Preliminary QA/QC Plan DUNE PDS 60% Design Review - June 19, 2020 V. Pimentel, MC. Bazetto, MH. M. Hamanaka ([email protected]) CTI Renato Archer - Lab Leptons/Unicamp - Physics Depart. CSU

Preliminary QA/QC Plan - INDICO-FNAL (Indico)

  • Upload
    others

  • View
    16

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Preliminary QA/QC Plan - INDICO-FNAL (Indico)

Preliminary QA/QC Plan

DUNE PDS 60% Design Review - June 19, 2020

V. Pimentel, MC. Bazetto, MH. M. Hamanaka

([email protected])

CTI Renato Archer - Lab Leptons/Unicamp - Physics Depart. CSU

Page 2: Preliminary QA/QC Plan - INDICO-FNAL (Indico)

2

- CTI Renato Archer, Scientific Instrumentation Laboratory - “Sc!Lab”

- PDS - Quality Management Organization Plan

- Preliminary QA/QC Plan

- QA/QC Documents Currently in EDMS

- Summary

- Acknowledgments

DUNE PDS 60% Design Review - June 19, 2020

Resume

Page 3: Preliminary QA/QC Plan - INDICO-FNAL (Indico)

3

Who are we? Center of Information Technology “Renato Archer”

D. Pedro I Highway, just 11.2 km from UNICAMP(Lab Leptons), LNLS and other

Education Institutions, Research Labs, Companies…

DUNE PDS 60% Design Review - June 19, 2020

CTI

Leptons Unicamp

LNLS/SIRIUS

Page 4: Preliminary QA/QC Plan - INDICO-FNAL (Indico)

4

The Scientific Instrumentation Lab “Sc!Lab” is part of the Coordination of Open Laboratories/Facilities-COLAB of CTI Renato Archer

Lambda 900 Vers. 6.5 Upgrade 6.5 50kR$ / 12June2020

Duetta Horiba 215kR$ Dec/2019

DUNE PDS 60% Design Review - June 19, 2020

Center of Information Technology “Renato Archer”

Page 5: Preliminary QA/QC Plan - INDICO-FNAL (Indico)

5

We started a QMC-Quality Management Control for the Collaboration between Lab Leptons & Sc!Lab

- Standardization of documentation (logbooks, delivery/receipt parts documentation, reports… ) and it was part of ProtoDUNE 1 and SBND - Documentation and materials handling experience gained will help with DUNE developments…

DUNE PDS 60% Design Review - June 19, 2020

Center of Information Technology “Renato Archer”

Page 6: Preliminary QA/QC Plan - INDICO-FNAL (Indico)

6 DUNE PDS 60% Design Review - June 19, 2020

PDS - Quality Management Organization Plan

Ettore Segreto Lead

David Warner Technical Coordinator

Monitoring System FG Conveners

David Martinez Zelimir Djurcic

Photosensor FG Conveners Vishnu Zutshi Robert Wilson Laura Patrizii

Light Collector FG Conveners Ana Machado Flavio Cavanna

Denver Whittington

Electronics/Cabling FG Conveners

Matt Toups Claudio Gotti

Deywis Moreno

PD Supports/Connectors

FG Conveners David Warner

Vinicius Pimentel PDS QA/QC officer

QA/QC officer responsible for QA/QC plans, documentation, and data management For the major component fabrication groups

Page 7: Preliminary QA/QC Plan - INDICO-FNAL (Indico)

7

The QA/QC Planning for DUNE started on May/June based on

ProtoDUNE 1 lessons and with FNAL Quality Team support.

