46
MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM, PATHANAMTHITTA DISTRICT, KERALA STATE, PIN CODE-691 551 CONTACT NUMBER : 09846214351 Pre Feasibility Report Building stone Quarry Aadhi Boomi Mining and Enviro Tech (P) Ltd., No.3/216, K.S.V.Nagar, Narasothipatti, Salem-4. Phone (0427) 2440446, Cell: 09842729655 [email protected], www.abmenvirotech.com

Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

MR. MATHEW DANIEL

MANGALATHU PADIJATATHIL,

ADOOR, PERINGANADU (PART),

PARAKOOTTAM, PATHANAMTHITTA DISTRICT,

KERALA STATE, PIN CODE-691 551

CONTACT NUMBER : 09846214351

Pre – Feasibility Report Building stone Quarry

Aadhi Boomi Mining and Enviro Tech (P) Ltd., No.3/216, K.S.V.Nagar, Narasothipatti, Salem-4.

Phone (0427) 2440446, Cell: 09842729655 [email protected], www.abmenvirotech.com

Page 2: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

1

List of Contents

Chapter No. Chapter Title Page No.

1 Executive Summary 3

2 Introduction 5

3 Project description 8

4 Site Analysis 17

5 Planning Brief 26

6 Proposed Infrastructure 31

7 Rehabilitation and Resettlement (R&R) Plan 33

8 Project Schedule and Cost 34

9 Analysis of Proposal 35

Page 3: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

2

List of Annexure

Annexure No. Chapter Title Page No.

I Approved Mining Plan Letter 36

BASELINE REPORT

II Result of Ambient Air Monitoring 37

III Result of Soil Analysis 38

IV Result of Water sample analysis 41

V Result of Noise levels 45

Page 4: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

3

Chapter 1: Executive Summary

FEATURE DETAILS Name of the Proponent and address

Mr. Mathew Daniel Mangalathu Padijatathil, Adoor, Peringanadu (part), Parakoottam, Pathanamthitta District, Kerala State, pin code-691 551 Mobile: +919846214351 [email protected]

Type of land Patta/ Forest/PWD

Patta land

Survey number 541 Geographical features Latitude: 09°06'17.41”N to 09°06'22.05”N

Longitude: 76°44'15.24" E to 76°44'20.53”E Elevation: 95 m above MSL (Toposheet No. 58 C/07)

Site Location Erathu Village Adoor Taluk Pathanamthitta District Kerala State

Type of Project Building stone Quarry Mining lease area 0.98.49 Hectares Geological Resources 260144 MT Recoverable Reserves 145523 MT Production (Maximum) 29901 MT per year Depth of Mining 34m from hill top or 20m bgl Water Table 32m bgl Method of Mining Open cast semi mechanized mining Category B2 Mining plan approval Eco friendly Mining plan from Geologist,

Department of Mining and Geology, Pathanamthitta, Kerala vide Lr. No. 931/ DOPTA/M/17 dated 01/08/2017.

Period of Lease 5 years Does it attracts any general conditions specified in the EIA notification, 2006?

Not applicable

Man Power 14 persons Water requirement Total water requirement – 3.0 KLD

Drinking and Utilities 1.0 KLD Dust suppression and Green Belt 2.0 KLD Source: Mineral water supply and water tank

EMP Cost Rs. 3.50 lakhs Project Cost Rs. 76.70 lakhs Nearest habitation Kadambanadu – 1.5 km (W) Nearest Town Adoor – 6 km (N)

Page 5: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

4

Nearest Railway station Chenganoor – 27 km (NW) Nearest Airport Trivandrum – 72 km (S) Nearest Hospital Erathu – 2.5 km (S) Land use pattern

S. No Description

Existing Land use (ha)

Land use pattern at the end of 5th Year (Ha)

1 Mine working pit

0.15.07 0.45.96

2 Roads 0.02.05 0.03.00

3 Safety and plantation area

0.49.28 0.49.28

4 Labour shed 0.00.25 0.00.25 5 Virgin 0.31.84 ----

Total 0.98.49 0.98.49

Page 6: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

5

Chapter 2: Introduction

1.1. PROJECT AND THE PROPONENT

The proponent, Mr. Mathew Daniel being residing at Mangalathu Padijatathil, Adoor,

Peringanadu (part), Parakoottam, Pathanamthitta District, Kerala State is owning a

small quarry with Quarry Permit under Rule 20 of KMMCR, 2015 for a period of one

year. He had applied for quarrying building stone located in S.Y.No. 541 with an

extent of 0.98.49 hectares in Erathu Village, Adoor Taluk, Pathanamthitta District,

Kerala.

For this quarrying project, Mining Plan was prepared under Rule 66 of Kerala

Minor Minerals Concession Rules, (Amended 2015) and Minor Mineral Conservation

and Development rule 2010 (Draft) for quarrying the building stone with due

consideration of environmental parameters so as to obtain Environment clearance

(EC) from DEAC/DEIAA, Pathanamthitta District. Permission requested to quarry is

for a period of Five years.

The Eco friendly Mining plan is approved by the Geologist, Department of

Mining and Geology, Pathanamthitta, Kerala vide Lr. No. 931/DOPTA/M/17 dated

01/08/2017. Copy of the approval letter is being attached in the additional

documents Annexure I.

As per the EIA (Environmental Impact Assessment) notification, 2006 and its

subsequent amendment MoEFCC Notification S.O. 141 (E) dated 15.01.2016, the

project area lesser than 5 Hectares are classified under B2 category for the purpose

of Environment Clearance. Hence, this project falls under B2 Category and require

Environment Clearance (EC) from DEIAA/DEAC, Pathanamthitta, Kerala.

1.2. NATURE OF THE PROJECT

The area was previously operated for quarrying of building stone by the applicant.

