs will
be active partners in implementing project interventions.
The project will be executed through the newly recruited professionals, who will be offered salary
package announced by the Project Policy of 2008 No. SOR-VI/E&AD/1-25/2007 and subsequent
updates of the Regulation Wing of the Government of Khyber Pakhtunkhwa Establishment &
Administration Department, the lump sum salary package for directly recruited staff is used for
estimating salary costs with 5% annual increment up to the maximum as provided in Table 8.
Table 8. Salary package for the directly recruited project staff in the KPK
BS/Equivalent Package Salary Pay per Month
Minimum Maximum
22 150,000 200,000
21 125,000 150,000
20 100,000 118,000
19 75,000 90,000
18 50,000 75,000
17 45,000 50,000
16 300,00 35,000
11-15 15,000 25,000
5-10 10,000 15,000
1-4 7,000 10,000
In addition, to the project employees recruited directly under a package salary, some of the staff of the
line departments will be deputed to work on the project and for the deputed employees additional charge
allowance will be provided by the project, in addition to the cost of TA/DA, fuel and maintenance of
department vehicles, etc. Their salary and routine allowances will be provided by the KPK line
departments. Similarly, any officer/official of the partner institutions other than line departments, if
posted on transfer (deputation), in the GZD-CAD Project, he/she will be provided similar support, but not
the salary and routine allowances. The operational cost required for implementing the project
interventions will be provided in addition to the charge allowance. The policy of the KPK government
will be followed strictly.
For effective implementation of the project, counterpart in each of the partners’ institutions will be
declared by their respective directorates, who will interact with the PD-PIU and respective Component
Leaders for effective implementation.
The Heads of the partners’ institutions will also be providing some of their time to guide their staff in
effective implementation of the project and as a member of the Steering Committee they will be having
responsibility to frame MOUs for signature jointly with the PD of the PIU. In lieu of their time, a charge
allowance and cost of TA/DA and travel exclusively for the project purposes will be part of the MOU.
Lump sum amount is kept in the project for this purpose.
Other than line departments, some other partners’ institutions may also contribute in R&D activities and
training and similar MOUs will be signed by them with the PD-PIU.
Moreover, if the Provincial Government announces any other allowance/incentives in future for the
project employees, the same will be made applicable and met out of the existing budget of the Project,
if possible or within the limit of exceeding the cost of 15% if the donor and GoKPK agrees.
36
7.3. Annual Component-Wise Estimation of Physical Activities and Financial Requirements
The year-wise and component-wise estimation of physical activities and financial requirements is
given in Table 9. The approach of package of interventions is adopted to provide flexibility to adjust
the needs of the farmers and their preferences, site-specificity and ground reality. These parameters
will determine the exact choice of the package of interventions within the average cost estimated for
the package. Actual cost will vary but the project average will stay same. However, targets for the
package have been fixed.
In addition to physical interventions, social, agricultural and training interventions are also part of the
project and essential for improving performance of irrigated agriculture in the newly developed
command area. The physical targets and financial requirements are given in Table 10.
Feasibility, mapping, layout and detailed design are essential for implementing physical interventions.
Furthermore, Supervisory Consultants are also needed to supervise the construction work of various
activities. Technical assistance is essential for innovative projects along with research to build
capacity of training and research institutions so that they can impart effective trainings at all levels.
The physical and financial requirements are presented in Table 11.
7.4. Exchange rate used to work out FEC in the PC-I
The USAID has shown willingness to provide US$ 33.00 million (Rs. 3069 million at current prices)
to this project as a grant. The exchange rate used to work out the Foreign Exchange Component in
the PC-I is 1 USD = 93.0 Rs.
8. Annual Operating and Maintenance Cost after Project Completion
It is expected that after closure of the project and termination of KPK government support the
operation of the command area and irrigated agriculture will continue on its own momentum, as this is
the prime responsibility of farmers, WUAs, FOs and Dam’s Organization. The private sector would
be able to establish sales and service network during the project period and their experienced staff will
continue providing services to the farmers and their organizations even after the completion of the
project. They will continue pushing the technology aggressively and providing after sales services at
rates acceptable to the farmers. The existing regular staff of district agriculture section would take
over the remaining activities (communication strategy for farmers regarding the project, farmers’
awareness campaigns, field days at the demonstration sites established by the project, farmers’
trainings in collaboration with the private sector, development of training curriculum and materials in
collaboration with PIU and private sector, and support to the PIU’s monitoring and evaluation system.
Farmers will be responsible for O&M of the command area and replacement of any part of
interventions after the completion of the project. Hence, there would be no recurring expenditure for
the completed schemes under the GZD-CADP.
37
Table 9. Year-Wise/Component-Wise Estimation of Physical Activities and Financial Requirements of GZD-CAD Project
Interventions Physical Targets Financial Requirements (Million Rupees)
Y-1 Y-2 Y-3 Y-4 Y-5 Total Y-1 Y-2 Y-3 Y-4 Y-5 Total
Command Area Development and Watercourse
Construction Package (Unit=Number of Mogha
Commands)
50 100 143 100 - 393 150.000 300.000 429.000 300.000 - 1179.00
0
Precision Laser Land Leveling (Unit=acres) 20738 41476 59310 41476 - 191000 124.428 248.856 355.86 248.856 - 978.0
Productivity Enhancement – Demonstrations of Drip,
Sprinkler and Furrow Irrigation on laser leveled
fields (Unit=Farm as a whole)
- 50 100 143 100 393 - 60.000 120.000 171.600 120.000 471.600
Construction of FO Support Centres for 3 FOs (using
unit rate of Rs. 3000/sft including, electrical, water
supply, sanitation, cooling, furnishing, etc. for
covered area of 6670 sft for each centre)
2 1 - - - 3 40.000 20.000 - - - 60.000
Construction of Field Offices (Covered area of 6670
sft @ Rs. 3000/sft)
1 - - - - 1 20.000 - - - - 20.000
Total 334.428 628.856 904.86 720.456 120.000 2708.60
Table 10. Year-Wise/Component-Wise Estimation of Social, Training and Agricultural Activities and Financial Requirements of GZD-CAD Project
Interventions Physical Targets Financial Requirements (Million Rupees)
Y-1 Y-2 Y-3 Y-4 Y-5 Total Y-1 Y-2 Y-3 Y-4 Y-5 Total
Organization of Water Users’ Associations using
Process of Social Organization for Mogha commands
and Registration under the KPK Ordinance of Water
Users’ Associations with the Department of
Agriculture, Livestock and Cooperatives. Federating
WUAs’ and registration as FOs under the KPK
NIDA Act with the Department of Irrigation and
Power.
100 150 143 - - - 2.500 3.750 3.575 - - 9.825
Test run of watercourse and field irrigation
system by farmers to ensure effective operation of
Mogha command and associated adjustments for a
full week to complete the Warabandi schedule of 7
days rotation
50 100 143 100 - 393 1.250 2.500 3.575 2.500 - 9.825
Fixing Watercourse level Warabandi and assisting
WUAs and FO to enforce Warabandi for equitable
50 100 143 100 - 393 0.500 1.000 1.430 1.00 - 3.93
38
distribution of water in collaboration with KPK
Department of Irrigation and Power
Provide trainings to men for O&M of watercourses
and women for stock water (package of 5 trainings
@ Rs. 0.040 per training)
50 100 143 100 - 393 10.000
20.000 28.600 20.000 - 78.600
Orientation and training of WUAs in field and
horticultural crops and Organization of Interest
Groups for specified commodities in collaboration
with Agri Business Programme of USAID(package
of 5 trainings @ Rs. 0.040 per training)
-
50 100 143 100 393 - 10.000 20.000 28.600 20.000 78.6
Orientation and training of WUAs in
management of livestock (package of 5 trainings @
Rs. 0.040 per training)
-
50 100 143 100 393 -
10.000 20.000 28.600 20.00 78.600
Productivity enhancement interventions for
livestock (estimated lump sum cost of Rs. 0.250
million per package)
-
50 100 143 100 393 - 12.500 25.000 35.750 25.000 98.250
Value Addition for Crops, Vegetables and Fruits
– interventions with Interest Groups for specified
commodities and local enterprises; linkages with
processing industry
- - 10 15 15 40 - - 20.000 30.000 30.000 80.000
Value addition of Livestock Products –
interventions with Interest Groups for specified
commodities and local enterprises; linkages with
processing industry
- - 10 15 15 40 - - 10.000 15.000 15.000 40.000
Marketing Channels for Crops, Vegetables and
Fruits – access to market and market information,
linkages, local marketing platforms, etc.
- - 1 2 - 3 - - 10.000 20.000 - 30.000
Marketing Channels for Livestock – access to
market information, linkages, local marketing
platforms, etc.
- - 1 2 - 3 - - 5.000 10.000 - 15.000
Total 14.25 59.75 147.18 191.45 110 522.63
39
Table 11. Year-Wise/Component-Wise Estimation of Consulting Services, Technical Assistance and Research, and Financial Requirements of GZD-CAD
Project
Interventions Physical Targets Financial Requirements (Million Rupees)
Y-1 Y-2 Y-3 Y-4 Y-5 Total Y-1 Y-2 Y-3 Y-4 Y-5 Total
Feasibility and Master Plan for GZD Command
Area Development, On-Farm Water Management
and Mapping and Layout of Katcha Link Roads and
Watercourses
393 - - - - - 50.000 - - - - 50
Detailed Designs and Estimation of Quantities of
Materials for Award of Contracts for Command
Area Development and On-Farm Water Management
Interventions
100 293 - - - 393 12.500 36.625 - - - 49.125
Technical Assistance and Research [2.5% of
interventions cost with distribution of 1.5% for
technical assistance (Rs. 48.5 million) and 1% for
research (Rs. 32.5 million)]
- - - - - - 10 20 25 15 11 81.000
Supervisory Consultants (2.5% of interventions
cost)
50 100 100 100 43 393 10.00 20.000 20.000 22.000 9.000 81.000
Total 82.500 76.625 45.000 37.000 20.000 261.125
40
9. Demand and Supply Analysis
The details of the demand-supply analysis are given in Table 12. All the parameters indicated in the
PC-I format are not applicable to this project. As farmers will be responsible for farming, production
and marketing the demand and supply analysis for interventions is not applicable to this project.
However, in general, there is always a demand for the development of the command area once water
supply is available from the dam. The benefits of investments in the dam for storage of water can be
achieved only if the command area is fully developed and farmers are in a position to farm whole of
the command area within limits of water availability. They will adjust their cropping pattern and
cropping intensity accordingly. As the canal network and command area will be developed for a
cropping intensity of 80, 100 and 120% for the three canal-commands, farmers will be trying to use
water efficiently to accomplish a cropping intensity of at least 200%. Thus both horizontal and
vertical development in production will be the target of the farmer.
Table 12. Details of demand and supply analysis of the project
Details Remarks
Description of products/services Not applicable
Demand/Supply along with Unit Price for last five year Not applicable
Import/Export for last five years along with Unit Price Not applicable
Projected demand/supply for 10 years Not applicable
Proposed year-wise production and unit price of the product Not applicable
Existing and proposed assignments for marketing Not applicable
10. Financial Plan and Source of Financing The Department of Agriculture, Livestock and Cooperative through the PMU/PIU of the project
would make the decision in respect of allocation of funds to various components of the projects as per
PC-I for implementation of the project. The funds allocated in ADP would be transferred to the
specifically opened Project Assignment Account. The provincial government will be responsible to
provide funding to PMU covering both the shares of GOKPK and USAID. Farmers’ share will be
deposited in the project account by the office of the PIU or adjusted against the payment to private
sector if such payments are collected by the private sector. A viable method has to be selected for
upfront collection from farmers. Details SOPs will be developed for financial management and
operation in the project.
Allocated funds would be transferred to the designated account as per government instructions. The
project budget would be channelled through the designated Bank(s) for payment to private sector as
per approved procedure. The project financial flow mechanism is described in the Annexure IX.
PMU/PIU would be responsible to follow prescribed procedure for incurring expenditure(s) ensuring
meeting all audit requirements as agreed upon and would furnish monthly-reconciled statement of
expenditure and audit account/report regularly to the Chief Coordinator of the Project for further
action and transmission to the concerned quarters.
10.1. Equity
The anticipated share of funding provided by each source is given hereunder:
Sponsors Own Resources Nil
Provincial Government Share Rs. 705.796 million
Provincial Government in-Cash Rs. 484.356 million
Provincial Government in-Kind Rs. 221.44 million
DFI's/banks Nil
Farmers’/Beneficiaries Rs. 526.000 million
Foreign Equity (USAID) Rs. 3069.000 million
41
Others Nil
10.2. Debt Not applicable
10.3. Grants along with sources
The major source of project funding is from USAID and will provide up to US$ 33.00 million (Rs.
3069.000 million at current prices) as a grant. In case of any change in USAID’s financial support or
changes in the exchange rate, the share of KPK Government will be increased or decreased
accordingly. The USAID indicated that GoKPK utilizes their contribution mainly for the command
area development and on-farm water management interventions, technical support, training, and
monitoring. Also, USAID indicated its interest to invest their contribution solely for the command
area farmers including women related activities.
10.4. Weighted cost of capital Not Applicable
11. Project Benefits and Analysis
11.1. Financial Benefits
There is no direct income to the project; however, with completion of each scheme (Mogha
command), a gross income of at least Rs. 57,200 per acre per year is expected to be accrued to the
farmers only from wheat crop (considering yield of 40 maunds per acre along with straw of 60
maunds per acre) with 100% cropping intensity, which is a contribution towards economic
development. It will increase further if farmers adopt high value crops and/or increase the cropping
intensity. It is expected that gross income will increase at least to Rs. 100,000 per acre with high value
crops and will increase further with value added agriculture and livestock. It is safe to estimate that
the net returns are half of the gross returns to the farmers for high value crops and more than half for
cereals. Therefore, farmers’ net returns from wheat will be around Rs. 28600/acre and will increase to
Rs. 50,000/acre if high value crops are included in the cropping pattern.
11.2. Economic Benefits
General feasibility and simplified economic analysis has been undertaken in the formulation of the
PC-I. On the basis of that analysis the project is highly viable. The details are:
The unit cost for developing the command area is Rs. 26385/acre considering the project cost
and the command area of 191000 acres.
The gross returns from wheat alone will be around Rs. 57200 per acre, using yield of wheat
grain of 4 tons/ha (40 maunds/acre) and price of Rs. 9.50 per kg and wheat straw of 6 tons/ha
(60 maunds/acre) and price of Rs. 3.0 per kg. Roughly the gross BCR is 2:1, whereas the net
BCR is around 1:1 after the first year of cropping in whole of the command area. That is
expected at the end of the project, when whole of the command area is fully developed.
Considering the cropping intensity of 100% and wheat crop alone would provide gross value
production of Rs. 9324 million at current prices and in nominal terms.
Considering current average wheat yield of 1.6 tons/ha, the additional gross value production
from the project interventions would be around Rs. 5594 million per annum at current prices.
The returns would increase further either through increasing the cropping intensity, or use of
high value agriculture or enhancing the productivity. The cropping pattern will change after
completion of the project.
There will be increase in livelihood for the local labour. It is estimated that 15000 new jobs
will be generated at the farm level during the project duration, once the whole of the
command area is developed and farmers started raising crops on the farms.
The livestock production and productivity will also increase as it is not possible to review the
livestock economic returns because of size of herds and type of livestock.
42
The link to metaled roads, development of small-scale enterprises, marketing of produce and
products to the nearby markets and towns would generate economic activity which might be
of the same size of returns from agriculture.
