S10Pgina1PresupuestoCONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DEL COLEGIO LA UNIN, EN EL ANEXO DE CACHI LLALLAS,DISTRITO DE HUANDO, PROVINCIA DE HUANCAVELICA.Presupuesto0301025MUNICIPALIDAD DISTRITAL DE HUANDO27/06/2012Costo alClienteLugarHUANCAVELICA - HUANCAVELICA - HUANDOPrecio S/.Parcial S/.ItemDescripcinUnd.Metrado

27/06/2012 10:13:05Fecha :

01CONSTRUCCION DEL PABELLON A - AULAS395,488.7801.01ESTRUCTURAS227,974.9901.01.01OBRAS PROVISIONALES2,243.12ALMACEN, OFICINA Y GUARDIANIAmes01.01.01.018.00150.001,200.00CARTEL DE OBRA DE 3.60MX2.40Mund01.01.01.021.001,043.121,043.1201.01.02TRABAJOS PRELIMINARES1,234.65LIMPIEZA DE TERRENO MANUALm201.01.02.01339.192.49844.58TRAZO Y REPLANTEO PRELIMINARm201.01.02.02339.191.15390.0701.01.03MOVIMIENTO DE TIERRAS72,554.69CORTE DE TERRENOm301.01.03.0116,628.861.0216,961.44EXCAVACION DE ZANJAS ZAPATASm301.01.03.02112.3527.873,131.19RELLENO CON MATERIAL PROPIOm301.01.03.0374.8813.941,043.83EXCAVACION MANUAL PARA CIMIENTOS CORRIDOSm301.01.03.0422.4124.39546.58NIVELACION INT.Y APISONADO PARA CIMIENTOm201.01.03.0541.211.4559.75NIVELACION Y APISONADO PARA PISO Y VEREDAm201.01.03.06273.732.17593.99ELIMINACION DE MATERIAL EXCEDENTE (INC. CARGUIO)m301.01.03.0716,464.893.0550,217.9101.01.04OBRAS DE CONCRETO SIMPLE9,400.52CIMIENTOS CORRIDOS 1:10 + 30% P.G.m301.01.04.0124.72164.844,074.84SOLADO PARA ZAPATA e=4" 1:12 CEM/HORm201.01.04.0266.6223.481,564.24SOBRECIMIENTO CONCRETO 1:8 + 25% P.M.m301.01.04.036.14253.371,555.69SOBRECIMIENTO ENCOFRADO Y DESENCOFRADOm201.01.04.0469.5631.712,205.7501.01.05OBRAS DE CONCRETO ARMADO112,937.92CONCRETO EN ZAPATAS F'C= 210 KG/CM2m301.01.05.0139.97289.7111,579.71ACERO EN ZAPATAS Fy=4200KG/CM2kg01.01.05.02600.483.392,035.63CONCRETO EN SOBRECIMIENTO ARMADO F'C= 210 KG/CM2m301.01.05.037.02291.512,046.40SOBRECIMIENTO ENCOFRADO Y DESENCOFRADOm201.01.05.0428.0931.71890.73ACERO EN SOBRECIMIENTO ARMADO FY=4200KG/CM2kg01.01.05.05539.843.852,078.38CONCRETO EN COLUMNAS F'C= 210 KG/CM2m301.01.05.0628.32395.0611,188.10ENCOFRADO Y DESENCOFRADO EN COLUMNASm201.01.05.07173.7728.744,994.15ACERO EN COLUMNA FY=4200KG/CM2kg01.01.05.084,734.513.3515,860.61CONCRETO EN VIGAS F'C=210 KG/CM2m301.01.05.0932.16394.8912,699.66ENCOFRADO Y DESENCOFRADO EN VIGASm201.01.05.10304.4230.489,278.72ACERO EN VIGAS Fy=4200KG/CM2kg01.01.05.113,398.433.3511,384.74CONCRETO EN COLUMNETAS F'C= 210 KG/CM2m301.01.05.122.75312.65859.79ENCOFRADO Y DESENCOFRADO EN COLUMNETASm201.01.05.1336.4043.251,574.30ACERO EN COLUMNETAS FY=4200KG/CM2kg01.01.05.14289.964.021,165.64CONCRETO EN VIGAS DE AMARRE F'C=210 KG/CM2 (MUROS NO PORTANTES)m301.01.05.152.88316.83912.47ENCOFRADO Y DESENCOFRADO EN VIGAS DE AMARREm201.01.05.1638.4337.001,421.91ACERO EN VIGAS DE AMARRE Fy=4200KG/CM2kg01.01.05.17187.284.15777.21CONCRETO EN LOSA ALIGERADA F'C=210 KG/CM2m301.01.05.1816.34279.944,574.22ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADAm201.01.05.19181.5927.084,917.46ACERO EN LOSA ALIGERADA F'Y= 4200 KG/CM2kg01.01.05.201,024.403.373,452.23LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADOund01.01.05.211,625.002.453,981.25CONCRETO EN LOSA MACIZA Y ESCALERA F'C=210 KG/CM2m301.01.05.225.77299.451,727.83ENCOFRADO Y DESENCOFRADO PARA LOSAS MACIZAS Y ESCALERASm201.01.05.2335.9157.032,047.95ACERO EN LOSA MACIZA Y ESCALERAS F'Y= 4200 KG/CM2kg01.01.05.24384.713.871,488.8301.01.06COBERTURAS29,604.09TIJERALES DE MADERA TORNILLO SEGUN DISEOund01.01.06.0110.001,259.8712,598.70S10Pgina1PresupuestoCONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DEL COLEGIO LA UNIN, EN EL ANEXO DE CACHI LLALLAS,DISTRITO DE HUANDO, PROVINCIA DE HUANCAVELICA.Presupuesto0301025MUNICIPALIDAD DISTRITAL DE HUANDO27/06/2012Costo alClienteLugarHUANCAVELICA - HUANCAVELICA - HUANDOPrecio S/.Parcial S/.ItemDescripcinUnd.Metrado

27/06/2012 10:13:05Fecha :CORREAS Y LISTONES DE MADERA TORNILLO DE 2"X3"m01.01.06.02300.6014.564,376.74COBERTURA C/LAMINA TERMOACUSTICA TIPO TEJA ANDINAm201.01.06.03285.5741.7111,911.12CUMBRERA PARA C/LAMINA TERMOACUSTICA TIPO TEJA ANDINAm01.01.06.0430.0623.87717.5301.02ARQUITECTURA146,783.3201.02.01MUROS DE ALBAILERIA18,955.32MURO DE SOGA LADRILLO DE ARCILLA TIPO IVm201.02.01.01103.3242.254,365.27MURO DE CABEZA LADRILLO DE ARCILLA T-IVm201.02.01.02207.6168.4314,206.75JUNTA DE CONSTRUCCION CON TEKNOPORT 1 "m201.02.01.0320.245.04102.01JUNTA DE CONSTRUCCION CON TEKNOPORT 2 "m201.02.01.0440.306.98281.2901.02.02REVOQUES ENLUCIDOS Y MOLDURAS21,443.90TARRAJEO EN MURO INTERIOR Y EXTERIORm201.02.02.01605.9613.007,877.48TARRAJEO EN COLUMNASm201.02.02.02167.5225.044,194.70TARRAJEO EN VIGASm201.02.02.03216.4430.236,542.98VESTIDURA DE DERRAMESm01.02.02.04113.929.491,081.10BRUAS DE 1 CMm01.02.02.05278.736.271,747.6401.02.03CIELORRASOS32,744.68CIELORRASOS CON MEZCLA DE CEMENTO-ARENAm201.02.03.01170.9344.847,664.50CIELORASO DE TRIPLEY DE 4MMm201.02.03.02222.47110.5924,602.96VESTIDURA DE FONDO ESCALERA CON MEZLA CEMENTO - ARENAm201.02.03.0317.1627.81477.2201.02.04PISOS Y PAVIMENTOS34,892.25FALSO PISO DE 3" DE CONCRETO 1:12m201.02.04.01171.7318.843,235.39CONTRAPISO DE 1".m201.02.04.02411.6621.889,007.12PISO MACHIHEMBRADOm201.02.04.03301.3646.2813,946.94PISO DE CERAMICO ANTIDESLIZANTE DE ALTO TRANSITOm201.02.04.04102.6745.944,716.66PISO DE CERAMICO DE PRIMERA BAOSm201.02.04.058.9733.47300.23VEREDA RIGIDA DE CONCRETO F'C=140 KG/CM2 E=10CM.,PASTA 1:2 INCLUYEENCOFRADOm201.02.04.0692.4637.933,507.01JUNTAS ASFALTICAS DE DITALACION DE VEREDA 1"m01.02.04.0717.008.29140.93JUNTAS ASFALTICAS DE DITALACION DE VEREDA 2"m01.02.04.082.8013.5637.9701.02.05ZOCALOS1,293.39ZOCALO DE CERAMICOm201.02.05.0127.0347.851,293.3901.02.06CONTRAZOCALOS4,548.09CONTRAZOCALO DE CERAMICO H=10 CMm01.02.06.0197.0322.122,146.30CONTRAZOCALO S/COLOREAR H = 30 CM, MZ 1:5 E=2CMm01.02.06.0265.6510.47687.36 CONTRAZOCALO MADERAm01.02.06.03176.209.731,714.4301.02.07CARPINTERIA DE MADERA4,083.19PUERTA DE MADERAm201.02.07.0119.78206.434,083.1901.02.08CARPINTERIA METALICA Y HERRERIA13,645.17VENTANA METALICAm201.02.08.01101.5879.318,056.31REJA METALICA PARA VENTANAm201.02.08.0248.7475.833,695.95BARANDA METALICA TUBO FG DE 3" EN PASADIZOm01.02.08.0341.8645.221,892.9101.02.09CERRAJERIA1,044.60CHAPA DE 2 GOLPESpza01.02.09.018.0079.92639.36BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2"pza01.02.09.0224.009.15219.60MANIJA DE BRONCE PARA VENTANAS DE FIERROpza01.02.09.0326.005.46141.96MANIJA DE BRONCE PARA PUERTASpza01.02.09.048.005.4643.6801.02.10VIDRIOS, CRISTALES Y SIMILARES2,918.20VIDRIOS SEMIDOBLES IMPORTADOp201.02.10.011,092.962.672,918.2001.02.11PINTURA11,214.53S10Pgina1PresupuestoCONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DEL COLEGIO LA UNIN, EN EL ANEXO DE CACHI LLALLAS,DISTRITO DE HUANDO, PROVINCIA DE HUANCAVELICA.Presupuesto0301025MUNICIPALIDAD DISTRITAL DE HUANDO27/06/2012Costo alClienteLugarHUANCAVELICA - HUANCAVELICA - HUANDOPrecio S/.Parcial S/.ItemDescripcinUnd.Metrado

