Click here to load reader

PM ConSim for Worldwide Joint Training and Scheduling Conference COL Karen Saunders [email protected] PM Constructive Simulation 407-384-3650

Embed Size (px)

Citation preview

  • Slide 1
  • PM ConSim for Worldwide Joint Training and Scheduling Conference COL Karen Saunders [email protected] PM Constructive Simulation 407-384-3650 Rick Copeland [email protected] DPM Constructive Simulation 407-384-3652
  • Slide 2
  • PEO Acquisition Center Director/PARC Associate Director Contracting Operations Associate Director Policy & Systems Business Operations DPEO (SES) Customer Support Project Support Special Staff PM TRADE PM ConSim PM Field OPS PM CATT PM ITTS PM FF(S) DPEO Programs PEO STRI Organization End 4.0 Shape a world class workforce with acquisition, functional and leadership skills PEO Vision The Center of Acquisition Excellence Providing Simulation, Training, and Testing Solutions for the Nation. PEO Mission To Provide Responsive Interoperable Simulation, Training, and Testing Solutions and Acquisition Services for the Warfighter and the Nation.
  • Slide 3
  • PM ConSim COL KAREN SAUNDERS (PM) MR. RICK COPELAND (DPM) APM JLCCTC PRODUCTION MR. ROY WHITEHEAD APM JLCCTC DEVELOPMENT MR. MIKE HADDAD TRAINING SIMULATIONS OFFICER LTC STEVE FRENCH PdM Warrior Training Integration (WTI) LTC KEITH FLAIL (PdM) Vacant (DPdM) Joint and Coalition Simulation Systems (JCSS) Vacant (Director) DON PHILPITT (APM) PdM OneSAF LTC ROB RASCH (PdM) MR. JOHN LOGSDON (DPdM) ConSim Organization JCSS
  • Slide 4
  • ConSim Vision: To be the Recognized Leader for Providing Constructive and Integrated Simulation Environments. ConSim Mission: To Provide Operationally Relevant Constructive and Integrated Simulation Environments for the Warfighter and the Nation. ConSim Mission Joint Coalition Simulation Systems (JCSS) - Develop, acquire, field and sustain interoperable simulation environments in support of Joint and Coalition Forces and the Nation. PdM OneSAF Develop, field and configuration manage the OneSAF constructive simulation for the US Army. The Training Simulation Office executes the SIMCI project for HQDA and serves as the designated FA57 proponent within PEO STRI. APM JLCCTC (Production) - Focused Management of both the Multi-Resolution Federation and Entity Resolution Federation compositions of the Joint Land Component Constructive Training Capability (JLCCTC). APM JLCCTC (Development) Focused Management on Objective Simulations targeted at training commanders and staffs at Brigade and above. PdM Warrior Training Integration (WTI) - Provide persistent and integrated LVC training enablers that allow Commanders to plan and execute realistic Battle Command, Intelligence, and Joint Training to prepare their soldiers and staffs for combat. Joint Coalition Simulation Systems (JCSS) - Develop, acquire, field and sustain interoperable simulation environments in support of Joint and Coalition Forces and the Nation. JCSS
  • Slide 5
  • BLUF: The LVC-IA will enable seamless LVC & C2 connections C2 ABCS GCCS CONSTRUCTIVE JLCCTC OneSAF LIVE HITS VIRTUAL AVCATT CCTT/RVTT CFFT LVC-IA Increment 1 Focus - Brigade Combat Team (BCT) - Home Station Training - BCTC is LVC Hub LVC-IA Increment 1 Concept
  • Slide 6
  • 6 LVC-IA Requirement/Capabilities: LVC-IA integrates L-V-C systems and ABCS enabling unit and battle staff configurable tailored combined arms and joint collective training at multiple echelons. LVC-IA provides appropriate 'conditions' for realistic training, increasing unit force effectiveness and readiness. It will create a Joint, interoperable, seamless architecture to support training environments for Current and Future Forces in the Institutional, Operational, and Self Development Domains. LVC-IA will support development of an LVC Integrated Training Environment (ITE) Current Activities: Acquisition documentation in support of Milestone B decision and program initiation ACAT III program, MDA delegation to PEO STRI Materiel Development Decision (MDD) - June 2009 Anticipated MS B in September 2009 Contract actions: Industry Day May 2009 Request for Information June 2009 Request for Proposal October 2009 Anticipated Contract Award January 2010 Live, Virtual, Constructive Integration Cell (LVCIC) Technological and Programmatic Risk Reduction LVC-IA Site Survey and Prioritization Visits OCONUS Fielding US Army Pacific (USARPAC) US Army Europe (USAREUR) FT Carson FT Lewis FT Bliss FT Hood FT Knox FT Campbell FT Bragg FT Stewart FT Drum Camp Shelby