Time does not permit to conduct full economic analysis for the computation of Net Present Value
using a specified and prevailing Discount Rates, BCR of project and EIRR. The three canal-
commands are designed for three different cropping intensity levels therefore full economic analysis
is needed for each of the three canal-commands. For this purpose, life of the project can be taken as
25 years.
11.3. Social Benefit with Indicator
The social benefits of the proposed project are given as under:
Improved, enhanced and new opportunities for livelihood generation reducing the poverty of
fragile ecosystem
Increased access to nearby towns and markets resulting in improved health, education and
employment opportunities
Empowerment of women and children
Reduced migration due to provision of perennial water supplies and year round farming thus
reducing the risks associated with floods and droughts common with any Spate irrigation and
Rod-kohi farming systems
Enhanced employment opportunities directly or indirectly and generation of local enterprises
would reduce the risks associated due to unemployment i.e. security and stability of the
fragile ecosystem
In addition to the abovementioned social benefits of the project, the project will also generate many
forward and backward linkages with private sector including the plastic and agro-based industry and
agriculture-businesses. It is expected that large number of direct/indirect employments would be
generated under the project through the involvement of private sector. As the agriculture activities in
the project area are the continuing activities, therefore these employments will be sustained even after
the completion of the project. Considerable numbers of high paying jobs will be generated in the
private sector for technicians and graduates in provision of services and supplies for high-value and
high efficiency irrigated farming in the command area. There will be some impacts due to diffusion
and transfer of technologies even after the completion of the project like high efficiency irrigation,
value addition and small scale enterprises these benefits will further enhanced in the future.
11.4. Environmental Impacts
Project is environment friendly and would not cause any adverse environmental concerns normally
associated with the new development, resettlement, depletion of land and water resources, and loss of
wildlife habitats. Project is expected to minimize the use of pesticides/herbicide besides improving
soil health. The use of plastic tube in installation of drip irrigation system would be recycled to
prevent environmental degradation. Pakistan and especially the KPK is one of the best examples of
having system of recycling. The beneficial impacts are listed as under:
Mitigation of damages caused to agriculture, livestock and settlements due to droughts and
floods due to storage of water and releases for perennial irrigated agriculture
Reduced soil erosion due to wind/ water because of the improved landscape and surface cover
Enhanced release and recycling of oxygen will reduced the impacts of greenhouse gases of
Carbon dioxide
Recharge of depleting ground water and increased potential of creating shallow layer of fresh
groundwater due to seepage and transit losses
Efficient irrigation will reduce risks of leaching nitrates and other chemicals soluble in water.
43
11.5 Sensitivity Analysis
Sensitivity analysis made in the Gomal Zam Dam construction project holds true for the proposed
project as the dam’s feasibility is dependent on agricultural development and production.
11.6 Employment Generation (Direct and Indirect)
The implementation of project would provide enhanced employment opportunities to the rural as well
as urban population in sectors of agriculture, processing, agro-based industries, agri-businesses, and
small-scale enterprise development. About 111 people will be directly employed by the project itself.
Furthermore, a number of private sector companies will recruit hundreds of skilled labor for provision
of services and supplies including design, installation and operation of high efficiency irrigation
systems. Local private industry dealing with high value and high efficiency irrigated agriculture will
open new avenues of employment for skilled workers. Improvements in crop yields will also boost
economic activity in rural areas that will also create further employment options for over 15000
labourers.
12. Implementation Schedule and Monitoring of the Project
12.1. Implementation Schedule
Project Start Date September 2012
Project Completion Date August 2017
The presentation of item-wise/year-wise implementation schedule in line chart correlated with
the phasing of physical activities is difficult to make in a graphical form because of so many
activities under this project, therefore these are presented in Tables 8 to 10. The generalized
implementation schedule for major components is presented in Figure 3.
12.3. Result Based Monitoring (RBM) Indicators
The Result Based Monitoring (RBM) framework indicators in quantifiable terms are presented in
Table 13.
44
Command Area Development and On-Farm Water
Management – Component #1
Productivity Enhancement of Crops and Horticulture
– Component #2a
Productivity Enhancement of Livestock – Component #2b
Value Added Agriculture and
Livestock – Component 3
Marketing of Marketable Products
– Component #4
Year 1 Year 2 Year 3 Year 4 Year 5 Figure 3. Implementation Schedule of major components of the Gomal Zam Dam Command Area Development and On-farm Water Management
Project
45
Table 13. Result based monitoring of major activities of the Gomal Zam Dam’s Command Area Development and On-farm Water Management
Project
Input Output
Outcome
Targeted Impact Baseline Indicator
Targets after
Completion of Project
Command area
development and
on-farm water
management
393 earthen watercourses
constructed along with Pacca
Naccas, culverts, etc. Test run of
the earthen watercourse to make
adjustments and then
modifications for equitable
distribution of water along with
lining of up to 20% of the length
of the watercourse including
sensitive reaches
Lack or unreliable
availability of non-
perennial Spate irrigation
for Spate farming – Rod-
Kohi
Perennial water
availability to 393
Mogha commands with
reduced conveyance
losses
Irrigated farming in whole of the
command area on sustainable basis
through reliable availability of
perennial canal water supplies
Water availability at each farm
under an agreed Warabandi
Complete lack of regulated
irrigation water supply
Equitable distribution
and allocation of water
Reduced conflicts on distribution of
water and equitable distribution
resulting in enhanced productivity
Precisely leveled fields on 77000
ha (191,000 acres) using laser
leveling to practice furrow
irrigation
Unlevelled fields with
huge water application
losses using surface
irrigation
Efficient surface
irrigation reducing
application losses of
water and nutrients
using furrow irrigation
on laser leveled fields
More area under crops – cropping
intensity of more than designed
capacity – design cropping intensity is
80, 100 and 120% in the three canal
commands which will increase 50%
from that of the designed cropping
intensity averaging 150% cropping
intensity
393 Katcha Link roads
constructed along with sodded
side drains
Lack of access to nearby
towns and markets
Access to metaled road,
nearby towns and
markets
Improved social indicators of health
and education and increased
employment opportunities and better
prices for the produce
786 Model demonstrations of
high efficiency irrigation systems
(furrow irrigation using laser
leveled fields and/or drip
irrigation) in 393 Mogha
commands
Inefficient floodwater
irrigation
786 Model Farms with
high value agriculture
using high efficiency
irrigation systems
(furrow irrigation using
laser leveled fields
Higher returns to farmers due to
increased cropping intensity,
enhanced productivity and premium
price on produce. Net returns will
increase rather doubled in these
Model Farms
46
and/or drip irrigation)
Trained water users and farmers Farmers are unaware with
efficient irrigation and
high value agriculture
Efficient water users and
irrigated farmers
Beginning of farming as an enterprise
with high value crops using high
efficiency irrigation systems
Enhanced
productivity of
agriculture and
livestock due to
provision of
perennial
irrigation water
Doubling the productivity
initially for wheat crop
Current productivity of
wheat crop is 1.6 tons/ha
or 16 maunds/acre
Enhanced productivity
of wheat of 4 tons/ha or
40 maunds/acre in whole
of the command area
Enhanced gross value production of
wheat from Rs. 3.7 to 9.3 billion per
annum only from wheat.
New livelihoods generated due to
increased labour requirement
Less and seasonal labour
opportunities only in wet
years
Enhanced and sustained
livelihoods
No or reduced migration of rural
population during the drought and
flood years
Local production of food crops Food insecure area during
the dry years
Food secure and food
surplus area on sustained
basis
Improved food security for the
households
Increased production of milk,
meat and vegetables
Milk, meat and vegetables
deficit area
Milk, meat and
vegetables secure and
surplus area
Improved nutritional security for the
households
Katcha road as a
link to metaled
road and
marketing
interventions
Access of farms and settlements
to the nearby towns and markets
Farms and settlements are
not linked to the nearby
towns and markets
Every farm and
settlement is linked to
nearby towns and
markets through Katcha
link roads connected to
the metaled roads
Prosperity due to improved
communication, effective marketing,
increased prices of land, access to
education and health and employment
opportunities
Small scale
Enterprise
development
Local development of small-scale
enterprises
Lack of local enterprises
supporting agricultural and
livestock development
Reduced un-
employment and youth
is involved in sustained
local business
enterprises
Less migration to towns
for seeking employment
especially during
drought and flood years
Social tranquility and political
stability due to local business
development
Gender mainstreaming Lack of gender
development
Women involved in
social and economic
Empowerment of women and
children (graziers, etc.)
47
activities
Children going to school
for education –
increased enrolment of
children in schools and
colleges
Value added
agriculture and
livestock
High value crops included in the
cropping pattern and grading and
packing
Only local varieties of
melons are grown with
some dates
High value crops
included in irrigated
farming and enhanced
capacity of farmers for
value addition
Enhanced income from value added
products
Secondary level processing of
fruits and vegetables
Losses of fruits and
melons
Secondary level
processing initiated at
the local level by small
scale enterprises and
linkages with primary
processing industry
Reduced risk of perishability of fruits
and vegetables and reduction in post-
harvest losses to the tune of 30-40%
Gender
development
Gender mainstreaming within the
cultural framework
Limited role of women in
agriculture and their role is
restricted to livestock
management, fuelwood
collection, etc.
Gender Interest Groups
organized and involved
in social and economic
activities including value
added agriculture and
livestock
Empowerment of women and
children and involvement in social
and economic activities including
education, health and hygiene.
48
13. Management Structure and Manpower Requirements
13.3. Administrative Arrangements for Implementation of Project
The project will be managed by the PMU, which will be established in the Department of Agriculture,
Livestock and Cooperatives at Peshawar. This is the essential administrative requirement for effective
management of the project. For effective implementation of the innovative interventions in an
integrated manner, the PIU will be placed in the real-life situation closer to the project area and will
be located in D. I. Khan. The Field Office of the command area will be established in the GZD Project
Area initially using some of the infrastructure available with WAPDA and later on shift to the
specifically constructed Field Office under the project. The construction of Field Office will take time
and thus temporary arrangement will be made in the beginning. After the completion of the Project,
the Field office will be used by the Dam’s Organization comprising of 3 FOs and 393 WUAs.
Project Steering Committee (PSC)
The administrative and institutional structure for steering the implementation of GZD-CAD Project
has been kept as lean as possible so that effective implementation is ensured. The PMU will be
governed by the PSC comprising of following 16 members including Chairman of the PSC:
Additional Chief Secretary , P&D Department Chairman
Secretary Agriculture, Livestock and Cooperative Member
Member Water, WAPDA
Representative of Department of Planning and Development Member
Representative of Department of Finance Member
Representative of Department of Irrigation and Power Member
DCO, District D. I. Khan Member
DCO, District Tank Member
Enlightened Farmers (Three) Member
Experts in Personal Capacity (Two) Member
Representative of USAID Member
Project Director, PIU Member
Project Director, PMU Member/Secretary
The visual illustration of the organization of the PSC is presented in Figure 4a. PSC would be
authorized to make necessary adjustments and corrections in the administrative, implementation and
financial modalities to remove difficulties besides allocation/reallocation of financial resources
according to ground realities, without changing overall scope of the project. In order to cover the
variability due to specific conditions of the project area, type of interventions and other inflation
factors, the PSC may review the cost of interventions and make changes accordingly to facilitate
smooth implementation of the project. The PSC will meet at least twice during each project year to
monitor progress and achievements, discuss project related issues, review action plans, and provide
guidelines for future course of action. In the beginning more frequent meetings would be required for
taking off the project.
Project Implementation Committee (PIC)
The administrative structure for the implementation of the GZD-CAD Project has been kept as lean as
possible to ensure effective implementation. The PIU will be governed by the PIC comprising of
following 9 members including Chairman of the PIC:
Secretary Agriculture, Livestock and Cooperative Chairman
Director General, Agriculture Extension, Member
Director General, Agricultural Research Member
Director General, Water Management Member
49
Director General, Livestock and Dairy Development Member
Director, Agricultural Engineering Member
Representative of GZD, WAPDA Member
Project Director, PMU Member
Project Director, PIU Member/Secretary
The visual illustration of the organization of the Project Implementation Committee (PIC) is presented
in Figure 4b. PIC would be authorized to review the progress of implementation and work as
Executive Committee of the PSC. PIC will ensure effective implementation of the project and remove
the bottlenecks and hurdles faced by the PIU. Also identify necessary adjustments and corrections in
the administrative, implementation and financial modalities to remove difficulties besides
allocation/reallocation of financial resources according to ground realities, without changing overall
scope of the project for the approval of the PSC. In order to cover the variability due to specific
conditions of the project area, type of interventions and other inflation factors, the PIC may review the
cost of interventions and suggest changes accordingly for the approval of the PSC. The PIC will meet
at least on quarterly basis during each project year to monitor progress and implementation of the
project. In the beginning monthly meetings would be required for taking off the project.
Strategy for Project Implementation
Major elements of the strategy for the implementation arrangements of the GZD-CAD Project are:
Project overall management will be the responsibility of the PMU established at the office of
Secretary, Agriculture, Livestock and Cooperative. It will be a very small Unit to oversee the
implementation and coordination among the line Departments at the provincial headquarters.
Project will be implemented by the PIU, which will be established in D. I. Khan under the
Department of Agriculture, Livestock and Cooperatives. The PIU will be responsible for
overall implementation of the project considering implementation of innovative interventions
in an integrated fashion. However, PIU will enter in to an agreement with the partner line
departments for contracting the specific assignments related to knowledge, technical
backstopping, training and demonstrations.
Feasibility, master plan development, detailed engineering designs and bill of quantity of
materials will be conducted by the consulting firms through cost and quality based bidding.
Only the pre-qualified companies and firms can compete in the bidding process.
Supervisory consultants will be selected based on cost and quality based bidding criteria and
will work as third party for the supervision of implementation of the project interventions.
Only the pre-qualified firms will be allowed to participate in the bidding process. Detailed
RFPs will be developed for pre-qualification and bidding of specific contracts. However, a
brief outline is given in the PC-I for the three RFPs.
The physical and biological interventions will be implemented by the private sector and only
pre-qualified private sector companies will participate in the bidding process based on cost
and quality based bidding criteria. Private sector companies will also be responsible to
provide O&M services for a period of 2 years after completion of interventions and during
this period they will be responsible to train the members of FOs and WUAs.
Some of the interventions especially in the area of productivity enhancement, value addition
and marketing will be undertaken by the line departments. The PIU will enter into an MOU
with the partner line departments/institutions for the implementation of the action area or
activity. The PIU will provide funding as per agreement between the PIU and the line
department/institution.
50
No specific budget allocation is made for the line departments or institutions but PIU is
authorized as per PC-I to enter into an MOU for acquiring services from the line departments
and institutions. The concept of Result Based Monitoring as recommended by the Planning
Commission will be used and MOU will be based on result-oriented funding rather than
supply side funding. However, a small grant as a support to strengthen the operational
capacity of the line departments is provided in the PC-I, which will be provided to these
institutions after the approval of the Steering Committee. For this purpose, the proposal will
be prepared by the PIU and recommended by the PIC.
GZD-CADP is not a project for strengthening of the line department’s institutions rather it is
aimed for command area development, on-farm water management and productivity
enhancement, therefore result based contracts will be developed for acquiring services from
public and private sectors..
Steering Committee will be responsible for overall administrative control of the project
implementation and provide policy guidelines for effective and efficient implementation of
the GZD-CAD Project.
Full time technical and support staff is provided for the project so that quality and timely
implementation is accomplished. Salaries allowed by the GoKPK for project employees
(fixed rates) will be used. In case the Line Department depute some of their staff on full-time
basis, arrangements will be made with USAID so that fixed salary package can also be
provided to such employees, off course through the competitive basis. The line departments
will also provide in-kind support over and above the project full time manpower and details of
this support is given in Annexure IX.