Definitions :

- Quality Assurance Plan

“With a focus on processes, it aims to ensure and document the

procedures and tests that must be followed for the production and validation of PDS's”

- Quality Control Plan

“With a focus on the PDS products, it aims to ensure tests for

validation of materials, components and devices”

Preliminary QA/QC Plan

DUNE PDS 60% Design Review - June 19, 2020

Page 8: Preliminary QA/QC Plan - INDICO-FNAL (Indico)

The QA - Quality Assurance Plan:

- The QA/QC documentation must be stored in the EDMS repository by

recommendation of FNAL QC/QA Team

- Defines QA/QC Teams and responsibilities in each workgroup

- Defines the structure for PDS parts construction & traceability

- Documentes all procedures and docs for PDS validations and tests

8

Preliminary QA/QC Plan

DUNE PDS 60% Design Review - June 19, 2020

Page 9: Preliminary QA/QC Plan - INDICO-FNAL (Indico)

9

Preliminary QA/QC Plan

DUNE PDS 60% Design Review - June 19, 2020 ED

MS

2384

692

The QA - Quality Assurance Plan:

- The QA/QC documentation must be stored in the EDMS repository by

recommendation of FNAL QC/QA Team

- Defines QA/QC Teams and responsibilities in each workgroup

- Defines the structure for PDS parts construction & traceability

- Documentes all procedures and docs for PDS validations and tests

Page 10: Preliminary QA/QC Plan - INDICO-FNAL (Indico)

10

Preliminary QA/QC Plan

DUNE PDS 60% Design Review - June 19, 2020

The QC - Quality Control

- Establishes “PDS Manufacturing Plan” with PBS (Parts Breakdown

Structure)

- Each component will have a unique part number

- Includes “PDS Procurement Plan”

- Acceptance criteria for tests and evaluations

Page 11: Preliminary QA/QC Plan - INDICO-FNAL (Indico)

11

Preliminary QA/QC Plan

DUNE PDS 60% Design Review - June 19, 2020

The QC - Quality Control

- Establishes “PDS Manufacturing Plan” with PBS (Parts Breakdown

Structure)

Page 12: Preliminary QA/QC Plan - INDICO-FNAL (Indico)

12

Preliminary QA/QC Plan

DUNE PDS 60% Design Review - June 19, 2020

The QC - Quality Control

- Establishes “PDS Manufacturing Plan” with PBS (Parts Breakdown

Structure)

- Each component will have a unique part number

Page 13: Preliminary QA/QC Plan - INDICO-FNAL (Indico)

The QC - Quality Control

- Establishes “PDS Manufacturing Plan” with PBS (Parts Breakdown

Structure)

- Each component will have a unique part number

- Includes “PDS Procurement Plan” (each parts specification , 1st .. 2nd …3rd

vendors options, costs…, warehouse definitions.., packaging to delivery at DUNE...)

- Acceptance criteria for tests and evaluations:

13

Preliminary QA/QC Plan

DUNE PDS 60% Design Review - June 19, 2020

Page 14: Preliminary QA/QC Plan - INDICO-FNAL (Indico)

The QC - Quality Control

- Establishes “PDS Manufacturing Plan” with PBS (Parts Breakdown

Structure)

- Each component will have a unique part number

- Includes “PDS Procurement Plan” (each parts specification , 1st .. 2nd …3rd

vendors options, costs…, warehouse definitions.., packaging to delivery at DUNE...)

- Acceptance criteria for tests and evaluations: (raw materials, devices,

cryogenic tests, mechanical interfaces, dimensional checks of critical components, completed

assemblies testing, small-scale test assemblies...)

14

Preliminary QA/QC Plan

DUNE PDS 60% Design Review - June 19, 2020

Page 15: Preliminary QA/QC Plan - INDICO-FNAL (Indico)

15

Preliminary QA/QC Plan

DUNE PDS 60% Design Review - June 19, 2020

The QC - Quality Control

- QA/QC plan is part of our Data Management Plan (considering paper

travelers or ipad-type electronic data storage)

- All data available in the DUNE database

- We must ensure that no components or PDS in the various plants and

WG go into the warehouse without identification and testing.

- The PDS documentation and packaging are part of the manufacturing

process es

Page 16: Preliminary QA/QC Plan - INDICO-FNAL (Indico)

16

Preliminary QA/QC Plan

DUNE PDS 60% Design Review - June 19, 2020

The QC - Quality Control

Incoming material and assembly documentation travellers will be used

to document incoming materials, productions, installations and tests

…. all for traceability…..

