POWER SUPPLY SITUATION IN THE SOUTH EAST:AN OVERVIEW. OWERRI || 14 th of October 2020 || Presented by: Engr. Vincent Ekwekwu. CTO EEDC.

POWER SUPPLY SITUATION IN THE SOUTH EAST:AN OVERVIEW

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: POWER SUPPLY SITUATION IN THE SOUTH EAST:AN OVERVIEW

POWER SUPPLY SITUATION IN THE SOUTH

EAST:AN OVERVIEW.

OWERRI || 14th of October 2020 || Presented by: Engr. Vincent Ekwekwu. CTO EEDC.

Page 2: POWER SUPPLY SITUATION IN THE SOUTH EAST:AN OVERVIEW

EEDC NETWORK COVERAGE

2

Page 3: POWER SUPPLY SITUATION IN THE SOUTH EAST:AN OVERVIEW

Network Statistics

EEDC INSTALLED CAPACITY

EEDC NETWORK STATISTICS UPDATE.

1 INSTALLED DISTRIBUTION CAPACITY @33/11kV (MVA) 1,110.00

2 INSTALLED DISTRIBUTION CAPACITY @33/0.415kV (MVA) 1,990.19

3 INSTALLED DISTRIBUTION CAPACITY @11/0.415kV (MVA) 2,812.22

4 NUMBER OF 33kV FEEDERS 80

5 NUMBER OF MANNED INJECTION SUBSTATIONS 71 (2 No. Switching Centres)

6 NUMBER OF 11kV FEEDERS 219

7 NUMBER OF POWER TRANSFORMERS (33/11kV) 95

8 NUMBER OF DISTRIBUTION TRANSFORMERS (33/0.415kV) 6,348

9 NUMBER OF DISTRIBUTION TRANSFORMERS (11/0.415kV) 10,137

10 33kV ROUTE LENGTH (km) 6,019.00

11 11kV ROUTE LENGTH (km) 4,233.003

Page 4: POWER SUPPLY SITUATION IN THE SOUTH EAST:AN OVERVIEW

EEDC INSTALLED CAPACITY & TCN CAPACITY

STATE

CURRENT TCN INSTALLED CAPACITY

(MVA)

CURRENT EEDC INSTALLED CAPACITY

(MVA) CURRENT EEDC DAILY PEAK LOAD (MW)

Abia State 297.5 945.64 108.38Anambra

State 410 1389.47 147.33

Ebonyi State 150 260.85 29.93

Enugu State 375 758.8 115.35

Imo State 160 867.79 77.88

TOTAL 1392.5 4222.55 478.87

10/15/20204

Page 5: POWER SUPPLY SITUATION IN THE SOUTH EAST:AN OVERVIEW

TCN vs EEDC INSTALLED CAPACITY

10/15/2020 5

STATE

TCN INSTALLED CAPACITY (MVA)

AS @ 2019 AS @ 2020EEDC INSTALLED CAPACITY (MVA)

EEDC DAILY PEAK LOAD (MW)

EEDC INSTALLED CAPACITY (MVA)

EEDC DAILY PEAK LOAD (MW)

Abia State 297.5 758.8 108.38

853.96108.38

Anambra State 410 1389.47 147.33

1598.89147.33

Ebonyi State 150 260.85 29.93

373.9432.29

Enugu State 375 945.64 115.35

1014.76128.81

Imo State 160 867.79 77.88

960.86108.52

TOTAL 1392.5 4222.55 478.87 4802.41 525.33

0

200

400

600

800

1000

1200

1400

1600

1800

Abia State Anambra

State

Ebonyi State Enugu State Imo State

TCN vs EEDC INSTALLED

CAPACITY

TCN INSTALLED CAPACITY (MVA)

EEDC INSTALLED CAPACITY (MVA)

Page 6: POWER SUPPLY SITUATION IN THE SOUTH EAST:AN OVERVIEW

EEDC FEEDER ROUTE LENGHT-1

TRANSMISSION STATION TRANSFORMERS/N STATE MAIN-FEEDER KM-RL NOS OF POINT LOADS

AWADA (ONITSHA)

