Process, Power and Marine Division
ANIMP INFORMATION and COMMUNICATION TECHNOLOGY SECTION
CONFERENCE MAY 2010
Using SmartPlant 3D on the
Suncor Firebag Project
(A Client Perspective)
© 2008 Intergraph Corporation. All Rights Reserved.
Using SmartPlant 3D on the
Suncor Firebag Project
Who is Suncor?
What is the Firebag Project?
Review Suncor Firebag Teams Accomplishments
Review Issues, Benefits and Risks
Discuss Future Steps
Presentation Objectives
Plant Images courtesy of Suncor Energy
Who is ?
© 2008 Intergraph Corporation. All Rights Reserved.
Suncor’s Integrated Strategy
© 2008 Intergraph Corporation. All Rights Reserved.
What is the Firebag Project ?
© 2008 Intergraph Corporation. All Rights Reserved.
Current Situation
© 2008 Intergraph Corporation. All Rights Reserved.
•SmartPlant
•Four basic modules in use:
• SmartPlant 3D,
• SmartPlant P&ID,
• SmartPlant Review, and
• SmartPlant Instrumentation
• SmartPlant 3D – CADD Modeling Tool
• SmartPlant P&ID – Intelligent P&ID database / drawing tool
• SmartPlant Review – Model Review, Visualization and Collaboration tool
• SmartPlant Instrumentation – Instrument database and design tool
Why SmartPlant 3D ?
© 2008 Intergraph Corporation. All Rights Reserved.
Firebag Accomplishments
© 2008 Intergraph Corporation. All Rights Reserved.
SmartPlant Interactive
User Documentation
© 2008 Intergraph Corporation. All Rights Reserved.
Firebag Accomplishments cont’d
© 2008 Intergraph Corporation. All Rights Reserved.
Firebag Accomplishments cont’d
Discipline Drawings Count
Comp/Total
Status / Issues / Concerns
Process P&IDs 510 / 510 Conversion from PIW to SPPID,
exceeded expectations
Piping GA’s
Iso’s
800 / 922
14,600 /
17,500~
Generation using drawing automation
Isogen used directly from model
Civil Piling
Concrete
Steel
400 / 428
400 / 450
2200 / 2237
working in SP3D drawing production tool
Electrical Layouts
Sections &
Details
500 / 655
50 / 63
Stage 3 production moving forward
under simplified workflow which will
provide consistent and stable results
using lessons learned from civil drawing
experience
© 2008 Intergraph Corporation. All Rights Reserved.
© 2008 Intergraph Corporation. All Rights Reserved.
Suncor’s Firebag- Project
(Collaboration Map)
Jacobs
Mumbai
Jacobs
Edmonton
Suncor
Host
Jacobs
Charleston
Colt
Calgary
Current SmartPlant 3D Implementation:
– ~ 300 - 350 Concurrent Users
– 5 Workshare Sites
– Single Replicated Model
Jacobs
Calgary
© 2008 Intergraph Corporation. All Rights Reserved.
Firebag Stage 3DSU
© 2008 Intergraph Corporation. All Rights Reserved.
SmartPlant 3D Screen Image courtesy of Suncor Energy
Suncor Energy
Firebag Stage 3 DSU Project
© 2008 Intergraph Corporation. All Rights Reserved.
Suncor – Firebag Stage 3
Firebag Stage 1 thru 6
(Stage 3 shown modeled)
© 2008 Intergraph Corporation. All Rights Reserved.
Project Issues
Area Criticality /
Performance
Comments
Modeling M/M Majority of key modeling issues resolved, minor ones
being addressed
Copy/Paste/Mirror functionality improved to meet
Stage 4+ requirements
Specs M/M Spec database complete
Mapping to material masters complete
Drawings H/M Drawing generation for Piping disciplines good, being
enhanced for Civil discipline
Workshare H/H Stable and good performance
Performance M/M Generally stable with little impact on project production
Installation of upgrades completed smoothly
SP Review M/M Adequate performance
Support M/H High level of support from Intergraph at all levels to
address outstanding issues
© 2008 Intergraph Corporation. All Rights Reserved.
Assessment of Key
Performance Indicators
KRA Assessment
(1-5)
Comments
Workshare 4 Meets expectations
Productivity 4 Medium drawing production in civil discipline
Piping iso production above standard milestone
Data Ownership 4 Meets expectations
Vendor Support 4 High level of support, both locally as well as
remotely
Data Reuse 4 Model reuse potential is good, currently being
evaluated and improved
General 4 General overall user buy-in to new system
Good collaboration between all parties on resolving
gaps between functionality and requirements
© 2008 Intergraph Corporation. All Rights Reserved.
Immediate Benefits derived
© 2008 Intergraph Corporation. All Rights Reserved.
• Mobilization of low cost engineering centre
~ 25,000 manhours at $75.00 cost
Difference = ~$1.5M
• Flexibility of workshare – $200k
• Single configuration database ~$200k
• Cost avoidance for multi-model management
~10% *100,000 mhrs- 10,000 hrs ~ $1.0M
Future Benefits
© 2008 Intergraph Corporation. All Rights Reserved.
Future Benefits
© 2008 Intergraph Corporation. All Rights Reserved.
Firebag 3D Model Data Reuse
Stage 4…Stage 5
22
© 2008. Intergraph Corporation. All Rights Reserved.
Firebag 3D Model Data Reuse
Process Area (Copy Rotate)
23
© 2008. Intergraph Corporation. All Rights Reserved.
2000-person capacity Quarry Park office
Full service EPC office
– In-situ heavy oil recovery
– Power and cogeneration
– Sulphur recovery
– Gas processing
– Refining and upgrading
JACOBS Calgary Operations
80 Specs
300 Process modules
500 Pipe Rack modules
27 Building modules
1,650 Tagged equipment
20,000 Lines
45,000 Isos
55,000 Spools
43,000 Valves
13,000 Instruments
40,000 Tons of steel
JACOBS Firebag Project Facts
4 Years in design
5 Workshare locations (3 countries, 2 continents)
340 Designers (120 + 60 + 15 + 65 + 80)
15 Admins ( 8 + 3 + 1 + 1 + 2)
4,700,000 Objects
80+ GB Database Size
JACOBSFirebag Project Facts