Project manpower will be recruited solely on merit basis and as per qualifications identified
for various positions. The officers of the line departments having similar qualifications can
also compete for the project positions.
The project is aimed to develop a new, innovative and integrated approach for the
development of command area, water management and productivity enhancement so that the
new approach can be scaled up in rest of the dams in the country. Therefore, innovative
interventions are suggested.
Annual fares and competitions of farmers and WUAs will be organized to motivate farmers
and WUAs to enhance productivity of land and water and awards (certificate and in kind
awards like seed of hybrids, etc.) will be provided to the winners.
Gender focus will be essential element of the strategy and mainstreaming activities will be
introduced in the command area.
Financial, Procurement, and Human Resource Management
The project will have manuals with detailed SOPs for financial management, procurement and human
resource management which will be based on the GoP systems in line with the USAID requirement.
GoP rules regarding Assignment Account and PIFRA systems will be strictly adhered to in relation to
financial and procurement management. The Auditor General of Pakistan will audit the accounts of
the Program and its use in accordance with internationally accepted auditing standards.
All procurement actions undertaken by the PIU must be consistent with the GoP and GoKPK laws,
regulation, rules, policies, and procedures. The Project will adhere to the applicable procurement
rules, regulation, policy guidelines and related pronouncements issued by the GoKPK.
51
Financial, Accounts and Administration Sections will jointly be responsible for financial, accounting,
procurement, and HR management related to the Project.
PC-I ensures that proper human resources will be made available with appropriate description of
duties, lines of reporting, package salary in accordance with the grade system as per policy of the
GoKPK, appropriate qualification, and segregation of duties, etc.
The Manuals and software already available for project management (from GoP and other sources i.e.
USAID and donors) will be evaluated to select the best suited for use in the project. The GoP has
already developed computer software for the financial and accounting management for projects and
same can also be adopted.
Monitoring & Evaluation
Monitoring & Evaluation system developed by the Planning Commission of Pakistan will be used
along with any other suitable software developed for this purpose. The RBM matrix is given in Table
12 and Section 12.2. The PD, Component Head and Sectional Heads of PIU along with Team of
Supervisory Consultants will further expand the RBM matrix and identify quantifiable targets and
expected impacts.
Quarterly Progress Report (QPR) will be prepared using the PC-III Performa. It will include both
program (physical) and financial progress indicators. However, the indicators included in the PC-III
will also conform to the Performance Management Plan guidelines of the USAID.
Draft QPR will be prepared by the PIU and will be reviewed by the PMU in a joint meeting with all
stakeholders. Final QPR will be shared with GoKPK, Planning Commission and USAID.
A simple format will be developed to record the findings and decisions of field visits conducted
during a month by the officers of the PIU. The format may contain a narrative of the visit and list of
key issues for decisions, course correction or follow-up. Based on the monthly field visit reports, a
Quarterly Monitoring Report (QMR) will be prepared.
The monthly and quarterly reports of the Supervisory Consultants will provide the basis for the
preparation of QPR of the project as their reports will provide basic data for the progress of
implementation of various interventions. The Supervisory Consultants will work as third party and
thus their reports will be providing reliable data and information for M&E reports. One of the major
roles of the Supervisory Consultants is to verify the quantity and quality of implementation of various
interventions therefore it is not required to have separate staff with the M&E Specialist. The M&E
Specialist will work in close association with the Supervisory Consultants.
As full-time Supervisory Consultants will be recruited for the verification of the quantity and quality
of interventions, therefore traditional concept of M&E system will not be required. The M&E
Specialist will provide all the necessary input while developing framework for the Supervisory
Consultants.
A Mid-term review will be conducted by a Third Party to ensure that the project is progressing in the
right direction. Project completion report will be administered by the PMU through a consultant in
accordance with the PC-IV format. This will ensure further processing of SNEs.
M&E, Planning and Reporting Specialists have been proposed under the PMU/PIU to be able to meet
monitoring and reporting requirements of the GOKPK and USAID. Detailed M&E structure and
terms of reference will be developed as part of the M&E Manual.
52
Internal Audit
The PMU and PIU will establish system of internal audit for the project activities both at the
Peshawar and D. I. Khan. The PMU will also be responsible for the conduct of the external audits of
the project in line with the requirement of the GoKPK and USAID. The required staff for internal
audit has been included both for the PMU and PIU.
13.4. Manpower Requirements
The technical manpower requirement of the GZD-CAD is given in Table 14. The manpower required
for the project is of full time nature; therefore these personnel will be placed under the administrative
control of the PMU/PIU for effective implementation of the project. The organizational structure of
PMU and related Components of PIU is given in Figures 5 to 9.
Table 14. Technical manpower required for the GZD-CAD Project
No. Post Package Salary
Equivalent of BS
Grades9
Number
Manpower for Office of Chief Coordinator and Project Management Unit (PMU)
1 Chief Coordinator (Part-time) 20/21 1
2. Project Director, PMU 20 1
3 Senior Programme Officer 18 1
4 Monitoring and Evaluation Officer 18 1
Manpower for Office of Project Director Project Implementation Unit (PIU)
1. Project Director, PIU 20 1
2. Component Leader #1 – Command Area Development
and On-Farm Water Management
19 1
3. Component Leader #2 – Productivity Enhancement 19 1
4. Component Leader #3 – Value Added Agriculture and
Livestock
19 1
5. Component Leader #4 – Marketing 19 1
6. Monitoring and Evaluation Officer 18 1
7. Planning and Reporting Officer 18 1
8. Gender Mainstreaming Officer 18 1
9. Training Organizer (Men) 18 1
10. Training Organizer (Women) 18 1
Manpower for Component on Command Area Development and On-Farm Water Management
1. Agricultural Engineer – Land Reclamation, Forming and
rough leveling of ravines and gullied lands and Field
layout
18 1
2. Agricultural Engineer – Katcha Rural Link Roads/Tracks 18 1
3. Agricultural Engineer – Watercourse Development 18 1
4. Agricultural Engineer – Laser Land Leveling 18 1
5. Agricultural Engineer – Irrigation 18 1
Manpower for Component on Productivity Enhancement
1. Agriculture Specialist – Crops 18 1
2. Agriculture Specialist – Horticulture 18 1
3. Livestock Production Specialist 18 1
4. Animal Health Specialist 18 1
Manpower for Component on Value Added Agriculture and Livestock
1. Processing Specialist – Horticulture 18 1
2. Processing Specialist – Milk and Meat 18 1
9 Grade is just an indication of Package Salary equivalent of the BS Grade system as approved by the government of KPK.
53
3. Processing Engineer for Innovations 18 1
Manpower for Component on Marketing
1. Marketing Specialist 18 1
Manpower for Field Office (Three canal-commands)
1. Command Area Field Team Leader 19 1
2. Field Officer – Command Area Development 17 1
3. Field officer – On-Farm Water Management 17 1
4. Field Officer – Rural Roads 17 1
5. Field Officer – Productivity Enhancement - Crops 17 1
6. Field Officer – Productivity Enhancement - Horticulture 17 1
7. Field Officer – Value Added Agriculture and Livestock 17 1
8. Field Officer - Marketing 17 1
9. Field Officer – Livestock 17 1
10. Field Officer - Gender 17 1
Total Manpower in BS-20 20 2
Total Manpower in BS-19 19 5
Total manpower in BS-18 18 20
Total manpower in Bs-17 17 9
Manpower in BS 17 to 20 36
In addition to the technical manpower, support staff is also needed and details are presented in Table
15. The ratio of technical to support staff is roughly 1:2, which is highly reasonable.
Table 15. Support staff required for the GZD-CAD Project
No. Post Package Salary
Equivalent of BS
Grades10
Number
Manpower for the Office of Chief Coordinator/Project Management Unit (PMU)
1 Administrative Officer 17 1
2. Finance and Accounts Officer 17 1
3. Internal Audit Officer 17 1
4 Office Secretary 16 1
5 Drivers 5 3
6 Naib Qasid 1 2
Manpower for Office of Project Director PIU
1 Administrative Officer 17 1
2. Finance and Accounts Officer 17 1
3. Internal Audit Officer 17 1
4. Office Secretary 16 1
5. Receptionist 11 1
6. Driver for the PD 5 1
7. Drivers for Component Leaders 5 4
8. Drivers for Monitoring, Planning, Training and Gender
Officers
5 5
9. Naib Qasids for PIU 1 3
10. Security Guards 1 4
11. Sweeper 1 1
Manpower for Component on Command Area Development and On-Farm Water Management
1. Office Assistant 11 1
2. Account Assistant 11 1
10 Grade is just an indication of Package Salary equivalent of the BS Grade system as approved by the government of KPK.
54
3. Drivers for Technical Staff 5 5
4. Naib Qasids 1 2
Manpower for Component on Productivity Enhancement
1. Office Assistant 11 1
2. Account Assistant 11 1
3. Drivers for Technical Staff 5 4
4. Naib Qasids 1 2
Manpower for Component on Value Added Agriculture and Livestock
1. Office Assistant 11 1
2. Account Assistant 11 1
3. Drivers for Technical Staff 5 3
4. Naib Qasids 1 2
Manpower for Component on Marketing
1. Office Assistant 11 1
2. Account Assistant 11 1
3. Drivers for Technical Staff 5 1
4. Naib Qasids 1 1
Manpower for Field Office (Three Canal-commands)
1. Office Assistant 11 1
2. Account Assistant 11 1
3. Drivers for Technical Staff 5 6
4. Naib Qasids 1 3
5. Security Guards 1 3
6. Sweeper 1 1
Total Manpower in BS-17 17 6
Total Manpower in BS-16 16 2
Total Manpower in BS-11 11 11
Total manpower in BS-5 5 32
Total manpower in Bs-1 1 24
Manpower in BS 1 to 18 75
13.3. Job Description and Eligibility of Project Manpower
The job description and eligibility of the project manpower is presented in Table 16.
55
Table 16. Job Description and Eligibility of Project Manpower
No. Post Grade Number of
Positions
Job Description Eligibility Requirement
Manpower for the Office of Chief Coordinator/PMU
1. Project
Director, PMU
20 1 Will be responsible to assist the Chief Coordinator in all
the matters related to the project. Management of the
implementation of GZD-CAD Project through the PIU
located at D. I. Khan and the line Departments and other
stakeholder’s institutions. Responsible for the overall
management of the project performance including
accounts and reporting of physical and financial progress
to the GoKPK and USAID. Responsible to work as
Member/Secretary of the Steering Committee and
arrange meetings and implement the decisions of the
PSC. Will manage the Project in a Team Spirit and
through interactive participatory approach to accomplish
project objectives as outlined in the PC-I.
Master degree in Agricultural Engineering
with specialization in water; or Agricultural
Sciences or Agricultural Social Sciences with
over 15 years of experience in implementation
of command area development, on-farm water
management or relevant projects. Experience
in working with donor financed projects is an
additional qualification. Candidates with
foreign degree will be given preference.
Minimum age limit is 40 years.
2. Senior
Programme
Officer
18 1 Assist the PD (PMU) in the implementation of GZD-
CAD Project through organizing meetings of the Steering
Committee, reviewing the annual plans, financial plans,
accounting and implementation of project activities.
Coordinate with the PD (PIU), Consultants, private
sector, contractors and farming community to convey
decisions of the Chief Coordinator and the GoKPK.
Responsible for maintaining the physical and financial
reports submitted by the PIU and other partners’
institutions and update the PD (PMU). Responsible to
assist the member/secretary of the Steering Committee
and facilitate for arranging meetings and implement the
decisions of the PSC. Will facilitate the PD (PMU) for
the implementation of the Project to accomplish project
objectives as outlined in the PC-I. The role is in-fact of a
facilitator through developing effective forward and
backward linkages.
Master degree in Agricultural Engineering
with specialization in water; or Agricultural
Sciences or Agricultural Social Sciences with
over 5 years of experience in implementation
of command area development, on-farm water
management or relevant projects. Experience
in working with donor financed projects is an
additional qualification. Candidates with
foreign degree will be given preference.
Minimum age limit is 25 years.
3. Monitoring 18 1 Monitoring and Evaluation of the GZD-CAD Project Master degree in Agricultural Economics,
56
and
Evaluation
Officer
activities in consultation with the PD (PMU) and PD (PIU) and maintain periodic Monitoring and
Evaluation Reports for submission to PD (PMU).
Will review periodic monitoring and evaluation
exercises with active collaboration with the M&E
Officer of the PIU. Will be responsible for review of
the physical and financial progress of the project and
reporting to the PD (PMU). Will conduct all the
exercises in a Team Spirit and through interactive
participatory approach ensuring culture of self-
assessment within the PIU.
Economics or Business Administration with specialization in monitoring and
evaluation of water and agriculture
projects covering crops and livestock or
relevant disciplines with over 5 years of
experience in the monitoring and
evaluation of command area development,
on-farm water management or similar
projects. Experience in working with
donor financed projects or with the private
sector monitoring and evaluation
assignments is an additional qualification.
Candidates with foreign degree will be
given preference. Minimum age limit is
25 years.
Manpower for Office of Project Director, PIU
1. Project
Director, PIU
20 1 Implementation of GZD-CAD Project through
Components Leaders, Consultants, private sector,
contractors and farming community. Responsible for
management of project accounts and reporting of
physical and financial progress to the PMU. Will keep a
close liaison with the PMU for the implementation of the
project. Also be responsible to work as
Member/Secretary of the Project Implementation
Committee and arrange meetings and implement the
decisions of the PIC. Will implement the Project in a
Team Spirit and through interactive participatory
approach to accomplish project objectives as outlined in
the PC-I.
Master degree in Agricultural Engineering
with specialization in water; or Agricultural
Sciences or Agricultural Social Sciences with
over 15 years of experience in implementation
of command area development, on-farm water
management or relevant projects. Experience
in working with donor financed projects is an
additional qualification. Candidates with
foreign degree will be given preference.
Minimum age limit is 40 years.
2. Component
Leader –
Command
Area
Development
19 1 Implementation of the GZD-CAD Project Component on
“Command Area Development and On-Farm Water
Management” in partnership with the private sector, line
departments, PIU and farming community. Will be
responsible for physical and financial progress of the
Master degree in Agricultural Engineering
with specialization in water management, land
development, irrigation or relevant disciplines
with over 10 years of experience in the
implementation of command area
57
and On-Farm
Water
Management
Component and reporting to the PD (PIU) and the Project
Implementation Committee. Will implement the
Component in a Team Spirit and through interactive
participatory approach to accomplish project objectives
as laid out in the PC-I.
development, on-farm water management,
irrigation or relevant projects. Experience in
working with donor financed projects is an
additional qualification. Candidates with
foreign degree will be given preference.
Minimum age limit is 30 years.
3. Component
Leader –
Productivity
Enhancement
19 1 Implementation of the GZD-CAD Project Component on
“Productivity Enhancement” in partnership with the
private sector, line departments, PIU and farming
community. Will be responsible for physical and
financial progress of the Component and reporting to the
PD (PIU) and the Project Implementation Committee.
Will implement the Component in a Team Spirit and
through interactive participatory approach to accomplish
project objectives as laid out in the PC-I.
Master degree in Agriculture with
specialization in crop production, horticulture
or Master Degree in Animal Husbandry or
relevant disciplines with over 10 years of
experience in the implementation of
productivity enhancement programme in crop
and livestock sectors or relevant projects.
Experience in working with donor financed
projects is an additional qualification.
Candidates with foreign degree will be given
preference. Minimum age limit is 30 years.
4. Component
Leader – Value
Added
Agriculture
and Livestock
19 1 Implementation of the GZD-CAD Project Component on
“Value Added Agriculture and Livestock’ in partnership
with the private sector, line departments, PIU and
farming community. Will be responsible for physical and
financial progress of the Component and reporting to the
PD (PIU) and the Project Implementation Committee.