Previous quarrying has rendered valuable data on nature of the deposit, Colour,

Probable depth persistence, 95 % of recovery, quantum of production expected,

etc.,.. The area contains mostly gneisses and Charnockite rocks. They are fine to

medium grained, composed of predominantly quartz and feldspar. The Charnockite

is composed of blue quartz and microcline feldspar with Biotite mica and

hypersthenes pyroxene and accessories.

Open cast, semi-mechanized mining will be adopted to extract building

stones of required size from the area for which lease applied for. Aspects considered

for quarrying are construction of semi-permanent structures, planning for the

development / production works, formation of faces, laying of approach road to

various benches for movement of dumpers, recruitment of man power, deployment

Page 7: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

6

of machinery, selection of dump sites, stacking yards etc. Top soil / overburden,

weathered materials shall be removed prior to development of working benches.

1.3. NEED AND SIGNIFICANCE

Building stones play a vital role in roads, concrete and building products. They are

used in walls and paving slabs as it is weather resistant and for its aesthetic appeal.

The aggregates of the stone is crushed and sorted into various sizes for use in

concrete, coated with bitumen to make asphalt or used dry as bulk fill in

construction because of its strong physical properties. Thus mining of Building

stones supports the country in improving the infrastructure as well as the economy.

It also supports the day to day life by comforting the living environment.

1.4. DEMAND – SUPPLY GAP

As Building stone is a significant raw material in the construction sector, the

demand exists in the market throughout the year. Thus quarrying of the mineral

finds consumer easily in the local market.

1.5. IMPORT VS INDIGENOUS PRODUCTION

Building stone exists in the proposed site and does not require any raw material to

be imported for the production process. The extracted blocks are broken into

required size for selling. Send to crushers if required.

1.6. EXPORT POSSIBILITY

Not applicable since the project meets local demand only.

1.7. EMPLOYMENT

Manpower proposed to look after and carry out the day to day quarrying activities

at the proposed production complies with statutory provisions of MMR 1961.The

project extends employment to a total of 18 persons.

1.7.1. Management and Supervisory personal

a. Mining Engineer / Mines Manager - 1 Person

(First/ Second class Mines Manager Competency certificate holder)

b. Mines Foreman - 1 Person

(Foreman competency Certificate holder)

c. Mining Mate - 1 Person

(Mine Mate competency Certificate holder)

d. Register keeper (Workman cadre) - 1 Person

Page 8: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

7

1.7.2. Labour

i) Skilled

Operator : 1 Person

ii) Semi-skilled

Driver : 2 Persons

iii) Un-skilled

Musdoors\ Labour : 7 Persons

Cleaners : 3 Persons

Register Keeper : 1 Person

----------------------

Total : 14 Persons

Page 9: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

8

Chapter 3: Project Description

3.1. TYPE OF PROJECT

The project involves quarrying of building stone blocks from the proposed area by

adopting eco-friendly and safer techniques. The building stones are broken into

required sizes and being sent to the market.

3.2. LOCATION

The area is represented by Survey of India Toposheet No. 58 C/7, the location map

is given in Plate 1 and figure 3.2.

Figure 3.1: Location of the proposed quarry

The area lies in the northern latitude ranges from 09°06'17.41”N to

09°06'21.59”N and eastern longitude from 76°44'15.24" E to 76°44'20.53” E. Figure

3.3 shows the lease boundary and Co-ordinates of the pillars of the quarry on the

Google earth image.

Page 10: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

9

Figure 3.2: Lease boundary and pillars overlaid on the Google Earth Image

3.3. ALTERNATIVE SITE

Since the project is site specific due to the availability of the minerals, no alternative

sites proposed for this project.

3.4. PRODUCTION (SIZE OF OPERATION)

The proposed annual rate of production is about 145523MT in the five years period

of mining plan. Production schedule is as given in table 3.1.

Table 3.1: Production proposed

Year ROM (MT)

Saleable ore/

Mineral @95%

(MT)

First 30220 28709

Second 30888 29344

Third 30675 29141

Fourth 31475 29901

Fifth 29924 28428

Total 153182 145523

3.5. PROJECT DESCRIPTION

3.5.1. Open cast mining

Under, Reg.106 (2) (b) of MMR, 1961, the bench height is designed as 5m and the

bench width should not be less than bench height. The slope of the benches should

not exceed 60° from horizontal. As far as mining of minor mineral is concerned,

Page 11: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

10

observance of provisions of the regulations 106 (2) (b) as above is seldom due to

various inherent petro genetic and mining difficulties. The bench height is designed

equal to height of boom of the excavator. Hence, the applicant is suitably directed to

obtain necessary relaxation from the chief inspector of mines, for which provision is

available within the regulation 106 (2) (b).

A bench height of 5m and a width not less than the height and five working

benches, each with a height of 5m as equal to the height of the excavator boom and

the width more than 3m is proposed to be maintained for safe movement of

machinery. The bench slope is maintained not more than 60° from horizontal.

The proposed Bench dimension to be maintained in the five years period of

mining plan is described in the production schedule.

S1 fencing shall be constructed at the top of high benches in order to safe

guard the unauthorized entry of men and machinery. In the case of entry and exit of

pit(s), G1 fencing as a parapet should be made to control tress passes.

3.5.2. Drilling

Drilling of shot-holes will be carried out by using a portable compressor with Jack

Hammers. Details of the equipments are as in table 3.2. Depth of holes shall be 1-2 m

bench height. The spacing shall be 0.75 m and the burden shall be 0.60m from the

preface.

Table 3.2: Drilling Equipment

3.5.3. Blasting

To achieve a correct blasting geometry, certain amount of trial blast is pre-requisite

to effect a perfect pre-determined fragmentation and fly rock control. In case of

heavy blasting, a qualified Mines manager has to be appointed for proper calculation

of powder factor, control blasting, sequencing and arrangements of explosives.

