Upload
doankiet
View
214
Download
0
Embed Size (px)
Citation preview
George GEH
12/03/2007
Power in China
Agenda
1. Market overview- The market- Key drivers-
Key customers
-
Competition
Page 3
2. ALSTOM Power’s positioning Page 10
3. ALSTOM Power’s strategy Page 21
Installed power capacity
• China has the 2nd
largest installed base in the world and is growing fast
• Thermal/Coal will remain dominant in the foreseeable future
Wind 1GWHydro
117MW 23%
Thermal 391GW
76%
Nuclear 6.8GW
Installed capacity by fuel type 2005
860
622
319
2001 2006 2010f
Total installed capacity in ChinaGW
10%
CAGR
Source: ALSTOM, EIA-DOE, Worldbank, government reports3
0
20
40
6080
100
120
140
160
01 02 03 04 05 06f 07f 08f 09f 10f
Hydro
Nuclear
ST Large Conv
ST CC
GT CC >=40MW
GT SC >=40MW
Av. 01-05: 70 GW/y Av. 06-10: ~40 GW/y
GW
• China accounts for 50% of world Hydro market growth with mega projects• Nuclear market in China will account for 40% of the world growth
(for the next 5 years)
• It’s the largest coal market already and a strong coal will restart after 2008
Market for new power plants
Source: ALSTOM, EIA-DOE, Worldbank, government reports
Demand for new power plants in China
4
Market for environmental control systems (ECS)
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
2006 2007 2008 2009 2010
IndustryPM
NOxSOx
€ Bn
• China will account for 30% of global ECS market
(for the
next 5 years)
• FGD is still the largest market while DeNox is developing
• Power ECS market remains very competitive
Source: ALSTOM, EIA-DOE, Worldbank, government reports
ECS demand in China, Bn€
5
Key market drivers
Key drivers Impact on power market
Strong GDP growth
(target: 8% p.a., 2006: 10.5%)
Electricity demand growth expected to be 6% p.a. (objective of 20% improvement in energy efficiency) but growth for 2006 first 9 months was 13.5%!
• Allow private/foreign utilities/IPP to invest in power with an improved government approval process
• Electricity price reform may make market more attractive for private/foreign players
Tighter control on air pollution and stricter enforcement of environmental regulations will lead to customer behavior change and a strong ECS market growth
Power sector deregulation
Tightening environmental requirements
6
Purchasing criteria by key customers
Source: ALSTOM, customer discussions7
Big 5 (Hydro+ Nuclear+Coal)
Others
Nuclear
Hydro
HuanengDatangHuadianGuodianCPICGNPCCNNCCTGPCErtanSGCCCSGC
Luneng
China Res.Guohua
• Local content (to have political and customer access)
• Mainly component market
• Price
• Lead time
• Equipment efficiency (due to fuel cost increases)
• After sales services
Key purchasing criteria
Key customers
Coal market and supply
Source: ALSTOM, various reports8
Coal demand in China, average 2001-05
GW
Supercriticalboilers
Subcriticalboilers
CFBs
<150
STsCFBs
>150
14
32
50
2 2
• Supply in coal dominated by the Big3 players (Dongfang, Harbin, & Shanghai Electric)
Highly fragmented with more than 100 Competitors
Competition: Market share (F&S, 2003)
Domestic OEMs23%
Utility affiliates and
service companies
50%
Local contractors
15%
Multinational OEMs 12%
Power service market competition
9
• Multinational Companies-
Alstom, GE, Siemens, Mitsubishi, IHI, Toshiba Babcock & Wilcox, Foster Wheeler, Doosan
Babcock
• Domestic OEMs-
Shanghai, Dongfang, Harbin, Wuhan
• Service Subsidiaries, Component Suppliers
• Local Contractors
• Participating in the industry consolidation down the road…
Agenda
1. Market overview Page 3
2. ALSTOM Power’s positioning- Hydro- Coal-
Nuclear
Page 10
3. ALSTOM Power Systems’ strategy Page 21
Tracy
Hydro in Canada•
Activity: Gen + Turb
Taubate
Hydro in Brazil•
Activity: Gen + Turb + Control
Hydro Europe
(Birr, Grenoble, Bilbao)•
Activity: Gen + Turb + control
Baroda
Hydro in India•
Activity: Gen + Turb + control
ALSTOM Power in Hydro –
global footprint
• ALSTOM Hydro is the world leader with No.1 market share in hydro power
• Tianjin
is the largest unit of ALSTOM Hydro with full capabilities
11
Tianjin
Hydro in China•
Activity: Gen + Turb + control
Harbin
ALSTOM
Dongfang
Other25%
23% 25%
27%
Three Gorges orders won: -
Left bank: 8 x 700 MW-
Right bank: 4 x 700 MW
ALSTOM Power in Hydro –
market leadership in China
Maintain market leadership through differentiation and partnerships
Market share, 2006
Major future projects:
-
Xiluodu, 18 x 700 MW
-
Linping
II, 8 x 600 MW
• In the large (>700 MW) segment:
Product differentiation with very large (e.g., 900 MW) Francis turbines
• In the PSP segment:
Maintain No.1 position through scope-sharing partnerships
12
06/07 07/08 08/09 09/10
5S / EHS
Lean hydro manufacturing concept
Design to manufacture
Design to constructability
ALSTOM Power in Hydro –
local operational excellence
Achieve operational excellence locally
Tianjin factory potential savings
Mechanical plant
-
Lead time reduction/WIP (35%)
-
Release capacity VTL /B&M (20%)
-
Cost reduction (process hours)
(15%)
Electrical plant
-
Lead time reduction/WIP (20%)
13
•
Achieving the next phase of strategy –
exporting from
Tianjin
to the rest
of Asia:
VietnamS.E. AsiaPakistanIndiaOther
Tianjin
Hydro
India•
Support ALSTOM Hydro India as needed
Vietnam•
Won project Sesan•
Target projects Srepok, Son La, etc.
