PM ConSim for Worldwide Joint Training and Scheduling
Conference COL Karen Saunders [email protected] PM
Constructive Simulation 407-384-3650 Rick Copeland
[email protected] DPM Constructive Simulation
407-384-3652
Slide 2
PEO Acquisition Center Director/PARC Associate Director
Contracting Operations Associate Director Policy & Systems
Business Operations DPEO (SES) Customer Support Project Support
Special Staff PM TRADE PM ConSim PM Field OPS PM CATT PM ITTS PM
FF(S) DPEO Programs PEO STRI Organization End 4.0 Shape a world
class workforce with acquisition, functional and leadership skills
PEO Vision The Center of Acquisition Excellence Providing
Simulation, Training, and Testing Solutions for the Nation. PEO
Mission To Provide Responsive Interoperable Simulation, Training,
and Testing Solutions and Acquisition Services for the Warfighter
and the Nation.
Slide 3
PM ConSim COL KAREN SAUNDERS (PM) MR. RICK COPELAND (DPM) APM
JLCCTC PRODUCTION MR. ROY WHITEHEAD APM JLCCTC DEVELOPMENT MR. MIKE
HADDAD TRAINING SIMULATIONS OFFICER LTC STEVE FRENCH PdM Warrior
Training Integration (WTI) LTC KEITH FLAIL (PdM) Vacant (DPdM)
Joint and Coalition Simulation Systems (JCSS) Vacant (Director) DON
PHILPITT (APM) PdM OneSAF LTC ROB RASCH (PdM) MR. JOHN LOGSDON
(DPdM) ConSim Organization JCSS
Slide 4
ConSim Vision: To be the Recognized Leader for Providing
Constructive and Integrated Simulation Environments. ConSim
Mission: To Provide Operationally Relevant Constructive and
Integrated Simulation Environments for the Warfighter and the
Nation. ConSim Mission Joint Coalition Simulation Systems (JCSS) -
Develop, acquire, field and sustain interoperable simulation
environments in support of Joint and Coalition Forces and the
Nation. PdM OneSAF Develop, field and configuration manage the
OneSAF constructive simulation for the US Army. The Training
Simulation Office executes the SIMCI project for HQDA and serves as
the designated FA57 proponent within PEO STRI. APM JLCCTC
(Production) - Focused Management of both the Multi-Resolution
Federation and Entity Resolution Federation compositions of the
Joint Land Component Constructive Training Capability (JLCCTC). APM
JLCCTC (Development) Focused Management on Objective Simulations
targeted at training commanders and staffs at Brigade and above.
PdM Warrior Training Integration (WTI) - Provide persistent and
integrated LVC training enablers that allow Commanders to plan and
execute realistic Battle Command, Intelligence, and Joint Training
to prepare their soldiers and staffs for combat. Joint Coalition
Simulation Systems (JCSS) - Develop, acquire, field and sustain
interoperable simulation environments in support of Joint and
Coalition Forces and the Nation. JCSS
Slide 5
BLUF: The LVC-IA will enable seamless LVC & C2 connections
C2 ABCS GCCS CONSTRUCTIVE JLCCTC OneSAF LIVE HITS VIRTUAL AVCATT
CCTT/RVTT CFFT LVC-IA Increment 1 Focus - Brigade Combat Team (BCT)
- Home Station Training - BCTC is LVC Hub LVC-IA Increment 1
Concept
Slide 6
6 LVC-IA Requirement/Capabilities: LVC-IA integrates L-V-C
systems and ABCS enabling unit and battle staff configurable
tailored combined arms and joint collective training at multiple
echelons. LVC-IA provides appropriate 'conditions' for realistic
training, increasing unit force effectiveness and readiness. It
will create a Joint, interoperable, seamless architecture to
support training environments for Current and Future Forces in the
Institutional, Operational, and Self Development Domains. LVC-IA
will support development of an LVC Integrated Training Environment
(ITE) Current Activities: Acquisition documentation in support of
Milestone B decision and program initiation ACAT III program, MDA
delegation to PEO STRI Materiel Development Decision (MDD) - June
2009 Anticipated MS B in September 2009 Contract actions: Industry
Day May 2009 Request for Information June 2009 Request for Proposal
October 2009 Anticipated Contract Award January 2010 Live, Virtual,
