Project Description: This project was developed to better support increasing levels of traffic, reduce congestion and improve roadway safety along this stretch of SR 32. Two intersections on the Top 150 Intersections list are in the project area and will be addressed with the completion of this project. Based on the current HSIP Priority List (2017), the project would address five of the top eleven Suburban Non- Freeway Segments and three of the top 100 Suburban Intersections by eliminating three traffic signals. What is the requested TRAC Tier Tier I - Construction Please identify the project mode (roadway, transit or freight): Roadway ODOT District District 8 County Clermont ODOT PID 103954 Project Mode Roadway Project Information Application ID 2019-D08-03 Date Submitted 5/29/2019 Project Name Clermont SR 32 Eastern Corridor Segment IVa What is the current TRAC Tier Tier III - Development & Multi-Phase Projects Processed: 6/6/2019 2019 TRAC Funding Application 1 of 13

Project Information Applications Recieved...4.5 Transportation Information In an effort to understand the complex issues associated with the project TRAC collects a variety of transportation

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

  • Project Description:This project was developed to better support increasing levels of traffic, reduce congestion and

    improve roadway safety along this stretch of SR 32. Two intersections on the Top 150 Intersections list are in the project area and will be addressed with the completion of this project. Based on the current HSIP Priority List (2017), the project would address five of the top eleven Suburban Non-Freeway Segments and three of the top 100 Suburban Intersections by eliminating three traffic

    signals.

    What is the requested TRAC Tier Tier I - Construction

    Please identify the project mode (roadway, transit or freight):

    Roadway

    ODOT District District 8 County Clermont

    ODOT PID 103954 Project Mode Roadway

    Project Information

    Application ID 2019-D08-03 Date Submitted 5/29/2019

    Project Name Clermont SR 32 Eastern Corridor Segment IVa

    What is the current TRAC TierTier III - Development & Multi-Phase

    Projects

    Processed: 6/6/2019 2019 TRAC Funding Application 1 of 13

  • What Type of Application Are you Submitting?Existing TRAC Project - Tier I, II or III project seeking additional funds to advance to the

    next stage of project development.

    Address 505 S SR 741

    City Lebanon

    State Ohio Zip Code: 45036

    Project Contact Charles Rowe

    Phone (513) 933-6596

    Email [email protected]

    Project Sponsor Information

    Project Name Clermont SR 32 Eastern Corridor Segment IVa

    Sponsoring Agency Ohio Department of Transportation

    Processed: 6/6/2019 2019 TRAC Funding Application 2 of 13

  • Utility Relocation In Progress 6/1/2022

    Detailed Design In Progress 11/1/2020

    Right-of-way Acquisition In Progress 6/1/2022

    Preliminary Engineering Studies Complete 7/8/2016

    Environmental / NEPA Approval Complete 7/5/2017

    Planning Studies Complete 10/31/2014

    Interchange Modification Study (IMS) / Interchange Justification Studies (IJS)

    Complete 7/22/2015

    Project ScheduleNew projects are required to supply project milestone information. Please select the status of each milestone below as either Not Yet Started, In Progress or Completed. Additionally please enter the corresponding date for the milestone and status.

    Status Date

    Processed: 6/6/2019 2019 TRAC Funding Application 3 of 13

  • 0 0 0 0

    0 0 0

    New Roadways / New Alignment 0

    Begin Latitude Begin longitude End Latitude End longitude

    0 0 0

    0 0 0

    Secondary Roadway Segments

    0 0 0

    0 0 0

    0 0 0

    ODOT NLFID Begin Point End PointPrimary Roadway

    SegmentSCLESR00032**C 2.25 4.5

    Transportation InformationIn an effort to understand the complex issues associated with the project TRAC collects a variety of transportation related data and information in the evaluation process including: congestion data, safety data, truck traffic, and model derived transportation values; such as, cost/benefit analysis and air quality. The roadway segments associated with the application is the basis of this analysis. Transit and Freight related projects should identify the roadway segments that will receive the benefit from projects implementation.

    New project applications must identify the primary roadway segment that will be improved by the project and ancillary roadways that will be improved as part of the project.

    Processed: 6/6/2019 2019 TRAC Funding Application 4 of 13

  • Truck Miles Traveled (TMT) Reduction Not Applicable

    Existing Freight Capacity Not Applicable

    Existing Freight Volume / Existing Freight Capacity Ratio

    Not Applicable

    Freight Capacity Increase Not Applicable

    Freight Multi-Modal Project Information

    Freight Type Not Applicable

    Route/Number Not Applicable

    Existing Freight Volume Not Applicable

    Existing Peak Hour Ridership / Capacity Ratio Not Applicable

    Added Peak Hour Capacity Not Applicable

    Vehicle Miles Traveled (VMT) Reduction Not Applicable

    Route/Number Not Applicable

    Peak Hour Ridership Not Applicable

    Existing Capacity Not Applicable

    Transit Multi-Modal Project Information

    Transit Type Not Applicable

    Processed: 6/6/2019 2019 TRAC Funding Application 5 of 13

  • Please provide a brief explanation as to how this project will connect an STS resource with a local freight or transit facility or resource

    0

    Will the project facilitate a connection between two or more corridors or modal hubs identified on the STS?