Southeast Asia•
Target various projects
ALSTOM Power in Hydro –
export from Tianjin
14
ALSTOM Power in Coal –
building local presence in STs
Build a local presence in manufacturing for STs
and
Generators through the ALSTOM Beizhong
Power JV (ABP)
0
100
200
300
400
500
05/06 06/07 07/08 08/09 09/10
Factory ramp-up, 1,000 hours
…
September 2005 …
March 2005 …
...
March
2006
45%CAGR
15
•
•
•
• Tailor 600 and 1,000 MW ST product designs and improve the cost level
• Build local engineering capabilities through ALSTOM’s Turbomachines Wuhan
Engineering Centre (TWE)
• Ramp up TWE:
ALSTOM Power in Coal –
local technical capabilities
Develop tailored product offerings and local technical capabilities
ABP mastering 600 MW supercritical technology
TWE integrated into ALSTOM Power global system
Key project references: -
Pingwei
(4x600 MW) -
Longshan
(2x600 MW)
16
40% CAGR
Mar. 07 Mar. 09
Headcount
80
115
30
Mar. 05
• To produce 600 & 1,000 MW PC boilers and large CFBs
• Build a new factory to gain productivity improvement
• Up to 40% of the capacity for export after 2009
ALSTOM Power in Coal –
Wuhan
Boiler Company acquisition
Wuhan Boiler Company (WBC)
No. 4 player in China
On-going process
Subject to Chinese State’s approval
The acquisition
Wuhan
17
ALSTOM Power in Coal –
environmental control systems
18
Strategy
• Build up local capacity organically for specific niche applications
• Target selected local companies for JV or acquisitions to accelerate the development
A large market with a highly fragmented supply industry
FGD market share in China 2004-05
ALSTOM + Partners
86%
More than 20 other players
14%
New
nuclear projects approved for
2006-2010Hongyanhe
(2+2) x 1,000 MWOwner: CGNPC/CPIConstructor: CNPECEst. NTP:
2007Reactor: CPR 1000
Yang Jiang
2 x 1,700 MWOwner:
CGNPCConstructor: CNPECEst. NTP:
2008 (?)Reactor: EPR
Haiyang
2 x 1,200 MWOwner:
CPIConstructor: CNNCEst. NTP:
2007/08Reactor: AP 1000Tianwan
2 x 1,000 MWOwner:
CNNCConstructor: CNNCEst. NTP:
2008 (?)Sanmen 2 x 1,200 MWOwner:
CNNCConstructor: CNNCEst. NTP:
2007Reactor: AP 1000
Ningde 2 x 1,000 MWOwner: CGNPC/DatangConstructor:CNPECEst. NTP:
2007Reactor: CPR 1000
Fangjiashan 2 x >1,000 MWOwner:
CNNCConstructor: CNNCEst. NTP:
2007/08
ALSTOM Power in Nuclear –
market opportunities in China
19
• Establish ‘Arabelle’ as preferred third generation (3G) technology
• Target full Conventional Island scope
• Further develop cooperation with Dongfang
and CNPEC
• Continue localization
Achievements
Strategy• > 50% installed base• Partnering with Dongfang• Key references:
-
Daya
Bay and Ling Ao, 4 x 1,000MW
-
Ling Ao II, 2 x 1,000MW
ALSTOM Power in Nuclear –
market leadership in China
20
Agenda
1. Market overview Page 3
2. ALSTOM Power’s positioning Page 10
3. ALSTOM Power’s strategy-
Adopt a 3-phased strategic approach Page 21
Export from Europe to China
ALSTOM Power strategy –
a three phased approach
Gas Example• Shanghai Bao
Shan• 1 x GT11, 150 MW• Operation: 1997
• Da
Ya
Bay & Ling Ao I • 4 x 1,000 MW• Operation: 2001
Nuclear Example
Export from
Europe1
Build up capacity in China to meet the local market needs
ALSTOM Power strategy –
a three phased approach
Wuhan
Boilers – WBCHeadcount: 2,500
Engineering – TWE
Headcount: 80
ECS –
local targets for JV or acquisition
Beijing Tianjin
Shanghai
Air Preheater – SBW JV
Headcount: 50
Hydro – TAH
Headcount: 1,200
Steam Turbines – ABPHeadcount: 470
Sales – GPS and CountryHeadcount: 37
Nuclear –
further local cooperation
JV withChinesepartners2
ALSTOM Power strategy –
a three phased approach
Integrate China footprint into ALSTOM’s global network and operations for China and export to the rest of the world
Tianjin ALSTOM Hydro-
Export to Vietnam now-
Export to rest of Asia-
25% export ratio
International Purchasing Office (IPO) -
Build and ramp up the IPO -
Sourcing for global operations-
20% of total sourcing from China
WBC, ABP and TWE-
Boiler export starting 2009-
TWE 100% global engineering-
ST and generator export
Chinesebase for
local & export 3
www.alstom.com