Constructive Integration Cell (LVCIC) Technological and
Programmatic Risk Reduction LVC-IA Site Survey and Prioritization
Visits OCONUS Fielding US Army Pacific (USARPAC) US Army Europe
(USAREUR) FT Carson FT Lewis FT Bliss FT Hood FT Knox FT Campbell
FT Bragg FT Stewart FT Drum Camp Shelby
Slide 7
BCTP TSS Convergence Roadmap JNEM ISM LOGFED 2005 2006 2007
2008 2009 2010 2011 2012 2013 2014 2015 OneSAF R & D BCT &
Below OneSAF Div & Above WARSIM R&D DIV (+) CSSTSS JNEM ISM
LOGFED CBCSE, BCTC Equipment & MCA OPA ERF
V2.0V1.0V3.0V4.0V5.0V6.0 V3.0 V4.0 V5.0 V6.0 V5.0 IEWTPT DBST
TACSIM Common HW Obj MRF Refresh LCMP/P3I WARSIM R&D BCT DBST
JCATS EADSIM FIRESIM TACSIM SIMPLE MUSE VISION XXI ACTF CBS TACSIM
CSS/TSS RTM MUSE AAR TOOLS V5.0 V6.0 MRF CBS TACSIM JLCCTC
Slide 8
* Friends of the family ERF MRF-W MRF-C JCATS (m) JDLM (or LID)
(m/i) JNEM (m) MUSE (m/i) ISM (m) RTM (i) AARS (t) FMT-R (t) EADSIM
(m) FIRESIM (m) ETSIU (i) SIMPLE (i) JSPA (t) HDC (t) SASS (t) CBS
(m) *BICM (m/i) WARSIM (m/i) WIM (m) *IEWTPT (m/i) ACE/ASCCE (m/i)
BE Server (m) *Archer (t) Rialto (t) ExCIS (m/i) TACSIM (m/i) ERF
MRF-W MRF-C OneSAF (m/i) m = model i = sim/C2 interface t = tool *
Friends of family JLCCTC Challenge
Slide 9
Fielding Plan or Schedule Capabilities Summary Current
Activities JLCCTC MRF-WARSIM is the US Armys next generation
constructive training simulation that creates a Realistic Training
Environment for Commanders and their Staffs. Capabilities includes:
Supporting a DIV WFX/CPX Use Case C2 Stim with ABCS 6.4 devices
including BCS3 and DCGS-A Three Enclave Solution with Intel
capabilities (HUMINT, IMINT, ELINT, COMINT, and MASINT systems)
Interface with AARS, ARCHER, MUSE, JNEM, ISM, and JCATS Provide
Fixed sites capability with BE Services Improved Diagnosis/Recovery
and parametric data management Just completed a very productive
MRF-W v5.5 VE and ORE at the NSC and BCTC/BCTP The MRF-W VE/ORE
provided the best operational environment to date to "stress and
shake-out" the system to ensure readiness for Army DIV WFXs. During
the VE, the federation availability was 98% with an overall
requirements pass rate of an impressive 85% During the ORE, the
System was solid and available 100% the first 60 hrs before
encountering the first period of down time; final availability was
91.8% Conducted four Analysis Events at Fort Huachuca to compare
their current simulation systems to WARSIMs capabilities: WARSIM
interfaced/stimulated DGCS-A v3.0.1 Verified/updated Intel sensors
parametric data/capability Demonstrated interface with IEWTPT Upon
addressing any outstanding gaps, Fort Huachuca plans to use WARSIM
for their school house training exercises Aug 09: Complete v5.5
MRF-W fielding to the NSC and BCTP Sep/Oct 09: Field Tech Control
Forward suite to Korea in support of the WARPATH II Exercise and
2ID CPX/ORE 2QFY10 & beyond: Field to additional Army Tier one
BCTCs as of 29 May '09 JLCCTC MRF-W Multi Resolution Federation
(MRF) - WARfighters SIMulation (WARSIM)
Slide 10
JLCCTC ERF Current Activities V5.x Being Fielded at 22
CONUS/OCONUS sites during FY09 Week 2 of the VE finished on 29 May
with the following results: 182 of 209 tests completed, with 86%
tests passed. The remaining tests will be run during the ERF ORE
with BCTP in July. Overall federation availability was 97%. 74 PTRs
were written, of which 43 were closed or deferred. V5.2 Development
(2 nd Qtr FY09) ROK 22 Fielded locations v5.1 2 nd Qtr FY09 v5.2 4
rd Qtr FY09 v5.3 4 th Qtr FY10 Italy FRG Capabilities Summary Full
automation of TTP behaviors and simulation objects down to the
soldier or vehicle level Supports exercises from Company to BDE
Models sides/factions BLUFOR, OPFOR, Non-aligned, Neutral and
Non-combatants Trains hundreds of commanders and staff yearly at 22
CONUS and OCONUS sites DIS / HLA Compliant Stimulates ABCS 6.4
including Native AFATDS Software operates on COTS HW Hardened the
integration of LOGFED in FY09.
