Pre-Inspection Mezzanine Walkthrough ChecklistDate: Station Name: Mezzanine #: Completed By:
Check Task Equipment Room ID Notes
Verify that electrical power design matches the field/record. Identify locations of theelectrical equipment.
Electrical Source Panel Name/Number:
Source Breaker Name/Number:
Electrical AFC Panel Name/Number:
Verify if disconnect switch is connected to the AFC electrical power panel. Low or High voltage SMNT/POWR escorts requirements?
Disconnect Name/Number:
SMNT/POWR escorts:
Check if there is a shared raceway between AFC Panel and Kiosk and identify additional source panels to be de-energized.
Do AFC Panel loads feed into a sharedraceway e.g. trench or trough? If Yes,specify source panels in notes.
Identify the assumed pathway of duct / conduit, the location of the handholes, manholes and boxes and accessibility or special escort requirement?
PLNT COMM / IT ELES
RAIL CMNT
Other Access/Support:
Identify handhole or manhole access requirement.
Required PLNT Mason forhandhole/manhole access?
Identified Conduit/Duct Transition to mezzanine level?
Emergency Power Verification
Check Task Equipment Room ID Notes
Verify if AFC electrical panel is connected to an Automatic Transfer Switch (ATS). ATS Name/Number:
Verification of Kiosk Emergency Panel(s) (KE, KES, KESS, etc)
Source Panel Name/Number:
Source Breaker Name/Number:
Panel Name/Number:
Notes and Discrepancies:
Sign Off GFP Representative WMATA PRGM
Name:
Signature:
Date:
Ver
11/04/2014 Potomac Ave - D07 061 Tino Sahoo
✔
Panel M
Breaker #20, #22, #24
Rm 301
Rm 301
1MM Rm 301
✔HIGH Voltage
✔ NO
✔
✔ Power run from Kiosk to AFC Panel is approx.156'.
✔
YES (see notes)
YES
Conduits/ducts on multiple levels.2" conduit running along ceiling down toMezzanine Floor. Overhead conduit to walker ductto handholes to Kiosk
✔
✔
MEE Rm 301
Breaker #22, #24 Rm 301
Kiosk Panel Kiosk
Panel ME serves Panel MEE breaker #10 (LOTO).
Tino Sahoo
11/04/2014
Picture 1: D07 Potomac Ave – Handholes & manhole in Mezzanine
Picture 2: D07 Potomac Ave – Conduit run from Electrical room to Mezzanine
Picture 3: D07 Potomac Ave – Conduit run from Electrical room to Mezzanine
Picture 4: D07 Potomac Ave – Conduit run from Electrical room to Mezzanine
Picture 5: D07 Potomac Ave – Conduit run from Electrical room to Mezzanine
Picture 6: D07 Potomac Ave – Conduit run from Electrical room to Mezzanine
Picture 7: D07 Potomac Ave – Conduit run from Electrical room to Mezzanine
Picture 8: D07 Potomac Ave – Emergency panel in Kiosk
Picture 9: D07 Potomac Ave – Emergency panel in Kiosk
Picture 10: D07 Potomac Ave – Emergency panel in Kiosk
Picture 11: D07 Potomac Ave – Emergency panel in Kiosk
Picture 12: D07 Potomac Ave – AFC Panel IMM in Room 301
Picture 13: D07 Potomac Ave – AFC Panel IMM in Room 301
Picture 14: D07 Potomac Ave – AFC Panel IMM in Room 301 – Bottom of panel
Picture 15: D07 Potomac Ave – Panel M in Room 301
Picture 16: D07 Potomac Ave – Panel M in Room 301
Picture 17: D07 Potomac Ave – Emergency Panel MEE in Room 301
Picture 18: D07 Potomac Ave – Emergency Panel MEE in Room 301 – Panel schedule
Pre-Inspection FieldVerification 11/04/2014
Pre-Inspection FieldVerification 11/04/2014
1&2
1
Pre-Inspection FieldVerification 11/04/2014
Breaker
Pre-Inspection FieldVerification 11/04/2014
Pre-Inspection Mezzanine Walkthrough ChecklistDate: Station Name: Mezzanine #: Completed By:
Check Task Equipment Room ID Notes
Verify that electrical power design matches the field/record. Identify locations of theelectrical equipment.