27/06/2012 10:13:05Fecha :PINTURA EN MUROS, COLUMNAS Y VIGAS 2 MANOSm201.02.11.01989.926.586,513.67PINTURA LATEX 2 MANOS EN CIELO RASOm201.02.11.02444.897.483,327.78PINTURA EN CARPINTERIA METALICA C/ANTICORROSIVO Y ESMALTE 2 MANOSm201.02.11.0398.348.45830.97PINTURA EN CARPINTERIA DE MADERAm201.02.11.0419.789.41186.13PINTURA LATEX 2 MANOS EN CONTRAZOCALO CEMENTOm201.02.11.0519.708.78172.97PINTURA VESTIDURA DE DERRAMES PUERTAS Y VENTANASm201.02.11.0618.589.85183.0101.03INSTALACIONES SANITARIAS5,845.0301.03.01SISTEMA DE AGUA DE LLUVIA2,700.06TUBERIA DE PVC SAL 3" PLUVIALm01.03.01.0134.0424.43831.60CODO PVC SAL 3"X90und01.03.01.028.0015.18121.44CANALETA SEMICIRCULAR GALVANIZADA DE 4"m01.03.01.0361.0014.94911.34SOPORTE DE CANALETAund01.03.01.0448.0017.41835.6801.03.02COLUMNETAS DE SOPORTE520.15CONCRETO EN FALSA COLUMNETA F'C= 140 KG/CM2m301.03.02.010.38263.52100.14ENCOFRADO Y DESENCOFRADO EN FALSA COLUMNETAm201.03.02.025.6143.25242.63TARRAJEO EN FALSA COLUMNETAm201.03.02.035.6125.04140.47PINTURA EN FALSA COLUMNETAm201.03.02.045.616.5836.9101.03.03SISTEMA DE AGUA FRIA745.90SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2"pto01.03.03.014.0020.8183.24TUBERIA PVC SAP 1/2"m01.03.03.0212.805.1365.66CODO 90 PVC SAP 1/2"und01.03.03.0313.0029.09378.17TEE PVC-SAP 1/2"und01.03.03.043.0016.2148.63VALVULA DE COMPUERTA DE BRONCE 1/2"und01.03.03.052.0050.97101.94CAJA DE MADERA PARA VALVULAund01.03.03.062.0034.1368.2601.03.04SISTEMA DE DESAGUE1,386.58SALIDA DE DESAGUE PVC DE 4"pto01.03.04.012.0093.02186.04SALIDA DE DESAGUE PVC 2"pto01.03.04.022.0083.44166.88SALIDA PARA VENTILACIONpto01.03.04.031.0065.9965.99TUBERIA PVC - SAL 4"m01.03.04.0427.3118.52505.78TUBERIA PVC-SAL 2"m01.03.04.051.172.182.55REGISTROS DE BRONCE DE 4"und01.03.04.062.0062.46124.92SUMIDERO DE BRONCE DE 3"und01.03.04.072.0055.78111.56CAJA DE REGISTRO DE DESAGUE 12" X 24"und01.03.04.081.00131.02131.02CODO PVC SAL 2"X90pza01.03.04.092.0017.3734.74CODO PVC SAL 4"X45pza01.03.04.101.0024.5624.56CODO PVC SAL 4"X90pza01.03.04.111.0024.1424.14YEE CON REDUCCION DE 4"-2"und01.03.04.122.003.106.20YEE DE 4"und01.03.04.131.002.202.2001.03.05APARATOS Y ACCESORIOS SANITARIOS492.34INODORO TANQUE BAJOund01.03.05.012.00131.30262.60LAVATORIO DE PARED 1 LLAVEund01.03.05.022.00114.87229.7401.04INSTALACIONES ELECTRICAS14,885.44SALIDA DE TECHO (CENTRO DE LUZ)pto01.04.0153.0049.262,610.78SALIDA PARA INTERRUPTOR SIMPLEpto01.04.022.0053.74107.48SALIDA PARA INTERRUPTOR DOBLEpto01.04.036.0054.05324.30SALIDA PARA INTERRUPTOR TRIPLEpto01.04.046.0086.76520.56SALIDA PARA INTERRUPTOR SIMPLE CONMUTADOpto01.04.052.00101.53203.06SALIDA PARA TOMACORRIENTES BIPOLARES SIMPLES CON PVCpto01.04.0636.0048.071,730.52S10Pgina1PresupuestoCONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DEL COLEGIO LA UNIN, EN EL ANEXO DE CACHI LLALLAS,DISTRITO DE HUANDO, PROVINCIA DE HUANCAVELICA.Presupuesto0301025MUNICIPALIDAD DISTRITAL DE HUANDO27/06/2012Costo alClienteLugarHUANCAVELICA - HUANCAVELICA - HUANDOPrecio S/.Parcial S/.ItemDescripcinUnd.Metrado

27/06/2012 10:13:05Fecha :01.04.07TUBERIAS DE CANALIZACION4,146.73TUBERIAS PVC SEL (ELECTRICAS) D=3/4"m01.04.07.01293.559.112,674.24TUBERIAS PVC SAP (ELECTRICAS) D=1"m01.04.07.02117.3312.551,472.4901.04.08CONDUCTORES ( CABLES )1,192.11CABLE ELECTRICO TW AWG-MCM NO. 14 -2.5 MM2.m01.04.08.01293.552.77813.13CABLE ELECTRICO TW AWG NO. 12 -4.0MM2m01.04.08.02117.333.23378.9801.04.09CAJAS86.28CAJA DE PASE FG LIV. 6"X6"X3"und01.04.09.016.0014.3886.2801.04.10TABLEROS Y CUCHILLAS (LLAVES)216.73TABLERO DE DISTRIBUCION CAJA METALICA DE 8 POLOSund01.04.10.011.00216.73216.7301.04.11ARTEFACTOS3,746.89FLUORESCENTE RECTO 2x40W C/EQUIPO PARA ADOSARund01.04.11.0136.0091.253,285.00ARTEF. FLOURECENTE PARA SPOT - LIGT(PASADIZO)und01.04.11.0217.0027.17461.8902CONSTRUCCION DEL PABELLON B - LABORATORIOS, BIBLIOTECA Y OTROS374,147.5902.01ESTRUCTURAS206,535.3702.01.01TRABAJOS PRELIMINARES1,534.52LIMPIEZA DE TERRENO MANUALm202.01.01.01383.632.49955.24TRAZO Y REPLANTEO PRELIMINARm202.01.01.02383.631.51579.2802.01.02MOVIMIENTO DE TIERRAS6,624.21EXCAVACION DE ZANJAS ZAPATASm302.01.02.01135.9627.873,789.21RELLENO CON MATERIAL PROPIOm302.01.02.0296.1913.941,340.89EXCAVACION MANUAL PARA CIMIENTOS CORRIDOSm302.01.02.0319.3324.39471.46NIVELACION INT.Y APISONADO PARA CIMIENTOm202.01.02.0453.841.4578.07NIVELACION Y APISONADO PARA PISO Y VEREDAm202.01.02.05297.662.17645.92ELIMINACION DE MATERIAL EXCEDENTE (INC. CARGUIO)m302.01.02.0697.923.05298.6602.01.03OBRAS DE CONCRETO SIMPLE12,302.74CIMIENTOS CORRIDOS 1:10 + 30% P.G.m302.01.03.0132.31164.845,325.98SOLADO PARA ZAPATA e=4" 1:12 CEM/HORm202.01.03.0279.7523.481,872.53SOBRECIMIENTO CONCRETO 1:8 + 25% P.M.m302.01.03.038.58253.372,173.91SOBRECIMIENTO ENCOFRADO Y DESENCOFRADOm202.01.03.0492.4131.712,930.3202.01.04OBRAS DE CONCRETO ARMADO146,894.12CONCRETO EN ZAPATAS F'C= 210 KG/CM2m302.01.04.0149.20289.7114,253.73ACERO EN ZAPATAS Fy=4200KG/CM2kg02.01.04.02725.473.892,822.08CONCRETO EN SOBRECIMIENTO ARMADO F'C= 210 KG/CM2m302.01.04.037.35291.512,142.60SOBRECIMIENTO ENCOFRADO Y DESENCOFRADOm202.01.04.0442.0531.711,333.41ACERO EN SOBRECIMIENTO ARMADO FY=4200KG/CM2kg02.01.04.05539.843.852,078.38CONCRETO EN COLUMNAS F'C= 210 KG/CM2m302.01.04.0633.92312.6510,605.09ENCOFRADO Y DESENCOFRADO EN COLUMNASm202.01.04.07260.6343.2511,272.25ACERO EN COLUMNA FY=4200KG/CM2kg02.01.04.085,503.214.0222,122.90CONCRETO EN VIGAS F'C=210 KG/CM2m302.01.04.0934.76312.4810,861.80ENCOFRADO Y DESENCOFRADO EN VIGASm202.01.04.10276.2737.0010,221.99ACERO EN VIGAS Fy=4200KG/CM2kg02.01.04.116,126.224.1525,423.81CONCRETO EN COLUMNETAS F'C= 210 KG/CM2m302.01.04.122.62312.65819.14ENCOFRADO Y DESENCOFRADO EN COLUMNETASm202.01.04.1334.8043.251,505.10ACERO EN COLUMNETAS FY=4200KG/CM2kg02.01.04.14336.394.021,352.29CONCRETO EN VIGAS DE AMARRE F'C=210 KG/CM2 (MUROS NO PORTANTES)m302.01.04.152.79316.83883.96ENCOFRADO Y DESENCOFRADO EN VIGAS DE AMARREm202.01.04.1637.1537.001,374.55ACERO EN VIGAS DE AMARRE Fy=4200KG/CM2kg02.01.04.17185.814.15771.11S10Pgina1PresupuestoCONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DEL COLEGIO LA UNIN, EN EL ANEXO DE CACHI LLALLAS,DISTRITO DE HUANDO, PROVINCIA DE HUANCAVELICA.Presupuesto0301025MUNICIPALIDAD DISTRITAL DE HUANDO27/06/2012Costo alClienteLugarHUANCAVELICA - HUANCAVELICA - HUANDOPrecio S/.Parcial S/.ItemDescripcinUnd.Metrado