MOB 40MVA

132KV/33KV

1 ANANMBRA

ARMY BARRACKS 33KV 4.86 15

2 ANANMBRA AWADA 2, 33KV 0.5 0

TR 13, 60MVA

132KV/33KV

3 ANANMBRA

NNEWI INDUSTRIAL 33KV 88.66 25

4 ANANMBRA NNEWI 33KV 189.86 55

5 ANANMBRA NICCUS 33KV 36.86 36

TR 13, 60MVA

132KV/33KV

6 ANANMBRA 3-3, 33KV 42.19 21

7 ANANMBRA

OSAMALA 33KV 55.29 14

8 ANANMBRA OBOSI 33KV 205.7 41

MOB 45MVA

132KV/33KV/11KV

9 ANANMBRA UMUNYA 33KV 20.37 27

10 ANANMBRA OGIDI 33KV 10.68 0

11 ANANMBRA WOLIWO 11KV 10.43 21

12 ANANMBRA NWAZIKI 11KV 8.56 23

TR 12, 15MVA

132KV/11KV

13 ANANMBRA PPI, 11KV 3 3

14 ANANMBRA IUNT 11KV 3.96 8

15 ANANMBRA EZEIWEKA 11KV 4.92 26

GENERAL COTTON MILL, GCM

60MVA

132KV/33KV

17 ANANMBRA

GOLDEN OIL 33KV 1.2 5

18 ANANMBRA ATANI 33KV 4.27 7

20 ANANMBRA E-AMOBI 33KV 0.58 1

TR3, 60MVA, 132KV/33KV

24 ANANMBRA NENI 33KV 113.44 31

25 ANANMBRA AGULU 33KV 220.29 56

AGU-AWKA MOB 40MVA, 132KV/33KV

27 ANANMBRA AGU-AWKA 33KV 0.13 1

28 ANANMBRA AGULERI 33KV 192.13 26

29 ANANMBRA

ENUGU UKWU 33KV 21.74 2

6

Page 7: POWER SUPPLY SITUATION IN THE SOUTH EAST:AN OVERVIEW

EEDC FEEDER ROUTE LENGHT-2

TRANSMISSION STATION TRANSFORMER S/N STATE MAIN-FEEDER KM-RL NOS OF POINT LOADS

New Haven

TR1 60MVA, 132KV/33KV

31 ENUGU NEW HAVEN 33KV 1 0

32 ENUGU INDEPENDENCE L/O 33KV 3.44 5

33 ENUGU NEW NNPC 33KV 24.32 41

TR2, 60MVA, 132KV/33KV

34 ENUGU KINGWAY LINE 1, 33KV 8.82 6

35 ENUGU KINGSWAY LINE 2, 33KV 25.87 3

36 ENUGU GOVERNMENT HOUSE

33KV 13.19 12

TR3, 60MVA

132KV/33KV

37 ENUGU TRANS EKULU 33KV 7.83 3

38 ENUGU ITUKU-OZALLA 33KV 46.66 26

39 ENUGU THINKERS CORNER 33KV 1.66 1

TR4, 60MVA

132KV/33KV

40 ENUGU EMENE INDUSTRIAL 33KV 8.86 8

41 ENUGU EMENE INDUSTRIAL 2,

33KV 5 2

UGWUAJI 132/33KV TRI 60MVA 132/33KV43 ENUGU GARIKI 33KV 23.81 8

44 ENUGU AMECHI 33KV 568.21 58

ABAKALIKI

TR1, 30MVA

132KV/33KV

47 EBONYI

ITIGIDI 33KV 217.47 12

TR2, 60MVA

132KV/33KV

49 EBONYI YAHE 33KV 227.73 16

50 EBONYI AFIKPO 33KV 7.03 2

51 EBONYI ISHEKE 33KV 198.54 20

NKALAGUT1A, 30MVA, 132KV/33KV 54 EBONYI EHA-AMUFU 33KV 157.79 9

T2A, 30MVA, 132KV/33KV 55 EBONYI EZILLO 33KV 256.53 15

OJI-RIVER

T1A, 30MVA

132KV/33KV

57 ENUGU WATER WORKS 33KV 17.47 3

58 ENUGU UDI 33KV 117.45 14

59 ENUGU ACHI 33KV 97.35 11

60 ENUGU OJI-URBAN 33KV 3 5

61 ENUGU COCA-COLA 33KV 26.02 1

62 ENUGU ORUMBA 33KV 144.78 11

NSUKKA T1A, 7.5MVA

66KV/33KV

64 ENUGU

IBAGWA 33KV 231.86 177

Page 8: POWER SUPPLY SITUATION IN THE SOUTH EAST:AN OVERVIEW

EEDC FEEDER ROUTE LENGHT-3

TRANSMISSION STATION TRANSFORMER S/N STATE MAIN-FEEDER KM-RL NOS OF POINT LOADS

NRU TS

TR1, 30MVA, 132KV/33KV 67 ENUGU OBA 33KV 269.56 17

68 ENUGU UNN 33KV 3.87 1

ABA CONTROL

T1A, 7.5MVA, 132KV/6.6KV

70 ABIA

EHI ROAD 6.6KV 6.41 6

T1B, 60MVA

132KV/33KV

71 ABIA

ABA OVERHEAD 33KV 3.4 1

T2A, 60MVA 132KV/33KV73 ABIA

ABA - OWERRI 33KV 14.5 15

74 ABIA UKWA 33KV 230.24 34

MOB 30MVA 132KV/33KV 76 ABIA IGI 33KV 61.4 6

77 ABIA ABA - UMUAHIA 145.2 29

OHIYA, UMUAHIA

TR1, 40MVA

132KV/33KV

79 ABIA AFARA 33KV 20.05 8

80 ABIA

NKWOEGWU 33KV 269.1 27

TR1, 40MVA

132KV/33KV

81 ABIA UBAKALA 33KV 43.8 10

82 ABIA NTIGHA 33KV 137.2 7

83 ABIA OBOWO 33KV 168.66 10

ITU, CROSS RIVERTR1, 60MVA 132KV/33KV 85 ABIA

AROCHUKWU 33KV 150.35 11

EGBU, OWERRI

TR1, 60MVA

132KV/33KV

87 IMO AIRPORT 33KV 180.26 66

88 IMO

OWERRI 3, 33KV 6.36 5

TR2, 60MVA

132KV/33KV

89 IMO OGUTA 33KV 256.22 101

90 IMO ORLU 33KV 265.13 31

91 IMONEW OWERRI 33KV 10.24

MOB 40MVA, 132KV/33KV

92 IMO MBAISE 33KV 211.6 25

93 IMO OKIGWE 33KV 399.37 46

94 IMO ORJI/ALEX 25 28

Page 9: POWER SUPPLY SITUATION IN THE SOUTH EAST:AN OVERVIEW

CLUSTER SUPPLY AVAILABILITY

Service Clusters Business Unit Source Feeder Feeder NameFeeder Type 11KV/33KV

MINUMUM DURATTION OF

SUPPLY(HRS/DAY) UPDATED

TOTAL ACTIVE CUSTOMERS(PRE & POST)

Service cluster 1 ABAKPA COCA-COLA COCA-COLA 33 22.18 0

Service cluster 1 ABAKPA TRANS EKULU 33KV TRANS EKULU 33KV 33 23 0

Service cluster 1 ABAKPA NEW NNPC 33KV NEW NNPC 33KV 33 22 75

Service cluster 1 ABAKPA UGWOGO 33KV UGWOGO 33KV 33 22.06 508

Service cluster 1 ARIARIA ABA-OWERRI 33KV ABA-OWERRI 33KV 33 22 7405

Service cluster 1 ARIARIA UKWA 33KV 05 UKWA 33KV 05 33 22 0

Service cluster 1 AWKUNANAW ITUKU OZALLA 33KV ITUKU OZALLA 33KV 33 21 310

Service cluster 1 NSUKKA UNN 33KV (FAULTY METER) UNN 11KV 11 22 1

Service cluster 1 NSUKKA BASS 11KV 11 21 4

Service cluster 1 NSUKKA UNN 33KV (FAULTY METER) WILSON 11KV 11 23 536

Service cluster 1 OGBARU E AMOBI 33KV E AMOBI 33KV 33 23 1

Service cluster 1 OGBARU GCM 11KV 11 22 1

Service cluster 1 OGBARU GCM-UGA 33KV GCM-UGA 33KV 33 22 66

Service cluster 1 OGBARU GOLDEN OIL 33KV GOLDEN OIL 11KV 11 23 1

Service cluster 1 OGBARU GCM: TR1, 15MVA, 33KV/11KV(NO METER) INTERFACT 11KV 11 23 1