Electrical Source Panel Name/Number:
Source Breaker Name/Number:
Electrical AFC Panel Name/Number:
Verify if disconnect switch is connected to the AFC electrical power panel. Low or High voltage SMNT/POWR escorts requirements?
Disconnect Name/Number:
SMNT/POWR escorts:
Check if there is a shared raceway between AFC Panel and Kiosk and identify additional source panels to be de-energized.
Do AFC Panel loads feed into a sharedraceway e.g. trench or trough? If Yes,specify source panels in notes.
Identify the assumed pathway of duct / conduit, the location of the handholes, manholes and boxes and accessibility or special escort requirement?
PLNT COMM / IT ELES
RAIL CMNT
Other Access/Support:
Identify handhole or manhole access requirement.
Required PLNT Mason forhandhole/manhole access?
Identified Conduit/Duct Transition to mezzanine level?
Emergency Power Verification
Check Task Equipment Room ID Notes
Verify if AFC electrical panel is connected to an Automatic Transfer Switch (ATS). ATS Name/Number:
Verification of Kiosk Emergency Panel(s) (KE, KES, KESS, etc)
Source Panel Name/Number:
Source Breaker Name/Number:
Panel Name/Number:
Notes and Discrepancies:
Sign Off GFP Representative WMATA PRGM
Name:
Signature:
Date:
Ver
11/04/2014 Stadium-Armory (South) - D08 062 Tino Sahoo
✔
SM
Breaker #8
Rm 211
Rm 211
SMF Rm 211
S.O.:Panel SM Breaker #2Panel SM Breaker #8Panel SMPO Breaker #5Panel SME Breaker #6
✔HIGH and LOW Voltage
✔ YES (see notes)Panels SMF, SML, and SMM share a trough.
✔
✔
NO
YES
All conduit/duct on one level.No handholes in mezzanine.
✔
✔
Kiosk
Kiosk
KE
Breaker #7
Emergency Power to Faregates
Tino Sahoo
11/04/2014
REVISION 1
Pictures 1&2: D08 Stadium-Armory (South) – Emergency panels in Kiosk
Picture 3: D08 Stadium-Armory (South) – AFC Panel SMF in Room 211
Picture 4: D08 Stadium-Armory (South) – AFC Panel SMF in Room 211
Pictures 5&6: D08 Stadium-Armory (South) – AFC Panel SMF in Room 211 – Bottom ducts & common trough
Pictures 7&8: D08 Stadium-Armory (South) – Panel SM & circuits 2&8 in Room 211
Picture 9: D08 Stadium-Armory (South) – Panel SM in Room 211 – Panel schedule
Picture 10: D08 Stadium-Armory (South) – Panel SME in Room 211
Picture 11: D08 Stadium-Armory (South) – Panel SME in Room 211 – Panel schedule
Picture 12: D08 Stadium-Armory (South) – Panel SML in Room 211
Picture 13&14: D08 Stadium-Armory (South) – Panel SMM in Room 211
Picture 15: D08 Stadium-Armory (South) – Panel SMPO in Room 211
Picture 16: D08 Stadium-Armory (South) – Panel SMPO in Room 211 – Panel schedule
Pre-Inspection FieldVerification 11/04/2014
Pre-Inspection FieldVerification 11/04/2014
Pre-Inspection FieldVerification 11/04/2014
Pre-Inspection FieldVerification 11/04/2014
Pre-Inspection Mezzanine Walkthrough ChecklistDate: Station Name: Mezzanine #: Completed By:
Check Task Equipment Room ID Notes
Verify that electrical power design matches the field/record. Identify locations of the electrical equipment.
Electrical Source Panel Name/Number:
Source Breaker Name/Number:
Electrical AFC Panel Name/Number:
Verify if disconnect switch is connected to the AFC electrical power panel. Low or High voltage SMNT/POWR escorts requirements?
Disconnect Name/Number:
SMNT/POWR escorts:
Check if there is a shared raceway between AFC Panel and Kiosk and identify additional source panels to be de-energized.
Do AFC Panel loads feed into a shared raceway e.g. trench or trough? If Yes, specify source panels in notes.