Will implement the Component in a Team Spirit and
through interactive participatory approach to accomplish
project objectives as laid out in the PC-I.
Master degree in Process Engineering or Food
Technology with specialization in value added
agriculture and livestock related to crops
and/or livestock or relevant disciplines with
over 10 years of experience in the
implementation of value addition, processing
or relevant projects. Experience in working
with donor financed projects or with the
private sector industry is an additional
qualification. Candidates with foreign degree
will be given preference. Minimum age limit
is 30 years.
5. Component
Leader –
Marketing
19 1 Implementation of the GZD-CAD Project Component on
“Marketing of Marketable Products” in partnership with
the private sector, line departments, PIU and farming
community. Will be responsible for physical and
financial progress of the Component and reporting to the
PD (PIU) and the Project Implementation Committee.
Will implement the Component in a Team Spirit and
Master degree in Agricultural Marketing with
specialization in marketing of crops and
livestock or relevant disciplines with over 10
years of experience in the implementation of
marketing of marketable products or relevant
projects. Experience in working with donor
financed projects or with the private sector
58
through interactive participatory approach to accomplish
project objectives as laid out in the PC-I.
marketing assignments is an additional
qualification. Candidates with foreign degree
will be given preference. Minimum age limit
is 30 years.
6. Monitoring and
Evaluation
Officer
18 1 Monitoring and Evaluation of the GZD-CAD Project
activities in consultation with the Component Leaders
and prepare periodic Monitoring and Evaluation Reports
for submission to PD (PIU) and Component leaders. Will
conduct periodic monitoring and evaluation exercises
with active partnership with the private sector, line
departments, PIU and farming community. Will be
responsible for assessment of physical and financial
progress of the four Components of the project and
reporting to the PD (PIU). Will conduct all the exercises
in a Team Spirit and through interactive participatory
approach ensuring culture of self-assessment within each
Component.
Master degree in Agricultural Economics,
Economics or Business Administration with
specialization in monitoring and evaluation of
water and agriculture projects covering crops
and livestock or relevant disciplines with over
5 years of experience in the monitoring and
evaluation of command area development, on-
farm water management or similar projects.
Experience in working with donor financed
projects or with the private sector monitoring
and evaluation assignments is an additional
qualification. Candidates with foreign degree
will be given preference. Minimum age limit
is 25 years.
7. Finance and
Account
Officer
18 1 Manage finance and accounts of the GZD-CAD Project
activities in consultation with the PD (PIU) and
Component Leaders. Will be responsible to prepare
monthly, quarterly and annual financial and accounts
reports and progress. Arrange periodic audits of the
project accounts as per requirement of the GoKPK and
the USAID. Prepare and finalize the project financial
plans and prepare annual budgets of project. Will manage
the project accounts in an effective and efficient manner.
Master degree in Finance, Accounts, or
Business Administration with specialization
in Finance and Account with over 5 years of
experience in the finance and accounts of
water and agriculture projects. Experience in
working with donor financed projects or with
the private sector finance and account system
is an additional qualification. Candidates with
foreign degree will be given preference.
Minimum age limit is 25 years.
8. Administrative
Officer
18 1 Manage administrative matters of the GZD-CAD Project
in consultation with the PD (PIU) and Component
Leaders. Will be responsible to prepare monthly,
quarterly and annual reports and progress related to
recruitment, procurement, and related aspects. Will
manage project administrative matters in an effective and
efficient manner. Will be responsible to assist the
Component Leaders and PD (PIU) for overall
Master degree in Business Administration
with specialization in administration of
development projects with over 5 years of
experience in the administration of water and
agriculture or relevant projects. Experience in
working with donor financed projects or with
the private sector administration system is an
additional qualification. Candidates with
59
procurement of the project. foreign degree will be given preference.
Minimum age limit is 25 years.
9. Planning and
Reporting
Officer
18 1 Responsible for planning and reporting of project
activities of the GZD-CAD in consultation with the PD
(PIU) and Component Leaders. Will be responsible to
prepare monthly, quarterly and annual reports and
progress related to project component activities,
administration, account and finance. Will prepare the
annual plans for the project in consultation with the
Team.
Master degree in Agricultural Economics or
Business Administration with specialization
in planning of development projects with over
5 years of experience in the area of planning
and reporting of water and agriculture or
relevant projects. Experience in working with
donor financed projects or with the private
sector planning system is an additional
qualification. Candidates with foreign degree
will be given preference. Minimum age limit
is 25 years.
10. Gender
Mainstreaming
Officer
18 1 Responsible for implementation of the gender related
activities in all the four components of the GZD-CAD
Project in consultation with the PD (PIU) and
Component Leaders. Will be responsible to prepare
monthly, quarterly and annual reports and progress
related to the gender related activities. Will be
responsible to ensure gender mainstreaming wherever
possible in the four components of the project.
Master degree in Agricultural Economics or
Rural Sociology or Agricultural Sciences or
Management Sciences with specialization in
gender and development with over 5 years of
experience in the area of gender related
aspects of water and agriculture or relevant
projects. Experience in working with donor
financed projects or with the private sector
gender mainstreaming activities is an
additional qualification. Candidates with
foreign degree will be given preference.
Minimum age limit is 25 years.
11. Training
Organizer
(Men)
18 1 Responsible for organizing and implementation of the
overall Training Programme of the GZD-CAD Project
covering all the four Components through collaboration
of the GoKPK Training Institutions and/or the Training
Experts in specialized areas or institutions located in
other provinces. Will develop the overall training
programme and plan in close consultations with the four
Component Leaders and the PD (PIU) and organize these
training events in real-life situation and/or at the selected
training institutions. Will be responsible for physical and
financial progress of the Training Programme of the
Master degree in Agricultural, Natural or
Social Sciences; or Agricultural Engineering
or relevant disciplines with over 5 years of
experience in relevant organizations and
implementation of the training programmes in
collaboration with the training experts and the
training institutions or relevant projects.
Experience in working with donor financed
projects is an additional qualification.
Candidates with foreign degree will be given
preference. Minimum age limit is 25 years.
60
Project. Will implement the Training programme in a
Team Spirit and through interactive participatory
approach.
12. Training
Organizer
(Women)
18 1 Responsible for organizing and implementation of the
overall Training Programme for the women of the GZD-
CAD Project covering all the four Components through
collaboration of the GoKPK Training Institutions and/or
the Training Experts in specialized areas or institutions
located in other provinces. Will develop the overall
training programme and plan in close consultations with
the four Component Leaders and the PD (PIU) and
organize these training events in real-life situation and/or
at the selected training institutions. Will be responsible
for physical and financial progress of the Training
Programme of the Project. Will implement the Training
programme in a Team Spirit and through interactive
participatory approach.
Master degree in Agricultural, Natural or
Social Sciences or Agricultural Engineering
or relevant disciplines with over 5 years of
experience in organization and
implementation of the training programmes
for women in collaboration with the training
experts and the training institutions or
relevant projects. Experience in working with
donor financed projects is an additional
qualification. Candidates with foreign degree
will be given preference. Minimum age limit
is 25 years.
Manpower for Component on Command Area Development and Water Management
1. Agricultural
Engineer –
Land
Reclamation,
Forming and
Field layout
18 1 Implementation of the GZD-CAD Project Action Area on
Land Reclamation, Land Forming and Rough Leveling of
ravines and gullied lands and Field Layout in partnership
with the private sector, line departments, PIU and
farming community. Will be responsible for physical and
financial progress of the Action Area and reporting to the
Component Leader of Command Area Development and
On-Farm Water Management. Will implement the Action
Area in a Team Spirit and through interactive
participatory approach.
Master degree in Agricultural Engineering
with specialization in land development and
field layout for irrigation or relevant
disciplines with over 5 years of experience in
the implementation of land reclamation, land
forming and field layout or relevant projects.
Experience in working with donor financed
projects is an additional qualification.
Candidates with foreign degree will be given
preference. Minimum age limit is 25 years.
2. Agricultural
Engineer –
Katcha Rural
Roads
18 1 Implementation of the GZD-CAD Project Action Area on
Katcha Rural Roads as a link to the metaled road in
partnership with the private sector, line departments, PIU
and farming community. Will be responsible for physical
and financial progress of the Action Area and reporting
to the Component Leader of “Command Area
Development and On-Farm Water Management”. Will
implement the Action Area in a Team Spirit and through
Master degree in Agricultural Engineering
with specialization in Rural Roads or relevant
disciplines with over 5 years of experience in
the implementation of Rural earthen roads or
tracks or relevant disciplines. Experience in
working with donor financed projects is an
additional qualification. Candidates with
foreign degree will be given preference.
61
interactive participatory approach. Minimum age limit is 25 years.
3. Agricultural
Engineer –
Watercourse
Development
18 1 Implementation of the GZD-CAD Project Action Area on
Watercourse Development in partnership with the private
sector, line departments, PIU and farming community.
Will be responsible for physical and financial progress of
the Action Area and reporting to the Component Leader
of “Command Area Development and On-Farm Water
Management”. Will implement the Action Area in a
Team Spirit and through interactive participatory
approach.
Master degree in Agricultural Engineering
with specialization in water management,
irrigation or relevant disciplines with over 5
years of experience in the implementation of
watercourse development or relevant projects.
Experience in working with donor financed
projects is an additional qualification.
Candidates with foreign degree will be given
preference. Minimum age limit is 25 years.
4. Agricultural
Engineer –
Laser land
Leveling
18 1 Implementation of the GZD-CAD Project Action Area on
Laser Land Leveling in partnership with the private
sector, line departments, PIU and farming community.
Will be responsible for physical and financial progress of
the Action Area and reporting to the Component Leader
of “Command Area Development and On-Farm Water
Management”. Will implement the Action Area in a
Team Spirit and through interactive participatory
approach.
Master degree in Agricultural Engineering
with specialization in Laser land leveling,
irrigation or relevant disciplines with over 5
years of experience in the implementation of
Laser land Leveling or relevant projects.
Experience in working with donor financed
projects is an additional qualification.
Candidates with foreign degree will be given
preference. Minimum age limit is 25 years.
5. Agricultural
Engineer –
Irrigation
18 1 Implementation of the GZD-CAD Project Action Area on
Farm Irrigation in partnership with the private sector, line
departments, PIU and farming community. Will be
responsible for physical and financial progress of the
Action Area and reporting to the Component Leader of
“Command Area Development and On-Farm Water
Management”. Will implement the Action Area in a
Team Spirit and through interactive participatory
approach.
Master degree in Agricultural Engineering
with specialization in Farm Irrigation,
Irrigation or relevant disciplines with over 5
years of experience in the implementation of
farm irrigation or relevant projects.
Experience in working with donor financed
projects is an additional qualification.
Candidates with foreign degree will be given
preference. Minimum age limit is 25 years.
Manpower for Component on Productivity Enhancement
1. Agriculture
Specialist –
Crops
18 1 Implementation of the GZD-CAD Project Action Area
related to the “Productivity Enhancement” of crops with
the private sector, line departments, PIU and farming
community. Will be responsible for physical and
financial progress of the Action Area and reporting to the
Component Leader of “Productivity Enhancement”. Will
implement the Action Area in a Team Spirit and through
Master degree in Agriculture with
specialization in Agronomy or relevant
disciplines with over 5 years of experience in
the implementation of crop productivity
enhancement or relevant projects. Experience
in working with donor financed projects is an
additional qualification. Candidates with
62
interactive participatory approach. foreign degree will be given preference.
Minimum age limit is 25 years.
2. Agriculture
Specialist –
Horticulture
18 1 Implementation of the GZD-CAD Project Action Area
related to the “Productivity Enhancement of Horticulture
(fruits and vegetables)” in partnership with the private
sector, line departments, PIU and farming community.
Will be responsible for physical and financial progress of
the Action Area and reporting to the Component Leader
of “Productivity Enhancement”. Will implement the
Action Area in a Team Spirit and through interactive
participatory approach.
Master degree in Agriculture with
specialization in Horticulture or relevant
disciplines with over 5 years of experience in
the implementation of crop productivity
enhancement or relevant projects. Experience
in working with donor financed projects is an
additional qualification. Candidates with
foreign degree will be given preference.
Minimum age limit is 25 years.
3. Livestock
Production
Specialist
18 1 Implementation of the GZD-CAD Project Action Area
related to the “Productivity Enhancement of Livestock
Production” in partnership with the private sector, line
departments, PIU and farming community. Will be
responsible for physical and financial progress of the
Action Area and reporting to the Component Leader of
“Productivity Enhancement”. Will implement the Action
Area in a Team Spirit and through interactive
participatory approach.
Master degree in Animal Husbandry with
specialization in Livestock Production or
relevant disciplines with over 5 years of
experience in the implementation of livestock
productivity enhancement or relevant projects.
Experience in working with donor financed
projects is an additional qualification.
Candidates with foreign degree will be given
preference. Minimum age limit is 25 years.
4. Animal Health
Specialist
18 1 Implementation of the GZD-CAD Project Action Area
related to the “Animal Health and Management” in
partnership with the private sector, line departments, PIU
and farming community. Will be responsible for physical
and financial progress of the Action Area and reporting
to the Component Leader of “Productivity
Enhancement”. Will implement the Action Area in a
Team Spirit and through interactive participatory
approach.
Master degree in Veterinary Sciences or
Medicines specialization in animal health or
relevant disciplines with over 5 years of
experience in the implementation of livestock
health care or relevant projects. Experience in
working with donor financed projects is an
additional qualification. Candidates with
foreign degree will be given preference.
Minimum age limit is 25 years.
Manpower for Component on Value Added Agriculture and Livestock
1. Processing
Specialist –
Horticulture
18 1 Implementation of the GZD-CAD Project Action Area
related to the Value Added Agriculture related to
Horticulture products in partnership with the private
sector, line departments, PIU and farming community.
Will be responsible for physical and financial progress of
the Action Area and reporting to the Component Leader
Master degree in Agricultural Engineering
with specialization in Food Technology, or
Food Technology or relevant disciplines with
over 5 years of experience in the
implementation of value added agriculture or
relevant projects. Experience in working with
63
of Value Added Agriculture. Will implement the Action
Area in a Team Spirit and through interactive
participatory approach.
donor financed projects is an additional
qualification. Candidates with foreign degree
will be given preference. Minimum age limit
is 25 years.
2. Processing
Specialist –
Milk and Meat
18 1 Implementation of the GZD-CAD Project Action Area
related to the Value Added Livestock related to Milk and
Meat products in partnership with the private sector, line
departments, PIU and the farming community. Will be
responsible for physical and financial progress of the
Action Area and reporting to the Component Leader of
Value Added Agriculture and Livestock. Will implement
the Action Area in a Team Spirit and through interactive
participatory approach.
Master degree in Animal husbandry
/Agricultural Engineering with specialization
in Dairy Technology, or Dairy Technology or
relevant disciplines with over 5 years of
experience in the implementation of value
added agriculture and livestock or relevant
projects. Experience in working with donor
financed projects is an additional
qualification. Candidates with foreign degree
will be given preference. Minimum age limit
is 25 years.
3. Processing
Engineer
(Innovations)
18 1 Implementation of the GZD-CAD Project Action
Area related to the Value Added Agriculture and
Livestock related to processing engineering in
partnership with the private sector, line departments,
PIU and the farming community. Will be
responsible for physical and financial progress of the
Action Area including the development of low-cost
machines for processing at secondary level and
reporting to the Component Leader of “Value Added
Agriculture and Livestock”. Will implement the
Action Area in a Team Spirit and through interactive
participatory approach.
