PROBLEMS WITH NEWER GENERATORS CLYDE MAUGHAN, PRESIDENT MAUGHAN GENERATOR CONSULTANTS SCHENECTADY, NEW YORK Phone: 518 377 5351 Email: [email protected] Web: clyde.maughan.com 1

PROBLEMS WITH NEWER GENERATORS - Users Group S

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PROBLEMS WITH NEWER GENERATORS - Users Group S

PROBLEMS WITH NEWER GENERATORS

CLYDE MAUGHAN, PRESIDENT MAUGHAN GENERATOR CONSULTANTS SCHENECTADY, NEW YORK Phone: 518 377 5351 Email: [email protected] Web: clyde.maughan.com

1

Page 2: PROBLEMS WITH NEWER GENERATORS - Users Group S

PRELUDE A FEW COMMENTS

2

Page 3: PROBLEMS WITH NEWER GENERATORS - Users Group S

LAST 15-YEAR FOCUS (OF A 27-YEAR CONSULTING CAREER)

CONSULTING WORK GENERATOR CONDITION ASSESSMENT FAILURE ROOT CAUSE DIAGNOSIS LITTLE-TO-NO TEST AND INSPECTION, OR REPAIR

WORK

TRAINING (KNOWLEDGE TRANSFER) EFFORTS SEMINAR: ~1000 PARTICIPANTS HANDS-OFF WHEN ASSESSING TECHNICAL PUBLICATION (PASSING ON TO THE NEXT

GENERATIONS THE KNOWLEDGE OF MY GENERATION OF GENERATOR ENGINEERS)

3

Page 4: PROBLEMS WITH NEWER GENERATORS - Users Group S

KNOWLEDGE TRANSFER Book

“Maintenance of Turbine-Driven Generators”, 210 pp, 250 color photographs,. Focused directly on knowledge helpful to utility personnel : Design impact, Operation impact, Failure mechanisms, Monitoring, Inspection, Test, and Repair

Papers “Generator Ground Protection Relay Deficiencies” “A Brief History of Turbine-Generator Electrical Insulation and Support Systems “Uprating and Upgrading of Generators” “Advances in Motor and Generator Rotor Health “Electromagnetic Interference (EMI) Testing of Electrical Equipment “Vibration Detection instrumentation for Turbine-generator Stator Endwindings” “Vibration Sparking and Other Electrical Failure Mechanisms on Large Generators” “Generator Condition Monitor Evolution and Capability” “Monitoring of Generator Condition – and some limitations thereof” “On-Line Partial Discharge Testing on Generator Stator Windings” “Electrical and Mechanical Testing of Medium-Voltage Generators” “Partial Discharge as a Stator Winding Evaluation Tool” “Carbon-Brush Collector Maintenance on Turbine-Generators” “Root-Cause Diagnostics of Generator Service Failures” “Testing of Turbine-Generator Stator Core Lamination Insulation” “Upgrading of Generators to Improve Reliability” “Inspection/Test Impact on Maintenance of Generators” “Partial Discharge as a Concern on Turbine Generators” “Generator Failure Diagnosis” “Testing of Large Electric Generators for Suitability of Service” “Visual Inspection of Large Electric Generators” “Generator Reliability as Influenced by Engineering Design Parameters” “Comparative Measurements – PD/EMI Prototype Test - Ohio Edison – Sammis #6”.

4

Page 5: PROBLEMS WITH NEWER GENERATORS - Users Group S

THIS “NO-ULTERIOR MOTIVE” TRAINING EFFORT . . .

PERSONAL COST . . . MAYBE 3000 HOURS OF UNPAID TIME MAYBE $60,000 OF EXPENSES PRESENTING

PAPERS AT TECHNICAL CONFERENCES PERSONAL BENEFIT . . . WELL, PHONE STILL RINGING ON INCOME-

PRODUCING CONSULTING JOBS AT AGE 87 ABSURD INCOME

AND A CERTAIN LEVEL OF JOB SATISFACTION SO WHY WOULD I COMPLAIN?

