http://slidepdf.com/reader/full/prime-alliance-largest-smart-grid-project-in-spain-establishing-prime-standard 1/23
21 a 23 de Agosto, 2012, São Paulo-SP, Brasil
Largest smart grid project in Spain:
Establishing PRIME Standard,
Interoperability and Field Test
Results
Andrew Soukup
Texas Instruments Inc.– USA
PRIME Alliance Founding
Member
Co-alocado com:
8/11/2019 Prime Alliance Largest Smart Grid Project in Spain Establishing Prime Standard Interoperability and Field Test
http://slidepdf.com/reader/full/prime-alliance-largest-smart-grid-project-in-spain-establishing-prime-standard 2/23
21 a 23 de Agosto, 2012, São Paulo-SP, Brasil
Agenda
PRIME Introduction
PRIME Technology highlights
Interoperability results
Field tests results
Conclusions
8/11/2019 Prime Alliance Largest Smart Grid Project in Spain Establishing Prime Standard Interoperability and Field Test
http://slidepdf.com/reader/full/prime-alliance-largest-smart-grid-project-in-spain-establishing-prime-standard 3/23
21 a 23 de Agosto, 2012, São Paulo-SP, Brasil
PRIME Introduction
PRIME stands for PoweRline Intelligent Metering Evolution:
It is a communications protocol used for Smart
Grid and Smart Metering
mainly to support massive meter reading &management.
It is a Power Line Communications (PLC) technology.
Originally defined OSI layers 1 & 2.
It was designed as a future-proof solution:
State-of-the-art.
Economies of scale (open, interoperable).
8/11/2019 Prime Alliance Largest Smart Grid Project in Spain Establishing Prime Standard Interoperability and Field Test
http://slidepdf.com/reader/full/prime-alliance-largest-smart-grid-project-in-spain-establishing-prime-standard 4/23
21 a 23 de Agosto, 2012, São Paulo-SP, Brasil
PRIME Introduction
PRIME is now a specification under theumbrella of the PRIME All iance registered as
a Belgian non-profit association
(http://www.prime-alliance.org/), a group of
companies working together to develop
PRIME interoperable solutions.
8/11/2019 Prime Alliance Largest Smart Grid Project in Spain Establishing Prime Standard Interoperability and Field Test
http://slidepdf.com/reader/full/prime-alliance-largest-smart-grid-project-in-spain-establishing-prime-standard 5/23
21 a 23 de Agosto, 2012, São Paulo-SP, Brasil5
Head End Private, Fixed
/ MobileNetwork
SS
PLC:
MV
(BPL)
SS
Fixed/Mobile
Public
Network
PLC: PRIME
PLC: PRIME
SS
SS
SS
Private, Fixed /
Mobile Network
MPLS/SDH/FO
5
PRIME Network architecture:
IBERDROLA example
8/11/2019 Prime Alliance Largest Smart Grid Project in Spain Establishing Prime Standard Interoperability and Field Test
http://slidepdf.com/reader/full/prime-alliance-largest-smart-grid-project-in-spain-establishing-prime-standard 6/23
21 a 23 de Agosto, 2012, São Paulo-SP, Brasil6
Royal Decree
1110/2007 obligesall Spanishresidential meters(contracted tariff
<15kW) to becomesubstituted fordigital meters
which are“remotely
manageable” by2018.
Part of a Europeantrend (Directive
2009/72/EC: 80%of Europeanmeters to be
substituted forsmart meters by
2020).
Iberdrola in Spain:~11 million “good,old”
electromechanicalFerraris meters to
be changed by“telecoms nodes”
which also happento perform energymeasurements.