27/06/2012 10:13:05Fecha :CONCRETO EN LOSA ALIGERADA F'C=210 KG/CM2m302.01.04.1821.09279.945,903.93ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADAm202.01.04.19103.7527.082,809.55ACERO EN LOSA ALIGERADA F'Y= 4200 KG/CM2kg02.01.04.201,257.193.374,236.73LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADOund02.01.04.211,740.002.454,263.00CONCRETO EN LOSA MACIZA Y ESCALERA F'C=210 KG/CM2m302.01.04.225.99299.451,793.71ENCOFRADO Y DESENCOFRADO PARA LOSAS MACIZAS Y ESCALERASm202.01.04.2336.9957.032,109.54ACERO EN LOSA MACIZA Y ESCALERAS F'Y= 4200 KG/CM2kg02.01.04.24393.463.871,522.6902.01.04.25MESA DE LABORATORIO4,410.7802.01.04.25.01OBRAS DE CONCRETO ARMADO4,410.78CONCRETO EN SOBRECIMIENTO ARMADO F'C= 210 KG/CM2m302.01.04.25.01.014.61291.511,343.86SOBRECIMIENTO ENCOFRADO Y DESENCOFRADOm202.01.04.25.01.029.2231.71292.37CONCRETO EN COLUMNAS F'C= 210 KG/CM2m302.01.04.25.01.032.27312.65709.72ENCOFRADO Y DESENCOFRADO EN COLUMNASm202.01.04.25.01.0415.1243.25653.94ACERO EN COLUMNA FY=4200KG/CM2kg02.01.04.25.01.0556.784.02228.26CONCRETO EN LOSA MACIZA Y ESCALERA F'C=210 KG/CM2m302.01.04.25.01.060.90299.45269.51ENCOFRADO Y DESENCOFRADO PARA LOSAS MACIZAS Y ESCALERASm202.01.04.25.01.079.0057.03513.27ACERO EN LOSA MACIZA Y ESCALERAS F'Y= 4200 KG/CM2kg02.01.04.25.01.08103.323.87399.8502.01.05COBERTURAS39,179.78TIJERALES DE MADERA TORNILLO SEGUN DISEOund02.01.05.0116.001,259.8720,157.92CORREAS Y LISTONES DE MADERA TORNILLO DE 2"X3"m02.01.05.02322.0014.564,688.32COBERTURA C/LAMINA TERMOACUSTICA TIPO TEJA ANDINAm202.01.05.03325.2241.7113,564.93CUMBRERA PARA C/LAMINA TERMOACUSTICA TIPO TEJA ANDINAm02.01.05.0432.2023.87768.6102.02ARQUITECTURA140,476.2902.02.01MUROS DE ALBAILERIA11,550.19MURO DE SOGA LADRILLO DE ARCILLA TIPO IVm202.02.01.0148.7840.801,990.22MURO DE CABEZA LADRILLO DE ARCILLA T-IVm202.02.01.02134.1868.439,181.94JUNTA DE CONSTRUCCION CON TEKNOPORT 1 "m202.02.01.0321.345.04107.55JUNTA DE CONSTRUCCION CON TEKNOPORT 2 "m202.02.01.0438.756.98270.4802.02.02REVOQUES ENLUCIDOS Y MOLDURAS22,241.08TARRAJEO EN MURO INTERIOR Y EXTERIORm202.02.02.01723.9313.009,411.09TARRAJEO EN COLUMNASm202.02.02.02143.8425.043,601.75TARRAJEO EN VIGASm202.02.02.03256.9530.237,767.60VESTIDURA DE DERRAMESm02.02.02.0462.859.49596.45BRUAS DE 1 CMm02.02.02.05137.836.27864.1902.02.03CIELORRASOS35,281.69CIELORRASOS CON MEZCLA DE CEMENTO-ARENAm202.02.03.01250.1544.8411,216.73CIELORASO DE TRIPLEY DE 4MMm202.02.03.02213.29110.5923,587.74VESTIDURA DE FONDO ESCALERA CON MEZLA CEMENTO - ARENAm202.02.03.0317.1627.81477.2202.02.04PISOS Y PAVIMENTOS34,565.23FALSO PISO DE 3" DE CONCRETO 1:12m202.02.04.01132.5111.221,486.76CONTRAPISO DE 1".m202.02.04.02347.5121.887,603.52PISO DE CERAMICO ANTIDESLIZANTE DE ALTO TRANSITOm202.02.04.03224.3445.9410,306.18PISO MACHIHEMBRADOm202.02.04.04239.7046.2811,093.32VEREDA RIGIDA DE CONCRETO F'C=140 KG/CM2 E=10CM.,PASTA 1:2 INCLUYEENCOFRADOm202.02.04.05102.7337.933,896.55JUNTAS ASFALTICAS DE DITALACION DE VEREDA 1"m02.02.04.0617.008.29140.93JUNTAS ASFALTICAS DE DITALACION DE VEREDA 2"m02.02.04.072.8013.5637.9702.02.05ZOCALOS5,600.36ZOCALO DE CERAMICOm202.02.05.01117.0447.855,600.36S10Pgina1PresupuestoCONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DEL COLEGIO LA UNIN, EN EL ANEXO DE CACHI LLALLAS,DISTRITO DE HUANDO, PROVINCIA DE HUANCAVELICA.Presupuesto0301025MUNICIPALIDAD DISTRITAL DE HUANDO27/06/2012Costo alClienteLugarHUANCAVELICA - HUANCAVELICA - HUANDOPrecio S/.Parcial S/.ItemDescripcinUnd.Metrado

27/06/2012 10:13:05Fecha :02.02.06CONTRAZOCALOS4,509.50CONTRAZOCALO DE CERAMICO H=10 CMm02.02.06.01109.0722.122,412.63CONTRAZOCALO S/COLOREAR H = 30 CM, MZ 1:5 E=2CMm02.02.06.0282.2510.47861.16 CONTRAZOCALO MADERAm02.02.06.03127.009.731,235.7102.02.07CARPINTERIA DE MADERA3,856.11PUERTA DE MADERAm202.02.07.0118.68206.433,856.1102.02.08CARPINTERIA METALICA Y HERRERIA8,129.11VENTANA METALICAm202.02.08.0148.3879.313,837.02REJA METALICA PARA VENTANAm202.02.08.0236.3575.832,756.42BARANDA METALICA TUBO FG DE 3" EN PASADIZOm02.02.08.0333.9645.221,535.6702.02.09CERRAJERIA1,270.26CHAPA DE 2 GOLPESpza02.02.09.0110.0079.92799.20BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2"pza02.02.09.0230.009.15274.50MANIJA DE BRONCE PARA VENTANAS DE FIERROpza02.02.09.0326.005.46141.96MANIJA DE BRONCE PARA PUERTASpza02.02.09.0410.005.4654.6002.02.10VIDRIOS, CRISTALES Y SIMILARES1,523.50VIDRIOS SEMIDOBLES IMPORTADOp202.02.10.01570.602.671,523.5002.02.11PINTURA11,949.26PINTURA EN MUROS, COLUMNAS Y VIGAS 2 MANOSm202.02.11.011,124.726.587,400.66PINTURA LATEX 2 MANOS EN CIELO RASOm202.02.11.02444.897.483,327.78PINTURA EN CARPINTERIA METALICA C/ANTICORROSIVO Y ESMALTE 2 MANOSm202.02.11.0353.038.45448.10PINTURA EN CARPINTERIA DE MADERAm202.02.11.0418.689.41175.78PINTURA LATEX 2 MANOS EN CONTRAZOCALO CEMENTOm202.02.11.0530.358.78266.47PINTURA VESTIDURA DE DERRAMES PUERTAS Y VENTANASm202.02.11.0633.559.85330.4702.03INSTALACIONES SANITARIAS10,697.5602.03.01SISTEMA DE AGUA DE LLUVIA2,683.48TUBERIA DE PVC SAL 3" PLUVIALm02.03.01.0131.1624.43761.24CODO PVC SAL 3"X90und02.03.01.028.0015.18121.44CANALETA SEMICIRCULAR GALVANIZADA DE 4"m02.03.01.0364.6014.94965.12SOPORTE DE CANALETAund02.03.01.0448.0017.41835.6802.03.02COLUMNETAS DE SOPORTE520.15CONCRETO EN FALSA COLUMNETA F'C= 140 KG/CM2m302.03.02.010.38263.52100.14ENCOFRADO Y DESENCOFRADO EN FALSA COLUMNETAm202.03.02.025.6143.25242.63TARRAJEO EN FALSA COLUMNETAm202.03.02.035.6125.04140.47PINTURA EN FALSA COLUMNETAm202.03.02.045.616.5836.9102.03.03SISTEMA DE AGUA FRIA1,890.49SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2"pto02.03.03.0118.0020.81374.58TUBERIA PVC SAP 1/2"m02.03.03.0240.185.13206.12CODO 90 PVC SAP 1/2"und02.03.03.0318.0029.09523.62TEE PVC-SAP 1/2"und02.03.03.0417.0016.21275.57VALVULA DE COMPUERTA DE BRONCE 1/2"und02.03.03.056.0050.97305.82CAJA DE MADERA PARA VALVULAund02.03.03.066.0034.13204.7802.03.04SISTEMA DE DESAGUE3,535.78SALIDA DE DESAGUE PVC 2"pto02.03.04.0118.0083.441,501.92TUBERIA PVC - SAL 4"m02.03.04.0210.0018.52185.20TUBERIA PVC-SAL 2"m02.03.04.0353.802.18117.28REGISTROS DE BRONCE DE 4"und02.03.04.048.0062.46499.68SUMIDERO DE BRONCE DE 3"und02.03.04.058.0055.78446.24S10Pgina1PresupuestoCONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DEL COLEGIO LA UNIN, EN EL ANEXO DE CACHI LLALLAS,DISTRITO DE HUANDO, PROVINCIA DE HUANCAVELICA.Presupuesto0301025MUNICIPALIDAD DISTRITAL DE HUANDO27/06/2012Costo alClienteLugarHUANCAVELICA - HUANCAVELICA - HUANDOPrecio S/.Parcial S/.ItemDescripcinUnd.Metrado

27/06/2012 10:13:05Fecha :CAJA DE REGISTRO DE DESAGUE 12" X 24"und02.03.04.062.00131.02262.04CODO PVC SAL 2"X90pza02.03.04.0718.0017.37312.66CODO PVC SAL 4"X45pza02.03.04.082.0024.5649.12CODO PVC SAL 4"X90pza02.03.04.096.0024.14144.84YEE CON REDUCCION DE 4"-2"und02.03.04.104.003.1012.40YEE DE 4"und02.03.04.112.002.204.4002.03.05APARATOS Y ACCESORIOS SANITARIOS2,067.66LAVATORIO DE PARED 1 LLAVEund02.03.05.0118.00114.872,067.6602.04INSTALACIONES ELECTRICAS16,438.37SALIDA DE TECHO (CENTRO DE LUZ)pto02.04.0153.0049.262,610.78SALIDA PARA INTERRUPTOR SIMPLEpto02.04.022.0053.74107.48SALIDA PARA INTERRUPTOR DOBLEpto02.04.035.0054.05270.25SALIDA PARA INTERRUPTOR TRIPLEpto02.04.049.0086.76780.84SALIDA PARA INTERRUPTOR SIMPLE CONMUTADOpto02.04.052.00101.53203.06SALIDA PARA TOMACORRIENTES BIPOLARES SIMPLES CON PVCpto02.04.0647.0048.072,259.2902.04.07TUBERIAS DE CANALIZACION4,685.07TUBERIAS PVC SEL (ELECTRICAS) D=3/4"m02.04.07.01324.039.112,951.91TUBERIAS PVC SAP (ELECTRICAS) D=1"m02.04.07.02138.1012.551,733.1602.04.08CONDUCTORES ( CABLES )1,343.54CABLE ELECTRICO TW AWG-MCM NO. 14 -2.5 MM2.m02.04.08.01324.002.77897.48CABLE ELECTRICO TW AWG NO. 12 -4.0MM2m02.04.08.02138.103.23446.0602.04.09CAJAS86.28CAJA DE PASE FG LIV. 6"X6"X3"und02.04.09.016.0014.3886.2802.04.10TABLEROS Y CUCHILLAS (LLAVES)216.73TABLERO DE DISTRIBUCION CAJA METALICA DE 8 POLOSund02.04.10.011.00216.73216.7302.04.11ARTEFACTOS3,875.05FLUORESCENTE RECTO 2x40W C/EQUIPO PARA ADOSARund02.04.11.0138.0091.253,467.50ARTEF. FLOURECENTE PARA SPOT - LIGT(PASADIZO)und02.04.11.0215.0027.17407.5503CONSTRUCCION DEL PABELLON C - ADMINISTRACION91,976.2103.01ESTRUCTURAS40,624.0803.01.01TRABAJOS PRELIMINARES585.20LIMPIEZA DE TERRENO MANUALm203.01.01.01146.302.49364.29TRAZO Y REPLANTEO PRELIMINARm203.01.01.02146.301.51220.9103.01.02MOVIMIENTO DE TIERRAS989.11EXCAVACION DE ZANJAS ZAPATASm303.01.02.0113.8227.87385.16RELLENO CON MATERIAL PROPIOm303.01.02.029.5813.94133.55EXCAVACION MANUAL PARA CIMIENTOS CORRIDOSm303.01.02.039.2124.39224.63NIVELACION INT.Y APISONADO PARA CIMIENTOm203.01.02.04134.121.45194.47ELIMINACION DE MATERIAL EXCEDENTE (INC. CARGUIO)m303.01.02.0516.823.0551.3003.01.03OBRAS DE CONCRETO SIMPLE5,709.07CIMIENTOS CORRIDOS 1:10 + 30% P.G.m303.01.03.0115.10164.842,489.08SOLADO PARA ZAPATA e=4" 1:12 CEM/HORm203.01.03.021.2023.4828.18SOBRECIMIENTO CONCRETO 1:8 + 25% P.M.m303.01.03.035.47253.371,385.93SOBRECIMIENTO ENCOFRADO Y DESENCOFRADOm203.01.03.0456.9531.711,805.8803.01.04OBRAS DE CONCRETO ARMADO18,979.96CONCRETO EN ZAPATAS F'C= 210 KG/CM2m303.01.04.017.21289.712,088.81ACERO EN ZAPATAS Fy=4200KG/CM2kg03.01.04.02110.883.89431.32CONCRETO EN COLUMNAS F'C= 210 KG/CM2m303.01.04.034.67312.651,460.08S10Pgina1PresupuestoCONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DEL COLEGIO LA UNIN, EN EL ANEXO DE CACHI LLALLAS,DISTRITO DE HUANDO, PROVINCIA DE HUANCAVELICA.Presupuesto0301025MUNICIPALIDAD DISTRITAL DE HUANDO27/06/2012Costo alClienteLugarHUANCAVELICA - HUANCAVELICA - HUANDOPrecio S/.Parcial S/.ItemDescripcinUnd.Metrado

