Project Management PMLC Training Section 2

Embed Size (px)

Citation preview

  • 7/30/2019 Project Management PMLC Training Section 2

    1/56

    Office of the SeniorAssociate Vice President

    for Finance

    Project ManagementLife Cycle (PMLC)

    Section 2

  • 7/30/2019 Project Management PMLC Training Section 2

    2/56

    Office of the SeniorAssociate Vice President

    for Finance

    OutlineProject Management Life Cycle

    PMLC Review

    Phases In Depth Planning

    Analysis, Design &Development

    Testing & Readiness

    Post Go Live Closing

    Wrap Up

    Page 2

    Monitoring&

    Controlling

  • 7/30/2019 Project Management PMLC Training Section 2

    3/56

    Office of the SeniorAssociate Vice President

    for Finance

    Process ComparisonProject Management Life Cycle

    Initiating Planning Executing Closing

    Page 3

    Monitoring & Controlling

    Chartered ProjectRequest

    PlanningAnalysis,Design &

    Development

    Testing &Readiness

    Post GoLive

    ClosingProposalIdea

    GOLIVE!

  • 7/30/2019 Project Management PMLC Training Section 2

    4/56

    Office of the SeniorAssociate Vice President

    for Finance

    PlanningProject Management Life Cycle

    Page 4

    Planning

    Develop schedule,plans andrequirements forimplementation

    Acquire resourcesand engage theproject team

    Planning

  • 7/30/2019 Project Management PMLC Training Section 2

    5/56

    Office of the SeniorAssociate Vice President

    for Finance

    PlanningAnalysis,Design &

    Development

    Testing &Readiness

    Post GoLive

    ClosingProposalIdea

    Schedule / ResourceManagement

    ChangeManagement

    RiskManagement

    StakeholderManagement

    Monitoring & ControllingProject Management Life Cycle

    Page 5

    Monitoring &Controlling

  • 7/30/2019 Project Management PMLC Training Section 2

    6/56

    Office of the SeniorAssociate Vice President

    for Finance

    ExecutingProject Management Life Cycle

    Page 6

    Executing

    Transform businessrequirements intoactionable items

    Design and developthe planned solution

    Validate the solutionagainst the businessrequirements

    Verify deploymentreadiness

    Analysis,Design &

    Development

    Testing &Readiness

    Post GoLive

    Verify solutiondeployment per plan

    Prepare to transitionproject to operationalorganization

  • 7/30/2019 Project Management PMLC Training Section 2

    7/56

    Office of the SeniorAssociate Vice President

    for Finance

    ClosingProject Management Life Cycle

    Page 7

    Closing

    Receive approval toclose the project

    Transition projectitems to theoperational owner

    Perform LessonsLearned

    Closing

  • 7/30/2019 Project Management PMLC Training Section 2

    8/56

    Office of the SeniorAssociate Vice President

    for Finance

    Planning Phase - ProcessProject Management Life Cycle

    Page 8

    Activities

    Baseline BusinessRequirements

    Acquire Project Team

    Create Project DefinitionDocument

    Develop WBS - Schedule

    Develop CommunicationsPlan

    Obtain Signed Contract(s)

    Yes

    No

    Close or delay theproject,

    Complete openplanning items

    Input

    Gate Review

    Project Manager

    Author ize tobegin

    Development?

    PlanGate

    PlanningAnalysis,Design &

    Development

    Testing &Readiness

    Post GoLive

    ClosingProposalIdea

    Receives Charter

  • 7/30/2019 Project Management PMLC Training Section 2

    9/56

    Office of the SeniorAssociate Vice President

    for Finance

    Planning Phase - ActivitiesProject Management Life Cycle

    Page 9

    Document the what of the idea at anactionable level

    If not baselined by Proposal Gate, mustbe by Planning Gate Review.

    Activities

    Baseline BusinessRequirements

    Acquire Project Team

    Create Project DefinitionDocument

    Develop WBS - Schedule

    Develop CommunicationsPlan

    Obtain Signed Contract(s)

    PlanningAnalysis,Design &

    Development

    Testing &Readiness

    Post GoLive

    ClosingProposalIdea

  • 7/30/2019 Project Management PMLC Training Section 2

    10/56

    Office of the SeniorAssociate Vice President

    for Finance

    Planning Phase - ActivitiesProject Management Life Cycle

    Page 10

    Contact managers of resourcescommitted by charter

    Establish expectations ofresource usage

    Conduct a kickoff meeting

    Present the project, including timelines

    Introduce members, roles & expectations

    Establish meeting frequency

    Begin communications planning

    Receive feedback on project

    Activities

    Baseline BusinessRequirements

    Acquire Projec t Team

    Create Project DefinitionDocument

    Develop WBS - Schedule

    Develop CommunicationsPlan

    Obtain Signed Contract(s)

