PRE FEASIBILITY REPORT
for
PROPOSED EXPANSION OF AGROCHEMICAL & AGROCHEMICAL
INTERMEDIATE PRODUCTS IN EXISTING UNIT
of
M/s. TAGROS CHEMICAL INDIA LTD.
PLOT NO. 43/1, GIDC DAHEJ, TALUKA: VAGRA
DIST. – BHARUCH – 392 130, GUJARAT
2
CONTENTS
Sr.
No.
Description Page No.
1. Executive Summary 3
2. Introduction of the Project/Background information 11
3. Project Description 12
4. Site Analysis 19
5. Planning Brief 22
6. Proposed Infrastructure 26
7. Rehabilitation and resettlement (R & R) Plan 27
8. Project Schedule & Cost Estimates 27
9. Analysis of Proposal (Final Recommendations) 28
3
1.0 EXECUTIVE SUMMARY
1.1 Company Profile
M/s. Tagros Chemical India Ltd. is a part of the Jhaver Group of Companies. Jhaver Group is
a family owned, professionally managed business group, with interests in diverse businesses
including Pharmaceuticals, Agrochemicals, Zippers, Information Technology, etc. Tagros
Chemicals India Limited is India’s leading manufacturer exporter of a range of
Agrochemicals. A strong commitment to adhere to higher standards of quality and care for
its people and environment are the guiding factors which has transformed this Company in
rising from a humble beginning a decade back to a leading supplier in Synthetic Pyrethroids
today. Tagros currently offers a range of high value Synthetic Pyrethroids, Pesticide
Intermediates and Fungicides. Apart from this, a wide range of formulated products based
on these active ingredients are offered. Tagros today caters to the requirement of not only
domestic buyers but also international buyers in more than 50 countries. Tagros owns
registrations in various countries where its products are exported. Tagros is an approved
supplier to WHO projects and has successfully executed various orders received on Public
Health across the globe. Tagros is also the only company in the World which is a Notifier for
EU Biocide Directive, ECC 98/8 for its Pyrethroids.
M/s. Tagros Chemical India Ltd. now proposes expansion of Agrochemical & Agrochemical
Intermediate Products at Plot No. 43/1, Dahej-GIDC Industrial Estate, Village: Dahej, Taluka:
Vagra, District: Bharuch, Gujarat. The proposed expansion project is to be set up within the
existing premises of land area of 71,359 m2 out of which approximately 21,359 m
2 land area
is used for greenbelt development. The total estimated cost of the project is Rs. 17239.11
Lakhs. The fund allocated for pollution control will be approximately Rs. 668.80 Lakhs.
4
1.2 Project Details
1.2.1 Products along with Production Capacity
SR.
NO.
PRODUCT NAME EXISTING
CAPACITY
(MT/MONTH)
TOTAL
PROPOSED
CAPACITY
(MT/MONTH)
PESTICIDES INTERMEDIATES & TECHNICAL
1 DV ACID CHLORIDE 200 250
2 Carfentrazone 100 150
3 Ethofumesate 50 100
4 Metamitron 100 150
5 Cypermethrin 150 200
6 Permethrin 75 100
7 Alphamethrin 50 75
8 Meta phenoxy Benzaldehyde 200 250
9 Metaphenoxybenzyl Alcohol 100 100
10 RRCMA 30 30
11 Dicamba 50 500
12 Deltamethrin tech. 10 30
13 Sulfentrazone 100 100
14 Thiamethoxam 50 100
TOTAL 1265 2135
BY PRODUCTS:
1 Sodium Sulfite Powder 560.7 747.6
2 NH4CL Powder 162.7 216.6
3 HCL Solution 606.51 606.51
4 AlCl3 572.50 656.75
5 KCL Powder 124.4 137.5
6 Cu(OH)2 Powder 2.10 2.63
7 Spent Acid 3333.7 7618
TOTAL 5362.61 9985.6
9 D.G. Sets 2500 KVA x 1,
1500 KVA x 1,
1000 KVA x 1
2500 KVA x 1,
1500 KVA x 2
1000 KVA x 2
5
1.3 Raw Material Requirement
Sr.