In Europe, Smart Metering is mandated by Regulation
PRIME driving forces:
the regulatory framework
6
8/11/2019 Prime Alliance Largest Smart Grid Project in Spain Establishing Prime Standard Interoperability and Field Test
http://slidepdf.com/reader/full/prime-alliance-largest-smart-grid-project-in-spain-establishing-prime-standard 7/23
21 a 23 de Agosto, 2012, São Paulo-SP, Brasil
……
…
……
PRIME Alliance Membership
7
A total of ~ 50 members (as of mid 2012)
8/11/2019 Prime Alliance Largest Smart Grid Project in Spain Establishing Prime Standard Interoperability and Field Test
http://slidepdf.com/reader/full/prime-alliance-largest-smart-grid-project-in-spain-establishing-prime-standard 8/23
21 a 23 de Agosto, 2012, São Paulo-SP, Brasil
PRIME Standardization status
PRIME is already an approved International standard by ITU
Annex B of the ITU-T G.9955 (PHY layer)
Annex B of the ITU-T G.9956 (Link layer).
PRIME is Normative Annex of IEEE P1901.2 draft standard
PRIME is about to be adopted as European CENELEC
Technical Specification CLC TS-50567-1
8/11/2019 Prime Alliance Largest Smart Grid Project in Spain Establishing Prime Standard Interoperability and Field Test
http://slidepdf.com/reader/full/prime-alliance-largest-smart-grid-project-in-spain-establishing-prime-standard 9/23
21 a 23 de Agosto, 2012, São Paulo-SP, Brasil
PRIME Protocol Stack Overview
IEC61334-4-32
IEC 62056-x
IPv4
… … …
IPv6
… … …… …
PHY LAYER
MAC LAYER
CONVERGENCE SUB-LAYER
P
R
I
M
E
PL medium
-4-32 IPv4 IPv6
Transmit and receive PPDUs
to/from Power Lines, Provide
Carrier Sense , Channel Quality
estimation and Zero Crossing
detection info
Provide path determination,
logical addressing, end-to-end
connections, flow control and
medium access
Mapping of any kind of
traffic into proper MAC
connection
Power Line Medium
8/11/2019 Prime Alliance Largest Smart Grid Project in Spain Establishing Prime Standard Interoperability and Field Test
http://slidepdf.com/reader/full/prime-alliance-largest-smart-grid-project-in-spain-establishing-prime-standard 10/23
21 a 23 de Agosto, 2012, São Paulo-SP, Brasil
PRIME Certification program
EXAMPLE TI:
PassedPRIMEConformance
Test
PHY: 100% MAC: 100%
• … Neutral Conformance Labs, KEMAand LABEIN Tecnalia, certifying vendortechnologies assuring compliance withPRIME Alliance requirements
Compliancy Assurance
• … Multiple certified meters and dataconcentrators are already available andwidely deployed in field
InteroperableProducts
Available
8/11/2019 Prime Alliance Largest Smart Grid Project in Spain Establishing Prime Standard Interoperability and Field Test
http://slidepdf.com/reader/full/prime-alliance-largest-smart-grid-project-in-spain-establishing-prime-standard 11/23
21 a 23 de Agosto, 2012, São Paulo-SP, Brasil11
Interoperability in the Field
8/11/2019 Prime Alliance Largest Smart Grid Project in Spain Establishing Prime Standard Interoperability and Field Test
http://slidepdf.com/reader/full/prime-alliance-largest-smart-grid-project-in-spain-establishing-prime-standard 12/23
21 a 23 de Agosto, 2012, São Paulo-SP, Brasil12
Multi-Vendor PRIME Inter-operability tests
Interoperable … and interchangeable !
8/11/2019 Prime Alliance Largest Smart Grid Project in Spain Establishing Prime Standard Interoperability and Field Test
http://slidepdf.com/reader/full/prime-alliance-largest-smart-grid-project-in-spain-establishing-prime-standard 13/23
21 a 23 de Agosto, 2012, São Paulo-SP, Brasil
• Smart grid deployment (from obligation to opportunity): STAR
• Location with 100,000 meters (175,000 inhabitants) – Deployment of PLC PRIME meters (GPRS meters outside
the scope for the time being)
This was just the beginning, now being replicated
in 10 “ Castellons” …• Up to 600 secondary substations
– Different levels of smartness: basic, advanced, automation
– Various WAN solutions:
MV PLC, GPRS, ADSL, fiber, etc.• Extendable MDM system
Introduction – Deployment in Castellón
13
8/11/2019 Prime Alliance Largest Smart Grid Project in Spain Establishing Prime Standard Interoperability and Field Test
http://slidepdf.com/reader/full/prime-alliance-largest-smart-grid-project-in-spain-establishing-prime-standard 14/23
21 a 23 de Agosto, 2012, São Paulo-SP, Brasil
Castellón municipality. Characteristics.
