Primary Clarifier RehabilitationCase Study

MWEA Annual Conference

TJ Bates – Donohue & Associates, Inc.June 25, 2019

Page 3: Primary Clarifier Rehabilitation

33

Outline

What’s so Complicated?

Holland WRF Background

Clarifier Condition Assessment

Alternative Evaluation

Construction Update

Lessons Learned

My Advice

Page 4: Primary Clarifier Rehabilitation

44

What’s so Complicated?

Primary

Effluent

Primary Clarifier

Sludge

RW

W

SCUM

Page 5: Primary Clarifier Rehabilitation

55

What’s so Complicated?

Circular

Page 6: Primary Clarifier Rehabilitation

66

What’s so Complicated?

Squircles

Page 7: Primary Clarifier Rehabilitation

77

What’s so Complicated?

Rectangular

Page 8: Primary Clarifier Rehabilitation

88

What’s so Complicated?

Covered

Page 9: Primary Clarifier Rehabilitation

99

What’s so Complicated?

Not all Primary Clarifiers are created equal

Primary clarifier repair shouldn’t be a standard detail

Page 10: Primary Clarifier Rehabilitation

1010

Holland WRF Background

Average day flow: 9 MGD

Design capacity: 12 MGD

Four covered primary clarifiers:

Two 7-ft deep, constructed in 1960

Two 14-ft deep, constructed in 1980

Odor control covers added in 1995

Page 11: Primary Clarifier Rehabilitation

1111

Centralized influent distributed to all four clarifiers

Holland WRF Background

1

2

3

4

Splitter

Page 12: Primary Clarifier Rehabilitation

1212

Weir modifications to better control distribution

Holland WRF Background

1

2

3

4

Page 13: Primary Clarifier Rehabilitation

1313

Effluent conditions vary

Holland WRF Background

1

2

3

4

Page 14: Primary Clarifier Rehabilitation

1414

Holland WRF Background

Covers and odor control to address complaints

Corrosive gassed trapped below cover

Page 15: Primary Clarifier Rehabilitation

1515

Holland WRF Background

Bridge creates air dam, making uniform air flow difficult

Concrete and steel are exposed and unprotected

Page 16: Primary Clarifier Rehabilitation

1616

Clarifier Condition Assessment

Significant corrosion to steel components above the water line

Page 17: Primary Clarifier Rehabilitation

1717

Clarifier Condition Assessment

Corrosion on the steel walking surface

Page 18: Primary Clarifier Rehabilitation

1818

Clarifier Condition Assessment

Conditions even worse than expected once portion of the cover was removed

Page 19: Primary Clarifier Rehabilitation

1919

Clarifier Condition Assessment

Iron oxide buildup

Holes in steel members

Page 20: Primary Clarifier Rehabilitation

2020

Clarifier Condition Assessment

Concrete deterioration

Most notable on outside face of the launder

Page 21: Primary Clarifier Rehabilitation

2121

Clarifier Condition Assessment

Exposed aggregate

“Soft” areas

Page 22: Primary Clarifier Rehabilitation

2222

Alternative Analysis

Design a repair that fits the existing conditions

Corrosion and concrete protection only where required

Corrosion and concrete deterioration require oxygen

Can existing conditions be made better

Remove corrosive gasses below cover

Improve odor control efficiency

Page 23: Primary Clarifier Rehabilitation

2323

Corrosion Protection – Only Where Required

Clarifier Mechanism

SS components were corrosion potential is high

Coated components where corrosion potential is low

Alternative Analysis

PC Mechanism Prices Based on Varying Materials

Construction Material Total Cost Cost Increase

Coated Steel $ 456,000 --

Partial Coated Steel,

Partial 304 SS$ 527,000 71,500

304 SS $ 612,000 156,000

316 SS $ 736,000 280,000

Prices from Nov 2017

Page 24: Primary Clarifier Rehabilitation

2424

Alternative Analysis

Corrosion Protection – Only Where Required

Concrete Repair

Epoxy coating

Applied only where necessary

Page 25: Primary Clarifier Rehabilitation

2525

Alternative Analysis

Remove gasses from below the cover

Page 26: Primary Clarifier Rehabilitation

2626

Alternative Evaluation

Odor Control Efficiency

Majority of odors are generated as the water falls over the weir

Capture odors at the source

Minimize volume the odor control system protects

Page 27: Primary Clarifier Rehabilitation

2727

Alternative Evaluation

Image Source: NEFCO

Launder Covers

Cover launder, weir, and baffle

Can be connect to odor control

Limit algae growth

Page 28: Primary Clarifier Rehabilitation

2828

Alternative Evaluation

Launder cover on final clarifier

Page 29: Primary Clarifier Rehabilitation

2929

Alternative Evaluation

Individual access hatches

Page 30: Primary Clarifier Rehabilitation

3030

Alternative Evaluation

Accessible for routine OM checks

Page 31: Primary Clarifier Rehabilitation

3131

Alternative Evaluation

Alternative 1

Remove cover

Coated steel mechanism

Install launder covers with odor control

Page 32: Primary Clarifier Rehabilitation

3232

Alternative Evaluation

Alternative 2

316SS above water line

Coated steel below waterline

Isolate steel bridge from corrosive environment

Page 33: Primary Clarifier Rehabilitation

3333

Alternative 2 Bridge Design

Page 34: Primary Clarifier Rehabilitation

3434

Alternative Evaluation

Bid Results

Elected to proceed with Alternate 2

Alternative Cost

Alternate 1:

Launder Covers

Coated mechanism

$2.24M

Alternate 2:

Exist Aluminum Cover

SS/Coated Mechanism

$2.04M

Prices from July 2018

Page 35: Primary Clarifier Rehabilitation

3535

Construction Update

Page 36: Primary Clarifier Rehabilitation

3636

Construction Update

Page 37: Primary Clarifier Rehabilitation

3737

Construction Update

Page 38: Primary Clarifier Rehabilitation

3838

Construction Update

Page 39: Primary Clarifier Rehabilitation

3939

Construction Update

Page 40: Primary Clarifier Rehabilitation

4040

Construction Update

Page 41: Primary Clarifier Rehabilitation

4141

Construction Update

Page 42: Primary Clarifier Rehabilitation

4242

Construction Update

Page 43: Primary Clarifier Rehabilitation

4343

Construction Update

Page 44: Primary Clarifier Rehabilitation

4444

Lessons Learned

Varying outlet conditions require a variable plan

Dedicated effluent box

Page 45: Primary Clarifier Rehabilitation

4545

Lessons Learned

Junction structure effluent box

Page 46: Primary Clarifier Rehabilitation

4646

Lessons Learned

Be selective with approving you’re coatings!

Page 47: Primary Clarifier Rehabilitation

4747

Lessons Learned

Page 48: Primary Clarifier Rehabilitation

4848

Lessons Learned

Page 49: Primary Clarifier Rehabilitation

4949

Lessons Learned

Page 50: Primary Clarifier Rehabilitation

5050

My Advice

Be aware of “simple” projects

When spending millions of $$

Tailor every solution to the problem

Bidding markets are complex

Alternatives can be helpful

Page 51: Primary Clarifier Rehabilitation

51

Thank You!