Master degree in Agricultural Engineering
with specialization in Processing, or
Process Engineering or relevant
disciplines with over 5 years of
experience in the implementation of
processing engineering or relevant
projects. Experience in working with
donor financed projects is an additional
qualification. Candidates with foreign
degree will be given preference.
Minimum age limit is 25 years.
Manpower for Component on Marketing
1. Marketing
Specialist
18 1 Implementation of the GZD-CAD Project Action Area
related to the “Marketing of Marketable Products” in
participation with the private sector, line departments,
market administrators or Chairman, PIU and farming
community. Will be responsible for physical and
financial progress of the Action Area and reporting to the
Component Leader of “Marketing of Marketable
Master degree in Agricultural
Economics/Agri marketing with specialization
in marketing of marketable products or
relevant disciplines with over 5 years of
experience in the implementation of
marketing or relevant projects. Experience in
working with donor financed projects is an
64
Products”. Will implement the Action Area in a Team
Spirit and through interactive participatory approach.
additional qualification. Candidates with
foreign degree will be given preference.
Minimum age limit is 25 years.
Manpower for Field Office (Three Canal-commands)
1. Field Team
Leader
19 1 Implementation of the GZD-CAD Project on “Command
Area Development and On-Farm Water Management” in
partnership with the private sector, line departments, PIU
and farming community and under the guidance of the
Component Leaders, Engineers and Specialists. Will be
responsible for field level implementation of the project
in line with the plans provided by the Component
Leaders. Will implement the Project interventions in a
Team Spirit and through interactive participatory
approach.
Master degree in Agricultural Engineering
with specialization in water management, land
development, irrigation; Agriculture with
specialization in Agronomy or Horticulture;
or relevant disciplines with over 10 years of
experience in the implementation of command
area development, on-farm water management
or relevant projects. Experience in working
with donor financed projects is an additional
qualification. Candidates with foreign degree
will be given preference. Minimum age limit
is 30 years.
2. Field Officer –
Command
Area
Development
17 1 Implementation of the GZD-CAD Project Action Area on
“Command Area Development and On-Farm Water
Management” in partnership with the private sector, line
departments, PIU, Component Leader and farming
community. Will be responsible for implementation of
interventions in the field and reporting to the Component
Leader through interactive participatory approach.
BS degree in Agricultural Engineering with
specialization in command area development
for irrigation or relevant disciplines.
Experience in the implementation of land
reclamation, land forming and rough leveling
of ravines and gullied lands and field layout
or relevant projects will be an additional
qualification. Minimum age limit is 21 years.
3. Field officer –
Water
Management
17 1 Implementation of the GZD-CAD Project Action Area on
“Watercourse Development” in partnership with the
private sector, line departments, PIU, Component Leader
and farming community. Will be responsible for
implementation of the Action Area and reporting to the
Component Leader through interactive participatory
approach.
BS degree in Agricultural Engineering with
specialization in water management, irrigation
or relevant disciplines. Experience in the
implementation of water management or
relevant projects will be an additional
qualification. Minimum age limit is 21 years.
4. Field Officer –
Rural Roads
17 1 Implementation of the GZD-CAD Project Action Area on
“Katcha Rural Roads” in partnership with the private
sector, line departments, PIU, Component Leader and
farming community. Will be responsible for
implementation of the Action Area and reporting to the
BS degree in Agricultural Engineering with
specialization in construction of rural roads or
relevant projects. Experience in the
implementation of rural Katcha link roads or
relevant projects will be an additional
65
Component Leader through interactive participatory
approach.
qualification. Minimum age limit is 21 years.
5. Field Officer –
Productivity
Enhancement -
Crops
17 1 Implementation of the GZD-CAD Project Action Area on
“Productivity Enhancement of Crops” in partnership with
the private sector, line departments, PIU, Component
Leader and farming community. Will be responsible for
implementation of the Action Area and reporting to the
Component Leader through interactive participatory
approach.
MS degree in Agronomy with specialization
in productivity enhancement or relevant
projects. Experience in the implementation of
productivity enhancement or relevant projects
will be an additional qualification. Minimum
age limit is 21 years.
6. Field Officer –
Productivity
Enhancement -
Horticulture
17 1 Implementation of the GZD-CAD Project Action Area on
“Productivity Enhancement of Horticulture (fruits and
vegetables)” in partnership with the private sector, line
departments, PIU, Component Leader and farming
community. Will be responsible for implementation of
the Action Area and reporting to the Component Leader
through interactive participatory approach.
MS degree in Horticulture with specialization
in productivity enhancement or relevant
projects. Experience in the implementation of
productivity enhancement or relevant projects
will be an additional qualification. Minimum
age limit is 21 years.
7. Field Officer –
Livestock
17 1 Implementation of the GZD-CAD Project Action Area on
“Productivity Enhancement of Livestock” in partnership
with the private sector, line departments, PIU,
Component Leader and farming community. Will be
responsible for implementation of the Action Area and
reporting to the Component Leader through interactive
participatory approach.
BS degree in Animal Husbandry or Livestock
Production with specialization in productivity
enhancement or relevant projects. Experience
in the implementation of productivity
enhancement or relevant projects will be an
additional qualification. Minimum age limit is
21 years.
8. Field Officer –
Value Added
Agriculture
and Livestock
17 1 Implementation of the GZD-CAD Project Action Area on
“Value Added Horticulture (fruits and vegetables)” in
partnership with the private sector, line departments,
PIU, Component Leader and farming community. Will
be responsible for implementation of the Action Area and
reporting to the Component Leader through interactive
participatory approach.
MS degree in Food Technology or BSc in
Agricultural Engineering with specialization
in Food Technology or relevant disciplines.
Experience in the implementation of
productivity enhancement or relevant projects
will be an additional qualification. Minimum
age limit is 21 years.
9. Field Officer -
Marketing
17 1 Implementation of the GZD-CAD Project Action Area on
“Marketing” in partnership with the private sector, line
departments, PIU, Component Leader and farming
community. Will be responsible for implementation of
the Action Area and reporting to the Component Leader
through interactive participatory approach.
MS degree in Agricultural Marketing with
specialization in marketing of marketable
products or relevant projects. Experience in
the implementation of marketing or relevant
projects will be an additional qualification.
Minimum age limit is 21 years.
66
10. Field Officer -
Gender
17 1 Implementation of the GZD-CAD Project Action Area on
“Gender” in partnership with the private sector, line
departments, PIU, Component Leader and farming
community. Will be responsible for implementation of
the Action Area and reporting to the Component Leader
through interactive participatory approach.
MS degree in Agricultural Economics or
Rural Sociology with specialization in gender
mainstreaming or relevant projects.
Experience in the implementation of gender
mainstreaming and development or relevant
projects will be an additional qualification.
Minimum age limit is 21 years. Preference
will be given to the women candidates.
67
Additional Chief
Secretary
Chairman Project
Steering Committee GZD-CAD Project
1. Secretary Agriculture,
Livestock and
Cooperatives
2. Member Water,
WAPDA
3. Project Director, PIU
4. Project Director (PMU)
as Member Secretary
Representatives of:
1. Finance
2. Planning
3. Irrigation and Power
4. DCOs of D. I. Khan and
Tank Districts
Representatives of:
1. USAID
2. Enlightened Farmers
3. Experts in Personal
Capacity
Figure 4a. Organizational structure of the Project Steering Committee (PSC) for the GZD-CAD Project
68
GZD-CAD
Chief Coordinator
Chairman Project
Implementation Committee
Secretary Agriculture,
Livestock and Cooperatives
Heads of:
1. Agriculture Research
2. Agriculture Extension
3. Water Management
4. Livestock and Dairy
Development
5. Agricultural Engineering
1. Representative of Gomal Zam
Dam, WAPDA
2. Representative of USAID
3. Project Director, PMU
4. Project Director, PIU
Figure 4b. Organizational structure of the Project Implementation Committee (PIC) for the GZD-CAD Project
69
Project Director
Project Implementation
Unit, GZD-CAD Project
D. I. Khan
Component Leader
Command Area Development
and On-Farm Water
Management
Component Leader
Productivity Enhancement of
Crops, Horticulture and
Livestock
Component Leader
Value Added Agriculture and
Livestock
Component Leader
Marketing of Marketable
Products
Administrative
Officer
Finance and Accounts
Officer
Monitoring and Evaluation
Officer
Planning and Reporting
Officer
Gender Mainstreaming
Officer
Chief Coordinator/
Secretary Department of
Agriculture, Livestock and
Cooperative
Project Director
PMU
1. Senior
Programme
Officer
2. Monitoring and
Evaluation
Officer
3. Finance and
Account Officer
4. Administrative
Officer
5. Internal Audit
Officer
Internal Audit
Officer
Project
Steering
Committee
Figure 5. Organizational Structure of Project Management and Implementation Units of GZD-CAD Project
70
Agricultural
Engineer
Laser Land Leveling
Agricultural
Engineer
Land Reclamation,
Forming and Field
Layout
Agricultural
Engineer Farm
Irrigation
Agricultural
Engineer
Rural Katcha Roads
Agricultural
Engineer
Watercourse
Development
Component Leader
Command Area
Development and
On-Farm Water
Management
Figure 6. Organizational Structure of the Project Component on “Command Area Development and On-Farm Water Management” of GZD-CAD
Project
71
Animal
Health
Specialist
Livestock
Production
Specialist
Agricultural
Specialist
Horticulture
Agricultural
Specialist
Crops
Component
Leader
Productivity
Enhancement
Figure 7. Organizational Structure of the Project Component on “Productivity Enhancement” of GZD-CAD Project
72
Processing
Specialist Milk
and Meat
Processing
Specialist
Horticulture
Processing
Engineer
(Innovation)
Component Leader
Value Added
Agriculture and
Livestock
Figure 8. Organizational Structure of the Project Component on “Value Added Agriculture and Livestock” of GZD-CAD Project
73
Component Leader
Marketing
Marketing
Specialist
Figure 9. Organizational Structure of the Project Component on “Marketing of Marketable Products” of GZD-CAD Project
74
14. Additional projects/decisions required
Preparation of Manual and guidelines for the pre-qualification of Consultants, tendering and
bidding documents, detailed RFPs and evaluation of technical and financial proposals.
Regulatory framework would be required for the pre-qualification and registration of private
sector companies having been already registered under the Companies Act and formulation of
detailed SOPs for various categories of the private sector companies for envisaging
partnership including bidding and contracting of services and procurement.
Framework development for engendering the development process including the organization
and registration of Women Interest Groups and their possible representation in the WUAs and
FOs.
Formulation of detailed RFPs for the Feasibility and Preparation of Master Plan, Layout of
watercourse and Katcha Tracks, Formulation of Detailed Designs and Estimation of Bill
of Quantities of Materials for the Command Area Interventions, and recruitment of
Supervisory Consultants. Formulation of Framework and Manual for Monitoring and Evaluation of Project
Formulation of Manual for the Procurement of equipment, services and supplies
Formulation of Manual for the roles, responsibilities and actions to be undertaken by the PSC
and PIC for the implementation of the project.
15. CERTIFICATE: Certified that the project proposal has been prepared on the basis of
instructions provided by the Planning Commission for the preparation of PC-I for the production
sector projects.
75
Annexure I. Outline for the RFP for the Consultants for the conduct of the “Feasibility
and Formulation of Master Plan”
1.1. The Context
Background
The proposed project would serve as a support project to the Gomal Zam Dam Project and funded out
of the USAID committed funds. With completion of Gomal Zam Dam Project, 77,000 ha (191000
acres) of land will be irrigated in the command area (Districts of D. I. Khan and Tank), where
command area will be developed for improving livelihoods and creation of new employments
through value added farming of high value crops using high-efficiency irrigation systems and
livestock production and products. This is the first project in the KPK where along with the
construction of dam, main canal and distributary canals, command area will also be developed fully
using a comprehensive, integrated and participatory approach. The purpose is to develop whole of the
command area rather than using traditional approaches of agriculture and livestock extension, which
are largely based on the concept of demonstration and training. The project is primarily aimed to
develop farming as an enterprise.
GZD-CAD Project will provide assistance and funding to the people of Gomal Zam dam command
area in building and operating a modern irrigation system with major considerations for water
productivity (same as the term of ‘water use efficiency’), while providing both food self-sufficiency
and income from high value crops. The development will create jobs, new industries, and increased
opportunity for the people in this fragile ecosystem. These opportunities will provide new and better
livelihoods for all especially women.
Overall Expected Results and Overall Purpose of the Project
The overall expected result is an established on-farm irrigation system that ensures efficient use of
water, achieves enhanced productivity by farmers, improves processing capacity and increases ability
to provide high quality products for markets. These efforts will ultimately lead to increases in income
and employment of the people living in the command area.
The overall purpose is that water available for 77000 ha (191,000 acres) of command area of the
Gomal Zam dam is used efficiently through integrated development of command area, farm water
management, productivity enhancement, value addition, processing and effective marketing.
Program Outline
The following four Components are suggested for the GZD-CADP.
Phase-I: The following two components can be started right from the beginning and that’s why are
included in Phase-I.
Component #1: Command area development and on-farm water management (will be started in 1st
years)
Component #2: Enhancing productivity of crops, horticulture and livestock (will be started in 2nd
year)
Phase-II: The value addition, processing and marketing components can be undertaken once the
command area is developed fully, i.e. the 3rd
year of the implementation of the project and that’s why
these components are included in Phase-II:
Component #3: Value Added Agriculture and Livestock
Component #4: Marketing of marketable products
76
Overall Objectives of the Project
The overall objective of the proposed project is in-line with the sectoral objectives as indicated in the
Comprehensive Development Strategy (CDS) of the GoKPK. The project objectives in reality are
drawn from the CDS of the GoKPK and cover water for agriculture, development of command area,
enhancement of productivity of crops, horticulture and livestock, value addition, processing and
marketing. The funding is expected from USAID who also provided funding for the completion of the
Gomal Zam dam, which is covered in the CDS and the current project is based on the concept of
efficient and sustainable utilization of stored water in the Gomal Zam dam.
Feasibility and Formulation of Master Plan for the three Canal commands
The study entitled “Feasibility and Formulation of Master Plan for the development of command
area of the three canal commands of the Gomal Zam Dam is aimed to develop 77000 ha (191,000
acres) of land for canal irrigated agriculture with irrigation facility for the use of perennial water,
Katcha rural link roads, land forming and other related works. Feasibility Consultants will be hired
through quality and cost based bidding. The outline for developing complete RFP (Request for
Proposals) is presented in the following sections. This includes outline of objectives, activities, scope
of the work and manpower requirement. Also identified the support staff requirement and estimated
total cost.
1.2. Objective of the Study
The study objective is to conduct a Feasibility and formulation of Master Plan for the three canal
commands comprising of 77000 ha (191,000 acres) for the development of command area, water
management, productivity enhancement, value addition, processing and marketing. The specific
purpose is to develop big picture for the development of the command area for high value and high
efficiency irrigated farming in the command area. The Master Plan would help to plan for the overall
command so that interventions can be introduced in a sequenced and prioritized manner leading
towards productivity enhancement, value addition, processing and effective marketing of produce and
products.
1.3. Proposed Activities
The list of proposed activities for the conduct of Feasibility and formulation of Master Plan for
development of command area for high value agriculture using high efficiency irrigation is as under:
Command Area Development and On-Farm Water Management
Organization of Water Users’ Associations (WUAs) using Process of Social Organization for
the Mogha command area and Registration under the KPK WUAs Act with the Department of
Agriculture. Federating WUAs’ into FWUAs and registration of FWUAs as FOs under the NIDA
Act of KPK with the Department of Irrigation and Power.