27/06/2012 10:13:05Fecha :ENCOFRADO Y DESENCOFRADO EN COLUMNASm203.01.04.0449.7243.252,150.39ACERO EN COLUMNA FY=4200KG/CM2kg03.01.04.05872.744.023,508.41CONCRETO EN VIGAS F'C=210 KG/CM2m303.01.04.065.39312.481,684.27ENCOFRADO Y DESENCOFRADO EN VIGASm203.01.04.0754.0437.001,999.48ACERO EN VIGAS Fy=4200KG/CM2kg03.01.04.08782.894.153,248.99CONCRETO EN COLUMNETAS F'C= 210 KG/CM2m303.01.04.091.65312.65515.87ENCOFRADO Y DESENCOFRADO EN COLUMNETASm203.01.04.1026.4843.251,145.26ACERO EN COLUMNETAS FY=4200KG/CM2kg03.01.04.11185.844.02747.0803.01.05COBERTURAS14,360.74CORREAS Y LISTONES DE MADERA TORNILLO DE 2"X3"m03.01.05.01163.2014.562,376.19COBERTURA C/LAMINA TERMOACUSTICA TIPO TEJA ANDINAm203.01.05.02128.5241.715,360.57CUMBRERA PARA C/LAMINA TERMOACUSTICA TIPO TEJA ANDINAm03.01.05.0313.6023.87324.63TIJERALES DE MADERA TORNILLO SEGUN DISEOund03.01.05.045.001,259.876,299.3503.02ARQUITECTURA44,621.3703.02.01MUROS DE ALBAILERIA6,522.60MURO DE SOGA LADRILLO DE ARCILLA TIPO IVm203.02.01.0134.0140.801,387.61MURO DE CABEZA LADRILLO DE ARCILLA T-IVm203.02.01.0275.0468.435,134.9903.02.02REVOQUES ENLUCIDOS Y MOLDURAS6,716.40TARRAJEO EN MURO INTERIOR Y EXTERIORm203.02.02.01259.6113.003,374.93TARRAJEO EN COLUMNASm203.02.02.0233.9025.04848.86TARRAJEO EN VIGASm203.02.02.0352.5930.231,589.80VESTIDURA DE DERRAMESm03.02.02.0433.459.49317.44BRUAS DE 1 CMm03.02.02.0593.366.27585.3703.02.03CIELORRASOS12,189.23CIELORASO DE TRIPLEY DE 4MMm203.02.03.01110.22110.5912,189.2303.02.04PISOS Y PAVIMENTOS5,456.65FALSO PISO DE 3" DE CONCRETO 1:12m203.02.04.0184.4011.22946.97PISO DE CERAMICO DE PRIMERA BAOSm203.02.04.024.2233.47141.24PISO MACHIHEMBRADOm203.02.04.0380.1846.283,710.73VEREDA RIGIDA DE CONCRETO F'C=140 KG/CM2 E=10CM.,PASTA 1:2 INCLUYEENCOFRADOm203.02.04.0417.3437.93657.7103.02.05ZOCALOS456.01ZOCALO DE CERAMICOm203.02.05.019.5347.85456.0103.02.06CONTRAZOCALOS935.82 CONTRAZOCALO MADERAm03.02.06.0138.009.73369.74CONTRAZOCALO S/COLOREAR H = 20 CM, MZ 1:5 E=2CMm03.02.06.0265.678.62566.0803.02.07CARPINTERIA DE MADERA4,064.61PUERTA DE MADERAm203.02.07.0119.69206.434,064.6103.02.08CARPINTERIA METALICA Y HERRERIA2,614.85VENTANA METALICAm203.02.08.0132.9779.312,614.8503.02.09CERRAJERIA764.64CHAPA DE 2 GOLPESpza03.02.09.016.0079.92479.52BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2"pza03.02.09.0224.009.15219.60MANIJA DE BRONCE PARA VENTANAS DE FIERROpza03.02.09.036.005.4632.76MANIJA DE BRONCE PARA PUERTASpza03.02.09.046.005.4632.7603.02.10VIDRIOS, CRISTALES Y SIMILARES947.10VIDRIOS SEMIDOBLES IMPORTADOp203.02.10.01354.722.67947.1003.02.11PINTURA3,953.46PINTURA EN MUROS, COLUMNAS Y VIGAS 2 MANOSm203.02.11.01346.116.582,277.40S10Pgina1PresupuestoCONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DEL COLEGIO LA UNIN, EN EL ANEXO DE CACHI LLALLAS,DISTRITO DE HUANDO, PROVINCIA DE HUANCAVELICA.Presupuesto0301025MUNICIPALIDAD DISTRITAL DE HUANDO27/06/2012Costo alClienteLugarHUANCAVELICA - HUANCAVELICA - HUANDOPrecio S/.Parcial S/.ItemDescripcinUnd.Metrado

27/06/2012 10:13:05Fecha :PINTURA LATEX 2 MANOS EN CIELO RASOm203.02.11.02109.047.48815.62PINTURA EN CARPINTERIA METALICA C/ANTICORROSIVO Y ESMALTE 2 MANOSm203.02.11.0332.978.45278.60PINTURA EN CARPINTERIA DE MADERAm203.02.11.0445.949.41432.30PINTURA LATEX 2 MANOS EN CONTRAZOCALO CEMENTOm203.02.11.0511.408.78100.09PINTURA VESTIDURA DE DERRAMES PUERTAS Y VENTANASm203.02.11.065.029.8549.4503.03INSTALACIONES SANITARIAS3,335.5803.03.01SISTEMA DE AGUA DE LLUVIA1,255.88TUBERIA DE PVC SAL 3" PLUVIALm03.03.01.0112.7624.43311.73CODO PVC SAL 3"X90und03.03.01.028.0015.18121.44CANALETA SEMICIRCULAR GALVANIZADA DE 4"m03.03.01.0327.1014.94404.87SOPORTE DE CANALETAund03.03.01.0424.0017.41417.8403.03.02COLUMNETAS DE SOPORTE454.58CONCRETO EN FALSA COLUMNETA F'C= 140 KG/CM2m303.03.02.010.33263.5286.96ENCOFRADO Y DESENCOFRADO EN FALSA COLUMNETAm203.03.02.024.9143.25212.36TARRAJEO EN FALSA COLUMNETAm203.03.02.034.9125.04122.95PINTURA EN FALSA COLUMNETAm203.03.02.044.916.5832.3103.03.03SISTEMA DE AGUA FRIA345.76SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2"pto03.03.03.013.0020.8162.43TUBERIA PVC SAP 1/2"m03.03.03.027.405.1337.96CODO 90 PVC SAP 1/2"und03.03.03.034.0029.09116.36VALVULA DE COMPUERTA DE BRONCE 1/2"und03.03.03.041.0050.9750.97CAJA DE VALVULA PREFABRICADApza03.03.03.051.0078.0478.0403.03.04SISTEMA DE DESAGUE844.68SALIDA DE DESAGUE PVC DE 4"pto03.03.04.011.0093.0293.02SALIDA DE DESAGUE PVC 2"pto03.03.04.022.0083.44166.88TUBERIA PVC - SAL 4"m03.03.04.0310.3618.52191.87TUBERIA PVC-SAL 2"m03.03.04.0417.412.1837.95REGISTROS DE BRONCE DE 4"und03.03.04.051.0062.4662.46SUMIDERO DE BRONCE DE 3"und03.03.04.061.0055.7855.78CAJA DE REGISTRO DE DESAGUE 12" X 24"und03.03.04.071.00131.02131.02CODO PVC SAL 2"X45pza03.03.04.082.0018.1136.22CODO PVC SAL 2"X90pza03.03.04.094.0017.3769.4803.03.05APARATOS Y ACCESORIOS SANITARIOS434.68INODORO TANQUE BAJOund03.03.05.011.00131.30131.30LAVATORIO DE PARED 1 LLAVEund03.03.05.021.00114.87114.87URINARIO DE PAREDund03.03.05.031.00188.51188.5103.04INSTALACIONES ELECTRICAS3,395.18SALIDA DE TECHO (CENTRO DE LUZ)pto03.04.0111.0049.26541.86SALIDA PARA INTERRUPTOR SIMPLEpto03.04.024.0053.74214.96SALIDA PARA INTERRUPTOR DOBLEpto03.04.033.0054.05162.15SALIDA PARA TOMACORRIENTES BIPOLARES SIMPLES CON PVCpto03.04.048.0048.07384.5603.04.05TUBERIAS DE CANALIZACION864.91TUBERIAS PVC SEL (ELECTRICAS) D=3/4"m03.04.05.0160.179.11548.15TUBERIAS PVC SAP (ELECTRICAS) D=1"m03.04.05.0225.2412.55316.7603.04.06CONDUCTORES ( CABLES )248.20CABLE ELECTRICO TW AWG-MCM NO. 14 -2.5 MM2.m03.04.06.0160.172.77166.67CABLE ELECTRICO TW AWG NO. 12 -4.0MM2m03.04.06.0225.243.2381.5303.04.07CAJAS14.38S10Pgina1PresupuestoCONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DEL COLEGIO LA UNIN, EN EL ANEXO DE CACHI LLALLAS,DISTRITO DE HUANDO, PROVINCIA DE HUANCAVELICA.Presupuesto0301025MUNICIPALIDAD DISTRITAL DE HUANDO27/06/2012Costo alClienteLugarHUANCAVELICA - HUANCAVELICA - HUANDOPrecio S/.Parcial S/.ItemDescripcinUnd.Metrado