No.
Product Name Raw Material Consumption
(MT/MT of product)
D V Acid Chloride
Acrylonitrile 0.460
Carbon tetra chloride 1.300
Acetonitrile 0.050
Cupric chloride 0.011
Liquid ammonia 0.043
Diethyl amine 0.015
Hydrochloric acid 1.734
Thionyl chloride 1.720
Dimethyl formamide 0.023
Triethylamine 0.091
Isobutylene 0.595
Sodium bi carbonate 0.153
n-hexane 0.351
BF3 Catalyst mixture 0.017
CS flakes 0.929
CS lye 2.439
1
Sulphuric acid 0.480
Metamitron
Sodium cyanide 0.580
Toluene 1.263
Benzaldehyde 1.022
Hydrochloric acid 4.244
Methanol / Ethanol 2.975
Sulphuric acid 1.852
Toluene 1.482
TEBA 0.042
Sod. Hypo 4.389
HH 0.655
PTSA 0.050
AH 0.794
DMA 3.935
AA 0.015
2
K2CO3 0.021
Cypermethrin
m-phenoxy Benzaldehyde 0.46
D V Acid Chloride 0.56
3
Sodium Cyanide 0.14
6
Soda Ash 0.015
Catalyst 0.015
Acetic acid 0.003
Hexane 0.061
Hypochlorite 0.42
Permethrin
m-Phenoxy Benzyl Alcohol 0.512
D V Acid Chloride 0.583
Hexane 0.043
Soda Ash 0.015
Acetic acid 0.003
4
Catalyst 0.015
Alphacypermethrin
m-phenoxy Benzaldehyde 0.883
D V Acid Chloride 1.022
Sodium Cyanide 0.255
Soda Ash 0.027
Catalyst 0.300
Acetic acid 0.006
Hexane 0.136
Hypochlorite 0.072
5
Sulphuric acid 0.002
Meta phenoxy Benzaldehyde
Benzaldehyde 1.000
Bromine 0.771
Chlorine 0.646
DCE 7.009
AlCl3 0.796
Sodium Thiosulphate 0.022
MEG 0.533
Phenol 0.751
KOH 0.465
Toluene 0.525
6
H2SO4 (98 %) 1.665
Meta phenoxybenzyl Alcohol
Hydrogen 0.12
MPB 0.990
Raney Nickel 0.049
7
Iso Propyl Alcohol 1.013
RRCMA
CIS-CMA 1.667
8
DMA opt. HCl 0.061
7
Ethylene Di chloride 0.550
Caustic soda 0.319
Hydrochloric acid 1.021
Deltamethrin
CIS-CMA 1.818
DMA opt. HCl 0.067
Ethylene Di chloride 0.600
Caustic soda 0.348
Hydrochloric acid 30% 1.114
Hydrochloric acid 33% 1.500
MDC /EDC 0.555
Aluminium chloride 1.410
HBr dry 2.535
Caustic lye 47% 0.773
Hexane 0.361
DMF 0.004
Thionyl chloride 0.540
Lye 2.071
Sodium cyanide 0.218
TEBAC 0.022
10% Sodium Hypo chloride 1.538
chloride MPB 0.735
Triethylamine 0.675
9
IPA 0.300
Dicamba
2,5- dichloro aniline 3.390
Sodium nitrite 1.460
98% Sulphuric acid 7.840
Sulfamic acid 0.100
Potassium chloride 1.080
Xylene 0.630
Carbon dioxide 1.700
Hydrochloric acid 30% 3.340
Sodium hydroxide 1.660
10
Dimethyl Sulphate 3.660
Carfentrazone
2-fluoroaniline 0.730
Sodium nitrite 0.460
Hydrochloric acid 4.210
Sodium sulfite 2.710
Caustic lye solution 2.644
11
20% Sodium hydroxide 4.275
8
10% Sodium Hydroxide 1.500
Acetaldehyde 0.382
Sodium cyanate 0.544
Chlorine 1.980
Acetic acid 0.500
Methanol 0.157
Potassium Carbonate 0.924
Dimethyl formamide 1.359
Dichlorofluoromethane 0.665
Oleum 5.565
Nitric acid 0.502
Dichloroethane 0.176
Catalyst Pd/C 0.060
Ethyl acrylate 0.425
Acetonitrile 0.409
IPA 1.076
Sulfentrazone
Phenyl hydrazine 0.765
Acetaldehyde 0.376
Sodium cyanate 0.530
Chlorine 2.308
Acetic acid 0.500
Methanol 0.212