Detailed Designs and Estimation of Quantities of Materials for the Award of Contracts for
Implementation of Command Area Development and On-Farm Water Management Interventions
Construction of Command Area Development and On-Farm Water Management
Interventions:
o Katcha Link roads to connect farm to metaled road
o Land reclamation, forming and rough leveling of ravines and gullied lands
o Field layout
o Construction of earthen watercourses with Pacca Naccas, culverts, buffaloes wallows, tail-
water pond at the tail-end of the watercourse and sand-filters for multiple uses of water
77
Precision land leveling of fields for efficient irrigation using Laser levelers
Test run of watercourse and field irrigation by farmers to ensure effective operation of the
Mogha command and associated adjustments for a full week to complete the Warabandi schedule
of 7 days rotation. After making adjustments in the earthen watercourses to meet farmers
requirement up to the level of their satisfaction and once they sign the completion document of
the earthen watercourse and Pacca control structures the process of lining of up to 20% of the
length of watercourse will be initiated.
Fixing Watercourse level Warabandi and assisting WUAs and FO to enforce Warabandi for
equitable distribution of water in collaboration with the KPK Department of Irrigation and Power
Provide trainings to men for O&M of watercourses and women for the use of stock water
Productivity Enhancement of Field Crops and Horticulture
Orientation and training of WUAs in field and horticultural crops and Organization of
Interest Groups for specified commodities in collaboration with Agri Business Programme of
the USAID
o Planning of cropping pattern and cropping intensity
o Production and productivity of field crops
o Production and productivity of horticultural crops
o Water use, irrigation scheduling and water productivity at the field level
o Farm profitability and management
Productivity enhancement demonstrations for high efficiency irrigation systems (furrow
irrigation on laser leveled fields, sprinkler, drip, etc.) for crops, fruit plants, melons and
vegetables considering farm as a whole – that means whole farm will be treated as a unit for
developing these demonstrations.
Productivity Enhancement of Livestock
Orientation and training of WUAs in management of livestock
o Improvement of breeds for cattle and small ruminants
o Improving nutrition for cattle and small ruminants
o Cost-effective livestock housing and management
o Tail-water pond for multiple use of water – quality and quantity
o Improved veterinary care
Productivity enhancement interventions for livestock o Improvement of Breeds for cattle and small ruminants (through provision of AI services;
progeny bulls, bucks and rams)
o Demonstration of fodders, silage and feeds
o Demonstration of livestock housing including management of tail-water ponds for stock water
use
o Veterinary care camps
Value Added Agriculture and Livestock
Value Addition for Crops, Vegetables and Fruits – interventions with Interest Groups for
specified commodities and local enterprises; linkages with processing industry
78
Value addition of Livestock Products – interventions with Interest Groups for specified
commodities and local enterprises; linkages with processing industry
Marketing
Marketing Channels for Crops, Vegetables and Fruits – access to market and market information,
linkages, local marketing platforms, etc.
Marketing Channels for Livestock – access to market information, linkages, local marketing
platforms, etc.
1.4. Scope of Work
The scope of the study is to conduct a feasibility of the project interventions at the macro-level and
formulate a master Plan for the prioritized and sequenced implementation of project interventions.
The Consultants are required to conduct feasibility of each of the interventions and the cost-
effectivity of these interventions has to be assessed and then arrange these in a prioritized and
sequenced manner. The criteria for evaluation of interventions would depend on cost-effectivity both
in terms of investments and O&M cost. Based on the initial feasibility, the Consultants will formulate
the Master Plan for the implementation of the project interventions.
The study is comprehensive and covers all the technical, technological, social, managerial, and
organizational aspects. Therefore a Team of Consultants would be required to accomplish the task.
Master Plan will provide detailed mapping of the command area along with the layout of various
interventions related to the command area development and on-farm water management. All the
physical activities related to the project requiring survey and designs are included in this study.
1.5. Manpower Requirement
The following manpower would be required and the number and duration of each of the member of
the Team has to be assessed by the bidding firm in the proposal (technical and financial). The
technical manpower required for the study is listed as under:
Team Leader with experience in national and international projects dealing with command
area development and on farm water management for high value agriculture using high
efficiency irrigation systems
Irrigation Engineer
Rural Roads Engineer
Design Engineer
Irrigated Agriculture Expert
Livestock Production Expert
Institutional Expert
Agricultural Economist
Value Added Agriculture and Livestock Expert
Monitoring and Evaluation Expert
GIS and Mapping Expert
The staff requirement would depend on the depth of the study and planned field work. These will
include sub-engineers, social organizers, field assistants, drivers, GIS and mapping staff, etc.
1.6. Duration of the Study
The duration of the study is 4 months for each of the canal command. Thus, the total duration of the
study is 12 months but output for each of the canal command has to be provided after a period of 4
months.
79
1.7. Estimated Cost
The estimated cost of the Feasibility Study and Master Plan is Rs. 50 million.
80
Annexure II. Outline for the RFP for Consultants for the conduct of the “Formulation
of Detailed Designs and Estimation of Bill of Quantities of Materials for
the Command Area Interventions”
2.1. The Context
Background
The proposed project would serve as a support project to the Gomal Zam Dam Project and funded out
of the USAID committed funds. With completion of Gomal Zam Dam Project, 77,000 ha (191000
acres) of land will be irrigated in the command area (Districts of D. I. Khan and Tank), where
command area will be developed for improving livelihoods and creation of new employments
through value added farming of high value crops using high-efficiency irrigation systems and
livestock production and products. This is the first project in the KPK where along with the
construction of dam, main canal and distributary canals, command area will also be developed fully
using a comprehensive, integrated and participatory approach. The purpose is to develop whole of the
command area rather than using traditional approaches of agriculture and livestock extension, which
are largely based on the concept of demonstration and training. The project is primarily aimed to
develop farming as an enterprise.
GZD-CADP Project will provide assistance and funding to the people of Gomal Zam dam command
area in building and operating a modern irrigation system with major considerations for water
productivity (same as the term of ‘water use efficiency’), while providing both food self-sufficiency
and income from high value crops. The development will create jobs, new industries, and increased
opportunity for the people in this fragile ecosystem. These opportunities will provide new and better
livelihoods for all especially women.
Overall Expected Results and Overall Purpose of the Project
The overall expected result is an established on-farm irrigation system that ensures efficient use of
water, achieves enhanced productivity by farmers, improves processing capacity and increases ability
to provide high quality products for markets. These efforts will ultimately lead to increases in income
and employment of the people living in the command area.
The overall purpose is that water available for 77000 ha (191,000 acres) of command area of the
Gomal Zam dam is used efficiently through integrated development of command area, farm water
management, productivity enhancement, value addition, processing and effective marketing.
Program Outline
The following four Components are suggested for the GZD-CADP.
Phase-I: The following two components can be started right from the beginning and that’s why are
included in Phase-I.
Component #1: Command area development and on-farm water management (will be started in the 1st
year of the implementation of the project)
Component #2: Enhancing productivity of crops, horticulture and livestock (will be started in the 2nd
year of the implementation of the project)
Phase-II: The value addition, processing and marketing components can be undertaken once the
command area is developed fully, i.e. in the 3rd
years since the implementation of the project, that’s
why these components are included in Phase-II:
81
Component #3: Value Added Agriculture and Livestock
Component #4: Marketing of marketable products
Overall Objectives of the Project
The overall objective of the proposed project is in-line with the sectoral objectives as indicated in the
Comprehensive Development Strategy (CDS) of the GoKPK. The project objectives in reality are
drawn from the CDS of the GoKPK and cover water for agriculture, development of command area,
on-farm water management, enhancement of productivity of crops, horticulture and livestock, value
added agriculture and livestock, and marketing. The funding is expected from USAID who also
provided funding for the completion of the Gomal Zam dam, which is covered in the CDS and the
current project is based on the concept of efficient and sustainable utilization of stored water in the
Gomal Zam dam.
Feasibility and Formulation of Master Plan for the three Canal commands
The study entitled “Feasibility and Formulation of Master Plan for the development of command
area of the three canal commands of the Gomal Zam Dam is aimed to develop 77000 ha (191,000
acres) of land for canal irrigated agriculture with irrigation facility for the use of perennial water,
Katcha rural link roads, land forming and other related works. Feasibility Consultants will be hired
through quality and cost based bidding. The outline for developing complete RFP (Request for
Proposals) is presented in the following sections. This includes outline of objectives, activities, scope
of the work and manpower requirement. Also identified the support staff requirement and estimated
total cost.
2.2. Objective of the Study
The study objective is to conduct surveys and detailed design of physical interventions related to the
command area development and on-farm water management interventions along with the estimation
of bill of quantities of materials to award contracts for the construction of these interventions in a
prioritized and sequenced manner. The ultimate purpose is to develop designs and detailed bills of
quantities for the 393 Mogha commands and all the physical interventions including other works so
that whole of the command area is developed in a sustainable manner.
The other purpose is to develop detailed designs and bill of quantities at the farm level including
mapping and layout of land forming, field channels and precision land leveling to accomplish the
objective of high efficiency irrigation for high value agriculture.
2.3. Proposed Activities
The list of proposed activities for the conduct of study related to Detailed Design, Mapping and
Layout of interventions for the development of command area for high value agriculture using high
efficiency irrigation systems is as under:
Command Area Development and On-Farm Water Management
Organization of Water Users’ Associations (WUAs) using Process of Social Organization for
the Mogha command area and Registration under the KPK WUAs Act with the Department of
Agriculture. Federating WUAs’ into FWUAs and registration of FWUAs as FOs under the NIDA
Act of KPK with the Department of Irrigation and Power
Construction of Command Area Development and On-Farm Water Management
Interventions:
Katcha Link roads to connect farm to metaled road
82
Land reclamation, forming and rough leveling of ravines and gullied lands
Field layout
Construction of earthen watercourses with Pacca Naccas, culverts, buffaloes wallows, tail-water
ponds at the tail-end of the watercourse and sand-filters for multiple uses of water
Precision land leveling of fields for efficient irrigation using Laser levelers
Test run of watercourse and field irrigation by farmers to ensure effective operation of the
Mogha command and associated adjustments for a full week to complete the Warabandi schedule
of 7 days rotation. After making adjustments in the earthen watercourses to meet farmers
requirement up to the level of their satisfaction and once they sign the completion document of
the earthen watercourse and Pacca control structures the process of lining of up to 20% of the
length of watercourse will be initiated.
Fixing Watercourse level Warabandi and assisting WUAs and FO to enforce Warabandi for
equitable distribution of water in collaboration with the KPK Department of Irrigation and Power
Provide trainings to men for O&M of watercourses and women for the multiple uses of water
including stock water
Productivity Enhancement of Field Crops and Horticulture
Productivity enhancement demonstrations for high efficiency irrigation systems (furrow
irrigation on laser leveled fields, sprinkler, drip, etc.) for crops, fruit plants, melons and
vegetables considering farm as a whole – whole farm will be treated as a unit for developing
these demonstrations.
Marketing
Marketing Channels for Crops, Vegetables and Fruits – access to market and market information,
linkages, local marketing platforms, etc.
Marketing Channels for Livestock – access to market information, linkages, local marketing
platforms, etc.
Other Activities
Construction of FOs Support Centre for the three canal commands
Construction of Field Offices and Facility
2.4. Scope of Work
The scope of the study is to conduct required field surveys and mapping for the detailed engineering
designs of the physical interventions related to command area and water management along with
estimation of the bills of quantities of materials for the construction of various interventions. The
Consultants are supposed to initiate their work in the 5th
month of the start of the project, when the
feasibility and master Plan for one of the canal command is available. The Consultants will work
within the framework of the feasibility study and the master plan of each of the canal commands. The
Consultants have to provide outputs starting from 5th month in a sequenced manner so that contracts
can be awarded in a phase-wise manner and Consultants will continue their work for a period of over
32 months. Thus the activity will be intermittent but in a continued manner. The cost effectivity both
83
in terms of investments and in O&M is the criteria to evaluate the intervention designs. An iterative
approach is recommended for the design of interventions. Traditional concepts of designing in a rigid
and fixed way is not the purpose therefore the Consultants have to be innovative and work in a
participatory manner with the farmers’ organizations, water users’ associations, private sector and the
experts of the line departments deputed in the project area. Based on the survey, design, mapping,
layout and bill of quantities of materials, the Consultant is required to submit report separately for
each of the Mogha command with detailed maps and design sheets.
The study is innovative and therefore innovative experts are required by the Consultants to constitute
the survey and design teams. All the physical activities related to the project requiring survey and
designs are included in this study.
Ultimately, the command area comprising of 77000 ha (191,000 acres) is developed for irrigation.
Katcha link roads, marketing platforms for each of the canal commands, FOs Services Centres and
Field offices are also part of the contract.
2.5. Manpower Requirement
The following manpower would be required and number and duration of each of the member of the
Team has to be assessed by the bidding firm in the proposal (technical and financial). The technical
manpower required for the study is listed as under:
Team Leader with experience in national and international projects dealing with the survey,
design and bill of quantities of materials for the interventions related to the Mogha command
for command area development and on-farm water management interventions for high value
agriculture using high efficiency irrigation systems.
Irrigation Engineer
Rural Roads Engineer
Design Engineer
Agricultural Economist
GIS and Mapping Expert
The staff requirement would depend on the depth of the study and planned field work. These will
include sub-engineers, drivers, GIS and mapping staff, etc.
2.6. Duration of the Study
The duration of the study is of 32 months for whole of the command area comprising the three canal
commands. However, the Consultants will submit the Design, mapping, layout and Bill of Quantity
of materials for each of the Mogha command in a sequenced manner so that contracts for construction
can be awarded during the duration of the study and in line with the annual plans. The construction of
all the interventions related to the command area development and on-farm water management are
planned to be completed in a period of 3 years, the initial three years.
2.7. Estimated Cost
The estimated average cost of each of the Mogha command survey, design, mapping, layout and bill
of quantities of materials is Rs. 0.125 million. For the 393 Mogha commands of the project, this
comes to Rs. 49.125 million.
84
Annexure III. Outline for the RFP for the Supervisory Consultants for the GZD-CAD
Project
3.1. The Context
Background
The proposed project would serve as a support project to the Gomal Zam Dam Project and funded out
of the USAID committed funds. With completion of Gomal Zam Dam Project, 77,000 ha (191000
acres) of land will be irrigated in the command area (Districts of D. I. Khan and Tank), where
command area will be developed for improving livelihoods and creation of new employments
through value added farming of high value crops using high-efficiency irrigation systems and
livestock production and products. This is the first project in the KPK where along with the
construction of dam, main canal and distributary canals, command area will also be developed fully
using a comprehensive, integrated and participatory approach. The purpose is to develop whole of the
command area rather than using traditional approaches of agriculture and livestock extension, which
are largely based on the concept of demonstration and training. The project is primarily aimed to
develop farming as an enterprise.
GZD-CAD Project will provide assistance and funding to the people of Gomal Zam dam command
area in building and operating a modern irrigation system with major considerations for water
productivity (same as the term of ‘water use efficiency’), while providing both food self-sufficiency
and income from high value crops. The development will create jobs, new industries, and increased
opportunity for the people in this fragile ecosystem. These opportunities will provide new and better
livelihoods for all especially women.
Overall Expected Results and Overall Purpose of the Project
The overall expected result is an established on-farm irrigation system that ensures efficient use of
water, achieves enhanced productivity by farmers, improves processing capacity and increases ability
to provide high quality products for markets. These efforts will ultimately lead to increases in income
and employment of the people living in the command area.
The overall purpose is that water available for 77000 ha (191,000 acres) of command area of the
Gomal Zam dam is used efficiently through integrated development of command area, farm water
management, productivity enhancement, value addition, processing and effective marketing.
Program Outline
The following four Components are suggested for the GZD-CADP.
Phase-I: The following two components can be started right from the beginning and that’s why are
included in Phase-I.