27/06/2012 10:13:05Fecha :CAJA DE PASE FG LIV. 6"X6"X3"und03.04.07.011.0014.3814.3803.04.08TABLEROS Y CUCHILLAS (LLAVES)216.73TABLERO DE DISTRIBUCION CAJA METALICA DE 8 POLOSund03.04.08.011.00216.73216.7303.04.09ARTEFACTOS747.43FLUORESCENTE RECTO 2x40W C/EQUIPO PARA ADOSARund03.04.09.017.0091.25638.75ARTEF. FLOURECENTE PARA SPOT - LIGT(PASADIZO)und03.04.09.024.0027.17108.6804CONSTRUCCION DEL PABELLON D - SALA DE USOS MULTIPLES129,731.0604.01ESTRUCTURAS64,897.5304.01.01TRABAJOS PRELIMINARES576.20LIMPIEZA DE TERRENO MANUALm204.01.01.01144.052.49358.68TRAZO Y REPLANTEO PRELIMINARm204.01.01.02144.051.51217.5204.01.02MOVIMIENTO DE TIERRAS1,523.15EXCAVACION DE ZANJAS ZAPATASm304.01.02.0125.3027.87705.11RELLENO CON MATERIAL PROPIOm304.01.02.0219.6413.94273.78EXCAVACION MANUAL PARA CIMIENTOS CORRIDOSm304.01.02.0310.1024.39246.34NIVELACION Y APISONADO PARA PISO Y VEREDAm204.01.02.0499.892.17216.76ELIMINACION DE MATERIAL EXCEDENTE (INC. CARGUIO)m304.01.02.0526.613.0581.1604.01.03OBRAS DE CONCRETO SIMPLE6,343.91CIMIENTOS CORRIDOS 1:10 + 30% P.G.m304.01.03.0114.54164.842,396.77SOLADO PARA ZAPATA e=4" 1:12 CEM/HORm204.01.03.0223.5123.48552.01SOBRECIMIENTO CONCRETO 1:8 + 25% P.M.m304.01.03.036.31253.371,598.76SOBRECIMIENTO ENCOFRADO Y DESENCOFRADOm204.01.03.0456.6531.711,796.3704.01.04OBRAS DE CONCRETO ARMADO50,645.94CONCRETO EN ZAPATAS F'C= 210 KG/CM2m304.01.04.0114.11289.714,087.81ACERO EN ZAPATAS Fy=4200KG/CM2kg04.01.04.02218.593.89850.32CONCRETO EN COLUMNAS F'C= 210 KG/CM2m304.01.04.038.55312.652,673.16ENCOFRADO Y DESENCOFRADO EN COLUMNASm204.01.04.0492.4243.253,997.17ACERO EN COLUMNA FY=4200KG/CM2kg04.01.04.05995.794.024,003.08CONCRETO EN VIGAS F'C=210 KG/CM2m304.01.04.0611.29312.483,527.90ENCOFRADO Y DESENCOFRADO EN VIGASm204.01.04.0798.7637.003,654.12ACERO EN VIGAS Fy=4200KG/CM2kg04.01.04.081,282.134.155,320.84CONCRETO EN COLUMNETAS F'C= 210 KG/CM2m304.01.04.093.15312.65984.85ENCOFRADO Y DESENCOFRADO EN COLUMNETASm204.01.04.1060.2043.252,603.65ACERO EN COLUMNETAS FY=4200KG/CM2kg04.01.04.11447.504.021,798.95CONCRETO EN VIGAS DE AMARRE F'C=210 KG/CM2 (MUROS NO PORTANTES)m304.01.04.120.81316.83256.63ENCOFRADO Y DESENCOFRADO EN VIGAS DE AMARREm204.01.04.139.7537.00360.75ACERO EN VIGAS DE AMARRE Fy=4200KG/CM2kg04.01.04.14601.234.152,495.10CONCRETO EN LOSA ALIGERADA F'C=210 KG/CM2m304.01.04.159.05299.452,710.02ENCOFRADO Y DESENCOFRADO PARA LOSAS MACIZAS Y ESCALERASm204.01.04.16113.1057.036,450.09ACERO EN LOSA F'Y= 4200 KG/CM2kg04.01.04.17645.973.872,499.90LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADOund04.01.04.18968.002.452,371.6004.01.05COBERTURAS5,808.33COBERTURA C/LAMINA TERMOACUSTICA TIPO TEJA ANDINAm204.01.05.01131.1041.715,468.18CUMBRERA PARA C/LAMINA TERMOACUSTICA TIPO TEJA ANDINAm04.01.05.0214.2523.87340.1504.02ARQUITECTURA56,821.5304.02.01MUROS DE ALBAILERIA6,183.75MURO DE SOGA LADRILLO DE ARCILLA TIPO IVm204.02.01.0124.1940.80986.95MURO DE CABEZA LADRILLO DE ARCILLA T-IVm204.02.01.0275.1768.435,143.88S10Pgina1PresupuestoCONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DEL COLEGIO LA UNIN, EN EL ANEXO DE CACHI LLALLAS,DISTRITO DE HUANDO, PROVINCIA DE HUANCAVELICA.Presupuesto0301025MUNICIPALIDAD DISTRITAL DE HUANDO27/06/2012Costo alClienteLugarHUANCAVELICA - HUANCAVELICA - HUANDOPrecio S/.Parcial S/.ItemDescripcinUnd.Metrado

27/06/2012 10:13:05Fecha :JUNTA DE CONSTRUCCION CON TEKNOPORT 1 "m204.02.01.0310.505.0452.9204.02.02REVOQUES ENLUCIDOS Y MOLDURAS9,283.12TARRAJEO EN MURO INTERIOR Y EXTERIORm204.02.02.01206.9313.002,690.09TARRAJEO EN COLUMNASm204.02.02.0274.1425.041,856.47TARRAJEO EN VIGASm204.02.02.0395.9430.232,900.27VESTIDURA DE DERRAMESm04.02.02.04106.579.491,011.35BRUAS DE 1 CMm04.02.02.05131.576.27824.9404.02.03CIELORRASOS15,109.37CIELORRASOS CON MEZCLA DE CEMENTO-ARENAm204.02.03.01109.3244.844,901.91CIELORASO DE TRIPLEY DE 4MMm204.02.03.0292.30110.5910,207.4604.02.04PISOS Y PAVIMENTOS7,533.18FALSO PISO DE 3" DE CONCRETO 1:12m204.02.04.0194.0711.221,055.47CONTRAPISO DE 1".m204.02.04.0275.5021.881,651.94PISO DE CERAMICO ANTIDESLIZANTE DE ALTO TRANSITOm204.02.04.0372.2245.943,317.79PISO DE CERAMICO DE PRIMERA BAOSm204.02.04.043.2833.47109.78VEREDA RIGIDA DE CONCRETO F'C=140 KG/CM2 E=10CM.,PASTA 1:2 INCLUYEENCOFRADOm204.02.04.0535.3737.931,341.58JUNTAS ASFALTICAS DE DITALACION DE VEREDA 1"m04.02.04.066.838.2956.6204.02.05ZOCALOS645.98ZOCALO DE CERAMICOm204.02.05.0113.5047.85645.9804.02.06CONTRAZOCALOS1,286.71CONTRAZOCALO S/COLOREAR H = 20 CM, MZ 1:5 E=2CMm04.02.06.0128.208.62243.08CONTRAZOCALO S/COLOREAR H = 30 CM, MZ 1:5 E=2CMm04.02.06.0240.1010.47419.85CONTRAZOCALO DE CERAMICO H=10 CMm04.02.06.0328.2022.12623.7804.02.07CARPINTERIA DE MADERA9,605.01PUERTA DE MADERAm204.02.07.0117.10206.433,529.95ESTRADOm204.02.07.0236.50166.446,075.0604.02.08CARPINTERIA METALICA Y HERRERIA2,184.20VENTANA METALICAm204.02.08.0127.5479.312,184.2004.02.09CERRAJERIA500.82CHAPA DE 2 GOLPESpza04.02.09.013.0079.92239.76BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2"pza04.02.09.0216.009.15146.40MANIJA DE BRONCE PARA VENTANAS DE FIERROpza04.02.09.0315.005.4681.90MANIJA DE BRONCE PARA PUERTASpza04.02.09.046.005.4632.7604.02.10VIDRIOS, CRISTALES Y SIMILARES791.20VIDRIOS SEMIDOBLES IMPORTADOp204.02.10.01296.332.67791.2004.02.11PINTURA3,698.19PINTURA EN MUROS, COLUMNAS Y VIGAS 2 MANOSm204.02.11.01377.006.582,480.66PINTURA LATEX 2 MANOS EN CIELO RASOm204.02.11.027.357.4854.98PINTURA EN CARPINTERIA METALICA C/ANTICORROSIVO Y ESMALTE 2 MANOSm204.02.11.0327.548.45232.71PINTURA EN CARPINTERIA DE MADERAm204.02.11.0434.209.41321.82PINTURA LATEX 2 MANOS EN CONTRAZOCALO CEMENTOm204.02.11.0542.928.78376.84PINTURA VESTIDURA DE DERRAMES PUERTAS Y VENTANASm204.02.11.0623.479.85231.1804.03INSTALACIONES SANITARIAS3,540.8504.03.01SISTEMA DE AGUA DE LLUVIA750.56TUBERIA DE PVC SAL 3" PLUVIALm04.03.01.0117.2024.43420.20CODO PVC SAL 3"X90und04.03.01.028.0015.18121.44SOPORTE DE CANALETAund04.03.01.0312.0017.41208.9204.03.02COLUMNETAS DE SOPORTE520.15S10Pgina1PresupuestoCONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DEL COLEGIO LA UNIN, EN EL ANEXO DE CACHI LLALLAS,DISTRITO DE HUANDO, PROVINCIA DE HUANCAVELICA.Presupuesto0301025MUNICIPALIDAD DISTRITAL DE HUANDO27/06/2012Costo alClienteLugarHUANCAVELICA - HUANCAVELICA - HUANDOPrecio S/.Parcial S/.ItemDescripcinUnd.Metrado

27/06/2012 10:13:05Fecha :CONCRETO EN FALSA COLUMNETA F'C= 140 KG/CM2m304.03.02.010.38263.52100.14ENCOFRADO Y DESENCOFRADO EN FALSA COLUMNETAm204.03.02.025.6143.25242.63TARRAJEO EN FALSA COLUMNETAm204.03.02.035.6125.04140.47PINTURA EN FALSA COLUMNETAm204.03.02.045.616.5836.9104.03.03SISTEMA DE AGUA FRIA439.39SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2"pto04.03.03.014.0024.8799.48TUBERIA PVC SAP 1/2"m04.03.03.029.855.1350.53CODO 90 PVC SAP 1/2"und04.03.03.037.0019.83138.81TEE PVC-SAP 1/2"und04.03.03.043.0016.2148.63VALVULA DE COMPUERTA DE BRONCE 1/2"und04.03.03.052.0050.97101.9404.03.04SISTEMA DE DESAGUE1,186.89SALIDA DE DESAGUE PVC DE 4"pto04.03.04.012.0093.02186.04SALIDA DE DESAGUE PVC 2"pto04.03.04.022.0083.44166.88SALIDA PARA VENTILACIONpto04.03.04.032.0065.99131.98TUBERIA PVC - SAL 4"m04.03.04.048.9418.52165.57TUBERIA PVC-SAL 2"m04.03.04.053.649.5934.91REGISTROS DE BRONCE DE 4"und04.03.04.062.0062.46124.92SUMIDERO DE BRONCE DE 3"und04.03.04.072.0056.32112.64CAJA DE REGISTRO DE DESAGUE 12" X 24"und04.03.04.081.00131.02131.02CODO PVC SAL 2"X90pza04.03.04.096.0017.37104.22CODO PVC SAL 2"X45pza04.03.04.101.0018.1118.11TEE PVC SAL DE 4"und04.03.04.112.005.3010.6004.03.05APARATOS Y ACCESORIOS SANITARIOS643.86INODORO TANQUE BAJOund04.03.05.012.00207.06414.12LAVATORIO DE PARED 1 LLAVEund04.03.05.022.00114.87229.7404.04INSTALACIONES ELECTRICAS4,471.15SALIDA DE TECHO (CENTRO DE LUZ)pto04.04.0116.0049.26788.16SALIDA PARA INTERRUPTOR SIMPLEpto04.04.024.0053.74214.96SALIDA PARA INTERRUPTOR DOBLEpto04.04.036.0054.05324.30SALIDA PARA TOMACORRIENTES BIPOLARES SIMPLES CON PVCpto04.04.0411.0048.07528.7704.04.05TUBERIAS DE CANALIZACION969.05TUBERIAS PVC SEL (ELECTRICAS) D=3/4"m04.04.05.0160.659.11552.52TUBERIAS PVC SAP (ELECTRICAS) D=1"m04.04.05.0233.1912.55416.5304.04.06CONDUCTORES ( CABLES )275.20CABLE ELECTRICO TW AWG-MCM NO. 14 -2.5 MM2.m04.04.06.0160.652.77168.00CABLE ELECTRICO TW AWG NO. 12 -4.0MM2m04.04.06.0233.193.23107.2004.04.07CAJAS14.38CAJA DE PASE FG LIV. 6"X6"X3"und04.04.07.011.0014.3814.3804.04.08TABLEROS Y CUCHILLAS (LLAVES)216.73TABLERO DE DISTRIBUCION CAJA METALICA DE 8 POLOSund04.04.08.011.00216.73216.7304.04.09ARTEFACTOS1,139.60FLUORESCENTE RECTO 2x40W C/EQUIPO PARA ADOSARund04.04.09.0111.0091.251,003.75ARTEF. FLOURECENTE PARA SPOT - LIGT(PASADIZO)und04.04.09.025.0027.17135.8505CONSTRUCCION DE BATERIAS DE SS.HH. (02 BATERIAS)94,951.1305.01ESTRUCTURAS32,793.6605.01.01TRABAJOS PRELIMINARES336.00LIMPIEZA DE TERRENO MANUALm205.01.01.0184.002.49209.16TRAZO Y REPLANTEO PRELIMINARm205.01.01.0284.001.51126.84S10Pgina1PresupuestoCONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DEL COLEGIO LA UNIN, EN EL ANEXO DE CACHI LLALLAS,DISTRITO DE HUANDO, PROVINCIA DE HUANCAVELICA.Presupuesto0301025MUNICIPALIDAD DISTRITAL DE HUANDO27/06/2012Costo alClienteLugarHUANCAVELICA - HUANCAVELICA - HUANDOPrecio S/.Parcial S/.ItemDescripcinUnd.Metrado