    PlanningAnalysis,Design &

    Development

    Testing &Readiness

    Post GoLive

    ClosingProposalIdea

  • 7/30/2019 Project Management PMLC Training Section 2

    11/56

    Office of the SeniorAssociate Vice President

    for Finance

    Planning Phase - ActivitiesProject Management Life Cycle

    Page 11

    Activities

    Baseline BusinessRequirements

    Acquire Project Team

    Create Project DefinitionDocument

    Develop WBS - Schedule

    Develop CommunicationsPlan

    Obtain Signed Contract(s)

    Scope Management

    Time Management

    Cost Management

    Quality Management

    HR Management

    Communications Mgt

    Risk Management

    Procurement Mgt

    Project Integration

    PlanningAnalysis,Design &

    Development

    Testing &Readiness

    Post GoLive

    ClosingProposalIdea

  • 7/30/2019 Project Management PMLC Training Section 2

    12/56

    Office of the SeniorAssociate Vice President

    for Finance

    Planning Phase - ActivitiesProject Management Life Cycle

    Page 12

    Activities

    Baseline BusinessRequirements

    Acquire Project Team

    Create Project DefinitionDocument

    Develop WBS - Schedule

    Develop CommunicationsPlan

    Obtain Signed Contract(s)

    PlanningAnalysis,Design &

    Development

    Testing &Readiness

    Post GoLive

    ClosingProposalIdea

  • 7/30/2019 Project Management PMLC Training Section 2

    13/56

    Office of the SeniorAssociate Vice President

    for Finance

    RASI MatrixProject Management Life Cycle

    Page 13

    Activities

    Baseline BusinessRequirements

    Acquire Project Team

    Create Project DefinitionDocument

    Develop WBS - Schedule

    Develop CommunicationsPlan

    Obtain Signed Contract(s)

  • 7/30/2019 Project Management PMLC Training Section 2

    14/56

    Office of the SeniorAssociate Vice President

    for Finance

    Planning Phase - ActivitiesProject Management Life Cycle

    Page 14

    StakeholderCommunications

    WBS1

    Postcards /Mailings

    WBS 1.2

    Email

    WBS1.3

    Initialannouncement

    email

    WBS 1.3.1

    First reminderemail

    WBS1.3.2

    Last reminderemail

    WBS 1.3.3

    Meetings /Seminars

    WBS 1.4

    WebsiteDevelopment

    WBS2

    Graphics Design

    WBS2.1

    Software Implementation Project

    Work Breakdown Structure(WBS)

    Activities

    Baseline BusinessRequirements

    Acquire Project Team

    Create Project DefinitionDocument

    Develop WBS - Schedule

    Develop CommunicationsPlan

    Obtain Signed Contract(s)

    PlanningAnalysis,Design &

    Development

    Testing &Readiness

    Post GoLive

    ClosingProposalIdea

  • 7/30/2019 Project Management PMLC Training Section 2

    15/56

    Office of the SeniorAssociate Vice President

    for Finance

    Planning Phase - ActivitiesProject Management Life Cycle

    Page 15

    Activities

    Baseline BusinessRequirements

    Acquire Project Team

    Create Project DefinitionDocument

    Develop WBS - Schedule

    Develop CommunicationsPlan

    Obtain Signed Contract(s)

    PlanningAnalysis,Design &

    Development

    Testing &Readiness

    Post GoLive

    ClosingProposalIdea

  • 7/30/2019 Project Management PMLC Training Section 2

    16/56

    Office of the SeniorAssociate Vice President

    for Finance

    Communications PlanningProject Management Life Cycle

    Page 16

    PlanningAnalysis,Design &

    Development

    Testing &Readiness

    Post GoLive

    ClosingProposalIdea

    The written strategy for getting theright information to the right project

    stakeholders at the right time.

    ORWho needs to know what, when and

    how at what level of detail andinformed by whom.

    Activities

    Baseline BusinessRequirements

    Acquire Project Team

    Create Project DefinitionDocument

    Develop WBS - Schedule

    DevelopCommunications Plan

    Obtain Signed Contract(s)

  • 7/30/2019 Project Management PMLC Training Section 2

    17/56

    Office of the SeniorAssociate Vice President

    for Finance

    Page 17

    Develop plan to actively communicate withstakeholders

    Internal to the project

    Project team meetings Project team status reports & meeting minutes

    Action Item registers

    External to the project

    Letters to stakeholders Blast emails & news

    Formal and informal stakeholdermeetings

    Planning Analysis,Design &Development

    Testing &Readiness

    Post GoLive

    ClosingProposalIdea

    Communications PlanningProject Management Life Cycle

  • 7/30/2019 Project Management PMLC Training Section 2

    18/56

    Office of the SeniorAssociate Vice President

    for Finance

    Communications PlanningProject Management Life Cycle

    Page 18

    Planning Analysis,Design &Development

    Testing &Readiness

    Post GoLive

    ClosingProposalIdea

    Vertical & Horizontal

    Top-down & Bottom-up

    Targeted & Tailored

    Written & Oral

    Concise

    Timely With Reminders

    Proper Perspective & Tone

  • 7/30/2019 Project Management PMLC Training Section 2

    19/56

    Office of the SeniorAssociate Vice President

    for Finance

    Communications PlanningProject Management Life Cycle

    Page 19

    Planning Analysis,Design &Development

    Testing &Readiness

    Post GoLive

    ClosingProposalIdea

    Matrix to organize and track progress

    Deliverable/Communication

    Description

    Audience

    Delivery Method

    Delivery Date/Timing/Deadline

    Frequency

    Approval/Reviewer

    Responsible Party/Owner

  • 7/30/2019 Project Management PMLC Training Section 2

    20/56

    Office of the SeniorAssociate Vice President

    for Finance

    Activities

    Baseline BusinessRequirements

    Acquire Project Team

    Create Project DefinitionDocument

    Develop WBS - Schedule

    Develop CommunicationsPlan

    Obtain Signed Contract(s)

