13
Main Road 83 Summerland Way Additional Crossing of the Clarence River at Grafton Page A25 Appendix 4 – Preliminary route options drawings This appendix presents basic plan and longitudinal section drawings for each of the 25 preliminary route options. The design criteria used for the development of these drawings is presented in Appendix 2.

Preliminary Route Options Report€¦ · woodward st oliver st bacon st prince st pound st railway welley ave villiers st dobie st kent st proposed bridge option alignment as shown

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Preliminary Route Options Report€¦ · woodward st oliver st bacon st prince st pound st railway welley ave villiers st dobie st kent st proposed bridge option alignment as shown

Main Road 83 Summerland Way Additional Crossing of the Clarence River at Grafton

Page A25

Appendix 4 – Preliminary route options drawings This appendix presents basic plan and longitudinal section drawings for each of the 25 preliminary route options. The design criteria used for the development of these drawings is presented in Appendix 2.

Page 2: Preliminary Route Options Report€¦ · woodward st oliver st bacon st prince st pound st railway welley ave villiers st dobie st kent st proposed bridge option alignment as shown

250

500

750

1

0

0

0

1250

0.000 T

P

237.122 T

P

3

5

3

.8

0

5

T

P

1

0

2

1

.1

2

8

T

P

1031.496 T

P

1288.312 T

P

V

IC

T

O

R

IA

S

T

D

U

K

E

S

T

ARDEN ST

ABBOTT ST

VE

RE

S

T

COWAN ST

SKINNER ST

WHARF ST

ARCHER ST

C

A

M

B

R

I

D

G

E

S

T

GW

YD

IR

H

WY

SP

RIN

G S

T

TH

RO

UG

H S

T

C

L

A

R

E

N

C

E

R

I

V

E

R

SU

SA

N

IS

LA

ND

250

500

750

1

0

0

0

1250

0.000 T

P

237.122 T

P

3

5

3

.8

0

5

T

P

1

0

2

1

.1

2

8

T

P

1031.496 T

P

1288.312 T

P

F

IT

Z

R

O

Y

S

T

C

LA

R

E

N

C

E

S

T

W

O

O

D

W

AR

D

S

T

O

LIV

E

R

S

T

B

A

C

O

N

S

T

P

R

IN

C

E

S

T

P

O

U

N

D

S

T

R

AILW

AY

W

E

LLE

Y

A

V

E

V

ILLIE

R

S

S

T

D

O

B

IE

S

T

K

E

N

T

S

T

PROPOSED

BRIDGE

OPTION ALIGNMENT AS

SHOWN IN JUNE 2011

COMMUNITY UPDATE

VILLIERS ST TO BE LOWERED

TO PROVIDE HIGH VEHICLE

CLEARANCE (5.3m) BENEATH

RAILWAY

EXISTING

BRIDGE

PROPOSED

BRIDGE

N

O

R

TH

ER

N

M

A

I

N

PLAN

LONGITUDINAL SECTION

0 100

HORIZONTAL SCALE 1:5000m

200 300 400 500

VERTICAL SCALE 1:1000m

0 20 40 60 80 100

EMBANKMENT

CLARENCE RIVER

LEGEND - LONGITUDINAL SECTION:

PRELIMINARY ROUTE OPTION

LEGEND - PLAN:

OPTION ALIGNMENT AS SHOWN IN

JUNE 2011 COMMUNITY UPDATE

INTERSECTION UPGRADE -

TREATMENT TO BE DETERMINED

NOTES

1. Q100 YEAR FLOOD LEVELS BASED ON LOWER

CLARENCE RIVER FLOOD STUDY REVIEW (WBM 2004).

2. IN ADDITION TO THE INTERSECTION UPGRADES

SHOWN ON THE PLAN, THE OPTION WOULD INCLUDE

AN UPGRADE OF THE FOLLOWING INTERSECTIONS :

- GWYDIR HWY / BENT ST

3. INTERSECTIONS REQUIRING AN UPGRADE INCLUDE:

• WHERE THE ESTIMATED NUMBER OF VEHICLES

APPROACHING THE INTERSECTIONS IS

RELATIVELY HIGH IN 2019 AND WOULD REQUIRE

INTERSECTION IMPROVEMENTS.

• THOSE THAT WILL REQUIRE AN UPGRADE TO

ACCOMMODATE TURNING VEHICLES

REGISTRATION NUMBER

DRAWING SHEET No.

No. Amendment Description Initials Date

This sheet may be prepared using colour and may be incomplete if copiedA1 original

SCALES

DESIGNED

REVIEWED

FILE No. PRINTED DATE

Arup Pty Ltd

ABN 18 000 966 165

ROADS AND MARITIME SERVICES

06/12/2011

1

220422_SK6001.dwg

-

0083.086.BA.2016

CLARENCE VALLEY COUNCIL

MAIN ROAD 83 - SUMMERLAND WAY

ADDITIONAL CROSSING OF THE CLARENCE RIVER AT GRAFTON

CORRIDOR 1 - PRELIMINARY ROUTE OPTION F

PLAN AND LONGITUDINAL SECTION

A

B

C

D

E

PROR - PART 2 - DRAFT 1

PROR - PARTS 1 & 2 - DRAFT 2

PROR - PARTS 1 & 2 - DRAFT 3

PROR - PARTS 1 & 2 - ISSUE

PROR - FINAL - RMS NAME UPDATED

REB

30/08/2011

REB 26/09/2011

REB 6/10/2011

REB 24/10/2011

REB 6/12/2011

Created using CADplot http://www.oasys-

software.com/cadplot/

Page 3: Preliminary Route Options Report€¦ · woodward st oliver st bacon st prince st pound st railway welley ave villiers st dobie st kent st proposed bridge option alignment as shown

C

L

A

R

E

N

C

E

R

I

V

E

R

S

P

R

I

N

G

S

T

T

H

R

O

U

G

H

S

T

N

O

R

T

H

E

R

N

V

I

C

T

O

R

I

A

S

T

P

R

I

N

C

E

S

T

V

E

R

E

S

T

G

W

Y

D

I

R

H

W

Y

S

K

I

N

N

E

R

S

T

P

O

U

N

D

S

T

D

U

K

E

S

T

B

E

N

T

S

T

B

L

I

G

H

S

T

A

R

C

H

E

R

S

T

W

H

A

R

F

S

T

K

E

L

L

Y

S

T

R

Y

A

N

S

T

F

I

T

Z

R

O

Y

S

T

C

O

W

A

N

S

T

A

B

B

O

T

T

S

T

B

A

C

O

N

S

T

O

L

I

V

E

R

S

T

Q

U

E

E

N

S

T

0

2

5

0

5

0

0

7

5

0

1

0

0

0

1

2

5

0

0

.

0

0

0

T

P

1

0

5

.

3

3

9

T

P

2

7

5

.9

6

1

T

P

4

1

4

.9

6

3

T

P

1

0

4

5

.

3

5

2

T

P

1

3

0

5

.

