59
Collins Earthworks Ltd Unit 2B Park Lane Kirkby-In-Ashfield Nottingham NG17 9LE Project PEPE, Warrington Project PEPE, Warrington Project PEPE, Warrington Project PEPE, Warrington Plate Loading Test to determine equivalent CBR Value Plate Loading Test to determine equivalent CBR Value Plate Loading Test to determine equivalent CBR Value Plate Loading Test to determine equivalent CBR Value REPORT NO: REPORT NO: REPORT NO: REPORT NO: ETS/121898 ETS/121898 ETS/121898 ETS/121898 C3030/42 In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 26/01/2015 Material Description: Brown Clay, Occ Stone Host + 2% Cement Date Tested: Supplier/Source: Test Location: Load Bearing Pressure Seating Load Test Load kN/m 2 mm mm 8.2 8.2 8.2 8.2 0.08 0.04 0.04 0.04 0.04 27.1 27.1 27.1 27.1 0.66 0.13 0.13 0.13 0.13 44.6 44.6 44.6 44.6 0.94 0.25 0.25 0.25 0.25 63.1 63.1 63.1 63.1 1.19 0.32 0.32 0.32 0.32 79.5 79.5 79.5 79.5 1.51 0.40 0.40 0.40 0.40 98.6 98.6 98.6 98.6 0.56 0.56 0.56 0.56 114.7 114.7 114.7 114.7 0.77 0.77 0.77 0.77 130.4 130.4 130.4 130.4 0.98 0.98 0.98 0.98 150.0 150.0 150.0 150.0 1.22 1.22 1.22 1.22 166.5 166.5 166.5 166.5 1.39 1.39 1.39 1.39 271.4 271.4 271.4 271.4 0.00 0.00 0.00 0.00 0.0 0.0 0.0 0.0 1.11 0.69 0.69 0.69 0.69 Recovery % 27 50 600 mm 0.83 Bearing Pressure @ 1.25mm Settlement 153.0 kN/m² Authorised Signatory Modulus of Subgrade Reaction K762 101.4 kN/m²/mm Equivalent CBR Value Equivalent CBR Value Equivalent CBR Value Equivalent CBR Value 28.9 28.9 28.9 28.9 % Moisture Content N/A % J A Hardcastle - Managing Director 20/01/2015 Location 2 Grid F3 Cemented Layer Plate Diameter Plate Correction Factor Settlement Ex-Site 153.0 0 100 200 300 0.00 0.50 1.00 1.50 2.00 2.50 3.00 Bearing Pressure (kN/m 2 ) Settlement (mm) Load vs Settlement Data TEST LOAD Expon. (Test Load) R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-121898 Page 1 of 1

Plate Loading Test to determine equivalent CBR Value

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/121898ETS/121898ETS/121898ETS/121898 C3030/42

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 26/01/2015

Material Description: Brown Clay, Occ Stone Host + 2% Cement Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2 mm mm

8.28.28.28.2 0.08 0.040.040.040.04

27.127.127.127.1 0.66 0.130.130.130.13

44.644.644.644.6 0.94 0.250.250.250.25

63.163.163.163.1 1.19 0.320.320.320.32

79.579.579.579.5 1.51 0.400.400.400.40

98.698.698.698.6 0.560.560.560.56

114.7114.7114.7114.7 0.770.770.770.77

130.4130.4130.4130.4 0.980.980.980.98

150.0150.0150.0150.0 1.221.221.221.22

166.5166.5166.5166.5 1.391.391.391.39

271.4271.4271.4271.4 0.000.000.000.00

0.00.00.00.0 1.11 0.690.690.690.69

Recovery % 27 50

600 mm

0.83

Bearing Pressure @ 1.25mm Settlement 153.0 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 101.4 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 28.928.928.928.9 %Moisture Content N/A % J A Hardcastle - Managing Director

20/01/2015

Location 2 Grid F3 Cemented Layer

Plate Diameter

Plate Correction Factor

Settlement

Ex-Site

153.0

0

100

200

300

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing P

ressure

(kN

/m2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-121898 Page 1 of 1

Page 2: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/121901ETS/121901ETS/121901ETS/121901 C3030/45

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 26/01/2015

Material Description: Brown Clay, Occ Stone Host + 2% Cement Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2 mm mm

8.28.28.28.2 0.05 0.010.010.010.01

27.127.127.127.1 0.40 0.070.070.070.07

44.644.644.644.6 0.59 0.160.160.160.16

63.163.163.163.1 0.74 0.230.230.230.23

79.579.579.579.5 0.91 0.350.350.350.35

98.698.698.698.6 0.440.440.440.44

114.7114.7114.7114.7 0.560.560.560.56

130.4130.4130.4130.4 0.690.690.690.69

150.0150.0150.0150.0 0.830.830.830.83

166.5166.5166.5166.5 1.001.001.001.00

271.4271.4271.4271.4 1.281.281.281.28

0.00.00.00.0 0.55 0.620.620.620.62

Recovery % 39 52

600 mm

0.83

Bearing Pressure @ 1.25mm Settlement 198.6 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 131.7 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 45.445.445.445.4 %Moisture Content N/A % J A Hardcastle - Managing Director

21/01/2015

Location 2 - Piling Rig

Plate Diameter

Plate Correction Factor

Settlement

Ex-Site

198.6

0

100

200

300

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing P

ressure

(kN

/m2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-121901 Page 1 of 1

Page 3: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/123078ETS/123078ETS/123078ETS/123078 C3030/135

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 25/02/2015

Material Description: Brown Clay + Occ Stone + Cement Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2

mm mm

8.28.28.28.2 0.03 0.010.010.010.01

27.127.127.127.1 0.23 0.080.080.080.08

44.644.644.644.6 0.36 0.120.120.120.12

63.163.163.163.1 0.49 0.150.150.150.15

79.579.579.579.5 0.58 0.190.190.190.19

98.698.698.698.6 0.230.230.230.23

114.7114.7114.7114.7 0.280.280.280.28

130.4130.4130.4130.4 0.340.340.340.34

150.0150.0150.0150.0 0.410.410.410.41

291.1291.1291.1291.1 1.311.311.311.31

346.4346.4346.4346.4 0.000.000.000.00

0.00.00.00.0 0.41 0.210.210.210.21

Recovery % 29 84

600 mm

0.83

Bearing Pressure @ 1.25mm Settlement 283.3 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 187.8 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 84.184.184.184.1 %Moisture Content N/A % J A Hardcastle - Managing Director

06/02/2015

Crane Mat, Location Number 5

Plate Diameter

Plate Correction Factor

Settlement

Ex-Site

283.3

0

100

200

300

400

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing Pressure (kN/m

2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-123078 Page 1 of 1

Page 4: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/123079ETS/123079ETS/123079ETS/123079 C3030/136

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 25/02/2015

Material Description: Type 1 Stone Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2

mm mm

8.28.28.28.2 0.03 0.020.020.020.02

27.127.127.127.1 0.35 0.140.140.140.14

44.644.644.644.6 0.61 0.220.220.220.22

63.163.163.163.1 0.83 0.320.320.320.32

79.579.579.579.5 1.12 0.480.480.480.48

98.698.698.698.6 0.680.680.680.68

114.7114.7114.7114.7 0.880.880.880.88

130.4130.4130.4130.4 1.091.091.091.09

150.0150.0150.0150.0 1.291.291.291.29

291.1291.1291.1291.1 0.000.000.000.00

346.4346.4346.4346.4 0.000.000.000.00

0.00.00.00.0 0.89 0.750.750.750.75

Recovery % 20 42

600 mm

0.83

Bearing Pressure @ 1.25mm Settlement 146.4 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 97.1 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 26.826.826.826.8 %Moisture Content N/A % J A Hardcastle - Managing Director

06/02/2015

Crane Mat, Location Number 6

Plate Diameter

Plate Correction Factor

Settlement

Ex-Site

146.4

0

100

200

300

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing Pressure (kN/m

2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-123079 Page 1 of 1

Page 5: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/123420ETS/123420ETS/123420ETS/123420 C3030/240

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 02/03/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2

mm mm

19.919.919.919.9 0.46 0.210.210.210.21

37.637.637.637.6 0.77 0.370.370.370.37

54.054.054.054.0 1.01 0.470.470.470.47

72.772.772.772.7 1.21 0.580.580.580.58

89.089.089.089.0 1.35 0.670.670.670.67

104.5104.5104.5104.5 0.760.760.760.76

122.2122.2122.2122.2 0.870.870.870.87

138.3138.3138.3138.3 0.970.970.970.97

153.4153.4153.4153.4 1.061.061.061.06

186.2186.2186.2186.2 1.261.261.261.26

331.6331.6331.6331.6 0.000.000.000.00

0.00.00.00.0 0.75 0.000.000.000.00

Recovery % 45 100

600 mm

0.83

Bearing Pressure @ 1.25mm Settlement 184.8 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 122.5 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 40.140.140.140.1 %Moisture Content N/A % J A Hardcastle - Managing Director

23/02/2015

Top Layer, B5

Plate Diameter

Plate Correction Factor

Settlement

Not Stated

184.8

0

100

200

300

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing Pressure (kN/m

2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-123420 Page 1 of 1

Page 6: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/123731ETS/123731ETS/123731ETS/123731 C3030/268

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 02/03/2015

Material Description: Recycled Aggregate Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2

mm mm

19.919.919.919.9 0.32 0.100.100.100.10

37.637.637.637.6 0.45 0.160.160.160.16

54.054.054.054.0 0.60 0.220.220.220.22

72.772.772.772.7 0.74 0.310.310.310.31

89.089.089.089.0 0.85 0.360.360.360.36

104.5104.5104.5104.5 0.420.420.420.42

122.2122.2122.2122.2 0.480.480.480.48

138.3138.3138.3138.3 0.530.530.530.53

153.4153.4153.4153.4 0.600.600.600.60

186.2186.2186.2186.2 0.720.720.720.72

331.6331.6331.6331.6 1.191.191.191.19

0.00.00.00.0 0.50 0.460.460.460.46

Recovery % 42 61

600 mm

0.83

Bearing Pressure @ 1.25mm Settlement >331.6 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 >220.2 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value >110.8>110.8>110.8>110.8 %Moisture Content N/A % J A Hardcastle - Managing Director