The massive formation shall be broken into pieces of portable size by jack

hammer drilling and shot hole blasting. Powder factor of explosives for breaking

such hard rock shall be in the order of 6-7 tonnes per Kg of explosives. Explosives

recommended for efficient blasting with safe practice are in table 3.3. Blasting

parameter proposed to be adopted for shot holes shall be,

Type No. Dia.of

hole

Bucket/

Capacity (MT) Make

Motive

Power H.P

Jack Hammer 2 32mm Hand held Atlas copco Air 45

Rock Breaker 1 - - - - 80

Page 12: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

11

Depth (m) * Burden (m) * Spacing (m) = Volume (m3)

1.00 x 0.60 x 0.75 = 0.45 m3

Quantity of broken rock per hole (0.45 x 2.6) = 1.17 MT

Blasting efficiency @90% (1.17 x 90% ) = 1.05 MT/hole

Charge per hole =140 gm of 25 mm dia. cartridge.

Quantity of rock broken per day = 97 M.T.

Requirement of explosives per day =14kg @ 7 M.T. per kg of explosives

No. of holes to be drilled per day = 97/1.05= 92 Holes

Table 3.3: Recommended Explosives

S.No. Description Class /

Division Type Size

1. Slurry class - 2 Nitrate Mixture 25 x 200

2. Detonators class - 6 Ordinary and Electric

(OD & ED) 6.5 x 32

3. Safety fuse class - 6

Div - 1

Blue sump fuse coils

of 10 mts each

Nitro compound explosives will be initiated directly by blue sump fuse with

ordinary detonators or electric detonators. The Powder factor for waste rock

development shall be 7 Tonnes per Kg. of explosives.

3.5.3.1. Measures proposed to minimize ground vibration due to blasting

The following steps shall be adopted to control ground vibration during blasting.

i. Geometry of blasting pattern like burden, spacing and inclination of hole

should be

Burden (m) * Spacing (m) Inclination

0.60 x 0.75 70°

ii. High strength explosives like slurry in the form of cartridge should be used.

ANFO mixture for shot holes should not be used which may cause huge fly

rock fragments in view of critical diameter problem.

iii. To control vibration abatement, use delay or relay arrangements with

specific charges

iv. Charge per hole should exceed the powder factor designed for each hole

based on quantum of blasting, strength of rocks, fracture pattern etc.

v. In case any objection from the public, a long trench in the direction of

blasting near lease boundary may be opened to a depth of 2m to control

longitudinal waves (P-waves) to arrest any damage to infrastructures.

vi. If any building lies within 50m, muffle blasting practice may be followed in

addition to the regular safety procedures and the charge per blast hole shall

not exceed 2kg as specified by DGMS.

vii. Any other method of safety measures shall be advised to the Applicant as and

when required by the qualified Mine Manager.

Page 13: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

12

3.5.3.2. Storage of explosives

The Applicant is advised to store the explosives as per the Indian Explosives Act,

1958 and the Explosive Rules, 1983. Necessary permissions should be obtained

from the Joint Controller of Explosives to store and uses of explosives in the quarry

in the magazine permit under Form -23 or Agreement shall be made with holder of

Form-22 who can supply and fire explosives as per safety practices. However

blasting in the mines or quarry shall be done as per the MMR, 1961 under the

supervision of Mines Blaster certificate holder, appointed under Reg.160 of

Metalliferous Mines Regulations, 1961.

3.5.4. Loading and Transportation

Loading of waste and reject materials shall be done by excavator into 10 tonners

tippers from the working place periodically. Such waste and building stones shall be

dumped in the site earmarked for dumping as shown in the Plates VI and VIII. The

applicant is proposed to engage one hydraulic excavator proposed for internal

transport of rejects from the working face to the dumps. Transport of Rejects and

waste shall be done by Tippers as given in table 3.4 and figure3.3.

Table 3.4: Proposed loading and transporting equipment

3.6. RESOURCES

The geological and recoverable reserves are estimated by cross-sectional Methods

up to a thickness of 34 m. Recovery of Khondalite is taken as 95% and 5% shall be

fines, mining losses and safe benches.

3.6.1. Geological Resources

The geological resources is estimated by cross sectional method is as 260144MT of building stone up to a thickness of 34m, having considered the depth of mining, recovery, safety barriers etc. A detail of estimation of geological resources is given in the Table 3.5

Table 3.5: Geological Resources

SECTION L

(m)

W

(m)

D

(m) B.D

Quantity

(MT)

Recovery

@95%

(MT)

Reject

@5%

(MT)

AB-

X1Y1

UNDER

SAFETY 13 16.5 19 2.5 10189 9679 509

Type Nos Bucket/ Capacity Make Motive Power H.P

Hydraulic

excavator 1 1.20 m3

Tata

Hitachi Diesel

EX

110

Tipper 2 10M.T Tata Diesel 120

Page 14: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

13

MINEABLE

13 19 4 2.5 2470 2347 124

35 29 5 2.5 12687.5 12053 634

29 17 5 2.5 6162.5 5854 308

24 7 5 2.5 2100 1995 105

UNDER

BENCHES

1 2 4 2.5 20 19 1

1 8 5 2.5 100 95 5

8 20 5 2.5 2000 1900 100

12 30 5 2.5 4500 4275 225

AB-

X2Y2

UNDER

SAFETY

7.5 9 10.5 2.5 1771.875 1683 89

7.5 16.5 20 2.5 6188 5878 309

MINEABLE

51 43 5 2.5 27412.5 26042 1371

51 31 5 2.5 19762.5 18774 988

51 21 5 2.5 13387.5 12718 669

45 11 5 2.5 6187.5 5878 309

UNDER

BENCHES

51 6 10.5 2.5 8033 7631 402

51 12 5 2.5 7650 7268 383

51 24 5 2.5 15300 14535 765

51 34 5 2.5 21675 20591 1084

6 44 5 2.5 3300 3135 165

AB-

X3Y3

UNDER

SAFETY 7.5 15 22.5 2.5 6328 6012 316

MINEABLE

42 14 2.5 2.5 3675 3491 184

40 28 5 2.5 14000 13300 700

43 32 5 2.5 17200 16340 860

42 22 5 2.5 11550 10973 578

35 10 5 2.5 4375 4156 219

UNDER

BENCHES

42 1 2.5 2.5 263 249 13

42 6 5 2.5 3150 2993 158

42 12 5 2.5 6300 5985 315

42 22 5 2.5 11550 10973 578

7 34 5 2.5 2975 2826 149

B-B'-

X4Y4

UNDER

SAFETY 10 15 22.5 2.5 8438 8016 422

MINEABLE 62 13 5 2.5 10075 9571 504

57 3 5 2.5 2137.5 2031 107

UNDER

BENCHES

1 2 5 2.5 25 24 1

6 12 5 2.5 900 855 45

TOTAL 273836 260144 13692

3.6.2. Mineable/ Recoverable reserves

The mineable\recoverable reserves is estimated by cross-sectional method having

considered the recovery factor, depth of mining, safety barriers etc., The mineable

