MEIDEN REVIEW Series No.174 2018 No.3 35 1 Preface In Bangkok, the capital of The Kingdom of Thailand, there are many on-going and future plans for railway network update and expansion to ease traffic congestion. In relation to part of these on- going plans, we have taken part in the Purple Line Project since 2014. Fig. 1 shows the route map of the Purple Line. This line links the Tao Poon Station in the north of Bangkok and the Khlong Phai Station in about 30 minutes. The route length is about 23km and there are 16 stations for this line. This paper introduces our supplied power facilities and related electrical construction work under the supplied system, elec- tric power is fed to the station facilities and trains. 2 Outline of Power Supply System Electric power for the Purple Line is received from two Bulk Substations ( BSSs ) and each BSS has a different receiving voltage level. These Bulk Substations are connected to the power transmis- sion network of the Metropolitan Electricity Authority ( MEA ) . BSS1 receives power at 115kV while BSS2 at 69kV. Voltages of electric power for Traction Substations ( TSS ) , Service Substations ( SSS ) , and the depot are stepped down at the main transformer of the BSS so that the incoming power is received at 22.8kV. The TSS supplies the rectified power at 750V DC to train cars. Part of the electric power is stepped down at 400V AC and fed to station facili- ties. Power facilities under the 400V power network are equipped with an Uninterruptible Power System ( UPS ) as a backup power for the power supply of mission-critical facilities. 2.1 Power Receiving Power Network System Fig. 2 shows an overall power network system including the 115/69kV power receiving and trans- mission and 22.8kV loop power distribution facili- ties. The 115/69kV power network system at the incoming power substation is designed according to the MEA Specifications. The main power trans- former of 50/75MVA ONAN/ONAF is equipped with an on-load tap changer and it conducts constant voltage control at 22.8kV. The main transformer capacity is designed to provide stable power supply even in a situation when train cars are changed ʦ Introduction of Supplied Equipment ʧ Power Facilities for the Purple Line, The Kingdom of Thailand Jun Tanada Keywords Thailand, Railway, Power transmission Abstract The Purple Line is an elevated railway that runs 23km. This line starts from the Khlong Bang Phai Station situated in Nonthaburi Province in the suburbs of Bangkok and joins the Tao Poon Station connected with the MRT Blue Line ( sub- way ) in the north of Bangkok. This line has been constructed to decrease the number of private passenger cars running from Nonthaburi Province to Bangkok to eliminate traffic congestion. We supplied one complete set of facilities for power receiving, traction power feeding, and power distribution to the Purple Line. In addition, we completed related equipment installation work. Tao Poon Wong Sawang Yaek Tiwanon Bang Son Ministry of Public Health Nonthaburi Civic Centre Bang Krasor Phra Nang Klao Bridge Sam Yaek Bang Yai Sai Ma Bang Rak Noi Tha It Bang Rak Yai Bang Phlu Talad Bang Yai Khlong Bang Phai CHAO PHRAYA RIVER Bang Su Depot & BSS1 Yaek Nonthaburi 1 Purple Line Station Park and Ride Purple Line Blue Line Station Blue Line [Legend] BSS2 Pure Line (future extension) Position of the purple line and the number of stations are shown. Fig. 1 Route Map of Purple Line

Power Facilities for the Purple Jun Tanada Line, The …...2018/10/03  · SSS1 SSS1 SSS2 HR22 89RM22 SSS2 STABLING YARD WORK SHOP DOMITORY & TRAINING CENTER OSS PL1C - 79141 PL1S

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Power Facilities for the Purple Jun Tanada Line, The …...2018/10/03  · SSS1 SSS1 SSS2 HR22 89RM22 SSS2 STABLING YARD WORK SHOP DOMITORY & TRAINING CENTER OSS PL1C - 79141 PL1S

MEIDEN REVIEW Series No.174 2018 No.3 35

1 Preface

In Bangkok, the capital of The Kingdom of Thailand, there are many on-going and future plans for railway network update and expansion to ease traffic congestion. In relation to part of these on- going plans, we have taken part in the Purple Line Project since 2014.

Fig. 1 shows the route map of the Purple Line. This line links the Tao Poon Station in the north of Bangkok and the Khlong Phai Station in about 30 minutes. The route length is about 23km and there are 16 stations for this line. This paper introduces our supplied power facilities and related electrical construction work under the supplied system, elec-tric power is fed to the station facilities and trains.