5

Page 6: PROBLEMS WITH NEWER GENERATORS - Users Group S

AND MY LIBRARY (OF HOPEFULLY USEFUL KNOWLEDGE)

You can find about everything I have written on generators in the last 15 years on the NEC web site: www.generatortechnicalforum.org

At the Home Page, click on “technical forum” to register. Go to the discussion topic, Inner Water-Cooled Stator Windings (of which I am moderator), click on any thread, click on the Documents tab at the top

Find 24 technical papers on about 20 different generator topics and my 210-page text on generator maintenance

No-cost download by double clicking the titles

6

Page 7: PROBLEMS WITH NEWER GENERATORS - Users Group S

NOW, TO THE TOPIC PROBLEMS WITH NEWER GENERATORS

7

Page 8: PROBLEMS WITH NEWER GENERATORS - Users Group S

PRESENT FLEET INDUSTRY-WIDE

OLDER GENERATORS GENERALLY SUBSTANTIAL MARGIN IN DESIGN BUT MANY ARE 40+ YEARS OLD, i.e WORN OUT LITTLE SIGN OF FUNDAMENTAL CHANGE SOON

NEWER GENERATORS SOMETIMES NEGATIVE MARGIN IN DESIGN NUMEROUS INFANT MORTALITY AND EARLY-FAILURE

PROBLEMS (COST-REDUCED, i.e., “CHEAP”) GENERALLY NOT HIGH EXPECTATIONS FOR LONG-

TERM RELIABILITY

8

Page 9: PROBLEMS WITH NEWER GENERATORS - Users Group S

SOME SPECIFIC PROBLEMS ON NEWER GENERATORS

SOME CONFINED TO SPECIFIC OEMs CORE VIBRATION ISOLATION DRY-TIE

SOME GENERIC PARTIAL DISCHARGE GLOBAL VPI

ON THESE SLIDES WILL NAME NAMES WITH CONCERN RECOGNIZING THAT NO OEM STANDS OUT

PARTICULARLY FROM THE REST (AND ROOT PROBLEM IS THAT UTILITIES BUY THE

CHEAPEST PRODUCT) 9

Page 10: PROBLEMS WITH NEWER GENERATORS - Users Group S

ALSTOM CORE ISOLATION PROBLEM

2-POLE CORES TYPICALLY OVAL ~2 MILS, i.e., UN-RESISTIBLE VIBRATION MAGNETIC PULL OF THE FIELD

ALSTOM SEEMS TO HAVE AT LEAST ONE LINE WITH LITTLE ISOLATION

BUT YOU MUST ISOLATE (I FIRST KNEW THIS IN MY FIRST YEAR AT GE – 1950)

MAJOR COST REDUCTION NO OBVIOUS REALISTIC FIX – REPLACE STATOR OR LIVE

WITH THE CONDITIONS NOISE – 116 dBA POSSIBLE FRAME CRACKING POSSIBLE FOUNDATION CRACKING

10

Page 11: PROBLEMS WITH NEWER GENERATORS - Users Group S

11

Page 12: PROBLEMS WITH NEWER GENERATORS - Users Group S

12

Page 13: PROBLEMS WITH NEWER GENERATORS - Users Group S

13

Page 14: PROBLEMS WITH NEWER GENERATORS - Users Group S

14

Page 15: PROBLEMS WITH NEWER GENERATORS - Users Group S

15

Page 16: PROBLEMS WITH NEWER GENERATORS - Users Group S

HIGH LEVELS OF PARTIAL DISCHARGE

PROBLEM ON ALL GENERATORS CONTRIBUTING FACTORS

WORSE ON AIR COOLED HIGH VOLTS/MIL STRESS DESIGN INADEQUATE GROUNDING PAINTS INADEQUATE SPACING IN END ARM REGIONS JUNCTION OF END ARM AND GROUNDING PAINTS