  • Slide 7
  • BCTP TSS Convergence Roadmap JNEM ISM LOGFED 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 OneSAF R & D BCT & Below OneSAF Div & Above WARSIM R&D DIV (+) CSSTSS JNEM ISM LOGFED CBCSE, BCTC Equipment & MCA OPA ERF V2.0V1.0V3.0V4.0V5.0V6.0 V3.0 V4.0 V5.0 V6.0 V5.0 IEWTPT DBST TACSIM Common HW Obj MRF Refresh LCMP/P3I WARSIM R&D BCT DBST JCATS EADSIM FIRESIM TACSIM SIMPLE MUSE VISION XXI ACTF CBS TACSIM CSS/TSS RTM MUSE AAR TOOLS V5.0 V6.0 MRF CBS TACSIM JLCCTC
  • Slide 8
  • * Friends of the family ERF MRF-W MRF-C JCATS (m) JDLM (or LID) (m/i) JNEM (m) MUSE (m/i) ISM (m) RTM (i) AARS (t) FMT-R (t) EADSIM (m) FIRESIM (m) ETSIU (i) SIMPLE (i) JSPA (t) HDC (t) SASS (t) CBS (m) *BICM (m/i) WARSIM (m/i) WIM (m) *IEWTPT (m/i) ACE/ASCCE (m/i) BE Server (m) *Archer (t) Rialto (t) ExCIS (m/i) TACSIM (m/i) ERF MRF-W MRF-C OneSAF (m/i) m = model i = sim/C2 interface t = tool * Friends of family JLCCTC Challenge
  • Slide 9
  • Fielding Plan or Schedule Capabilities Summary Current Activities JLCCTC MRF-WARSIM is the US Armys next generation constructive training simulation that creates a Realistic Training Environment for Commanders and their Staffs. Capabilities includes: Supporting a DIV WFX/CPX Use Case C2 Stim with ABCS 6.4 devices including BCS3 and DCGS-A Three Enclave Solution with Intel capabilities (HUMINT, IMINT, ELINT, COMINT, and MASINT systems) Interface with AARS, ARCHER, MUSE, JNEM, ISM, and JCATS Provide Fixed sites capability with BE Services Improved Diagnosis/Recovery and parametric data management Just completed a very productive MRF-W v5.5 VE and ORE at the NSC and BCTC/BCTP The MRF-W VE/ORE provided the best operational environment to date to "stress and shake-out" the system to ensure readiness for Army DIV WFXs. During the VE, the federation availability was 98% with an overall requirements pass rate of an impressive 85% During the ORE, the System was solid and available 100% the first 60 hrs before encountering the first period of down time; final availability was 91.8% Conducted four Analysis Events at Fort Huachuca to compare their current simulation systems to WARSIMs capabilities: WARSIM interfaced/stimulated DGCS-A v3.0.1 Verified/updated Intel sensors parametric data/capability Demonstrated interface with IEWTPT Upon addressing any outstanding gaps, Fort Huachuca plans to use WARSIM for their school house training exercises Aug 09: Complete v5.5 MRF-W fielding to the NSC and BCTP Sep/Oct 09: Field Tech Control Forward suite to Korea in support of the WARPATH II Exercise and 2ID CPX/ORE 2QFY10 & beyond: Field to additional Army Tier one BCTCs as of 29 May '09 JLCCTC MRF-W Multi Resolution Federation (MRF) - WARfighters SIMulation (WARSIM)
  • Slide 10
  • JLCCTC ERF Current Activities V5.x Being Fielded at 22 CONUS/OCONUS sites during FY09 Week 2 of the VE finished on 29 May with the following results: 182 of 209 tests completed, with 86% tests passed. The remaining tests will be run during the ERF ORE with BCTP in July. Overall federation availability was 97%. 74 PTRs were written, of which 43 were closed or deferred. V5.2 Development (2 nd Qtr FY09) ROK 22 Fielded locations v5.1 2 nd Qtr FY09 v5.2 4 rd Qtr FY09 v5.3 4 th Qtr FY10 Italy FRG Capabilities Summary Full automation of TTP behaviors and simulation objects down to the soldier or vehicle level Supports exercises from Company to BDE Models sides/factions BLUFOR, OPFOR, Non-aligned, Neutral and Non-combatants Trains hundreds of commanders and staff yearly at 22 CONUS and OCONUS sites DIS / HLA Compliant Stimulates ABCS 6.4 including Native AFATDS Software operates on COTS HW Hardened the integration of LOGFED in FY09.