2 Outline of Power Supply System

Electric power for the Purple Line is received from two Bulk Substations (BSSs) and each BSS has a different receiving voltage level. These Bulk Substations are connected to the power transmis-sion network of the Metropolitan Electricity Authority (MEA). BSS1 receives power at 115kV while BSS2 at 69kV. Voltages of electric power for Traction Substations (TSS), Service Substations (SSS), and the depot are stepped down at the main transformer of the BSS so that the incoming power is received at 22.8kV. The TSS supplies the rectified power at 750V DC to train cars. Part of the electric power is stepped down at 400V AC and fed to station facili-ties. Power facilities under the 400V power network are equipped with an Uninterruptible Power System (UPS) as a backup power for the power supply of mission-critical facilities.

2.1 Power Receiving Power Network System Fig. 2 shows an overall power network system

including the 115/69kV power receiving and trans-mission and 22.8kV loop power distribution facili-ties. The 115/69kV power network system at the incoming power substation is designed according to the MEA Specifications. The main power trans-former of 50/75MVA ONAN/ONAF is equipped with an on-load tap changer and it conducts constant voltage control at 22.8kV. The main transformer capacity is designed to provide stable power supply even in a situation when train cars are changed

[ Introduction of Supplied Equipment ]

Power Facilities for the Purple Line, The Kingdom of Thailand

Jun Tanada

Keywords Thailand, Railway, Power transmission

Abstract

The Purple Line is an elevated railway that runs 23km. This line starts from the Khlong Bang Phai Station situated in Nonthaburi Province in the suburbs of Bangkok and joins the Tao Poon Station connected with the MRT Blue Line (sub-way) in the north of Bangkok. This line has been constructed to decrease the number of private passenger cars running from Nonthaburi Province to Bangkok to eliminate traffic congestion. We supplied one complete set of facilities for power receiving, traction power feeding, and power distribution to the Purple Line. In addition, we completed related equipment installation work.

Tao Poon

Wong Sawang

Yaek Tiwanon

Bang Son

Ministry ofPublic Health

Nonthaburi Civic CentreBang Krasor

Phra NangKlao Bridge

Sam YaekBang Yai

Sai Ma

Bang RakNoi Tha It

Bang RakYai

BangPhlu

Talad Bang Yai

Khlong Bang Phai

CHAO PHRAYARIVER

Bang Su

Depot& BSS1

Yaek Nonthaburi 1

Purple Line Station

Park and Ride

Purple Line

Blue Line Station

Blue Line

[Legend]

BSS2

Pure Line (future extension)

Position of the purple line and the number of stations are shown.

Fig. 1 Route Map of Purple Line

Page 2: Power Facilities for the Purple Jun Tanada Line, The …...2018/10/03  · SSS1 SSS1 SSS2 HR22 89RM22 SSS2 STABLING YARD WORK SHOP DOMITORY & TRAINING CENTER OSS PL1C - 79141 PL1S

MEIDEN REVIEW Series No.174 2018 No.336

ME

AM

EA

ME

A

LEG

EN

D

SY

MB

OL

DE

SC

RIP

TIO

N

3 W

IND

ING

S T

RA

NS

FO

RM

ER

2 W

IND

ING

S T

RA

NS

FO

RM

ER

RE

CT

IFIE

R

CIR

CU

IT B

RE

AK

ER

(N

/C)

DIS

CO

NN

EC

ING

SW

ITC

H (

N/C

)

LOA

D B

RE

AK

SW

ITC

H (

N/C

)

CIR

CU

IT B

RE

AK

ER

(N

/C)

DIS

CO

NN

EC

ING

SW

ITC

H (

N/C

)

LOA

D B

RE

AK

SW

ITC

H (

N/C

)

VO

LTA

GE

TR

AN

SF

OR

ME

R

N/O

: NO

RM

ALL

Y O

PE

N,

N/C

: NO

RM

ALL

Y C

LOS

ED

ME

A 1

15kV

AC

ME

A 6

9kV

AC

ME

A

PL1

S-7

012

PL1

C-7

912

~M

T01

50/7

5MV

A

~M

T01

50/7

5MV

A

H5

52IN

1

H11

52G

1H

R01

52R

M1

HR

0152

RM

1H

R11

89R

M11

HR

1189

RM

11H

R12

89R

M12

HR

1289

RM

12

HR

2189

RM

21

HR

2189

RM

21

HR

2289

RM

22

HR

1489

RM

14

HR

1489

RM

14H

R23

89R

M23

HR

1389

RM

13N

/OH

R03

52F

R1

HR

0352

FR

1

HR

1352

RM

13

HR

2352

RM

23

H13

52IN

1

RE

C01

2.5M

WR

EC

012.