25/02/2015

B1, Base Layer

Plate Diameter

Plate Correction Factor

Settlement

Ex Site

0

200

400

600

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing Press

ure (kN/m

2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-123731 Page 1 of 1

Page 7: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/123789AETS/123789AETS/123789AETS/123789A C3030/292A

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 11/03/2015

Material Description: Stone Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2

mm mm

15.415.415.415.4 0.37 0.290.290.290.29

34.134.134.134.1 0.82 0.510.510.510.51

55.555.555.555.5 1.29 0.670.670.670.67

76.976.976.976.9 1.67 0.850.850.850.85

99.599.599.599.5 2.11 0.930.930.930.93

117.2117.2117.2117.2 1.161.161.161.16

143.5143.5143.5143.5 1.991.991.991.99

162.8162.8162.8162.8 2.372.372.372.37

187.5187.5187.5187.5 2.782.782.782.78

251.3251.3251.3251.3 4.094.094.094.09

432.6432.6432.6432.6 0.000.000.000.00

0.00.00.00.0 1.61 1.641.641.641.64

Recovery % 24 60

762 mm

1.03

Bearing Pressure @ 1.25mm Settlement 120.0 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 98.9 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 27.627.627.627.6 %Moisture Content N/A % J A Hardcastle - Managing Director

27/02/2015

E3

Plate Diameter

Plate Correction Factor

Settlement

Not Stated

120.0

0

100

200

300

400

0.00 2.00 4.00 6.00

Bearing Pressure (kN/m

2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-123789A Page 1 of 1

Page 8: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/123789BETS/123789BETS/123789BETS/123789B C3030/292B

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 11/03/2015

Material Description: Stone Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2

mm mm

15.415.415.415.4 0.44 0.120.120.120.12

34.134.134.134.1 0.85 0.210.210.210.21

55.555.555.555.5 1.15 0.310.310.310.31

76.976.976.976.9 1.44 0.430.430.430.43

99.599.599.599.5 1.68 0.570.570.570.57

117.2117.2117.2117.2 0.760.760.760.76

143.5143.5143.5143.5 1.031.031.031.03

162.8162.8162.8162.8 1.251.251.251.25

187.5187.5187.5187.5 1.581.581.581.58

251.3251.3251.3251.3 2.512.512.512.51

432.6432.6432.6432.6 0.000.000.000.00

0.00.00.00.0 0.99 0.670.670.670.67

Recovery % 41 73

762 mm

1.03

Bearing Pressure @ 1.25mm Settlement 162.8 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 134.1 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 46.946.946.946.9 %Moisture Content N/A % J A Hardcastle - Managing Director

27/02/2015

E4

Plate Diameter

Plate Correction Factor

Settlement

Not Stated

162.8

0

100

200

300

400

0.00 1.00 2.00 3.00 4.00

Bearing Pressure (kN/m

2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-123789B Page 1 of 1

Page 9: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/123968AETS/123968AETS/123968AETS/123968A C3030/313

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 11/03/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2

mm mm

14.714.714.714.7 0.18 0.080.080.080.08

48.148.148.148.1 0.67 0.300.300.300.30

79.379.379.379.3 1.05 0.480.480.480.48

112.2112.2112.2112.2 1.40 0.640.640.640.64

141.3141.3141.3141.3 1.74 0.830.830.830.83

175.3175.3175.3175.3 1.111.111.111.11

204.0204.0204.0204.0 1.381.381.381.38

231.9231.9231.9231.9 1.701.701.701.70

266.7266.7266.7266.7 2.012.012.012.01

423.5423.5423.5423.5 3.493.493.493.49

548.9548.9548.9548.9 0.000.000.000.00

0.00.00.00.0 1.04 1.531.531.531.53

Recovery % 40 56

450 mm

0.64

Bearing Pressure @ 1.25mm Settlement 190.2 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 97.8 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 27.127.127.127.1 %Moisture Content N/A % J A Hardcastle - Managing Director

04/03/2015

Crane Pad 1 - A

Plate Diameter

Plate Correction Factor

Settlement

Ex Site

190.2

0

200

400

600

0.00 2.00 4.00 6.00

Bearing Pressure (kN/m

2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-123968A Page 1 of 1

Page 10: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/123968BETS/123968BETS/123968BETS/123968B C3030/313B

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 11/03/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2

mm mm

14.714.714.714.7 0.19 0.050.050.050.05

48.148.148.148.1 0.84 0.220.220.220.22

79.379.379.379.3 1.41 0.340.340.340.34

112.2112.2112.2112.2 1.91 0.490.490.490.49

141.3141.3141.3141.3 2.40 0.640.640.640.64

175.3175.3175.3175.3 0.950.950.950.95

204.0204.0204.0204.0 1.171.171.171.17

231.9231.9231.9231.9 1.451.451.451.45

266.7266.7266.7266.7 1.751.751.751.75

423.5423.5423.5423.5 2.722.722.722.72

548.9548.9548.9548.9 0.000.000.000.00

0.00.00.00.0 1.89 1.371.371.371.37

Recovery % 21 50

450 mm

0.64

Bearing Pressure @ 1.25mm Settlement 211.7 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 108.9 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 32.732.732.732.7 %Moisture Content N/A % J A Hardcastle - Managing Director

04/03/2015

Crane Pad 1 - B

Plate Diameter

Plate Correction Factor

Settlement

Ex Site

211.7

0

200

400

600

0.00 2.00 4.00 6.00

Bearing Pressure (kN/m

2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-123968B Page 1 of 1

Page 11: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/123969BETS/123969BETS/123969BETS/123969B C3030/314B

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 11/03/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2

mm mm

14.714.714.714.7 0.12 0.050.050.050.05

48.148.148.148.1 0.35 0.280.280.280.28

79.379.379.379.3 0.56 0.450.450.450.45

112.2112.2112.2112.2 0.94 0.640.640.640.64

141.3141.3141.3141.3 1.05 0.800.800.800.80

175.3175.3175.3175.3 1.121.121.121.12

204.0204.0204.0204.0 1.531.531.531.53

231.9231.9231.9231.9 1.951.951.951.95

266.7266.7266.7266.7 2.352.352.352.35

454.8454.8454.8454.8 4.714.714.714.71

548.9548.9548.9548.9 0.000.000.000.00

0.00.00.00.0 0.75 2.392.392.392.39

Recovery % 28 49

450 mm

0.64

Bearing Pressure @ 1.25mm Settlement 184.3 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 94.8 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 25.725.725.725.7 %Moisture Content N/A % J A Hardcastle - Managing Director

04/03/2015

Crane Pad 2 - B

Plate Diameter

Plate Correction Factor

Settlement

Ex Site

184.3

0

200

400

600

0.00 2.00 4.00 6.00

Bearing Pressure (kN/m

2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-123969B Page 1 of 1

Page 12: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/124173AETS/124173AETS/124173AETS/124173A C3030/320

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 11/03/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2

mm mm

24.924.924.924.9 0.39 0.190.190.190.19

55.055.055.055.0 0.76 0.360.360.360.36

89.689.689.689.6 1.00 0.500.500.500.50

124.1124.1124.1124.1 1.22 0.630.630.630.63

160.5160.5160.5160.5 1.41 0.750.750.750.75

189.1189.1189.1189.1 0.890.890.890.89

231.5231.5231.5231.5 1.071.071.071.07

262.6262.6262.6262.6 1.221.221.221.22

302.5302.5302.5302.5 1.411.411.411.41

373.4373.4373.4373.4 0.000.000.000.00

700.2700.2700.2700.2 0.000.000.000.00

0.00.00.00.0 0.72 0.470.470.470.47

Recovery % 49 67

600 mm

0.83

Bearing Pressure @ 1.25mm Settlement 268.2 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 177.8 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 76.576.576.576.5 %Moisture Content N/A % J A Hardcastle - Managing Director

05/03/2015

C1, Substation

Plate Diameter

Plate Correction Factor

Settlement

Ex Site

268.2

0

200

400

600

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing Press

ure (kN/m

2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-124173A Page 1 of 1

Page 13: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/124173BETS/124173BETS/124173BETS/124173B C3030/320B

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 11/03/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2

mm mm

24.924.924.924.9 0.86 0.360.360.360.36

55.055.055.055.0 1.85 0.590.590.590.59

89.689.689.689.6 2.38 0.770.770.770.77

124.1124.1124.1124.1 2.80 0.920.920.920.92

160.5160.5160.5160.5 3.20 1.111.111.111.11

189.1189.1189.1189.1 1.451.451.451.45

231.5231.5231.5231.5 0.000.000.000.00

262.6262.6262.6262.6 0.000.000.000.00

302.5302.5302.5302.5 0.000.000.000.00

373.4373.4373.4373.4 0.000.000.000.00

700.2700.2700.2700.2 0.000.000.000.00

0.00.00.00.0 2.31 0.420.420.420.42

Recovery % 28 71

600 mm

0.83

Bearing Pressure @ 1.25mm Settlement 172.6 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 114.4 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 35.635.635.635.6 %Moisture Content N/A % J A Hardcastle - Managing Director

05/03/2015

B1, Substation

Plate Diameter

Plate Correction Factor

Settlement

Ex Site

172.6

0

100

200

300

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing Pressure (kN/m

2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-124173B Page 1 of 1

Page 14: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/124477AETS/124477AETS/124477AETS/124477A C3030/371

