Upload
sumanta-dutta
View
223
Download
0
Embed Size (px)
8/10/2019 PowerCenter Upgrade
1/41
PowerCenter Upgrade
Upgrading to PowerCenter 9.6.0
Presented by Venu Gangu / Saradhi Potharaju
13 15 May2014
8/10/2019 PowerCenter Upgrade
2/41
PowerCenter UpgradeUpgrading to PowerCenter 9.6.0
8/10/2019 PowerCenter Upgrade
3/41
You can upgrade to 9.6 Power Center and Data Quality, DaExplorer, Data Services from the following versions
9.1x 9.5x
PowerCenter installations on prior versions, will need to upto one of the above and then upgrade to 9.6
Power Center
8.61 and higher to 9.1x/9.5x
Data Quality, Data Explorer and Data Services
9.0.1 to 9.5x
Supported Versions for 9.6 Upgrade
8/10/2019 PowerCenter Upgrade
4/41
Product 8.61/8.62 9.0.1 9.1x
PowerCenter Not Supported Not Supported Supported
PowerExchange Not Supported Not Supported Supported
Data Quality Not Supported Not Supported Supported
Data Explorer Not Supported Not Supported Supported
Data Services N/A Not Supported Supported
Direct upgrade paths from earlier versions to 9.6
9.6 Upgrade Support Matrix
Versions not listed here are Not supported
8/10/2019 PowerCenter Upgrade
5/41
Complete the pre-upgrade tasks for the domain and serve
ensure that you can successfully run the installer.
Upgrade the Informatica domain and server files. Use the installer to upgrade Informatica domain and upgrade the s
on each node. If the domain contains multiple nodes, upgr
gateway node before you upgrade the worker nodes.
After you upgrade the first gateway node, verify that the up
successful before you upgrade the other nodes in the dom
Upgrade Tasks
8/10/2019 PowerCenter Upgrade
6/41
Complete the pre-upgrade tasks for the application service
Upgrade the application services. After installation, log in tAdministrator tool and upgrade the application services.
Upgrade PowerCenter Client. Use the client installer to up
PowerCenter Client.
Perform the post-upgrade tasks.
Upgrade Tasks (Contd.)
8/10/2019 PowerCenter Upgrade
7/41
The following are the approximate times taken for completupgrading to 9.6
Domain Done during the upgrade process
15 - 30 mins
Repository Services
CRS 15 mins per service
MRS 15 - 30 mins per service
Approximate
Time taken for Upgrade to 9.6
8/10/2019 PowerCenter Upgrade
8/41
Review the operating system specific requirements. Revie
prerequisites and environment variable configuration.
Uninstall Informatica B2B Data Transformation.
Prepare the domain. Back up the domain and verify databaaccount permissions.
Prepare the PowerCenter repository. Back up the PowerC
repository.
Export the Jaspersoft resource.
Pre-Upgrade Tasks
8/10/2019 PowerCenter Upgrade
9/41
Prepare Metadata Manager:
A. Back up the Metadata Manager warehouse. B. Export, purge, and delete business glossaries.
C. Disable the Metadata Manager service.
D. Back up the Metadata Manager properties file.
Prepare the Data Analyzer repository. Assign roles to user
groups, back up the Data Analyzer repository, and verify da
user account requirements.
Pre-Upgrade Tasks (Contd.)
8/10/2019 PowerCenter Upgrade
10/41
Shut down the domain. You must shut down the domain be
upgrade it. To shut down the domain, stop the Informatica
process on each node in the domain.
Prepare to change the node configuration. Complete the apre-upgrade tasks if you choose to change the node config
A. Review the operating system specific requirements.
B. Copy the installation directory.
C. Verify the keystore file name and location.
Pre-Upgrade Tasks (Contd.)
8/10/2019 PowerCenter Upgrade
11/41
If the domain configuration repository is in a database vers
not supported, you must migrate to a database version tha
supported.
Migrate the repository in the existing Informatica instance bupgrade.
For example, if the domain configuration repository is in a ASE 15.0.3 database, migrate the repository to a Sybase A
database.
Migrate to a Supported Database
8/10/2019 PowerCenter Upgrade
12/41
Shut down all application services in the domain.
Shut down the domain.
Create a database schema and a user account in a supported da
Restore the domain configuration backup to the database schem
Run the infasetup RestoreDomain command to restore the domaconfiguration in the backup file to the specified database schema
Update the database connection for each gateway node.
When you run the installer on each gateway node, select the optichanges to the host name and port number. When you select
you can update the location of the domain configuration repositor
Migrate to a Supported Database (Contd.)