  • Slide 11
  • Users: RDECs / Battle Labs / Active Duty Brigades & Battalions Service / Joint Organizations International Partners USG Contractors / Academia Objectives: Reduce Army Life Cycle M&S costs Capable of replacing USA legacy entity based simulations: BBS, OTB / ModSAF, CCTT / AVCATT SAF, Janus (A&T), JCATS MOUT Technical Capability Highlights: Provides entity modeling to BDE level Supports both Constructive & Virtual Domains Provides Urban Operation modeling with COE Focus Provides DIS/HLA/JC3IEDM/ ABCS Interoperability Supports ACR, RDA, TEMO) Domain applications Programmatics: MNS: May 97 PM Charter: May 00 V1.0 (FOC): Sep 06 V3.0: Feb 09 Ares Control Interface OneSAF Overview
  • Slide 12
  • Capabilities Summary Supports PEO STRI integration of Army System & Non-System training devices with existing and emerging Army Battle Command Systems (ABCS) Augments & Supports CTSF distributed Army Interoperability Certification (AIC) / testing Supports PEO STRI Training Development Community by providing ABCS technical expertise and early access to emerging ABCS SW Baselines Current Activities Undergoing DIACAP for DIL Network Accreditation Federated Net-Centric Site (FaNS) Accreditation 5 June 2009 RFP for new competitive effort expected to be posted by mid June DREN PM ConSim JLCCTC WARSIM OneSAF PM CATT Other Agencies JFCOM/JDIF RDECOM NSC PM TRADE LT2 DRTS ETC-IS SE CORE AVCATT CCTT PM STS AFATDS AMDWS ASAS FAAD FBCB2 GCCS-A MCS BCS DCGS-A System Architecture/DIL Network Diagram DIGITAL INTEGRATION LABORATORY (DIL)
  • Slide 13
  • Slide 14
  • Acronyms AARAfter Action Review APIApplication Protocol Interface BCBattle Command CATTCombined Arms Tactical Trainer C2SECommand and Control Simulation Equipment C2Command and Control CBSCORPS Battle Simulation COEContemporary Operating Environment CSSCombat Service Support CSSTSSCombat Service Support Training Simulation System CTIA Common Training Instrumentation Architecture DBSTDigital Battlestaff Sustainment Trainer DIFData Interchange Format IEWTPTIntelligence & Electronic Warfare Tactical Proficiency Trainer ISR Intelligence, Surveillance and Reconnaissance JCATSJoint Conflict And Tactical Simulation JDLMJoint Deployment Logistics Model JOEJoint Operations Environment JLCCTCJoint Land Component Constructive Training Capability -MRFMulti-Resolution Federation -ERF Entity Resolution Federation LODLow Overhead Driver LVC - IALive, Virtual, Constructive - Integrated Architecture MOUTMilitary Operations in Urban Terrain OneSAFOne Semi-Automated Forces OneTESSOne Tactical Engagement Simulation System OISFuture Instrumentation System PoPProof of Principal SE CoreSynthetic Environment Core TACSIMTactical Simulation TENATest and Training ENabling Architecture WARSIMWarfighter's Simulation
  • Slide 15
  • ConSim Portfolio UBC CONSTRUCTIVE LIVE VIRTUAL LVC-IA
  • Slide 16
  • ConSim Portfolio JLCCTC (WARSIM) FT Riley BCTC IEWTPT HCC
  • Slide 17
  • LVC IC Build 0
  • Slide 18
  • Enabling Technologies: Each of the training domains provide unique complementary capabilities to the entire LVC training environment. Elements of Live Virtual Constructive Integration of Battle Command: Real world tactical systems used in the training environment.
