⚡Presentation _CHEMICAL CLEANING OF PRE-BOILER SYSTEM. OBJECTIVES To remove dirt,oil,grease etc., from Condensate,Feed water, Drip and Extraction steam lines of HP and

Embed Size (px)

Citation preview

  • 8/19/2019 ⚡Presentation _CHEMICAL CLEANING OF PRE-BOILER SYSTEM. OBJECTIVES To remove dirt,oil,grease etc., from Co…

    1/12

    3/15/2016 ⚡Presentation "CHEMICAL CLEANING OF PRE-BOILER SYSTEM. OBJECTIVES To remove dirt,oil,grease etc., from Condensate,Feed water, D…

    http://slideplayer.com/slide/3817737/ 1/12

    Search…   Search Upload

    0

    Presentation on theme: "CHEMICAL CLEANING OF PRE-BOILER SYSTEM.

    OBJECTIVES To remove dirt,oil,grease etc., from Condensate,Feed water, Drip and

    Extraction steam lines of HP and." — Presentation transcript:

    Slide 1

    CHEMICAL CLEANING OF PRE-BOILER SYSTEM

    Download Code

    CHEMICAL CLEANING OF PRE-BOILER SYSTEM. OBJECTIVES To removedirt,oil,grease etc., from Condensate,Feed water, Drip and Extraction steam lines of HP and.Publish Mckenna Darnley, Modified 6 years ago

    9views

    ► Water Pumps

    ► Steam Boiler 

    ► Gas Water Boiler 

     Ads by Google

    Gmail for Work

    Look more professional with

    custom Gmail from GoogleStart free trial

      ► Steam Boiler    ► Centrifugal Pumps   ► Hydraulic Pump   ► Plumbing a Boiler  Ads by Google