OZONE PRODUCTION POTENTIAL HEALTH HAZARD ATTACK ON SOME MATERIALS

BUT GENERALLY PD DOES NOT CAUSE FAILURE 16

Page 17: PROBLEMS WITH NEWER GENERATORS - Users Group S

17

Page 18: PROBLEMS WITH NEWER GENERATORS - Users Group S

18

Page 19: PROBLEMS WITH NEWER GENERATORS - Users Group S

19

Page 20: PROBLEMS WITH NEWER GENERATORS - Users Group S

20

Page 21: PROBLEMS WITH NEWER GENERATORS - Users Group S

21

Page 22: PROBLEMS WITH NEWER GENERATORS - Users Group S

22

Page 23: PROBLEMS WITH NEWER GENERATORS - Users Group S

23

Page 24: PROBLEMS WITH NEWER GENERATORS - Users Group S

24

Page 25: PROBLEMS WITH NEWER GENERATORS - Users Group S

25

Page 26: PROBLEMS WITH NEWER GENERATORS - Users Group S

26

Page 27: PROBLEMS WITH NEWER GENERATORS - Users Group S

27

Page 28: PROBLEMS WITH NEWER GENERATORS - Users Group S

28

Page 29: PROBLEMS WITH NEWER GENERATORS - Users Group S

29

Page 30: PROBLEMS WITH NEWER GENERATORS - Users Group S

30

Page 31: PROBLEMS WITH NEWER GENERATORS - Users Group S

31

Page 32: PROBLEMS WITH NEWER GENERATORS - Users Group S

32

Page 33: PROBLEMS WITH NEWER GENERATORS - Users Group S

33

Page 34: PROBLEMS WITH NEWER GENERATORS - Users Group S

34

Page 35: PROBLEMS WITH NEWER GENERATORS - Users Group S

35

Page 36: PROBLEMS WITH NEWER GENERATORS - Users Group S

36

Page 37: PROBLEMS WITH NEWER GENERATORS - Users Group S

VIBRATION SPARKING OLD PROBLEM FROM FIRST HARD INSULATION

SYSTEMS – LATE 1950s RECURRED ON A LINE OF SIEMENS GENERATORS

~4 YEARS AGO DRAMATIC AND FAST ACTING

IN-SERVICE FAILURE IF NOT CORRECTED 2-3 YEARS, OR SOONER

COMPLICATED ACTIONS, BUT PRETTY WELL UNDERSTOOD STATOR BAR VIBRATION IN THE SLOT (SIDE OR VERTICAL) LOW GROUNDING PAINT RESISTANCE

37

Page 38: PROBLEMS WITH NEWER GENERATORS - Users Group S

38

Page 39: PROBLEMS WITH NEWER GENERATORS - Users Group S

39

Page 40: PROBLEMS WITH NEWER GENERATORS - Users Group S

40

Page 41: PROBLEMS WITH NEWER GENERATORS - Users Group S

41

Page 42: PROBLEMS WITH NEWER GENERATORS - Users Group S

42

Page 43: PROBLEMS WITH NEWER GENERATORS - Users Group S

43

Page 44: PROBLEMS WITH NEWER GENERATORS - Users Group S

REWINDING GLOBALLY VACUUM PRESSURE IMPREGNATED STATOR WINDINGS

MANY GENERATORS IN SERVICE LOW STATOR WINDING MANUFACTURING COSTS MOST OEMs DO THIS UP TO ~400MVA

CONDITIONS ENTIRE STATOR GOES INTO A VERY LARGE

IMPREGNATION TANK BONDS (GLUES) BARS IN SLOTS VERY DIFFICULT TO REMOVE WINDING

COSTLY AND TIME CONSUMING MAY DAMAGE CORE

MAY DECIDE TO JUST BUY A NEW STATOR 44

Page 45: PROBLEMS WITH NEWER GENERATORS - Users Group S

GE DRY-TIE PROBLEM IMPLEMENTED FOR SAFETY AND COST REASONS BUT GE ENDWINDING DESIGN IS BASED ON

EVERYTHING BONDING TOGETHER HISTORIC SYSTEM

WET ROVING GLASS, DIRECTLY OUT OF A RESIN BATH HIGH BOND STRENGTH BETWEEN GLASS AND BAR/CONNECTION

RING INSULATION

DRY TIE USES A PRE-IMPREGNATED GLASS TAPE RESIN IS B-STAGED, i.e., RESIN IS DRIED BUT UNDER HEAT SOFTENS AND FLOWS IN THEORY OKAY, BUT BOND TURNS OUT TO BE WEAK