Page 15: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

14

reserves is estimated as 145523 MT. of building stone to a depth of mining 34 m.

Details of estimation of mineable reserves are given in Table 3.6.

Table 3.6: Recoverable reserves

SECTION BENCH L

(m)

W

(m)

D

(m) B.D

Quantity

(MT)

Recovery

@95%

(MT)

Reject

@5%

(MT)

AB-X1Y1

IV 13 19 4 2.5 2470 2347 124

V 35 29 5 2.5 12687.5 12053 634

VI 29 17 5 2.5 6162.5 5854 308

VII 24 7 5 2.5 2100 1995 105

AB-X2Y2

V 51 43 5 2.5 27412.5 26042 1371

VI 51 31 5 2.5 19762.5 18774 988

VII 51 21 5 2.5 13387.5 12718 669

VIII 45 11 5 2.5 6187.5 5878 309

AB-X3Y3

II 42 14 2.5 2.5 3675 3491 184

III 40 28 5 2.5 14000 13300 700

IV 43 32 5 2.5 17200 16340 860

V 42 22 5 2.5 11550 10973 578

VI 35 10 5 2.5 4375 4156 219

B-B'-X4Y4 III 62 13 5 2.5 10075 9571 504

IV 57 3 5 2.5 2137.5 2031 107

TOTAL 153182.5 145523 7659

TOPSOIL

AB-X1Y1 I 35 38 1.5 2.5 4988 4988

AB-X2Y2 I 42 47 1.5 2.5 7403 7403

B-B'-X4Y4 I 64 17 1.5 2.5 4080 4080

TOTAL 16471 16471

GRAND TOTAL 169653.5 145523 24130

SUMMARY OF RESERVE ESTIMATION

Total Geological resources (A) = 260144 MT

(Remaining + already mined out + Safety Zone)

Mineral reserves blocked under benches (B) = 83353 MT

Mineral reserves blocked in safety zone (C) = 31268 MT

Total Mineable/Recoverable reserves = A-(B+C)

=260296-(83353+31268)

=260144-114621

Mineable reserves calculated as =145523MT

The overall pit slope shall be less than 45° from the horizontal only. The recovery

factor is taken as 95% from the top bench up to the bottom. The life of the mine is

computed as 5 year at an average production rate of 29105 MT per annum to a

Page 16: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

15

depth of 34m from the hill top. The reserves below this level shall increase the life

substantially.

3.7. WATER SOURCE AND REQUIREMENT

Whole some drinking water shall be provided as per the Mines Rules, 1955.

Quantity for drinking and utilities is 1.0KLD. Dust suppression and green belt of

water is 2.0KLD.Minimum quantity of 3.0KLD has to be maintained as per the Rule.

Drinking water is obtained by Mineral water industries by water canes. Dust

suppression and green belt is obtained from water tank.

3.8. POWER SOURCE AND REQUIREMENT

Electricity is not required as the mine will be working during day time only which

does not demand artificial light. Table 3.2 and 3.4 shows the fuel required for

operating the machineries. They will out sourced to meet the requirement.

3.9. WASTE GENERATION

Building stone rejects which amounts to 5% of the total excavation; about 7659MT

will be generated for mining up to 34 m depth from top. Year wise waste generation

is as in table 3.7.

Table 3.7: Generation of Waste/ Reject

Year Gravel/

Topsoil (MT)

Overburden/

Waste (MT)

Building stone

Rejects (MT)

Total

I 16471 ---- 1511 17982

II --- ---- 1544 1544

III --- ---- 1534 1534

IV --- ---- 1574 1574

V --- ---- 1496 1496

Total 16471 ---- 7659 24130

Page 17: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

16

3.10. SCHEMATIC REPRESENTATION OF THE FEASIBILITY DRAWING

Page 18: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

17

Chapter 4: Site Analysis

4.1. CONNECTIVITY

The site is accessible from Pathanamthitta as given in figure 4.1.

Figure 3.1: Route

4.2. LAND DETAILS

The area applied for quarrying is almost a hilly terrain. The land use of the lease

area before and after proposed project is as shown in table 4.1. The proposed land is

a private land.

Table 4.1: Land use

S. No Description Existing

Land use

(Ha)

Land use pattern

at the end of 5th

Year (Ha)

1 Mine working pit 0.15.07 0.45.96

2 Roads 0.02.05 0.03.0

3 Safety and

Plantation area 0.49.28 0.49.28

4 Labour shed and

office 0.00.25 0.00.25

5 Virgin 0.31.84 ---

Total 0.98.49 0.98.49

4.3. TOPOGRAPHY

The area applied for quarry lease is almost a hilly terrain with elevation ranges from

95 m to 85 m above mean sea level. Average height of the lease area is 30m above

the regional ground level. There are no perennial water course/water bodies

/streams /nallah within the permit area, and the area surrounded by native plants

and rubber trees. Drainage pattern of the permit area is found in dendritic in nature.