    https://googleads.g.doubleclick.net/pagead/ads?client=ca-pub-8693394182295906&output=html&h=90&slotname=2435655075&adk=2767657104&w=200&lmt=1457981082&loeid=312815106&flash=18.0.0&url=http%3A%2F%2Fslideplayer.com%2Fslide%2F3817737%2F&wgl=1&dt=1457981074578&bpp=1568&bdt=31354&fdt=1978&idt=7464&shv=r20160308&cbv=r20151006&saldr=aa&correlator=1695809454081&frm=20&ga_vid=*&ga_sid=*&ga_hid=*&ga_fc=0&pv=2&iag=3&icsg=2&nhd=1&dssz=2&mdo=0&mso=0&u_tz=330&u_his=1&u_java=1&u_h=768&u_w=1366&u_ah=728&u_aw=1366&u_cd=24&u_nplug=5&u_nmime=7&dff=lucida%20grande&dfs=12&biw=1349&bih=599&eid=575144605&ref=http%3A%2F%2Fslideplayer.com%2Fslide%2F6084531%2F&rx=0&eae=0&fc=208&pc=1&brdim=0%2C0%2C0%2C0%2C1366%2C0%2C1366%2C728%2C1366%2C599&vis=2&rsz=%7C%7Cl%7C&abl=CS&ppjl=f&pfx=0&fu=16&bc=1&ifi=1&xpc=rXH5aBnqx2&p=http%3A//slideplayer.com&dtd=8258&rl_rc=true&adsense_enabled=true&ad_type=text&oe=utf8&height=90&width=200&format=fpkc_al_lp&prev_fmts=200x90_0ads_al&kw_type=radlink&hl=en&kw0=Water+Pumps&kw1=Steam+Boiler&kw2=Gas+Water+Boiler&okw=Water+Pumps&rt=ChBW5wbdAAU9gwpohQw7BMG2EgtXYXRlciBQdW1wcxoI7QwE_A1gmH0gqK72DygBSKiu9g9SEwiO3_OD68DLAhXYHmgKHU57ARUhttps://www.google.com/url?ct=abg&q=https://www.google.com/adsense/support/bin/request.py%3Fcontact%3Dabg_afc%26url%3Dhttp://slideplayer.com/slide/3817737/%26gl%3DIN%26hl%3Den%26client%3Dca-pub-8693394182295906%26ai0%3D&usg=AFQjCNG3kOHSylbajITrMs8dNFy0Jo7m9Qhttps://googleads.g.doubleclick.net/pagead/ads?client=ca-pub-8693394182295906&output=html&h=15&slotname=4149342671&adk=1620207087&w=728&lmt=1457981117&loeid=312815106&flash=18.0.0&url=http%3A%2F%2Fslideplayer.com%2Fslide%2F3817737%2F&wgl=1&dt=1457981078888&bpp=551&bdt=35664&fdt=37942&idt=38703&shv=r20160308&cbv=r20151006&saldr=aa&prev_fmts=728x15_0ads_al&prev_slotnames=2435655075&correlator=1695809454081&frm=20&ga_vid=*&ga_sid=*&ga_hid=*&ga_fc=0&pv=1&iag=3&icsg=2&nhd=1&dssz=2&mdo=0&mso=0&u_tz=330&u_his=1&u_java=1&u_h=768&u_w=1366&u_ah=728&u_aw=1366&u_cd=24&u_nplug=5&u_nmime=7&dff=helvetica%20neue&dfs=13&biw=1349&bih=599&eid=575144605&ref=http%3A%2F%2Fslideplayer.com%2Fslide%2F6084531%2F&rx=0&eae=0&fc=208&pc=1&brdim=0%2C0%2C0%2C0%2C1366%2C0%2C1366%2C728%2C1366%2C599&vis=2&rsz=%7C%7Ca%7C&abl=CA&ppjl=f&pfx=0&fu=16&bc=1&ifi=5&xpc=UxhoQjqUwr&p=http%3A//slideplayer.com&dtd=38837&rl_rc=true&adsense_enabled=true&ad_type=text&oe=utf8&height=15&width=728&format=fpkc_al_lp&kw_type=radlink&hl=en&kw0=Steam+Boiler&kw1=Centrifugal+Pumps&kw2=Hydraulic+Pump&kw3=Plumbing+a+Boiler&okw=Plumbing+a+Boiler&rt=ChBW5wb_AA3A1ApoJMFVCZcOEhFQbHVtYmluZyBhIEJvaWxlchoIdmCeX7cIUpYgqK72DygBMAJIqK72D1ITCIvFs5TrwMsCFYmJaAod9mcHTghttps://googleads.g.doubleclick.net/pagead/ads?client=ca-pub-8693394182295906&output=html&h=15&slotname=4149342671&adk=1620207087&w=728&lmt=1457981117&loeid=312815106&flash=18.0.0&url=http%3A%2F%2Fslideplayer.com%2Fslide%2F3817737%2F&wgl=1&dt=1457981078888&bpp=551&bdt=35664&fdt=37942&idt=38703&shv=r20160308&cbv=r20151006&saldr=aa&prev_fmts=728x15_0ads_al&prev_slotnames=2435655075&correlator=1695809454081&frm=20&ga_vid=*&ga_sid=*&ga_hid=*&ga_fc=0&pv=1&iag=3&icsg=2&nhd=1&dssz=2&mdo=0&mso=0&u_tz=330&u_his=1&u_java=1&u_h=768&u_w=1366&u_ah=728&u_aw=1366&u_cd=24&u_nplug=5&u_nmime=7&dff=helvetica%20neue&dfs=13&biw=1349&bih=599&eid=575144605&ref=http%3A%2F%2Fslideplayer.com%2Fslide%2F6084531%2F&rx=0&eae=0&fc=208&pc=1&brdim=0%2C0%2C0%2C0%2C1366%2C0%2C1366%2C728%2C1366%2C599&vis=2&rsz=%7C%7Ca%7C&abl=CA&ppjl=f&pfx=0&fu=16&bc=1&ifi=5&xpc=UxhoQjqUwr&p=http%3A//slideplayer.com&dtd=38837&rl_rc=true&adsense_enabled=true&ad_type=text&oe=utf8&height=15&width=728&format=fpkc_al_lp&kw_type=radlink&hl=en&kw0=Steam+Boiler&kw1=Centrifugal+Pumps&kw2=Hydraulic+Pump&kw3=Plumbing+a+Boiler&okw=Hydraulic+Pump&rt=ChBW5wb_AA3A0wpoJMFVCZcOEg5IeWRyYXVsaWMgUHVtcBoI59iibspHgrsgqK72DygBMAJIqK72D1ITCIvFs5TrwMsCFYmJaAod9mcHTghttps://googleads.g.doubleclick.net/pagead/ads?client=ca-pub-8693394182295906&output=html&h=15&slotname=4149342671&adk=1620207087&w=728&lmt=1457981117&loeid=312815106&flash=18.0.0&url=http%3A%2F%2Fslideplayer.com%2Fslide%2F3817737%2F&wgl=1&dt=1457981078888&bpp=551&bdt=35664&fdt=37942&idt=38703&shv=r20160308&cbv=r20151006&saldr=aa&prev_fmts=728x15_0ads_al&prev_slotnames=2435655075&correlator=1695809454081&frm=20&ga_vid=*&ga_sid=*&ga_hid=*&ga_fc=0&pv=1&iag=3&icsg=2&nhd=1&dssz=2&mdo=0&mso=0&u_tz=330&u_his=1&u_java=1&u_h=768&u_w=1366&u_ah=728&u_aw=1366&u_cd=24&u_nplug=5&u_nmime=7&dff=helvetica%20neue&dfs=13&biw=1349&bih=599&eid=575144605&ref=http%3A%2F%2Fslideplayer.com%2Fslide%2F6084531%2F&rx=0&eae=0&fc=208&pc=1&brdim=0%2C0%2C0%2C0%2C1366%2C0%2C1366%2C728%2C1366%2C599&vis=2&rsz=%7C%7Ca%7C&abl=CA&ppjl=f&pfx=0&fu=16&bc=1&ifi=5&xpc=UxhoQjqUwr&p=http%3A//slideplayer.com&dtd=38837&rl_rc=true&adsense_enabled=true&ad_type=text&oe=utf8&height=15&width=728&format=fpkc_al_lp&kw_type=radlink&hl=en&kw0=Steam+Boiler&kw1=Centrifugal+Pumps&kw2=Hydraulic+Pump&kw3=Plumbing+a+Boiler&okw=Centrifugal+Pumps&rt=ChBW5wb_AA3A0ApoJMFVCZcOEhFDZW50cmlmdWdhbCBQdW1wcxoIQHv_qnM4ks4gqK72DygBMAJIqK72D1ITCIvFs5TrwMsCFYmJaAod9mcHTghttps://googleads.g.doubleclick.net/pagead/ads?client=ca-pub-8693394182295906&output=html&h=15&slotname=4149342671&adk=1620207087&w=728&lmt=1457981117&loeid=312815106&flash=18.0.0&url=http%3A%2F%2Fslideplayer.com%2Fslide%2F3817737%2F&wgl=1&dt=1457981078888&bpp=551&bdt=35664&fdt=37942&idt=38703&shv=r20160308&cbv=r20151006&saldr=aa&prev_fmts=728x15_0ads_al&prev_slotnames=2435655075&correlator=1695809454081&frm=20&ga_vid=*&ga_sid=*&ga_hid=*&ga_fc=0&pv=1&iag=3&icsg=2&nhd=1&dssz=2&mdo=0&mso=0&u_tz=330&u_his=1&u_java=