Service cluster 1 OGBARU TRI,15MVA 132KV /11KV(ONITSHA) IUNT 11KV 11 23.76 21

Service cluster 1 OGBARU OSSOMALLA 33KV OSSOMALLA 33KV 33 20.84 7258

Service cluster 1 OGIDI NICCUS 33KV NICCUS 33KV(main line) 33 22 800

Service cluster 1 OGIDI TRI,15MVA 132KV /11KV(ONITSHA) PPI 11KV 11 20.98 8

Service cluster 1 OGUI KINGSWAY LINE 1, 33KV ABAKALIKI ROAD 11KV 11 20 1154

9

Page 10: POWER SUPPLY SITUATION IN THE SOUTH EAST:AN OVERVIEW

CLUSTER SUPPLY AVAILABILITY

10

Service cluster 1 OGUI GOVERNMENT HOUSE 33KV GOVERNMENT HOUSE 11KV 11 20 73

Service cluster 1 OGUI GOVERNMENT HOUSE 33KV GOVERNMENT HOUSE 33KV 33 21.77 51

Service cluster 1 OGUI INDEPENDENCE LAYOUT 33KV INDEPENDENCE LAYOUT 33KV 33 23 4

Service cluster 1 OGUI KINGSWAY LINE 1 33KV KINGSWAY LINE 1 33KV 33 23 9

Service cluster 1 OGUI KINGSWAY LINE 2 33KV KINGSWAY LINE 2 33KV 33 23 4

Service cluster 1 OGUI OJI WATERWORKS 33KV OJI WATERWORKS 33KV 33 22 69

Service cluster 1 OWERRI ORLU 33KV SHANGHAI 11 22 1

Service cluster 1 OWERRI OWERRI 3 33KV OWERRI 3 33KV 33 23 56

Service cluster 1 UMUAHIA AFARA 33KV AFARA 33KV 33 22 252

Service cluster 1 ABAKALIKI AFIKPO 33KV AFIKPO 33KV 33 22 774

Service cluster 1 OGIDI OGIDI 33KV(NO METER) ALBEN 11KV 11 23 4

Service cluster 1 OGIDI ARMY BARRACKS 33KV ARMY BARRACKS 33KV 33 22 815

Service cluster 1 ABAKPA EMENE INDUSTRIAL 33KV EMENE INDUSTRIAL 33KV 33 23 1066

Service cluster 1 ABAKPA EMENE INDUSTRIAL 33KV -2 EMENE INDUSTRIAL 33KV -2 33 22 2

Service cluster 1 ABA ABA OVERHEAD 33KV ABA OVERHEAD 33KV 33 20 2

Service cluster 1 ABAKALIKI AFIKPO 33KV NEW GOVERNMENT HOUSE, 11KV 11 21 2

Service cluster 1 AWKA ENUGU UKWU 33KV ENUGU UKWU 33KV 33 20 6

Service cluster 1 AWKUNANAW UGWUAJI GARIKKI 33KV UGWUAJI GARIKKI 33KV 33 22 747

Service cluster 1 NEW OWERRI AIRPORT 33KV(NEW OWERRI) AIRPORT 33KV(NEW OWERRI) 33 20 4548

Service cluster 1 OWERRI AIRPORT 33KV(OWERRI) AIRPORT 33KV(OWERRI) 33 20 726

Service cluster 1 UMUAHIA CBN 33KV(UMUAHIA) CBN 33KV(UMUAHIA) 33 22 5

Service cluster 1 UMUAHIA AFARA 33KV GOLDEN GUINEA 11KV 11 23 1

Service cluster 1 ABAKPA THINKERS CORNER 33KV NIKE LAKE 11KV 11 21 16

Page 11: POWER SUPPLY SITUATION IN THE SOUTH EAST:AN OVERVIEW

CLUSTER SUPPLY AVAILABILITY

Service cluster 1 ARIARIA ABA-OWERRI 33KV POLEMA 11KV 11 20 13

Service cluster 1 AWKA AGU-AWKA 33KV UNIZIK 11 20 731

Service cluster 1 OGUI KINGSWAY LINE 1, 33KV POWER HOUSE 11KV 11 20 900

Service cluster 1 ONITSHA 3-3, 33KV 3-3, 33KV 33 22 506

Service cluster 1 OWERRI OGUTA 33KV(OWERRI) OGUTA 33KV(OWERRI) 33 20 7524

Service cluster 1 NEW OWERRI CBN TEE OFF ON OGUTA 33KV(NEW OWERRI)CBN TEE OFF ON OGUTA 33KV(NEW OWERRI) 33 22 510

Service cluster 1 OWERRI ORLU 33KV(OWERRI) ORLU 33KV(OWERRI) 33 20.7 1530

Service cluster 1 AWKA ENUGUKWU 33KV SECRETARIAT 11 23 4

Service cluster 1 OGUI INDEPENDENCE L/O 33KV PRESIDENTIAL 11KV 11 20 44

Service cluster 1 ABA ABA UMUAHIA 33KV ABA UMUAHIA 33KV 33 20 5009

Service cluster 1 ABA IGI 33KV IGI 33KV 33 20 1298

Service cluster 1 NEW OWERRI OGUTA 33KV PORTHARCOURT 11KV 11 20 3490

Service cluster 1 OGBARU GCM: TR1, 15MVA, 33KV/11KV(NO METER) DOZZY 11KV 11 20 120

Service cluster 1 UMUAHIA UBAKALA 33KV RESEARCH 11KV 11 20 3

Service cluster 1 AWKUNANAW AMECHI 33KV AMECHI 33KV 33 20 407

Service cluster 1 AWKUNANAW 0UNEC 11KV 11 20 3078

Service cluster 1 MBAISE ALEX MBAISE ALEX MBAISE 33 22 1

Service cluster 1 ABAKPA KINGSWAY LINE 2, 33KV 9TH MILE INDUSTRIAL 11KV 11 20 342

Service cluster 1 NSUKKA UNN 33KV (FAULTY METER) NSUKKA TOWNSHIP 11KV 11 22 1850

Service cluster 1 NSUKKA UNN 33KV (FAULTY METER) ONUIYI 11KV 11 22 6966

Service cluster 1 NSUKKA T2, 7.5MVA, 33KV/11KV UGWUOYE 11KV 11 20 3371

Service cluster 1 AWKUNANAW ITUKU OZALLA 33KV AMECHI UWANI 11KV 11 20 398

Service cluster 1 AWKUNANAW TCN AUXILIARY TCN AUXILIARY 33 20 1

11

Page 12: POWER SUPPLY SITUATION IN THE SOUTH EAST:AN OVERVIEW

CLUSTER SUPPLY AVAILABILITY

Service cluster 2 NNEWI OBOSI - ORAIFITE 33KV OBOSI - ORAIFITE 33KV 33 18 3373

Service cluster 2 MBAISE AIRPORT 33KV(MBAISE) AIRPORT 33KV(MBAISE) 33 19 13

Service cluster 2 MBAISE MBAISE 33KV MBAISE 33KV 33 19 5027

Service cluster 2 NNEWI NNEWI INDUSTRIAL 33kV NNEWI INDUSTRIAL 33kV 33 18 1598

Service cluster 2 OGIDI UMUNYA 33KV UMUNYA 33KV 33 18 6984

Service cluster 2 OGUI KINGSWAY LINE 2, 33KV ONITSHA ROAD 11KV 11 18 1518

Service cluster 2 ABAKALIKI AFIKPO 33KV AZUIYIOKWU 2 11 18 3531

Service cluster 2 ABAKALIKI AFIKPO 33KV OCHUDO CITY 1 11 18 7

Service cluster 2 NNEWI NNEWI - OBA 33KV NNEWI - OBA 33KV 33 18 3856

Service cluster 2 OGUI KINGSWAY LINE 2, 33KV GOLF 11KV 11 18 1268

Service cluster 2 ABAKALIKI TR3, 15MVA, 33KV/11KV INDUSTRIAL ABAKALIKI 11 18 5478