10% Sodium Hydroxide 1.500
Potassium Carbonate 0.900
Dimethyl formamide 0.972
Dichlorofluoromethane 0.650
Oleum 4.450
Nitric acid 0.386
Dichloroethane 0.073
Catalyst Pd/C 0.063
Methane Sulfonyl chloride 0.689
Pyridine 0.049
Toluene 0.384
Dichloromethane 0.319
12
IPA 3.848
Thiamethoxam
Allyl chloride 0.670
Chlorine 1.330
47% caustic lye 0.900
Ammonium thio cyanate 0.780
13
EDC 0.150
9
SO2 0.120
4N Sodium Hydroxide 3.000
Guanidine nitrate 1.255
Sulfuric acid 3.365
40% Methyl amine 0.890
Para formaldehyde 0.742
Formic acid 0.345
DMC 0.210
Potassium carbonate 0.900
Ethofumesate
Isobutyraldehyde 0.500
Morpholine 0.604
Quinone 0.600
Toluene 0.482
Water 6.000
Methyl Sulfonyl chloride 0.650
Triethylamine 0.058
48% sodium hydroxide 0.500
Ethanol 1.000
35% HCl 0.250
14
Sodium bi carbonate 0.100
1.4 Water Requirement, Waste Water Generation and Treatment
Total water requirement after proposed expansion will be 2353 KL/day (1413 KL/day Fresh
+ 940 KL/day Recycled) which shall be met through GIDC water supply. The wastewater
generation after proposed expansion will be 1474 KL/day. Effluent generated shall be
treated in ETP consisting of primary, secondary and tertiary treatment facility followed by
MEE & RO Unit. Out of 1474 KL/day of Effluent, 494 KL/day Final Treated effluent shall be
sent to GIDC effluent pipeline for final disposal into deep sea, 940 KL/day treated effluent
i.e. RO Permeate shall be recycled/reused & remaining 40 KL/day treated effluent i.e. Steam
Condensate shall be used for Floor Washing.
1.5 Air Pollution Source and Control Management
There will be emission from Boiler (3 Nos. having common stack), D.G. sets (3 Nos.) and
Process vents (4 Nos.). To control the emission from stack & process vents, adequate air
pollution control equipments are installed i.e. Multi Cyclone followed by Bag Filter, Two
stage water scrubber followed by alkali scrubber & two stage water scrubbers.
10
1.6 Hazardous Waste
Sr.
No.
Quantity
Type of Waste Category
no.
Existing Additional Total
Method of Disposal
1. Used Lube Oil 5.1 6050.4
Liters/Year
2000
Liters/Year
8050.4
Liters/Year
Collection, Storage, Transportation &
Disposal by sale to GPCB authorized
Recyclers
2. Discarded Drums &
containers
240
MT/Year
240
MT/Year
480
MT/Year
Discarded liners &
cardboards
33.3
36
MT/Year
36
MT/Year
72
MT/Year
Collection, Storage, Decontamination,
& transportation back to the supplier
for reuse or sold to GPCB authorized
vendor
3. Cotton wastes/ raw
dust / bag filters
containing pesticides
29.1 1.2
MT/Year
1.2
MT/Year
2.4
MT/Year
Collection, Storage transportation for
co-processing at cement industry or
common incineration facility
4. Date expired
pesticides
29.3 2.142
MT/year
2.142
MT/year
4.284
MT/Year
Collection, Storage transportation &
disposal by common incineration
facility.