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 26/03/2015

Material Description: Brown Clay Occ Stone Host + 2% Lime Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2

mm mm

8.28.28.28.2 0.03 0.020.020.020.02

27.127.127.127.1 0.12 0.100.100.100.10

44.644.644.644.6 0.19 0.140.140.140.14

63.163.163.163.1 0.25 0.160.160.160.16

79.579.579.579.5 0.31 0.200.200.200.20

98.698.698.698.6 0.240.240.240.24

114.7114.7114.7114.7 0.290.290.290.29

185.3185.3185.3185.3 0.450.450.450.45

202.7202.7202.7202.7 0.500.500.500.50

220.6220.6220.6220.6 0.540.540.540.54

346.4346.4346.4346.4 0.860.860.860.86

0.00.00.00.0 0.16 0.270.270.270.27

Recovery % 49 68

600 mm

0.83

Bearing Pressure @ 1.25mm Settlement >346.4 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 >230 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value >119.5>119.5>119.5>119.5 %Moisture Content N/A % J A Hardcastle - Managing Director

11/03/2015

C1, Top Layer

Plate Diameter

Plate Correction Factor

Settlement

Not Stated

0

200

400

600

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing Press

ure (kN/m

2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-124477A Page 1 of 1

Page 15: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/124477BETS/124477BETS/124477BETS/124477B C3030/371

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 26/03/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2

mm mm

8.28.28.28.2 0.03 0.010.010.010.01

27.127.127.127.1 0.33 0.090.090.090.09

44.644.644.644.6 0.62 0.150.150.150.15

63.163.163.163.1 0.84 0.220.220.220.22

79.579.579.579.5 1.03 0.340.340.340.34

98.698.698.698.6 0.490.490.490.49

114.7114.7114.7114.7 0.630.630.630.63

185.3185.3185.3185.3 1.281.281.281.28

202.7202.7202.7202.7 1.431.431.431.43

220.6220.6220.6220.6 0.000.000.000.00

308.8308.8308.8308.8 0.000.000.000.00

0.00.00.00.0 0.85 0.810.810.810.81

Recovery % 18 44

600 mm

0.83

Bearing Pressure @ 1.25mm Settlement 181.9 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 120.6 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 39.039.039.039.0 %Moisture Content N/A % J A Hardcastle - Managing Director

11/03/2015

D1, Top Layer

Plate Diameter

Plate Correction Factor

Settlement

Not Stated

181.9

0

100

200

300

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing Pressure (kN/m

2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-124477B Page 1 of 1

Page 16: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/124477CETS/124477CETS/124477CETS/124477C C3030/371

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 26/03/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2

mm mm

8.28.28.28.2 0.05 0.040.040.040.04

27.127.127.127.1 0.26 0.220.220.220.22

44.644.644.644.6 0.40 0.320.320.320.32

63.163.163.163.1 0.53 0.390.390.390.39

79.579.579.579.5 0.65 0.470.470.470.47

98.698.698.698.6 0.550.550.550.55

114.7114.7114.7114.7 0.630.630.630.63

185.3185.3185.3185.3 0.970.970.970.97

202.7202.7202.7202.7 1.051.051.051.05

255.9255.9255.9255.9 1.301.301.301.30

308.8308.8308.8308.8 0.000.000.000.00

0.00.00.00.0 0.28 0.310.310.310.31

Recovery % 57 76

600 mm

0.83

Bearing Pressure @ 1.25mm Settlement 245.6 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 162.8 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 65.665.665.665.6 %Moisture Content N/A % J A Hardcastle - Managing Director

11/03/2015

B1, Top Layer

Plate Diameter

Plate Correction Factor

Settlement

Not Stated

245.6

0

100

200

300

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing Pressure (kN/m

2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-124477C Page 1 of 1

Page 17: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/124477DETS/124477DETS/124477DETS/124477D C3030/371

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 26/03/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2

mm mm

8.28.28.28.2 0.02 0.020.020.020.02

27.127.127.127.1 0.14 0.090.090.090.09

44.644.644.644.6 0.27 0.140.140.140.14

63.163.163.163.1 0.41 0.190.190.190.19

79.579.579.579.5 0.53 0.260.260.260.26

98.698.698.698.6 0.370.370.370.37

114.7114.7114.7114.7 0.490.490.490.49

185.3185.3185.3185.3 0.990.990.990.99

202.7202.7202.7202.7 1.121.121.121.12

255.9255.9255.9255.9 1.501.501.501.50

308.8308.8308.8308.8 0.000.000.000.00

0.00.00.00.0 0.34 0.680.680.680.68

Recovery % 36 55

600 mm

0.83

Bearing Pressure @ 1.25mm Settlement 221.4 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 146.8 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 54.954.954.954.9 %Moisture Content N/A % J A Hardcastle - Managing Director

11/03/2015

B2, Top Layer

Plate Diameter

Plate Correction Factor

Settlement

Not Stated

221.4

0

100

200

300

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing Pressure (kN/m

2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-124477d Page 1 of 1

Page 18: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/124477EETS/124477EETS/124477EETS/124477E C3030/371

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 26/03/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2

mm mm

8.28.28.28.2 0.04 0.030.030.030.03

27.127.127.127.1 0.21 0.130.130.130.13

44.644.644.644.6 0.35 0.190.190.190.19

63.163.163.163.1 0.51 0.270.270.270.27

79.579.579.579.5 0.67 0.370.370.370.37

98.698.698.698.6 0.510.510.510.51

114.7114.7114.7114.7 0.670.670.670.67

185.3185.3185.3185.3 1.441.441.441.44

202.7202.7202.7202.7 0.000.000.000.00

255.9255.9255.9255.9 0.000.000.000.00

308.8308.8308.8308.8 0.000.000.000.00

0.00.00.00.0 0.44 0.520.520.520.52

Recovery % 34 64

600 mm

0.83

Bearing Pressure @ 1.25mm Settlement 167.5 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 111.1 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 33.833.833.833.8 %Moisture Content N/A % J A Hardcastle - Managing Director

11/03/2015

B3, Top Layer

Plate Diameter

Plate Correction Factor

Settlement

Not Stated

167.5

0

100

200

300

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing Pressure (kN/m

2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-124477E Page 1 of 1

Page 19: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/124477FETS/124477FETS/124477FETS/124477F C3030/371

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 26/03/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2

mm mm

8.28.28.28.2 0.03 0.010.010.010.01

27.127.127.127.1 0.16 0.060.060.060.06

44.644.644.644.6 0.27 0.080.080.080.08

63.163.163.163.1 0.37 0.110.110.110.11

79.579.579.579.5 0.48 0.160.160.160.16

98.698.698.698.6 0.230.230.230.23

114.7114.7114.7114.7 0.320.320.320.32

185.3185.3185.3185.3 0.760.760.760.76

202.7202.7202.7202.7 0.870.870.870.87

255.9255.9255.9255.9 1.311.311.311.31

308.8308.8308.8308.8 0.000.000.000.00

0.00.00.00.0 0.39 0.710.710.710.71

Recovery % 19 46

600 mm

0.83

Bearing Pressure @ 1.25mm Settlement 248.5 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 164.8 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 67.067.067.067.0 %Moisture Content N/A % J A Hardcastle - Managing Director

11/03/2015

A3, Top Layer

Plate Diameter

Plate Correction Factor

Settlement

Not Stated

248.5

0

100

200

300

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing Pressure (kN/m

2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-124477F Page 1 of 1

Page 20: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/124477GETS/124477GETS/124477GETS/124477G C3030/371

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 26/03/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2

mm mm

8.28.28.28.2 0.03 0.040.040.040.04

27.127.127.127.1 0.27 0.160.160.160.16

44.644.644.644.6 0.45 0.230.230.230.23

63.163.163.163.1 0.66 0.310.310.310.31

79.579.579.579.5 0.91 0.420.420.420.42

98.698.698.698.6 0.570.570.570.57

114.7114.7114.7114.7 0.720.720.720.72

185.3185.3185.3185.3 1.351.351.351.35

202.7202.7202.7202.7 0.000.000.000.00

255.9255.9255.9255.9 0.000.000.000.00

308.8308.8308.8308.8 0.000.000.000.00

0.00.00.00.0 0.66 0.760.760.760.76

Recovery % 27 44

600 mm

0.83

Bearing Pressure @ 1.25mm Settlement 172.8 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 114.6 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 35.735.735.735.7 %Moisture Content N/A % J A Hardcastle - Managing Director

11/03/2015

A2, Top Layer

Plate Diameter

Plate Correction Factor

Settlement

Not Stated

172.8

0

100

200

300

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing Pressure (kN/m

2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-124477G Page 1 of 1

Page 21: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/124617AETS/124617AETS/124617AETS/124617A C3030/372A

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 16/03/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2 mm mm

8.28.28.28.2 0.08 0.060.060.060.06

27.127.127.127.1 0.31 0.170.170.170.17

44.644.644.644.6 0.51 0.240.240.240.24

63.163.163.163.1 0.68 0.300.300.300.30

79.579.579.579.5 0.86 0.400.400.400.40

98.698.698.698.6 0.540.540.540.54

114.7114.7114.7114.7 0.690.690.690.69

130.4130.4130.4130.4 0.850.850.850.85

150.0150.0150.0150.0 1.021.021.021.02

166.5166.5166.5166.5 1.191.191.191.19

185.3185.3185.3185.3 1.371.371.371.37

0.00.00.00.0 0.63 0.780.780.780.78

Recovery % 27 43

600 mm

0.83

Bearing Pressure @ 1.25mm Settlement 172.8 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 114.6 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 35.735.735.735.7 %Moisture Content N/A % J A Hardcastle - Managing Director

12/03/2015

1 - A1 Top Layer

Plate Diameter

Plate Correction Factor

Settlement

Not Stated

172.8

0

100

200

300

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing P

ressure

(kN

/m2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-124617A Page 1 of 1

Page 22: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/124617BETS/124617BETS/124617BETS/124617B C3030/372B

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 16/03/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2 mm mm