27/06/2012 10:13:05Fecha :05.01.02MOVIMIENTO DE TIERRAS925.11EXCAVACION DE ZANJAS ZAPATASm305.01.02.0116.7727.87467.38RELLENO CON MATERIAL PROPIOm305.01.02.0210.0213.94139.68EXCAVACION MANUAL PARA CIMIENTOS CORRIDOSm305.01.02.037.4724.39182.19NIVELACION INT.Y APISONADO PARA CIMIENTOm205.01.02.048.381.4512.15ELIMINACION DE MATERIAL EXCEDENTE (INC. CARGUIO)m305.01.02.0540.563.05123.7105.01.03OBRAS DE CONCRETO SIMPLE3,393.37CIMIENTOS CORRIDOS 1:10 + 30% P.G.m305.01.03.017.72164.841,272.56SOLADO PARA ZAPATA e=4" 1:12 CEM/HORm205.01.03.0214.5823.48342.34SOBRECIMIENTO CONCRETO 1:8 + 25% P.M.m305.01.03.036.73232.551,565.06SOBRECIMIENTO ENCOFRADO Y DESENCOFRADOm205.01.03.046.7331.71213.4105.01.04OBRAS DE CONCRETO ARMADO28,139.18CONCRETO EN ZAPATAS F'C= 210 KG/CM2m305.01.04.018.75297.522,603.30ACERO EN ZAPATAS Fy=4200KG/CM2kg05.01.04.02142.563.89554.56CONCRETO EN COLUMNAS F'C= 210 KG/CM2m305.01.04.034.44312.651,388.17ENCOFRADO Y DESENCOFRADO EN COLUMNASm205.01.04.0438.9843.251,685.89ACERO EN COLUMNA FY=4200KG/CM2kg05.01.04.05425.764.021,711.56CONCRETO EN VIGAS F'C=210 KG/CM2m305.01.04.066.78312.482,118.61ENCOFRADO Y DESENCOFRADO EN VIGASm205.01.04.0744.4437.001,644.28ACERO EN VIGAS Fy=4200KG/CM2kg05.01.04.081,358.554.155,637.98CONCRETO EN LOSA ALIGERADA F'C=210 KG/CM2m305.01.04.095.68296.671,685.09ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADAm205.01.04.1067.8427.081,837.11ACERO EN LOSA ALIGERADA F'Y= 4200 KG/CM2kg05.01.04.11618.143.372,083.13LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADOund05.01.04.12704.002.451,724.80CONCRETO EN LAVADEROS F'C= 210 KG/CM2m305.01.04.131.16322.29373.86ACERO EN LAVADEROS FY=4200KG/CM2kg05.01.04.1414.833.8557.10ENCOFRADO Y DESENCOFRADO EN LAVADEROSm205.01.04.1568.4244.343,033.7405.02ARQUITECTURA43,572.0405.02.01MUROS DE ALBAILERIA8,103.01MURO DE SOGA LADRILLO KING-KONG TIPO IVm205.02.01.0157.2043.612,494.49MURO DE CABEZA LADRILLO KING-KONG TIPO IVm205.02.01.0281.9668.435,608.5205.02.02REVOQUES ENLUCIDOS Y MOLDURAS6,757.40TARRAJEO EN MURO INTERIOR Y EXTERIORm205.02.02.01289.3114.914,313.61TARRAJEO EN COLUMNASm205.02.02.0237.4214.91557.93TARRAJEO EN VIGASm205.02.02.0366.9914.91998.82VESTIDURA DE DERRAMES PUERTAS Y VENTANASm05.02.02.0489.609.90887.0405.02.03CIELORRASOS277.163,041.95CIELORRASOS CON MEZCLA DE CEMENTO-ARENAm205.02.03.0167.8444.843,041.9505.02.04PISOS Y PAVIMENTOS4,793.22FALSO PISO DE 4" DE CONCRETO 1:8m205.02.04.0152.3220.041,048.49PISO DE CERAMICO DE PRIMERA PARA BAOSm205.02.04.0252.3233.471,751.15VEREDA RIGIDA DE CONCRETO F'C=140 KG/CM2 E=10CM.,PASTA 1:2 INCLUYEENCOFRADOm205.02.04.0329.1868.321,993.5805.02.05ZOCALOS5,718.08ZOCALO DE CERAMICOm205.02.05.01119.5047.855,718.0805.02.06CARPINTERIA DE MADERA4,056.76PUERTA DE MADERAm205.02.06.0111.76102.911,210.22VENTANA DE MADERAm205.02.06.0210.67266.782,846.5405.02.07CARPINTERIA METALICA Y HERRERIA5,692.39S10Pgina1PresupuestoCONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DEL COLEGIO LA UNIN, EN EL ANEXO DE CACHI LLALLAS,DISTRITO DE HUANDO, PROVINCIA DE HUANCAVELICA.Presupuesto0301025MUNICIPALIDAD DISTRITAL DE HUANDO27/06/2012Costo alClienteLugarHUANCAVELICA - HUANCAVELICA - HUANDOPrecio S/.Parcial S/.ItemDescripcinUnd.Metrado

27/06/2012 10:13:05Fecha :TABIQUE METALICO EN BAOSm205.02.07.0125.8477.011,989.94PUERTA METALICA EN BAOSm205.02.07.0213.44275.483,702.4505.02.08CERRAJERIA687.60CHAPA DE 2 GOLPESund05.02.08.016.0079.92479.52BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2"pza05.02.08.0212.009.15109.80MANIJA PARA VENTANAS METALICASund05.02.08.036.005.4632.76MANIJA DE BRONCE PARA PUERTASund05.02.08.0412.005.4665.5205.02.09VIDRIOS, CRISTALES Y SIMILARES306.49VIDRIOS SEMIDOBLES IMPORTADOp205.02.09.01114.792.67306.4905.02.10PINTURA4,415.14PINTURA EN MUROS, COLUMNAS Y VIGAS 2 MANOSm205.02.10.01278.927.902,203.47PINTURA LATEX 2 MANOS EN CIELO RASOm205.02.10.0267.849.66655.33PINTURA BARNIZ EN CARPINTERIA DE MADERAm205.02.10.0322.4359.231,328.53PINTURA VESTIDURA DE DERRAMES PUERTAS Y VENTANASm205.02.10.0422.4010.17227.8105.03INSTALACIONES SANITARIAS14,303.7105.03.01SISTEMA DE AGUA DE LLUVIA1,058.04TUBERIA DE PVC SAL 3" PLUVIALm05.03.01.0121.2024.43517.92CODO PVC SAL 3"X90und05.03.01.022.0015.1830.36SOPORTE DE CANALETAund05.03.01.0329.2817.41509.7605.03.02COLUMNETAS DE SOPORTE454.73CONCRETO EN FALSA COLUMNETA F'C= 140 KG/CM2m305.03.02.010.33395.06130.37ENCOFRADO Y DESENCOFRADO EN FALSA COLUMNETAm205.03.02.024.9143.25212.36TARRAJEO EN FALSA COLUMNETAm205.03.02.034.9114.9173.21PINTURA EN FALSA COLUMNETAm205.03.02.044.917.9038.7905.03.03SISTEMA DE AGUA FRIA2,805.36SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2"pto05.03.03.0140.0024.87994.80TUBERIA PVC SAP 1/2"m05.03.03.0272.005.99431.28TEE PVC-SAP 1/2"und05.03.03.0336.0016.21583.56CODO 90 PVC SAP 1/2"und05.03.03.0430.0019.83594.90VALVULA DE COMPUERTA DE BRONCE 1/2"und05.03.03.056.0033.47200.8205.03.04INSTALACIONES SANITARIAS6,708.34SALIDA DE DESAGUE PVC DE 4"pto05.03.04.0110.0093.02930.20SALIDA DE DESAGUE PVC 2"pto05.03.04.0226.0083.442,169.44SALIDA PARA VENTILACIONpto05.03.04.036.0065.99395.94TUBERIA PVC - SAL 4"m05.03.04.0429.7223.28691.88TUBERIA PVC-SAL 2"m05.03.04.0538.639.59370.46REGISTROS DE BRONCE DE 4"und05.03.04.0610.0062.46624.60SUMIDERO DE BRONCE DE 3"und05.03.04.0714.0056.32788.48CAJA DE REGISTRO DE DESAGUE 12" X 24"und05.03.04.086.00122.89737.3405.03.05APARATOS Y ACCESORIOS SANITARIOS3,277.24INODORO TANQUE BAJOund05.03.05.018.00207.061,656.48LAVATORIO DE PARED 1 LLAVEund05.03.05.0212.00114.871,378.44URINARIO CORRIDO SEGUN DISEO REV. C/MAYOLICAm05.03.05.031.80134.62242.3205.04INSTALACIONES ELECTRICAS4,281.7205.04.01SALIDA PARA ELECTRICIDAD Y TOMACORRIENTES1,854.32SALIDA DE TECHO (CENTRO DE LUZ)pto05.04.01.0112.0073.14877.68SALIDA PARA INTERRUPTOR SIMPLEpto05.04.01.026.0058.42350.52SALIDA PARA INTERRUPTOR DOBLEpto05.04.01.034.0054.05216.20S10Pgina1PresupuestoCONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DEL COLEGIO LA UNIN, EN EL ANEXO DE CACHI LLALLAS,DISTRITO DE HUANDO, PROVINCIA DE HUANCAVELICA.Presupuesto0301025MUNICIPALIDAD DISTRITAL DE HUANDO27/06/2012Costo alClienteLugarHUANCAVELICA - HUANCAVELICA - HUANDOPrecio S/.Parcial S/.ItemDescripcinUnd.Metrado

