19
PRESERVATION and PROGRESS IN THE DRAGON RUN DRAFT DRAGON RUN CONSERVATION OVERLAY DISTRICT PARADIGM DESIGN MAY 31, 2005 Work Session

PRESERVATION and PROGRESS IN THE DRAGON RUN DRAFT DRAGON RUN CONSERVATION OVERLAY DISTRICT PRESERVATION and PROGRESS IN THE DRAGON RUN DRAFT DRAGON RUN

Embed Size (px)

Citation preview

Page 1: PRESERVATION and PROGRESS IN THE DRAGON RUN DRAFT DRAGON RUN CONSERVATION OVERLAY DISTRICT PRESERVATION and PROGRESS IN THE DRAGON RUN DRAFT DRAGON RUN

PRESERVATION and PROGRESS IN THE DRAGON

RUN

DRAFT

DRAGON RUN CONSERVATION OVERLAY DISTRICT

PRESERVATION and PROGRESS IN THE DRAGON

RUN

DRAFT

DRAGON RUN CONSERVATION OVERLAY DISTRICTPARADIGM DESIGN MAY 31, 2005 Work Session

Page 2: PRESERVATION and PROGRESS IN THE DRAGON RUN DRAFT DRAGON RUN CONSERVATION OVERLAY DISTRICT PRESERVATION and PROGRESS IN THE DRAGON RUN DRAFT DRAGON RUN

GOALS from the MODEL COMP. PLAN DISTRICT

GOALS from the MODEL COMP. PLAN DISTRICT

• Maintain the health and quality of the Dragon Run stream system and associated natural areas

 • Achieve the objectives of the Memorandum of

Agreement and reinforce the existing shared values for preserving the Dragon Run.

 • Support the traditional economic base of the

Dragon Run area and its rural industries such as farming and forestry that are compatible with preserving the natural health of the stream system.

 • Support new rural economic development and

industries that are compatible with the traditional pattern of rural land uses in the Dragon Run area.

• Maintain the health and quality of the Dragon Run stream system and associated natural areas

 • Achieve the objectives of the Memorandum of

Agreement and reinforce the existing shared values for preserving the Dragon Run.

 • Support the traditional economic base of the

Dragon Run area and its rural industries such as farming and forestry that are compatible with preserving the natural health of the stream system.

 • Support new rural economic development and

industries that are compatible with the traditional pattern of rural land uses in the Dragon Run area.

Page 3: PRESERVATION and PROGRESS IN THE DRAGON RUN DRAFT DRAGON RUN CONSERVATION OVERLAY DISTRICT PRESERVATION and PROGRESS IN THE DRAGON RUN DRAFT DRAGON RUN

KEY ISSUES for the MODEL ZONING OVERLAY

(from the April 26 Work Session)

KEY ISSUES for the MODEL ZONING OVERLAY

(from the April 26 Work Session)• Very little desire to change densities in the area

• Desire to use performance standards:• Don’t “reinvent the wheel”• Use Ches. Bay or other existing standards

• Desire to see standards both for the watershed and for “streamside”

• Work on a simple Table of Uses:• Apply to watershed as a whole• Only deal with clearly incompatible uses• May not be applicable to all counties (e.g. King &

Queen)

• Work on a Stream Buffer provision:• Shouldn’t create hardship for Forestry or Farming

(traditional industries)

• Look at Clustering Option

• Very little desire to change densities in the area

• Desire to use performance standards:• Don’t “reinvent the wheel”• Use Ches. Bay or other existing standards

• Desire to see standards both for the watershed and for “streamside”

• Work on a simple Table of Uses:• Apply to watershed as a whole• Only deal with clearly incompatible uses• May not be applicable to all counties (e.g. King &

Queen)

• Work on a Stream Buffer provision:• Shouldn’t create hardship for Forestry or Farming

(traditional industries)