Page 19: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

18

4.4. ENVIRONMENTAL FEATURES

4.4.1. Water environment

No surface water bodies nearby. Water table is located at a depth of 32 m below

ground level. Water samples drawn from the old mine pit. No adverse health

hazards were reported due to quality of water like fluorosis. TDS, COD, BOD,

Salinity, hardness etc of the water sample as per the test report is in table 4.3. Mean

while mineral water shall be supplied in canes for drinking purposes or RO systems

shall be provided if necessary.

Table 4.3: Water sample - test report

Sl.

No

.

PA

RA

ME

TE

RS

UN

ITS

RE

SU

LT

S

As Per IS 10500:2012 PROTOCOL

Re

qu

ire

me

nt

(Acc

ep

tab

le l

imit

)

Pe

rmis

sib

le l

imit

in

th

e

ab

sen

ce o

f a

lte

rna

te

sou

rce

AP

HA

22

nd

Ed

itio

n 2

01

2

Physical Properties

1 Appearance When Analyzed

- Turbid - - -

After Filtration

Clear - - -

2 pH value at 25oC

- 6.85 6.5 – 8.5 6.5 – 8.5 4500 H+ B

3 Color Hazen Unit 20.0 5 15 2120 B 4 Odor - Agreeable Agreeable Agreeable IS 3025 P.5 1983

R.2012 5 Turbidity NTU 2.6 1 5 2130 B 6 Electrical

conductivity Micro mhos/cm

98.0 - - 2510 B

at 25oC

Chemical Properties

7 Total Suspended Solids

mg/l 14.0 - - IS:3025: P.17:1984:R.2012

8 Total Dissolved Solids

mg/l 50 500 2000 IS 3025:P.16:1984:R.2012

9 Total mg/l 32 200 600 2340 C

Page 20: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

19

Hardness as CaCO3

10 Calcium Hardness as CaCO3

mg/l 20 - - 3500 - Ca B

11 Magnesium Hardness as CaCO3

mg/l 12 - - 3500 - Mg B

12 Calcium as Ca

mg/l 8 75 200 3500 - Ca B

13 Magnesium as Mg

mg/l 2.88 30 100 2340 C

14 Phenolphthalein Alkalinity as CaCO3

mg/l Nil - - 2320 B

15 Total Alkalinity as CaCO3

mg/l 16 200 600 2320 B

16 Chlorides as Cl

mg/l 4 250 1000 4500 Cl- B

17 Sulfates as SO4

mg/l 14 200 400 4500 SO4 E

18 Total Iron as Fe

mg/l 0.38 0.3 0.3 3500 Fe B

19 Silica (Reactive) as SiO2

mg/l 2.9 - - 4500 SiO2 C

20 Carbonate Hardness as CaCO3

mg/l 16 - - 2340 A

21 Non-Carbonate Hardness as CaCO3

mg/l 16 - - 2340 A

22 Free Residual Chlorine

mg/l <0.2 0.2 **1 4500 Cl B

Microbiological Examination

1 Total

Coliforms

MPN /

100ml

34 Shall not be detectable

in any100 ml

IS:1622-1981

Amd.4 RA 2009

2 E.coli MPN /

100ml

7 Shall not be detectable

in any100 ml

IS:1622-1981

Amd.4 RA 2009

BDL-Below Detectable Limit; DL-Detection Limit.

Page 21: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

20

4.4.2. Air Quality

Air sampling was done and the pollutants are found to be well within the limits as

per the report (Table 4.4). Dust fall data may be taken from the district observation

for threshold values.

Figure 3.2: Photographs taken while sampling Air

Table 4.4: Air Sample analysis result

S.No PARAMETERS PROTOCOL UNIT RESULT NAAQS*

1 Particulate Matter (PM

2.5)

Envirotech

Manual μg / m3 37.40 60

2 Respirable Particulate

Matter ( PM10)

IS 5182 Part

23-2006 μg / m3 86.20 100

3 Sulphur Dioxide (SO2) IS 5182 Part 2

-2001 μg / m3 6.85 80

4 Nitrogen Dioxide (NO2) IS 5182 Part

6-2006 μg / m3 13.95 80

5 Ozone (O3) IS 5182 Part

9-2009 μg / m3 36.70 180

6 Lead (Pb) IS 5182 Part

22-2004 μg / m3

BDL

(DL=0.1) 1

7 Carbon Monoxide (CO)

(1 Hour )

IS 5182 Part

10-2003 mg/m3

BDL

(DL=1.15) 4

8 Ammonia (NH3) Indophenol

Method μg / m3 16.45 400

9 Arsenic (As) IS 5182 Part

22:2004

R.2009

ng / m3 BDL

(DL=1.0) 6

10 Nickel (Ni) IS 5182 Part ng / m3 BDL 20

Page 22: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

21

22:2004

R.2009

(DL=0.1)

11 Benzene (C6H6) IS 5182 Part

11-2006 μg / m3

BDL

(DL=0.1) 5

12 Benzo (a) Pyrene IS 5182 Part

12-2004 ng / m3

BDL

(DL=0.1) 1

BDL – Below Detectable Limit ; DL – Detection Limit

Remarks: The above results meet the *National Ambient Air Quality Standards –

CPCB

4.4.3. Acoustic and Seismic Environment

Threshold sound level is reported as 72.80 dB. Report of the sound/ noise level is

given in table 4.5. No activity of quarrying is being done to measure the peak

particle velocity due to longitudinal waves.

Fig. 3.3 Ambient Noise levels

Page 23: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

22

Table 4.5: Noise survey report

S.No Sampling Location Noise Value

dB (A)

Average

Noise

Value dB

(A)

Limits as per

KPCB dB (A)

( Day Time)

1 Core zone of quarry

lease during

operation

65.6

38.1- 65.6 75

2

Near Lease boundary

during non working

hours

38.10

4.4.4. Soil Environment

Samples have been collected in the lease area for analysis its characteristics. Table

4.6 shows the test report with physical and chemical values of the samples.

Table 4.6: Soil sample analysis report

Method Of Analysis: IS 2720 and EPA Method.