8.28.28.28.2 0.12 0.020.020.020.02

27.127.127.127.1 0.24 0.100.100.100.10

44.644.644.644.6 0.38 0.170.170.170.17

63.163.163.163.1 0.51 0.270.270.270.27

79.579.579.579.5 0.65 0.360.360.360.36

98.698.698.698.6 0.470.470.470.47

114.7114.7114.7114.7 0.610.610.610.61

130.4130.4130.4130.4 0.790.790.790.79

150.0150.0150.0150.0 1.021.021.021.02

166.5166.5166.5166.5 1.161.161.161.16

185.3185.3185.3185.3 1.351.351.351.35

0.00.00.00.0 0.38 0.460.460.460.46

Recovery % 41 66

600 mm

0.83

Bearing Pressure @ 1.25mm Settlement 175.4 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 116.3 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 36.636.636.636.6 %Moisture Content N/A % J A Hardcastle - Managing Director

12/03/2015

2 - J4 Top Layer

Plate Diameter

Plate Correction Factor

Settlement

Not Stated

175.4

0

100

200

300

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing P

ressure

(kN

/m2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-124617B Page 1 of 1

Page 23: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/124617CETS/124617CETS/124617CETS/124617C C3030/372C

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 16/03/2015

Material Description: Brown Clay Occ Stone Host + 2% Lime Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2

mm mm

8.28.28.28.2 0.08 0.050.050.050.05

27.127.127.127.1 0.33 0.210.210.210.21

44.644.644.644.6 0.49 0.300.300.300.30

63.163.163.163.1 0.62 0.370.370.370.37

79.579.579.579.5 0.75 0.440.440.440.44

98.698.698.698.6 0.540.540.540.54

114.7114.7114.7114.7 0.620.620.620.62

130.4130.4130.4130.4 0.690.690.690.69

150.0150.0150.0150.0 0.760.760.760.76

166.5166.5166.5166.5 0.820.820.820.82

291.1291.1291.1291.1 1.271.271.271.27

0.00.00.00.0 0.37 0.460.460.460.46

Recovery % 51 63

600 mm

0.83

Bearing Pressure @ 1.25mm Settlement 286.8 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 190.2 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 85.985.985.985.9 %Moisture Content N/A % J A Hardcastle - Managing Director

12/03/2015

3 - J5 Top Layer

Plate Diameter

Plate Correction Factor

Settlement

Not Stated

286.8

0

100

200

300

400

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing Pressure (kN/m

2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-124617C Page 1 of 1

Page 24: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/124618AETS/124618AETS/124618AETS/124618A C3030/373A

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 16/03/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2 mm mm

15.415.415.415.4 0.18 0.080.080.080.08

34.134.134.134.1 0.33 0.160.160.160.16

55.555.555.555.5 0.47 0.190.190.190.19

76.976.976.976.9 0.57 0.240.240.240.24

99.599.599.599.5 0.70 0.290.290.290.29

117.2117.2117.2117.2 0.370.370.370.37

143.5143.5143.5143.5 0.510.510.510.51

162.8162.8162.8162.8 0.600.600.600.60

187.5187.5187.5187.5 0.680.680.680.68

204.9204.9204.9204.9 0.770.770.770.77

341.5341.5341.5341.5 1.391.391.391.39

0.00.00.00.0 0.56 0.710.710.710.71

Recovery % 19 49

762 mm

1.03

Bearing Pressure @ 1.25mm Settlement 316.6 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 260.8 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 148.5148.5148.5148.5 %Moisture Content N/A % J A Hardcastle - Managing Director

12/03/2015

1 - C5 Top Layer

Plate Diameter

Plate Correction Factor

Settlement

Not Stated

316.6

0

200

400

600

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing P

ressure

(kN

/m2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-124618A Page 1 of 1

Page 25: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/124618BETS/124618BETS/124618BETS/124618B C3030/373B

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 16/03/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2 mm mm

15.415.415.415.4 0.12 0.150.150.150.15

34.134.134.134.1 0.29 0.260.260.260.26

55.555.555.555.5 0.36 0.300.300.300.30

76.976.976.976.9 0.44 0.350.350.350.35

99.599.599.599.5 0.53 0.400.400.400.40

117.2117.2117.2117.2 0.470.470.470.47

143.5143.5143.5143.5 0.550.550.550.55

162.8162.8162.8162.8 0.630.630.630.63

187.5187.5187.5187.5 0.690.690.690.69

204.9204.9204.9204.9 0.820.820.820.82

341.5341.5341.5341.5 1.381.381.381.38

0.00.00.00.0 0.30 0.480.480.480.48

Recovery % 44 65

762 mm

1.03

Bearing Pressure @ 1.25mm Settlement 310.0 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 255.4 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 143.2143.2143.2143.2 %Moisture Content N/A % J A Hardcastle - Managing Director

12/03/2015

2 - C4 Top Layer

Plate Diameter

Plate Correction Factor

Settlement

Not Stated

310.0

0

200

400

600

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing P

ressure

(kN

/m2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-124618B Page 1 of 1

Page 26: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/124618CETS/124618CETS/124618CETS/124618C C3030/373C

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 16/03/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2 mm mm

15.415.415.415.4 0.05 0.050.050.050.05

34.134.134.134.1 0.08 0.080.080.080.08

55.555.555.555.5 0.12 0.110.110.110.11

76.976.976.976.9 0.16 0.140.140.140.14

99.599.599.599.5 0.20 0.200.200.200.20

117.2117.2117.2117.2 0.250.250.250.25

143.5143.5143.5143.5 0.290.290.290.29

162.8162.8162.8162.8 0.330.330.330.33

187.5187.5187.5187.5 0.400.400.400.40

204.9204.9204.9204.9 0.440.440.440.44

434.1434.1434.1434.1 0.890.890.890.89

0.00.00.00.0 0.05 0.480.480.480.48

Recovery % 77 46

762 mm

1.03

Bearing Pressure @ 1.25mm Settlement >434.1 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 >357.7 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value >256.8>256.8>256.8>256.8 %Moisture Content N/A % J A Hardcastle - Managing Director

12/03/2015

3 - C3 Top Layer

Plate Diameter

Plate Correction Factor

Settlement

Not Stated

0

200

400

600

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing P

ressure

(kN

/m2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-124618C Page 1 of 1

Page 27: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/124619AETS/124619AETS/124619AETS/124619A C3030/374A

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 16/03/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2 mm mm

15.415.415.415.4 0.96 0.070.070.070.07

34.134.134.134.1 1.51 0.130.130.130.13

55.555.555.555.5 1.83 0.200.200.200.20

76.976.976.976.9 2.04 0.260.260.260.26

99.599.599.599.5 2.16 0.320.320.320.32

117.2117.2117.2117.2 0.420.420.420.42

143.5143.5143.5143.5 0.490.490.490.49

162.8162.8162.8162.8 0.600.600.600.60

187.5187.5187.5187.5 0.730.730.730.73

231.5231.5231.5231.5 0.950.950.950.95

318.4318.4318.4318.4 1.341.341.341.34

0.00.00.00.0 1.98 0.770.770.770.77

Recovery % 8 42

762 mm

1.03

Bearing Pressure @ 1.25mm Settlement 302.9 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 249.5 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 137.5137.5137.5137.5 %Moisture Content N/A % J A Hardcastle - Managing Director

14/03/2015

1 - D3 Injection Bay

Plate Diameter

Plate Correction Factor

Settlement

Ex Site

302.9

0

200

400

600

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing P

ressure

(kN

/m2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-124619A Page 1 of 1

Page 28: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/124619BETS/124619BETS/124619BETS/124619B C3030/374B

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 16/03/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2 mm mm

15.415.415.415.4 0.56 0.180.180.180.18

34.134.134.134.1 0.91 0.300.300.300.30

55.555.555.555.5 1.23 0.370.370.370.37

76.976.976.976.9 1.54 0.460.460.460.46

99.599.599.599.5 1.70 0.540.540.540.54

117.2117.2117.2117.2 0.620.620.620.62

143.5143.5143.5143.5 0.730.730.730.73

162.8162.8162.8162.8 0.860.860.860.86

187.5187.5187.5187.5 0.980.980.980.98

231.5231.5231.5231.5 1.181.181.181.18

275.5275.5275.5275.5 1.431.431.431.43

0.00.00.00.0 1.28 0.590.590.590.59

Recovery % 24 59

762 mm

1.03

Bearing Pressure @ 1.25mm Settlement 242.5 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 199.7 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 93.593.593.593.5 %Moisture Content N/A % J A Hardcastle - Managing Director

14/03/2015

2 - D4 Injection Bay

Plate Diameter

Plate Correction Factor

Settlement

Ex Site

242.5

0

200

400

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing P

ressure

(kN

/m2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-124619B Page 1 of 1

Page 29: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/124619CETS/124619CETS/124619CETS/124619C C3030/374C

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 16/03/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2 mm mm

15.415.415.415.4 0.32 0.170.170.170.17

34.134.134.134.1 0.51 0.310.310.310.31

55.555.555.555.5 0.72 0.400.400.400.40

76.976.976.976.9 0.88 0.510.510.510.51

99.599.599.599.5 1.05 0.590.590.590.59

117.2117.2117.2117.2 0.680.680.680.68

143.5143.5143.5143.5 0.790.790.790.79

162.8162.8162.8162.8 0.930.930.930.93

187.5187.5187.5187.5 1.051.051.051.05

231.5231.5231.5231.5 1.251.251.251.25

275.5275.5275.5275.5 0.000.000.000.00

0.00.00.00.0 0.67 0.640.640.640.64

Recovery % 36 49

762 mm

1.03

Bearing Pressure @ 1.25mm Settlement 231.5 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 190.7 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 86.386.386.386.3 %Moisture Content N/A % J A Hardcastle - Managing Director