5MW

D1

72P

1D

172

P1

D2

72F

1D

372

F2

D3

72F

2D

272

F1

D4

72F

3

D5

72F

4

RT

0128

00kV

A

RT

0128

00kV

A

RT

0128

00kV

A

RT

0128

00kV

A

RT

0128

00kV

A

RT

0128

00kV

A

RT

0128

00kV

A

RT

0128

00kV

A

HR

0252

RM

2H

R02

52R

M2

H12

52F1

H1

52SC

1H

252

RM1

H3

52LM

1H

452

RM2

H7

52RM

3H

852

LM2

H9

52RM

4H

1052

F2H

152

F1H

252

RM1

H3

52LM

1H

452

LM2

H5

52RM

2H

652

BT1

H7

52RM

3H

852

LM3

H9

52RM

4H

1052

LM4

H12

52SC

1H

1452

F2

H4

52LF

2H

452

LF2

H4

52LF

2H

452

LF2

H1

52LF

1H

552

LF3

H4

52LF

2H

552

LF3

H4

52LF

2H

152

LF1

H1

52LF

1H

152

LF1

H1

52LF

1H

152

LF1

H4

52LF

2H

152

LF1

H4

52LF

2H

152

LF1

H4

52LF

2H

452

LF2

H1

52LF

1H

152

LF1

H2

52F

R1

D1

72P

1D

172

P1

D1

72P

1D

172

P1

D1

72P

1D

172

P1

D1

72P

1D

172

P1

D1

72P

1D

172

P1

H2

52F

R1

H2

52F

R1

H2

52FR

1H

252

FR

1H

252

FR

1

RT

0128

00kV

A

H2

52F

R1

D5

72F

4D

572

F4

D5

72F

4

MH

289

F34

MH

289

F34

MH

289

F34

MH

189

F12

MH

189

F12

MH

189

F12

MH

289

F34

MH

189

F12

MH

289

F34

MH

189

F12

D4

72F

3D

472

F3

D4

72F

3D

372

F2

D3

72F

2D

372

F2

D2

72F

1D

272

F1

D2

72F

1

D5

72F

4

D4

72F

3D

372

F2

D2

72F

1

MH

289

F34

MH

189

F12

MH

289

F34

MH

189

F12

D5

72F

4D

572

F4

D4

72F

3D

372

F2

D4

72F

3D

372

F2

D2

72F

1D

272

F1

MH

289

F34

MH

189

F12

D5

72F

4

D4

72F

3D

372

F2

D2

72F

1

MH

289

F34

MH

189

F12

D5

72F

4

D4

72F

3D

372

F2

D2

72F

1

D5

72F

4

D4

72F

3D

372

F2

D2

72F

1

MH

289

F34

MH

189

F12

D5

72F

4

D4

72F

3D

372

F2

D2

72F

1

H6

52B

T1

GS

U

ST

01

24kV

AC

GE

N1

1250

kVA

G

AT02

400

kVA

AT01

2500

kVA

AT02

2500

kVA

AT01

400

kVA

AT02

400

kVA

AT01

200

kVA

AT02

200

kVA

24kV

AC

AT01

630

kVA

AT02

630

kVA

AT01

400

kVA

1250

kVA

BS

S1

DE

PO

TB

SS

2

NB

NB

NB

NB

NB

NB

NB

NB

NB

NB

SB

SB

NB

SB

SO

UT

H B

OU

ND

NO

RT

H B

OU

ND

SB

SB

SB

SB

SB

SB

SB

TS

ST

SS

SS

S1

SS

S1

SS

S2

HR

2289

RM

22S

SS

2

STA

BLI

NG

YA

RD

WO

RK

SH

OP

DO

MIT

OR

Y &

TR

AIN

ING

CE

NT

ER

OS

S

PL1

C-7

9141

PL1

S-

7022

ME

A

MR

TA

ME

A

MR

TA

PL2

S-6

012

PL2

C-6

912

PL2

S-

6022

RE

C01

2.5M

WR

EC

012.