5. Spent catalyst (Reney
Nickel Catalyst)
35.2 583.68
MT/year
583.68
MT/year
1167.36
MT/Year
Collection, Storage, transportation,
send back for regeneration or return
to suppliers.
6. Process/ Distillation
Residue
29.1 1105.2
MT/Year
1234.8
MT/Year
2340
MT/Year
Collection, Storage transportation &
disposal by co-processing or sent to
common incineration facility
7. ETP Sludge 29.2 54
MT/Year
254
MT/Year
308
MT/Year
Collection, Storage, Transportation,
Disposal at TSDF Sites.
8. MEE salt 34.3 300
MT/month
500
MT/month
800
MT/Year
Collection, Storage, Transportation,
Disposal at TSDF Sites.
9. Spent carbon from ETP 34.3 250
Kg/month
150
Kg/month
400
Kg/Year
Collection, Storage, Transportation,
Disposal at TSDF Sites.
10. Sludge from wet
scrubber
36.1 1
MT/month
1
MT/month
2
MT/Year
Collection, Storage, Transportation,
Disposal at TSDF Sites.
11. Spent Ion Exchange
Resins
34.2 84
Kg/month
100
Kg/month
184
Kg/Year
Collection, Storage, Transportation,
Disposal by giving for regeneration or
return to supplier.
12. Incineration ash 36.2 10
MT/year
10
MT/year
20
MT/Year
Collection, Storage, Transportation,
Disposal at TSDF Sites.
13. Spent Solvent 20.2 1800
MT/Year
1800
MT/Year
3600
MT/Year
Collection, Storage, transportation &
recovery within premises
11
1.7 Green Belt
Total 71,359 sq. meter land area is available at site; out of this area about 21,359 sq. meter
(30 %) area is covered as greenbelt and other forms of greenery.
1.8 Power & Fuel Requirements
Total Power Requirement & Source of Power
Estimated power requirement is 5.5 MW (Existing: 4.5 MW + Additional: 1 MW). Power will
be taken from DGVCL. Stand by DG sets will be used as emergency power back up.
Fuel Requirement
EXISTING
Sr.
No.
Fuel Requirement
(MT/Day)
1 Coal 50 (MT/Day)
2 HSD 250 (lit. /hr.)
PROPOSED
1 Coal 90 (MT/Day)
2 HSD 450 (lit. /hr.)
2.0 INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION
2.1 Identification of the project and project proponent. In case of mining project, a copy
of mining lease/letter of intent should be given.
Identification of the project & project proponent
M/s. Tagros Chemical India Ltd now proposes expansion of Agrochemical & Agrochemical
Intermediate Products at Plot No. 43/1, Dahej-GIDC Industrial Estate, Village: Dahej, Taluka:
Vagra, District: Bharuch – 392 130, Gujarat.
2.2 Brief description of nature of the Project
Proposed expansion of Agrochemical & Agrochemical Intermediate Products in existing
manufacturing unit.
12
2.3 Need for the project and its importance to the country and or region
The demand for products intended to be manufacture is increasing in the international
market. By expanding this unit, M/s. Tagros Chemical India Ltd. will be able to meet the
demand of various products in foreign countries. The project will earn forex. This will also
generate direct and indirect employment opportunity for various levels of people in the
state of Gujarat.
2.4 Demand-Supply Gap
Based on our informal survey of the market with our current customers and various traders,
we have found that there is a big potential for the range of the products we are
manufacturing.
2.5 Imports vs. Indigenous production
Based on the current cost of indigenous raw materials and the non availability of some
materials, we will have to import some of the raw materials as they are not available
indigenously. This will make us very competitive against imported finished products and we
will export of our finished products to the international markets.
2.6 Domestic/Export Markets
Our products have good demand in international markets. We shall export substantial out
put from the plant.