Service cluster 2 NSUKKA IBAGWA 33KV IBAGWA 33KV 33 18 1292

Service cluster 2 OGIDI AGULERI 33KV AGULERI 33KV 33 16 448

Service cluster 2 ABAKALIKI TR4, 15MVA, 33KV/11KV ABAKALIKI TOWNSHIP 11 18 4344

Service cluster 2 ABAKALIKI TR3, 15MVA, 33KV/11KV AZUIYIOKWU 11 18 6641

Service cluster 2 ABAKPA THINKERS CORNER 33KV EMENE 1, 11KV 11 18 3233

Service cluster 2 NNEWI NNEWI INDUSTRIAL TEACHING HOSPITAL PRIVATE 11KV 11 18 1

Service cluster 2 NSUKKA EHA - AMUFU 33KV EHA - AMUFU 33KV 33 17 1242

Service cluster 2 OGBARU GCM: TR1, 15MVA, 33KV/11KV(NO METER) HABOUR 11KV 11 18 99

Service cluster 2 OGBARU ATANI 33KV PREMIER 11KV 11 18 1353

Service cluster 2 AWKA AGU-AWKA 33KV AWKA INDUSTRIAL 11 18 3439

12

Page 13: POWER SUPPLY SITUATION IN THE SOUTH EAST:AN OVERVIEW

CLUSTER SUPPLY AVAILABILITY

Service cluster 2 AWKUNANAW ITUKU OZALLA 33KV GARIKI 11KV 11 18 5184

Service cluster 2 AWKA NIBO: TR4, 15MVA, 33KV/11KV AWKA MAIN 11KV 11 18 4017

Service cluster 2 OGUI THINKERS CORNER 33KV ENUGU GRA 11KV 11 18 118

Service cluster 2 ABAKPA THINKERS CORNER 33KV ABAKPA 1, 11KV 11 18 7638

Service cluster 2 ABAKPA THINKERS CORNER 33KV ABAKPA 2, 11KV 11 18 6855

Service cluster 2 ABAKPA EMENE 2,11KV EMENE 2,11KV 33 18 3464

Service cluster 2 ABAKPA TRANS EKULU 33KV NOWAS, 11KV 11 18 4791

Service cluster 2 AWKA AGU-AWKA 33KV IFITE 11 18 4508

Service cluster 2 NSUKKA T2, 7.5MVA, 33KV/11KV CAMPUS 11KV 11 18 1222

Service cluster 2 OGBARU UGA 11KV 11 18 3294

Service cluster 2 OGUI MARYLAND 11KV 11 18 5445

Service cluster 2 OGBARU ATANI 33KV ATANI WATER WORKS 11KV 11 18 2414

Service cluster 2 ABAKPA THINKERS CORNER 33KV ABAKPA 3 11KV 11 18 2443

Service cluster 2 OGIDI AWADA 2, 33KV MGBEMENA 11KV 11 18 3700

Service cluster 2 ONITSHA 3-3, 33KV NKWELLE 11KV 11 18 8127

Service cluster 2 ABAKPA AJALI 33KV AJALI 33KV 33 18 121

13

Page 14: POWER SUPPLY SITUATION IN THE SOUTH EAST:AN OVERVIEW

CLUSTER SERVICE AVAILABILITY

Service cluster 3 NEW OWERRI OGUTA 33KV CONCORD 11KV 11 15 2380

Service cluster 3 OGUI KINGSWAY LINE 1, 33KV ARTISAN 11KV 11 15 3113

Service cluster 3 OGUI 0CHIME AVENUE 11KV 11 15 2919

Service cluster 3 ORLU ORLU 33KV(ORLU) ORLU 33KV(ORLU) 33 15.7 1433

Service cluster 3 ORLU OGUTA 33KV(ORLU) OGUTA 33KV(ORLU) 33 15 471

Service cluster 3 OGUI NEW HEAVEN 33KV NEW HAVEN 11KV 11 15 1958

Service cluster 3 ABAKALIKI TR4, 15MVA, 33KV/11KV UDEMEZUE 11 15 7678

Service cluster 3 ABAKPA TRANS EKULU 33KV PHASE 6, 11KV 11 15 2667

Service cluster 3 AWKUNANAW GOVERNMENT HOUSE 33KV ACHARA LAYOUT 11KV 11 15 2540

Service cluster 3 AWKUNANAW ITUKU OZALLA 33KV ARMY 11KV AWKUNANAW 11 15 5550

Service cluster 3 EKWULOBIA AGULU 33KV AGULU 33KV 33 15 5657

Service cluster 3 EKWULOBIA NENI 33KV NENI 33KV 33 15 3147

Service cluster 3 NNEWI NNEWI INDUSTRIAL 33KV(NO METER) NNEWICHI 11KV 11 13 3241

Service cluster 3 OGBARU ATANI 33KV WHALF 11KV 11 15 54

Service cluster 3 ONITSHA 3-3, 33KV HOUSING 11KV 11 15 2244

Service cluster 3 ABA ABA-EAST 11 KV 11 15 1152

Service cluster 3 EKWULOBIA AGULU 33KV NAFDAC 11KV 11 15 1

Service cluster 3 OGUI ACHI 33KV ACHI 33KV 33 15 417

Service cluster 3 AWKA ENUGU AGIDI VILLAGE ENUGU AGIDI VILLAGE 33 15 790

Service cluster 3 NSUKKA ORBA NSUKKA 33KV ORBA NSUKKA 33KV 33 15 1645

Service cluster 3 OGUI KINGSWAY LINE 1, 33KV COAL CAMP 11KV 11 15 5959

Service cluster 3 ABAKALIKI YAHE 33KV FDR YAHE 33KV FDR 33 15 1883

Service cluster 3 ABAKPA TRANS EKULU 33KV DHAMIJA, 11KV 11 15 1932

Service cluster 3 ABAKPA UDI 33KV UDI 33KV 33 13 110

Service cluster 3 AWKA ENUGWU-AGIDI 11 13 4207

Service cluster 3 AWKA NIBO: TR4, 15MVA, 33KV/11KV UDOKA 11 KV 11 15 5123