27/06/2012 10:13:05Fecha :SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVCpto05.04.01.046.0068.32409.9205.04.02TUBERIAS DE CANALIZACION675.77TUBERIAS PVC SAP (ELECTRICAS) D=1"m05.04.02.0112.7612.55160.14TUBERIAS PVC SEL (ELECTRICAS) D=3/4"m05.04.02.0256.609.11515.6305.04.03CONDUCTORES ( CABLES )35.35CABLE ELECTRICO TW AWG-MCM NO. 14 -2.5 MM2.m05.04.03.0112.762.7735.3505.04.04CAJAS24.80CAJA DE PASE FG LIV. 6"X6"X3"und05.04.04.012.0012.4024.8005.04.05TABLEROS ELECTRICOS433.46TABLERO DE DISTRIBUCION CAJA METALICA DE 8 POLOSund05.04.05.012.00216.73433.4605.04.06ARTEFACTOS1,258.02FLUORESCENTE RECTO 2x40W C/EQUIPO PARA ADOSARund05.04.06.0112.0091.251,095.00ARTEF. FLOURECENTE PARA SPOT - LIGT(PASADIZO)und05.04.06.026.0027.17163.0206PATIO GENERAL30,014.2406.01TRABAJOS PRELIMINARES1,662.39LIMPIEZA DE TERRENO MANUALm206.01.01423.002.801,184.40TRAZO Y REPLANTEOm206.01.02423.001.13477.9906.02MOVIMIENTO DE TIERRAS9,470.61EXCAVACION MANUAL EN MATERIAL SUELTOm306.02.0184.0024.862,088.24AFIRMADO DE 4" PARA LOSAm206.02.02423.0011.764,974.48EXCAVACION PARA SARDINELESm306.02.0313.7455.01755.84EXCAVACION PARA DADOSm306.02.0413.2631.44416.89REFINE, NIVELACIN Y COMPACTACINm206.02.05423.002.921,235.1606.03OBRAS DE CONCRETO SIMPLE18,499.68CONCRETO F'C=175 KG/CM2..m306.03.0142.30282.9011,966.67ENCOFRADO Y DESENCOFRADO EN LOSAm206.03.0241.4039.381,630.33CONCRETO EN SARDINELES F'C= 175 KG/CM2m306.03.0314.09278.723,927.16CONCRETO EN DADOS F'C= 175 KG/CM2m306.03.043.50278.72975.5206.04JUNTAS381.56JUNTA DE DILATACIN EN PISO CON BREA DE 1"m06.04.01147.322.59381.560702 LOSA MULTIUSOS91,273.5807.01TRABAJOS PRELIMINARES5,659.20LIMPIEZA DE TERRENO MANUALm207.01.011,440.002.804,032.00TRAZO Y REPLANTEOm207.01.021,440.001.131,627.2007.02MOVIMIENTO DE TIERRAS21,561.75AFIRMADO DE 4" PARA LOSAm207.02.011,440.0011.7616,934.40EXCAVACION PARA DADOSm307.02.0213.4431.44422.55REFINE, NIVELACIN Y COMPACTACINm207.02.031,440.002.924,204.8007.03OBRAS DE CONCRETO SIMPLE48,414.77CONCRETO F'C=175 KG/CM2..m307.03.01157.44282.9044,539.78ENCOFRADO Y DESENCOFRADO EN LOSAm207.03.0298.4039.383,874.9907.04PINTURA Y JUNTAS4,791.22PINTURA COLOR BLANCO FULBITOm07.04.01330.003.02996.60PINTURA COLOR AMARILLO BASQETm07.04.02217.803.02657.76PINTURA COLOR ROJO VOLEYm07.04.03194.803.02588.30JUNTA DE DILATACIN EN PISO CON BREA DE 1"m07.04.04984.002.592,548.5607.05ESTRUCTURA METALICA10,846.64ARCO DE FULBITO EMPOTRADO CON ESTRUCTURA PARA TABLERO DE BASKETund07.05.014.001,622.226,488.88S10Pgina1PresupuestoCONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DEL COLEGIO LA UNIN, EN EL ANEXO DE CACHI LLALLAS,DISTRITO DE HUANDO, PROVINCIA DE HUANCAVELICA.Presupuesto0301025MUNICIPALIDAD DISTRITAL DE HUANDO27/06/2012Costo alClienteLugarHUANCAVELICA - HUANCAVELICA - HUANDOPrecio S/.Parcial S/.ItemDescripcinUnd.Metrado

27/06/2012 10:13:05Fecha :ACCESORIOS Y TABLERO PARA BASQUETund07.05.024.00622.222,488.88POSTES DE FIERRO Y NET DE VOLEYund07.05.034.00467.221,868.8808AREAS VERDES, ESCALERAS Y RAMPAS94,562.9108.01AREAS VERDES28,965.6508.01.01SEMBRADO DE GRASS15,151.07LIMPIEZA DE TERRENO MANUALm208.01.01.012,215.072.495,515.52SEMBRADO DE GRASSm208.01.01.022,215.074.359,635.5508.01.02SEMBRADO DE ARBUSTOS Y FLORES13,814.58SEMBRADO DE ARBUSTOSund08.01.02.01300.0032.199,657.00SEMBRADO DE FLORESund08.01.02.02798.005.214,157.5808.02VEREDAS EXTERIORES52,911.05EXCAVACION PARA SARDINELESm308.02.0116.9255.01930.77REFINE, NIVELACIN Y COMPACTACINm208.02.021,005.072.922,934.80ENCOFRADO Y DESENCOFRADO PARA SARDINEL DE VEREDASm208.02.03225.5957.0312,865.40CONCRETO F'C=175 KG/CM2..m308.02.04127.89282.9036,180.0808.03RAMPAS8,223.19EXCAVACION PARA SARDINELESm308.03.018.3055.01456.58REFINE, NIVELACIN Y COMPACTACINm208.03.02139.352.92406.90ENCOFRADO Y DESENCOFRADO PARA SARDINEL DE RAMPASm208.03.03110.9523.142,567.38CONCRETO F'C=175 KG/CM2..m308.03.0416.94282.904,792.3308.04ESCALERAS4,463.02EXCAVACION PARA SARDINELESm308.04.012.6155.01143.58REFINE, NIVELACIN Y COMPACTACINm208.04.024.342.9212.67ENCOFRADO Y DESENCOFRADO PARA ESCALERASm208.04.0316.1457.03920.46CONCRETO F'C=175 KG/CM2..m308.04.0411.97282.903,386.3109MUROS DE CONTENCION65,253.7409.01TRABAJOS PRELIMINARES157.25LIMPIEZA DE TERRENO MANUALm209.01.0143.202.49107.57TRAZO Y REPLANTEO PRELIMINARm209.01.0243.201.1549.6809.02MOVIMIENTO DE TIERRAS7,431.38EXCAVACION MANUAL PARA CIMIENTOS CORRIDOSm309.02.01231.1924.395,638.72RELLENO CON MATERIAL PROPIOm309.02.0283.7913.941,168.03ELIMINACION DE MATERIAL EXCEDENTE (INC. CARGUIO)m309.02.03184.263.05561.99NIVELACION INT.Y APISONADO PARA CIMIENTOm209.02.0443.201.4562.6409.03OBRAS DE CONCRETO ARMADO56,144.56CONCRETO F'C= 210 KG/CM2. EN CIMENTACIONm309.03.0126.85249.746,705.52ENCOFRADO Y DESENCOFRADO PLANOm209.03.0246.8744.362,079.15ENCOFRADO Y DESENCOFRADO INCLINADOm209.03.03192.3144.368,530.87CONCRETO F'C= 210 KG/CM2. PARA PANTALLAm309.03.0489.75249.7422,414.17ACERO Fy=4200 KG/CM2 PARA CIMENTACIONkg09.03.051,149.033.393,895.21ACERO Fy=4200 KG/CM2 PARA PANTALLAkg09.03.063,693.113.3912,519.6409.04SUMINISTRO Y COLOCACION DE TUBOS1,520.55TUBERIA DE PVC - DM = 4" @ 2 m2m09.04.0145.0033.791,520.5510ANDENERIA171,317.42EXCAVACION MANUAL EN MATERIAL SUELTOm310.01352.7924.868,770.36REFINE Y NIVELACION EN TERRENO NORMALm210.02564.624.832,727.11ENCOFRADO Y DESENCOFRADO NORMALm210.032,974.2319.4157,729.80CONCRETO CICLOPEO FC=140 KG/CM2 + 70 % PM.m310.04615.52165.86102,090.15S10Pgina1PresupuestoCONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DEL COLEGIO LA UNIN, EN EL ANEXO DE CACHI LLALLAS,DISTRITO DE HUANDO, PROVINCIA DE HUANCAVELICA.Presupuesto0301025MUNICIPALIDAD DISTRITAL DE HUANDO27/06/2012Costo alClienteLugarHUANCAVELICA - HUANCAVELICA - HUANDOPrecio S/.Parcial S/.ItemDescripcinUnd.Metrado

27/06/2012 10:13:05Fecha :11INSTALACIONES EXTERIORES12,926.8311.01INSTALACIONES SANITARIAS5,504.2411.01.01SISTEMA DE AGUA FRIA1,420.50TUBERIA PVC SAP 3/4"m11.01.01.01234.125.131,201.04TEE PVC-SAP 3/4"und11.01.01.022.0016.2132.42VALVULA DE COMPUERTA DE BRONCE 3/4"und11.01.01.033.0050.97152.91CAJA DE MADERA PARA VALVULAund11.01.01.041.0034.1334.1311.01.02SISTEMA DE DESAGUE4,083.74TUBERIA PVC - SAL 6"m11.01.02.01144.2028.324,083.7411.02INSTALACIONES ELECTRICAS7,422.5911.02.01TUBERIAS DE CANALIZACION5,099.32TUBERIAS PVC SAP (ELECTRICAS) D=1"m11.02.01.01406.3212.555,099.3211.02.02CONDUCTORES ( CABLES )1,312.41CABLE ELECTRICO TW AWG NO. 12 -4.0MM2m11.02.02.01406.323.231,312.4111.02.03TABLEROS Y CUCHILLAS (LLAVES)1,010.86TABLERO GENERAL TERMOMAGNETICO MONOFASICO DE 12 POLOSund11.02.03.011.00117.78117.78POZO PUESTA A TIERRA INCLUIDO INSTALACIONund11.02.03.022.00446.54893.0812CERCO PERIMETRICO134,654.2212.01OBRAS PRELIMINARES1,071.18LIMPIEZA DE TERRENO MANUALm212.01.01365.592.49910.32TRAZO Y REPLANTEOm212.01.02365.590.44160.8612.02MOVIMIENTO DE TIERRAS14,177.39EXCAVACIONm312.02.01128.0639.034,998.18NIVELACION INTERIOR APISONADO MANUALm212.02.02182.950.92168.31ELIMINACION CON TRANSPORTE (CARGUIO A MANO) REN.=25 M3/DIAm312.02.03160.0856.299,010.9012.03OBRAS DE CONCRETO SIMPLE40,390.22CONCRETO 1:10 +30% P.G. PARA CIMIENTO CORRIDO (CEMENTO PV)m312.03.01128.76168.5921,707.65SOBRECIMIENTO CONCRETO 1:8 + 25% P.M.m312.03.0227.98221.346,193.09ENCOFRADO Y DESENCOF. SOBRECIMIENTO DE 0.30 A 0.60 MTm212.03.03373.0716.176,032.54ACERO EN SOBRECIMIENTO REFORZADO GRADO 60kg12.03.041,668.463.876,456.9412.04OBRAS DE CONCRETO ARMADO41,208.70CONCRETO EN COLUMNAS F'C=175 KG/CM2m312.04.0129.66286.068,484.54ENCOFRADO Y DESENCOFRADO EN COLUMNASm212.04.02455.8025.8711,791.55ACERO EN COLUMNA FY=4200KG/CM2kg12.04.033,456.473.3411,544.61CONCRETO EN VIGAS F'C=175 KG/CM2m312.04.048.23271.852,237.33ENCOFRADO Y DESENCOFRADO EN VIGASm212.04.05109.7630.483,345.48ACERO EN VIGAS Fy=4200KG/CM2kg12.04.061,142.703.333,805.1912.05COBERTURAS3,453.62COBERTURA C/TEJA ARCILLA EN CERCO DE LADRILLOm12.05.01365.859.443,453.6212.06MUROS DE ALBAILERIA28,245.99MUROS DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:4 X 1.5CM.m212.06.01994.5027.9527,796.28JUNTA DE CONSTRUCCION CON TEKNOPORTm212.06.0248.679.24449.7112.07REVOQUES ENLUCIDOS Y MOLDURAS6,107.12TARRAJEO EN COLUMNASm212.07.01456.326.132,797.24TARRAJEO EN VIGASm212.07.02109.769.321,022.96TARRAJEO EN SOBRECIMIENTOSm212.07.03373.076.132,286.9213PORTADA DE INGRESO20,730.1213.01OBRAS PRELIMINARES41.02S10Pgina1PresupuestoCONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DEL COLEGIO LA UNIN, EN EL ANEXO DE CACHI LLALLAS,DISTRITO DE HUANDO, PROVINCIA DE HUANCAVELICA.Presupuesto0301025MUNICIPALIDAD DISTRITAL DE HUANDO27/06/2012Costo alClienteLugarHUANCAVELICA - HUANCAVELICA - HUANDOPrecio S/.Parcial S/.ItemDescripcinUnd.Metrado