14/03/2015

3 - D5 Injection Bay

Plate Diameter

Plate Correction Factor

Settlement

Ex Site

231.5

0

200

400

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing P

ressure

(kN

/m2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-124619C Page 1 of 1

Page 30: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/124619DETS/124619DETS/124619DETS/124619D C3030/374D

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 16/03/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2 mm mm

15.415.415.415.4 0.59 0.130.130.130.13

34.134.134.134.1 0.92 0.230.230.230.23

55.555.555.555.5 1.04 0.280.280.280.28

76.976.976.976.9 1.22 0.340.340.340.34

99.599.599.599.5 1.40 0.390.390.390.39

117.2117.2117.2117.2 0.480.480.480.48

143.5143.5143.5143.5 0.610.610.610.61

162.8162.8162.8162.8 0.720.720.720.72

187.5187.5187.5187.5 0.820.820.820.82

231.5231.5231.5231.5 1.041.041.041.04

318.4318.4318.4318.4 1.451.451.451.45

0.00.00.00.0 1.15 0.750.750.750.75

Recovery % 18 48

762 mm

1.03

Bearing Pressure @ 1.25mm Settlement 273.5 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 225.3 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 115.3115.3115.3115.3 %Moisture Content N/A % J A Hardcastle - Managing Director

14/03/2015

4 - D6 Injection Bay

Plate Diameter

Plate Correction Factor

Settlement

Ex Site

273.5

0

200

400

600

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing P

ressure

(kN

/m2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-124619D Page 1 of 1

Page 31: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/124619EETS/124619EETS/124619EETS/124619E C3030/374E

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 16/03/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2 mm mm

15.415.415.415.4 0.46 0.350.350.350.35

34.134.134.134.1 0.96 0.500.500.500.50

55.555.555.555.5 1.39 0.620.620.620.62

76.976.976.976.9 1.75 0.730.730.730.73

99.599.599.599.5 2.06 0.840.840.840.84

117.2117.2117.2117.2 0.960.960.960.96

143.5143.5143.5143.5 1.061.061.061.06

162.8162.8162.8162.8 1.151.151.151.15

187.5187.5187.5187.5 1.231.231.231.23

204.9204.9204.9204.9 1.301.301.301.30

318.4318.4318.4318.4 0.000.000.000.00

0.00.00.00.0 0.95 0.620.620.620.62

Recovery % 54 53

762 mm

1.03

Bearing Pressure @ 1.25mm Settlement 192.3 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 158.4 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 62.662.662.662.6 %Moisture Content N/A % J A Hardcastle - Managing Director

14/03/2015

5 - E6

Plate Diameter

Plate Correction Factor

Settlement

Not Stated

192.3

0

100

200

300

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing P

ressure

(kN

/m2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-124619E Page 1 of 1

Page 32: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/124619FETS/124619FETS/124619FETS/124619F C3030/374F

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 16/03/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2 mm mm

15.415.415.415.4 0.55 0.320.320.320.32

34.134.134.134.1 1.12 0.440.440.440.44

55.555.555.555.5 1.62 0.570.570.570.57

76.976.976.976.9 2.03 0.640.640.640.64

99.599.599.599.5 2.38 0.780.780.780.78

117.2117.2117.2117.2 0.960.960.960.96

143.5143.5143.5143.5 1.101.101.101.10

162.8162.8162.8162.8 1.271.271.271.27

187.5187.5187.5187.5 0.000.000.000.00

204.9204.9204.9204.9 0.000.000.000.00

318.4318.4318.4318.4 0.000.000.000.00

0.00.00.00.0 1.87 0.000.000.000.00

Recovery % 22 100

762 mm

1.03

Bearing Pressure @ 1.25mm Settlement 160.2 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 132.0 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 45.645.645.645.6 %Moisture Content N/A % J A Hardcastle - Managing Director

14/03/2015

6 - F2

Plate Diameter

Plate Correction Factor

Settlement

Not Stated

160.2

0

100

200

300

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing P

ressure

(kN

/m2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-124619F Page 1 of 1

Page 33: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/124619GETS/124619GETS/124619GETS/124619G C3030/374G

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 16/03/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2 mm mm

15.415.415.415.4 0.60 0.320.320.320.32

34.134.134.134.1 0.61 0.430.430.430.43

55.555.555.555.5 1.36 0.560.560.560.56

76.976.976.976.9 1.69 0.670.670.670.67

99.599.599.599.5 1.97 0.800.800.800.80

117.2117.2117.2117.2 1.001.001.001.00

143.5143.5143.5143.5 1.231.231.231.23

162.8162.8162.8162.8 1.421.421.421.42

187.5187.5187.5187.5 0.000.000.000.00

204.9204.9204.9204.9 0.000.000.000.00

318.4318.4318.4318.4 0.000.000.000.00

0.00.00.00.0 1.35 0.510.510.510.51

Recovery % 31 64

762 mm

1.03

Bearing Pressure @ 1.25mm Settlement 145.8 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 120.1 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 38.838.838.838.8 %Moisture Content N/A % J A Hardcastle - Managing Director

14/03/2015

7 - F3

Plate Diameter

Plate Correction Factor

Settlement

Not Stated

145.8

0

100

200

300

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing P

ressure

(kN

/m2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-124619G Page 1 of 1

Page 34: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/124619HETS/124619HETS/124619HETS/124619H C3030/374H

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 16/03/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2 mm mm

15.415.415.415.4 0.21 0.220.220.220.22

34.134.134.134.1 0.50 0.370.370.370.37

55.555.555.555.5 0.82 0.520.520.520.52

76.976.976.976.9 1.13 0.650.650.650.65

99.599.599.599.5 1.47 0.740.740.740.74

117.2117.2117.2117.2 0.900.900.900.90

143.5143.5143.5143.5 1.171.171.171.17

162.8162.8162.8162.8 1.441.441.441.44

187.5187.5187.5187.5 1.681.681.681.68

204.9204.9204.9204.9 0.000.000.000.00

318.4318.4318.4318.4 0.000.000.000.00

0.00.00.00.0 1.00 0.650.650.650.65

Recovery % 32 61

762 mm

1.03

Bearing Pressure @ 1.25mm Settlement 149.1 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 122.9 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 40.340.340.340.3 %Moisture Content N/A % J A Hardcastle - Managing Director

14/03/2015

8 - E2

Plate Diameter

Plate Correction Factor

Settlement

Not Stated

149.1

0

100

200

300

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing P

ressure

(kN

/m2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-124619H Page 1 of 1

Page 35: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/124619IETS/124619IETS/124619IETS/124619I C3030/374I

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 16/03/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2 mm mm

15.415.415.415.4 0.17 0.080.080.080.08

34.134.134.134.1 0.32 0.150.150.150.15

55.555.555.555.5 0.48 0.200.200.200.20

76.976.976.976.9 0.59 0.220.220.220.22

99.599.599.599.5 0.69 0.270.270.270.27

117.2117.2117.2117.2 0.320.320.320.32

143.5143.5143.5143.5 0.390.390.390.39

162.8162.8162.8162.8 0.470.470.470.47

187.5187.5187.5187.5 0.540.540.540.54

204.9204.9204.9204.9 0.600.600.600.60

434.1434.1434.1434.1 1.261.261.261.26

0.00.00.00.0 0.47 0.680.680.680.68

Recovery % 31 46

762 mm

1.03

Bearing Pressure @ 1.25mm Settlement 430.8 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 354.9 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 253.3253.3253.3253.3 %Moisture Content N/A % J A Hardcastle - Managing Director

14/03/2015

9 - D2

Plate Diameter

Plate Correction Factor

Settlement

Not Stated

430.8

0

200

400

600

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing P

ressure

(kN

/m2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-124619I Page 1 of 1

Page 36: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/124619JETS/124619JETS/124619JETS/124619J C3030/374J

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 16/03/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2 mm mm

15.415.415.415.4 0.29 0.190.190.190.19

34.134.134.134.1 0.50 0.360.360.360.36

55.555.555.555.5 0.67 0.430.430.430.43

76.976.976.976.9 0.82 0.540.540.540.54

99.599.599.599.5 1.33 0.710.710.710.71

117.2117.2117.2117.2 0.830.830.830.83

143.5143.5143.5143.5 0.920.920.920.92

162.8162.8162.8162.8 1.091.091.091.09

187.5187.5187.5187.5 1.261.261.261.26

204.9204.9204.9204.9 1.371.371.371.37

275.5275.5275.5275.5 1.811.811.811.81

0.00.00.00.0 0.93 1.381.381.381.38

Recovery % 30 24

762 mm

1.03

Bearing Pressure @ 1.25mm Settlement 185.6 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 152.9 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 58.958.958.958.9 %Moisture Content N/A % J A Hardcastle - Managing Director

14/03/2015

10 - E5 Top Layer

Plate Diameter

Plate Correction Factor

Settlement

Not Stated

185.6

0

100

200

300

400

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing P

ressure

(kN

/m2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-124619J Page 1 of 1

Page 37: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/124619KETS/124619KETS/124619KETS/124619K C3030/374K

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 16/03/2015

Material Description: Brown Clay Occ Stone Host + 2% Lime Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2

mm mm

15.415.415.415.4 0.30 0.170.170.170.17

34.134.134.134.1 0.52 0.350.350.350.35

55.555.555.555.5 0.67 0.410.410.410.41

76.976.976.976.9 0.84 0.480.480.480.48

99.599.599.599.5 1.34 0.590.590.590.59

117.2117.2117.2117.2 0.750.750.750.75

143.5143.5143.5143.5 0.840.840.840.84

162.8162.8162.8162.8 1.021.021.021.02

187.5187.5187.5187.5 1.151.151.151.15

204.9204.9204.9204.9 1.301.301.301.30

275.5275.5275.5275.5 1.731.731.731.73

0.00.00.00.0 0.95 1.301.301.301.30

Recovery % 29 25

762 mm

1.03

Bearing Pressure @ 1.25mm Settlement 199.4 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 164.3 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 66.766.766.766.7 %Moisture Content N/A % J A Hardcastle - Managing Director