Service cluster 3 EKWULOBIA ORUMBA 33KV ORUMBA 33KV 33 15 1786

Service cluster 3 UMUAHIA UBAKALA 33KV UBAKALA 33KV 33 16 348

Service cluster 3 UMUAHIA AROCHUKWU 33KV AROCHUKWU 33KV 33 15 3234

Service cluster 3 UMUAHIA NKWOEGWU 33KV NKWOEGWU 33KV 33 15 4848

Service cluster 3 UMUAHIA TOWNSHIP 11KV UMUAHIA 11 15 5651

14

Page 15: POWER SUPPLY SITUATION IN THE SOUTH EAST:AN OVERVIEW

CLUSTER SUPPLY AVAILABILITY

Service cluster 3 ABA ABA OVERHEAD 33KV ABA TOWNSHIP 11KV 11 15 1730

Service cluster 3 ABA EHI ROAD 6.6KV EHI ROAD 6.6KV 33 13 2297

Service cluster 3 ABAKALIKI ISHIEKE 33KV FDR ISHIEKE 33KV FDR 33 15 1431

Service cluster 3 ABAKALIKI ITIGIDI 33KV FDR ITIGIDI 33KV FDR 33 15 955

Service cluster 3 ABAKPA EMENE INDUSTRIAL 33KV EMENE 3, 11KV 11 13 4940

Service cluster 3 AWKA AGU-AWKA 33KV AMANSEA 11KV 11 15 1377

Service cluster 3 AWKUNANAW ITUKU OZALLA 33KV SATELLITE 11KV 11 15 4063

Service cluster 3 NNEWI OBOSI 33KV NKWOEDO 11KV 11 15 998

Service cluster 3 NNEWI NNEWI INDUSTRIAL 33KV(NO METER) OTOLO 11KV 11 15 3608

Service cluster 3 NSUKKA T2, 7.5MVA, 33KV/11KV AKU (LEJJA) 11KA 11 15 2069

Service cluster 3 OGBARU ATANI 33KV FEGGE 11 KV 11 15 1697

Service cluster 3 OGBARU ATANI 33KV IYIOWA 11KV 11 15 5498

Service cluster 3 OGBARU AWADA 2, 33KV OKPOKO 11KV 11 15 3988

Service cluster 3 UMUAHIA AZIKIWE RD 11KV 11 15 2018

Service cluster 3 ARIARIA GUINNESS 33KV GUINNESS 33KV 33 13 1174

Service cluster 3 UMUAHIA NTIGHA 33KV NTIGHA 33KV 33 13 1029

Service cluster 3 ABAKPA AKPOGA 33KV AKPOGA 33KV 33 13 32

Service cluster 3 ABAKPA THINKERS CORNER 33KV AMAORJI 11KV 11 15 5048

Service cluster 3 ABAKPA EZEAGU EZEAGU 33 13 2137

Service cluster 3 ABAKPA NTA 11KV 11 15 1083

Service cluster 3 ABAKPA OKWE 11KV 11 15 1232

Service cluster 3 AWKUNANAW ITUKU OZALLA 33KV TOP LAND 11KV 11 15

Service cluster 3 OGIDI ARMY BARRACKS 33KV MINAJ 1, 11KV 11 13 5344

Service cluster 3 ONITSHA ARMY BARRACKS 33KV INLAND 11KV 11 15 5018

Service cluster 3 ONITSHA 3-3, 33KV NSUGBE 11KV 11 15 6199

Service cluster 3 ONITSHA ATANI 33KV IWEKA 11KV 11 15 2254

Service cluster 3 ONITSHA ATANI 33KV MARKET 11KV 11 15 7909

Service cluster 3 ONITSHA TRI,15MVA 132KV /11KV(ONITSHA) WOLIWO 11 KV 11 15 7214

Service cluster 3 OWERRI AIRPORT 33KV EGBU 11KV 11 14 3447

Service cluster 3 UMUAHIA ABA ROAD 11KV 11 15 4301

15

Page 16: POWER SUPPLY SITUATION IN THE SOUTH EAST:AN OVERVIEW

CLUSTER SUPPLY AVAILABILITY

Service cluster 3 UMUAHIA NKWOEGWU 33KV NKWOEGWU 11KV 11 15 3159

Service cluster 3 NEW OWERRI OGUTA 33KV IRETE INDUSTRIAL 11KV 11 15 5110

Service cluster 3 NEW OWERRI OGUTA 33KV IRETE 11KV 11 13

Service cluster 3 NEW OWERRI OWERRI 3, 33KV NEW OWERRI 11KV 11 15 1611

Service cluster 3 NEW OWERRI OGUTA 33KV WORLD BANK (NEW OWERRI) 11 15 6488

Service cluster 3 NNEWI NNEWI INDUSTRIAL 33KV(NO METER) MBANAGU 11KV 11 13 1167

Service cluster 3 NNEWI OBOSI 33KV UBAHU 11KV 11 15 1105

Service cluster 3 NNEWI OBOSI 33KV UMUOFOR 11KV 11 13 839

Service cluster 3 OGIDI ARMY BARRACKS 11KV(OGIDI) 11 13 98

Service cluster 3 OGIDI AWADA 2, 33KV AWADA 11KV 11 15 11002

Service cluster 3 OGIDI TRI,15MVA 132KV /11KV(ONITSHA) EZEIWEKA 11KV 11 15 5101

Service cluster 3 OGIDI ARMY BARRACKS 33KV MINAJ 2, 11KV 11 13 8002

Service cluster 3 OGIDI TRI,15MVA 132KV /11KV(ONITSHA) NWAZIKI 11KV 11 15 5882

Service cluster 3 OGIDI OGIDI 33KV(NO METER) TOLL-GATE 11 KV 11 13 5579

Service cluster 3 ONITSHA ATANI 33KV BIDA 11KV 11 15 2712

Service cluster 3 OWERRI OWERRI 3, 33KV NEW OWERRI 11KV (OWERRI) 11 15 1606

Service cluster 3 UMUAHIA UBAKALA 33KV NDUME 11KV 11 15 2454