Physical Parameters

S. No PARAMETERS RESULTS

1 pH value (10% Solution) 5.55

2 EC@ 25oC (Micromhos/cm)

(10% solution) 12

3 Moisture 7.15% w/w

4 Density 1.16g/cc

5 Color Brownish

6 Consistency Hard

7 Structure Structureless

8 Texture

Clay=39.45%

Sand =12.17

Gravel = 48.38 %

Gravel Soil

9 Loss On Ignition 11.85 % w/w

10 Lime Status (Lime

Requirement) Nil

Chemical Parameters

S. No PARAMETERS RESULTS

1 Alkalinity 0.024%w/w

2 Sodium Absorption Ratio 0.301 meq/Kg

3 Cation Exchange Ratio 10.0 meq/100g

4 Oil & Grease <10.0 ppm

5 Chlorides 0.0091 % w/w

Page 24: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

23

6 Sulphates 0.0039 % w/w

7 Nitrates 0.009% w/w

8 Total Nitrogen 0.011% w/w

9 Total Phosphorous 0.0008% w/w

10 Calcium 0.460% w/w

Figure 3.4: Photographs taken while sampling Soil

4.4.5. Eco Sensitive area

There is no major water body, seasonal odai or Nallah found within 500 m radius of

the lease boundary. Archaeological monuments, bridges, Theme parks, School are

also not located in the area. No reserve forest, wild life sanctuaries found within the

10 km radius.

4.5. INFRASTRUCTURE

Table 4.7 shows the infrastructure found near the lease area.

Table 4.7: Infrastructures

S.

No.

Particulars Location Approximate

Distance in km

Direction

(Avg)

1. Post office Enathu 2.5 North

2. Town (Taluk Head) Adoor 6 North

3. Police Station Erathu 2 South East

4. Fire Station Adoor 6 North

5. Govt. Hospital Erathu 2.5 South

6. School Choorakkodu 1.5 North

7. DSP Office Adoor 6 North

8. Railway Station Chenganoor 27 North West

Page 25: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

24

9. Nearest Airport Trivandrum 72 South

10. Sea port Neendakara 26 North West

11. Villages

i) Adoor 6 North

ii) Enathu 2.5 South

iii) Kadambanadu 1.5 West

iv) Enadimangalam 8 East

4.5.1. Road

The mode of transport of the building stone produced and marketed is by road to

various consumer destination of their own. Approach road is available from the

lease area for transportation. A village road located nearby the site on the western

side for transport of material. A State Highway road is found to be situated at about

1.5 km away towards eastern side of the site.

4.5.2. Power Supply

Since simple methods are adopted and the limited scale of activities involved in the

building stone mining, high tension electric power supply or huge workshop facility

is not required.

4.5.3. Sanitary Facilities

Surface latrines and urinals shall be constructed at convenient place for usage of

male and female labours separately

4.5.4. First Aid Facility

Being a small mine, a first aid station as per provisions under Rule (44) of Mines

Rules 1955 shall be provided with facilities as prescribed in third schedule. Initial

medical examination has to be conducted for the mine workers under rule 29B of

Mines Rule 1955.

4.6. SOIL CLASSIFICATION

The soil type is reported as Gravel soil as per the sample analysis. Table 4.6 shows

the physical and chemical parameters of the analysed soil samples.

4.7. CLIMATIC CONDITION

The Pathanamthitta district received the rain under the influence of both southwest

and northwest monsoons. The southwest monsoon chiefly contributes to the rainfall

in the district. Most of the precipitation occurs in the form of cyclonic storms caused

due to the depressions in Arabian Sea. The normal annual rainfall over the district

varies from about 2850 mm. It is the minimum around Pathanamthitta in the south

Page 26: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

25

eastern part of the district. The highest humidity is generally recorded in May with

the value of 87%.

4.7.1. Temperature

Throughout the month of August day time temperatures will generally reach highs

of around 28°C that's about 83°F. At night the average minimum temperature drops

down to around 22°C, that's 72°F.

4.7.2. Rain Fall

The average monthly amount of precipitation has been recorded at around 320 mm,

that's 13 inches. Throughout the month you can expect to see rain or drizzle falling

on 19 days of the month.

4.8. SOCIAL INFRASTRUCTURE

Infrastructures such as Hospital, Police station, school are available in Erathu which

is 2 km from the lease area.

Page 27: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

26

Chapter 5: Planning Brief

5.1. PLANNING CONCEPT

Excavation of building stone is planned and described in section 3.4 and 3.6.

Proposed land is a Patta land which does not come under Residential, Forest or any

other sensitive land classification. As a small project, it is not demanding any town

or country planning. However, approach roads and haul roads will be laid for the

transportation of excavated materials to the market and to the dump.

5.2. POPULATION PROJECTION

Population of the nearby villages are as in table 5.1. Population characteristics and

Occupational characteristics of the Erathu Village, Adoor Taluk, Pathanamthitta

District is given in table 5.2 and 5.3 respectively. The proposed project will not affect

the village population, and hence population projection is not significant. However,

it provides occupation to about 14 persons of which 80% of them will be from the

local villages. Other than mine employment, workshops, spare parts, tyres and tubes

and related several self-employment opportunities.