Identify the assumed pathway of duct / conduit, the location of the handholes, manholes and boxes and accessibility or special escort requirement?
PLNT COMM / IT ELES
RAIL CMNT
Other Access/Support:
Identify handhole or manhole access requirement.
Required PLNT Mason for handhole/manhole access?
Identified Conduit/Duct Transition to mezzanine level?
Emergency Power Verification
Check Task Equipment Room ID Notes
Verify if AFC electrical panel is connected to an Automatic Transfer Switch (ATS). ATS Name/Number:
Verification of Kiosk Emergency Panel(s) (KE, KES, KESS, etc)
Source Panel Name/Number:
Source Breaker Name/Number:
Panel Name/Number:
Notes and Discrepancies:
Sign Off GFP Representative WMATA PRGM
Name:
Signature:
Date:
Ver
11/04/2014 Stadium-Armory (North) - D08 063 Tino Sahoo
✔
NM
Breaker #8
Rm 212
Rm 212
NMF Rm 212
S.O.:SWBD NGB, Breaker #1SWBD NSB1, Breaker #6Panel NEL, Breaker #2
✔
HIGH and LOW Voltage
✔ YES (see notes)Panels NMF Sect I and II, NMM, NML, NME, NM,NMPO share a common trough.
✔
✔
✔
YES (see notes)
YES
All conduit/duct on one level. Run is approx. 55'from Kiosk to AFC Panel.
✔
✔
NME Rm 212
Breaker #7 Rm 212
Kiosk Emergency Panel Kiosk
Panel KE located in Kiosk, Breaker #6 willde-energize emergency power to the faregates.
Tino Sahoo
11/04/2014
Picture 1: D08 Stadium-Armory (North) – No handholes in Mezzanine
Picture 2: D08 Stadium-Armory (North) – Manhole on floor of electrical Room 212
Pictures 3&4: D08 Stadium-Armory (North) – Emergency panel in Kiosk
Picture 5: D08 Stadium-Armory (North) – AFC Panel NMF Sect II in Room 212
Picture 6: D08 Stadium-Armory (North) – AFC Panel NMF Sect II in Room 212
Picture 7: D08 Stadium-Armory (North) – AFC Panel NMF Sect II in Room 212 – Bottom ducts & conduits
Picture 8: D08 Stadium-Armory (North) – AFC Panel NMF Sect II in Room 212 – Panel schedule
Picture 9: D08 Stadium-Armory (North) – Common trough for multiple panels in Room 212
Pictures 10&11: D08 Stadium-Armory (North) – Switchboard and Panel M-85 in Room 212
Pictures 12&13: D08 Stadium-Armory (North) – Panels NM & NME in Room 212
Pictures 14&15: D08 Stadium-Armory (North) – Panels NMF Sect I & NML in Room 212
Pictures 16&17: D08 Stadium-Armory (North) – Panels NMM & NMPO in Room 212
Pre-Inspection FieldVerification 11/04/2014
One handhole
Pre-Inspection FieldVerification 11/04/2014
Pre-Inspection FieldVerification 11/04/2014
Breaker #8
Pre-Inspection FieldVerification 11/04/2014
Pre-Inspection Mezzanine Walkthrough ChecklistDate: Station Name: Mezzanine #: Completed By:
Check Task Equipment Room ID Notes
Verify that electrical power design matches the field/record. Identify locations of theelectrical equipment.
Electrical Source Panel Name/Number:
Source Breaker Name/Number:
Electrical AFC Panel Name/Number:
Verify if disconnect switch is connected to the AFC electrical power panel. Low or High voltage SMNT/POWR escorts requirements?
Disconnect Name/Number:
SMNT/POWR escorts:
Check if there is a shared raceway between AFC Panel and Kiosk and identify additional source panels to be de-energized.
Do AFC Panel loads feed into a sharedraceway e.g. trench or trough? If Yes,specify source panels in notes.
Identify the assumed pathway of duct / conduit, the location of the handholes, manholes and boxes and accessibility or special escort requirement?
PLNT COMM / IT ELES
RAIL CMNT
Other Access/Support:
Identify handhole or manhole access requirement.
Required PLNT Mason forhandhole/manhole access?
Identified Conduit/Duct Transition to mezzanine level?
