Upload
others
View
4
Download
0
Embed Size (px)
Citation preview
Willamette River Transit BridgePortland - Milwaukie Light Rail Willamette River Bridgek hDesign Workshop 07.02.09
Willamette River Transit BridgeProposed Bridge Alignment
Marquam
R I l dRoss Island
Willamette River Transit BridgeWillamette River Transit BridgeCable Stayed – Refined
Willamette River Transit BridgeWillamette River Transit BridgeCable Stayed – Refined
Endorsed by:
• Citizen Advisory Committee
• Willamette River Bridge Advisory Committee
• Steering Committee
Willamette River Transit BridgeCommittee Introductions
Cable Stay - Refined
Willamette River Transit BridgeProject Overview
A t 2009 15% D i S b itt l• August 2009: 15% Design Submittal
• December 2009: 25% Design Submittalg
• March 2010: PE Complete
Cable Stay - Refined
SAN FRANCISCO – OAKLAND BAY BRIDGE / EAST SPANOakland, CA
SAN FRANCISCO – OAKLAND BAY BRIDGE / EAST SPANOakland, CA
SAN FRANCISCO – OAKLAND BAY BRIDGE / EAST SPANOakland, CA
SAN FRANCISCO – OAKLAND BAY BRIDGE / EAST SPANOakland, CA
SAN FRANCISCO – OAKLAND BAY BRIDGE / EAST SPANOakland, CA
SAN FRANCISCO – OAKLAND BAY BRIDGE / EAST SPANOakland, CA
SAN FRANCISCO – OAKLAND BAY BRIDGE / EAST SPANOakland, CA
DUBAI MARINA BRIDGEDubai, United Arab Emirates
DUBAI MARINA BRIDGEDubai, United Arab Emirates
DUBAI MARINA BRIDGEDubai, United Arab Emirates
DUBAI MARINA BRIDGEDubai, United Arab Emirates
COOPER RIVER BRIDGECharleston, SC
COOPER RIVER BRIDGECharleston, SC
COOPER RIVER BRIDGECharleston, SC
COOPER RIVER BRIDGECharleston, SC
COOPER RIVER BRIDGECharleston, SC
INDIAN RIVER BRIDGEDover, DE
INDIAN RIVER BRIDGEDover, DE
GOLDEN GATE BRIDGE – TOLL PLAZASan Francisco, CA
GOLDEN GATE BRIDGE – BIKE RAILINGSan Francisco, CA
6th STREET VIADUCTLos Angeles, CA
6th STREET VIADUCTLos Angeles, CA
6th STREET VIADUCTLos Angeles, CA
CYPRESS BRIDGERedding, CA
I-80 PEDESTRIAN BRIDGEBerkeley, CA
I-80 PEDESTRIAN BRIDGEBerkeley, CA
PEDESTRIAN PATHWAY BICYCLE PATHWAY
I-80 PEDESTRIAN BRIDGEBerkeley, CA
LALOMA FOOTHILL PEDESTRIAN BRIDGEBerkeley, CA
LA LOMA FOOTHILL PEDESTRIAN BRIDGEBerkeley, CA
IRON HORSE TRAIL PEDESTRIAN BRIDGEPleasant Hill, CA
IRON HORSE TRAIL PEDESTRIAN BRIDGEPleasant Hill, CA
COOPER RIVER BRIDGE – GRAND OPENINGCharleston, SC
Willamette River Transit BridgeWillamette River Transit BridgeCable Stayed – Refined
Willamette River Transit BridgeNext Steps
Refinement of significant elements• Tower – pier• Railing• Lighting and OCS integration• GreenwayGreenway• Programming bicycle and pedestrian path
Cable Stay - Refined
Willamette River Transit Bridge
Willamette River Transit Bridge
SCHEME A
Inclined Tower
SCHEME A
Inclined Tower
SCHEME A
Inclined Tower
SCHEME A
Inclined Tower
SCHEME A
Inclined Tower
SCHEME B
V – Tower with Strut
SCHEME B
V – Tower with Strut
SCHEME B
V – Tower with Strut
SCHEME C
Split V – Tower with Strut
SCHEME C
Split V – Tower with Strut
SCHEME D
H – Tower
SCHEME D
H – Tower
SCHEME E
Steel – Tower
ELEVATION OF SLOPED TOWER LEGS – Lawrence Halprin fountains – Ira Keller's Fountain and Lovejoy Fountain
SECTION AT MID SPANPlace Making
Willamette River Transit BridgeWillamette River Transit BridgeDiscussion
SCHEME A SCHEME B SCHEME CSCHEME AInclined Tower
SCHEME BV – Tower with Strut
SCHEME CSplit V – Tower with Strut
SCHEME DH – Tower
SCHEME ESteel – Tower
Willamette River Transit BridgeWillamette River Transit BridgePublic Comment
SCHEME A SCHEME B SCHEME CSCHEME AInclined Tower
SCHEME BV – Tower with Strut
SCHEME CSplit V – Tower with Strut
SCHEME DH – Tower
SCHEME ESteel – Tower
Willamette River Transit Bridge
Willamette River Transit Bridge
SCHEME 1 & 2
SCHEME 3 & 4
WEST & EAST END
SOLAR PANELS
Willamette River Transit BridgeNext Steps
Tower, Piers and Walkway Refinement• Working Group Meeting • July 24, 2009• 9:00 to 11:00 am• Mall Project Field OfficeMall Project Field Office
NW 5th and Everett
Cable Stay - Refined
Willamette River Transit Bridge
Reference Drawingsg
Willamette River Transit BridgeCross Section at AbutmentsFrom initial Bridge Study Work 10-15-2008
Landside Pier at Eastbank
Moved west as part of refinement
Willamette River Transit BridgeCable Stayed – Refined
Willamette River Transit BridgeCable Stayed – Refined
Willamette River Transit BridgeCable Stayed – Refined
Willamette River Transit BridgeCable Stayed – Refined
Willamette River Transit BridgeCable Stayed – Refined
Willamette River Transit BridgeCable Stayed – Refined
Willamette River Transit Bridge
Thank youThank you
For more information, visit: trimet.org/pm