14/03/2015

11 - F6 Top Layer

Plate Diameter

Plate Correction Factor

Settlement

Ex Site

199.4

0

100

200

300

400

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing Pressure (kN/m

2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-124619K Page 1 of 1

Page 38: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/124619LETS/124619LETS/124619LETS/124619L C3030/374L

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 16/03/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2 mm mm

15.415.415.415.4 0.53 0.170.170.170.17

34.134.134.134.1 0.95 0.270.270.270.27

55.555.555.555.5 1.31 0.400.400.400.40

76.976.976.976.9 1.57 0.470.470.470.47

99.599.599.599.5 1.82 0.550.550.550.55

117.2117.2117.2117.2 0.670.670.670.67

143.5143.5143.5143.5 0.820.820.820.82

162.8162.8162.8162.8 1.001.001.001.00

187.5187.5187.5187.5 1.251.251.251.25

204.9204.9204.9204.9 1.381.381.381.38

231.5231.5231.5231.5 1.511.511.511.51

0.00.00.00.0 1.43 0.810.810.810.81

Recovery % 21 46

762 mm

1.03

Bearing Pressure @ 1.25mm Settlement 187.5 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 154.5 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 59.959.959.959.9 %Moisture Content N/A % J A Hardcastle - Managing Director

14/03/2015

12 - G6 Top Layer

Plate Diameter

Plate Correction Factor

Settlement

Ex Site

187.5

0

100

200

300

400

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing P

ressure

(kN

/m2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-124619L Page 1 of 1

Page 39: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/124619METS/124619METS/124619METS/124619M C3030/374M

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 16/03/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2 mm mm

15.415.415.415.4 0.48 0.240.240.240.24

34.134.134.134.1 0.90 0.350.350.350.35

55.555.555.555.5 1.28 0.460.460.460.46

76.976.976.976.9 1.61 0.560.560.560.56

99.599.599.599.5 1.91 0.680.680.680.68

117.2117.2117.2117.2 0.770.770.770.77

143.5143.5143.5143.5 0.880.880.880.88

162.8162.8162.8162.8 0.980.980.980.98

187.5187.5187.5187.5 1.111.111.111.11

204.9204.9204.9204.9 1.201.201.201.20

231.5231.5231.5231.5 1.271.271.271.27

0.00.00.00.0 1.26 0.780.780.780.78

Recovery % 34 38

762 mm

1.03

Bearing Pressure @ 1.25mm Settlement 223.4 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 184.0 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 81.281.281.281.2 %Moisture Content N/A % J A Hardcastle - Managing Director

14/03/2015

13 - H6 Top Layer

Plate Diameter

Plate Correction Factor

Settlement

Not Stated

223.4

0

100

200

300

400

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing P

ressure

(kN

/m2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-124619M Page 1 of 1

Page 40: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/124619NETS/124619NETS/124619NETS/124619N C3030/374N

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 16/03/2015

Material Description: Brown Clay Occ Stone Host + 2% Lime Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2

mm mm

15.415.415.415.4 0.17 0.190.190.190.19

34.134.134.134.1 0.41 0.350.350.350.35

55.555.555.555.5 0.72 0.500.500.500.50

76.976.976.976.9 0.95 0.680.680.680.68

99.599.599.599.5 1.18 0.900.900.900.90

117.2117.2117.2117.2 1.081.081.081.08

143.5143.5143.5143.5 1.391.391.391.39

162.8162.8162.8162.8 1.661.661.661.66

187.5187.5187.5187.5 2.012.012.012.01

204.9204.9204.9204.9 2.332.332.332.33

318.4318.4318.4318.4 4.504.504.504.50

0.00.00.00.0 0.52 1.561.561.561.56

Recovery % 56 65

762 mm

1.03

Bearing Pressure @ 1.25mm Settlement 131.4 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 108.2 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 32.332.332.332.3 %Moisture Content N/A % J A Hardcastle - Managing Director

14/03/2015

14 - H2

Plate Diameter

Plate Correction Factor

Settlement

Not Stated

131.4

0

200

400

600

0.00 1.00 2.00 3.00 4.00 5.00 6.00

Bearing Press

ure (kN/m

2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-124619N Page 1 of 1

Page 41: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/124619OETS/124619OETS/124619OETS/124619O C3030/374O

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 16/03/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2 mm mm

15.415.415.415.4 0.38 0.200.200.200.20

34.134.134.134.1 0.77 0.410.410.410.41

55.555.555.555.5 1.21 0.620.620.620.62

76.976.976.976.9 1.55 0.820.820.820.82

99.599.599.599.5 1.89 1.001.001.001.00

117.2117.2117.2117.2 1.191.191.191.19

143.5143.5143.5143.5 1.301.301.301.30

162.8162.8162.8162.8 1.481.481.481.48

187.5187.5187.5187.5 0.000.000.000.00

204.9204.9204.9204.9 0.000.000.000.00

318.4318.4318.4318.4 0.000.000.000.00

0.00.00.00.0 1.11 0.490.490.490.49

Recovery % 41 67

762 mm

1.03

Bearing Pressure @ 1.25mm Settlement 131.7 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 108.5 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 32.532.532.532.5 %Moisture Content N/A % J A Hardcastle - Managing Director

14/03/2015

15 - E3

Plate Diameter

Plate Correction Factor

Settlement

Ex Site

131.7

0

100

200

300

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing P

ressure

(kN

/m2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-124619O Page 1 of 1

Page 42: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/124628AETS/124628AETS/124628AETS/124628A C3030/375A

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 16/03/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2 mm mm

15.415.415.415.4 0.36 0.190.190.190.19

34.134.134.134.1 0.65 0.330.330.330.33

55.555.555.555.5 0.85 0.420.420.420.42

76.976.976.976.9 1.00 0.490.490.490.49

99.599.599.599.5 1.16 0.580.580.580.58

117.2117.2117.2117.2 0.650.650.650.65

162.8162.8162.8162.8 0.860.860.860.86

231.5231.5231.5231.5 1.191.191.191.19

297.5297.5297.5297.5 1.491.491.491.49

341.5341.5341.5341.5 1.701.701.701.70

434.1434.1434.1434.1 2.102.102.102.10

0.00.00.00.0 0.61 0.910.910.910.91

Recovery % 47 57

762 mm

1.03

Bearing Pressure @ 1.25mm Settlement 242.3 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 199.6 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 93.593.593.593.5 %Moisture Content N/A % J A Hardcastle - Managing Director

14/03/2015

F4

Plate Diameter

Plate Correction Factor

Settlement

Not Stated

242.3

0

200

400

600

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Beari

ng P

ressure

(kN

/m2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-124628A.xlsx Page 1 of 1

Page 43: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/124628BETS/124628BETS/124628BETS/124628B C3030/375B

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 16/03/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2 mm mm

15.415.415.415.4 0.41 0.130.130.130.13

34.134.134.134.1 0.98 0.220.220.220.22

55.555.555.555.5 1.57 0.300.300.300.30

76.976.976.976.9 2.10 0.370.370.370.37

99.599.599.599.5 2.67 0.460.460.460.46

117.2117.2117.2117.2 0.570.570.570.57

162.8162.8162.8162.8 1.041.041.041.04

231.5231.5231.5231.5 1.721.721.721.72

297.5297.5297.5297.5 2.452.452.452.45

341.5341.5341.5341.5 2.942.942.942.94

434.1434.1434.1434.1 3.363.363.363.36

0.00.00.00.0 1.34 0.780.780.780.78

Recovery % 50 77

762 mm

1.03

Bearing Pressure @ 1.25mm Settlement 183.8 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 151.4 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 57.957.957.957.9 %Moisture Content N/A % J A Hardcastle - Managing Director

14/03/2015

F5

Plate Diameter

Plate Correction Factor

Settlement

Not Stated

183.8

0

200

400

600

0.00 1.00 2.00 3.00 4.00 5.00

Beari

ng P

ressure

(kN

/m2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-124628B.xlsx Page 1 of 1

Page 44: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/124628CETS/124628CETS/124628CETS/124628C C3030/375C

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 16/03/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2 mm mm

15.415.415.415.4 0.36 0.140.140.140.14

34.134.134.134.1 0.56 0.240.240.240.24

55.555.555.555.5 0.82 0.380.380.380.38

76.976.976.976.9 1.04 0.500.500.500.50

99.599.599.599.5 1.21 0.640.640.640.64

117.2117.2117.2117.2 0.760.760.760.76

162.8162.8162.8162.8 1.091.091.091.09

231.5231.5231.5231.5 1.561.561.561.56

297.5297.5297.5297.5 1.961.961.961.96

341.5341.5341.5341.5 2.222.222.222.22

434.1434.1434.1434.1 2.792.792.792.79

0.00.00.00.0 0.49 0.650.650.650.65

Recovery % 59 77

762 mm

1.03

Bearing Pressure @ 1.25mm Settlement 187.9 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 154.8 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 60.160.160.160.1 %Moisture Content N/A % J A Hardcastle - Managing Director

14/03/2015

G2

Plate Diameter

Plate Correction Factor

Settlement

Not Stated

187.9

0

200

400

600

0.00 1.00 2.00 3.00 4.00 5.00

Beari

ng P

ressure

(kN

/m2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-124628C.xlsx Page 1 of 1

Page 45: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/124628DETS/124628DETS/124628DETS/124628D C3030/375D

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 16/03/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2 mm mm

15.415.415.415.4 0.35 0.200.200.200.20

34.134.134.134.1 0.54 0.350.350.350.35

55.555.555.555.5 0.77 0.600.600.600.60

76.976.976.976.9 0.96 0.770.770.770.77

99.599.599.599.5 1.23 0.980.980.980.98

117.2117.2117.2117.2 1.181.181.181.18

162.8162.8162.8162.8 1.641.641.641.64

231.5231.5231.5231.5 2.342.342.342.34

297.5297.5297.5297.5 3.033.033.033.03

341.5341.5341.5341.5 3.483.483.483.48

434.1434.1434.1434.1 4.194.194.194.19

0.00.00.00.0 0.00 1.371.371.371.37

Recovery % 100 67

762 mm

1.03

Bearing Pressure @ 1.25mm Settlement 125.6 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 103.5 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 29.929.929.929.9 %Moisture Content N/A % J A Hardcastle - Managing Director