Slide 11
Users: RDECs / Battle Labs / Active Duty Brigades &
Battalions Service / Joint Organizations International Partners USG
Contractors / Academia Objectives: Reduce Army Life Cycle M&S
costs Capable of replacing USA legacy entity based simulations:
BBS, OTB / ModSAF, CCTT / AVCATT SAF, Janus (A&T), JCATS MOUT
Technical Capability Highlights: Provides entity modeling to BDE
level Supports both Constructive & Virtual Domains Provides
Urban Operation modeling with COE Focus Provides DIS/HLA/JC3IEDM/
ABCS Interoperability Supports ACR, RDA, TEMO) Domain applications
Programmatics: MNS: May 97 PM Charter: May 00 V1.0 (FOC): Sep 06
V3.0: Feb 09 Ares Control Interface OneSAF Overview
Slide 12
Capabilities Summary Supports PEO STRI integration of Army
System & Non-System training devices with existing and emerging
Army Battle Command Systems (ABCS) Augments & Supports CTSF
distributed Army Interoperability Certification (AIC) / testing
Supports PEO STRI Training Development Community by providing ABCS
technical expertise and early access to emerging ABCS SW Baselines
Current Activities Undergoing DIACAP for DIL Network Accreditation
Federated Net-Centric Site (FaNS) Accreditation 5 June 2009 RFP for
new competitive effort expected to be posted by mid June DREN PM
ConSim JLCCTC WARSIM OneSAF PM CATT Other Agencies JFCOM/JDIF
RDECOM NSC PM TRADE LT2 DRTS ETC-IS SE CORE AVCATT CCTT PM STS
AFATDS AMDWS ASAS FAAD FBCB2 GCCS-A MCS BCS DCGS-A System
Architecture/DIL Network Diagram DIGITAL INTEGRATION LABORATORY
(DIL)
Slide 13
Slide 14
Acronyms AARAfter Action Review APIApplication Protocol
Interface BCBattle Command CATTCombined Arms Tactical Trainer
C2SECommand and Control Simulation Equipment C2Command and Control
CBSCORPS Battle Simulation COEContemporary Operating Environment
CSSCombat Service Support CSSTSSCombat Service Support Training
Simulation System CTIA Common Training Instrumentation Architecture
DBSTDigital Battlestaff Sustainment Trainer DIFData Interchange
Format IEWTPTIntelligence & Electronic Warfare Tactical
Proficiency Trainer ISR Intelligence, Surveillance and
Reconnaissance JCATSJoint Conflict And Tactical Simulation
JDLMJoint Deployment Logistics Model JOEJoint Operations
Environment JLCCTCJoint Land Component Constructive Training
Capability -MRFMulti-Resolution Federation -ERF Entity Resolution
Federation LODLow Overhead Driver LVC - IALive, Virtual,
Constructive - Integrated Architecture MOUTMilitary Operations in
Urban Terrain OneSAFOne Semi-Automated Forces OneTESSOne Tactical
Engagement Simulation System OISFuture Instrumentation System
PoPProof of Principal SE CoreSynthetic Environment Core
TACSIMTactical Simulation TENATest and Training ENabling
Architecture WARSIMWarfighter's Simulation
Slide 15
ConSim Portfolio UBC CONSTRUCTIVE LIVE VIRTUAL LVC-IA
Slide 16
ConSim Portfolio JLCCTC (WARSIM) FT Riley BCTC IEWTPT HCC
Slide 17
LVC IC Build 0
Slide 18
Enabling Technologies: Each of the training domains provide
unique complementary capabilities to the entire LVC training
environment. Elements of Live Virtual Constructive Integration of
Battle Command: Real world tactical systems used in the training
environment.