Table 5.1: Details of nearby villages

Name of Village

Direction Distance

from Mine (m)

Population (Approx)

Adoor North 6 29171 Enathu South 2.5 13916 Kadambanadu East 1.5 26839 Enadimangalam West 8 20568

Table 5.2: Population Characteristics (2001and 2011)

Sl. No. Characteristics 2001 % 2011 %

1 Total Household 5914 6730

2 Total Population 25005 24880

3 Male Population 11955 47.81 11626 46.73

4 Female Population 13050 52.19 13254 53.27

5 Total Literacy 20618 82.46 21654 87.03

6 Male Literacy 10088 84.38 10183 87.59

7 Female Literacy 10530 80.69 11471 86.55

8 Sex Ratio 1092 1140

Page 28: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

27

Table 5.3: Occupational Characteristics (2001 and 2011)

Sl. No. Characteristics 2001 % 2011 %

1 Total Population 25005 24880

2 Male Population 11955 47.81 11626 46.73

3 Female Population 13050 52.19 13254 53.27

4 Total Workers 8805 35.21 8199 32.95

5 Male Workers 6077 50.83 6062 52.14

6 Female Workers 2728 20.90 2137 16.12

7 Total Main workers 6160 24.64 6498 26.12

8 Male Main workers 4552 38.08 4989 42.91

9 Female Main Workers 1608 12.32 1509 11.39

10 Total Cultivators 835 9.48 801 9.77

11 Male Cultivators 790 13.00 764 12.60

12 Female Cultivators 45 1.65 37 1.73

13 Total Main Agricultural Laborers 1033 11.73 653 7.96

14 Male Agri. Laborers 900 14.81 618 10.19

15 Female Agri. Laborers 133 4.88 35 1.64

16 Total Main HHI 142 1.61 109 1.33

17 Male HHI 99 1.63 93 1.53

18 Female HHI 43 1.58 16 0.75

19 Total Main Other Tertiary workers 4150 47.13 4935 60.19

20 Male OT 2763 45.47 3514 57.97

21 Female OT 1387 50.84 1421 66.50

22 Total Non-workers 16200 64.79 16681 67.05

23 Male Non-workers 5878 49.17 5564 47.86

24 Female Non workers 10322 79.10 11117 83.88

5.3. LAND USE PLANNING

Existing and proposed land use pattern is discussed in previous chapter in Table 4.1.

About 97% of the un-worked land will be used for mining and the remaining for

haul roads.

5.4. INFRASTRUCTURE DEMAND

Labour shed, Surface latrines and urinals are required to be constructed easily

accessible from the working area. Green belt is proposed which is given in

afforestation plan (Table 5.5). No other infrastructures required.

Page 29: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

28

Table 5.5: Afforestation Plan

Year Place Types of Trees Number Rate of

Survival

I

Lease Boundary and

Dump Rubber, Teak, etc.

30 80 %

II 30 80 %

III 30 80 %

IV 30 80 %

V 30 80 %

5.5. AMENITIES/ FACILITIES

List of equipments and materials required are discussed in Chapter 3 and listed in

Table 3.3 to 3.5.

5.6. HAZARDS AND RISK MANAGEMENT

5.6.1 Explosives

Blasting is done by means of explosives which are hazardous during handling,

storage and blasting.

5.6.1.1. Storage and Handling

The Applicant is advised to store the explosives as per the Indian Explosives Act,

1958 and the Explosive Rules, 1983. Necessary permissions should be obtained

from the Joint Controller of Explosives to store and uses of explosives in the quarry

in the magazine permit under Form - 23 or Agreement shall be made with holder of

Form - 22 who can supply and fire explosives as per safety practices. However

blasting in the mine or quarry shall be done as per the MMR, 1961 under the

supervision of Mines Blaster certificate holder, appointed under Reg. 160 of

Metalliferous Mines Regulations, 1961.

5.6.1.2. Blasting

Poorly designed shots can result in misfires early ignition and flying rock. Safety can

be ensured by planning for round of shots to ensure face properly surveyed, holes

correctly drilled, direction logged, the weight of explosion for good fragmentation.

Blast design, charge and fire around of explosives should be carried out by a trained

person.

5.6.1.3. Drilling

Slipping and Falling of labours from the edge of a bench during drilling is possible.

Part of training should include instructions to face towards the open edge of the

bench so any inadvertent backward step is away from the edge. Suitable portable

Page 30: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

29

rail fencing which can be erected between the drilling operations and the edge of the

mine can be provided. Attachment of a safety line to the drilling rig and provide

harness for the driller to wear can be done. Newer drill machines are provided with

cabin which controls noise level within cabins. Driller operators should be protected

with ear protection.

5.6.2. Loading

Possible risks during loading of mined rocks are falling of rock on the driver, plant

toppling aver due to uneven ground, failure of hydraulic system, fires, fall while

gaining access to operating cabin, electrocution in Draglines, failure of wire ropes in

Dragline. In order to overcome these risks:

Operator cabin should be of suitable strength to protect the driver in

event of rock fall.

Electrical supply to dragline should be properly installed with adequate

earth continuity and earth leakage protection.

Wire rope should be suitable for work undertaken and be examined

periodically.

Ensure that loaders are positioned sufficiently away from face edges

5.6.3. Transportation

Brake failure, lack of all-around visibility from driver position, vehicle movements

particularly while reversing, rollover, Vibrations, Noise, Dust and improper / no

signalling are some of the factors causing risk. This can be avoided by following

measures:

Visibility defects can be eliminated by the use of visibility aids such as

closed circuit television and suitable mirrors.

Edge protection is necessary to prevent inadvertent movement.

Seatbelt to protect driver in event of vehicle rollover.

Good maintenance and regular testing necessary to reduce possibility of

brake failure.

Avoid driving at the edge of roadway under construction

Heavy earth moving equipment and vehicle drivers and those giving

signals should be well trained.

5.6.4. Unstable face

Chances of Rock fall or slide exists. Regular examination of face must be done and

remedial measures must be taken to make it safe if there is any doubt that a collapse

could take place. Working should be advanced in a direction taken into account the

geology such that face and quarry side remain stable.

Page 31: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

30

5.6.5. General safety measures

Provisions of the Mines Act, Rules and Regulations orders made there under shall be

complied with, so that the safety of the mine, machinery and persons will be

ensured. Permission, relaxation or exemption wherever required for the safe and

scientific mining of the deposit will be obtained from the Department of Mine Safety.

Copy of Agreement for handling of Explosives under License Holder at Proposed site

is given in additional document.

Safety kits should be located in easily accessible place with major first aid

materials in it.