3

9

6

T

P

S

U

S

A

N

I

S

L

A

N

D

B

E

N

T

S

T

M

A

I

N

R

A

I

L

W

A

Y

PROPOSED

BRIDGE

OPTION ALIGNMENT AS

SHOWN IN JUNE 2011

COMMUNITY UPDATE

VILLIERS ST TO BE LOWERED

TO PROVIDE HIGH VEHICLE

CLEARANCE (5.3m) BENEATH

RAILWAY

PLAN

LONGITUDINAL SECTION

0 100

HORIZONTAL SCALE 1:5000m

200 300 400 500

VERTICAL SCALE 1:1000m

0 20 40 60 80 100

PRELIMINARY ROUTE OPTION

ROAD CLOSURE

LEGEND - PLAN:

OPTION ALIGNMENT AS SHOWN IN

JUNE 2011 COMMUNITY UPDATE

INTERSECTION UPGRADE -

TREATMENT TO BE DETERMINED

EMBANKMENT

CLARENCE RIVER

LEGEND - LONGITUDINAL SECTION:

NOTES

1. Q100 YEAR FLOOD LEVELS BASED ON LOWER CLARENCE

RIVER FLOOD STUDY REVIEW (WBM 2004).

2. INTERSECTIONS REQUIRING AN UPGRADE INCLUDE:

• WHERE THE ESTIMATED NUMBER OF VEHICLES

APPROACHING THE INTERSECTIONS IS RELATIVELY HIGH

IN 2019 AND WOULD REQUIRE INTERSECTION

IMPROVEMENTS.

• THOSE THAT WILL REQUIRE AN UPGRADE TO

ACCOMMODATE TURNING VEHICLES.

REGISTRATION NUMBER

DRAWING SHEET No.

No. Amendment Description Initials Date

This sheet may be prepared using colour and may be incomplete if copiedA1 original

SCALES

DESIGNED

REVIEWED

FILE No. PRINTED DATE

Arup Pty Ltd

ABN 18 000 966 165

ROADS AND MARITIME SERVICES

06/12/2011

2

220422_SK6002.dwg

-

0083.086.BA.2016

CLARENCE VALLEY COUNCIL

MAIN ROAD 83 - SUMMERLAND WAY

ADDITIONAL CROSSING OF THE CLARENCE RIVER AT GRAFTON

CORRIDOR 1 - PRELIMINARY ROUTE OPTION E

PLAN AND LONGITUDINAL SECTION

A

B

C

D

E

PROR - PART 2 - DRAFT 1

PROR - PARTS 1 & 2 - DRAFT 2

PROR - PARTS 1 & 2 - DRAFT 3

PROR - PARTS 1 & 2 - ISSUE

PROR - FINAL - RMS NAME UPDATED

REB

30/08/2011

REB 26/09/2011

REB 6/10/2011

REB 24/10/2011

REB 6/12/2011

Created using CADplot http://www.oasys-

software.com/cadplot/

Page 4: Preliminary Route Options Report€¦ · woodward st oliver st bacon st prince st pound st railway welley ave villiers st dobie st kent st proposed bridge option alignment as shown

G

W

Y

D

I

R

H

W

Y

1

7

0

1

.

0

2

9

T

P

1

4

0

0

.

9

1

5

T

P

7

5

0

5

0

0

9

8

2

.

4

0

4

T

P

1

5

0

0

1

2

5

0

1

0

0

0

2

5

0

0

.

0

0

0

T

P

C

L

A

R

E

N

C

E

R

I

V

E

R

A

R

M

I

D

A

L

E

S

T

S

P

R

I

N

G

S

T

P

A

C

I

F

I

C

H

W

Y

I

O

L

A

N

T

H

E

S

T

T

H

R

O

U

G

H

S

T

C

L

A

R

E

N

C

E

S

T

R

A

I

L

W

A

Y

V

I

C

T

O

R

I

A

S

T

P

R

I

N

C

E

S

T

S

P

R

I

N

G

S

T

V

E

R

E

S

T

S

K

I

N

N

E

R

S

T

P

O

U

N

D

S

T

D

U

K

E

S

T

B

A

C

O

N

S

T

B

E

N

T

S

T

B

L

I

G

H

S

T

A

R

C

H

E

R

S

T

W

H

A

R

F

S

T

K

E

L

L

Y

S

T

M

A

IN

N

O

R

T

H

E

R

N

R

Y

A

N

S

T

B

E

N

T

S

T

F

I

T

Z

R

O

Y

S

T

PA

CIF

IC

H

WY

Q

U

E

E

N

S

T

VILLIERS ST TO BE LOWERED

TO PROVIDE HIGH VEHICLE

CLEARANCE (5.3m) BENEATH

RAILWAY

POUND ST

CONNECTION

TO EXISTING

BRIDGE

EXISTING

BRIDGE

PROPOSED

BRIDGE

PLAN

LONGITUDINAL SECTION

0 100

HORIZONTAL SCALE 1:5000m

200 300 400 500

VERTICAL SCALE 1:1000m

0 20 40 60 80 100

PRELIMINARY ROUTE OPTION

ROAD CLOSURE

LEGEND - PLAN:

INTERSECTION UPGRADE -

TREATMENT TO BE DETERMINED

EMBANKMENT

CLARENCE RIVER

LEGEND - LONGITUDINAL SECTION:

NOTES

1. Q100 YEAR FLOOD LEVELS BASED ON LOWER CLARENCE

RIVER FLOOD STUDY REVIEW (WBM 2004).

2. INTERSECTIONS REQUIRING AN UPGRADE INCLUDE:

• WHERE THE ESTIMATED NUMBER OF VEHICLES

APPROACHING THE INTERSECTIONS IS RELATIVELY HIGH

IN 2019 AND WOULD REQUIRE INTERSECTION

IMPROVEMENTS.

• THOSE THAT WILL REQUIRE AN UPGRADE TO

ACCOMMODATE TURNING VEHICLES.

REGISTRATION NUMBER

DRAWING SHEET No.

No. Amendment Description Initials Date

This sheet may be prepared using colour and may be incomplete if copiedA1 original

SCALES

DESIGNED

REVIEWED

FILE No. PRINTED DATE

Arup Pty Ltd

ABN 18 000 966 165

ROADS AND MARITIME SERVICES

06/12/2011

3

220422_SK6003.dwg

-

0083.086.BA.2016

CLARENCE VALLEY COUNCIL

MAIN ROAD 83 - SUMMERLAND WAY

ADDITIONAL CROSSING OF THE CLARENCE RIVER AT GRAFTON

CORRIDOR 2 - PRELIMINARY ROUTE OPTION 5

PLAN AND LONGITUDINAL SECTION

A

B

C

D

E

PROR - PART 2 - DRAFT 1

PROR - PARTS 1 & 2 - DRAFT 2

PROR - PARTS 1 & 2 - DRAFT 3

PROR - PARTS 1 & 2 - ISSUE

PROR - FINAL - RMS NAME UPDATED

REB

30/08/2011

REB 26/09/2011

REB 6/10/2011

REB 24/10/2011

REB 6/12/2011

Created using CADplot http://www.oasys-

software.com/cadplot/

Page 5: Preliminary Route Options Report€¦ · woodward st oliver st bacon st prince st pound st railway welley ave villiers st dobie st kent st proposed bridge option alignment as shown

B

R

E

I

M

B

A

S

T

C

L

A

R

E

N

C

E

R

I

V

E

R

0

2

5

0

500

7

5

0

1

0

0

0

1

2

5

0

1

5

0

0

1

7

5

0

2000

2

2

5

0

2

5

0

0

0

.