Service cluster 3 UMUAHIA WORLD BANK 11KV UMUAHIA 11 15 4676

16

Page 17: POWER SUPPLY SITUATION IN THE SOUTH EAST:AN OVERVIEW

CLUSTER SERVICE AVAILABILITY

Service cluster 4 AWKUNANAW AMECHI-AWGU 33kV AMECHI-AWGU 33kV 33 8 420

Service cluster 4 AWKUNANAW AMECHI-AGBANI 33KV AMECHI-AGBANI 33KV 33 10 1275

Service cluster 4 ABAKALIKI EZILLO EZILLO 33 10 563

Service cluster 4 ARIARIA ABA OVERHEAD 33KV ABA GRA 11KV 11 8 4522

Service cluster 4 ARIARIA ABA-OWERRI 33KV ABAYI 11KV 11 8 5074

Service cluster 4 ARIARIA ABA-OWERRI 33KV ARIARIA 11KV 11 8 5101

Service cluster 4 ARIARIA UKWA 33KV ASA OKPUAJA 11KV 11 8 8002

Service cluster 4 ARIARIA T3A 15MVA 33/11KV OMUMA 11KV 11 8 5882

Service cluster 4 ARIARIA ABA-OWERRI 33KV OSISIOMA 11KV 11 8 5579

Service cluster 4 ARIARIA ABA-OWERRI 33KV WORLD BANK 11KV ARIARIA 11 8 2712

Service cluster 4 ARIARIA ABA OVERHEAD 33KV ABA INDUSTRIAL 11KV 11 10 1606

Service cluster 4 ARIARIA OWERRINTA 33KV OWERRINTA 33KV 33 10 392

Service cluster 4 EKWULOBIA EZIOKO 11KV 11 8 850

Service cluster 4 EKWULOBIA NENI 33KV EKE MARKET NRI 11KV 11 10 137

Service cluster 4 EKWULOBIA ORUMBA 33KV NDIOWU 11KV 11 10 3

Service cluster 4 EKWULOBIA NENI 33KV URU NRI 11KV 11 10 166

Service cluster 4 NNEWI OBOSI 33KV IBOLO 11KV 11 10 1440

Service cluster 4 NNEWI NNEWI 33KV URUAGU II,11KV 11 8 3907

Service cluster 4 NNEWI NNEWI - UMUDIM 33kV NNEWI - UMUDIM 33kV 33 8 3727

Service cluster 4 OGBARU ATANI 33KV HOUSING EBH 11KV 11 10 2244

Service cluster 4 OGUI OJI-URBAN 33KV OJI URBAN 11KV 11 10 1273

Service cluster 4 OGUI KINGSWAY LINE 1, 33KV HILL TOP 11KV 11 10 1990

Service cluster 4 OGUI KINGSWAY LINE 2, 33KV PRISONS 11KV 11 10 4653

Service cluster 4 ONITSHA ARMY BARRACKS 33KV MGBUKA 11KV 11 10 7538

Service cluster 4 ONITSHA 3 -3 33KV ABATA - NSUGBE 33 10 1722

Service cluster 4 ONITSHA ARMY BARRACKS 33KV ONITSHA G.R.A 11KV 11 10 3941

Service cluster 4 ONITSHA ARMY BARRACKS 33KV OMAGBA 11KV 11 10 1640

Service cluster 4 ORLU ORLU 33KV IHIOMA ROAD. ORLU 11KV 11 8 199

Service cluster 4 ORLU ORLU 33KV OWERRI ROAD, ORLU 11KV 11 8 600

Service cluster 4 ORLU OKIGWE 33KV (ORLU) OKIGWE 33KV (ORLU) 33 8 462

Service cluster 4 ORLU ORLU 33KV UMUAKA 11KV 11 10 14

Service cluster 4 OWERRI AIRPORT 33KV FUT 11KV 11 8 8583

Service cluster 4 OWERRI ORLU 33KV IFAKALA 11KV 11 8 6856

Service cluster 4 OWERRI ORLU 33KV MBIERI 11KV 11 8 4800

Service cluster 4 OWERRI OWERRI 3, 33KV NAZE 11KV 11 8 4716

17

Page 18: POWER SUPPLY SITUATION IN THE SOUTH EAST:AN OVERVIEW

CLUSTER SERVICE AVAILABILITY

Service cluster 4 OWERRI OWERRI 3, 33KV GRA 11KV 11 10 3373

Service cluster 4 OWERRI AIRPORT 33KV IKENEGBU 11KV 11 10 4784

Service cluster 4 OWERRI OWERRI 3, 33KV TOWNSHIP 11KV OWERRI 11 10 3168

Service cluster 4 OWERRI MBAISE 33KV EMEKUKU 11KV 11 8 4751

Service cluster 4 MBAISE AIRPORT 33KV MBUTU 11KV 11 8 6

Service cluster 5 MBAISE MBAISE 33KV NKWOALA 11KV 11 8 429

Service cluster 4 ABA UMUARO 11KV 11 10 0

Service cluster 4 ABA ABA-UMUAHIA 33KV 7-UP 11KV 11 10 3144

Service cluster 4 ABA T3B, 15MVA, 33/11KV NGWA ROAD 11KV 11 8 4935

Service cluster 4 ABA IGI 33KV OPOBO ROAD 11KV 11 8 1758

Service cluster 4 ABA ABA OVERHEAD 33KV ABA BARRACKS 11KV(ABA) 11 10 793

Service cluster 4 ABA ABA-UMUAHIA 33KV ABA WATER SIDE 11 KV 11 12 3652

Service cluster 4 ABA T3B, 15MVA, 33/11KV OBOHIA 11KV 11 10 4852

Service cluster 4 ABA T3A 15MVA 33/11KV PORT HARCOURT ROAD 11KV 11 10 4044

Service cluster 4 AWKA ENUGUKWU 33KV OKPUNO 11KV 11 8 5026

Service cluster 4 ARIARIA ABA OVERHEAD 33KV ABA BARRACKS 11KV(ARIARIA) 11 10 3402