Entry of any unauthorized person into mine and plant areas shall be

completely prohibited

Arrangements for fire fighting in the mine’s office complex and mining area

Provision of all the safety appliances such as safety boot, helmets, goggles,

ear plugs etc. shall be made available for the employees

Mining will be undertaken in coexistence with the requirements of the

Mining Plan which shall be updated from time to time

Handling of explosives, charging and blasting shall be undertaken only by a

competent person

Adequate safety equipment shall be provided at the explosive magazine

All the mining equipment shall be maintained as per the guidelines of the

manufacturer

Elevating the awareness of employees, contract workers and public as a

whole by celebrating Annual Safety Week which includes various

competitions like posters, essay, slogan, quiz etc.

Page 32: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

31

Chapter 6: Proposed Infrastructure

6.1. GREEN BELT

Afforestation plan is proposed to develop a green belt around the mining lease as in

table 5.5 of chapter 5.

6.2. SOCIAL INFRASTRUCTURE

6.2.1. CSR Activities

The proponent is proposed to spend CSR as per the Companies Act, 2013 and CSR

Rules, 2014 to the Panchayat for maintenance of road, street light, school sanitation

etc.

6.2.2. Employment potential

The proposed project will enhance the socio-economic activities in the adjoining

areas. Several shops and service providers shall grow in the public adjacent to

mines. Schools and city development shall also be possible owing to the fact of

economic growth in the village. This will result in following benefits

- Improvements in physical infrastructure.

- Improvements in Social Infrastructure.

- Increase in Employment Potential

- Contribution to the Exchequer.

- Prevention of illegal mining.

- During and Post-mining enhancement of green cover.

6.3. CONNECTIVITY

Haul roads will be laid as per the production plan which will be connecting to the

approach road in the south eastern side. This will be leading to the market through

the existing village road and to the state road.

6.4. DRINKING WATER MANAGEMENT

Water requirement and management are as discussed in section 3.7 of chapter 3.

6.5. DRAINAGE PLAN

Water draining plan to collect, filter and discharge the storm water is being

prepared and given in plate XII of the Mining plan.

6.6. SOLID WASTE MANAGEMENT

Waste generation is as in section 3.9. Top soil / Over burden from the mine will be

stored on the safety zone of the mine as shown in Production plan, Plate VI-VIC.

Page 33: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

32

Building stone rejects are planned to be backfilled over which the side burden will

be spread for plantation.

6.7. POWER REQUIREMENT AND SOURCE

Details of the power requirement and source are as discussed in section 4.5.2 of

Chapter 4.

Page 34: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

33

Chapter 7: Rehabilitation and Resettlement (R&R) Plan

Being a small building stone excavation, the project does not involve displacement

of any residents or public infrastructures. Thus resettlement is not proposed.

Humus top soil shall be used for rehabilitation and afforestation purposes. In

case of steep slopes, fencing shall be made to control, inadvertent entry of animals

and local persons. The mined out area shall be used for storage of rain water with

proper barricade which will help recharge of regional ground water table. No major

dumps, however plantation shall be made over small dumps to prevent soil

erosion\wash outs and help ecological balance.

Fencing shall be made around open cast working as per DGMS circulars with

S1 type fencing. Back filling shall be done to a reasonable extent and depth during

closure of mine.

Page 35: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

34

Chapter 8: Project schedule and Cost estimation

Period of quarrying is proposed for five years. It does not require any construction

phase period. However removal of top soil comes under development phase.

Development and production phase are planned and discussed in chapter 3.

a) Project cost / investment

i) Land Cost : Rs. 33,00,000

ii) Machinery to be used : Rs. 20,00,000

iii) Fencing : Rs. 1,25,000

iv) Laborers Shed : Rs. 55,000

v) Sanitary facility : Rs. 50,000

Total : Rs. 55.25 Lakhs

b) Expenditures

i) Drinking water facility for the laborers = Rs. 1,00,000

ii) Safety kits = Rs. 50,000

iii) Water Sprinkling = Rs. 50,000

iv) Afforestation = Rs. 50,000

v) Water quality test = Rs. 50,000

vi) Air quality test = Rs. 25,000

vii) Noise / Vibration test = Rs. 25,000

viii) Cost towards charity = Rs. 25,000

Total Rs. 3.75 Lakhs

Page 36: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

35

Chapter 9: Analysis of Proposal

The quarrying activities in this belt will benefit to the local people both directly and

indirectly. The direct beneficiaries will be those who get employed in the mines as

skilled and un-skilled workers.

There will be no environmental impact from the project since the scale of

operation is very minimum. This operation doesn’t need relocation of any habitats.

The proponent will maintain the infrastructures and provide development

fee of 2.5% of the profit as per the Companies Act, 2013 and CSR Rules, 2014 to the

local panchayat.

The mined out area shall be used for storage of rainwater or pisiculture. The

applicant shall plant sufficient number of trees around the lease boundary as well as

along the village road to keep the environment green.

(Mr.Mathew Daniel) (Mr.S. SURIYAKUMAR)

Signature of the Proponent Signature of EIA coordinator (Mining)

M.Sc., M.Phil, F.C.C. (Min) PGDBA, DIPC

Date: 05-08-2017

Place: Salem

Page 37: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

36

Annexure – I: Approved Mining Plan Letter

Page 38: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

37

Annexure – II: Result of Ambient Air Monitoring

Page 39: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

38

Annexure – III: Result of Soil Analysis

Page 40: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

39

Page 41: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

40

Page 42: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

41

Annexure – IV: Result of Water sample Analysis

Page 43: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

42

Page 44: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

43

Page 45: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

44

Page 46: Pre – Feasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017. 8. 5. · MR. MATHEW DANIEL MANGALATHU PADIJATATHIL, ADOOR, PERINGANADU (PART), PARAKOOTTAM,

Pre Feasibility Report for Mr. Mathew Daniel, Erathu Village, Adoor, Pathanamthitta. Consultant: Aadhi Boomi Mining and Enviro Tech (P) Ltd., Salem, Tamil Nadu

45

Annexure – V: Result of Noise levels