14
Rural
Urban
(Coast)Urban
SubUrban
Industrial –
Suburban
Castellón Deployment Strategy: Plug&Play
8/11/2019 Prime Alliance Largest Smart Grid Project in Spain Establishing Prime Standard Interoperability and Field Test
http://slidepdf.com/reader/full/prime-alliance-largest-smart-grid-project-in-spain-establishing-prime-standard 15/23
21 a 23 de Agosto, 2012, São Paulo-SP, Brasil
Performance Monitoring: Meter availability
15
PRIME sub-network evolution:
Meter availability at PRIME protocol level
Connected
meters
Number of switches
TIME (1 week)
P M it i
8/11/2019 Prime Alliance Largest Smart Grid Project in Spain Establishing Prime Standard Interoperability and Field Test
http://slidepdf.com/reader/full/prime-alliance-largest-smart-grid-project-in-spain-establishing-prime-standard 16/23
21 a 23 de Agosto, 2012, São Paulo-SP, Brasil16
Per ormance MonitoringPer Secondary Substation
Substation address
Number of PRIME Meters found
Capability to detect and correct database errors
Availability
Short cycle
duration per meter
Long cycle duration
per meter
Capability to detect Meters with
wrong application configuration
8/11/2019 Prime Alliance Largest Smart Grid Project in Spain Establishing Prime Standard Interoperability and Field Test
http://slidepdf.com/reader/full/prime-alliance-largest-smart-grid-project-in-spain-establishing-prime-standard 17/23
21 a 23 de Agosto, 2012, São Paulo-SP, Brasil17
Meter MAC
Termin
al Sw itch
Unavai
lable
Avai la bl
e
Total
Time
Short
Cycles
Failur
es
Short
Cycles
Succe
sses
Short
Cycles
Numb
er
%
Avail ab i
lity
Short
Long
Cycles
Failures
Long
Cycles
Success
es
Long
Cycles
Number
%
Avai la bi
lity Long
Cycles
34625882 40:40:22:10:59:5a 0,59% 99,41% 0,00% 100,00% 597462 0 170 170 100,00% 0 46 46 100,00%
34625824 40:40:22:10:59:20 98,89% 1,11% 0,00% 100,00% 598268 0 170 170 100,00% 0 46 46 100,00%
35005985 40:40:22:16:26:21 99,82% 0,18% 0,00% 100,00% 597487 170 0 170 0,00% 46 0 46 0,00%
34625879 40:40:22:10:59:57 79,92% 20,08% 0,00% 100,00% 597519 0 170 170 100,00% 0 46 46 100,00%
34625895 40:40:22:10:59:67 90,33% 9,67% 0,00% 100,00% 596758 0 170 170 100,00% 0 46 46 100,00%
34625899 40:40:22:10:59:6b 99,79% 0,20% 0,00% 100,00% 597510 0 170 170 100,00% 0 46 46 100,00%
34625168 40:40:22:10:56:90 99,87% 0,09% 0,04% 99,96% 597029 0 170 170 100,00% 1 45 46 97,83%
34625831 40:40:22:10:59:27 99,57% 0,36% 0,07% 99,93% 597486 0 170 170 100,00% 0 46 46 100,00%
34625875 40:40:22:10:59:53 99,90% 0,03% 0,07% 99,93% 597621 0 170 170 100,00% 0 46 46 100,00%
35005984 40:40:22:16:26:20 99,66% 0,18% 0,16% 99,84% 598314 1 169 170 99,41% 0 46 46 100,00%
Performance Monitoring
Meter concentration
Meter with wrong application
configuration
Per ormance Monitoring
8/11/2019 Prime Alliance Largest Smart Grid Project in Spain Establishing Prime Standard Interoperability and Field Test
http://slidepdf.com/reader/full/prime-alliance-largest-smart-grid-project-in-spain-establishing-prime-standard 18/23
21 a 23 de Agosto, 2012, São Paulo-SP, Brasil18
Per ormance Monitoring Analysis: topology
Capability to associate PRIME MAC address and PRIME
network topology to specify physical location in the street
8/11/2019 Prime Alliance Largest Smart Grid Project in Spain Establishing Prime Standard Interoperability and Field Test
http://slidepdf.com/reader/full/prime-alliance-largest-smart-grid-project-in-spain-establishing-prime-standard 19/23
21 a 23 de Agosto, 2012, São Paulo-SP, Brasil19
The results so far . . .