14/03/2015

G3

Plate Diameter

Plate Correction Factor

Settlement

Not Stated

125.6

0

200

400

600

0.00 1.00 2.00 3.00 4.00 5.00

Beari

ng P

ressure

(kN

/m2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-124628D.xlsx Page 1 of 1

Page 46: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/124628EETS/124628EETS/124628EETS/124628E C3030/375E

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 16/03/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2 mm mm

15.415.415.415.4 0.17 0.310.310.310.31

34.134.134.134.1 0.44 0.440.440.440.44

55.555.555.555.5 0.63 0.560.560.560.56

76.976.976.976.9 0.83 0.670.670.670.67

99.599.599.599.5 1.15 0.760.760.760.76

117.2117.2117.2117.2 0.900.900.900.90

162.8162.8162.8162.8 1.231.231.231.23

231.5231.5231.5231.5 1.601.601.601.60

297.5297.5297.5297.5 1.941.941.941.94

341.5341.5341.5341.5 2.162.162.162.16

434.1434.1434.1434.1 2.532.532.532.53

0.00.00.00.0 0.51 0.000.000.000.00

Recovery % 56 100

762 mm

1.03

Bearing Pressure @ 1.25mm Settlement 167.8 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 138.2 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 49.449.449.449.4 %Moisture Content N/A % J A Hardcastle - Managing Director

14/03/2015

G4

Plate Diameter

Plate Correction Factor

Settlement

Not Stated

167.8

0

200

400

600

0.00 1.00 2.00 3.00 4.00 5.00

Beari

ng P

ressure

(kN

/m2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-124628E.xlsx Page 1 of 1

Page 47: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/124628FETS/124628FETS/124628FETS/124628F C3030/375F

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 16/03/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2 mm mm

15.415.415.415.4 0.18 0.310.310.310.31

34.134.134.134.1 0.46 0.570.570.570.57

55.555.555.555.5 0.74 0.690.690.690.69

76.976.976.976.9 1.00 0.750.750.750.75

99.599.599.599.5 1.20 0.800.800.800.80

117.2117.2117.2117.2 0.890.890.890.89

162.8162.8162.8162.8 1.191.191.191.19

231.5231.5231.5231.5 1.531.531.531.53

297.5297.5297.5297.5 1.821.821.821.82

341.5341.5341.5341.5 2.002.002.002.00

434.1434.1434.1434.1 0.000.000.000.00

0.00.00.00.0 0.67 0.590.590.590.59

Recovery % 44 70

762 mm

1.03

Bearing Pressure @ 1.25mm Settlement 173.3 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 142.8 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 52.352.352.352.3 %Moisture Content N/A % J A Hardcastle - Managing Director

14/03/2015

G5

Plate Diameter

Plate Correction Factor

Settlement

Not Stated

173.3

0

200

400

600

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Beari

ng P

ressure

(kN

/m2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-124628F.xlsx Page 1 of 1

Page 48: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/124628GETS/124628GETS/124628GETS/124628G C3030/375G

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 16/03/2015

Material Description: Brown Clay Occ Stone Host + 2% Lime Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2

mm mm

15.415.415.415.4 0.16 0.180.180.180.18

34.134.134.134.1 0.45 0.340.340.340.34

55.555.555.555.5 0.70 0.490.490.490.49

76.976.976.976.9 1.00 0.590.590.590.59

99.599.599.599.5 1.16 0.700.700.700.70

117.2117.2117.2117.2 0.840.840.840.84

162.8162.8162.8162.8 1.171.171.171.17

231.5231.5231.5231.5 2.332.332.332.33

297.5297.5297.5297.5 2.852.852.852.85

341.5341.5341.5341.5 3.183.183.183.18

434.1434.1434.1434.1 3.523.523.523.52

0.00.00.00.0 0.67 1.821.821.821.82

Recovery % 43 48

762 mm

1.03

Bearing Pressure @ 1.25mm Settlement 169.2 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 139.4 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 50.150.150.150.1 %Moisture Content N/A % J A Hardcastle - Managing Director

14/03/2015

H3

Plate Diameter

Plate Correction Factor

Settlement

Not Stated

169.2

0

200

400

600

0.00 1.00 2.00 3.00 4.00 5.00

Bearing Press

ure (kN/m

2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-124628G Page 1 of 1

Page 49: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/124628HETS/124628HETS/124628HETS/124628H C3030/375H

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 16/03/2015

Material Description: Brown Clay Occ Stone Host + 2% Lime Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2

mm mm

15.415.415.415.4 0.11 0.190.190.190.19

34.134.134.134.1 0.34 0.280.280.280.28

55.555.555.555.5 0.57 0.330.330.330.33

76.976.976.976.9 0.69 0.360.360.360.36

99.599.599.599.5 0.84 0.420.420.420.42

117.2117.2117.2117.2 0.480.480.480.48

162.8162.8162.8162.8 0.590.590.590.59

231.5231.5231.5231.5 0.880.880.880.88

297.5297.5297.5297.5 1.261.261.261.26

341.5341.5341.5341.5 1.401.401.401.40

434.1434.1434.1434.1 1.701.701.701.70

0.00.00.00.0 0.29 0.650.650.650.65

Recovery % 66 62

762 mm

1.03

Bearing Pressure @ 1.25mm Settlement 294.2 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 242.3 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 130.8130.8130.8130.8 %Moisture Content N/A % J A Hardcastle - Managing Director

14/03/2015

H4

Plate Diameter

Plate Correction Factor

Settlement

Not Stated

294.2

0

200

400

600

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing Press

ure (kN/m

2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-124628H Page 1 of 1

Page 50: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/124628IETS/124628IETS/124628IETS/124628I C3030/375I

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 16/03/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2 mm mm

15.415.415.415.4 0.28 0.190.190.190.19

34.134.134.134.1 0.47 0.290.290.290.29

55.555.555.555.5 0.69 0.370.370.370.37

76.976.976.976.9 0.90 0.430.430.430.43

99.599.599.599.5 1.01 0.490.490.490.49

117.2117.2117.2117.2 0.540.540.540.54

162.8162.8162.8162.8 0.720.720.720.72

231.5231.5231.5231.5 1.031.031.031.03

297.5297.5297.5297.5 1.381.381.381.38

341.5341.5341.5341.5 1.711.711.711.71

434.1434.1434.1434.1 2.402.402.402.40

0.00.00.00.0 0.66 1.381.381.381.38

Recovery % 34 42

762 mm

1.03

Bearing Pressure @ 1.25mm Settlement 272.9 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 224.8 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 114.8114.8114.8114.8 %Moisture Content N/A % J A Hardcastle - Managing Director

14/03/2015

H5

Plate Diameter

Plate Correction Factor

Settlement

Not Stated

272.9

0

200

400

600

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Beari

ng P

ressure

(kN

/m2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-124628I.xlsx Page 1 of 1

Page 51: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/126800ETS/126800ETS/126800ETS/126800 C3030/400

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 24/04/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2

mm mm

24.924.924.924.9 0.51 0.200.200.200.20

55.055.055.055.0 0.68 0.350.350.350.35

89.689.689.689.6 0.86 0.490.490.490.49

124.1124.1124.1124.1 1.09 0.650.650.650.65

160.5160.5160.5160.5 1.30 0.790.790.790.79

189.1189.1189.1189.1 0.910.910.910.91

231.5231.5231.5231.5 1.041.041.041.04

262.6262.6262.6262.6 1.191.191.191.19

302.5302.5302.5302.5 1.331.331.331.33

444.4444.4444.4444.4 0.000.000.000.00

0.00.00.00.0 0.000.000.000.00

0.00.00.00.0 0.85 0.420.420.420.42

Recovery % 35 69

600 mm

0.83

Bearing Pressure @ 1.25mm Settlement 279.3 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 185.2 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 82.082.082.082.0 %Moisture Content N/A % J A Hardcastle - Managing Director

23/04/2015

Grid C2, H/S Layer

Plate Diameter

Plate Correction Factor

Settlement

Not Stated

279.3

0

100

200

300

400

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing Pressure (kN/m

2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-126800A Page 1 of 1

Page 52: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/126801ETS/126801ETS/126801ETS/126801 C3030/401

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 24/04/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2

mm mm

24.924.924.924.9 0.27 0.160.160.160.16

55.055.055.055.0 0.47 0.310.310.310.31

89.689.689.689.6 0.67 0.470.470.470.47

124.1124.1124.1124.1 0.85 0.600.600.600.60

160.5160.5160.5160.5 1.13 0.720.720.720.72

189.1189.1189.1189.1 0.850.850.850.85

231.5231.5231.5231.5 0.980.980.980.98

262.6262.6262.6262.6 1.121.121.121.12

302.5302.5302.5302.5 1.261.261.261.26

444.4444.4444.4444.4 0.000.000.000.00

0.00.00.00.0 0.000.000.000.00

0.00.00.00.0 0.45 0.460.460.460.46

Recovery % 60 64

600 mm

0.83

Bearing Pressure @ 1.25mm Settlement 299.5 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 198.6 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 92.692.692.692.6 %Moisture Content N/A % J A Hardcastle - Managing Director

23/04/2015

Grid C6, H/S Layer

Plate Diameter

Plate Correction Factor

Settlement

Not Stated

299.5

0

100

200

300

400

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing Pressure (kN/m

2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-126801 Page 1 of 1

Page 53: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/126802ETS/126802ETS/126802ETS/126802 C3030/402