2.7 Employment Generation (Direct and Indirect) due to project.
After proposed expansion M/s. Tagros Chemical India Ltd. will give direct employment to
people based on qualification and requirement. In addition to direct employment, indirect
employment shall generate additional business to some extent for the local population.
3.0 Project Description
3.1 Type of Project including interlinked and interdependent projects, if any.
No interlinked project has been submitted.
13
3.2 Location (map showing general location, specific location and project boundary &
project site layout) with coordinates.
• Map showing general location
(Courtesy: Environmental Information Center, New Delhi)
14
• Specific location and project boundary
(Courtesy: Environmental Information Center, New Delhi)
15
• Project Site (Google Map)
16
• Plot Layout
17
3.3 Details of alternate sites considered and the basis of selecting the proposed site,
particularly the environmental considerations gone into should be highlighted.
Looking to the international market demand of the products it was decided by M/s. Tagros
Chemical India Ltd., to expand the existing manufacturing facility at GIDC, Dahej. As Dahej is
centrally located near to Sea Port & Import Export activities can be easily handled. Over and
above Gujarat has been chemical industry friendly, Skilled/ un-skilled persons are easily
available so it was finally decided to expand existing unit at Dahej, GIDC in Gujarat.
Major factors involved in the selection of site are listed below:
• Proposed expansion project site is within the existing premises in GIDC, Dahej.
• The project site is located on level ground, which does not require any major land filling
for area grading work.
• Proximity to Raw Material suppliers.
• Site is very well connected by sea, road, air and railway.
• Availability of Power, Water, etc.
• Availability of Skilled, Un-skilled persons.
• Availability of Good Housing for Staffs
Modern infrastructure support and amenities at par in other global markets, including:
� Efficient transport facilities.
� Environment-friendly zone.
� Uninterrupted power supply.
3.4 Size or Magnitude of Operation
Please refer Section-1.2.1, Page No. 4.
3.5 Project Description with process details (a schematic diagram/flow chart showing the
project layout, components of the project, etc. should be given)
Please refer Please refer Form-I, Annexure-III.
18
3.6 Raw Material required along with estimated quantity, likely source, marketing area of
final product/s, mode of transport of raw material and Finished product.
For raw material required along with quantity; Please refer Section 1.3 on Page No. 5. We
shall procure the raw material as much as possible from domestic market and if there is no
availability of any raw material we will import. We shall export substantial out put from the
plant.
3.7 Resource optimization/recycling and reuse envisaged in the project, if any, should be
briefly outlined.
After proposed expansion, every effort will put to recycle/reuse the water, as of now we
have envisaged around 940 KL/day of water to be recycled.
3.8 Availability of water its source, energy/power requirement and source should be
given.
Water Source
Total water requirement shall meet through GIDC water supply.
Power & Fuel Requirement
Total Power Requirement & Source of Power
Estimated power requirement is 5.5 MW (Existing: 4.5 MW + Additional: 1 MW). Power will
be taken from DGVCL. Stand by DG sets will be used as emergency power back up.
Fuel Requirement
EXISTING
Sr.
No.
Fuel Requirement
(MT/Day)
1 Coal 50 (MT/Day)
2 HSD 250 (Lit./hr.)
PROPOSED
1 Coal 90 (MT/Day)
2 HSD 450 (Lit./hr.)
19
3.9 Quantity of waste to be generated (liquid and solid) and scheme for their
management/disposal.
Please refer Please refer Form-I, Annexure-V.
3.10 Schematic representations of the feasibility drawing which give information of EIA
purpose.
4.0 Site Analysis
4.1 Connectivity
• Site is very well connected by sea, road, air & railway.
• Availability of water, power, etc.