8/10/2019 PowerCenter Upgrade
13/41
If a node is installed on an operating system that is not supmust migrate the installation to a supported operating syste
you upgrade.
For example, effective in 9.6.0, Informatica dropped suppoLinux. If any node in the domain is on 32-bit Linux, you mu
the installation to a supported operating system before upgnode to 9.6.0.
Migrate to a Supported Operating System
8/10/2019 PowerCenter Upgrade
14/41
Shut down the node.
To shutdown the node, run the command INFA_HOME/tomcat/bin
infaservice.sh shutdown.
Back up the installation directory, INFA_HOME. If the domain has
enabled, backup the keystore files as well.
Move the installation backup to a supported operating system.
When you upgrade the node on the supported operating system, pro
restored installation, and choose to allow changes to the node host n
port numbers. After you upgrade the node on the supported operatinremove the restored installation directory.
Migrate to a Supported Operating System (Contd.)
8/10/2019 PowerCenter Upgrade
15/41
Domain Upgrade
8/10/2019 PowerCenter Upgrade
16/41
Starting the domain upgrade
8/10/2019 PowerCenter Upgrade
17/41
Selecting the upgrade directories
8/10/2019 PowerCenter Upgrade
18/41
While either installing 9.6 fresh or while upgrading to 9.6 keyw
required from user
This is used to create an installation specific encryption key
The encryption key is used to encrypt fields that are identified (i.e. passwords) and stored within the Domain and Repository
MRS) DBs.
Note: Currently the sensitive tag is used Only for password
This replaces the generic encryption key (shipped with the proencrypt passwords within the server environment
What's new in 9.6 (enhanced) Encryption key
Upgrading to 9.6
8/10/2019 PowerCenter Upgrade
19/41
Apart from Encryption key there are no new caveats for up9.6
Kerberos as an authentication mechanism available in 9.6;to native and LDAP
This can be chosen during a fresh 9.6 install or
Can be enabled via infaSetup switchToKerberosMode comma
upgrading to 9.6
Enabling Kerberos as the authentication mechanism for the dooffered as part of the upgrade process itself
Upgrading to 9.6
8/10/2019 PowerCenter Upgrade
20/41
Master node Keyword input
String keyword input
used to create aninstallation specific
encryption key
Location where the
encryption key is stored.There is an option tochoose a non-default
location
8/10/2019 PowerCenter Upgrade
21/41
If there is more than one node within the domain then loca
encryption key created for gateway node needs to be prov
This is required for the Gateway nodes only; not for worker
One of the gateway nodes can become the master gateway nfailover scenario
After upgrading the first gateway node, the same encryptioneeds to be copied to other gateway nodes. All gateway no
domain should use the same encryption key.
For Gateway nodes
Keyword Input
8/10/2019 PowerCenter Upgrade
22/41
Gateway node Keyword input
Location forencryption key
to be stored
Location of previocreated encryptio
for Master nod
8/10/2019 PowerCenter Upgrade
23/41
If you plan a hardware or database upgrade while upgradinInformatica products, Informatica 9.6 has the capability to s
following:
Upgrade a node that runs on an unsupported operating sys
Upgrade a clone of a production domain (without altering th
production environment)
Use the Allow changes to the node host name and port
number option during the Upgrade Directory installation, tofollowing key changes to domain configuration:
Node Host Name & Port Number
Domain Database Connection
Advanced upgrade options in PowerCenter 9.6.0
8/10/2019 PowerCenter Upgrade
24/41
The following are the manual steps required to use the adv
options before upgrading:
Change Domain Host: Requires copying a few configuration new machine before upgrade.
Change Domain Database:Requires a backup and restore oa new database instance before upgrade.
Advanced upgrade options in PowerCenter 9.6.0
8/10/2019 PowerCenter Upgrade
25/41
Advanced upgrade options in PowerCenter 9.6.0
8/10/2019 PowerCenter Upgrade
26/41
Domain Configuration Repository Details
8/10/2019 PowerCenter Upgrade
27/41
Completion of domain upgrade
8/10/2019 PowerCenter Upgrade
28/41
Application service upgrade
8/10/2019 PowerCenter Upgrade
29/41
The following table lists the services that require metadata upg
upgrading to Informatica 9.6:
Services that require metadata upgrade
U di li ti i
8/10/2019 PowerCenter Upgrade
30/41
Use the service upgrade wizard to upgrade application ser9.6.0. The service upgrade wizard provides the following o
Upgrade multiple services.
Enable services before the upgrade.
Display upgraded services in a list along with services that upgrade.
Save the current or previous upgrade report.