27/06/2012 10:13:05Fecha :LIMPIEZA DE TERRENO MANUALm213.01.0114.002.4934.86TRAZO Y REPLANTEOm213.01.0214.000.446.1613.02MOVIMIENTO DE TIERRAS5,073.90EXCAVACIONm313.02.01130.0039.035,073.9013.03OBRAS DE CONCRETO SIMPLE671.28CONCRETO 1:10 +30% P.G. PARA CIMIENTO CORRIDO (CEMENTO PV)m313.03.012.74168.59461.94SOBRECIMIENTO CONCRETO 1:8 + 25% P.M.m313.03.020.43221.3495.18ENCOFRADO Y DESENCOF. SOBRECIMIENTO DE 0.30 A 0.60 MTm213.03.037.0616.17114.1613.04OBRAS DE CONCRETO ARMADO10,586.58CONCRETO EN ZAPATAS F'C= 210 KG/CM2m313.04.013.15289.71912.59ACERO EN ZAPATAS Fy=4200KG/CM2kg13.04.0245.003.89175.05CONCRETO EN COLUMNAS F'C=175 KG/CM2m313.04.031.33286.06380.46ACERO EN COLUMNA FY=4200KG/CM2kg13.04.04197.563.34659.85ENCOFRADO Y DESENCOFRADO EN COLUMNASm213.04.05197.5625.875,110.88CONCRETO EN VIGAS F'C=175 KG/CM2m313.04.065.41271.851,470.71ENCOFRADO Y DESENCOFRADO EN VIGAS y LOSA MACIZAm213.04.0749.2130.481,499.92ACERO EN VIGAS Fy=4200KG/CM2kg13.04.08113.253.33377.1213.05REVOQUES ENLUCIDOS Y MOLDURAS357.34TARRAJEO EN COLUMNASm213.05.0144.366.13271.93TARRAJEO EN VIGASm213.05.024.069.3237.84TARRAJEO EN SOBRECIMIENTOSm213.05.037.766.1347.5713.06CARPINTERIA METALICA4,000.00PUERTA METAL LAC 1/16" C/MARCO 2"X2"X1/4" Y REFUERZOS INGRESO POR LAVIAund13.06.012.002,000.004,000.0014TANQUE ELEVADO CON TANQUE CISTERNA32,970.8514.01TRABAJOS PRELIMINARES35.80LIMPIEZA DE TERRENO - TANQUE ELEVADOm214.01.0116.810.9816.47TRAZO Y REPLANTEO PRELIMINARm214.01.0216.811.1519.3314.02ESTRUCTURAS21,390.4314.02.01MOVIMIENTO DE TIERRAS1,003.31EXCAV. DE ZANJAS MAT. SUEL. H=1.00 Mm14.02.01.0120.0914.47290.70NIVELACION Y COMPACTACION DE ZANJASm14.02.01.0225.116.10153.17RELLENO CON MATERIAL PROPIO DE ZANJAS DE TUBERIASm14.02.01.033.5813.9449.91ELIMINACION DE MATERIAL EXCEDENTEm314.02.01.0428.6917.76509.5314.02.02OBRAS DE CONCRETO SIMPLE153.86SOLADO DE CONCRETO C:H 1:2 E=4" PARA ZAPATASm214.02.02.014.9631.02153.8614.02.03OBRAS DE CONCRETO ARMADO20,233.2614.02.03.01ZAPATAS440.63CONCRETO EN ZAPATAS F'C= 210 KG/CM2m314.02.03.01.011.28289.71370.83ACERO EN EN ZAPATAS Fy=4200KG/CM2kg14.02.03.01.0220.593.3969.8014.02.03.02VIGAS DE CIMENTACION662.18CONCRETO EN VIGAS DE CIMENTACION F'C=210 KG/CM2m314.02.03.02.010.96312.06299.58ACERO EN VIGAS DE CIMENTACION Fy=4200KG/CM2kg14.02.03.02.02108.243.35362.6014.02.03.03COLUMNAS3,165.02CONCRETO EN COLUMNAS F'C= 210 KG/CM2m314.02.03.03.012.81395.061,110.12ACERO EN COLUMNA FY=4200KG/CM2kg14.02.03.03.02292.203.35978.87ENCOFRADO Y DESENCOFRADO EN COLUMNASm214.02.03.03.0337.4428.741,076.0314.02.03.04VIGAS1,927.73CONCRETO EN VIGAS F'C=210 KG/CM2m314.02.03.04.011.68394.89663.42S10Pgina1PresupuestoCONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DEL COLEGIO LA UNIN, EN EL ANEXO DE CACHI LLALLAS,DISTRITO DE HUANDO, PROVINCIA DE HUANCAVELICA.Presupuesto0301025MUNICIPALIDAD DISTRITAL DE HUANDO27/06/2012Costo alClienteLugarHUANCAVELICA - HUANCAVELICA - HUANDOPrecio S/.Parcial S/.ItemDescripcinUnd.Metrado

27/06/2012 10:13:05Fecha :ACERO EN VIGAS Fy=4200KG/CM2kg14.02.03.04.02231.833.35776.63ENCOFRADO Y DESENCOFRADO EN VIGASm214.02.03.04.0316.0030.48487.6814.02.03.05LOSA MACIZA Y PLACAS DE CONCRETO14,037.70CONCRETO EN LOSAS Y PLACAS F'C=210 KG/CM2m314.02.03.05.0126.60394.8910,504.07ACERO EN LOSAS Y PLACAS Fy=4200KG/CM2kg14.02.03.05.02525.283.351,759.69ENCOFRADO Y DESENCOFRADO EN LOSAS Y PLACASm214.02.03.05.0358.2030.481,773.9414.03ARQUITECTURA3,715.6514.03.01MUROS Y TABIQUES DE ALBAILERIA1,172.44MURO DE SOGA LADRILLO KING-KONG TIPO IVm214.03.01.0127.7542.251,172.4414.03.02REVOQUES ENLUCIDOS Y MOLDURAS1,002.04TARRAJEO EN MURO INTERIOR Y EXTERIORm214.03.02.0177.0813.001,002.0414.03.03CIELORRASOS362.16CIELO RASO INCL. VIGAS EMPOTRADAS C/MORTERO 1:4 X 1.5CM.m214.03.03.018.0045.27362.1614.03.04PISOS Y PAVIMENTOS468.31FALSO PISO DE 2" DE CONCRETO 1:12m214.03.04.018.0018.84150.72ACABADO PULIDO DE PISO C/MORTERO 1:2 X 1.5 CM. DE ESPESORm214.03.04.028.0015.85126.80VEREDA RIGIDA DE CONCRETO F'C=140 KG/CM2 E=10CM.,PASTA 1:2 INCLUYEENCOFRADOm214.03.04.035.0337.93190.7914.03.05CARPINTERIA METALICA Y HERRERIA510.78ESCALERA DE GATO PARA EL TANQUE ELEVADOund14.03.05.011.00216.78216.78VENTANA METALICAm214.03.05.020.2380.5118.52PUERTA METALICA DE 0.90x1.90 m:und14.03.05.031.00275.48275.4814.03.06CERRAJERIA79.92CHAPA DE 2 GOLPESpza14.03.06.011.0079.9279.9214.03.07PINTURA120.00PINTURA EN MUROS, COLUMNAS VIGAS Y CIELORRASOSm214.03.07.0116.007.50120.0014.04INSTALACIONES ELECTRICAS4,019.1814.04.01SALIDAS DE CENTROS DE LUZ103.00SALIDA DE TECHO (CENTRO DE LUZ)pto14.04.01.011.0049.2649.26SALIDA PARA INTERRUPTOR SIMPLEpto14.04.01.021.0053.7453.7414.04.02CANALIZACION Y/O TUBERIA701.70CANALIZACION DE TUBERIA ENTERRADA 20X30 CMm14.04.02.0130.0010.84325.20TUBERIAS PVC SAP (ELECTRICAS) D=1"m14.04.02.0230.0012.55376.5014.04.03CONDUCTORES Y/O CABLES50.10REDES 2X2.5MM2 TW 1X2.5MM2 TWm14.04.03.0130.001.6750.1014.04.04ARTEFACTOS ELECTRICOS3,164.38ELECTROBOMBA DE 1.5 HPund14.04.04.011.002,820.962,820.96TABLERO GENERAL TERMOMAGNETICO MONOFASICO DE 12 POLOSund14.04.04.021.00117.78117.78TABLEROS DE DISTRIBUCION DE ENERGIA ELECTRICAund14.04.04.031.00134.39134.39FLUORESCENTE RECTO 2x40W C/EQUIPO PARA ADOSARund14.04.04.041.0091.2591.2514.05INSTALACIONES SANITARIAS3,809.79REDES DE DISTRIBUCIONGLB14.05.011.00792.85792.85ACCESORIOS DE REDES PARA TUBERIA DE SUCCIONGLB14.05.021.00494.46494.46ACCESORIOS DE REDES PARA TUBERIA DE IMPULSIONGLB14.05.031.00558.86558.86ACCESORIOS DE REDES PARA TUBO ALIMENTADORGLB14.05.041.001,434.361,434.36ACCESORIOS DE REDES PARA TUB. REBOSE Y LIMPIEZAGLB14.05.051.00529.26529.2615MOBILIARIOS99,470.6015.01EQUIPAMIENTO99,470.60MOBILIARIO ESCOLAR Y DOCENTEGLB15.01.011.0099,470.6099,470.60S10Pgina1PresupuestoCONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DEL COLEGIO LA UNIN, EN EL ANEXO DE CACHI LLALLAS,DISTRITO DE HUANDO, PROVINCIA DE HUANCAVELICA.Presupuesto0301025MUNICIPALIDAD DISTRITAL DE HUANDO27/06/2012Costo alClienteLugarHUANCAVELICA - HUANCAVELICA - HUANDOPrecio S/.Parcial S/.ItemDescripcinUnd.Metrado

27/06/2012 10:13:05Fecha :16FLETE TERRESTRE75,414.26FLETE TERRESTREGLB16.011.0075,414.2675,414.26COSTO DIRECTO1,914,883.54GASTOS GENERALES (7%)134,041.85UTILIDAD (6%)114,893.01----------------------------------------------------------------------------------------------------SUBTOTAL2,163,818.40IGV (18%)389,487.31=====================================================================PRESUPUESTO DE OBRA2,553,305.71SUPERVISIN (4%)102,132.23======================================================================PRESUPUESTO TOTAL2,655,437.94