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 24/04/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2

mm mm

24.924.924.924.9 0.25 0.170.170.170.17

55.055.055.055.0 0.45 0.290.290.290.29

89.689.689.689.6 0.65 0.430.430.430.43

124.1124.1124.1124.1 0.85 0.590.590.590.59

160.5160.5160.5160.5 1.05 0.750.750.750.75

189.1189.1189.1189.1 0.930.930.930.93

231.5231.5231.5231.5 1.121.121.121.12

262.6262.6262.6262.6 1.261.261.261.26

302.5302.5302.5302.5 1.491.491.491.49

373.4373.4373.4373.4 1.941.941.941.94

700.2700.2700.2700.2 0.000.000.000.00

0.00.00.00.0 0.54 0.530.530.530.53

Recovery % 48 72

600 mm

0.83

Bearing Pressure @ 1.25mm Settlement 261.0 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 173.1 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 73.073.073.073.0 %Moisture Content N/A % J A Hardcastle - Managing Director

23/04/2015

Grid J6, H/S Layer

Plate Diameter

Plate Correction Factor

Settlement

Not Stated

261.0

0

100

200

300

400

500

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing Pressure (kN/m

2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-126802 Page 1 of 1

Page 54: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/126803ETS/126803ETS/126803ETS/126803 C3030/403

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 24/04/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2

mm mm

24.924.924.924.9 0.34 0.200.200.200.20

55.055.055.055.0 0.63 0.410.410.410.41

89.689.689.689.6 0.92 0.630.630.630.63

124.1124.1124.1124.1 1.19 0.810.810.810.81

160.5160.5160.5160.5 1.44 1.021.021.021.02

189.1189.1189.1189.1 1.251.251.251.25

231.5231.5231.5231.5 1.441.441.441.44

262.6262.6262.6262.6 1.671.671.671.67

302.5302.5302.5302.5 1.851.851.851.85

373.4373.4373.4373.4 0.000.000.000.00

700.2700.2700.2700.2 0.000.000.000.00

0.00.00.00.0 0.68 0.620.620.620.62

Recovery % 53 66

600 mm

0.83

Bearing Pressure @ 1.25mm Settlement 189.9 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 125.9 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 42.042.042.042.0 %Moisture Content N/A % J A Hardcastle - Managing Director

23/04/2015

Grid K5, H/S Layer

Plate Diameter

Plate Correction Factor

Settlement

Not Stated

189.9

0

100

200

300

400

500

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing Pressure (kN/m

2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-126803 Page 1 of 1

Page 55: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/126804ETS/126804ETS/126804ETS/126804 C3030/404

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 24/04/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2

mm mm

24.924.924.924.9 0.29 0.130.130.130.13

55.055.055.055.0 0.58 0.230.230.230.23

89.689.689.689.6 0.79 0.440.440.440.44

124.1124.1124.1124.1 1.04 0.660.660.660.66

160.5160.5160.5160.5 1.28 0.880.880.880.88

189.1189.1189.1189.1 1.091.091.091.09

231.5231.5231.5231.5 1.271.271.271.27

262.6262.6262.6262.6 1.471.471.471.47

302.5302.5302.5302.5 0.000.000.000.00

373.4373.4373.4373.4 0.000.000.000.00

700.2700.2700.2700.2 0.000.000.000.00

0.00.00.00.0 0.57 0.600.600.600.60

Recovery % 55 59

600 mm

0.83

Bearing Pressure @ 1.25mm Settlement 226.8 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 150.4 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 57.257.257.257.2 %Moisture Content N/A % J A Hardcastle - Managing Director

23/04/2015

Grid J2, H/S Layer

Plate Diameter

Plate Correction Factor

Settlement

Not Stated

226.8

0

100

200

300

400

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing Pressure (kN/m

2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-126804 Page 1 of 1

Page 56: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/126805ETS/126805ETS/126805ETS/126805 C3030/405

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 24/04/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2

mm mm

24.924.924.924.9 0.34 0.180.180.180.18

55.055.055.055.0 0.60 0.340.340.340.34

89.689.689.689.6 0.83 0.510.510.510.51

124.1124.1124.1124.1 1.07 0.720.720.720.72

160.5160.5160.5160.5 1.32 0.890.890.890.89

189.1189.1189.1189.1 1.071.071.071.07

231.5231.5231.5231.5 1.281.281.281.28

262.6262.6262.6262.6 1.541.541.541.54

302.5302.5302.5302.5 1.741.741.741.74

373.4373.4373.4373.4 0.000.000.000.00

700.2700.2700.2700.2 0.000.000.000.00

0.00.00.00.0 0.51 0.700.700.700.70

Recovery % 61 60

600 mm

0.83

Bearing Pressure @ 1.25mm Settlement 225.9 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 149.8 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 56.856.856.856.8 %Moisture Content N/A % J A Hardcastle - Managing Director

23/04/2015

Grid J3, H/S Layer

Plate Diameter

Plate Correction Factor

Settlement

Not Stated

225.9

0

100

200

300

400

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing Pressure (kN/m

2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-126805 Page 1 of 1

Page 57: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/126806ETS/126806ETS/126806ETS/126806 C3030/406

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 24/04/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2

mm mm

24.924.924.924.9 0.31 0.050.050.050.05

55.055.055.055.0 0.44 0.070.070.070.07

89.689.689.689.6 0.55 0.080.080.080.08

124.1124.1124.1124.1 0.64 0.100.100.100.10

160.5160.5160.5160.5 0.71 0.120.120.120.12

189.1189.1189.1189.1 0.150.150.150.15

231.5231.5231.5231.5 0.180.180.180.18

262.6262.6262.6262.6 0.210.210.210.21

302.5302.5302.5302.5 0.240.240.240.24

444.4444.4444.4444.4 0.380.380.380.38

700.2700.2700.2700.2 0.000.000.000.00

0.00.00.00.0 0.63 0.250.250.250.25

Recovery % 11 35

600 mm

0.83

Bearing Pressure @ 1.25mm Settlement >444.4 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 295.1 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value >184>184>184>184 %Moisture Content N/A % J A Hardcastle - Managing Director

23/04/2015

Grid K4, H/S Layer

Plate Diameter

Plate Correction Factor

Settlement

Not Stated

0

200

400

600

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing Press

ure (kN/m

2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-126806 Page 1 of 1

Page 58: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/126807ETS/126807ETS/126807ETS/126807 C3030/407

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 24/04/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2

mm mm

24.924.924.924.9 0.70 0.290.290.290.29

55.055.055.055.0 1.36 0.570.570.570.57

89.689.689.689.6 1.94 0.730.730.730.73

124.1124.1124.1124.1 2.46 0.910.910.910.91

160.5160.5160.5160.5 2.90 1.171.171.171.17

189.1189.1189.1189.1 1.591.591.591.59

231.5231.5231.5231.5 2.312.312.312.31

262.6262.6262.6262.6 3.043.043.043.04

302.5302.5302.5302.5 3.693.693.693.69

373.4373.4373.4373.4 0.000.000.000.00

700.2700.2700.2700.2 0.000.000.000.00

0.00.00.00.0 1.91 1.361.361.361.36

Recovery % 34 63

600 mm

0.83

Bearing Pressure @ 1.25mm Settlement 166.1 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 110.1 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 33.333.333.333.3 %Moisture Content N/A % J A Hardcastle - Managing Director

23/04/2015

Grid K3, H/S Layer

Plate Diameter

Plate Correction Factor

Settlement

Not Stated

166.1

0

100

200

300

400

0.00 1.00 2.00 3.00 4.00 5.00

Bearing Pressure (kN/m

2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-126807 Page 1 of 1

Page 59: Plate Loading Test to determine equivalent CBR Value

Collins Earthworks Ltd

Unit 2B

Park Lane

Kirkby-In-Ashfield

Nottingham

NG17 9LE

Project PEPE, WarringtonProject PEPE, WarringtonProject PEPE, WarringtonProject PEPE, Warrington

Plate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR ValuePlate Loading Test to determine equivalent CBR Value REPORT NO:REPORT NO:REPORT NO:REPORT NO: ETS/126808ETS/126808ETS/126808ETS/126808 C3030/408

In house method based on BS1377: Part 9: 1990 & HA 25/95 (replaced by IAN 73/06) Report Date: 24/04/2015

Material Description: T1SB Date Tested:

Supplier/Source: Test Location:

Load

Bearing Pressure Seating Load Test Load

kN/m2

mm mm

5.05.05.05.0 0.04 0.050.050.050.05

24.924.924.924.9 0.09 0.080.080.080.08

39.339.339.339.3 0.13 0.110.110.110.11

55.055.055.055.0 0.17 0.150.150.150.15

72.172.172.172.1 0.21 0.180.180.180.18

89.689.689.689.6 0.220.220.220.22

107.3107.3107.3107.3 0.290.290.290.29

124.1124.1124.1124.1 0.350.350.350.35

142.8142.8142.8142.8 0.480.480.480.48

249.2249.2249.2249.2 1.271.271.271.27

302.5302.5302.5302.5 0.000.000.000.00

0.00.00.00.0 0.08 0.870.870.870.87

Recovery % 62 32

600 mm

0.83

Bearing Pressure @ 1.25mm Settlement 246.8 kN/m² Authorised Signatory

Modulus of Subgrade Reaction K762 163.6 kN/m²/mm

Equivalent CBR ValueEquivalent CBR ValueEquivalent CBR ValueEquivalent CBR Value 66.266.266.266.2 %Moisture Content N/A % J A Hardcastle - Managing Director

23/04/2015

Grid K6, H/S Layer

Plate Diameter

Plate Correction Factor

Settlement

Not Stated

246.8

0

100

200

300

400

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Bearing Pressure (kN/m

2)

Settlement (mm)

Load vs Settlement DataTEST LOAD

Expon. (Test Load)

R:\ETS Reports\Collins Earthworks\C3030 - Project PEPE, Warrington\Plates\ETS-126808 Page 1 of 1