  • Slide 19
  • Current State of Modeling and Simulation for Training V IRTUAL C ONSTRUCTIVE L IVE
  • Slide 20
  • Todays Reality Live EnablersProductsFuture Products LT2 Product Line CTIA FASIT OneTESS Standard DIS/HLA Distributed Repository Security Services Common Components C4I Adapter SE Core VSA DVED CM2 CCTT AVCATT Games for Training CDT RCTS JFETS Virtual Constructive CTC OIS MILES Digital Ranges T-IED HITS CTC IS Modification ETC-IS I-MTS OneTESS JLCCTC CBS WARSIM OneSAF One Merged Federation & LVC-IA
  • Slide 21
  • 21 as of:For Official Use Only 21 MRF-W Plan to Support 2ID WARPATH II Exercise & CPX/ORE V5.5 (3QFY09) Capabilities: - DIV WFX/CPX Use Case - Three Enclaves with Intel (HUMINT, IMINT, ELINT, COMINT, MASINT) - Improved Diagnosis / Recovery and parametric data management - Address v5 Concerns/PTRs Interfaces: - ABCS 6.4 including BCS3 Stim - AARS, ARCHER - JNEM, ISM, MUSE - Fixed sites capability with BE Services MRF-W Preparation / Key Activities:2ID WARPATH II Exercise and CPX/ORE Plan Forward: 26 May 17 July 09: SW and Scenario Development of seven main tasks. (SW Freeze ~17 July) Early June Sept 09: Conduct IPRs with all stakeholders (2ID, 8th Army, KBSC, BCTP, NSC) 20 July 8 Aug : Integration and TestExer Design Conf: 13-17 July in Korea 3 Aug 11 Sept: Numerous Scenario Data Scrubs14-25 Sep 09: Master Training in Korea 8 14 Aug: PTR Freeze date and Final SW Build produced 5-9 Oct 09: RolePlayer Functional Training in Korea 24 Aug 4 Sept: SW Release Test at the NSC12-16 Oct 09: WARPATH II Exercise Execution in Korea 7-12 Sept 09: Set-up Tech Control Forward in Korea 6-19 Nov 09: 2ID CPX/ORE and prep activities
  • Slide 22
  • Current Activities Fielded v4.1 to NSC, BCTP, Hood, Bragg, Lewis, KBSC, and JMTC in FY 08. Fielded V5.1 to Ft. Hood Jan 09 V5.2 FINAL PLANNED VERSION VE June 22 nd July 2nd FY2010 CBS in Full Sustainment KBSC FRG Capabilities Summary Models units from section/squad through division Corps, Division & Unit Employment Operations, High Fidelity Intel, Logistics & AAR Federates Linkage to Battle Command & Control Systems Trains commanders and staff Only US Ground model that is KSIMS compatible Key Events: Unified Endeavor, Ulchi-Freedom Guardian, Key Resolve, Yama Sakura, WarPath, Cobra, Rapid Thunder, Iron Focus. Security Classification : Unclassified to TS/SCI JMTC JLCCTC MRF-C
  • Slide 23
  • 23 Capabilities Summary Supports Intelligence Surveillance & Reconnaissance Operates in the Constructive & Live Domains Supports the Intel Warfighter and Commander Trains Intel Warfighter in their Go-to-War system Forces cross domain fusion within intel BOS Robust AAR Generation Hardware/Software and contractor support at sites Utilizes Service Based Architecture for large entity counts as well as aligning with Army ISR systems (DCGS- A, ACS) 3-D environment to support realistic tactical questioning techniques and procedures 19 scenarios currently fielded 3 MP; 16 HUMINT Current Activities Developing Signals environment in the TCC to stimulate SIGINT ISR platforms V4.0 Development (2 nd Qtr FY10) Integrating technology into HCC Building new scenarios for the HCC 7 scenarios (5 HUMINT, 2 MPs) currently being developed; 5 additional HUMINT scenarios planned Integrating Quick Reaction Capabilities into TCC Supporting Army G2 initiative in developing a training solution for DCGS-A Working with Army Evaluation Center to use IEWTPT for DCGS-A testing and evaluation Successfully supported Austere Challenge 09 Current Fielded Sites FT Lewis FT Hood Schofield FT Huachuca FT Bragg IEWTPT TCC/HCC
  • Slide 24