1&u_h=768&u_w=1366&u_ah=728&u_aw=1366&u_cd=24&u_nplug=5&u_nmime=7&dff=helvetica%20neue&dfs=13&biw=1349&bih=599&eid=575144605&ref=http%3A%2F%2Fslideplayer.com%2Fslide%2F6084531%2F&rx=0&eae=0&fc=208&pc=1&brdim=0%2C0%2C0%2C0%2C1366%2C0%2C1366%2C728%2C1366%2C599&vis=2&rsz=%7C%7Ca%7C&abl=CA&ppjl=f&pfx=0&fu=16&bc=1&ifi=5&xpc=UxhoQjqUwr&p=http%3A//slideplayer.com&dtd=38837&rl_rc=true&adsense_enabled=true&ad_type=text&oe=utf8&height=15&width=728&format=fpkc_al_lp&kw_type=radlink&hl=en&kw0=Steam+Boiler&kw1=Centrifugal+Pumps&kw2=Hydraulic+Pump&kw3=Plumbing+a+Boiler&okw=Steam+Boiler&rt=ChBW5wb_AA3AxQpoJMFVCZcOEgxTdGVhbSBCb2lsZXIaCBOhP_XnevouIKiu9g8oATACSKiu9g9SEwiLxbOU68DLAhWJiWgKHfZnB04http://www.googleadservices.com/pagead/aclk?sa=L&ai=CouCU-AbnVpH6IsS9oAP-rp-wB7ibv50HkNeKvOMB0ITdoJkCEAEgqqqmImDlwuSDpA6gAYDLkdADyAECqAMByAPBBKoEjgFP0Ha3EQ6FpMsdvkR0C7ml5AV3Av2n9iOK1mM0kdZ6w5EEOEPQ4l54izCZx8yECjY9ulp5lXvO44Yd552LyRsI0fRigQFBQJPfNMJaxko7VwhT_V3dR4Zrv1RJuHwto8yRfHfRmSZ9X2L95jdhzjjwgvJcnhqnZEfPS8UnbwYMpuJtI8avLmxsqQQPSW74iAYBoAYCgAfotO4vqAemvhvYBwE&num=1&cid=5GgF1AI6JeTmAOPX3fhJYpq5&sig=AOD64_067y_HshhOyC3CY7NFsss9iIwgDA&client=ca-pub-8693394182295906&adurl=http://info.terragotech.com/GA/TerraGo-Definitive-Guide-GPS-Data-Collectionhttp://www.googleadservices.com/pagead/aclk?sa=L&ai=C9RuW9AbnVqUDjqWgA4K9qqgNuJu_nQeI2Iq84wHQhN2gmQIQASCqqqYiYOXC5IOkDqABgMuR0APIAQKoAwHIA8EEqgSOAU_QgSF98mVRaTqREey7F_-eFkXXF_jun7vJIS-A0bGcZfPW2cmIgIwHCS5hBvMSocSiB-i8sDt9LlTgong5wzWhj2f8GovtNvGvyhZQgxGGXbTdQyO_EiyveaF5mPucW4J_HCjwXfQed-c8sT4oW5ujeZkHoexAgN_23OXe74j-dJQWnuX9qjtvLOElYeaIBgGgBgKAB-i07i-oB6a-G9gHAQ&num=1&cid=5Gi4KIDWOuQp-vHvRZcLLBwW&sig=AOD64_1Yve-G-qwomPK0D4Emn_LLpylRPw&client=ca-pub-8693394182295906&adurl=http://info.terragotech.com/GA/TerraGo-Definitive-Guide-GPS-Data-Collectionhttps://www.google.com/url?ct=abg&q=https://www.google.com/adsense/support/bin/request.py%3Fcontact%3Dabg_afc%26url%3Dhttp://slideplayer.com/slide/3817737/%26gl%3DIN%26hl%3Den%26client%3Dca-pub-8693394182295906%26ai0%3D&usg=AFQjCNG3kOHSylbajITrMs8dNFy0Jo7m9Qhttps://googleads.g.doubleclick.net/pagead/ads?client=ca-pub-8693394182295906&output=html&h=90&slotname=2435655075&adk=2767657104&w=200&lmt=1457981082&loeid=312815106&flash=18.0.0&url=http%3A%2F%2Fslideplayer.com%2Fslide%2F3817737%2F&wgl=1&dt=1457981074578&bpp=1568&bdt=31354&fdt=1978&idt=7464&shv=r20160308&cbv=r20151006&saldr=aa&correlator=1695809454081&frm=20&ga_vid=*&ga_sid=*&ga_hid=*&ga_fc=0&pv=2&iag=3&icsg=2&nhd=1&dssz=2&mdo=0&mso=0&u_tz=330&u_his=1&u_java=1&u_h=768&u_w=1366&u_ah=728&u_aw=1366&u_cd=24&u_nplug=5&u_nmime=7&dff=lucida%20grande&dfs=12&biw=1349&bih=599&eid=575144605&ref=http%3A%2F%2Fslideplayer.com%2Fslide%2F6084531%2F&rx=0&eae=0&fc=208&pc=1&brdim=0%2C0%2C0%2C0%2C1366%2C0%2C1366%2C728%2C1366%2C599&vis=2&rsz=%7C%7Cl%7C&abl=CS&ppjl=f&pfx=0&fu=16&bc=1&ifi=1&xpc=rXH5aBnqx2&p=http%3A//slideplayer.com&dtd=8258&rl_rc=true&adsense_enabled=true&ad_type=text&oe=utf8&height=90&width=200&format=fpkc_al_lp&prev_fmts=200x90_0ads_al&kw_type=radlink&hl=en&kw0=Water+Pumps&kw1=Steam+Boiler&kw2=Gas+Water+Boiler&okw=Gas+Water+Boiler&rt=ChBW5wbdAAU9kgpohQw7BMG2EhBHYXMgV2F0ZXIgQm9pbGVyGgg4IYvUAx0MRiCorvYPKAFIqK72D1ITCI7f84PrwMsCFdgeaAodTnsBFQhttps://googleads.g.doubleclick.net/pagead/ads?client=ca-pub-8693394182295906&output=html&h=90&slotname=2435655075&adk=2767657104&w=200&lmt=1457981082&loeid=312815106&flash=18.0.0&url=http%3A%2F%2Fslideplayer.com%2Fslide%2F3817737%2F&wgl=1&dt=1457981074578&bpp=1568&bdt=31354&fdt=1978&idt=7464&shv=r20160308&cbv=r20151006&saldr=aa&correlator=1695809454081&frm=20&ga_vid=*&ga_sid=*&ga_hid=*&ga_fc=0&pv=2&iag=3&icsg=2&nhd=1&dssz=2&mdo=0&mso=0&u_tz=330&u_his=1&u_java=1&u_h=768&u_w=1366&u_ah=728&u_aw=1366&u_cd=24&u_nplug=5&u_nmime=7&dff=lucida%20grande&dfs=12&biw=1349&bih=599&eid=575144605&ref=http%3A%2F%2Fslideplayer.com%2Fslide%2F6084531%2F&rx=0&eae=0&fc=208&pc=1&brdim=0%2C0%2C0%2C0%2C1366%2C0%2C1366%2C728%2C1366%2C599&vis=2&rsz=%7C%7Cl%7C&abl=CS&ppjl=f&pfx=0&fu=16&bc=1&ifi=1&xpc=rXH5aBnqx2&p=http%3A//slideplayer.com&dtd=8258&rl_rc=true&adsense_enabled=true&ad_type=text&oe=utf8&height=90&width=200&format=fpkc_al_lp&prev_fmts=200x90_0ads_al&kw_type=radlink&hl=en&kw0=Water+Pumps&kw1=Steam+Boiler&kw2=Gas+Water+Boiler&okw=Steam+Boiler&rt=ChBW5wbdAAU9kApohQw7BMG2EgxTdGVhbSBCb2lsZXIaCKzZC0rr1BTRIKiu9g8oAUiorvYPUhMIjt_zg-vAywIV2B5oCh1OewEVhttps://googleads.g.doubleclick.net/pagead/ads?client=ca-pub-8693394182295906&output=html&h=90&slotname=2435655075&adk=2767657104&w=200&lmt=1457981082&loeid=312815106&flash=18.0.0&url=http%3A%2F%2Fslideplayer.com%2Fslide%2F3817737%2F&wgl=1&dt=1457981074578&bpp=1568&bdt=31354&fdt=1978&idt=7464&shv=r20160308&cbv=r20151006&saldr=aa&correlator=1695809454081&frm=20&ga_vid=*&ga_sid=*&ga_hid=*&ga_fc=0&pv=2&iag=3&icsg=2&nhd=1&dssz=2&mdo=0&mso=0&u_tz=330&u_his=1&u_java=1&u_h=768&u_w=1366&u_ah=728&u_aw=1366&u_cd=24&u_nplug=5&u_nmime=7&dff=lucida%20grande&dfs=12&biw=1349&bih=599&eid=575144605&ref=http%3A%2F%2Fslideplayer.com%2Fslide%2F6084531%2F&rx=0&eae=0&fc=208&pc=1&brdim=0%2C0%2C0%2C0%2C1366%2C0%2C1366%2C728%2C1366%2C599&vis=2&rsz=%7C%7Cl%7C&abl=CS&ppjl=f&pfx=0&fu=16&bc=1&ifi=1&xpc=rXH5aBnqx2&p=http%3A//slideplayer.com&dtd=8258&rl_rc=true&adsense_enabled=true&ad_type=text&oe=utf8&height=90&width=200&format=fpkc_al_lp&prev_fmts=200x90_0ads_al&kw_type=radlink&hl=en&kw0=Water+Pumps&kw1=Steam+Boiler&kw2=Gas+Water+Boiler&okw=Water+Pumps&rt=ChBW5wbdAAU9gwpohQw7BMG2EgtXYXRlciBQdW1wcxoI7QwE_A1gmH0gqK72DygBSKiu9g9SEwiO3_OD68DLAhXYHmgKHU57ARUhttp://slideplayer.com/user/4581661/http://slideplayer.com/user/slides/