    No

    Please provide a brief explanation as to how this project will facilitate a connection between two or more STS resources.

    0

    Will the project connect an STS resource with a local freight or transit facility or resource?

    No

    Strategic Transportation System (STS) Connections

    The Strategic Transportation System (STS), identified as part of Access Ohio 2040 - ODOT’s long range transportation plan - stratifies Ohio’s significant transportation corridors and inter-modal hubs across Ohio. Additional information about the STS and Access Ohio 2040 can be view at the Access Ohio 2040 Website

    Is the project part of an STS corridor? Yes

    Processed: 6/6/2019 2019 TRAC Funding Application 6 of 13

  • Warehouse 122,861

    Commercial 3,791,940

    Institutional 382,631

    Water and Sewer Service 100%

    What is the estimated square footage for the following building types within the calculated project area?

    Light Industrial 490,417

    Heavy Industrial -

    Estimated Project Area Acreage 6,054

    What is the estimated percentage of acres being served by the local services within the estimated project area calculated above?

    Local Streets and Roadways 100%

    Electrical Service 100%

    Local Investment FactorsBuilt Out Local Attributes

    Local Investment factors analysis and evaluation of the dollar value of existing, local built-out attributes such as streets, water, and land use. For this analysis TRAC has standardized the project area as a one-mile "rectangular" buffer around the primary roadway segment. Additionally TRAC also considers percentage of acres served by local services within the rectangular buffer with the following formula: (Length of the primary roadway segment in miles + 2 miles) x 2 miles x 640 acres)

    What is the length of the primary roadway segment being improved by the project?

    2.73

    Processed: 6/6/2019 2019 TRAC Funding Application 7 of 13

  • Poverty Rate Data SourceSub-County Unemployment RateUnemployment Rate Data Source

    0

    00

    Do you want to enter distress values for a sub-county area to be used in the evaluation of this

    application?

    No - I want to use the information collected by ODOT.

    County 0Sub-County Poverty Rate 0

    What is the dollar value of committed or recent public investment in new, non-project

    infrastructure within the project area? (Millions) $ 164

    What is the present value of private investment in existing facilities within the project area? (Millions)

    $ 450

    Economic Distress - Poverty & Unemployment RatesAs part of the application scoring process, ODOT collects county level information as the standard measurement for poverty and unemployment factors; however, if a project sponsor provides defensible data at a sub-county or census tract level, TRAC can consider that level of geographic analysis for scoring and evaluation.

    What is the estimated percentage of road route miles served by transit routes (excluding ADA/Para

    Transit) within the project area?7%

    What is the estimated percentage of existing building square footage that is currently vacant?

    2%

    New Local InvestmentsTRAC will consider the monetized value of public investments or commitments for new, non-project infrastructure and private investments within 5-year time horizon prior to and after the date of this TRAC Application.

    Processed: 6/6/2019 2019 TRAC Funding Application 8 of 13

  • -$ -$ -$ -$

    Will additional TRAC funds be needed for future phases of development or construction? No

    PE DD RW CO

    PE DD RW CO6.25$ 1.49$ 5.00$ -$

    CO Funding Request 37.85$ 2022

    Total New TRAC Funding Request 61.40$

    Has TRAC previously committed funding for the development or construction of this project?

    Yes

    DD Funding Request 0.35$ 2020

    RW Funding Request 23.20$ 2020

    Which phase(s) you are requesting new TRAC funding for as part of this application?

    DD - Detailed DesignRW - Right-of-wayCO - Construction

    Amount (Millions) Requested Fiscal YearPE Funding Request -$ 0

    Project Funding PlanTRAC Funding Request

    Please indicate the amount of funding being requested by phase and fiscal year. Funding requests should consider the funding that will be needed with the next two fiscal years.

    Processed: 6/6/2019 2019 TRAC Funding Application 9 of 13

  • Local Funding TotalsPE DD RW CO

    -$ 0.20$ 4.63$ 31.34$

    PE DD RW CO-$ -$ -$ 19.00$

    -$ -$ 4.63$ 8.30$

    Local funding Source (5) OKI

    Local funding Source (4) Clermont County TID

    PE DD RW CO

    PE DD RW CO-$ -$ -$ 0.10$

    -$ 0.20$ -$ 0.10$

    Local funding Source (3) Union Township

    Local funding Source (2) Clermont County Engineer

    PE DD RW CO

    PE DD RW CO-$ -$ -$ 3.84$

    Will local funding sources be used in the development or construction of this project? Yes

    What is the total number of local funding sources for the development and construction of this project? 5

    Local funding Source (1) Clermont County Conveyance/CIC

    Local Funding CommitmentsProject Development and construction can be funded with multiple local funding sources. The questions below will help identify the funding sources for this project.