Component #1: Command area development and on-farm water management (will be started in the 1st
year of the implementation of the project)
Component #2: Enhancing productivity of crops, horticulture and livestock (will be started in the 2nd
year of the implementation of the project)
Phase-II: The value addition, processing and marketing components can be undertaken once the
command area is developed fully, i.e. in the 3rd
years since the implementation of the project, that’s
why these components are included in Phase-II:
Component #3: Value Added Agriculture and Livestock
85
Component #4: Marketing of marketable products
Overall Objectives of the Project
The overall objective of the proposed project is in-line with the sectoral objectives as indicated in the
Comprehensive Development Strategy (CDS) of the GoKPK. The project objectives in reality are
drawn from the CDS of the GoKPK and cover water for agriculture, development of command area,
enhancement of productivity of crops, horticulture and livestock, value addition, processing and
marketing. The funding is expected from USAID who also provided funding for the completion of the
Gomal Zam dam, which is covered in the CDS and the current project is based on the concept of
efficient and sustainable utilization of stored water in the Gomal Zam dam.
Feasibility and Formulation of Master Plan for the three Canal commands
The study entitled “Feasibility and Formulation of Master Plan for the development of command
area of the three canal commands of the Gomal Zam Dam is aimed to develop 77000 ha (191,000
acres) of land for canal irrigated agriculture with irrigation facility for the use of perennial water,
Katcha rural link roads, land forming and other related works. Feasibility Consultants will be hired
through quality and cost based bidding. The outline for developing complete RFP (Request for
Proposals) is presented in the following sections. This includes outline of objectives, activities, scope
of the work and manpower requirement. Also identified the support staff requirement and estimated
total cost.
3.2. Objective of the Supervisory Consulting
The objective of engaging the Supervisory Consultants is to monitor the progress of implementation
of the project in line with the detailed design, mapping, layout and bill of quantities of materials as
outlined by the design consultants within the framework of the Feasibility and Master Plan prepared
in the project by the consultants. They will ensure timely implementation of project interventions and
supervise the quality of each and every phase of the implementation of each category of works. The
firms selected through cost and quality based criteria have to get clearance of the supervisory
consultants and make changes or adjustments to incorporate all the comments of the supervisory
consultants. The payments to the firms will be made after the verification of bill of quantities of
materials by the Supervisory Consultants.
3.3. Proposed Activities
The list of proposed activities for the Supervisory Consultants for the implementation of interventions
for the GZD-CAD Project is as under:
Command Area Development and On-Farm Water Management
Organization of Water Users’ Associations (WUAs) using Process of Social Organization for
the Mogha command area and Registration under the KPK WUAs Act with the Department of
Agriculture. Federating WUAs’ into FWUAs and registration of FWUAs as FOs under the NIDA
Act of KPK with the Department of Irrigation and Power.
Construction of Command Area Development and On-Farm Water Management
Interventions:
o Katcha Link roads to connect farm to metaled road
o Land reclamation, forming and rough leveling of ravines and gullied lands
o Field layout
o Construction of earthen watercourses with Pacca Naccas, culverts, buffaloes wallows, tail-
water ponds at the tail-end of the watercourse and sand-filters for multiple uses of water
86
Precision land leveling of fields for efficient irrigation using Laser levelers
Test run of watercourse and field irrigation by farmers to ensure effective operation of the
Mogha command and associated adjustments for a full week to complete the Warabandi schedule
of 7 days rotation. After making adjustments in the earthen watercourses to meet farmers
requirement upto the level of their satisfaction and once they sign the completion document of the
earthen watercourse and Pacca control structures the process of lining of up to 20% of the length
of watercourse will be initiated.
Fixing Watercourse level Warabandi and assisting WUAs and FO to enforce Warabandi for
equitable distribution of water in collaboration with the KPK Department of Irrigation and Power
Provide trainings to men for O&M of watercourses and women for the multiple use of water
including stock water
Productivity Enhancement of Field Crops and Horticulture
Orientation and training of WUAs in field and horticultural crops and Organization of
Interest Groups for specified commodities in collaboration with Agri Business Programme of
the USAID
o Planning of cropping pattern and cropping intensity
o Production and productivity of field crops
o Production and productivity of horticultural crops
o Water use, irrigation scheduling and water productivity at the field level
o Farm profitability and management
Productivity enhancement demonstrations for high efficiency irrigation systems (furrow
irrigation on laser leveled fields, sprinkler, drip, etc.) for crops, fruit plants, melons and
vegetables considering farm as a whole – whole farm will be treated as a unit for developing
these demonstrations.
Productivity Enhancement of Livestock
Orientation and training of WUAs in management of livestock
o Improvement of breeds for cattle and small ruminants
o Improving nutrition for cattle and small ruminants
o Cost-effective livestock housing and management
o Tail-water ponds for multiple use of water – quality and quantity
o Improved veterinary care
Productivity enhancement interventions for livestock (estimated lump sum cost of a package)
o Improvement of Breeds for cattle and small ruminants (estimated costs is based on AI services
and provision of progeny bulls, bucks and rams)
o Demonstration of fodders, silage and feeds
o Demonstration of livestock housing including stock water
o Veterinary care camps
Value Added Agriculture and Livestock
Value Addition for Crops, Vegetables and Fruits – interventions with Interest Groups for
specified commodities and local enterprises; linkages with processing industry
Value addition of Livestock Products – interventions with Interest Groups for specified
commodities and local enterprises; linkages with processing industry
87
Marketing
Marketing Channels for Crops, Vegetables and Fruits – access to market and market information,
linkages, local marketing platforms, etc.
Marketing Channels for Livestock – access to market information, linkages, local marketing
platforms, etc.
3.4. Scope of Work
The scope of work of the Supervisory Consultants is basically a support role to the PIU as a Third
Party to supervise quantity and quality of all the categories of works of the project and monitoring of
the implementation of works on behalf of the project. They will supervise each and every category of
work and will be involved in all the phases of implementation of these works rights from the
beginning to the completion of the project. Although, their major work will start after a period of 6
months of the start of the project but their bidding process will start early so that they are in place
right from the beginning of the implementation of the physical, social and technical interventions.
The Supervisory Consultants will monitor and supervise the quantity and quality of works for each of
the Mogha command and submit the short reports. Their reports and data in MSWord and MS Excel
files will be valuable information for the monitoring and evaluation of the project activities.
The private sector will work in close supervision of the Supervisory Consultants and their payments
for each category of works have to be verified by the Supervisory Consultants. In case of any
objections raised by the Supervisory Consultants, the private sector companies are supposed to have
full compliance. The bill of quantities and quality for each category of works has to be verified by the
Supervisory Consultants.
Along with the monthly, quarterly and annual reports the Supervisory Consultants will give
presentations to the PIU and the Chief Coordinator whenever required. The QPRs of the Supervisory
Consultants will provide significant information for the Project QPRs, which will be acceptable to the
GoKPK, GoP and USAID.
The work of Supervisory Consultants is comprehensive and covers all the technical, technological,
social, managerial, and organizational aspects. Therefore a Team of Consultants would be required to
accomplish the task.
3.5. Manpower Requirement
The following manpower would be required and the number and duration of each of the member of
the Team has to be assessed by the bidding firm in the proposal (technical and financial). The
technical manpower required for the study is listed as under:
Team Leader with experience in national and international projects dealing with supervision
of quantity and quality of works related to command area development and on-farm water
management for high value agriculture using high efficiency irrigation systems
Agricultural Engineer (Water)
Agricultural Engineer (Roads, Land and Earthworks)
Irrigated Agriculture Expert
Institutional Expert
The staff requirement would depend on the depth of the Supervisory activities and planned field
works. These will include sub-engineers, field assistants, drivers, database and reporting staff, etc.
88
3.6. Duration of the Supervisory Works
The duration of the supervisory works is 54 months and will start after 6 months of the start of the
project.
3.7. Estimated Cost
The estimated cost of the Supervisory Consultants is Rs. 81 million.
89
Annexure IV. Year-wise and Total Package Salary Costs for the Technical Manpower of GZD-CAD Project
No. Post Grade Number Cost (Rs.) Total
1st 2nd 3rd 4th 5th (Rs.)
Manpower for Office of Chief Coordinator/PMU
1 Chief Coordinator (Part Time) 20/21 1 900000 900000 900000 900000 900000 4500000
2 Project Director, PMU 20 1 1200000 1260000 1323000 1389150 1416000 6588150
3 Senior Programme Officer 18 1 600000 630000 661500 694575 729304 3315379
4 Monitoring and Evaluation Officer 18 1 600000 630000 661500 694575 729304 3315379
Sub-Total 3300000 3420000 3546000 3678300 3774608 17718908
Manpower for Office of Project Director PIU
1 Project Director, PIU 20 1 1200000 1260000 1323000 1389150 1416000 6588150
2 Component Leader #1 – Command Area
Development and On-Farm Water Management 19 1 900000 945000 992250 1041862.5 1080000 4959113
3 Component Leader #2 – Productivity
Enhancement 19 1 0 900000 945000 992250 1041863 3879113
4 Component Leader #3 – Value Added
Agriculture and Livestock 19 1 0 0 900000 945000 992250 2837250
5 Component Leader #4 – Marketing 19 1 0 0 900000 945000 992250 2837250
6 Monitoring and Evaluation Officer 18 1 600000 630000 661500 694575 729304 3315379
7 Planning and Reporting Officer 18 1 600000 630000 661500 694575 729304 3315379
8 Gender Mainstreaming Officer 18 1 600000 630000 661500 694575 729304 3315379
9 Training Organizer (Men) 18 1 600000 630000 661500 694575 729304 3315379
10 Training Organizer (Women) 18 1 600000 630000 661500 694575 729304 3315379
Sub-Total 5100000 6255000 8367750 8786138 9168881 37677769
Manpower for Component on Command Area Development and On-Farm Water Management
1 Agricultural Engineer – Land Reclamation,
Forming and Field layout 18 1 540000 567000 595350 625117.5 656373 2983841
2 Agricultural Engineer – Katcha Rural Link
Roads/Tracks 18 1 600000 630000 661500 694575 729304 3315379
3 Agricultural Engineer – Watercourse
Development 18 1 600000 630000 661500 694575 729304 3315379
4 Agricultural Engineer – Laser Land Leveling 18 1 600000 630000 661500 694575 729304 3315379
5 Agricultural Engineer – Irrigation 18 1 600000 630000 661500 694575 729304 3315379
Sub-Total 2940000 3087000 3241350 3403418 3573588 16245356
90
Manpower for Component on Productivity Enhancement
1 Agriculture Specialist – Crops 18 1 0 600000 630000 661500 694575 2586075
2 Agriculture Specialist – Horticulture 18 1 0 600000 630000 661500 694575 2586075
3 Livestock Production Specialist 18 1 0 600000 630000 661500 694575 2586075
4 Animal Health Specialist 18 1 0 600000 630000 661500 694575 2586075
Sub-Total 2400000 2520000 2646000 2778300 10344300
Manpower for Component on Value Added Agriculture and Livestock
1 Processing Specialist – Horticulture 18 1 0 0 600000 630000 661500 1891500
2 Processing Specialist – Milk and Meat 18 1 0 0 600000 630000 661500 1891500
3 Processing Engineer for Innovations 18 1 0 0 600000 630000 661500 1891500
Sub-Total 0 0 1800000 1890000 1984500 5674500
Manpower for Component on Marketing
1 Marketing Specialist 18 1 0 0 600000 630000 661500 1891500
Sub-Total 0 0 600000 630000 661500 1891500
Manpower for Field Office (Three Sub-commands)
1 Command Area Field Team Leader 19 1 900000 945000 992250 1041863 1080000 4959113
2 Field Officer – Command Area Development 17 1 540000 567000 595350 600000 600000 2902350
3 Field officer – On-Farm Water Management 17 1 540000 567000 595350 600000 600000 2902350
4 Field Officer – Rural Roads 17 1 540000 567000 595350 600000 600000 2902350
5 Field Officer – Productivity Enhancement -
Crops 17 1 0 540000 567000 595350 600000 2302350
6 Field Officer – Productivity Enhancement -
Horticulture 17 1 0 540000 567000 595350 600000 2302350
7 Field Officer – Livestock 17 1 0 540000 567000 595350 600000 2302350
8 Field Officer – Value Added Agriculture and
Livestock 17 1 0 0 540000 567000 595350 1702350
9 Field Officer - Marketing 17 1 0 0 540000 567000 595350 1702350
10 Field Officer - Gender 17 1 0 540000 540000 567000 595350 2242350
Sub-Total 2520000 4806000 6099300 6328913 6466050 26220263
Total Cost for Manpower in BS 17 to 20 (Rs. in
million) 36+1 13.860 19.968 26.174 27.363 28.407 115.773
91
Annexure V. Year-wise and Total Package Salary Costs for the Support Staff of GZD-CAD Project
No. Post Grade Number Cost (Rs.) Total
1st 2nd 3rd 4th 5th (Rs.)
Manpower for Office of Chief Coordinator/PMU
1 Administrative Officer 17 1 540000 567000 595350 600000 600000 2902350
2 Finance and Accounts Officer 17 1 540000 567000 595350 600000 600000 2902350
3 Internal Audit Officer 17 1 540000 567000 595350 600000 600000 2902350
4 Office Secretary 16 1 360000 378000 396900 416745 420000 1971645
5 Drivers 5 3 360000 378000 396900 416745 437582 1989227
6 Naib Qasids 1 2 168000 176400 185220 194481 204205 928306
Sub-Total 2508000 2633400 2765070 2827971 2861787 13596228
Manpower for Office of Project Director PIU
1 Administrative Officer 17 1 540000 567000 595350 600000 600000 2902350
2 Finance and Accounts Officer 17 1 540000 567000 595350 600000 600000 2902350
3 Internal Audit Officer 17 1 540000 567000 595350 600000 600000 2902350
4 Office Secretary 16 1 360000 378000 396900 416745 420000 1971645
5 Receptionist 11 1 180000 189000 198450 208373 218791 994614
6 Driver for the PD 5 1 120000 126000 132300 138915 145861 663076
7 Drivers for Component Leaders 5 4 480000 504000 529200 555660 583443 2652303
8 Drivers for Monitoring, Planning,
Training and Gender Officers 5 5 600000 630000 661500 694575 729304 3315379
9 Naib Qasids for PIU 1 3 252000 264600 277830 291721.5 306308 1392459
10 Security Guards 1 4 336000 352800 370440 388962 408410 1856612
11 Sweeper 1 1 84000 88200 92610 97241 102103 464153
Sub-Total 2412000 2532600 2659230 2792192 2914219 13310240
Manpower for Component on Command Area Development and On-Farm Water Management
1 Office Assistant 11 1 180000 189000 198450 208373 218791 994614
2 Account Assistant 11 1 180000 189000 198450 208373 218791 994614
3 Drivers for Technical Staff 5 5 600000 630000 661500 694575 729303.75 3315379
4 Naib Qasids 1 2 168000 176400 185220 194481 204205 928306
Sub-Total 1128000 1184400 1243620 1305801 1371091 6232912
Manpower for Component on Productivity Enhancement
1 Office Assistant 11 1 180000 189000 198450 208372.5 218791 994614
92
2 Account Assistant 11 1 180000 189000 198450 208372.5 218791 994614
3 Drivers for Technical Staff 5 4 480000 504000 529200 555660 583443 2652303
4 Naib Qasids 1 2 168000 176400 185220 194481 204205 928306
Sub-Total 1008000 1058400 1111320 1166886 1225230 5569836
Manpower for Component on Value Added Agriculture and Livestock
1 Office Assistant 11 1 180000 189000 198450 208373 218791 994614
2 Account Assistant 11 1 180000 189000 198450 208373 218791 994614
3 Drivers for Technical Staff 5 3 360000 378000 396900 416745 437582.25 1989227
4 Naib Qasids 1 2 168000 176400 185220 194481 204205 928306
Sub-Total 888000 932400 979020 1027971 1079370 4906761
Manpower for Component on Marketing
1 Office Assistant 11 1 180000 189000 198450 208373 218791 994614
2 Account Assistant 11 1 180000 189000 198450 208373 218791 994614
3 Drivers for Technical Staff 5 1 120000 126000 132300 138915 145861 663076
4 Naib Qasids 1 1 84000 88200 92610 97241 102103 464153
Sub-Total 564000 592200 621810 652900.5 685545.5 3116456
Manpower for Field Office (Three Sub-commands)
1 Office Assistant 11 1 180000 189000 198450 208373 218791 994614
2 Account Assistant 11 1 180000 189000 198450 208373 218791 994614
3 Drivers for Technical Staff 5 6 720000 756000 793800 833490 875165 3978455
4 Naib Qasids 1 3 252000 264600 277830 291722 306308 1392459
5 Security Guards 1 3 252000 264600 277830 291722 306308 1392459
6 Sweeper 1 1 84000 88200 92610 97241 102103 464153
Sub-Total 1668000 1751400 1838970 1930919 2027464 9216753
Total Staff Cost in BS 1 to 17 (million Rs.) 89 10.176 10.685 11.219 11.705 12.165 55.949
93
Annexure VI. Year-wise and Total TA/DA Cost for the Technical Manpower for GZD-CADP
No. Post Grade Number Cost (Rs.) Total
1st 2nd 3rd 4th 5th (Rs.)