5MW

RE

C01

2.5M

WR

EC

012.

5MW

RE

C01

2.5M

W

RT0

128

00kV

A

H2

52F

R1

RE

C01

2.5M

W

750V

DC

RT

0128

00kV

A

H2

52F

R1

RE

C01

2.5M

W

RT

0128

00kV

A

H2

52F

R1

RE

C01

2.5M

WR

EC

012.

5MW

RE

C01

2.5M

W

HR

1289

RM

12

HR

1389

RM

13H

R13

89R

M13

HR

1389

RM

13

HR

2389

RM

23H

R23

89R

M23

HR

2389

RM

23

HR

1189

RM

11

HR

2289

RM

22H

R21

89R

M21

AT01

1200

kVA

AT02

1200

kVA

AT01

1000

kVA

AT01

1000

kVA

AT01

1000

kVA

AT01

1000

kVA

AT01

1000

kVA

AT01

1000

kVA

AT01

1000

kVA

AT01

1000

kVA

AT01

1000

kVA

AT01

1000

kVA

AT01

1000

kVA

AT01

1000

kVA

AT01

1000

kVA

AT01

1000

kVA

AT02

1000

kVA

AT02

1000

kVA

HR

1389

RM

13

HR

2389

RM

23

AT02

1000

kVA

HR

1389

RM

13

HR

2389

RM

23

AT02

1000

kVA

HR

1389

RM

13

HR

2389

RM

23

AT02

1000

kVA

HR

1389

RM

13

HR

2389

RM

23

HR

2389

RM

23H

R23

89R

M23

HR

2289

RM

22H

R21

89R

M21

HR

2289

RM

22

HR

1389

RM

13

HR

1389

RM

13

HR

1289

RM

12H

R14

89R

M14

HR

1489

RM

14

HR

1189

RM

11

HR

1189

RM

11

HR

1289

RM

12

HR

2489

RM

24

HR

2189

RM

21

HR

2489

RM

24

AT02

1000

kVA

HR

1389

RM

13

HR

2389

RM

23

AT02

1000

kVA

HR

1389

RM

13

HR

2389

RM

23

AT02

1000

kVA

HR

1389

RM

13

HR

2389

RM

23

AT02

1000

kVA

HR

1389

RM

13

HR

2389

RM

23

AT02

1000

kVA

HR

1389

RM

13

HR

2389

RM

23

AT02

1000

kVA

HR

1389

RM

13

HR

2389

RM

23

AT02

1000

kVA

HR

1389

RM

13

HR

2389

RM

23

AT02

1000

kVA

AT02

1000

kVA

AT01

1000

kVA

AT02

1000

kVA

SS

S1

HR

1289

RM

12H

R11

89R

M11

SS

S1

HR

1289

RM

12H

R11

89R

M11

SS

S1

HR

1289

RM

12H

R11

89R

M11

SS

S1

HR

1289

RM

12H

R11

89R

M11

SS

S1

HR

1289

RM

12H

R11

89R

M11

SS

S1

HR

1289

RM

12H

R11

89R

M11

SS

S1

HR

1189

RM

11H

R12

89R

M12

SS

S1

HR

1189

RM

11H

R12

89R

M12

SS

S1

HR

1189

RM

11H

R12

89R

M12

SS

S1

HR

1189

RM

11H

R12

89R

M12

SS

S1

HR

1189

RM

11H

R12

89R

M12

SS

S1

HR

1189

RM

11H

R12

89R

M12

SS

S1

HR

1189

RM

11H

R12

89R

M12

SS

S1

SS

S1

SS

S1

SS

S2

S16

TAO

PO

ON

HR

2289

RM

22H

R21

89R

M21

SS

S2

S15

BA

NG

SO

N

HR

2289

RM

22H

R21

89R

M21

SS

S2

S14

WO

NG

SA

WA

NG

HR

2289

RM

22H

R21

89R

M21

SS

S2

S13

YE

AK

TIW

AN

ON

HR

2289

RM

22H

R21

89R

M21

SS

S2

S12

MIN

IST

RY

OF

PU

BLI

C H

EA

LTH

HR

2289

RM

22H

R21

89R

M21

SS

S2

S11

NO

NT

HA

BU

RI

CIV

IC C

EN

TE

R

HR

2289

RM

22H

R21

89R

M21

N/O

N/O

N/O

N/O

SS

S2

SS

S2

S10

SI P

HO

NS

AW

AN

HR

2189

RM

21H

R22

89R

M22

SS

S2

S07

SA

I MA

HR

2189

RM

21H

R22

89R

M22

SS

S2

S06

TH

A IT

HR

2189

RM

21H

R22

89R

M22

SS

S2

S05

BA

NG

RA

K Y

AI

HR

2189

RM

21H

R22

89R

M22

SS

S2

S04

BA

NG

PH

LU

HR

2189

RM

21H

R22

89R

M22

SS

S2

S03

SA

M Y

EA

KB

AN

G Y

AI

HR

2189

RM

21H

R22

89R

M22

SS

S2

S02

TALA

D B

AN

GYA

I

HR

2189

RM

21H

R22

89R

M22

SS

S2

S01

KH

LON

G B

AN

GP

HA

I

S09

YE

AK

NO

NT

HA

BU

RI 1

SS

S2

S08