  • 8/19/2019 ⚡Presentation _CHEMICAL CLEANING OF PRE-BOILER SYSTEM. OBJECTIVES To remove dirt,oil,grease etc., from Co…

    2/12

    3/15/2016 ⚡Presentation "CHEMICAL CLEANING OF PRE-BOILER SYSTEM. OBJECTIVES To remove dirt,oil,grease etc., from Condensate,Feed water, D…

    http://slideplayer.com/slide/3817737/ 2/12

    Slide 2

    OBJECTIVES To remove dirt,oil,grease etc., from Condensate,Feed water, Drip and Extraction

    steam lines of HP and LP heaters prior to putting these systems in regular service. This is to

    ensure flow of clean condensate and feed water to the boiler.

    Slide 3

    STATE OF THE PLANT Hydro-test of the entire system to be flushed declared completed. All the regenerative

    equipments are installed in position and temporary pipeline connection as per scheme is complete. The bore of the

    temporary pipelines should preferably be the same as that used in permanent system. All permanent support are

    provided for all the pipelines before flushing. Plugs to be provided in the safety valves of LPHs,water seal inlets in flash

    tanks and LPH 1 and in C&I tapping. Screens to be provided on booster pump suction line and acid cleaning pump

    suction line

    Slide 4

     Availability of auxiliary steam. Reagent preparation plant. Sampling points for each circuit. Level gauge on tank,

    pressure gauges and temperature indicators wherever required. All the cutting and welding work on instrument

    tapping points are complete upto isolating root valves. All the orifices,flow nozzles, control valves and NRV internals

    are removed and a checklist is prepared. Spool pieces are provided wherever required. Installation of temporary

    chemical cleaning pumps(2 nos.) and connected piping along with required instrumentation is complete. During post

    mounting cleaning it is proposed to use chemically clean water from condensate storage tank.

    Slide 5

    Readiness of process water supply system,condenser circulating water system with pump house. Availability of 

    compressed air. Proximate analysis laboratory facility. Power supply to acid cleaning pumps,CEPs,condensate

    emergency make up pumps, condensate normal make up pumps, motor operated valves and lighting.

    Slide 6

    EQUIPMENTS AND RESOURCES FOR WATER WASHING Condensate storage tanks. Condenser of volume 1000m 3 as a

    reservoir for storing the dematerialized water. Turbine condensate pumps (3 nos.). Chemical cleaning pumps(q=300t/h,h=80mwg,n=1500rpm)- 2nos. Compressor plant and pipeline Dn100 to supply air into the washing circuit

    with the parameters not less than q=20m 3 /min,p=0.6MPa Pipelines and valves Dn 20-300,Pn 1.6MPa

    Slide 7

    EQUIPMENT AND RESOURCES FOR CHEMICAL CLEANING AND PASSIVATION Deaerator and Feed Water Storage

    Tank. Chemical cleaning pumps (q=300t/h,h=80mwg,n=1500rpm)- 2nos. Pipelines and valves Dn 20-300,Pn 1.6MPa

    SG Package neutralizing basin for collecting the spent solutions. Reagent Preparation Plant designed for storage,

    preparation and supply of chemical reagents. Chemical reagents. Washing process controlling instruments (flowelements, pressure gauges, level gauges, temperature elements)

    Slide 8

  • 8/19/2019 ⚡Presentation _CHEMICAL CLEANING OF PRE-BOILER SYSTEM. OBJECTIVES To remove dirt,oil,grease etc., from Co…

    3/12

    3/15/2016 ⚡Presentation "CHEMICAL CLEANING OF PRE-BOILER SYSTEM. OBJECTIVES To remove dirt,oil,grease etc., from Condensate,Feed water, D…

    http://slideplayer.com/slide/3817737/ 3/12

    The pre-boiler system consists of Condensate system Drip system Feed water system Extraction steam lines to

    Regenerative Heaters

    Slide 9

    →  Condensate system comprises of 3 nos. of Condensate Extraction Pumps,Low Pressure Heaters, Gland Steam

    Cooler,Deaerator,connecting pipelines including excess condensate line upto Condensate storage tank.

    Slide 10

    →Feed water system comprises 2 nos. of motor driven boiler feed pumps,2 nos. of Turbine driven boiler feed

    pumps,their booster pumps and recirculation lines, high pressure heaters, their connecting pipelines upto econimiser

    inlet.Reheater and Superheater spray line are also included for the purpose of flushing.

    Slide 11

    →  Drip system comprises of the shell side of all LP and HP heaters and their normal and emergency drip lines.

    Slide 12

    →Extraction steam system consists of bled steam lines from different stages of Turbines (HPT,IPT and LPT) to LP and

    HP heaters,Deaerator and TDBFPs.

    Slide 13

    CLEANING METHOD Pre- mounting cleaning. Extraction steam lines to regenerative heaters Post-mounting cleaning.

    Feed water line,Condendate line and heater drip lines. Steam blowing. MS line,CRH line, HRH line,steam line to

    TDBFPs etc.

    Slide 14

    METHODS AND SCOPE OF CLEANING Post Mounting Cleaning Main Turbine and BFP Drive Turbine Condenser

    Cleaning. Hydro-pneumatic Washing with Demineralized Water of Unit Circulating System. Chemical Cleaning of Water–

    Steam path of Heater and Pipeline with hydrofluoric Acid solution. Chemical Passivation of Water-Steam path of Heater

    and Pipeline with Hydrogen Peroxide solution added with Ammonia.