Manpower for Office of Chief Coordinator
1 Chief Coordinator (Part Time) 20/21 1 288000 288000 288000 288000 288000 1440000
2 Project Director, PMU 20 1 288000 288000 288000 288000 288000 1440000
3 Senior Programme Officer 18 1 180000 180000 180000 180000 180000 900000
4 Monitoring and Evaluation Officer 18 1 180000 180000 180000 180000 180000 900000
Sub-Total 936000 936000 936000 936000 936000 4680000
Manpower for Office of Project Director PMU
1 Project Director, PIU 20 1 384000 384000 384000 384000 384000 1920000
2
Component Leader #1 –
Command Area Development
and On-Farm Water
Management
19 1
270000 270000 270000 270000 270000 1350000
3 Component Leader #2 –
Productivity Enhancement 19 1
0 270000 270000 270000 270000 1080000
4 Component Leader #3 – Value
Added Agriculture and
Livestock
19 1
0 0 270000 270000 270000 810000
5 Component Leader #4 –
Marketing 19 1
0 0 270000 270000 270000 810000
6 Monitoring and Evaluation
Officer 18 1
180000 180000 180000 180000 180000 900000
7 Planning and Reporting Officer 18 1 180000 180000 180000 180000 180000 900000
8 Gender Mainstreaming Officer 18 1 180000 180000 180000 180000 180000 900000
9 Training Organizer (Men) 18 1 180000 180000 180000 180000 180000 900000
10 Training Organizer (Women) 18 1 0 180000 180000 180000 180000 720000
Sub-Total 1374000 1824000 2364000 2364000 2364000 10290000
Manpower for Component on Command Area Development and On-Farm Water Management
1 Agricultural Engineer – Land
Reclamation, Forming and Field
layout
18 1
120000 120000 120000 120000 120000 600000
2 Agricultural Engineer – Katcha 18 1 120000 120000 120000 120000 120000 600000
94
Rural Link Roads/Tracks
3 Agricultural Engineer –
Watercourse Development 18 1
120000 120000 120000 120000 120000 600000
4 Agricultural Engineer – Laser
Land Leveling 18 1
120000 120000 120000 120000 120000 600000
5 Agricultural Engineer –
Irrigation 18 1
120000 120000 120000 120000 120000 600000
Sub-Total 600000 600000 600000 600000 600000 3000000
Manpower for Component on Productivity Enhancement
1 Agriculture Specialist – Crops 18 1 0 120000 120000 120000 120000 480000
2 Agriculture Specialist –
Horticulture 18 1
0 120000 120000 120000 120000 480000
3 Livestock Production Specialist 18 1 0 120000 120000 120000 120000 480000
4 Animal Health Specialist 18 1 0 120000 120000 120000 120000 480000
Sub-Total 0 480000 504000 529200 555660 2068860
Manpower for Component on Value Added Agriculture and Livestock
1 Processing Specialist –
Horticulture 18 1
0 0 120000 120000 120000 360000
2 Processing Specialist – Milk and
Meat 18 1
0 0 120000 120000 120000 360000
3 Processing Engineer for
Innovations 18 1
0 0 120000 120000 120000 360000
Sub-Total 0 0 360000 360000 360000 1080000
Manpower for Component on Marketing
1 Marketing Specialist 18 1 0 0 120000 120000 120000 360000
Sub-Total 0 0 120000 120000 120000 360000
Manpower for Field Office (Three Sub-commands)
1 Command Area Field Team
Leader 19 1
90000 90000 90000 90000 90000 450000
2 Field Officer – Command Area
Development 17 1
60000 60000 60000 60000 60000 300000
3 Field officer – On-Farm Water
Management 17 1
60000 60000 60000 60000 60000 300000
4 Field Officer – Rural Roads 17 1 60000 60000 60000 60000 60000 300000
5 Field Officer – Productivity 17 1 0 60000 60000 60000 60000 240000
95
Enhancement - Crops
6 Field Officer – Productivity
Enhancement - Horticulture 17 1
0 60000 60000 60000 60000 240000
7 Field Officer – Livestock 17 1 0 60000 60000 60000 60000 240000
8 Field Officer – Value Added
Agriculture and Livestock 17 1
0 0 60000 60000 60000 180000
9 Field Officer - Marketing 17 1 0 0 60000 60000 60000 180000
10 Field Officer - Gender 17 1 0 60000 60000 60000 60000 240000
Sub-Total 270000 510000 630000 630000 630000 2670000
Total Cost for Manpower in BS 17 to
20 (Rs. in million) 42 3.180 4.350 5.514 5.539 5.566 24.149
96
Annexure VII. Year-wise and Total TA/DA Costs for the Support Staff of GZD-CAD Project
No. Post Grade Number Cost (Rs.) Total
1st 2nd 3rd 4th 5th (Rs.)
Manpower of Chief Coordinator/Project Director PMU
1 Administrative Officer 17 1 72000 72000 72000 72000 72000 360000
2 Finance and Accounts Officer 17 1 72000 72000 72000 72000 72000 360000
3 Internal Audit Officer 17 1 72000 72000 72000 72000 72000 360000
4 Drivers 5 3 90000 60000 60000 60000 60000 330000
Sub-Total 90000 60000 60000 60000 60000 330000
Manpower for Office of Project Director PIU
1 Administrative Officer 17 1 72000 72000 72000 72000 72000 360000
2 Finance and Accounts Officer 17 1 72000 72000 72000 72000 72000 360000
3 Internal Audit Officer 17 1 72000 72000 72000 72000 72000 360000
4 Driver for the PD 5 1 30000 30000 30000 30000 30000 150000
5 Drivers for Component Leaders 5 4 120000 120000 120000 120000 120000 600000
6 Drivers for Monitoring, Planning and Gender
Officers 5 5 150000 157500 165375 173643.8 182326 828845
Sub-Total 516000 523500 531375 539644 548326 2658845
Manpower for Component on Command Area Development and On-Farm Water Management
1 Drivers for Technical Staff 5 5 150000 150000 150000 150000 150000 750000
Sub-Total 150000 150000 150000 150000 150000 750000
Manpower for Component on Productivity Enhancement
1 Drivers for Technical Staff 5 4 120000 120000 120000 120000 120000 600000
Sub-Total 120000 120000 120000 120000 120000 600000
Manpower for Component on Value Added Agriculture and Livestock
1 Drivers for Technical Staff 5 3 90000 90000 90000 90000 90000 450000
Sub-Total 90000 90000 90000 90000 90000 450000
Manpower for Component on Marketing
1 Drivers for Technical Staff 5 1 30000 30000 30000 30000 30000 150000
Sub-Total 30000 30000 30000 30000 30000 150000
Manpower for Field Office (Three Sub-commands)
1 Drivers for Technical Staff 5 3 90000 90000 90000 90000 90000 450000
Sub-Total 90000 90000 90000 90000 90000 450000
Total Staff Cost in BS 1 to 17 (million Rs.) 35 1.086 1.064 1.071 1.080 1.088 5.389
97
Annexure VIII. Year-wise and Total Transport Costs of the GZD-CAD Project
No. Post Number of Vehicles Total Unit Cost Total
1st 2nd 3rd 4th 5th Number (Rs.)
Office of Chief Coordinator/PMU
1 Land Cruiser 1 0 0 0 0 1 12500000 12500000
2 Car 1300 CC 2 0 0 0 0 2 2000000 4000000
Sub-Total 16500000
Office of Project Director PIU
1 Land Cruiser 1 0 0 0 0 1 12500000 12500000
2 Jeep 4-Wheel Drive 5 0 0 0 0 5 2500000 12500000
3 Station Wagon Hiace 2 0 0 0 0 2 4500000 9000000
4 Single Cab Pick-ups 2 0 0 0 0 2 2100000 4200000
Sub-Total 38200000
Component on Command Area Development and On-Farm Water
Management
1 Jeep 4-Wheel Drive 5 0 0 0 0 5 2500000 12500000
Sub-Total 12500000
Manpower for Component on Productivity Enhancement
1 Jeep 4-Wheel Drive 0 4 0 0 0 4 2500000 10000000
Sub-Total 10000000
Manpower for Component on Value Added Agriculture and Livestock
1 Jeep 4-Wheel Drive 0 0 3 0 0 3 2500000 7500000
Sub-Total 7500000
Manpower for Component on Marketing
1 Jeep 4-Wheel Drive 0 0 1 0 0 1 2500000 2500000
Sub-Total 2500000
Manpower for Field Office (Three Sub-commands)
1 Jeep 4-Wheel Drive 1 0 0 0 0 1 2000000 2000000
2 Single Cab Pick-ups 2 2 0 0 0 4 2100000 8400000
3 Station Wagon Hiace 1 0 0 0 0 1 4500000 4500000
4 Motorcycle - 125 CC 5 5 0 0 0 10 125000 1250000
Sub-Total 16150000
Total Cost of Vehicles and motorcycles (Rs. in million) 103.350
Number of Vehicles 32
Number of Motorcycles 10
98
Annexure IX. In-kind Contribution of Government of KPK in the GZD-CAD Project
S. No Name of Activity Amount (Rs. Million)
Project Management Unit
1 Meetings by Secretary Agriculture 2 days/month @
Rs.10000/day 0.240
2 CPO and DDP for 5 days/month @Rs. 5000/day 0.600
3 2 Ministerial staff (OA, Computer Operator) for 5 days/month
@ Rs. 1000/day 0.120
4 Office building, equipment/machinery, electricity etc. 0.400
Total amount for 1-year period: 1.360
Total amount for 5-year period: 6.800
Agriculture Research
1 Meetings/visits by the Director, General 4 days/month @ Rs.
8,000/day
0.384
2 Meetings/visits by the Director, ARI, D.I. Khan 5 days/month @
Rs. 6,000/day
0.360
3 Soil Chemists/Research officer for 5 days/month @Rs. 6000/day 0.720
4 Three Research officers for 8 days/month @Rs. 4000/day 1.152
5 Two Lab Assistant for 10 days/month @ Rs 1000/day 0.240
6 Two Lab Attendant for 10 days/month @Rs. 800/day 0.192
7 Lab equipment/machinery etc. 3.00
8 Offices/logistics of Soil testing labs 0.300
Total amount for 1-year period: 6.384
Total amount for 5-year period: 31.740
Agriculture Extension
1 Meetings/visits by the DG/Director 5 days/month @ Rs.
8,000/day 0.960
2 Two DDOs for 8 days/month @Rs. 6000/day 1.16
3 2 SMS(SMS Plant Protection ) for 10 days/month @Rs.
6000/day 1.44
4 10 FAs for 10 days/month @Rs. 1000/day 1.200
5 2 Ministerial staff (OA, Superintendent) for 8 days/month @
Rs. 1000/month 0.192
6 Office building, equipment/machinery 3.00
7 Offices/logistics of 2 MFSCs @24000 0.24
Total amount for 1-year period: 8.200
Total amount for 5-year period: 41.000
Water Management
1 Meetings/visits by the DG/Director 8 days/month @ Rs.
8,000/day 0.768
2 Two District Officers WM for 10 days/month @Rs. 6000/day 1.44
3 2 Assistant Directors WM for 10 days/month @ Rs. 5000/day 1.200
4 2 Sub Engineers for 10 days/month @ Rs. 3000/day 0.720
5 2 KPO for 10 days/month @ Rs. 1000/day 0.240
6 4 Ministerial Staff for 10 days/month @ Rs. 1000/day 0.480
7 Office building, equipment/machinery etc. 4.00
Total amount for 1-year period: 8.85
Total amount for 5-year period: 44.25
Agriculture Engineering
1 Meetings by the Director 3 days/month@ Rs. 8,000/day 0.288
2 Assistant Agri. Engineer 2 Hours daily visit @ Rs.500/day 0.180
3 01 .Unit Supervisor having monthly salary of Rs.25,000 0.300
4 10 Bulldozer Operator having monthly salary of Rs. 20,000 each 0.240
5 10 Bull dozer Greaser having monthly salary of Rs. 15,000 each 0.180
6 02 Mechanic having monthly salary of Rs. 18,000 each 0.432
99
7 02 Mechanic Helper having monthly salary of Rs. 15,000 each 0.360
8 Truck and Tanker Charges for fueling &Shifting @ Average of
Rs. 1000/day each 0.720
9 Office building, equipment/machinery etc. 2.00
Total amount for 1-year period: 4.700
Total amount for 5-year period: 23.500
Livestock & DD (Extension)
1 Meetings/visits by the DG/Director 5 days/month @ Rs.
8,000/day 0.480
2 Two District LS Officers for 8 days/month @Rs. 6000/day 1.160
3 6 Veterinary officers for 10 days/month @Rs. 2000/day 1.44
4 40 VAs for 10 days/month @Rs 1000/day 4.8
5 4 Ministerial staff (OA, ,SK,JC) for 8 days/month @Rs.
1000/day 0.384
7 Office building, equipment/machinery 3.00
8 Offices/logistics of 20 Veterinary Institutions @ Rs. 24000 each 0.48
Total amount for 1-year period: 11.750
Total amount for 5-year period: 58.750
L&DD (Research)
1 Meetings/visits by the DG/Director 3 days/month @ Rs.
8,000/day 0.288
2 Regional Director and Station Director for 8 days/month
@ Rs 3000/day 0.384
3 3 Research officers for 8 days/month @ Rs. 2000/day 0.576
4 2 Agriculture Officers for 5 days/month @ Rs. 2000day 0.240
6 04 Ministerial staff (OA, ,SK,JC) for 8 days/month @ Rs.
1000/day 0.384
7 Office building, equipment/machinery 0.48
8 Offices/logistics of 2 Veterinary Regional Institution @ Rs.
3000/month 0.72
Total amount for 1-year period 3.08
Total amount for 5-year period 15.40
Total for Project Duration 221.440
100
Government of KPK
Department of Finance
A/C No. 1
Office of Chief Coordinator
Line Departments
Office of Chief Coordinator
Secretary Agriculture, Livestock and
Cooperatives
Project Director
PMU
Banks
Private
Sector
Farmers’ Organizations
Water Users’ Associations
Annexure X. Financial flow mechanisms proposed for the project