0

0

0

T

P

1

1

6

.

0

1

9

T

P

313.942 T

P

572.543 T

P

6

6

9

.

7

3

7

T

P

7

8

3

.

5

8

7

T

P8

4

4

.

0

6

5

T

P

8

4

4

.

0

6

5

T

P

8

7

4

.

3

0

8

T

P

9

2

8

.

6

8

3

T

P

9

4

1

.

0

3

0

T

P

1

0

2

7

.

5

0

5

T

P

1

1

1

2

.1

6

7

T

P

1

5

1

6

.8

1

3

T

P

1

7

3

3

.

3

3

7

T

P

1

8

7

7

.

4

2

9

T

P

1957.596 TP

1995.715 TP

2

0

6

5

.

4

9

7

T

P2

1

5

1

.

4

2

4

T

P

2

2

0

1

.

4

4

3

T

P

2

2

2

1

.

4

5

1

T

P

2

3

9

6

.

2

6

1

T

P

2

4

0

0

.

2

1

4

T

P

2

4

4

1

.

4

6

7

T

P

2

6

0

0

.

5

0

2

T

P

2

6

6

0

.

8

8

3

T

P

A

R

M

ID

A

L

E

S

T

S

P

R

I

N

G

S

T

P

A

C

I

F

I

C

H

W

Y

I

O

L

A

N

T

H

E

S

T

T

H

R

O

U

G

H

S

T

T

H

R

O

U

G

H

S

T

C

L

A

R

E

N

C

E

S

T

V

I

L

L

I

E

R

S

S

T

R

A

I

L

W

A

Y

V

I

C

T

O

R

I

A

S

T

P

R

I

N

C

E

S

T

S

P

R

I

N

G

S

T

V

E

R

E

S

T

G

W

Y

D

I

R

H

W

Y

S

K

I

N

N

E

R

S

T

P

O

U

N

D

S

T

D

U

K

E

S

T

B

A

C

O

N

S

T

B

E

N

T

S

T

B

L

I

G

H

S

T

A

R

C

H

E

R

S

T

W

H

A

R

F

S

T

K

E

L

L

Y

S

T

MAIN

N

O

R

T

H

E

R

N

O

L

I

V

E

R

S

T

W

O

O

D

W

A

R

D

S

T

W

E

L

L

E

Y

A

V

E

K

E

N

T

S

T

D

O

B

I

E

S

T

R

Y

A

N

S

T

B

E

N

T

S

T

F

I

T

Z

R

O

Y

S

T

P

A

C

IF

IC

H

W

Y

PROPOSED

BRIDGE

EXISTING

BRIDGE

VILLIERS ST TO BE LOWERED

TO PROVIDE HIGH VEHICLE

CLEARANCE (5.3m) BENEATH

RAILWAY

PLAN

LONGITUDINAL SECTION

0 100

HORIZONTAL SCALE 1:5000m

200 300 400 500

VERTICAL SCALE 1:1000m

0 20 40 60 80 100

PRELIMINARY ROUTE OPTION

ROAD CLOSURE

LEGEND - PLAN:

INTERSECTION UPGRADE -

TREATMENT TO BE DETERMINED

EMBANKMENT

CLARENCE RIVER

LEGEND - LONGITUDINAL SECTION:

NOTES

1. Q100 YEAR FLOOD LEVELS BASED ON LOWER

CLARENCE RIVER FLOOD STUDY REVIEW (WBM 2004).

2. INTERSECTIONS REQUIRING AN UPGRADE INCLUDE:

• WHERE THE ESTIMATED NUMBER OF VEHICLES

APPROACHING THE INTERSECTIONS IS

RELATIVELY HIGH IN 2019 AND WOULD REQUIRE

INTERSECTION IMPROVEMENTS.

• THOSE THAT WILL REQUIRE AN UPGRADE TO

ACCOMMODATE TURNING VEHICLES.

REGISTRATION NUMBER

DRAWING SHEET No.

No. Amendment Description Initials Date

This sheet may be prepared using colour and may be incomplete if copiedA1 original

SCALES

DESIGNED

REVIEWED

FILE No. PRINTED DATE

Arup Pty Ltd

ABN 18 000 966 165

ROADS AND MARITIME SERVICES

06/12/2011

4

220422_SK6004.dwg

-

0083.086.BA.2016

CLARENCE VALLEY COUNCIL

MAIN ROAD 83 - SUMMERLAND WAY

ADDITIONAL CROSSING OF THE CLARENCE RIVER AT GRAFTON

CORRIDOR 2 - PRELIMINARY ROUTE OPTION A

PLAN AND LONGITUDINAL SECTION

A

B

C

D

E

PROR - PART 2 - DRAFT 1

PROR - PARTS 1 & 2 - DRAFT 2

PROR - PARTS 1 & 2 - DRAFT 3

PROR - PARTS 1 & 2 - ISSUE

PROR - FINAL - RMS NAME UPDATED

REB

30/08/2011

REB 26/09/2011

REB 6/10/2011

REB 24/10/2011

REB 6/12/2011

Created using CADplot http://www.oasys-

software.com/cadplot/

Page 6: Preliminary Route Options Report€¦ · woodward st oliver st bacon st prince st pound st railway welley ave villiers st dobie st kent st proposed bridge option alignment as shown

C

L

A

R

E

N

C

E

R

I

V

E

R

A

R

M

ID

A

L

E

S

T

S

P

R

I

N

G

S

T

I

O

L

A

N

T

H

E

S

T

T

H

R

O

U

G

H

S

T

T

H

R

O

U

G

H

S

T

B

R

E

I

M

B

A

S

T

C

L

A

R

E

N

C

E

S

T

V

I

L

L

I

E

R

S

S

T

R

A

I

L

W

A

Y

V

I

C

T

O

R

I

A

S

T

S

P

R

I

N

G

S

T

V

E

R

E

S

T

G

W

Y

D

I

R

H

W

Y

S

K

I

N

N

E

R

S

T

P

O

U

N

D

S

T

B

A

C

O

N

S

T

B

E

N

T

S

T

B

L

I

G

H

S

T

A

R

C

H

E

R

S

T

W

H

A

R

F

S

T

K

E

L

L

Y

S

T

MAIN

N

O

R

T

H

E

R

N

O

L

I

V

E

R

S

T

W

O

O

D

W

A

R

D

S

T

W

E

L

L

E

Y

A

V

E

K

E

N

T

S

T

D

O

B

I

E

S

T

P

A

C

IF

IC

H

W

Y

P

A

C

I

F

I

C

H

W

Y

0

2

5

0

500

7

5

0

1

0

0

0

1

2

5

0

1

5

0

0

1

7

5

0

2000

2

2

5

0

0

.

0

0

0

T

P

1

1

6

.

0

1

9

T

P

313.942 T

P

564.026 T

P

6

6

2

.

8

9

7

T

P

1

1

1

0

.

6

7

6

T

P

1

2

5

3

.8

2

5

T

P

1

5

9

1

.2

1

9

T

P

1

7

4

0

.

