Data penggunaan Pondasi Dangkal Area MS 1B Dan MS2 Pondasi Pondasi Dangkal Pondasi Dalam CV-25 - Take Up Tower CV-25 - Transfer Tower 3 - CV-26 (Ground Modul) - Take Up Tower CV-26 - Transfer Tower 4 - CV-27 Take Up Tower CV-27 Gardu Hubung PLN Reclaim Tunnel Train Loading Staion Office Building Warehouse Substation 3 Substation 4 Box Culvert Fire Fighting RCP Rail Way

Pondasi Dangkal

Embed Size (px)

DESCRIPTION

ok

Citation preview

Page 1: Pondasi Dangkal

Data penggunaan Pondasi Dangkal Area MS 1B Dan MS2

Pondasi Pondasi Dangkal Pondasi Dalam List Struktur Pondasi DangkalCV-25 - √ -

Take Up Tower CV-25 - √ -Transfer Tower 3 - √ -

CV-26 (Ground Modul) √ - G2Take Up Tower CV-26 - √ -

Transfer Tower 4 - √ -CV-27 √ √ G3

Take Up Tower CV-27 √Gardu Hubung PLN

Reclaim TunnelTrain Loading Staion

Office BuildingWarehouse Substation 3Substation 4Box Culvert

Fire Fighting RCP

Rail Way

Page 2: Pondasi Dangkal

Status Calculation (Pondasi Dangkal) Status Gambar (Pondasi Dangkal) PIC- - -- - -- - -

APROVED Belum IFC Wahyu- - -- - -

Revised Belum IFC Wahyu