• Look at Clustering Option

Page 4: PRESERVATION and PROGRESS IN THE DRAGON RUN DRAFT DRAGON RUN CONSERVATION OVERLAY DISTRICT PRESERVATION and PROGRESS IN THE DRAGON RUN DRAFT DRAGON RUN

PROPOSED

DRAGON RUN CONSERVATION

OVERLAY DISTRICT (DRCOD)

PROPOSED

DRAGON RUN CONSERVATION

OVERLAY DISTRICT (DRCOD)

Page 5: PRESERVATION and PROGRESS IN THE DRAGON RUN DRAFT DRAGON RUN CONSERVATION OVERLAY DISTRICT PRESERVATION and PROGRESS IN THE DRAGON RUN DRAFT DRAGON RUN

BASIC STRUCTUREBASIC STRUCTURETWO ZONES:

1. The Drainage Area Conservation Zone – the area that naturally drains into the Dragon Run (the “watershed”)

 2. The Stream Buffer Zone – a 200 foot buffer

landward of the existing Chesapeake Bay Resource Protection Area within the overlay district.

TWO ZONES:

1. The Drainage Area Conservation Zone – the area that naturally drains into the Dragon Run (the “watershed”)

 2. The Stream Buffer Zone – a 200 foot buffer

landward of the existing Chesapeake Bay Resource Protection Area within the overlay district.

Page 6: PRESERVATION and PROGRESS IN THE DRAGON RUN DRAFT DRAGON RUN CONSERVATION OVERLAY DISTRICT PRESERVATION and PROGRESS IN THE DRAGON RUN DRAFT DRAGON RUN

KEY PROVISIONSKEY PROVISIONS1. THE WATERSHED SCALE (The Drainage Area

Conservation Zone)

• An Overlay Zone (modifies underlying zoning district standards)

• Most Uses are Not Changed

• List of Prohibited Uses

• List of Special Exception Uses

• Needs to be customized for each County

1. THE WATERSHED SCALE (The Drainage Area Conservation Zone)

• An Overlay Zone (modifies underlying zoning district standards)

• Most Uses are Not Changed

• List of Prohibited Uses

• List of Special Exception Uses

• Needs to be customized for each County

Page 7: PRESERVATION and PROGRESS IN THE DRAGON RUN DRAFT DRAGON RUN CONSERVATION OVERLAY DISTRICT PRESERVATION and PROGRESS IN THE DRAGON RUN DRAFT DRAGON RUN

• Automotive Sales• Laundry Services• Mini-Warehouses• Detention Facilities• Garbage Service Companies• Heavy Industry• Meat Packing Operations• Scrap metal Processing Yards• Stockyards• Truck terminal • Vehicle Dismantling Yard• Parking Lots (except as accessory uses)• Commercial Feed Lot• Landfill• Surface or Subsurface Discharges from a Wastewater Treatment

Plant

PROHIBITED USES:

The Drainage Area Conservation Zone

PROHIBITED USES:

The Drainage Area Conservation Zone

Page 8: PRESERVATION and PROGRESS IN THE DRAGON RUN DRAFT DRAGON RUN CONSERVATION OVERLAY DISTRICT PRESERVATION and PROGRESS IN THE DRAGON RUN DRAFT DRAGON RUN

• Camps and campgrounds• Marinas and boat yards• Sawmills and planning mills• Seafood processing plants• Farm implement sales• Feed, seed, and fertilizer

sales• Professional occupations• Service businesses• Convenience stores• Surface mining• Land application of biosolids• Manufactured homes• Golf courses• Commercial animal kennels• Publicly owned airports

SPECIAL EXCEPTION USES:

The Drainage Area Conservation Zone

SPECIAL EXCEPTION USES:

The Drainage Area Conservation Zone

• Homes for the aged• Private landing strips for

exclusive use of owners, clients and guests

• Public and private communications facilities

• Self-storage center• Repair garages• Automobile racetrack• Sport shooting facilities• Assembly and retreat facilities