Emergency Power Verification
Check Task Equipment Room ID Notes
Verify if AFC electrical panel is connected to an Automatic Transfer Switch (ATS). ATS Name/Number:
Verification of Kiosk Emergency Panel(s) (KE, KES, KESS, etc)
Source Panel Name/Number:
Source Breaker Name/Number:
Panel Name/Number:
Notes and Discrepancies:
Sign Off GFP Representative WMATA PRGM
Name:
Signature:
Date:
Ver
10/30/2014 Minnesota Ave. - D09 064 Meghan Powell
✔
Essential Panel - SSI
Transformer 'T4' - (Mezzanine)
Rm 211
Rm 211
F Rm C107
Rm 211 Wayside of Track 2
✔
Transformer T4
LOW Voltage
Rm C107
✔ YES (see notes) Rm C107M, MMIShut off via transformer T4 (DS)
✔
None
✔
NO
UNDETERMINED
All on mezzanine level.No manholes.Assuming single conduit/duct run between Kioskand panel.
✔
E3 Rm C107
Breaker #5, #7 Rm C107
No name on panel Kiosk
Mini-mezzanine (1 faregate) on mezzanine level.
Picture 1: D09 Minnesota Ave. – No handholes in Mezzanine
Picture 2: D09 Minnesota Ave. – Emergency Panel (Unnamed) in Kiosk
Picture 3: D09 Minnesota Ave. – Emergency Panel E3 in Room C107
Picture 4: D09 Minnesota Ave. – Emergency Panel E3 Schedule in Room C107
Picture 5: D09 Minnesota Ave. – AFC Panel F in Room C107
Picture 6: D09 Minnesota Ave. – AFC Panel F in Room C107
Picture 7: D09 Minnesota Ave. – AFC Panel F Schedule in Room C107
Picture 8: D09 Minnesota Ave. – Panel M in Room C107
Picture 9: D09 Minnesota Ave. – Panel M Schedule in Room C107
Picture 10: D09 Minnesota Ave. – Panel MMI in Room C107
Picture 11: D09 Minnesota Ave. – Panel MMI Schedule in Room C107
Picture 12: D09 Minnesota Ave. – Transformer ‘T4’ Disconnect Switch in Room C107
Pre-Inspection FieldVerification 10/30/2014
"T4"
Pre-Inspection FieldVerification 10/30/2014
Pre-Inspection FieldVerification 10/30/2014
Pre-Inspection Mezzanine Walkthrough ChecklistDate: Station Name: Mezzanine #: Completed By:
Check Task Equipment Room ID Notes
Verify that electrical power design matches the field/record. Identify locations of theelectrical equipment.
Electrical Source Panel Name/Number:
Source Breaker Name/Number:
Electrical AFC Panel Name/Number:
Verify if disconnect switch is connected to the AFC electrical power panel. Low or High voltage SMNT/POWR escorts requirements?
Disconnect Name/Number:
SMNT/POWR escorts:
Check if there is a shared raceway between AFC Panel and Kiosk and identify additional source panels to be de-energized.
Do AFC Panel loads feed into a sharedraceway e.g. trench or trough? If Yes,specify source panels in notes.
Identify the assumed pathway of duct / conduit, the location of the handholes, manholes and boxes and accessibility or special escort requirement?
PLNT COMM / IT ELES
RAIL CMNT
Other Access/Support:
Identify handhole or manhole access requirement.
Required PLNT Mason forhandhole/manhole access?
Identified Conduit/Duct Transition to mezzanine level?