Slide 19
Current State of Modeling and Simulation for Training V IRTUAL
C ONSTRUCTIVE L IVE
Slide 20
Todays Reality Live EnablersProductsFuture Products LT2 Product
Line CTIA FASIT OneTESS Standard DIS/HLA Distributed Repository
Security Services Common Components C4I Adapter SE Core VSA DVED
CM2 CCTT AVCATT Games for Training CDT RCTS JFETS Virtual
Constructive CTC OIS MILES Digital Ranges T-IED HITS CTC IS
Modification ETC-IS I-MTS OneTESS JLCCTC CBS WARSIM OneSAF One
Merged Federation & LVC-IA
Slide 21
21 as of:For Official Use Only 21 MRF-W Plan to Support 2ID
WARPATH II Exercise & CPX/ORE V5.5 (3QFY09) Capabilities: - DIV
WFX/CPX Use Case - Three Enclaves with Intel (HUMINT, IMINT, ELINT,
COMINT, MASINT) - Improved Diagnosis / Recovery and parametric data
management - Address v5 Concerns/PTRs Interfaces: - ABCS 6.4
including BCS3 Stim - AARS, ARCHER - JNEM, ISM, MUSE - Fixed sites
capability with BE Services MRF-W Preparation / Key Activities:2ID
WARPATH II Exercise and CPX/ORE Plan Forward: 26 May 17 July 09: SW
and Scenario Development of seven main tasks. (SW Freeze ~17 July)
Early June Sept 09: Conduct IPRs with all stakeholders (2ID, 8th
Army, KBSC, BCTP, NSC) 20 July 8 Aug : Integration and TestExer
Design Conf: 13-17 July in Korea 3 Aug 11 Sept: Numerous Scenario
Data Scrubs14-25 Sep 09: Master Training in Korea 8 14 Aug: PTR
Freeze date and Final SW Build produced 5-9 Oct 09: RolePlayer
Functional Training in Korea 24 Aug 4 Sept: SW Release Test at the
NSC12-16 Oct 09: WARPATH II Exercise Execution in Korea 7-12 Sept
09: Set-up Tech Control Forward in Korea 6-19 Nov 09: 2ID CPX/ORE
and prep activities
Slide 22
Current Activities Fielded v4.1 to NSC, BCTP, Hood, Bragg,
Lewis, KBSC, and JMTC in FY 08. Fielded V5.1 to Ft. Hood Jan 09
V5.2 FINAL PLANNED VERSION VE June 22 nd July 2nd FY2010 CBS in
Full Sustainment KBSC FRG Capabilities Summary Models units from
section/squad through division Corps, Division & Unit
Employment Operations, High Fidelity Intel, Logistics & AAR
Federates Linkage to Battle Command & Control Systems Trains
commanders and staff Only US Ground model that is KSIMS compatible
Key Events: Unified Endeavor, Ulchi-Freedom Guardian, Key Resolve,
Yama Sakura, WarPath, Cobra, Rapid Thunder, Iron Focus. Security
Classification : Unclassified to TS/SCI JMTC JLCCTC MRF-C
Slide 23
23 Capabilities Summary Supports Intelligence Surveillance
& Reconnaissance Operates in the Constructive & Live
Domains Supports the Intel Warfighter and Commander Trains Intel
Warfighter in their Go-to-War system Forces cross domain fusion
within intel BOS Robust AAR Generation Hardware/Software and
contractor support at sites Utilizes Service Based Architecture for
large entity counts as well as aligning with Army ISR systems
(DCGS- A, ACS) 3-D environment to support realistic tactical
questioning techniques and procedures 19 scenarios currently
fielded 3 MP; 16 HUMINT Current Activities Developing Signals
environment in the TCC to stimulate SIGINT ISR platforms V4.0
Development (2 nd Qtr FY10) Integrating technology into HCC
Building new scenarios for the HCC 7 scenarios (5 HUMINT, 2 MPs)
currently being developed; 5 additional HUMINT scenarios planned
Integrating Quick Reaction Capabilities into TCC Supporting Army G2
initiative in developing a training solution for DCGS-A Working
with Army Evaluation Center to use IEWTPT for DCGS-A testing and
evaluation Successfully supported Austere Challenge 09 Current
Fielded Sites FT Lewis FT Hood Schofield FT Huachuca FT Bragg
IEWTPT TCC/HCC
Slide 24
OneSAF Capabilities Summary CGF/SAF modeling from entity to BDE
Supports Constructive & Virtual Domains COE Focus with Urban
Operation modeling Operations from Scenario Generation thru AAR DIS
/ HLA / JC3IEDM / ABCS Interoperability Supports ACR, RDA, TEMO
Domain Events Software only Platform independent (Linux/Windows)
software Current Activities TEMO Domain assessment @ NSC (July)
OmniFusion (OF) 09 @ Maneuver Battle Lab (July) FCS Events @ Ft.