RECONNAISSANCE SURVEY OF EXISTING PLANT ANNUAL REPORT
MARKET ASSESSMENT
FINANCIAL REPORT
PROJECT REPORT
INTRODUCTION
MONITORING OF AIR, WATER & SOIL QUALITY & NOISE
LEVELS. DATA ON METEOROLOGY SOCIO-ECONOMIC STATUS
& BASIC AMENITIES. SITE VISITS BY AND INTERVIEWS WITH
LOCALS
BASELINE
ENVIRONMENTAL
STATUS
ENVIRONMENTAL INFORMATION CENTRE
CENTRAL GROUND WATER BOARD
GUJARAT POLLUTION CONTROL BOARD (GPCB)
PUBLIC HEALTH ENGINEERING DEPT.
AGRICULTURE DEPARTMENT
FOREST DEPARTMENT
IRRIGATION DEPARTMENT
EMPLOYMENT EXCHANGE
HEALTH CENTER
CENSUS DEPT.
INDIAN METEOROLOGICAL DEPT.
SOCIOECONOMIC
STATUS &
INFRASTRUCTURE
Proposed
PLANT
FACILITY DESCRIPTION
IMPACTS
METHODOLOGY OF
IMPACT
ASSESSMENT
IDENTIFICATION & ASSESSMENT OF IMPACTS
EVALUATION OF IMPACTS BY MATRIX METHOD
SOURCE OF INFORMATION OVERVIEW OF
E. I. A. STUDIES
ACTIVITIES
ENVIRONMENTAL
MANAGEMENT PLAN
DESCRIPTION OF EFFLUENT TREATMENT PLAN, AIR
POLLUTION CONTROL, HAZARDOUS WASTE MANAGEMENT,
GREEN BELT DEVELOPMENT MONITORING PROGRAM
RISK ANALYSIS
STUDIES &
DISASTER
MANAGEMENT PLAN
SAFETY, HEALTH & ENVIRONMENTAL POLICY, GUIDELINES BY
DIRECTOR GENERAL OF FACTORY SAFETY, MINISTRY OF LABOR. CONSEQUENCE ANALYSIS
PREPARATION OF DISASTER MANAGEMENT PLAN
20
4.2 Land Form, Land Use and Land Ownership
It will be incorporated in the EIA Study.
4.3 Existing land use pattern (agriculture, non-agriculture, forest, water bodies (including area
under CRZ)), shortest distances from the periphery of the project to periphery of the forests,
national park, wild life sanctuary, eco sensitive areas, water bodies (distance from HFL of the
river), CRZ. In case of the notified industrial area, a copy of the Gazette notification should be
given.
It will be incorporated in the EIA Study.
4.4 Existing Infrastructure
SR. NO. LAND USE PROPOSED AREA
(SQ. MT2)
1 Production Plants 12,500
2 Storage (Raw Materials)
3 Storage (Production)
2,500
4 Storage (Fuel) 500
5 Storage (Water) 1,000
6 Storage (Hazardous/Solid waste) 1,500
7 Storage (Hazardous Chemical) 5,000
8 Coal Storage Area 1,000
9 Green Belt 21,359
10 Effluent Treatment plant 2,500
11 Utility 2,500
12 Area available for future expansion 12,000
13 Recovery plant 2,000
14 Other (Admin, Workshop, Canteen, Warehouse,
Store, Medical Centre, Fire station, Research
center, Security office, Weigh Bridge)
7,000
TOTAL 71,359 m2
21
4.5 Soil Classification
Soil Characteristics under Project Area are as below Table;
CATEGORY AREA_SQ
KM DESCRIPTION TAXONOMY1 TAXONOMY2 CLASS SUB_CLASS
A 88.93
Very deep,
moderately
well drained,
calcareous,
fine soils on
very gently
sloping
alluvial plain
with slight
erosion and
moderate
salinity;
associated
with very
deep
moderately
well drained,
calcareous,
fine soils
with
moderate
erosion.