Emergency Power Verification
Check Task Equipment Room ID Notes
Verify if AFC electrical panel is connected to an Automatic Transfer Switch (ATS). ATS Name/Number:
Verification of Kiosk Emergency Panel(s) (KE, KES, KESS, etc)
Source Panel Name/Number:
Source Breaker Name/Number:
Panel Name/Number:
Notes and Discrepancies:
Sign Off GFP Representative WMATA PRGM
Name:
Signature:
Date:
Ver
10/30/2014 Deanwood - D10 065 Meghan Powell
✔
Essential Panel - 'SS-1'
Transformer 'T-4'
Rm 215
Rm 215
Panel F Rm C104
Rm 215 Wayside of Track 2Rm C104 is inside of Rm C100
✔
Transformer T-4
LOW Voltage
Rm C104
✔ YES (see notes)Panel M, Panel MMI
All shut down w/ transformer T-4
✔
✔
✔
YES (see notes)
UNDETERMINED
All conduit is on one level.100+ ft of conduit.All in one run between kiosk & panel.Manhole is for mini-mezzanine
✔
E3 Rm C104
Breaker #7 Rm C104
Panel KE Kiosk
Meghan Powell
Picture 1: D10 Deanwood – Mezzanine
Picture 2: D10 Deanwood – Mezzanine
Picture 3: D10 Deanwood – Emergency Panel KE in Kiosk
Picture 4: D10 Deanwood – Emergency Panel E3 in Room C104
Picture 5: D10 Deanwood – Emergency Panel E3 schedule in Room C104
Picture 6: D10 Deanwood – AFC Panel F in Room C104
Picture 7: D10 Deanwood – AFC Panel F in Room C104
Picture 8: D10 Deanwood – AFC Panel F bottom conduits in Room C104
Picture 9: D10 Deanwood – Panel M in Room C104
Picture 10: D10 Deanwood – Panel MMI in Room C104
Picture 11: D10 Deanwood – Panel MMI bottom conduits in Room C104
Picture 12: D10 Deanwood – Shared trough for Panel M,MMI,F in Room C104
Picture 13: D10 Deanwood – Transformer Disconnect Switch T4 in Room C104
Pre-Inspection FieldVerification 10/30/2014
Pre-Inspection FieldVerification 10/30/2014
T-4
Pre-Inspection FieldVerification 10/30/2014
E-3 feeds Kiosk PanelCircuits #7
Pre-Inspection Mezzanine Walkthrough ChecklistDate: Station Name: Mezzanine #: Completed By:
Check Task Equipment Room ID Notes
Verify that electrical power design matches the field/record. Identify locations of theelectrical equipment.
Electrical Source Panel Name/Number:
Source Breaker Name/Number:
Electrical AFC Panel Name/Number:
Verify if disconnect switch is connected to the AFC electrical power panel. Low or High voltage SMNT/POWR escorts requirements?
Disconnect Name/Number:
SMNT/POWR escorts:
Check if there is a shared raceway between AFC Panel and Kiosk and identify additional source panels to be de-energized.
Do AFC Panel loads feed into a sharedraceway e.g. trench or trough? If Yes,specify source panels in notes.
Identify the assumed pathway of duct / conduit, the location of the handholes, manholes and boxes and accessibility or special escort requirement?
PLNT COMM / IT ELES
RAIL CMNT
Other Access/Support:
Identify handhole or manhole access requirement.
Required PLNT Mason forhandhole/manhole access?
Identified Conduit/Duct Transition to mezzanine level?
Emergency Power Verification
Check Task Equipment Room ID Notes
Verify if AFC electrical panel is connected to an Automatic Transfer Switch (ATS). ATS Name/Number:
Verification of Kiosk Emergency Panel(s) (KE, KES, KESS, etc)
Source Panel Name/Number:
Source Breaker Name/Number:
Panel Name/Number:
Notes and Discrepancies:
Sign Off GFP Representative WMATA PRGM
Name:
Signature:
Date:
Ver
10/30/2014 Cheverly - D11 066 Meghan Powell
✔
Panel M
Main breaker
RmC205
Panel F Rm C205
Rm C205 is inside of Rm C200
✔
DS
LOW Voltage
Rm C205 No name on DS - Panel; next to Panel F.
✔ YES (see notes)Panel - P2, (taken out from main on Panel - M),Panel - M (main breaker).Panel - P2, Panel - M are connected to DS
✔
✔
✔
YES (see notes)
YES
All conduit/duct is on one level.Layout: Panel to shared trough, to duct.