Service cluster 4 AWKA ENUGUKWU 33KV NIMO 11KV 11 8 1698

Service cluster 4 AWKA ENUGUKWU 33KV ABAGANA 11 8 3302

Service cluster 4 AWKA ENUGUKWU 33KV ENUGU UKWU 11KV 11 8 5280

Service cluster 4 AWKA ENUGUKWU 33KV UKPO 11KV 11 8 2160

Service cluster 4 AWKA NIBO: TR4, 15MVA, 33KV/11KV NIBO 11 10 2316

Service cluster 4 EKWULOBIA AGULU 33KV AGULUEZECHUKWU 11KV 11 10 1541

Service cluster 4 EKWULOBIA AGULU 33KV EKWULOBIA MAIN OFFICE 11KV 11 10 1945

Service cluster 4 EKWULOBIA ORUMBA 33KV UMUNZE 11KV 11 10 366

Service cluster 4 OWERRI OGUTA 33KV EGBEADA 11KV 11 10 8346

Service cluster 4 OWERRI OKIGWE 33KV (OWERRI) OKIGWE 33KV (OWERRI) 33 11 462

Service cluster 4 UMUAHIA GRA 11KV 11 10 2608

Service cluster 4 ABAKPA ABOR ABOR 33 10 345

Service cluster 5 NEW OWERRI OGUTA 33KV OBINZE 11KV 11 10 2879

Service cluster 5 OGIDI NICCUS 33KV TEE - OFF NICCUS 33KV 33 8 2221

Service cluster 4 OGIDI NICCUS 33KV AVENCO 11 KV 11 10 1363

Service cluster 4 OGIDI IDEMILI 33KV IDEMILI 33KV 33 10 3133

Service cluster 4 OGIDI OGIDI 33KV(NO METER) NKPOR 11 KV 11 12 7023

Service cluster 4 OGIDI OGIDI 33KV(NO METER) OGIDI 11 KV 11 12 5034

Service cluster 4 OGIDI NICCUS 33KV OJOTO 11KV 11 10 1315

Service cluster 4 OGIDI UGWUAGBA 11KV 11 12 4760

Service cluster 4 UMUAHIA NKWOEGWU 33KV AMAOGWUGWU 11KV 11 10 665

Service cluster 4 UMUAHIA 0ASAGA 11KV 11 10 1445

Service cluster 4 UMUAHIA UBAKALA 33KV OLD UMUAHIA 11KV 11 10 2765

Service cluster 4 UMUAHIA UBAKALA 33KV OLOKORO 11KV 11 10 3923

Service cluster 4 UMUAHIA UBAKALA 33KV UBAKALA 11KV 11 10 351

Service cluster 4 UMUAHIA UBAKALA 33KV UMUDIKE 11KV 11 10 2596

18

Page 19: POWER SUPPLY SITUATION IN THE SOUTH EAST:AN OVERVIEW

CLUSTER SERVICE AVAILABILITY

Service cluster 5 NNEWI NNEWI - AMICHI 33kV NNEWI - AMICHI 33kV 33 4 1250

Service cluster 5 NNEWI NNEWI - AWKA ETITI 33kV NNEWI - AWKA ETITI 33kV 33 4 1004

Service cluster 5 NNEWI OBOSI - IHIALA 33KV OBOSI - IHIALA 33KV 33 4 1174

Service cluster 5 NNEWI OBOSI - OZUBULU 33KV OBOSI - OZUBULU 33KV 33 4 3153

Service cluster 5 NNEWI OBOSI - ULI 33KV OBOSI - ULI 33KV 33 4 480

Service cluster 5 NNEWI UKPOR - NNEWI 33kV UKPOR - NNEWI 33kV 33 4 221

Service cluster 5 OGIDI AGULERI 33KV AGULERI - AUKUZU 33 5 485

Service cluster 5 OGIDI AGULERI 33KV AGULER - NTEJE 33 5

Service cluster 5 OGIDI AGULUERI 33KV CHIATULA 11KV 11 5 10

Service cluster 5 OGIDI AGULUERI 33KV ROMANS 11KV 11 5 6

Service cluster 5 ORLU OKIGWE 33KV LIMCA, OKIGWE 11KV 11 6.6 470

Service cluster 5 ORLU URUALLA CIVC CENTER 11KV 11 6.6 19

Service cluster 5 MBAISE OBOWO 33KV OBOWO 33KV 33 6.6 3434

Service cluster 5 EKWULOBIA ORUMBA 33KV AMUDA 11KV 11 4 13

Service cluster 5 EKWULOBIA ORUMBA 33KV OGBUNKA ROAD 11KV 11 4 142

Service cluster 5 EKWULOBIA OKO POLY 11KV 11 6 1556

Service cluster 5 MBAISE OKIGWE 33KV (MBAISE) OKIGWE 33KV (MBAISE) 33 6 3655

Service cluster 5 UMUAHIA NKWOEGWU 33KV ABIRIBA 11KV 11 5 786

Service cluster 5 UMUAHIA OBOWO 33KV AMACHARA 11KV 11 6 3095

Service cluster 5 UMUAHIA OBOWO 33KV EKENOBIZI 11KV 11 6 1015

Service cluster 5 ABA ABA-UMUAHIA 33KV OMOBA 11KV 11 6 894

Service cluster 5 ARIARIA UKWA 33KV UKWA 33KV 33 6 3944

Service cluster 5 ARIARIA UKWA 33KV URATTA 11KV 11 5 5025

Service cluster 5 MBAISE MBAISE 33KV AVUVU 11KV 11 6 474

Service cluster 5 MBAISE EGBEREDE 11KV MBAISE 11 6 309

Service cluster 5 ORLU ORLU 33KV AMAIGBO ROAD. ORLU 11KV 11 7 2044

Service cluster 5 ORLU OKIGWE 33KV TOWNSHIP, OKIGWE 11KV 11 7 1749

Service cluster 5 UMUAHIA AROCHUKWU 33KV OHAFIA BARRACKS 11KV 11 5 812

Service cluster 5 EKWULOBIA ORUMBA 33KV NGODO 11KV 11 7 1

Service cluster 5 MBAISE LAGWA 11KV 11 6 8

Service cluster 5 MBAISE OBOWO 33KV UMUIHI 11KV 11 6 127

Service cluster 5 MBAISE OBIANGWU 11KV 11 6 18

19

Page 20: POWER SUPPLY SITUATION IN THE SOUTH EAST:AN OVERVIEW

FUTURE IMPROVEMENT(SHORT TERM)

• 41 Feeders (11kv and 33kv)will be migrate to 13hrs of supply availability from cluster 4 to cluster 3 by Next Month ,November,2020.

• Anambra 9nos

• Enugu 3nos

• Imo 4nos

• Abia 26nos.

20

Page 21: POWER SUPPLY SITUATION IN THE SOUTH EAST:AN OVERVIEW

Future Improvement(Medium term)

• The following feeders would be impacted by EEDC medium term investment, by the first quarter of 2021

• Okigwe 33kv and the fed 11kv lines Imo state

• Orlu 33kv and the fed 11kv feeders Imo state

• Mbaise 33kv and the fed 11kv feeders Imo state

• Obowo 33kv and the fed 11kv feeders Imo state

• Nnewi 33kv feeder and the fed 11kv feeders Anambra state

• Obosi 33kv feeder Anambra state.

21

Page 22: POWER SUPPLY SITUATION IN THE SOUTH EAST:AN OVERVIEW

Future improvement (long term)

• EEDC long term plan for supply improvement in 65 nosfeeder in its network is predicated on the completion of the underlisted TCN projects and (or) Partnership with embedded generation developers within the areas affected.