Page 9: PRESERVATION and PROGRESS IN THE DRAGON RUN DRAFT DRAGON RUN CONSERVATION OVERLAY DISTRICT PRESERVATION and PROGRESS IN THE DRAGON RUN DRAFT DRAGON RUN

KEY PROVISIONSKEY PROVISIONS2. THE STREAMSIDE SCALE (The Stream Buffer

Zone)

• An Overlay Zone (modifies underlying zoning district standards)

• List of Permitted Uses

• Restricts any new development

• No additional restrictions on Forestry / Farming,(other than BMP’s)

2. THE STREAMSIDE SCALE (The Stream Buffer Zone)

• An Overlay Zone (modifies underlying zoning district standards)

• List of Permitted Uses

• Restricts any new development

• No additional restrictions on Forestry / Farming,(other than BMP’s)

Page 10: PRESERVATION and PROGRESS IN THE DRAGON RUN DRAFT DRAGON RUN CONSERVATION OVERLAY DISTRICT PRESERVATION and PROGRESS IN THE DRAGON RUN DRAFT DRAGON RUN

PERMITTED USES:

The Stream Buffer Zone

PERMITTED USES:

The Stream Buffer Zone

•Non-commercial catwalks, piers, fences, and duck blinds

•Cultivation and harvesting of shellfish and worms for bait.

• Small scale outdoor recreational activities

• Conservation, repletion, education, and research activities

• Maintenance, repair, or addition to existing roads, highways, or facilities

• Governmental activity on [publicly owned] wetlands or swamps

•Maintenance of existing man-made drainage ditches

• Agricultural management activities [with BMPs]

• Forestry management activities [with BMPs]

Page 11: PRESERVATION and PROGRESS IN THE DRAGON RUN DRAFT DRAGON RUN CONSERVATION OVERLAY DISTRICT PRESERVATION and PROGRESS IN THE DRAGON RUN DRAFT DRAGON RUN

 THE DRAGON RUN CONSERVATION OVERLAY DISTRICT

SUMMARY OF REQUIREMENTS 

ZONE: Boundaries of Zone

Permitted Uses

Forestry Agriculture

DRAINAGE AREA CONSERVATION ZONE

Area naturally draining into the Dragon Run

All uses in Base Zone, except prohibited uses as listed

Permitted as in base zone (no additional restrictions)

Permitted as in base zone (no additional restrictions)

STREAM BUFFER ZONE

200 ft. landward of the Chesapeake Bay R.P.A.

Specific low-intensity uses as listed

Permitted with BMP’s

Permitted withBMP’s

Page 12: PRESERVATION and PROGRESS IN THE DRAGON RUN DRAFT DRAGON RUN CONSERVATION OVERLAY DISTRICT PRESERVATION and PROGRESS IN THE DRAGON RUN DRAFT DRAGON RUN

CONSERVATION SUBDIVISION OPTION

CONSERVATION SUBDIVISION OPTION

Page 13: PRESERVATION and PROGRESS IN THE DRAGON RUN DRAFT DRAGON RUN CONSERVATION OVERLAY DISTRICT PRESERVATION and PROGRESS IN THE DRAGON RUN DRAFT DRAGON RUN

CONSERVATION SUBDIVISION OPTION

CONSERVATION SUBDIVISION OPTION

KEY PROVISIONS

• An Optional method of subdivision

• Must be initiated by applicant

• “Density Neutral” Option (doesn’t change zoned density)

• Allows more design flexibility in exchange for permanent conservation

• Responds to issue of Incremental Minor Subdivision Development

KEY PROVISIONS

• An Optional method of subdivision

• Must be initiated by applicant

• “Density Neutral” Option (doesn’t change zoned density)

• Allows more design flexibility in exchange for permanent conservation

• Responds to issue of Incremental Minor Subdivision Development

Page 14: PRESERVATION and PROGRESS IN THE DRAGON RUN DRAFT DRAGON RUN CONSERVATION OVERLAY DISTRICT PRESERVATION and PROGRESS IN THE DRAGON RUN DRAFT DRAGON RUN