Fine,
montmorillonitic
(calcareous),
hyperthermic
Typic
Chromusterts
Fine,
montmorillonitic
(calcareous)
hyperthermic
Udic
Chromusters
Soils of
west
coast
(soils
of
Gujarat
plain)
Soils of
alluvial
plains
C 108.64
Very deep,
poorly
drained,
calcareous
fine-loamy
soils on very
gently
sloping
coastal plain
with
moderate
erosion and
strong
salinity;
associated
with very
Fine-loamy,
mixed
(calcareous),
hyperthermic
Aeric
Haplaquepts
Fine, mixed
(calcareous),
hyperthermic
Typic
Halaquepts
Soils of
west
coast
(soils
of
Gujarat
plain)
Soils of
coastal
plains
22
deep ,
imperfectly
drained,
calcareous,
fine soils
with severe
erosion and
strong
salinity.
- 116.43 Sea - - - -
4.6 Climatic data from secondary sources.
Climatic data from primary & secondary sources will be incorporated in the EIA Study.
5.0 Planning Brief
5.1 Planning Concept (type of industries, facilities, transportation etc) Town and Country
planning/Development authority classification.
Type of Industry: Proposed expansion of Agrochemical & Agrochemical Intermediate
Products in existing manufacturing unit.
5.2 Population Projection
Name Population
(Persons)
Population Density
(Person / sq. km.)
Sex ratio
(No. of females per
1000 males)
Within 5 km Radius (2011) 25483 324 675
Within 10 km Radius (2011) 32430 103 728
Taluka Vagra (2001) 82569 94 916
Taluka Vagra (2011) 100044 114 870
District Bharuch (2001) 1370104 210 920
District Bharuch (2011) 1551019 238 925
(Courtesy: Census Dept., GOI)
23
5.3 Land use planning (breakup along with green belt etc.)
Please refer Topic no. 4.4 on Page No. 20.
5.4 Assessment of Infrastructure Demand (Physical & Social)
• Employment would be as per prevailing norms of state government for skilled and
unskilled people for the proposed expansion project.
• Social Welfare
• Cordial relation with the nearby villagers is established and representation is made to
villages for help for creation of facilities related to health, education, etc.
24
5.5 Amenities/Facilities
Details of amenities available in study area
(Courtesy: Census Dept., GOI)
ABBREVIATIONS
1. Education
P-Primary Elementary School
H-Matriculation or Secondary
O-Other Educational Institution
PUC-Higher Secondary/Intermediate/pre-University/junior Collage
AC – Adult literacy class
TR – Training center
2. Medical Facilities
RP-Registered Private Practitioner
PHS-Primary Health Centre
FPC-Family Planning Centre
D- Dispensary
CHW - Community Health Worker/Health Worker
Taluka Village Educational Medical Drinking
Water
Post &
Telegrap
h
Communicati
on
Approac
h
to
Village
Nearest
Town
Power
Supply
Galenda P(2),Ac,O RP,CHW T,W,TK PO BS PR,KR Bharuch EA
Samatpor P(2),Ac RP,CHW W,TK -(-5 Kms) BS PR,KR Bharuch EA
Vav P(2),Ac RP,CHW T,W,TK,HP -(-5 Kms) BS,RS PR,KR Bharuch EA
Jolva P(2),Ac,O PHS,FPC,RP,CHW W,TK -(-5 Kms) BS,NW PR,KR Bharuch EA
Vadadla P(2),Ac CHW W,TK PO BS PR,KR Bharuch EA
Dahej
P(4),H,Ac(4),
O
PHC,D,FPC,RP,
CHW
T,W,TK PTO,
Phone
BS,RS,NW PR,KR Bharuch EA
Lakhigam P(2) PHS,RP,CHW W,TK po BS,NW PR,KR Bharuch EA
Luvara P(2),Ac RP,CHW W,TK -(-5 Kms) BS,NW PR,KR,NR Bharuch EA
Jageshwar P(2),Ac,H RP,CHW W,TK PO BS,NW PR,KR,NR Bharuch EA
Ambheta P(2),Ac CHW T,W,TK PO BS,NW KR,NR Bharuch EA
Suva P(2),Ac -(5-10 Kms) W,TK,R -(-5 Kms) BS,NW PR,KR,NR Bharuch EA
Rahiad P(2),Ac(2),O RP,CHW W,TK PO BS,NW PR,KR.NR Bharuch EA
Harinagar Un inhabited
Padariya P(2),Ac RP,CHW W,TK PO BS PR,KR Amod EA
Kadodara P(2),Ac(2),H PHS,FPC, RP,CHW W,TK PO BS PR,KR Bharuch EA
Vagra
Sambheti P(2),Ac -(10+Kms) W,TK PO BS,RS PR,KR Bharuch EA
25
H - Hospital
NH - Nursing Home
MH - Maternity Home
PHC - Public Health Centre
CWC - Child Welfare Centre