CORRECTION REMOVE ALL DRY TIES AND REPLACE WITH WET TIES

45

Page 46: PROBLEMS WITH NEWER GENERATORS - Users Group S

46

Page 47: PROBLEMS WITH NEWER GENERATORS - Users Group S

47

Page 48: PROBLEMS WITH NEWER GENERATORS - Users Group S

48

Page 49: PROBLEMS WITH NEWER GENERATORS - Users Group S

49

Page 50: PROBLEMS WITH NEWER GENERATORS - Users Group S

50

Page 51: PROBLEMS WITH NEWER GENERATORS - Users Group S

51

Page 52: PROBLEMS WITH NEWER GENERATORS - Users Group S

52

Page 53: PROBLEMS WITH NEWER GENERATORS - Users Group S

ALSTOM ROTOR WINDING COPPER BRAZE PROBLEM

FAILURE OF RECENTLY REWOUND FIELD CRACKING AND FRACTURE OF WINDING

COPPER ROOT CONCERN INABILITY TO REUSE COPPER WINDING WHEN

REWINDING FIELD ROOT CONDITION THIN COPPER ATTACHMENT BRAZE CONTROL

PROBABLY TOO HIGH TEMPERATURE WITH BETTER QUALITY CONTROL, MAYBE OKAY

53

Page 54: PROBLEMS WITH NEWER GENERATORS - Users Group S

54

Page 55: PROBLEMS WITH NEWER GENERATORS - Users Group S

55

Page 56: PROBLEMS WITH NEWER GENERATORS - Users Group S

GE STATOR WINDING TAPE MIGRATION PROBLEM

A RETURN OF A PROBLEM OF THE 1950-60s CONDITION

ASPHALT INSULATION SYSTEM MICA IMPREGNATED WITH ASPHALT (REALLY!) GREAT SYSTEM FROM THE 1915s BUT IF SELECTED ASPHALT BECAME SOFT (LIQUID) AT

OPERATING TEMPERATURES NO MECHANICAL STABILITY INSULATION MIGRATED INWARD IN SLOT WITH LOAD

CYCLING

I AM THE WORLD EXPERT ON THIS PROBLEM (BECAUSE NO ONE ELSE IN THE WORLD IS OLD

ENOUGH TO REMEMBER THE PROBLEM)

56

Page 57: PROBLEMS WITH NEWER GENERATORS - Users Group S

57

Page 58: PROBLEMS WITH NEWER GENERATORS - Users Group S

58

Page 59: PROBLEMS WITH NEWER GENERATORS - Users Group S

59

Page 60: PROBLEMS WITH NEWER GENERATORS - Users Group S

60

Page 61: PROBLEMS WITH NEWER GENERATORS - Users Group S

61

Page 62: PROBLEMS WITH NEWER GENERATORS - Users Group S

62

Page 63: PROBLEMS WITH NEWER GENERATORS - Users Group S

A FEW OTHER (POTENTIAL) PROBLEMS

FRAME CRACKING FIELD FORGING CRACKING

MAIN FIELD FORGING ONE CASE IN SPAIN ABOUT 4 YEARS AGO

RETAINING RINGS GET RID OF YOUR 18/5 RINGS

ONLY COST YOU HALF A MILLION DOLLARS EVEN 18/18 RINGS CAN CRACK IF BAD ENOUGH

OPERATING CONDITION STATOR ENDWINDING VIBRATION NEGATIVE SEQUENCE CURRENTS FIELD WINDING GROUNDS

63

Page 64: PROBLEMS WITH NEWER GENERATORS - Users Group S

64

Page 65: PROBLEMS WITH NEWER GENERATORS - Users Group S

65

Page 66: PROBLEMS WITH NEWER GENERATORS - Users Group S

66

Page 67: PROBLEMS WITH NEWER GENERATORS - Users Group S

67

Page 68: PROBLEMS WITH NEWER GENERATORS - Users Group S

68

Page 69: PROBLEMS WITH NEWER GENERATORS - Users Group S

69

Page 70: PROBLEMS WITH NEWER GENERATORS - Users Group S

70

Page 71: PROBLEMS WITH NEWER GENERATORS - Users Group S

IN CLOLSING

LOTS OF OTHER FAILURE OPPORTUNITIES (UNFORTUNATELY) I’M STILL RUNNING INTO THINGS I

HAVE NEVER SEEN BEFORE AFTER 60+ YEARS

GOOD LUCK TO YOU BUT I AM GOING TO HAVE TO STOP

(TALKING AND CONSULTING) BEST WISHES!