  • OneSAF Capabilities Summary CGF/SAF modeling from entity to BDE Supports Constructive & Virtual Domains COE Focus with Urban Operation modeling Operations from Scenario Generation thru AAR DIS / HLA / JC3IEDM / ABCS Interoperability Supports ACR, RDA, TEMO Domain Events Software only Platform independent (Linux/Windows) software Current Activities TEMO Domain assessment @ NSC (July) OmniFusion (OF) 09 @ Maneuver Battle Lab (July) FCS Events @ Ft. Bliss (July) V3.0 International Development (3 rd & 4 th Qtr FY09) V4.0 Development (Planned delivery: 2 nd Qtr FY10) V5.0 Development (Planned delivery: 2 nd Qtr FY11) Merged software development baseline with SE Core FLOIS TALON STRIKE (TS) using OneSAF for collaborative US & UK Battle Command stimulation (FY10) CTCs, Staff & Virtual Trainers Paving The Way To The Future GEGE Over 200 Hundred Domestic Locations & 7 International Partners v3.0 Released 2 nd Qtr FY09 v3.5 4 th Qtr FY09 (Planned) Interoperable Applications Common Architectures DIS, HLA C4I Adapter, SNE, AAR, Scenario Generation CTIA, VSA, OneSAF Common APIs, DIFs, & Protocols Common Components
  • Slide 25
  • Battle Command Training Capability Equipment Support (BCTC-ES) Fielding Plan or Schedule Capabilities Summary Furniture, Fixtures, and Equipment Battlefield Visualization System Radio-Wire Integration System Network Infrastructure Upgrade and Simulation System connectivity Battle Command (C2) Server Fielding / Refresh Simulation-to-C2 end-to-end Connectivity and Integration Packet Radio Units and Antenna Systems (Fixed / Mobile) Current Activities Fielding Ft. Riley BCTC (med) (estimated completion 8 Jun) Working with the Ft. Benning (Harmony Church) team for a 100% Design for the new facility Preparing contract actions for the Ft. Campbell & Ft. Bliss Medium BCTC Fielding Scheduling Red Zone Meeting to complete plans on fielding for the FY10 BCTC Fieldings AdminSupport Staff AAR Reconfigurable Tactical Operations Centers (RTOC) Expandable Comms Workcells Tech Control Expandable Classrooms WSMR Ft. Riley Ft. Sam Houston Ft. Leonard Wood Ft. Campbell Ft. Benning Ft. Bliss FY09 Fielding FY10 Fielding FY11 Fielding
  • Slide 26
  • FITE JCTD Transition: Extended Use of Interim Capability, Targeted Locations: Camp Lejeune and Fort Benning If conducted, resourced through BA4 funding Follow-on Development, Production, Fielding, and Sustainment, Targeted POR/Programs: Dismounted Soldier (PM CATT) CACTF (PM TRADE) IIT (PM TRASYS) Mission Rehearsal (USSOCOM) SITE [proposed TBD (PM TRASYS)] Participants: User Sponsor: JFCOM Operational Manager: JFCOM Technical Manager: ONR Transition Manager: PEO STRI Oversight Executive: ODUSD (AS&C) Schedule: Technical Demonstrations: May 09, Apr 10 Operational Demonstrations: Aug 09, Jul 10 Operational Utility Assessments Reports: Oct 09, Sep 10 Capabilities Solution: Three Configurations: Spiral 1: Individual-worn Virtual Reality Spiral 2: Facility-based Mixed Reality Spiral 2: Individual-worn Augmented Reality Configuration Components: Software virtual environment Commercial hardware Visual, auditory, touch, and smell components Position and weapons tracking system AAR system Funded by OSD/AS&C, JIEDDO, and JFCOM
  • Slide 27
  • SIMCI Simulation-to-C4 Interoperability FY09/10 Focus Areas Mitigating the impact of Capability Set 11-12 on M&S systems Initialization JC3IEDM Migration Army StaffMaterial DevelopersCombat DevelopersCross DomainSIMCI Management SIMCI OIPT Membership M&S Domain C4I Domain Interoperability of Current and Future Systems M&S C4I Shared Solutions Processes Common Data Reusable Components Architectures Common Standards Description Mission: Provide policy, organizational, process, and technical recommendations to Army Leadership to improve interoperability of M&S and C4I systems Focused on common components, data, standards, architectures, and processes Co-chaired by PEO STRI & PEO C3T; originally chartered in FY2000 Migration