Bliss (July) V3.0 International Development (3 rd & 4 th Qtr
FY09) V4.0 Development (Planned delivery: 2 nd Qtr FY10) V5.0
Development (Planned delivery: 2 nd Qtr FY11) Merged software
development baseline with SE Core FLOIS TALON STRIKE (TS) using
OneSAF for collaborative US & UK Battle Command stimulation
(FY10) CTCs, Staff & Virtual Trainers Paving The Way To The
Future GEGE Over 200 Hundred Domestic Locations & 7
International Partners v3.0 Released 2 nd Qtr FY09 v3.5 4 th Qtr
FY09 (Planned) Interoperable Applications Common Architectures DIS,
HLA C4I Adapter, SNE, AAR, Scenario Generation CTIA, VSA, OneSAF
Common APIs, DIFs, & Protocols Common Components
Slide 25
Battle Command Training Capability Equipment Support (BCTC-ES)
Fielding Plan or Schedule Capabilities Summary Furniture, Fixtures,
and Equipment Battlefield Visualization System Radio-Wire
Integration System Network Infrastructure Upgrade and Simulation
System connectivity Battle Command (C2) Server Fielding / Refresh
Simulation-to-C2 end-to-end Connectivity and Integration Packet
Radio Units and Antenna Systems (Fixed / Mobile) Current Activities
Fielding Ft. Riley BCTC (med) (estimated completion 8 Jun) Working
with the Ft. Benning (Harmony Church) team for a 100% Design for
the new facility Preparing contract actions for the Ft. Campbell
& Ft. Bliss Medium BCTC Fielding Scheduling Red Zone Meeting to
complete plans on fielding for the FY10 BCTC Fieldings AdminSupport
Staff AAR Reconfigurable Tactical Operations Centers (RTOC)
Expandable Comms Workcells Tech Control Expandable Classrooms WSMR
Ft. Riley Ft. Sam Houston Ft. Leonard Wood Ft. Campbell Ft. Benning
Ft. Bliss FY09 Fielding FY10 Fielding FY11 Fielding
Slide 26
FITE JCTD Transition: Extended Use of Interim Capability,
Targeted Locations: Camp Lejeune and Fort Benning If conducted,
resourced through BA4 funding Follow-on Development, Production,
Fielding, and Sustainment, Targeted POR/Programs: Dismounted
Soldier (PM CATT) CACTF (PM TRADE) IIT (PM TRASYS) Mission
Rehearsal (USSOCOM) SITE [proposed TBD (PM TRASYS)] Participants:
User Sponsor: JFCOM Operational Manager: JFCOM Technical Manager:
ONR Transition Manager: PEO STRI Oversight Executive: ODUSD
(AS&C) Schedule: Technical Demonstrations: May 09, Apr 10
Operational Demonstrations: Aug 09, Jul 10 Operational Utility
Assessments Reports: Oct 09, Sep 10 Capabilities Solution: Three
Configurations: Spiral 1: Individual-worn Virtual Reality Spiral 2:
Facility-based Mixed Reality Spiral 2: Individual-worn Augmented
Reality Configuration Components: Software virtual environment
Commercial hardware Visual, auditory, touch, and smell components
Position and weapons tracking system AAR system Funded by
OSD/AS&C, JIEDDO, and JFCOM
Slide 27
SIMCI Simulation-to-C4 Interoperability FY09/10 Focus Areas
Mitigating the impact of Capability Set 11-12 on M&S systems
Initialization JC3IEDM Migration Army StaffMaterial
DevelopersCombat DevelopersCross DomainSIMCI Management SIMCI OIPT
Membership M&S Domain C4I Domain Interoperability of Current
and Future Systems M&S C4I Shared Solutions Processes Common
Data Reusable Components Architectures Common Standards Description
Mission: Provide policy, organizational, process, and technical
recommendations to Army Leadership to improve interoperability of
M&S and C4I systems Focused on common components, data,
standards, architectures, and processes Co-chaired by PEO STRI
& PEO C3T; originally chartered in FY2000 Migration