    Slide 15

    Pre-Mounting Cleaning Chemical Cleaning of Pipelines in a bath of Hydrofluoric Acid solution. Spent solution

    displacement. Chemical Passivation of Pipelines with Hydrogen Peroxide solution added with ammonia. Air Blowing of 

    Passivated pipelines for drying.

    Slide 16

    Main Turbine and BFP Drive Turbine Condenser Cleaning or Condenser Degreasing. STEP- I The demineralized water is

    heated upto 70 0 c in the De-aerator FST. The Chemical solution prepared in reagent preparation plant is mixed with

    the hot water in the De-aerator FST.

  • 8/19/2019 ⚡Presentation _CHEMICAL CLEANING OF PRE-BOILER SYSTEM. OBJECTIVES To remove dirt,oil,grease etc., from Co…

    4/12

    3/15/2016 ⚡Presentation "CHEMICAL CLEANING OF PRE-BOILER SYSTEM. OBJECTIVES To remove dirt,oil,grease etc., from Condensate,Feed water, D…

    http://slideplayer.com/slide/3817737/ 4/12

    Slide 17

    The hot solution is transferred to Condenser with the help of temporary chemical cleaning pump through temporary

    pipelines connecting pump discharge header to the CEP discharge header and the cooling device sprayers of 

    Condenser. Circulation is completed by bringing this solution from condenser to Chemical Cleaning pump suction

    header through CEP suction header and temporary pipeline connection. Circulation is continued for 4 hrs. System is

    isolated after closing one temporary gate valve provided in the circuit (refer to scheme.)

    Slide 18

    FST DEAERATOR AUX.STEAM CHEMICAL BP ACID CLEANING PUMPS CONDENSERS CEPS

    Slide 19

    STEP –II CEPs are charged from water side by opening suction valve and through proper venting, keeping discharge

    valve in closed condition and suction strainer in position. Flushing started by alternately starting and stopping CEPs andcompleting the circulation from CEP discharge to CEP suction line through recirculation line and condenser.

    Slide 20

    Circulation is continued for 4 hrs. After cleaning the spent solution is pumped from condenser to neutralizing basin.

    Water washing of Condenser started and continued for 4 hrs. using the two circuits already described..

    Slide 21

    DEAERATOR FST AUX.STEAM CHEMICAL BP ACID CLEANING PUMPS CONDENSERS CEPS

    Slide 22

    Hydro-pneumatic Washing of Unit Circulating System with Demineralized Water and air. →  Hydro-pneumatic washing

    of unit circulating system is carried out step by step with simultaneous water and air supply. →Demineralized water for

    washing is stored in the De-aerator FST and Condenser. →Hydropneumatic washing is declared completed if 

    suspended matter content of the washing water reaches no more than 100mg/kg. →Hydro-pneumatic washing of unit

    circulating system is done using following four circuits.

    Slide 23

    CIRCUIT 1: Circuit 1A De-aerator FST – TDBFP A booster pump suction line – BP strainers – Temporary header

    connecting the BP suction lines downstream of the strainers – Acid cleaning pumps – Temporary discharge header –

    Temporary lines to the discharge gate valves of four feed pumps – Feed lines to HPH – Bypass line of all HPH – HPH

    bypass lines – Water path of HPH 6,7,8 – Feed water line upto boiler feed control unit – Temporary discharge line to

    the circulating water line - De-aerator FST.

    Slide 24

    Circuit 1B De-aerator FST – TDBFP B booster pump suction line – BP strainers – Temporary header connecting the BP

  • 8/19/2019 ⚡Presentation _CHEMICAL CLEANING OF PRE-BOILER SYSTEM. OBJECTIVES To remove dirt,oil,grease etc., from Co…

    5/12

    3/15/2016 ⚡Presentation "CHEMICAL CLEANING OF PRE-BOILER SYSTEM. OBJECTIVES To remove dirt,oil,grease etc., from Condensate,Feed water, D…

    http://slideplayer.com/slide/3817737/ 5/12

    suction lines downstream of the strainers – Acid cleaning pumps – Temporary discharge header – Temporary lines to

    the discharge gate valves of four feed pumps – Feed lines to HPH – Bypass line of all HPH – HPH bypass lines – Water

    path of HPH 6,7,8 – Feed water line upto boiler feed control unit – Temporary discharge line to the circulating water

    line - De-aerator FST.

    Slide 25

    Circuit 1C De-aerator FST – MDBFP booster pump suction line – BP strainers – Temporary header connecting the BP

    suction lines downstream of the strainers – Acid cleaning pumps – Temporary discharge header – Temporary lines to

    the discharge gate valves of four feed pumps – Feed lines to HPH – Bypass line of all HPH – HPH bypass lines – Water

    path of HPH 6,7,8 – Feed water line upto boiler feed control unit – Temporary discharge line to the circulating water

    line - De-aerator FST.

    Slide 26

    Circuit 1D De-aerator FST – Booster pump suction line – BP strainers – Temporary header connecting the BP suction

    lines downstream of the strainers – Acid cleaning pumps – Temporary discharge header – Temporary lines to the

    discharge gate valves of TDBFP A – Feed lines to HPH – Bypass line of all HPH – HPH bypass lines – Water path of HPH

    6,7,8 – Feed water line upto boiler feed control unit – Temporary discharge line to the circulating water line - De-

    aerator FST.

    Slide 27

    Circuit 1E De-aerator FST – Booster pump suction line – BP strainers – Temporary header connecting the BP suction

    lines downstream of the strainers – Acid cleaning pumps – Temporary discharge header – Temporary lines to the

    discharge gate valves of TDBFP B – Feed lines to HPH – Bypass line of all HPH – HPH bypass lines – Water path of HPH

    6,7,8 – Feed water line upto boiler feed control unit – Temporary discharge line to the circulating water line - De-

    aerator FST.

    Slide 28

    Circuit 1F De-aerator FST – Booster pump suction line – BP strainers – Temporary header connecting the BP suction

    lines downstream of the strainers – Acid cleaning pumps – Temporary discharge header – Temporary lines to the

    discharge gate valves of MDBFP A – Feed lines to HPH – Bypass line of all HPH – HPH bypass lines – Water path of 

    HPH 6,7,8 – Feed water line upto boiler feed control unit – Temporary discharge line to the circulating water line - De-

    aerator FST.

    Slide 29

    Circuit 1G De-aerator FST – Booster pump suction line – BP strainers – Temporary header connecting the BP suction

    lines downstream of the strainers – Acid cleaning pumps – Temporary discharge header – Temporary lines to the

    discharge gate valves of MDBFP B – Feed lines to HPH – Bypass line of all HPH – HPH bypass lines – Water path of 

    HPH 6,7,8 – Feed water line upto boiler feed control unit – Temporary discharge line to the circulating water line - De-

    aerator FST.