Automatically restart the services after they have been upg
You can access the service upgrade wizard from the Manathe header area.
Upgrading application services
R i th S i U d Wi d
8/10/2019 PowerCenter Upgrade
31/41
1. In the Informatica Administrator header area click Manage > Upg
2. Select the objects to upgrade.
3. Optionally, specify if you want to Automatically recycle services aIf you choose to automatically recycle services after upgrade, the
wizard restarts the services after they have been upgraded.
4. Click Next.
5.
If dependency errors exist, the Dependency Errors dialog box apReview the dependency errors and click OK. Then, resolve depeerrors and click Next.
Running the Service Upgrade Wizard
R i th S i U d Wi d (C td )
8/10/2019 PowerCenter Upgrade
32/41
6. Enter the repository login information. Optionally, choose to use the same login inforepositories.
7. Click Next.
The service upgrade wizard upgrades each service and displays the status and pro
8. When the upgrade completes, the Summary section displays the list of services andstatus.Click each service to view the upgrade details in the Service Details section.
9.
Optionally, click Save Report to save the upgrade details to a file.
If you choose not to save the report, you can click Save Previous Report the next ti
the service upgrade wizard.10.Click Close.
11. If you did not choose to automatically recycle services after upgrade, restart upgrad
Running the Service Upgrade Wizard (Contd.)
S i U d Wi d b f l ti i
8/10/2019 PowerCenter Upgrade
33/41
Service Upgrade Wizard before completing service
Ser ice Upgrade Wi ard after completing ser ice p
8/10/2019 PowerCenter Upgrade
34/41
Service Upgrade Wizard after completing service up
Post Upgrade tasks
8/10/2019 PowerCenter Upgrade
35/41
Update ODBC data sources. The Informatica installation includes new DataDirect O
Re-create each ODBC data source to use the new drivers.
Verify that the log events directory is correct. To use a different directory for the logsDirectory Path property for the domain.
If you exported business glossaries from Metadata Manager, import the glossaries i
tool.
Post-Upgrade tasks
Post Upgrade tasks (Contd )
8/10/2019 PowerCenter Upgrade
36/41
Complete the following post-upgrade tasks for each Metadata Manager Service:
Update the Metadata Manager properties file to include any customization.
Enable the Metadata Manager Service.
Create business glossary resources based on the business glossaries that you imported into
Uninstall and reinstall the Metadata Manager Agent after you configure the Metadat
Service.
Update the Reporting and Dashboards Service properties file and upgrade to Jaspe
Set the required environment variables
Post-Upgrade tasks (Contd.)
Informatica Client Upgrade
8/10/2019 PowerCenter Upgrade
37/41
Use the client installer to upgrade a previous version of the Informatica cInformatica client tools are installed on the installation directory you spec
The client installer configures the newly installed client tools with the sam
the previous version. The client installer does not modify the files of the previous version of the
Run the installer on all machines that host previous versions of the Inform
tools that you want to upgrade. You can upgrade the Informatica clients i
silent mode.
When you run the client installer, select the Informatica client tool to upgr
For PowerCenter, you can upgrade the PowerCenter Client tools. PowerCa set of tools you can use to manage the PowerCenter repository, mappi
sessions.
Informatica Client Upgrade
Informatica Client Upgrade (Contd )
8/10/2019 PowerCenter Upgrade
38/41
The client upgrade also upgrades the following client tools:
Custom Metadata Configurator
Mapping Architect for Visio
Mapping Analyst for Excel
By default, the when you upgrade PowerCenter Client, the following com
also upgraded:
DataDirect ODBC drivers
Java Runtime Environment libraries
Informatica Client Upgrade (Contd.)
Tips & Tricks
8/10/2019 PowerCenter Upgrade
39/41
Mandatory upgrade of Repository Services (CRS & MRS) rafter upgrade to 9.6
Due to change in encryption key
Encryption key created is recommended to be saved in a slocation for reference at a later point in time
You should also persist the keyword entered
Will be required for changing the keyword to a new value vinfaSetup command; migrateEncryptionKey
Domain needs to be brought down before changing keyword
Tips & Tricks
References
8/10/2019 PowerCenter Upgrade
40/41
The 9.6 Upgrade Planner is available on My Support: https://mysupport.informatica.com/Multimedia/Upgrade_Planner_9
PowerCenter Upgrade Guide for Version 9.1.0, 9.5.0, 9.5.1
PowerCenter 9.6.0 Installation and Configuration Guide
Product Availability Matrix for PowerCenter
https://mysupport.informatica.com/community/my-support/product
matrices
References
8/10/2019 PowerCenter Upgrade
41/41