22

Page 23: POWER SUPPLY SITUATION IN THE SOUTH EAST:AN OVERVIEW

CHALLENGES

Transmission Capacity Constraints: Inadequate TCN capacity to serve the South-East

Proximity of the TCN Stations to the distributions load resulting to over stretched 33kv lines

Regulatory Actions Service reflective tariff

Increasing minimum remittance

Removal of freeze on Transmission cost

10/15/2020CORE VALUES: INTEGRITY >CUSTOMER

FOCUS >PROFESSIONALISM >INNOVATION

23

Page 24: POWER SUPPLY SITUATION IN THE SOUTH EAST:AN OVERVIEW

ENUGU REGION TRANSMISSION.S/N FEEDER/TCN

STATION

EXISTING TCN

STATION

FEEDER ROUTE

LENGTH (KM)

AREAS AFFECTED ON-GOING TCN STATION PROJECT INTERVENTION

SOUGHT

EEDCS' PROPOSED

PROJECTS.

1 AMECHI 33KV UGWUAJI 1 X

40MVA

568.21 ,AGBANI

AWGWU,

AGBANI

NENWE 1 X 60MVA COMPLETION OF ON-

GOING TCN PROJECT2NOS 33KV FEEDERS

TO RELIEF AMECHI

AND ITUKU OZALA

33KV.

2 NNEWI 33KV AWADA

T13,60MVA

189.86 AWKA-ETITI,

UMUDIM

NNEWI,AMICHI,

UKPOR

NNEWI 2 X 60MVA -do- 4NOS 33KV FEEDERS

TO RELIEF NNEWI 33KV

AND NNEWI

INDUSTRIAL.

3 OBOSI 33KV AWADA

T11,60MVA

205.7

IHIALA,

OZUBULU, UKPOR

ULI

IHIALA 1 X 60MVA -do- 2NO 33KV FEEDERS TO

RELIEF OBOSI 33KV

AND ENVIRONS.

4 UMUNYA

33KV, OGIDI

33KV

AWADA (MOB

45MVA)

113.8

OGIDI

ANI,URU,OGBUNIKE

,ABAGANA,ACHI

1 X 100MVA

COMMISSIONING OF

1 X 100MVA TRF. AT

AWADA

1 NO FEEDER FOR

FEGGE(under

construction),and

reduce loadsheeding.

5 AGULU 33KV NIBO TR1

60MVA

220.29 OBODO UKWU,

AKOKWA,

UGA (3 LGAs)

INSTALLATION OF 1 X 60MVA POWER

TRF.

COMPLETION OF ON-

GOING TCN PROJECT

2NOS 33KV FEEDERS

TO DELOAD NENI AND

AGULU.

Page 25: POWER SUPPLY SITUATION IN THE SOUTH EAST:AN OVERVIEW

ENUGU REGION CONTINUES

6 NENI NIBO TR1 60MVA 113.44 ALOR,

ADAZI (2 LGAs)

-do- -do-

SAME AS ABOVE.

7 EZILLO

33KV

NKALAGU

TR2A,30MVA

256.53 AFIKPO NORTH

& SOUTH,

OBURU AND

AMASIRI

AMASIRI 1 X 60MVA COMPLETION OF ON-

GOING TCN PROJECT

3NOS 33KV FEEDERS

TO RELIEF

AFIKPO,ITIGIDI,YAHE

AND ISHIEKE 33KV

FEEDERS.

8 ITIGIDI

33KV

MILE 50 TR1

30MVA

217.17 IKWO &

ONUEKE

-do- -do-

SAME AS ABOVE.

9 YAHE

33KV

MILE 50 TR2

60MVA

227.37 IBOKO, NWOFE,

IZIOGO,

UGBODO

-do- -do-

SAME AS ABOVE.

10 ISHIEKE MILE 50 TR2

60MVA

198.54EJIOM,

MGBOKOT

-do- -do-

SAME AS ABOVE.

11 OJI 1 X

30MVA

OJI 1 X 30MVA

0.1

WATER WORKS

33KV, UDI 33KV,

ACHI 33KV, OJI-

URBAN 33KV,

ORUMBA 33KV

INSTALLATION OF 1 X 60MVA,

1232/33KV POWER TRF.

COMPLETION AND

COMMISSIONING OF

ON-GOING TCN

PROJECT

TO STOP

LOADSHEDING OF OUR

33KV FEEDERS.

12 AGU-

AWKA

(MOB

40MVA)

AGU AWKA MOB

40MVA

0.2 AGULERI 33KV,

ENUGWU

UKWU 33KV,

AGU-AWKA 2 X

15MVA

AGU-AWKA 2 X 60MVA COMMISSIONING OF

COMPLETED

PROJECT 3NOS 33KV FEEDERS

ALREADY

CONSTRUCTED,AWAITI

NG COMMISSIONIG.

Page 26: POWER SUPPLY SITUATION IN THE SOUTH EAST:AN OVERVIEW

PORTHACOUT REGION TRANSMISSIONS/N FEEDER/TCN

STATION

EXISTING TCN

STATION

FEEDER ROUTE

LENGTH (KM)

AREAS

AFFECTED

ON-GOING TCN STATION

PROJECT

INTERVENTION

SOUGHT

EEDCS'

PROPOSED

PROJECTS.

1 OKIGWE 33KV EGBU MOB 40MVA 399.37 OKIGWE/MB

AISE

OKIGWE

ORLU

ISIALA

MBANO,

EHIME

MBANO

AMAIMO

AMARAKU

OKIGWE 2 X 60MVA COMPLETION

OF ON-GOING

TCN PROJECT

2NOS 33KV

FEEDERS TO

DELOADD

OKIIGWE AND

SUPPLY THE

ENVIRONS.

2 ORLU 33KV EGBU,TR2 60MVA 265.22

ENTIRE

ORLU L.G.A,

AKOKWA

ORLU 2 X 60MVA -do- 2NOS 33KV

FEEDERS TO

DELOADD ORLU

33KV AND SUPPLY

THE ENVIRONS.

3 MBAISE 33KV EGBU MOB 40MVA 211.16 MBAISE,

OBOWO,

UMUAWAD

A,

OKPOFE,

UVURU

ABO MBAISE 2 X 60MVA -do-

2NOS FEEDERS TO

DELOAD MBAISE

AND AIRPORT

FEEDERS.

4 AIRPORT 33KV EGBU TR1 60MVA 180.26 NGO-

OKPALA

ABO MBAISE 2 X 60MVA -do-

SAME AS ABOVE.

5 AROCHUKWU

33KV

ITU 60 150.35 AROCHUKWU 1 X 4OMVA COMPLETION

OF ON-GOING

2NOS FEEDERS TO

FEED

Page 27: POWER SUPPLY SITUATION IN THE SOUTH EAST:AN OVERVIEW

Corporate Head Quarters, Plot 62 Okpara Avenue, Enugu

Tel: +234 8150824383 || www.enugudisco.com

Thank You !