Project Execution Planning for Building Information Modeling (BIM) Project Execution Planning for Building Information Modeling (BIM) Building Information Modeling (BIM) Building Information Modeling (BIM) PACE Spring Seminar April 22 nd , 2009 PACE Spring Seminar April 22 nd , 2009 Craig Dubler Nevena Zikic Chitwan Saluja Craig Dubler Nevena Zikic Chitwan Saluja Chitwan Saluja Colleen Kasprzak Shane Goodman John Messner, Ph.D Chitwan Saluja Colleen Kasprzak Shane Goodman John Messner, Ph.D

Project Execution Planning for Building Information … Execution Planning for Building Information Modeling (BIM) PACE Spring Seminar ‐April 22ndnd, 2009 Craig Dubler Nevena Zikic

Embed Size (px)

Citation preview

Project Execution Planning forBuilding Information Modeling (BIM)Project Execution Planning forBuilding Information Modeling (BIM)Building Information Modeling (BIM) Building Information Modeling (BIM) 

PACE Spring Seminar ‐ April 22nd, 2009PACE Spring Seminar ‐ April 22nd, 2009

Craig DublerNevena ZikicChitwan Saluja

Craig DublerNevena ZikicChitwan SalujaChitwan SalujaColleen KasprzakShane GoodmanJohn Messner, Ph.D

Chitwan SalujaColleen KasprzakShane GoodmanJohn Messner, Ph.D

Problem StatementProblem Statement

Many owners and project teamMany owners and project team members are struggling with how to ff ti l i l t BIM th h teffectively implement BIM throughout the lifecycle of a building project.

Project GoalProject Goal

Develop a method that focused on the decisions required to increase the Building Information Modelingrequired to increase the Building Information Modeling process efficiency throughout the stages of a building project:project:

PlanningDesignConstructionOperations

Project DeliverablesProject Deliverables

BIM Execution Planning GuideIncludes guidelines for BIM implementation at various project phasesIncludes guidelines for BIM implementation at various project phases.Posted and distributed through the buildingSMART Alliance.

BIM Implementation ResourcesBIM Implementation ResourcesSpreadsheets, Word Templates, and Process Map TemplatesAssist Team Member to make decisions necessary for BIM Use 

implementationimplementation

Execution Planning ProcessExecution Planning Process

•Decision Support System to proceed from projectBIM UseBIM Use proceed from project characteristic to recommended BIM uses

BIM Use IdentificationBIM Use 

Identification

•Develop  a process specifically tailored to the project which includes tasks supported by BIM Process BIM Process BIM along with information exchanges between processes

PlanningPlanning

•Development of a detailed plan and procedure for each use and the information flow between  the uses

BIM Execution Plan 

D l t

BIM Execution Plan 

D l t

Project X

BIM ExecutionDevelopmentDevelopment Execution

Plan

BIM Use IdentificationBIM Use Identification

BIM UseBIM UseBIM Use Identification

BIM Use Identification

BIM Process BIM Process PlanningPlanning

BIM Execution Plan

BIM Execution PlanPlan 

DevelopmentPlan 

Development

BIM Use – Engineering AnalysisBIM Use – Engineering Analysis

Lighting and Energy AnalysisLighting and Energy Analysis

BIM Use – 4D Phase PlanningBIM Use – 4D Phase Planning

4D Phase Planning4D Phase Planning

BIM Use – 3D Design CoordinationBIM Use – 3D Design Coordination

3D MEP Coordination – Dickinson School of Law & Hershey Cancer Institute

BIM Use – Record ModelingBIM Use – Record Modeling

Record Modeling – Dickinson School of LawRecord Modeling Dickinson School of Law

Coordination Model Courtesy Gilbane Building Co.

BIM Process PlanningBIM Process Planning

BIM UseBIM UseBIM Use IdentificationBIM Use 

Identification

BIM Process BIM Process PlanningPlanning

BIM Execution Plan

BIM Execution PlanPlan 

DevelopmentPlan 

Development

Planning the BIM Execution ProcessPlanning the BIM Execution Process

• BIM Use Map

Level 1•A high level process map that outlines the various BIM uses in the different phases and information exchange that bind them.

Level 2

• Template Process Map•Template process maps will be mapped out for various BIM uses for reference by the project teams. These will contain……. 

Level 3

• Project Specific Process Map•The template process maps created in level 2 can then be taken to develop project specific process map, tailored to the process at handLevel 3 at hand.

Planning the BIM Execution ProcessPlanning the BIM Execution Process

• BIM Use Map

Level 1•A high level process map that outlines the various BIM uses in the different phases and information exchange that bind them.

Level 2

• Template Process Map•Template process maps will be mapped out for various BIM uses for reference by the project teams. These will contain……. 

Level 3

• Project Specific Process Map•The template process maps created in level 2 can then be taken to develop project specific process map, tailored to the process at handLevel 3 at hand.

Template Process Map – Design CoordinationTemplate Process Map – Design CoordinationCoordinationCoordination

Planning the BIM Execution ProcessPlanning the BIM Execution Process

• BIM Use Map

Level 1•A high level process map that outlines the various BIM uses in the different phases and information exchange that bind them.

Level 2

• Template Process Map•Template process maps will be mapped out for various BIM uses for reference by the project teams. These will contain……. 

Level 3

• Project Specific Process Map•The template process maps created in level 2 can then be taken to develop project specific process map, tailored to the process at handLevel 3 at hand.

Project Specific Process Map – Design Coordination (Millennium Science Project)Project Specific Process Map – Design Coordination (Millennium Science Project)( j )( j )

BIM Execution Plan DevelopmentBIM Execution Plan Development

Project Reference InformationBIM UseBIM Use

Project Goals /BIM Objectives

BIM Process Design

BIM Use IdentificationBIM Use 

Identification

g

Delivery Strategy / Contract

BIM S D fi iti

Project X

BIM Execution BIM Process BIM Process 

BIM Scope Definitions

Organizational Roles and Responsibilities

PlanPlanningPlanning

Communication Procedures

Technology Infrastructure NeedsBIM Execution Plan

BIM Execution Plan

Model Quality Control Procedures

Plan Development

Plan Development

Milestone Schedule

• May 15, 2009 – Draft Guide Complete

• May 2009 thru March 2010 Guide Implementation• May 2009 thru March 2010 – Guide Implementation

• March 2010 – Final Guide Complete

Acknowledgments

• Project Sponsors:– The Charles Pankow Foundation– The Construction Industry Institute (CII)– The Partnership for Achieving Construction Excellence e a t e s p o c e g Co st uct o ce e ce(PACE)

– Penn State Office of Physical Plant (OPP)

• Advisory Board Members – Balfour Beatty, Barton Malow

• Interview Participants Clark Gilbane• Interview Participants – Clark, GilbaneBIM Execution Website: bimex.wikispaces.com