PH

RA

NA

NG

KLA

O B

RID

GE

Pur

ple

Line

Pow

er S

uppl

y O

vera

ll S

yste

m D

iagr

am is

sho

wn.

Fig

. 2P

urp

le L

ine

Po

wer

Su

pp

ly O

vera

ll S

yste

m D

iag

ram

Page 3: Power Facilities for the Purple Jun Tanada Line, The …...2018/10/03  · SSS1 SSS1 SSS2 HR22 89RM22 SSS2 STABLING YARD WORK SHOP DOMITORY & TRAINING CENTER OSS PL1C - 79141 PL1S

MEIDEN REVIEW Series No.174 2018 No.3 37

from 3-car train to 6-car train.

2.2 22.8kV AC Power Distribution System As shown in Fig. 2, the TSS works on a 22.8kV

loop network system while the SSS and depot belong to a 22.8kV ring network system.

For loop network system between TSS and another TSS, the protection of sections is covered by directional overcurrent and earth fault protection. Each SSS has enough capacity to maintain a sta-tion service even if there is a failure in one of the dual power transmission lines. If there is a power outage in one of the dual transmission lines con-necting a BSS, the power system is designed to control an automatic power supply extension using the other healthy transmission line connected to other BSS. For this purpose, the Programmable Logic Controller (PLC) is installed. By using this equipment, power network‘s power outage time is reduced to a minimum. By using this PLC, recovery operation of the power network system is automati-cally carried out to return the power supply in the normal mode.

When both power receiving network systems of 115kV and 69kV face a power failure, an emer-gency power generator installed at the BSS1 is used to feed power to the operation command facility located inside the depot.

2.3 750V DC Traction Power System As shown in Fig. 2, each TSS is equipped with

a rectifier unit. At each substation, a 12-phase recti-fier transformer is installed. The phase of the delta winding on the primary side is shifted by ±7.5 degrees. By using each transformer between the two different substations, it synthesizes two 12-pulse outputs with different phase (±7.5° shifted) into a 24-pulse output. By this method, we aimed to reduce the amount of harmonics flow-out. The rectifier capacity is specified to eliminate any adverse influ-ence upon train operations even in the event of an out of order TSS.

The 750V traction feeder line is provided with a direct acting function on a DC Circuit-Breaker (CB). In addition, multi-function protection relays are used. These relays come with the functions of measuring the current changing rate (rate of rise) and the cur-rent increase range (ΔI). Further, the DC feeder is an equipped function of a transfer trip. This function is a de-energized fault zone.

In the DC traction system, system restoration

is possible even though an electric accident may occur. For this reason, a DC system is a provided function of a CB reclosure. In addition, since a load measuring function is additionally provided, it is possible to identify the presence of any short-circuit failure in the line. This function is effective in meas-uring the external line voltage and resistance by trial line charging through current limited resistance. If measuring the value under the setting, this function will cancel the HSCB closing command.

