PPT Kapsel 24 April 2014

Embed Size (px)

Citation preview

  • 8/11/2019 PPT Kapsel 24 April 2014

    1/27

    BREMA

    FOKUS: BIOENERGITara F Khaira

    April 2014

  • 8/11/2019 PPT Kapsel 24 April 2014

    2/27

    BREMA

    PT BREMA BRATABioEnergy Engineering

    Project Management andControlling

    Study Stage

    Tendering Stage

    Design Stage

    Implementation Stage

    OUR SERVICE

  • 8/11/2019 PPT Kapsel 24 April 2014

    3/27

    BREMA

    Major Client Groups

    Bankers Engineer

    Studies e.g. Due Diligence

    Project Monitoring

    Supervision of subcontractors

    Procurement Management

    Design Review

    Workshop inspection

    Project Management

    Design

    Tender Preparation

    Bid Evaluation

    Contracting

    Project Implementation

    Design Approval

    Factory Acceptance Tests

    Supervision of Erection and

    Commissioning

    Operation and Maintenance

    Owners Engineer

    Bankable Feasibility Study

    Market Studies and Analyses

    Project Finance Advisory Services

    Tariff and Pricing Studies

    Financier

    Contractor

    Owner, Investor

    Owners Engineering services

    Market Studies

    Business Development Support

    Energy Planning

    Institutional & Regulatory Support

    Utilities & GovernmentsBREMA

  • 8/11/2019 PPT Kapsel 24 April 2014

    4/27

    BREMA

    Design

    Development Construction

    Commissioning

    Operation

    ... transferring knowledge

    from the energy experts

    to the Client

    We offers customized services

    in each phase of a project

    Idea

    Consulting Services

  • 8/11/2019 PPT Kapsel 24 April 2014

    5/27

    BREMA

    FOKUS: BIOENERGI

  • 8/11/2019 PPT Kapsel 24 April 2014

    6/27

  • 8/11/2019 PPT Kapsel 24 April 2014

    7/27BREMA

    Energi Fosil Sumber Daya Cadangan Produksi Rasio

    Energi Terbarukan Sumber Daya Terpasang

  • 8/11/2019 PPT Kapsel 24 April 2014

    8/27BREMA

    Hubbert peak oil theory

    the peak of the world's production of conventionalpetroleum (crude oil) is reached.

  • 8/11/2019 PPT Kapsel 24 April 2014

    9/27BREMA

    Berpotensi menjadi negara net importir energi

    Pemerintah menetapkan target energi terbarukan

    Komitmen Presiden RI untuk menurunkan emisi GRK

    MAKA INDONESIA...

  • 8/11/2019 PPT Kapsel 24 April 2014

    10/27BREMA

  • 8/11/2019 PPT Kapsel 24 April 2014

    11/27BREMA

    TARGET

    REALISTIS?

  • 8/11/2019 PPT Kapsel 24 April 2014

    12/27BREMA

    SUBSIDI BBM DAN LISTRIK

  • 8/11/2019 PPT Kapsel 24 April 2014

    13/27BREMA

  • 8/11/2019 PPT Kapsel 24 April 2014

    14/27BREMA

    SEMENTARA ITU...

    Palm Kernel Shell

  • 8/11/2019 PPT Kapsel 24 April 2014

    15/27BREMA

    Palm Oil Mill Effluent

    Palm Oil Empty Fruit Bunches

    Sumber energi terbuang sia-sia

    Sumber energi terbuang sia-sia

  • 8/11/2019 PPT Kapsel 24 April 2014

    16/27BREMA

    Sumber energi terbuang sia-sia

  • 8/11/2019 PPT Kapsel 24 April 2014

    17/27BREMA

    Sumber energi terbuang sia-sia

  • 8/11/2019 PPT Kapsel 24 April 2014

    18/27BREMA

    Sumber energi terbuang sia-sia

  • 8/11/2019 PPT Kapsel 24 April 2014

    19/27BREMA

    Sumber energi yang akan buang sia-siaJakarta 6000 ton/har

  • 8/11/2019 PPT Kapsel 24 April 2014

    20/27BREMA

    SOLUSINYA..

    Dari :

    Kelapa Sawit

    Sampah Kota

    Pemanfaatan BIOENERGIdengan teknologi:

    BIOMASA

    BIOGAS

  • 8/11/2019 PPT Kapsel 24 April 2014

    21/27

    BREMA

    BIOMASS GASIFICATION

  • 8/11/2019 PPT Kapsel 24 April 2014

    22/27

    BREMA

    BIOGAS

  • 8/11/2019 PPT Kapsel 24 April 2014

    23/27

    BREMA

    BIOGAS

    MSW

  • 8/11/2019 PPT Kapsel 24 April 2014

    24/27

    BREMA

    BIOMASS

    GASIFICATION

    MSW

  • 8/11/2019 PPT Kapsel 24 April 2014

    25/27

    BREMA

    Keuntungan Bioenergi bagi PLN

    1MWh electrical power dengan menggunakan Diesel

    Konsumsi Diesel/jam= 219 liter

    Setara dgn = 219 liter X Rp. 11,000

    = Rp. 2,409,000 / jam = Rp. 57,816,000 / hari

    Dengan BioenergiRate per kWh = Rp. 1,300

    Setara dgn = 1,000 kW X Rp. 1,300 = Rp. 1,300,000 / jam

    = Rp. 31,200,000 / hari

    Penghematan PLN sebesar

    Rp. 26,616,000 PER HARI

  • 8/11/2019 PPT Kapsel 24 April 2014

    26/27

    BREMA

    Projected Cash Flow (dalam juta rupiah)

    Tahun 1 Tahun 2 Tahun 3 Tahun 4

    Saldo awal 30.500 500 8.000 15.500 23.000

    PENGELUARAN

    Investasi 30.000

    Operasional 300 300 300 300

    Perawatan 200 200 200 200

    PENDAPATAN

    Jual Listrik ke PLN 8.000 8.000 8.000 8.000

    LABA (RUGI) 7.500 7.500 7.500 7.500

    Saldo Akhir 500 8.000 15.500 23.000 30.500

    www brema brata com

  • 8/11/2019 PPT Kapsel 24 April 2014

    27/27

    BREMA

    Thank you!

    www.brema-brata.com