1

6

1

T

P

1

8

7

9

.

2

8

2

T

P

1988.0

00 T

P

2096.3

87 T

P

2

1

5

9

.

5

5

2

T

P

2

3

9

4

T

P

F

I

T

Z

R

O

Y

S

T

R

Y

A

N

S

T

B

E

N

T

S

T

P

R

I

N

C

E

S

T

D

U

K

E

S

T

VILLIERS ST TO BE LOWERED

TO PROVIDE HIGH VEHICLE

CLEARANCE (5.3m) BENEATH

RAILWAY

PROPOSED

BRIDGE

EXISTING

BRIDGE

BRIDGE

OVER

RAILWAY

VIADUCT

OVER

RAILWAY

PLAN

LONGITUDINAL SECTION

0 100

HORIZONTAL SCALE 1:5000m

200 300 400 500

VERTICAL SCALE 1:1000m

0 20 40 60 80 100

PRELIMINARY ROUTE OPTION

ROAD CLOSURE

LEGEND - PLAN:

INTERSECTION UPGRADE -

TREATMENT TO BE DETERMINED

EMBANKMENT

CLARENCE RIVER

LEGEND - LONGITUDINAL SECTION: NOTES

1. Q100 YEAR FLOOD LEVELS BASED ON LOWER

CLARENCE RIVER FLOOD STUDY REVIEW

(WBM 2004).

2. INTERSECTIONS REQUIRING AN UPGRADE

INCLUDE:

• WHERE THE ESTIMATED NUMBER OF

VEHICLES APPROACHING THE

INTERSECTIONS IS RELATIVELY HIGH IN

2019 AND WOULD REQUIRE

INTERSECTION IMPROVEMENTS.

• THOSE THAT WILL REQUIRE AN UPGRADE

TO ACCOMMODATE TURNING VEHICLES.

REGISTRATION NUMBER

DRAWING SHEET No.

No. Amendment Description Initials Date

This sheet may be prepared using colour and may be incomplete if copiedA1 original

SCALES

DESIGNED

REVIEWED

FILE No. PRINTED DATE

Arup Pty Ltd

ABN 18 000 966 165

ROADS AND MARITIME SERVICES

06/12/2011

5

220422_SK6005.dwg

-

0083.086.BA.2016

CLARENCE VALLEY COUNCIL

MAIN ROAD 83 - SUMMERLAND WAY

ADDITIONAL CROSSING OF THE CLARENCE RIVER AT GRAFTON

CORRIDOR 2 - PRELIMINARY ROUTE OPTION B

PLAN AND LONGITUDINAL SECTION

A

B

C

D

E

PROR - PART 2 - DRAFT 1

PROR - PARTS 1 & 2 - DRAFT 2

PROR - PARTS 1 & 2 - DRAFT 3

PROR - PARTS 1 & 2 - ISSUE

PROR - FINAL - RMS NAME UPDATED

REB

30/08/2011

REB 26/09/2011

REB 6/10/2011

REB 24/10/2011

REB 6/12/2011

Created using CADplot http://www.oasys-

software.com/cadplot/

Page 7: Preliminary Route Options Report€¦ · woodward st oliver st bacon st prince st pound st railway welley ave villiers st dobie st kent st proposed bridge option alignment as shown

G

W

Y

D

I

R

H

W

Y

C

L

A

R

E

N

C

E

R

I

V

E

R

A

R

M

I

D

A

L

E

S

T

S

P

R

I

N

G

S

T

P

A

C

I

F

I

C

H

W

Y

I

O

L

A

N

T

H

E

S

T

T

H

R

O

U

G

H

S

T

C

L

A

R

E

N

C

E

S

T

R

A

I

L

W

A

Y

V

I

C

T

O

R

I

A

S

T

P

R

I

N

C

E

S

T

S

P

R

I

N

G

S

T

V

E

R

E

S

T

S

K

I

N

N

E

R

S

T

P

O

U

N

D

S

T

D

U

K

E

S

T

B

A

C

O

N

S

T

B

E

N

T

S

T

B

L

I

G

H

S

T

A

R

C

H

E

R

S

T

W

H

A

R

F

S

T

K

E

L

L

Y

S

T

M

A

IN

N

O

R

T

H

E

R

N

D

O

B

I

E

S

T

R

Y

A

N

S

T

B

E

N

T

S

T

F

I

T

Z

R

O

Y

S

T

PA

CIF

IC

H

WY

Q

U

E

E

N

S

T

VILLIERS ST TO BE LOWERED

TO PROVIDE HIGH VEHICLE

CLEARANCE (5.3m) BENEATH

RAILWAY

CONNECTION TO

NEW BRIDGE

POUND ST TO BE LOWERED

TO PROVIDE HIGH VEHICLE

CLEARANCE (5.3m) BENEATH

RAILWAY

BRIDGE OVER

RAILWAY

OPTION ALIGNMENT AS

SHOWN IN JUNE 2011

COMMUNITY UPDATE

250

5

0

0

7

5

0

1

0

0

0

1

2

5

0

1500

1

7

5

0

2

0

0

0

2

2

5

0

0

.

0

0

0

T

P

1

1

6

.

0

1

9

T

P

3

1

3

.

9

4

2

T

P

5

6

4

.

0

2

6

T

P

6

6

2

.

8

9

7

T

P

1

1

1

4

.

0

5

6

T

P

1

9

9

5

.

2

0

6

T

P

2

4

3

5

.

1

2

1

T

P

CLARENCE ST ROAD

CLOSURE DEVIATED

TO FITZROY ST

EXISTING

BRIDGE

PROPOSED

BRIDGE

PLAN

LONGITUDINAL SECTION

0 100

HORIZONTAL SCALE 1:5000m

200 300 400 500

VERTICAL SCALE 1:1000m

0 20 40 60 80 100

PRELIMINARY ROUTE OPTION

ROAD CLOSURE

LEGEND - PLAN:

OPTION ALIGNMENT AS SHOWN IN

JUNE 2011 COMMUNITY UPDATE

INTERSECTION UPGRADE -

TREATMENT TO BE DETERMINED

EMBANKMENT

CLARENCE RIVER

LEGEND - LONGITUDINAL SECTION:

1. Q100 YEAR FLOOD LEVELS BASED ON LOWER

CLARENCE RIVER FLOOD STUDY REVIEW (WBM

2004).

2. INTERSECTIONS REQUIRING AN UPGRADE

INCLUDE:

• WHERE THE ESTIMATED NUMBER OF

VEHICLES APPROACHING THE

INTERSECTIONS IS RELATIVELY HIGH IN 2019

AND WOULD REQUIRE INTERSECTION

IMPROVEMENTS.

• THOSE THAT WILL REQUIRE AN UPGRADE TO

ACCOMMODATE TURNING VEHICLES.

NOTES

REGISTRATION NUMBER

DRAWING SHEET No.