    Processed: 6/6/2019 2019 TRAC Funding Application 10 of 13

  • % Local % ODOT % OTIC % TRAC28.5% 13.0% 0.0% 58.5%

    Total Local Total ODOT Total OTIC Total TRAC36.17$ 16.50$ -$ 74.14$

    Funding Totals 6.25$ 2.04$ 32.83$ 85.69$

    Total Project Cost 126.81$

    New TRAC Funding -$ 0.35$ 23.20$ 37.85$

    Future TRAC Funding -$ -$ -$ -$

    OTIC Bond Funding -$ -$ -$ -$

    Previous TRAC Funding 6.25$ 1.49$ 5.00$ -$

    Local Funding -$ 0.20$ 4.63$ 31.34$

    ODOT / Earmark Funding -$ -$ -$ 16.50$

    Funding Summary

    PE DD RW CO

    PE DD RW CO-$ -$ -$ -$

    -$ -$ -$ 16.50$

    OTIC Turnpike Bond Revenue Funding

    Have Ohio Turnpike and Infrastructure Commission (OTIC) Revenue Bonds been committed for the No

    ODOT Program or Earmark Funding Commitments

    Will funding from another ODOT program or legislative earmarks be used in the development or Yes

    PE DD RW CO

    Processed: 6/6/2019 2019 TRAC Funding Application 11 of 13

  • Date of Inflated Estimate 9/15/2021

    Year of Inflation Estimate 2019

    Railroad $ -

    Contingency $ 9.40

    Total Estimate $ 86.00

    Traffic Control $ 3.50

    Structures $ 8.30

    Retaining Walls $ 5.30

    Tier I Construction Estimate

    Projects requesting Tier I status are required to submit a budgetary construction estimate. Additionally estimates must be inflated to the anticipated year of construction.

    Roadway $ 51.60

    Drainage $ 7.70

    Processed: 6/6/2019 2019 TRAC Funding Application 12 of 13

  • District Acknowledgement

    Has the appropriate ODOT District Planning Office been contacted about the development and construction of this project?

    Yes

    Has the ODOT District Office provided a letter or support or acknowledgment for this project? Yes

    Attachments

    Is this project within the boundaries of a Metropolitan Planning Organization (MPO)? Yes

    Please identify the respective MPO. OKI

    Has the MPO provided a letter or support or acknowledgment for this project? Yes

    MPO & District AcknowledgementMPO Acknowledgement

    Processed: 6/6/2019 2019 TRAC Funding Application 13 of 13

  • INFRA GRANT Appalachian Opportunity Corridor, Ohio SR 32 Total Project Cost: $118,531,225