✔
Panel - E-2 Rm C205
Breaker #10
No name on panel in the kiosk Kiosk
Picture 1: D11 Cheverly – Handholes in Mezzanine
Picture 2: D11 Cheverly – Manhole in Room C200
Picture 3: D11 Cheverly – Emergency Panel (Unnamed) in Kiosk
Picture 4: D11 Cheverly – Emergency Panel-E-2 in Room C205
Picture 5: D11 Cheverly – Emergency Panel-E-2 Schedule in Room C205
Picture 6: D11 Cheverly – Panel F in Room C205
Picture 7: D11 Cheverly – Panel F (without cover) in Room C205
Picture 8: D11 Cheverly – Panel F (bottom conduits) in Room C205
Picture 9: D11 Cheverly – Panel M in Room C205
Picture 10: D11 Cheverly – Panel F & M common trough in Room C205
Picture 11: D11 Cheverly – Panel F & M common trough in Room C205
Picture 12: D11 Cheverly – Panel P2 in Room C205
Picture 13: D11 Cheverly – Panel P2 schedule in Room C205
Picture 14: D11 Cheverly – Disconnect Switch in Room C205
Pre-Inspection FieldVerification 10/30/2014
Rm 205
Pre-Inspection FieldVerification 10/30/2014
M
Pre-Inspection FieldVerification 10/30/2014
Pre-Inspection Mezzanine Walkthrough ChecklistDate: Station Name: Mezzanine #: Completed By:
Check Task Equipment Room ID Notes
Verify that electrical power design matches the field/record. Identify locations of theelectrical equipment.
Electrical Source Panel Name/Number:
Source Breaker Name/Number:
Electrical AFC Panel Name/Number:
Verify if disconnect switch is connected to the AFC electrical power panel. Low or High voltage SMNT/POWR escorts requirements?
Disconnect Name/Number:
SMNT/POWR escorts:
Check if there is a shared raceway between AFC Panel and Kiosk and identify additional source panels to be de-energized.
Do AFC Panel loads feed into a sharedraceway e.g. trench or trough? If Yes,specify source panels in notes.
Identify the assumed pathway of duct / conduit, the location of the handholes, manholes and boxes and accessibility or special escort requirement?
PLNT COMM / IT ELES
RAIL CMNT
Other Access/Support:
Identify handhole or manhole access requirement.
Required PLNT Mason forhandhole/manhole access?
Identified Conduit/Duct Transition to mezzanine level?
Emergency Power Verification
Check Task Equipment Room ID Notes
Verify if AFC electrical panel is connected to an Automatic Transfer Switch (ATS). ATS Name/Number:
Verification of Kiosk Emergency Panel(s) (KE, KES, KESS, etc)
Source Panel Name/Number:
Source Breaker Name/Number:
Panel Name/Number:
Notes and Discrepancies:
Sign Off GFP Representative WMATA PRGM
Name:
Signature:
Date:
Ver
10/30/2014 Landover - D12 067 Meghan Powell
✔
Panel M
Breaker #23
RmC108
Rm C108
Panel F Rm C108
Rm C108 is inside of Rm C100
✔
No
LOW Voltage
✔ NO
✔
✔
✔
YES (see notes)
YES
All conduit/duct is on mezzanine level.Layout: Assume freeside straight run back to panelfrom HH at kiosk (120+ ft.).
✔
Panel - E-2 Rm C108
Breaker #9 Rm C108
Panel KE Kiosk
Picture 1: D12 Landover – Handholes in Mezzanine
Picture 2: D12 Landover – Manholes in Mezzanine (not part of duct run)
Picture 3: D12 Landover – Manholes in Mezzanine (not part of duct run)
Picture 4: D12 Landover – No handhole in passageway of Room C100
Picture 5: D12 Landover – Panel F in Room C108
Picture 6: D12 Landover – Panel F in Room C108
Picture 7: D12 Landover – Panel F bottom conduits in Room C108
Picture 8: D12 Landover – Panel F Schedule in Room C108
Picture 9: D12 Landover – Panel M in Room C108
Picture 10: D12 Landover – Panel M in Room C108 (breaker #23 is at bottom of panel)
Picture 11: D12 Landover – Panel M Schedule in Room C108
Picture 12: D12 Landover – Kiosk Emergency Panel-E2 in Room C108
Picture 13: D12 Landover – Kiosk Emergency Panel-E2 Schedule Room C108
Pre-Inspection FieldVerification 10/30/2014
Pre-Inspection FieldVerification 10/30/2014
Pre-Inspection FieldVerification 10/30/2014