No. Amendment Description Initials Date

This sheet may be prepared using colour and may be incomplete if copiedA1 original

SCALES

DESIGNED

REVIEWED

FILE No. PRINTED DATE

Arup Pty Ltd

ABN 18 000 966 165

ROADS AND MARITIME SERVICES

06/12/2011

6

220422_SK6006.dwg

-

0083.086.BA.2016

CLARENCE VALLEY COUNCIL

MAIN ROAD 83 - SUMMERLAND WAY

ADDITIONAL CROSSING OF THE CLARENCE RIVER AT GRAFTON

CORRIDOR 2 - PRELIMINARY ROUTE OPTION 6

PLAN AND LONGITUDINAL SECTION

A

B

C

D

E

PROR - PART 2 - DRAFT 1

PROR - PARTS 1 & 2 - DRAFT 2

PROR - PARTS 1 & 2 - DRAFT 3

PROR - PARTS 1 & 2 - ISSUE

PROR - FINAL - RMS NAME UPDATED

REB

30/08/2011

REB 26/09/2011

REB 6/10/2011

REB 24/10/2011

REB 6/12/2011

Created using CADplot http://www.oasys-

software.com/cadplot/

Page 8: Preliminary Route Options Report€¦ · woodward st oliver st bacon st prince st pound st railway welley ave villiers st dobie st kent st proposed bridge option alignment as shown

C

L

A

R

E

N

C

E

R

I

V

E

R

A

R

M

ID

A

L

E

S

T

T

H

R

O

U

G

H

S

T

B

R

E

I

M

B

A

S

T

C

L

A

R

E

N

C

E

S

T

V

I

L

L

I

E

R

S

S

T

S

P

R

I

N

G

S

T

D

U

K

E

S

T

B

A

C

O

N

S

T

B

E

N

T

S

T

K

E

L

L

Y

S

T

MAIN

N

O

R

T

H

E

R

N

O

L

I

V

E

R

S

T

W

O

O

D

W

A

R

D

S

T

W

E

L

L

E

Y

A

V

E

K

E

N

T

S

T

D

O

B

I

E

S

T

R

Y

A

N

S

T

B

E

N

T

S

T

H

E

B

E

R

S

T

A

L

IP

O

U

C

R

E

E

K

F

I

T

Z

R

O

Y

S

T

P

R

I

N

C

E

S

T

M

C

H

U

G

H

S

T

P

O

W

E

L

L

S

T

P

O

U

N

D

S

T

P

A

C

I

F

I

C

H

W

Y

I

O

L

A

N

T

H

E

S

T

2

5

0

500

7

5

0

1

0

0

0

1

2

5

0

1

5

0

0

1

7

5

0

2

0

0

0

0

.

0

0

0

T

P

3

2

.

9

3

4

T

P

4

2

.

5

7

4

T

P

7

0

.

7

3

7

T

P

1

7

8

.

3

0

4

T

P

6

8

6

.0

3

9

T

P

1

4

6

0

.0

1

7

T

P

1

6

0

1

.

2

6

5

T

P

2

0

6

0

.

8

9

4

T

P

P

A

C

IF

IC

H

W

Y

R

A

I

L

W

A

Y

PROPOSED

BRIDGE

EXISTING

BRIDGE

POUND ST TO BE LOWERED

TO PROVIDE HIGH VEHICLE

CLEARANCE (5.3m) BENEATH

RAILWAY

VILLIERS ST TO BE LOWERED

TO PROVIDE HIGH VEHICLE

CLEARANCE (5.3m) BENEATH

RAILWAY

PLAN

LONGITUDINAL SECTION

0 100

HORIZONTAL SCALE 1:5000m

200 300 400 500

VERTICAL SCALE 1:1000m

0 20 40 60 80 100

EMBANKMENT

CLARENCE RIVER

LEGEND - LONGITUDINAL SECTION:

PRELIMINARY ROUTE OPTION

LEGEND - PLAN:

INTERSECTION UPGRADE -

TREATMENT TO BE DETERMINED

1. Q100 YEAR FLOOD LEVELS BASED ON LOWER

CLARENCE RIVER FLOOD STUDY REVIEW (WBM

2004).

2. INTERSECTIONS REQUIRING AN UPGRADE

INCLUDE:

• WHERE THE ESTIMATED NUMBER OF

VEHICLES APPROACHING THE

INTERSECTIONS IS RELATIVELY HIGH IN 2019

AND WOULD REQUIRE INTERSECTION

IMPROVEMENTS.

• THOSE THAT WILL REQUIRE AN UPGRADE TO

ACCOMMODATE TURNING VEHICLES.

NOTES

REGISTRATION NUMBER

DRAWING SHEET No.

No. Amendment Description Initials Date

This sheet may be prepared using colour and may be incomplete if copiedA1 original

SCALES

DESIGNED

REVIEWED

FILE No. PRINTED DATE

Arup Pty Ltd

ABN 18 000 966 165

ROADS AND MARITIME SERVICES

06/12/2011

7

220422_SK6007.dwg

-

0083.086.BA.2016

CLARENCE VALLEY COUNCIL

MAIN ROAD 83 - SUMMERLAND WAY

ADDITIONAL CROSSING OF THE CLARENCE RIVER AT GRAFTON

CORRIDOR 2 - PRELIMINARY ROUTE OPTION C

PLAN AND LONGITUDINAL SECTION

A

B

C

D

E

PROR - PART 2 - DRAFT 1

PROR - PARTS 1 & 2 - DRAFT 2

PROR - PARTS 1 & 2 - DRAFT 3

PROR - PARTS 1 & 2 - ISSUE

PROR - FINAL - RMS NAME UPDATED

REB

30/08/2011

REB 26/09/2011

REB 6/10/2011

REB 24/10/2011

REB 6/12/2011

Created using CADplot http://www.oasys-

software.com/cadplot/

Page 9: Preliminary Route Options Report€¦ · woodward st oliver st bacon st prince st pound st railway welley ave villiers st dobie st kent st proposed bridge option alignment as shown

C

L

A

R

E

N

C

E

R

I

V

E

R

A

R

M

ID

A

L

E

S

T

T

H

R

O

U

G

H

S

T

B

R

E

I

M

B

A

S

T

C

L

A

R

E

N

C

E

S

T

V

I

L

L

I

E

R

S

S

T

S

P

R

I

N

G

S

T

D

U

K

E

S

T

B

A

C

O

N

S

T

B

E

N

T

S

T

K

E

L

L

Y

S

T

MAIN

N

O

R

T

H

E

R

N

O

L

I

V

E

R

S

T

W

E

L

L

E

Y

A

V

E

K

E

N

T

S

T

D

O

B

I

E

S

T

R

Y

A

N

S

T

B

E

N

T

S

T

H

E

B

E

R

S

T

A

L

IP

O

U

C

R

E

E

K

F

I

T

Z

R

O

Y

S

T

P

R

I

N

C

E

S

T

M

c

H

U

G

H

S

T

P

O

W

E

L

L

S

T

P

O

U

N

D

S

T

P

A

C

I

F

I

C

H

W

Y

2

5

0

500

7

5

0

1

0

0

0

1

2

5

0

1

5

0

0

1

7

5

0

2

0

0

0

0

.

0

0

0

T

P

3

2

.

9

3

1

T

P

4

2

.

6

3

2

T

P

7

0

.

7

4

6

T

P

1

7

8

.

2

9

6

T

P

6

8

6

.0

3

3

T

P

1

6

2

4

.5

5

0

T

P

1

7

7

4

.