The negative panel is equipped with a Voltage Limiting Device (VLD) together with a function of leakage current measurement. The VLD is used to detect the presence of overvoltage between the negative and the earth. When an overvoltage is sensed, a magnetic contactor is instantly turned on to short-circuit the section between the negative and the earth. This operation protects passengers from any electric shock at the station by using a potential difference between the car body (negative pole) and the platform.

For the measurement of leakage current, a mesh earth to collect the stray current recovery is connected to the negative panel and the panel measures the current value of the leakage.

Meanwhile, protection against a DC ground fault is conducted by the frame leakage relay. With a ground wire connected directly to the panel frame, the frame leakage relay detects the ground fault current. The rectifiers and DC CB panels are, there-fore, installed on the insulated floor.

2.4 Electrical Construction Work We conducted installation work and cabling

works for our electrical facilities. The electrical facilities include a variety of large and small equip-ment and units. According to the equipment struc-ture and size, we planned and implemented safe equipment carry-in and solid installation work. When 24kV power cables were laid, we used a work train and the total length of cables amounted to approximately 400km. Fig. 3 shows a view of cable laying work.

3 Specifications of Incoming Power Substation Facilities

Under the Purple Line, it is designed so that even a single failure will not affect the entire system operation. The basic system configuration for the power facilities is such that all facilities are made

Page 4: Power Facilities for the Purple Jun Tanada Line, The …...2018/10/03  · SSS1 SSS1 SSS2 HR22 89RM22 SSS2 STABLING YARD WORK SHOP DOMITORY & TRAINING CENTER OSS PL1C - 79141 PL1S

MEIDEN REVIEW Series No.174 2018 No.338

redundant or it uses backup facilities. Major equip-ment specifications are as follows:

3.1 Incoming Bulk Substation (1) 115kV Gas Insulated Switchgear (GIS) (BSS1)/ 69kV GIS (BSS2) Standard: IEC62271 Type: Indoor GIS

Ratings: Rated voltage: 115kV (BSS1)/69kV (BSS2) Rated breaking current: 40kA Rated current: 2000A

Fig. 4 shows an external appearance of the 69kV GIS. (2) 112/22.8kV (BSS1) 67/22.8kV (BSS2) main power transformers Standard: IEC60076 Type: Outdoor oil-immersed self-cooled/forced air cooled type Ratings: 50/75MVA

112/22.8kV (BSS1) 50Hz with OLTC 67/22.8kV (BSS2) 50Hz with OLTC Percent impedance: 12.5% Connections: Dyn1

Fig. 5 shows an external appearance of the 112/ 22.8kV main power transformer. (3) 22.8kV GIS Standard: IEC60298 Type: Indoor GIS Ratings: Rated voltage: 24kV

Rated breaking current: 25kA Rated current: 2000/1250A

Fig. 6 shows an external appearance of the 22.8kV GIS. (4) Emergency generator (BSS1) Standard: IEC60034-1 Type: Diesel engine generator Ratings: Rated capacity: 1250kV

Rated voltage: 416/240V 50Hz Rated current: 2000/1250A

Fig. 7 shows an external appearance of the emer-gency generator.

View of cable laying work is shown.

Fig. 3 View of Cable Laying Work

External appearance of GIS for receiving power from a power utility’s 69kV electric power network system is shown.

Fig. 4 69kV GIS

Main power transformer for stepping down from 112kV to 22.8kV is shown.

Fig. 5 112/22.8kV Main Power Transformer

Page 5: Power Facilities for the Purple Jun Tanada Line, The …...2018/10/03  · SSS1 SSS1 SSS2 HR22 89RM22 SSS2 STABLING YARD WORK SHOP DOMITORY & TRAINING CENTER OSS PL1C - 79141 PL1S

MEIDEN REVIEW Series No.174 2018 No.3 39

In addition, the BSS is composed of the protec-tive relay panels to MEA Specifications, on-load tap changer control panels for main power transform-ers, main transformer secondary side grounding resistors (NGR), 22.8kV step-up cast resin molded transformers for emergency generators, local trans-formers, 110V DC source panels, UPS, and others.