CONSERVATION SUBDIVISION OPTION

CONSERVATION SUBDIVISION OPTION

HOW IT WORKS:

• Incentive: Allows up to 10 lots as Minor Subdivisions

• Applies only to tracts 50 ac. Or over

• At least 75% of Tract is set aside for Conservancy Lots

• Conservancy Lots are min. 25 ac. Size (private ownership)

• Remaining 25% of tract in Lots of 1-2 ac. (up to max. of 10 lots)

• Conservancy Lots protected by Legal Instrument (easement)

HOW IT WORKS:

• Incentive: Allows up to 10 lots as Minor Subdivisions

• Applies only to tracts 50 ac. Or over

• At least 75% of Tract is set aside for Conservancy Lots

• Conservancy Lots are min. 25 ac. Size (private ownership)

• Remaining 25% of tract in Lots of 1-2 ac. (up to max. of 10 lots)

• Conservancy Lots protected by Legal Instrument (easement)

Page 15: PRESERVATION and PROGRESS IN THE DRAGON RUN DRAFT DRAGON RUN CONSERVATION OVERLAY DISTRICT PRESERVATION and PROGRESS IN THE DRAGON RUN DRAFT DRAGON RUN

CONSERVATION SUBDIVISION OPTION

CONSERVATION SUBDIVISION OPTION

HOW IT WORKS:HOW IT WORKS:

Page 16: PRESERVATION and PROGRESS IN THE DRAGON RUN DRAFT DRAGON RUN CONSERVATION OVERLAY DISTRICT PRESERVATION and PROGRESS IN THE DRAGON RUN DRAFT DRAGON RUN

CONSERVATION SUBDIVISION OPTION

CONSERVATION SUBDIVISION OPTION

OTHER KEY FEATURES:

• Criteria for designating Conservancy Lot Area• Includes all sensitive natural areas, historic

sites, habitats, Ches. Bay RPA (Primary)• Should include prime forest, farm and

viewshed areas (Secondary)• At least 75% of area to be contiguous

• Easement Criteria:• Easement to be recorded on Deed• Easement to non-profit Conservation

Organization, OR• Governmental entity (must include County)

• Criteria for Approval (Grounds for Denial)

OTHER KEY FEATURES:

• Criteria for designating Conservancy Lot Area• Includes all sensitive natural areas, historic

sites, habitats, Ches. Bay RPA (Primary)• Should include prime forest, farm and

viewshed areas (Secondary)• At least 75% of area to be contiguous

• Easement Criteria:• Easement to be recorded on Deed• Easement to non-profit Conservation

Organization, OR• Governmental entity (must include County)

• Criteria for Approval (Grounds for Denial)

Page 17: PRESERVATION and PROGRESS IN THE DRAGON RUN DRAFT DRAGON RUN CONSERVATION OVERLAY DISTRICT PRESERVATION and PROGRESS IN THE DRAGON RUN DRAFT DRAGON RUN

NEXT STEPSNEXT STEPS

Page 18: PRESERVATION and PROGRESS IN THE DRAGON RUN DRAFT DRAGON RUN CONSERVATION OVERLAY DISTRICT PRESERVATION and PROGRESS IN THE DRAGON RUN DRAFT DRAGON RUN

DRAFT DRAGON RUN CONSERVATION OVERLAY DISTRICT

DRAFT DRAGON RUN CONSERVATION OVERLAY DISTRICT

NEXT STEPS:

• Key is Continuity of Purpose with Flexibility by County

• Finalize “Model” Ordinance

• Tech. Memos to begin customizing Model for each County

• Will need Staff / Legal Review

• Develop illustrations and public presentations

• Work with each County on Model Comp. Plan and Zoning drafts

NEXT STEPS:

• Key is Continuity of Purpose with Flexibility by County

• Finalize “Model” Ordinance

• Tech. Memos to begin customizing Model for each County

• Will need Staff / Legal Review

• Develop illustrations and public presentations

• Work with each County on Model Comp. Plan and Zoning drafts