8

8

7

T

P

1

8

4

5

.

4

5

2

T

P

2

0

8

3

.

1

4

1

T

P

2

1

6

8

.

6

7

9

T

P

P

A

C

IF

IC

H

W

Y

I

O

L

A

N

T

H

E

S

T

W

O

O

D

W

A

R

D

S

T

R

A

I

L

W

A

Y

PROPOSED

BRIDGE

EXISTING

BRIDGE

CLARENCE ST

OVERPASS

VILLIERS ST TO BE LOWERED

TO PROVIDE HIGH VEHICLE

CLEARANCE (5.3m) BENEATH

RAILWAY

PLAN

LONGITUDINAL SECTION

0 100

HORIZONTAL SCALE 1:5000m

200 300 400 500

VERTICAL SCALE 1:1000m

0 20 40 60 80 100

EMBANKMENT

CLARENCE RIVER

LEGEND - LONGITUDINAL SECTION:

PRELIMINARY ROUTE OPTION

LEGEND - PLAN:

INTERSECTION UPGRADE -

TREATMENT TO BE DETERMINED

1. Q100 YEAR FLOOD LEVELS BASED ON LOWER

CLARENCE RIVER FLOOD STUDY REVIEW (WBM

2004).

2. INTERSECTIONS REQUIRING AN UPGRADE

INCLUDE:

• WHERE THE ESTIMATED NUMBER OF

VEHICLES APPROACHING THE

INTERSECTIONS IS RELATIVELY HIGH IN 2019

AND WOULD REQUIRE INTERSECTION

IMPROVEMENTS.

• THOSE THAT WILL REQUIRE AN UPGRADE TO

ACCOMMODATE TURNING VEHICLES.

NOTES

REGISTRATION NUMBER

DRAWING SHEET No.

No. Amendment Description Initials Date

This sheet may be prepared using colour and may be incomplete if copiedA1 original

SCALES

DESIGNED

REVIEWED

FILE No. PRINTED DATE

Arup Pty Ltd

ABN 18 000 966 165

ROADS AND MARITIME SERVICES

06/12/2011

8

220422_SK6008.dwg

-

0083.086.BA.2016

CLARENCE VALLEY COUNCIL

MAIN ROAD 83 - SUMMERLAND WAY

ADDITIONAL CROSSING OF THE CLARENCE RIVER AT GRAFTON

CORRIDOR 2 - PRELIMINARY ROUTE OPTION D

PLAN AND LONGITUDINAL SECTION

A

B

C

D

E

PROR - PART 2 - DRAFT 1

PROR - PARTS 1 & 2 - DRAFT 2

PROR - PARTS 1 & 2 - DRAFT 3

PROR - PARTS 1 & 2 - ISSUE

PROR - FINAL - RMS NAME UPDATED

REB

30/08/2011

REB 26/09/2011

REB 6/10/2011

REB 24/10/2011

REB 6/12/2011

Created using CADplot http://www.oasys-

software.com/cadplot/

Page 10: Preliminary Route Options Report€¦ · woodward st oliver st bacon st prince st pound st railway welley ave villiers st dobie st kent st proposed bridge option alignment as shown

C

L

A

R

E

N

C

E

R

I

V

E

R

2

5

0

5

0

0

7

5

0

1

0

0

0

1

2

5

0

1

5

0

0

1

7

5

0

2

0

0

0

0

.

0

0

0

T

P

5

4

.

6

9

1

T

P

2

5

6

.

8

2

6

T

P

7

0

7

.

2

1

2

T

P

9

3

3

.7

5

5

T

P

1

3

1

2

.

3

1

3

T

P

1

4

1

8

.6

3

5

T

P

1

6

5

6

.7

7

8

T

P

1

9

4

4

.

3

2

1

T

P

2

0

0

2

.

0

1

0

T

P

A

R

M

ID

A

L

E

S

T

S

P

R

I

N

G

S

T

P

A

C

I

F

I

C

H

W

Y

I

O

L

A

N

T

H

E

S

T

T

H

R

O

U

G

H

S

T

T

H

R

O

U

G

H

S

T

B

R

E

I

M

B

A

S

T

C

L

A

R

E

N

C

E

S

T

V

I

L

L

I

E

R

S

S

T

R

A

I

L

W

A

Y

V

I

C

T

O

R

I

A

S

T

P

R

I

N

C

E

S

T

S

P

R

I

N

G

S

T

V

E

R

E

S

T

G

W

Y

D

I

R

H

W

Y

S

K

I

N

N

E

R

S

T

P

O

U

N

D

S

T

D

U

K

E

S

T

B

A

C

O

N

S

T

B

E

N

T

S

T

B

L

I

G

H

S

T

A

R

C

H

E

R

S

T

W

H

A

R

F

S

T

K

E

L

L

Y

S

T

MAIN

N

O

R

T

H

E

R

N

O

L

I

V

E

R

S

T

W

O

O

D

W

A

R

D

S

T

W

E

L

L

E

Y

A

V

E

K

E

N

T

S

T

D

O

B

I

E

S

T

R

Y

A

N

S

T

B

E

N

T

S

T

F

I

T

Z

R

O

Y

S

T

P

A

C

IF

IC

H

W

Y

H

E

B

E

R

S

T

PROPOSED

BRIDGE

EXISTING

BRIDGE

CLARENCE ST

OVERPASS

VILLIERS ST TO BE LOWERED

TO PROVIDE HIGH VEHICLE

CLEARANCE (5.3m) BENEATH

RAILWAY

PLAN

LONGITUDINAL SECTION

0 100

HORIZONTAL SCALE 1:5000m

200 300 400 500

VERTICAL SCALE 1:1000m

0 20 40 60 80 100

PRELIMINARY ROUTE OPTION

ROAD CLOSURE

LEGEND - PLAN:

INTERSECTION UPGRADE -

TREATMENT TO BE DETERMINED

EMBANKMENT

CLARENCE RIVER

LEGEND - LONGITUDINAL SECTION:

1. Q100 YEAR FLOOD LEVELS BASED ON LOWER

CLARENCE RIVER FLOOD STUDY REVIEW (WBM

2004).

2. INTERSECTIONS REQUIRING AN UPGRADE

INCLUDE:

• WHERE THE ESTIMATED NUMBER OF

VEHICLES APPROACHING THE

INTERSECTIONS IS RELATIVELY HIGH IN 2019

AND WOULD REQUIRE INTERSECTION

IMPROVEMENTS.

• THOSE THAT WILL REQUIRE AN UPGRADE TO

ACCOMMODATE TURNING VEHICLES.

NOTES

REGISTRATION NUMBER

DRAWING SHEET No.