    Charlie RoweRectangle

    Charlie RoweRectangle

  • £¤50£¤50

    Randolph5.4

    Kanawha5.1

    Greenbrier5.1

    Hardy5.5

    Fayette6.5

    Preston5.2

    Boone6

    Roane7.7

    Logan7.1

    Webster5.9

    Lewis5.9Ritchie5.2

    Monroe4.5Mercer6.2

    Wirt7Grant5.6

    Pocahontas6.2

    Raleigh5.3

    Nicholas6.5Wayne6

    Clay8.3

    Pendleton3.6

    Mingo7.8

    Braxton6.6Mason6

    Wood5.4 Tucker5.3

    Lincoln6.9

    Hampshire4.2

    Jackson5.4

    Wyoming7

    Wetzel6.7Tyler6.7

    Gilmer6.3

    McDowell6.9

    Harrison4.6

    Upshur5.5

    Putnam4.9

    Marion8.5

    Cabell4.7

    Mineral5.6Barbour5.9

    Summers5.5

    Berkeley4.1

    Marshall5.5

    Calhoun9.8

    Monongalia4 Morgan4.3Taylor4.7

    Jefferson3.4

    Ohio4.8

    Pleasants6.2

    Brooke6.2

    Hancock6

    Ross4.5

    Stark4.8

    Knox4.3Darke3.9 Licking3.9

    Scioto6.6

    Pike6.5Adams7

    Gallia6.1

    Wayne3.6Allen4.4

    Butler4.1

    Brown5.3

    Clark4.5

    Logan3.7 Union3.4

    Athens5.6

    Hardin4.3

    Franklin3.7Noble6.7

    Mercer2.7

    Miami3.8 Belmont5.5Preble4

    Highland5.5

    Monroe7.9

    Carroll5.2Shelby3.7

    Clinton5.2Warren3.8

    Holmes3.2

    Greene4

    Guernsey5.5

    Hancock3.4

    Pickaway4.2

    Coshocton6.1

    Putnam3.3

    Harrison5.1

    Van Wert3.5

    Champaign3.8

    Perry5.4

    Meigs7.1Vinton6.1

    Fairfield4

    Muskingum5.2

    Marion4.5

    Richland4.8

    Washington5.5Morgan6

    Madison3.7

    Morrow4.4

    Fayette4.1

    Ashland4.5

    Hocking4.9

    Jackson6.5Clermont4

    Tuscarawas4.5Delaware3.3

    Lawrence5.5

    Auglaize3.3

    Hamilton4.1

    Wyandot3.2 Columbiana5.2

    Crawford5.2Mahoning5.9

    Montgomery4.4

    Huron5.8 Medina4.2 Summit4.6Portage4.5

    £¤50

    ¬«32¬«32

    ¬«32

    Sources: Esri, HERE, DeLorme, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China(Hong Kong), Esri Korea, Esri (Thailand), MapmyIndia, NGCC, © OpenStreetMap contributors, and theGIS User Community

    Corridor D Appalachian Highway

    LegendCorridor D Appalachian HighwayState Boundary

    Unemployment Rate3.9% or Lower4.0% - 4.5%4.6% - 6.0%6.1% or Higher

    Pennsylvania

    VirginiaKentucky

  • From: Robert Koehler Sent: Tuesday, May 14, 2019 9:46 AM To: Rowe, Charles Subject: RE: CLE 32 TRAC OKI acknowledges and supports ODOT’s TRAC application for TRAC app for CLE 32 IVa. This application would request the remaining funds to complete phases 4-10 making SR32 a free flow corridor with an overpass at Glen Este-Withamsville and an interchange at Bach Buxton Road. OKI has invested nearly $30,000,000 in corridor projects completed or in progress including SR-32 interchange at I-275, Eastgate Blvd, Aicholtz Connector, Aicholtz Road roundabouts, Clepper Lane, Old SR 74 (Stonelick to Armstrong), Old SR 74 (Schoolhouse to Glen Este-Withamsville). This project will continue the systematic regional improvements to address safety, mobility and commerce in this thriving area of western Clermont County. Robert Koehler, P.E. Deputy Executive Director OKI Regional Council of Governments

  • From: Robert Koehler Sent: Tuesday, May 14, 2019 9:46 AM To: Rowe, Charles Subject: RE: CLE 32 TRAC OKI acknowledges and supports ODOT’s TRAC application for TRAC app for CLE 32 IVa. This application would request the remaining funds to complete phases 4-10 making SR32 a free flow corridor with an overpass at Glen Este-Withamsville and an interchange at Bach Buxton Road. OKI has invested nearly $30,000,000 in corridor projects completed or in progress including SR-32 interchange at I-275, Eastgate Blvd, Aicholtz Connector, Aicholtz Road roundabouts, Clepper Lane, Old SR 74 (Stonelick to Armstrong), Old SR 74 (Schoolhouse to Glen Este-Withamsville). This project will continue the systematic regional improvements to address safety, mobility and commerce in this thriving area of western Clermont County. Robert Koehler, P.E. Deputy Executive Director OKI Regional Council of Governments

  • From: Spinosa, StefanTo: Rowe, CharlesSubject: RE: TRAC letterDate: Tuesday, May 28, 2019 2:30:35 PMAttachments: image002.png

    image003.png

    Charlie, Thank you for your email notifying ODOT of your intention to submit a TRAC application for theEastern Corridor Segment IVa project.  This is an important project for our District, and I appreciate your efforts in advancing it. Respectfully,  Stefan C. Spinosa, P.E.Capital Programs AdministratorODOT District 8 Capital Programs505 South SR 741, Lebanon, Ohio 45036513.933.6639transportation.ohio.gov

     

    From: Rowe, Charles Sent: Tuesday, May 28, 2019 12:51 PMTo: Spinosa, Stefan Subject: TRAC letter Stefan, Just a reminder I need a letter/email from you stating the support D8 has for the CLE 32 TRAC app. Thanks, Charlie Rowe, P.E.Senior Project Manager/Design Build CoordinatorODOT District 8505 South State Route 741 Lebanon, OH 45036(p)513.933.6596transportation.ohio.gov

    mailto:[email protected]:[email protected]://www.dot.stat.oh.us/mailto:[email protected]://transportation.ohio.gov/

  •  

    2019-D08-03APP-D08-03

    77123009_trac_2019_project_map77123010_ohiowvunemployment77123011_support_letter_from_oki77123013_support_letter_from_oki77123014_odot__trac_letter