    Slide 30

  • 8/19/2019 ⚡Presentation _CHEMICAL CLEANING OF PRE-BOILER SYSTEM. OBJECTIVES To remove dirt,oil,grease etc., from Co…

    6/12

    3/15/2016 ⚡Presentation "CHEMICAL CLEANING OF PRE-BOILER SYSTEM. OBJECTIVES To remove dirt,oil,grease etc., from Condensate,Feed water, D…

    http://slideplayer.com/slide/3817737/ 6/12

    Circuit 1H De-aerator FST – Booster pump suction line – BP strainers – Temporary header connecting the BP suction

    lines downstream of the strainers – Acid cleaning pumps – Temporary discharge header – Temporary lines to the

    discharge gate valves of four feed pumps – Feed lines to HPH – 50 % bypass line of all HPH– Feed water line upto

    boiler feed control unit – Temporary discharge line to the circulating water line - De-aerator FST.

    Slide 31

    Circuit 1I De-aerator FST –Booster pump suction line – BP strainers – Temporary header connecting the BP suction

    lines downstream of the strainers – Acid cleaning pumps – Temporary discharge header – Temporary lines to the

    discharge gate valves of four feed pumps – Feed lines to HPH – 100 % bypass line of all HPH – Feed water line upto

    boiler feed control unit – Temporary discharge line to the circulating water line - De-aerator FST.

    Slide 32

    Circuit 1J De-aerator FST –Booster pump suction line – BP strainers – Temporary header connecting the BP suction

    lines downstream of the strainers – Acid cleaning pumps – Temporary discharge header – Temporary lines to the

    discharge gate valves of four feed pumps – Feed lines to HPH bypass line for 6A,7A,8A – Feed water line upto boiler

    feed control unit – Temporary discharge line to the circulating water line – De-aerator FST.

    Slide 33

    Circuit 1K De-aerator FST –Booster pump suction line – BP strainers – Temporary header connecting the BP suction

    lines downstream of the strainers – Acid cleaning pumps – Temporary discharge header – Temporary lines to the

    discharge gate valves of four feed pumps – Feed lines to HPH bypass line for 6B,7B,8B – Feed water line upto boiler

    feed control unit – Temporary discharge line to the circulating water line – De-aerator FST.

    Slide 34

    Circuit 1E De-aerator FST –Booster pump suction line – BP strainers – Temporary header connecting the BP suction

    lines downstream of the strainers – Acid cleaning pumps – Temporary discharge header – Temporary lines to the

    discharge gate valves of four feed pumps – Feed lines to HPH – Water path of HPH 6A,7A,8A – Feed water line upto

    boiler feed control unit – Temporary discharge line to the circulating water line – De-aerator FST.

    Slide 35

    Circuit 1L De-aerator FST –Booster pump suction line – BP strainers – Temporary header connecting the BP suction

    lines downstream of the strainers – Acid cleaning pumps – Temporary discharge header – Temporary lines to the

    discharge gate valves of four feed pumps – Feed lines to HPH – Water path of HPH 6B,7B,8B – Feed water line upto

    boiler feed control unit – Temporary discharge line to the circulating water line – De-aerator FST.

    Slide 36

    CIRCUIT 2: Circuit 2A Condenser – CEP suction lines – Acid cleaning pumps – CEP discharge header – Condensate line

    bypassing LPHs – line down stream of LPHs – Temporary discharge line to the circulating water system – De- aerator

    FST Circuit 2B Condenser – CEP suction lines – Acid cleaning pumps – CEP discharge header – Water side of LPHs –

    Line down stream of LPHs – Temporary discharge line to the circulating water system – De-aerator FST

  • 8/19/2019 ⚡Presentation _CHEMICAL CLEANING OF PRE-BOILER SYSTEM. OBJECTIVES To remove dirt,oil,grease etc., from Co…

    7/12

    3/15/2016 ⚡Presentation "CHEMICAL CLEANING OF PRE-BOILER SYSTEM. OBJECTIVES To remove dirt,oil,grease etc., from Condensate,Feed water, D…

    http://slideplayer.com/slide/3817737/ 7/12

    Slide 37

    CIRCUIT 3: Circuit 3A Condenser – CEP suction lines – Acid cleaning pumps – CEP discharge header – Condensate line

    bypassing LPHs – Temporary header for water supply to the HPH steam space – Steam side of HPH 6A – HPH

    discharge line – Temporary discharge line to the circulating water system – De-aerator FST

    Slide 38

    Circuit 3B Condenser – CEP suction lines – Acid cleaning pumps – CEP discharge header – Condensate line bypassing

    LPHs – Temporary header for water supply to the HPH steam space – Steam side of HPH 6B – HPH discharge line –

    Temporary discharge line to the circulating water system – De-aerator FST

    Slide 39

    Circuit 3C Condenser – CEP suction lines – Acid cleaning pumps – CEP discharge header – Condensate line bypassing

    LPHs – Temporary header for water supply to the HPH steam space – Steam side of HPH 7A – HPH discharge line –

    Temporary discharge line to the circulating water system – De-aerator FST

    Slide 40

    Circuit 3D Condenser – CEP suction lines – Acid cleaning pumps – CEP discharge header – Condensate line bypassing

    LPHs – Temporary header for water supply to the HPH steam space – Steam side of HPH 7B – HPH discharge line –

    Temporary discharge line to the circulating water system – De-aerator FST

    Slide 41

    Circuit 3E Condenser – CEP suction lines – Acid cleaning pumps – CEP discharge header – Condensate line bypassing

    LPHs – Temporary header for water supply to the HPH steam space – Steam side of HPH 8A – HPH discharge line –

    Temporary discharge line to the circulating water system – De-aerator FST

    Slide 42

    Circuit 3F Condenser – CEP suction lines – Acid cleaning pumps – CEP discharge header – Condensate line bypassing

    LPHs – Temporary header for water supply to the HPH steam space – Steam side of HPH 8B – HPH discharge line –

    Temporary discharge line to the circulating water system – De-aerator FST

    Slide 43

    CIRCUIT 4: Circuit 4A Condenser – CEP suction lines – Acid cleaning pumps – CEP discharge header – Condensate line

    bypassing LPHs – Temporary header for water supply to the LPH steam space – Steam side of LPH 1A – LPH discharge

    line – Temporary discharge line to the circulating water system – De-aerator FST

    Slide 44

    Circuit 4B Condenser – CEP suction lines – Acid cleaning pumps – CEP discharge header – Condensate line bypassing

    LPHs – Temporary header for water supply to the LPH steam space – Steam side of LPH 1B – LPH discharge line –