No. Amendment Description Initials Date

This sheet may be prepared using colour and may be incomplete if copiedA1 original

SCALES

DESIGNED

REVIEWED

FILE No. PRINTED DATE

Arup Pty Ltd

ABN 18 000 966 165

ROADS AND MARITIME SERVICES

06/12/2011

9

220422_SK6009.dwg

-

0083.086.BA.2016

CLARENCE VALLEY COUNCIL

MAIN ROAD 83 - SUMMERLAND WAY

ADDITIONAL CROSSING OF THE CLARENCE RIVER AT GRAFTON

CORRIDOR 2 - PRELIMINARY ROUTE OPTION I

PLAN AND LONGITUDINAL SECTION

A

B

C

D

E

PROR - PART 2 - DRAFT 1

PROR - PARTS 1 & 2 - DRAFT 2

PROR - PARTS 1 & 2 - DRAFT 3

PROR - PARTS 1 & 2 - ISSUE

PROR - FINAL - RMS NAME UPDATED

REB

30/08/2011

REB 26/09/2011

REB 6/10/2011

REB 24/10/2011

REB 6/12/2011

Created using CADplot http://www.oasys-

software.com/cadplot/

Page 11: Preliminary Route Options Report€¦ · woodward st oliver st bacon st prince st pound st railway welley ave villiers st dobie st kent st proposed bridge option alignment as shown

G

W

Y

D

I

R

H

W

Y

C

L

A

R

E

N

C

E

R

I

V

E

R

A

R

M

I

D

A

L

E

S

T

S

P

R

I

N

G

S

T

I

O

L

A

N

T

H

E

S

T

T

H

R

O

U

G

H

S

T

C

L

A

R

E

N

C

E

S

T

R

A

I

L

W

A

Y

V

I

C

T

O

R

I

A

S

T

P

R

I

N

C

E

S

T

S

P

R

I

N

G

S

T

P

O

U

N

D

S

T

D

U

K

E

S

T

B

A

C

O

N

S

T

B

E

N

T

S

T

W

H

A

R

F

S

T

K

E

L

L

Y

S

T

M

A

IN

N

O

R

T

H

E

R

N

D

O

B

I

E

S

T

R

Y

A

N

S

T

B

E

N

T

S

T

F

I

T

Z

R

O

Y

S

T

PA

CIF

IC

H

WY

F

E

D

E

R

A

T

I

O

N

S

T

P

A

C

I

F

I

C

H

W

Y

R

E

I

D

S

T

H

U

N

T

E

R

S

T

H

E

B

E

R

S

T

VILLIERS ST TO BE LOWERED

TO PROVIDE HIGH VEHICLE

CLEARANCE (5.3m) BENEATH

RAILWAY

VIADUCT OVER

RAILWAY

CLARENCE ST

CLOSURE DEVIATED

TO FITZROY ST

A

L

I

P

O

U

C

R

E

E

K

A

L

I

P

O

U

S

T

OPTION ALIGNMENT AS

SHOWN IN JUNE 2011

COMMUNITY UPDATE

2

5

0

500

750

1000

1250

1

5

0

0

1

7

5

0

2

0

0

0

2

2

5

0

0

.

0

0

0

T

P

2

5

6

.

5

5

3

T

P

468.475 T

P

1262.419 T

P

1

8

2

8

.

3

3

4

T

P

2

0

7

2

.

5

4

8

T

P

2

2

1

3

.2

5

1

T

P

2

2

9

5

.3

5

0

T

P

2

3

5

9

.

3

7

3

T

P

2

4

3

1

.

1

0

7

T

P

EXISTING

BRIDGE

PROPOSED

BRIDGE

C

R

A

I

G

S

T

PLAN

LONGITUDINAL SECTION

0 100

HORIZONTAL SCALE 1:5000m

200 300 400 500

VERTICAL SCALE 1:1000m

0 20 40 60 80 100

PRELIMINARY ROUTE OPTION

ROAD CLOSURE

LEGEND - PLAN:

OPTION ALIGNMENT AS SHOWN IN

JUNE 2011 COMMUNITY UPDATE

INTERSECTION UPGRADE -

TREATMENT TO BE DETERMINED

EMBANKMENT

CLARENCE RIVER

LEGEND - LONGITUDINAL SECTION:

NOTES

1. Q100 YEAR FLOOD LEVELS BASED ON

LOWER CLARENCE RIVER FLOOD STUDY

REVIEW (WBM 2004).

2. IN ADDITION TO THE INTERSECTION

UPGRADES SHOWN ON THE PLAN, THE

OPTION WOULD INCLUDE AN UPGRADE

OF THE FOLLOWING INTERSECTIONS :

- FITZROY ST / PRINCE ST

3. INTERSECTIONS REQUIRING AN

UPGRADE INCLUDE:

• WHERE THE ESTIMATED NUMBER OF

VEHICLES APPROACHING THE

INTERSECTIONS IS RELATIVELY

HIGH IN 2019 AND WOULD REQUIRE

INTERSECTION IMPROVEMENTS.

• THOSE THAT WILL REQUIRE AN

UPGRADE TO ACCOMMODATE

TURNING VEHICLES.

REGISTRATION NUMBER

DRAWING SHEET No.

No. Amendment Description Initials Date

This sheet may be prepared using colour and may be incomplete if copiedA1 original

SCALES

DESIGNED

REVIEWED

FILE No. PRINTED DATE

Arup Pty Ltd

ABN 18 000 966 165

ROADS AND MARITIME SERVICES

06/12/2011

10

220422_SK6010.dwg

-

0083.086.BA.2016

CLARENCE VALLEY COUNCIL

MAIN ROAD 83 - SUMMERLAND WAY

ADDITIONAL CROSSING OF THE CLARENCE RIVER AT GRAFTON

CORRIDOR 2 - PRELIMINARY ROUTE OPTION 8

PLAN AND LONGITUDINAL SECTION

A

B

C

D

E

PROR - PART 2 - DRAFT 1

PROR - PARTS 1 & 2 - DRAFT 2

PROR - PARTS 1 & 2 - DRAFT 3

PROR - PARTS 1 & 2 - ISSUE

PROR - FINAL - RMS NAME UPDATED

REB

30/08/2011

REB 26/09/2011

REB 6/10/2011

REB 24/10/2011

REB 6/12/2011

Created using CADplot http://www.oasys-

software.com/cadplot/

Page 12: Preliminary Route Options Report€¦ · woodward st oliver st bacon st prince st pound st railway welley ave villiers st dobie st kent st proposed bridge option alignment as shown

C

L

A

R

E

N

C

E

R

I

V

E

R

I

O

L

A

N

T

H

E

S

T

T

H

R

O

U

G

H

S

T

C

L

A

R

E

N

C

E

S

T

R

A

I

L

W

A

Y

V

I

C

T

O

R

I

A

S

T

P

R

I

N

C

E

S

T

S

P

R

I

N

G

S

T

P

O

U

N

D

S

T

D

U

K

E

S

T

B

A

C

O

N

S

T

M

A

I

N

D

O

B

I

E

S

T

B

E

N

T

S

T

F

I

T

Z

R

O

Y

S

T

P

A

C

IF

IC

H

W

Y

Q

U

E

E

N

S

T

H

E

B

E

R

S

T

VIADUCT

A

L

I

P

O

U

CR

EE

K

A

L

I

P

O

U

S

T

VILLIERS ST TO BE LOWERED

TO PROVIDE HIGH VEHICLE

CLEARANCE (5.3m) BENEATH

RAILWAY

POUND ST TO BE LOWERED

TO PROVIDE HIGH VEHICLE

CLEARANCE (5.3m) BENEATH

RAILWAY

OPTION ALIGNMENT AS

SHOWN IN JUNE 2011

COMMUNITY UPDATE

0

250

500

750

1

0

0

0

1

2

5

0

1

5

0

0

1

7

5

0

0.000 T

P

666.122 T

P

1

2

9

9

.