700,000 bills sent to suppliers based on PRIMEPLC meter readings
2,000 disconnection orders executed
1,700 re-connection orders executed
thousands of on-demand readings
5,000 remote tariff changes (P contracted)
thousands of remote DC and meter firmwareupgrades
8/11/2019 Prime Alliance Largest Smart Grid Project in Spain Establishing Prime Standard Interoperability and Field Test
http://slidepdf.com/reader/full/prime-alliance-largest-smart-grid-project-in-spain-establishing-prime-standard 20/23
21 a 23 de Agosto, 2012, São Paulo-SP, Brasil
10.8 M (Spain)
IBERDROLA is currently deploying further 300,000 smart meters in 12 different locations.
RFQ released in January 2012, for 1 mill ion PRIME meters to be deployed throughFebruary 2013
>16 meter manufacturers participated in this competitive RFQ, 7 awarded.
Current deployments are in line with IBERDROLA plan to deploy 11 million smart metersby 2018 in Spain.
Iberdrola customers basis is higher than 30 Million
Beyond 100,000 Castellon deployment. .
.
5.1 M (UK)
1.14 M (US)
0.6 M (US)
1.15 M (Brazil)
3.13 M (Brazil)
2.23 M (Brazil)0.5 M (Bolivia)
5.03 M (Brazil)
0.07 M (Bolivia)
8/11/2019 Prime Alliance Largest Smart Grid Project in Spain Establishing Prime Standard Interoperability and Field Test
http://slidepdf.com/reader/full/prime-alliance-largest-smart-grid-project-in-spain-establishing-prime-standard 21/23
21 a 23 de Agosto, 2012, São Paulo-SP, Brasil
PRIME Alliance Future Extensions
• Wider Frequency Band – PRIME FCC bands will span from 40 – 490 kHz with a
data rate of 980kbps maximum
• WAN Protocol
– WAN Protocol Task Force has the objective to producean open standard, generic and secure solution
• Security
– Security and data privacy as the key topic for enabling asuccessful roll-out of large scale PLC-based networks
like an infrastructure for Smart Metering
8/11/2019 Prime Alliance Largest Smart Grid Project in Spain Establishing Prime Standard Interoperability and Field Test
http://slidepdf.com/reader/full/prime-alliance-largest-smart-grid-project-in-spain-establishing-prime-standard 22/23
21 a 23 de Agosto, 2012, São Paulo-SP, Brasil
PRIME is an open, royalty freeworldwide standard suitable for “lastmile” Smart Metering and Smart Grid
applications
PRIME is a stablebut future proof
OFDM PLCtechnology,
specified andmaintained by thePRIME All iance,made by several
leading industrialplayers
PRIME does have
a clearindependentcertification
process
PRIME ensurestrue
interoperabilityamong equipmentsand systems fromseveral differentmanufacturers
PRIME is fieldproven in highvolumes andready to be
deployed nowworldwide !
23
Conclusions
8/11/2019 Prime Alliance Largest Smart Grid Project in Spain Establishing Prime Standard Interoperability and Field Test
http://slidepdf.com/reader/full/prime-alliance-largest-smart-grid-project-in-spain-establishing-prime-standard 23/23
21 a 23 de Agosto, 2012, São Paulo-SP, Brasil
OBRIGADO
About PRIME