 You will nd y our local partner at: www.boschpackagingservices.com Preventive Maintenance Kits for SVB vertical baggers 10/2010 | PAUR/MKT | Bosch Packaging Services (subject to alterations) Preventive Maintenance made easy: PM Kits for SVB vertical baggers We have all been there: An entire packaging line is down for an hour because a small bearing deep inside a machine has failed just as an urgent shipment is scheduled to leave for the distribution center. This would not have happened, had the bearing been replaced during a scheduled downtime the previous weekend. Preventiv e Maintenance has long been instituted in manufacturing plants around the world, but it comes with its own challenges. Which parts do you replace? How often do they need to be replaced? This is where our PM Kits come in. Bosch has drawn on its experience from seeing equipment in many dif ferent plants and circumstances, and has compiled a kit with parts that should be replaced at cer tain intervals. This takes the guesswork out of preventive maint enance, and eliminat es time consuming ordering of individual small parts.  Y our Benets Preventive Maintenance without the guesswork. Know which parts to replace at which interval. Minimize maintenance downtime by following a methodical, planned approach. Typically 5% discount on kit orders compared to individual parts. Minimize unplanned downtime with scheduled preventive maintenance Standard approach, customized solution When an order is received, Bosch begins its review by comparing the standard list of parts for each machine type with the original bill of material of the specic machine being serviced. This ensures an efcient and standardized solution that is tailored to your needs. Pricing On all standard PM Kits, Bosch is granting a discount of typically 5% off the price of individual parts.

Preventive Maintenance: PM Kits for SVB Vertical Baggers

Embed Size (px)

Citation preview

Page 1: Preventive Maintenance: PM Kits for SVB Vertical Baggers

8/12/2019 Preventive Maintenance: PM Kits for SVB Vertical Baggers

http://slidepdf.com/reader/full/preventive-maintenance-pm-kits-for-svb-vertical-baggers 1/2

 You will find your local partner at: www.boschpackagingservices.com

Preventive Maintenance Kits for SVB vertical baggers 10/2010 | PAUR/MKT | Bosch Packaging Services (subject to alterations)

Preventive Maintenance made easy:PM Kits for SVB vertical baggers

We have all been there: An entire packaging line is down

for an hour because a small bearing deep inside a

machine has failed just as an urgent shipment is

scheduled to leave for the distribution center. This

would not have happened, had the bearing been

replaced during a scheduled downtime the previous

weekend.

Preventive Maintenance has long been instituted in

manufacturing plants around the world, but it comes

with its own challenges. Which parts do you replace?

How often do they need to be replaced?

This is where our PM Kits come in. Bosch has drawn on

its experience from seeing equipment in many different

plants and circumstances, and has compiled a kit with

parts that should be replaced at certain intervals. This

takes the guesswork out of preventive maintenance, and

eliminates time consuming ordering of individual small

parts.

 Your Benefits

Preventive Maintenance without the

guesswork. Know which parts to replace at

which interval.

Minimize maintenance downtime by following

a methodical, planned approach.

Typically 5% discount on kit orders compared

to individual parts.

Minimize unplanned downtime with

scheduled preventive maintenance

Standard approach, customized solution

When an order is received, Bosch begins its review by

comparing the standard list of parts for each machine

type with the original bill of material of the specific

machine being serviced. This ensures an efficient and

standardized solution that is tailored to your needs.

Pricing

On all standard PM Kits, Bosch is granting a discount of

typically 5% off the price of individual parts.

Page 2: Preventive Maintenance: PM Kits for SVB Vertical Baggers

8/12/2019 Preventive Maintenance: PM Kits for SVB Vertical Baggers

http://slidepdf.com/reader/full/preventive-maintenance-pm-kits-for-svb-vertical-baggers 2/2

 You will find your local partner at: www.boschpackagingservices.com

Preventive Maintenance Kits for SVB vertical baggers 10/2010 | PAUR/MKT | Bosch Packaging Services (subject to alterations)

Preventive Maintenance made easy:PM Kits for SVB vertical baggers

Figure 1 — Sample contents of a PM Kit (Minor PM Kit for SVB - Guide Rollers (w/ hardware) shown)

Minor PM Kits Part number* Recommended frequency**

Minor PM Kit for SVB — Long Seam Cylinder 8110 114 012 every 2,000-4,000 hours

Minor PM Kit for SVB — Vertical Jaw Bushings 8110 114 011 every 2,000-4,000 hours

Minor PM Kit for SVB — Guide Rollers (w/ hardware) N/A (order by kit name) every 10,000 hours

Minor PM Kit for SVB — Guide Rollers (w/o hardware) N/A (order by kit name) every 10,000 hours

Minor PM Kit for SVB — Dancer Arm (roller and prox) N/A (order by kit name) every 40,000 hours

List of individual PM Kits

Use the table provided below to reference the specific PM Kit for your machine.

Major PM Kits Part number* Recommended frequency**

Major PM Kit for SVB — Belt Transport N/A (order by kit name) every 40,000 hours

Major PM Kit for SVB — Cross Jaw Housing N/A (order by kit name) every 15,000 hours

Major PM Kit for SVB — Dancer Arm (complete) N/A (order by kit name) every 40,000 hours

* Please have machine type and serial number available when ordering.

** Assumes typical use. Depending on product type, environmental conditions, etc., the required interval may be longer or shorter.