7

0

9

T

P

1

9

4

9

.

7

5

0

T

P

EXISTING

BRIDGE

PROPOSED

BRIDGE

N

O

R

TH

E

R

N

PLAN

LONGITUDINAL SECTION

0 100

HORIZONTAL SCALE 1:5000m

200 300 400 500

VERTICAL SCALE 1:1000m

0 20 40 60 80 100

EMBANKMENT

CLARENCE RIVER

LEGEND - LONGITUDINAL SECTION:

PRELIMINARY ROUTE OPTION

LEGEND - PLAN:

OPTION ALIGNMENT AS SHOWN IN

JUNE 2011 COMMUNITY UPDATE

INTERSECTION UPGRADE -

TREATMENT TO BE DETERMINED

NOTES

1. Q100 YEAR FLOOD LEVELS BASED ON WBM LOWER

CLARENCE RIVER FLOOD STUDY 2004.

2. IN ADDITION TO THE INTERSECTION UPGRADES

SHOWN ON THE PLAN, THE OPTION WOULD

INCLUDE AN UPGRADE OF THE FOLLOWING

INTERSECTIONS :

- PACIFIC HWY / GWYDIR HWY

- GWYDIR HWY / BENT ST

3. INTERSECTIONS REQUIRING AN UPGRADE

INCLUDE:

• WHERE THE ESTIMATED NUMBER OF

VEHICLES APPROACHING THE INTERSECTIONS

IS RELATIVELY HIGH IN 2019 AND WOULD

REQUIRE INTERSECTION IMPROVEMENTS.

• THOSE THAT WILL REQUIRE AN UPGRADE TO

ACCOMMODATE TURNING VEHICLES.

REGISTRATION NUMBER

DRAWING SHEET No.

No. Amendment Description Initials Date

This sheet may be prepared using colour and may be incomplete if copiedA1 original

SCALES

DESIGNED

REVIEWED

FILE No. PRINTED DATE

Arup Pty Ltd

ABN 18 000 966 165

ROADS AND MARITIME SERVICES

06/12/2011

11

220422_SK6011.dwg

-

0083.086.BA.2016

CLARENCE VALLEY COUNCIL

MAIN ROAD 83 - SUMMERLAND WAY

ADDITIONAL CROSSING OF THE CLARENCE RIVER AT GRAFTON

CORRIDOR 2 - PRELIMINARY ROUTE OPTION 9

PLAN AND LONGITUDINAL SECTION

A

B

C

D

E

PROR - PART 2 - DRAFT 1

PROR - PARTS 1 & 2 - DRAFT 2

PROR - PARTS 1 & 2 - DRAFT 3

PROR - PARTS 1 & 2 - ISSUE

PROR - FINAL - RMS NAME UPDATED

REB

30/08/2011

REB 26/09/2011

REB 6/10/2011

REB 24/10/2011

REB 6/12/2011

Created using CADplot http://www.oasys-

software.com/cadplot/

Page 13: Preliminary Route Options Report€¦ · woodward st oliver st bacon st prince st pound st railway welley ave villiers st dobie st kent st proposed bridge option alignment as shown

C

L

A

R

E

N

C

E

R

I

V

E

R

P

A

C

I

F

I

C

H

W

Y

I

O

L

A

N

T

H

E

S

T

T

H

R

O

U

G

H

S

T

C

L

A

R

E

N

C

E

S

T

R

A

I

L

W

A

Y

S

P

R

I

N

G

S

T

P

O

U

N

D

S

T

D

U

K

E

S

T

B

A

C

O

N

S

T

M

A

I

N

N

O

R

T

H

E

R

N

D

O

B

I

E

S

T

B

E

N

T

S

T

F

I

T

Z

R

O

Y

S

T

P

A

C

IF

IC

H

W

Y

0

.

0

0

0

T

P

2

5

0

5

0

0

7

5

0

1000

1

2

5

0

1

5

0

0

1

7

5

0

2

0

0

0

8

0

4

.

9

3

9

T

P

1

2

8

6

.

2

1

9

T

P

2

1

5

5

.

8

4

3

T

P

A

L

I

P

O

U

CR

EE

K

A

L

I

P

O

U

S

TPROPOSED

BRIDGE

EXISTING

BRIDGE

VIADUCT

VILLIERS ST TO BE LOWERED TO

PROVIDE HIGH VEHICLE CLEARANCE

(5.3m) BENEATH RAILWAY

PLAN

LONGITUDINAL SECTION

0 100

HORIZONTAL SCALE 1:5000m

200 300 400 500

VERTICAL SCALE 1:1000m

0 20 40 60 80 100

PRELIMINARY ROUTE OPTION

ROAD CLOSURE

LEGEND - PLAN:

INTERSECTION UPGRADE -

TREATMENT TO BE DETERMINED

EMBANKMENT

CLARENCE RIVER

LEGEND - LONGITUDINAL SECTION:

NOTES

1. Q100 YEAR FLOOD LEVELS BASED ON WBM

LOWER CLARENCE RIVER FLOOD STUDY 2004.

2. IN ADDITION TO THE INTERSECTION

UPGRADES SHOWN ON THE PLAN, THE

OPTION WOULD INCLUDE AN UPGRADE OF

THE FOLLOWING INTERSECTIONS :

- PACIFIC HWY / GWYDIR HWY

- GWYDIR HWY / BENT ST

3. INTERSECTIONS REQUIRING AN UPGRADE

INCLUDE:

• WHERE THE ESTIMATED NUMBER OF

VEHICLES APPROACHING THE

INTERSECTIONS IS RELATIVELY HIGH IN

2019 AND WOULD REQUIRE

INTERSECTION IMPROVEMENTS.

• THOSE THAT WILL REQUIRE AN UPGRADE

TO ACCOMMODATE TURNING VEHICLES.

REGISTRATION NUMBER

DRAWING SHEET No.

No. Amendment Description Initials Date

This sheet may be prepared using colour and may be incomplete if copiedA1 original

SCALES

DESIGNED

REVIEWED

FILE No. PRINTED DATE

Arup Pty Ltd

ABN 18 000 966 165

ROADS AND MARITIME SERVICES

06/12/2011

12

220422_SK6012.dwg

-

0083.086.BA.2016

CLARENCE VALLEY COUNCIL

MAIN ROAD 83 - SUMMERLAND WAY

ADDITIONAL CROSSING OF THE CLARENCE RIVER AT GRAFTON

CORRIDOR 2 - PRELIMINARY ROUTE OPTION 10

PLAN AND LONGITUDINAL SECTION

A

B

C

D

E

PROR - PART 2 - DRAFT 1

PROR - PARTS 1 & 2 - DRAFT 2

PROR - PARTS 1 & 2 - DRAFT 3

PROR - PARTS 1 & 2 - ISSUE

PROR - FINAL - RMS NAME UPDATED

REB

30/08/2011

REB 26/09/2011

REB 6/10/2011

REB 24/10/2011

REB 6/12/2011