    Temporary discharge line to the circulating water system – De-aerator FST

  • 8/19/2019 ⚡Presentation _CHEMICAL CLEANING OF PRE-BOILER SYSTEM. OBJECTIVES To remove dirt,oil,grease etc., from Co…

    8/12

    3/15/2016 ⚡Presentation "CHEMICAL CLEANING OF PRE-BOILER SYSTEM. OBJECTIVES To remove dirt,oil,grease etc., from Condensate,Feed water, D…

    http://slideplayer.com/slide/3817737/ 8/12

    Slide 45

    Circuit 4C Condenser – CEP suction lines – Acid cleaning pumps – CEP discharge header – Condensate line bypassing

    LPHs – Temporary header for water supply to the LPH steam space – Steam side of LPH 2 – LPH discharge line –

    Temporary discharge line to the circulating water system – De-aerator FST

    Slide 46

    Circuit 4D Condenser – CEP suction lines – Acid cleaning pumps – CEP discharge header – Condensate line bypassing

    LPHs – Temporary header for water supply to the LPH steam space – Steam side of LPH 3 – LPH discharge line –

    Temporary discharge line to the circulating water system – De-aerator FST

    Slide 47

    Circuit 4E Condenser – CEP suction lines – Acid cleaning pumps – CEP discharge header – Condensate line bypassing

    LPHs – Temporary header for water supply to the LPH steam space – Steam side of LPH 4 – LPH discharge line –

    Temporary discharge line to the circulating water system – De-aerator FST

    Slide 48

    M M M M M M M M M M M M M M M M M M LPH-1A LPH-1B LPH-2 LPH-3 LPH-4 M M M DRIP /P-A DRIP /P-B M M M M

    BP M MMM M MM M M M M M MAIN CONDENSER - 1 MAIN CONDENSER - 2 M M M M M M GSC CPU M CEP-3CEP-

    2CEP-1 M HPH-6A HPH-7A HPH-8A M M M M M M M M M HPH-6B HPH-7B HPH-8B M M M M M M M M M M M M M M M

    M M TO ECO I/L

    Slide 49

    BP M MMM M MM M M M M M MAIN CONDENSER - 1 MAIN CONDENSER - 2 M M M M M M GSC CPU M CEP-3CEP-

    2CEP-1 M HPH-6A HPH-7A HPH-8A M M M M M M M M M HPH-6B HPH-7B HPH-8B M M M M M M M M M M M TO ECO

    I/L

    Slide 50

    M M M M M M M M M M M M M M M LPH-1A LPH-1B LPH-2 LPH-3 LPH-4 M M BP M M M MM M M M M M MAIN

    CONDENSER - 1 MAIN CONDENSER - 2 M M M M M M CPU M CEP-3CEP-2CEP-1 M M M M M M M M M M M GSC M M M

    Slide 51

    M M M M BP M MMM M MM M M M M M MAIN CONDENSER - 1 MAIN CONDENSER - 2 M M M M M M GSC CPU M CEP-

    3CEP-2CEP-1 M HPH-6A HPH-7A HPH-8A M M M M M M HPH-6B HPH-7B HPH-8B M M M M M M M M M M M M M M M

    TO ECO I/L

    Slide 52

    M M M M M M LPH-1A LPH-1B LPH-2 LPH-3 LPH-4 M M M DRIP /P-A DRIP /P-B M M BP M MMM M MM M M M M M

    MAIN CONDENSER - 1 MAIN CONDENSER - 2 M M M M M M GSC CPU M CEP-3CEP-2CEP-1 M M M M M M M M M

  • 8/19/2019 ⚡Presentation _CHEMICAL CLEANING OF PRE-BOILER SYSTEM. OBJECTIVES To remove dirt,oil,grease etc., from Co…

    9/12

    3/15/2016 ⚡Presentation "CHEMICAL CLEANING OF PRE-BOILER SYSTEM. OBJECTIVES To remove dirt,oil,grease etc., from Condensate,Feed water, D…

    http://slideplayer.com/slide/3817737/ 9/12

    Similar presentations

    WELCOME TOPIC- STEAM BLOWING By- Operation Team ADANI POWER MAHARASHTRA LTD,TIRODA, 5 X 660 MW.

    1. 2 ANY PIPE CONNECTION TO THE TURBINE IS A POTENTIAL SOURCE OF WATER EITHER BY INDUCTION FROM

    EXTERNAL EQUIPMENT OR BY ACCUMULATION OF CONDENSED STEAM.

    Devdeep Bose DGM ( Commng & Testing).

    Slide 53

     ACID CLEANING: → Acid cleaning is made using the same four circuits on which water washing is made. To make

    closed circuit the de-aerator is included into the scheme, in which cleaning solution can be heated if required.

    →Reagents in liquid form, each by separate pipeline, are supplied from reagent preparation plant into suction pipeline

    of acid cleaning pump. →Minimum Hydrofluoric acid solution temperature is 20 0 C and optimum temperature is 40 0

    C → Acid cleaning phase duration is 4-8 hours at temperature up to 40 0 C →Hydrofluoric acid cleaning solutionconcentration is selected depending on ferric oxide quantity in the circuit to be washed.

    Slide 54

    CLEANING SOLUTION DISPLACEMENT: →Primary displacement of spent cleaning solution is carried out by compressed

    air from the compressor-house ; this allows saving of water for washing. →The final removal of solution is carried out

    with standard speed ; in drainable section – not less than 1m/s and in non- drainable section not less than 2m/s.

    Solution is removed from the circuits by hydraulic pneumatic method with water supply from condensers by acid

    cleaning pumps. → Acid cleaning is declared finished if discharge water conductivity reaches 20µs/cm.

    Slide 55

    PASSIVATION: →Passivation of acid cleaned surface is carried out with Hydrogen Peroxide solution added with

    ammonia. →Before passivation the acid cleaned surface is neutralized with the circulation of ammonia solution.

    →Passivation is carried out with demineralized water under the following conditions: Hydrogen Peroxide concentration

    is 0.02%. Ammonia Concentration is upto 0.8%. Solution temperature is 40 0 C. Duration 4-6 hours. Solution flow

    velocity is 0.3 to 0.5 m/s

    Slide 56

    →Metal surface treatment with oxidant solution permits to form thin protective ferric oxide film.