Page 17: Preliminary QA/QC Plan - INDICO-FNAL (Indico)

17

Preliminary QA/QC Plan The ProtoDUNE 1 QA/QC repository …

Will be a guide to ProtoDUNE 2 documentation .. current documents at EDMS#

DUNE PDS 60% Design Review - June 19, 2020

Procedure/Document Status EDMS #

Pre-Cold and Postcold Tester PCB Procedures Done 2384692

SiPM/SiPM Mounting Assembly Board thermal cicle test Record In Progress

Assembly Instructions for Fermilab Design PD Modules 05-04-17 Rev2 In Progress

FNAL Designs Photon Detector Bar assembly Crawings No Longer Needed

FNAL Design PD Module Traveler No Longer Needed

Assembly Instruction for IU desing PD Module 05-04-17 Rev2 Basis for X-APARUCA

IU Design Photon Detector Bar Assembly Drawings Basis for X-APARUCA

IU Design PD Module Traveler Basis for X-APARUCA

Incomming Material Travelers Basis fo X-ARAPUCA

PD Assembly Cleaning Procedure 05-04-17 Rev 2 Still Valid

Photon Detector Bill of Material Done 2384656

ProtoDUNE Photon Detector Hardware Database Still Valid

Proton detector mounting System Assembly Drawings Done 2384656

Quality Control Procedures for SiPM Mounting boards Done 2384692

SiPM Mounting Board Drawings Done 2384981

Cable Shrinkage Calculation document Engineering analysis 2380106

Page 20: Preliminary QA/QC Plan - INDICO-FNAL (Indico)

20

Summary

- The materials experiments/studies & small batches of PDS type X-ARAPUCA was a nice preparation/school for QA/QC plans for DUNE to Sc!Lab - We are expanding the ProtoDUNE 1 QA/QC control system with support from the FNAL Quality Team (Jim & Kevin). That recomendates the use of EDMS as official repository - Designation of local people for QA/QC in each work group is planned - QA/QC documents are part of the Data Management Plan and are available in the DUNE database. - Forms and travelers for ProtoDUNE 2 are being generated and preliminary documentation is ready or being generated - The DUNE delivery final packaging and travelers are part of the manufacturing process.

DUNE PDS 60% Design Review - June 19, 2020

Page 21: Preliminary QA/QC Plan - INDICO-FNAL (Indico)

21

Acknowledgment

Thanks for the attention and also to Sc!Lab & Lab Leptons teams, Dave, Jim,

Kevin, Francesco, Matt, Deywis, and many other colleagues who are

collaborating to complete the challenge.

We will need even more help and we look forward to helping everyone also.

([email protected])

DUNE PDS 60% Design Review - June 19, 2020

Page 22: Preliminary QA/QC Plan - INDICO-FNAL (Indico)

BACKUP

22 DUNE PDS 60% Design Review - June 19, 2020

Page 23: Preliminary QA/QC Plan - INDICO-FNAL (Indico)

23

08/2015 2018 2019 2020

Collaboration history between Lab Leptons & Sc!Lab

DUNE PDS 60% Design Review - June 19, 2020

The collaboration between Lab Leptons & Sc!Lab started in 2015 with

prototypes tests

Page 24: Preliminary QA/QC Plan - INDICO-FNAL (Indico)

24

Center of Information Tech. “CTI Renato Archer”

- It was founded in 1982, located in Campinas state of São Paulo, is currently a

branch of the “MCTI” - Ministry of Science, Technology and Innovations.

- A research pot-pourri is carried out in sensors, materials, micro-nano-organic-

electronics, photonics, 3D printing, artificial intelligence, ... and also ... our Lab

of Scientific Instrumentation- “ Sc!Lab ”

DUNE PDS 60% Design Review - June 19, 2020