PlanPlus
Overview and Progress in Uttar Pradesh
Presented by: NIC & State PR Department
Project Highlights
1. Overview
2. Training and Capacity Building
3. Progress (Year-wise Status)
4. Issues & Challenges
5. Solutions
6. Future Plans
Overview
In Uttar Pradesh PlanPlus was implemented with effect from 2007-
2008.
A Government Order was issued on 17th July, 2009 by Planning
Department to implement PlanPlus in UP
PlanPlus was made as a compulsory module, for 3 years, in all the
training imparted by State Planning Institute, Lucknow for District
Level Officers since 2010.
Efforts are being made to implement it in all the districts since 2015-
2016.
Till 2014-2015, PlanPlus was Implemented in all 35 BRGF districts
concerning BRGF Scheme only
Training & Technical Support provided by NIC, UP & SPMU,PR, Lucknow.
GO Issued by Planning Department, UP on 17th July, 2009
Training and Capacity Building
Time-to-time various Extensive Trainings and Capacity Building
Programmes are being organized-
To Strengthen functionaries knowledge about PlanPlus.
To update about new Features added.
To reply the queries and problems of Day-to-Day working.
From each targeted district a District Level Government Officer and
one eligible staff capable of doing data entry were trained.
Year-wise Status- Approved Annual Draft Plans in BRGF Districts
Financial Year
District
Panchayat
Block
Panchayat
Village
Panchayat Muncipality Town Area Corporation
2007-2008 37 384 3613 59 121 1
2008-2009 40 363 3984 70 161 1
2009-2010 36 335 3601 71 137 1
2010-2011 14 194 2398 31 74 1
2011-2012 34 343 3617 66 152 1
2012-2013 36 396 4092 71 168 1
2013-2014 30 341 4983 70 149 1
2014-2015 31 324 2887 60 127 1
Year-wise Status- Approved Annual Draft Plans in BRGF Districts
0
50
100
150
200
250
300
350
400
ZP
BP
Muncipality
Town Area
Year-wise Status- Approved Annual Draft Plans in BRGF Districts
0
1000
2000
3000
4000
5000
6000
Gram Panchayat
Gram Panchayat
Corporation
2007-2008
2008-2009
2009-2010
2010-2011
2011-2012
2012-2013
2013-2014
2014-2015
Process Flow of Developing the Plan
Gram Panchayat
Block Panchayat
GP1
BP1 BPn
Zila Panchayat
GPn
District Planning Committee (DPC)
State
Govt Funds Transfer GoI
Inputs taken from Gram Sabha Meeting
Funds
Tra
nsf
er
Composition of DPC • 4/5th Elected Representatives
• 1/5th Nominated members
• Headed by Cabinet Minister In-charge
• CDO is Member Secretary
Issues & Challenges in Implementing PlanPlus-
An Information Gap on Scheme-wise Funds availability to PRIs.
Lack of due diligence in preparing the plan & insignificant involvement of public at
large
Lack of Planning Knowledge at Grass-root Level (despite of facilitators allotted)
Non-Procedural Planning at various levels.
Lack of Technical Manpower at Gram Panchayat Level.
Non-availability of Proper Infrastructure like Connectivity & Hardware etc. at Gram
Panchayat Level.
At Software level, plans of GP/BP/GP entered @ ZP level
Improper Planning Documentation & Record Keeping at Gram Panchayat level
Handling of Issues and Challenges-
Trainings conducted at State Level.
Few Technical Staff were trained as Master Trainers.
Google Group was made to reply Queries of concerned ZPs.
PlanPlus was made an agenda point (compulsory) in the Monthly Meeting
of AMAs.
All PRIs Plans were Entered and Updated at ZP Level.
Solution of Software Problems through NIC HQs/SPMU well in time.
Focus Areas-
More focused thrust on Planning Knowledge for better results
Timely information of scheme-wise funds availability.
Availability of Technical manpower at GP Level.
Availability of proper Infrastructure related to Connectivity and
Hardware.
Proper & Timely Record Keeping at Gram Panchayat & Block Panchayat
Levels.
Frequent Trainings to enhance the working knowledge.
All software level entries to be made by respective level of PRIs
Future Plans-
To Implement PlanPlus/ActionSoft in all Districts of Uttar in co-ordination
with State Panchayat Department, UP.
In GPDP proposed guidelines, a resource group @ cluster of GPs & Block
level proposed---who would help in GPDP & plan plus co-ordination
The resource group would act as Master Trainer & would train the ERs/PFs
on planning needs