    Download "CHEMICAL CLEANING OF PRE-BOILER SYSTEM. OBJECTIVES To remove dirt,oil,grease etc., from Condensate,Feed water, Drip and Extraction steam lines of HP and."

    http://slideplayer.com/slide/5929811/http://slideplayer.com/slide/5929811/http://slideplayer.com/slide/5929811/http://slideplayer.com/slide/5929811/http://slideplayer.com/slide/3712744/http://slideplayer.com/slide/5683980/http://slideplayer.com/slide/5802296/

  • 8/19/2019 ⚡Presentation _CHEMICAL CLEANING OF PRE-BOILER SYSTEM. OBJECTIVES To remove dirt,oil,grease etc., from Co…

    10/12

    3/15/2016 ⚡Presentation "CHEMICAL CLEANING OF PRE-BOILER SYSTEM. OBJECTIVES To remove  dirt,oil,grease etc., from Condensate,Feed water, D…

    http://slideplayer.com/slide/3817737/ 10/12

     Adani Power Limited Power Business Goal - 20,000 MW.

     ABOUT NTPC NTPC, India's largest power company, was set up in 1975 to accelerate power development in India. It is

    emerging as an' Integrated Power Major,

    Exit Program Major Components Component Controls Process Control System Operation System Function Circulating Water

    System This presentation is designed.

    2 July 20151 Turbine Condensate System www.powerpointpresentationon.blogspot.com.

    Jimei university Lesson 16 Marine boilers Marine boilers.

    POINTS OF DISCUSSION SUB CRITICAL & SUPER CRITICAL BOILER SIPAT BOILER DESIGN BOILER DESIGN

    PARAMETERS CHEMICAL TREATMENT SYSTEM OPERATION.

    Generic Pressurized Water Reactor (PWR): Safety Systems Overview.

     ACADs (08-006) Covered Keywords Circulating water, condensate system, flowpath, feedwater Description The purpose of 

    this class is to familiarize students.

    1 WELCOME TO PRESENTATION ON SUPERCRITICAL BOILER BY Mr. C.P. Sahoo, AVP, O&M ADANI POWER MAHARASHTRA 

    LTD. 5 X 660 MW.

    WATER CHEMISTRY ASPECTS FOR SUPERCRITICAL UNIT V Chandrasekharan Sr. Manager NTPC SIPAT.

    Introduction to HVAC Systems Presented by AirTight University.

    1 JSW Energy Limited of 149 RWPL MOPR – JULY - 14.

    Controls of Super Critical 3 rd Feb 2009 CONTROLS OF SUPER CRITICAL BOILERS Presentation By AJAY SHUKLA Sr.Faculty

    PMI,

    http://slideplayer.com/slide/3501690/http://slideplayer.com/slide/3501690/http://slideplayer.com/slide/3501690/http://slideplayer.com/slide/3501690/http://slideplayer.com/slide/1417046/http://slideplayer.com/slide/6050327/http://slideplayer.com/slide/1424443/http://slideplayer.com/slide/3907556/http://slideplayer.com/slide/6084531/http://slideplayer.com/slide/4310183/http://slideplayer.com/slide/1568189/http://slideplayer.com/slide/5896807/http://slideplayer.com/slide/1638098/http://slideplayer.com/slide/5269814/http://slideplayer.com/slide/2498502/http://slideplayer.com/slide/1637843/http://slideplayer.com/slide/5929811/

  • 8/19/2019 ⚡Presentation _CHEMICAL CLEANING OF PRE-BOILER SYSTEM. OBJECTIVES To remove dirt,oil,grease etc., from Co…

    11/12

    3/15/2016 ⚡Presentation "CHEMICAL CLEANING OF PRE-BOILER SYSTEM. OBJECTIVES To remove dirt,oil,grease etc., from Condensate,Feed water, D …

    http://slideplayer.com/slide/3817737/ 11/12

    USG - 1823 Drinking Water Treatment System for high turbid water source.

    Hydronic Mechanical Controls. Air Scoop or Air Purge 1. Located in the system (commonly on top of expansion tank 2. Has

    internal baffles that divert bubble.

    SIPAT SUPER THERMAL POWER PROJECT. SIPAT STAGE # 1 BOILER.

    System components 1.Pressure gauges 2.Compressors 3.Oil separators 4.Condensers 5.Liquid receiver 6.Liquid indicator

    7.Evaporators 8.Expansion valves 9.High.

    SECTION 10 CHILLED WATER AIR CONDITIONING SYSTEMS UNIT 48 HIGH-PRESSURE, LOW-PRESSURE, AND ABSORPTION

    CHILLED- WATER SYSTEMS.

    Steam power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031

    DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant professor.

    Power Sector Western Region Technology Day 11 th May 2009.

    Chapter No: 3 Air Compressors. Pneumatics: A system which uses compressed air is called pneumatics. It deals with

    the study of behaviour & application.

    FOOD ENGINEERING DESIGN AND ECONOMICS PIPE-LINE DESIGN.

    Feed pumps, Feed Injectors, Feed Regulators, Feed heaters, Air Heaters and Steam Accumulators A. Ranganath.

    Thermal Power Plant Familiarisation (Part- I : Boiler) Presented By-: Mohit Chandra Joshi Engineer National Load Despatch

    Centre Power Grid Corporation.

    NTPC National Thermal Power Corporation Project: Study the Working Principles and Functioning of the Power plant.

    http://slideplayer.com/slide/6425259/http://slideplayer.com/slide/6425259/http://slideplayer.com/slide/6425259/http://slideplayer.com/slide/6425259/http://slideplayer.com/slide/5905570/http://slideplayer.com/slide/1637588/http://slideplayer.com/slide/4554707/http://slideplayer.com/slide/5924358/http://slideplayer.com/slide/5916963/http://slideplayer.com/slide/3560355/http://slideplayer.com/slide/1638295/http://slideplayer.com/slide/7087965/http://slideplayer.com/slide/3448836/http://slideplayer.com/slide/3920546/http://slideplayer.com/slide/5902592/http://slideplayer.com/slide/3501690/

  • 8/19/2019 ⚡Presentation _CHEMICAL CLEANING OF PRE-BOILER SYSTEM. OBJECTIVES To remove dirt,oil,grease etc., from Co…

    12/12

    3/15/2016 ⚡Presentation "CHEMICAL CLEANING OF PRE-BOILER SYSTEM. OBJECTIVES To remove dirt,oil,grease etc., from Condensate,Feed water, D…

    Prof. Osama El Masry Steam Condenser I Mechanical Engineering Department ME332 Operation and Management of Power

    Plants Prof. Osama A El Masry.

    Prigorodnoye LNG Overview LNG Prigorodnoye Overview.

    © 2016 SlidePlayer.com Inc. All rights reserved.

      Search

     ABOUT PROJECT

    SlidePlayer

    FEEDBACK 

    Terms of Use

    Privacy Policy

    Feedback 

    http://slideplayer.com/support/feedback/http://slideplayer.com/support/privacy/http://slideplayer.com/support/terms/http://slideplayer.com/support/project/http://slideplayer.com/slide/3240877/http://slideplayer.com/slide/6425259/