TB - T.B Clinic
O - Others
3. Drinking Water
T-Tap Water
HP-Hand Pump
TK-Tank Water
W-Well Water
R-River Water
C-Canal
N - Nallah
S - Spring
4. Post & Telegraph
PO-Post Office
PTO-Post & Telegraph
Phone-Telephone Communication
5. Transportation
RS- Railway Station
BS-Bus Station
NW-Navigable Waterway
6. Approach to Village
PR-Pucca Road
KR-Kuccha Road
7. Power Supply
EA-Electricity for all purposes
EAG - Electricity for Agriculture
ED - Electricity for domestic
EO - Electricity for other purpose like Industrial, Commercial etc.
26
6.0 Proposed Infrastructure
Please refer Topic no. 4.4 on Page No. 20.
6.1 Green Belt
Total 71,359 sq. meter land area is available at site; out of this area about 21,359 sq. meter
(30 %) area is covered as greenbelt and other forms of greenery.
6.2 Connectivity (Traffic and Transportation Road/ Rail/Metro/ Water ways etc)
Major factors involved in the selection of site are listed below:
• Site is very well connected by sea, road, air & railways.
• Proximity to Raw Material suppliers
• Availability of sufficient land free from cultivation
• Availability of power evacuation facilities
• Availability of water for industrial use
6.3 Drinking water Management (Source & Supply of water)
Total water requirement shall meet through GIDC supply.
6.4 Sewerage System
Sewage pipes are laid in entire company for the removal and disposal of mainly non-
harmful liquid wastes from the offices, canteen and domestic waste coming from different
sections. These liquid wastes are sent to ETP.
6.5 Solid Waste Management
Please refer Form-I, Annexure-V.
6.6 Power Requirement & Supply/Source
Please refer Section 1.8, Page No. 11 of this report.
27
7.0 Rehabilitation and Resettlement (R & R) Plan
7.1 Policy to be adopted (central/state) in respect of the project affected including home
oustees, land oustees and landless laborers (a brief outline to be given)
There is no habitation on the proposed expansion project land as expansion is within the
existing premises, so R & R policy is not applicable to this project.
There shall not be displacement of any population in project area. Any major activity that
may lead to resettlement of the people is considered as permanent impact. Hence, there is
no permanent impact on this account. The increasing industrial activity will boost the
commercial and economical status of the locality up to some extent.
8. Project Schedule & Cost Estimates
8.1 Likely date of start of construction and likely date of completion (Time schedule for
the project to be given).
We shall start construction after getting EC & CTE. We shall start production after applying
for CCA.
8.2 Estimated Project cost along with analysis in terms of economic viability of the
project.
Total Project Cost for proposed project activity is Rs. 17239.11 Lacs.
Sr.
No. Description
Project Cost
(Rs in Lacs)
1 Land Cost 420.13
2 Building 4524.10
3 Plant & Machinery 11626.08
4
Environment Management System
(includes cost of ETP, Tree Plantation,
Evaporator System, Rain Water Harvesting
etc.)
668.80
Total Project Cost 17239.11
9. Analysis of Proposal (Final Recommendations)
9.1 Financial and social benefits with special emphasis on the benefit to be local people
including tribal population, if any, in the area.
28
• Employment would be as per prevailing norms of state government for skilled and
unskilled people for the proposed expansion project.
• Social Welfare shall be done.
• Cordial relation with the nearby villagers shall be established and representation shall
be made to villages for help for creation of facilities related to health, education, etc.