3.2 TSS (1) 22.8kV GIS Standard: IEC60298 Type: Indoor GIS Ratings: Rated voltage: 22.8kV

Rated breaking current: 25kA Rated current: 1250A

(2) Rectifier transformer Standard: IEC60076 Type: Indoor cast resin mold Ratings: 2800/1400/1400kVA

22.8/0.585kV 50Hz Percent impedance: 8.0% Connections: D (+7.5 or -7.5) d0y11

Fig. 8 shows an external appearance of the rectifier transformer. (3) Auxiliary transformer Standard: IEC60076 Type: Indoor cast resin mold Ratings: 2500/1200/1000/630/400/200kVA

22.8/0.416kV 50Hz Percent impedance: 6% Connections: Dyn1

(4) Rectifiers Standard: IEC60146 Type: Indoor self-cooled Ratings: Rated voltage: 900V DC

Rated capacity: 2500kW (12-phase rectifi-cation)

Overload capacity: 150% for 2 hours, 300% for 1 minute

Fig. 9 shows an external appearance of rectifiers.

External appearance of 22.8kV system distribution GIS is shown.

Fig. 6 22.8kV GIS

External appearance of emergency generator is shown.

Fig. 7 Emergency Generator

External appearance of transformer to be connected to the rectifier.

Fig. 8 Rectifier Transformer

Page 6: Power Facilities for the Purple Jun Tanada Line, The …...2018/10/03  · SSS1 SSS1 SSS2 HR22 89RM22 SSS2 STABLING YARD WORK SHOP DOMITORY & TRAINING CENTER OSS PL1C - 79141 PL1S

MEIDEN REVIEW Series No.174 2018 No.340

(5) 750V DC CB panel Standard: IEC61992 Type: Indoor DC CB panel Ratings: Rated voltage: 900V DC

Rated breaking current: 180kA peak Rated current: 4000A

Fig. 10 shows an external appearance of the 750V DC CB panel. (6) 750V DC bypass LBS panel Standard: IEC61992 Type: Indoor DC CB panel Ratings: Rated voltage: 900V DC

Rated breaking current: 180kA peak Rated current: 4000A

Fig. 11 shows an external appearance of the 750V DC bypass LBS panel. (7) 750V negative panel Type: Indoor DC cathode panel Ratings: Rated voltage: 900V DC

Rated current: 6000A (8) VLD Standard: EN50122-1 Ratings: Rated voltage: 900V DC Rated current: 500A Fig. 12 shows an external appearance of the VLD and cathode panel.

Device for converting AC electricity into DC electricity.

Fig. 9 Rectifiers

Direct current CB board that protects 750V DC to the vehicle is shown.

Fig. 10 750V DC CB Panel

Bypass board that extends power supply in case of emergency is shown.

Fig. 11 750V DC Bypass LBS Panel

VLD and Cathode Panel are shown.

Fig. 12 VLD (Left) and Cathode Panel (Right)

Page 7: Power Facilities for the Purple Jun Tanada Line, The …...2018/10/03  · SSS1 SSS1 SSS2 HR22 89RM22 SSS2 STABLING YARD WORK SHOP DOMITORY & TRAINING CENTER OSS PL1C - 79141 PL1S

MEIDEN REVIEW Series No.174 2018 No.3 41

Local facilities in TSS are composed mainly of 110V DC source panels and UPS.

3.3 SSS The equipment for each SSS comes in the

24kV Ring Main Unit (RMU), local transformer, 110V

DC source panel, and UPS. Equipment specifica-tions are as shown below. (1) 22.8kV RMU Standard: IEC62271 Type: Indoor GIS Ratings: Rated voltage: 24kV

Rated current: 630A Fig. 13 shows an external appearance of the RMU.

3.4 Depot Substation Equipment of the depot substation is the same

as that of a TSS.

4 Postscript

The Purple Line commenced its business operation on August 6, 2016. Since then, stable operation has been maintained. We expect that the Purple Line will be popular and be used by many people in the future whereby improving connectivity and transit. We sincerely believe that this project could not be completed successfully in such a short period of time without the sound advices and coop-eration from project-related people.

Lastly, we would like to express our gratitude to the project-related people.

・ All product and company names mentioned in this paper are

the trademarks and/or service marks of their respective owners.

RMU for 22.8kV distribution is shown.

Fig. 13 RMU