    Planning Phase - ActivitiesProject Management Life Cycle

    Page 20

    Engage OGC in contractsapproval process

    Monitor to ensure GW Executivesignature

    Confirm all necessary partieshave signed

    Planning Analysis,Design &Development

    Testing &Readiness

    Post GoLive

    ClosingProposalIdea

  • 7/30/2019 Project Management PMLC Training Section 2

    21/56

    Office of the SeniorAssociate Vice President

    for Finance

    Planning Phase Gate ReviewProject Management Life Cycle

    If Planning Approved: Decision to proceed to the Analysis, Design &

    Development Phase

    Resources can begin the planned work

    Determination of artifacts required, participants

    required and/or action items for next phase Meeting minutes with decisions made

    Gate Review Approval Document

    If Planning Rejected:

    If project cancelled, proceed to Closing Phase Address planning issues and re-review

    Meeting minutes with decisions made

    Page 21

    Activities

    Baseline BusinessRequirements

    Acquire Project Team

    Create Project DefinitionDocument

    Develop WBS - Schedule

    Develop CommunicationsPlan

    Obtain Signed Contract(s)

    PlanGate

    Planning Analysis,Design &Development

    Testing &Readiness

    Post GoLive

    ClosingProposalIdea

  • 7/30/2019 Project Management PMLC Training Section 2

    22/56

    Office of the SeniorAssociate Vice President

    for Finance

    Page 22

    Project Monitoring & ControllingProject Management Life Cycle

    Monitoring & Controlling

    Triple

    Constraints

    Planning Analysis,Design &Development

    Testing &Readiness

    Post GoLive

    ClosingProposalIdea

    Schedule / Resource Management

    Monitoring activities & variationfrom dates

    Adding and updating action items

    Document Management

    Change Management

    Documenting & facilitatingchange requests

    Guarding scope throughdisciplined change

    management

    Stakeholder Management

    Status Reporting

    Communications

    Risk Management

    Risk register

    Status reporting

  • 7/30/2019 Project Management PMLC Training Section 2

    23/56

    Office of the SeniorAssociate Vice President

    for Finance

    Page 23

    Change Management FAQsProject Management Life Cycle

    Monitoring & Controlling

    TripleConstraints

    Planning Analysis,Design &Development

    Testing &Readiness

    Post GoLive

    ClosingProposalIdea

    What change requests will go through process?- Schedule - Anything impacting committed deliverable dates.

    - Costs - Anything increasing resources required.

    - Scope/Quality - Any requested change in the requirements.

    Who approves changes?

    - The project owner can approve a change, if impact not significant.

    - The Change Review Board has ultimate authority.

    - In PMLC, the Gate Reviewers could be the Change Reviewers.

    Where is this documented?

    - The plan, including the Change Reviewers, can be documented in PDDor separate Change Management Plan.

    - Change requests should be documented in a running log.

  • 7/30/2019 Project Management PMLC Training Section 2

    24/56

    Office of the SeniorAssociate Vice President

    for Finance

    Page 24

    Activities

    Create Test Plan &Procedures

    Create Deployment Plan Complete System and / or

    Process Development

    Complete RequirementsTraceability Matrix

    Develop Service LevelAgreement

    Update Project Schedule

    Yes

    No

    Close or delay theproject,

    Complete opendevelopment items

    Input

    Gate Review

    Project Manager

    Author ize tobegin

    Testing?

    DevGate

    Planning Analysis,Design &Development

    Testing &Readiness

    Post GoLive

    ClosingProposalIdea

    Analysis, Design & Development Phase - ProcessProject Management Life Cycle

  • 7/30/2019 Project Management PMLC Training Section 2

    25/56

    Office of the SeniorAssociate Vice President

    for Finance

    Test Plan - Describesmethodology and coordination of

    testing

    Test Procedures - Describe thetest scenarios and test cases to

    be executed as part of testing

    Page 25

    Planning Analysis,Design &Development

    Testing &Readiness

    Post GoLive

    ClosingProposalIdea

    Activities

    Create Test Plan &Procedures

    Create Deployment Plan

    Complete System and / orProcess Development

    Complete RequirementsTraceability Matrix

    Develop Service Level

    Agreement Update Project Schedule

    Analysis, Design & Development Phase - ActivitiesProject Management Life Cycle

  • 7/30/2019 Project Management PMLC Training Section 2

    26/56

    Office of the SeniorAssociate Vice Presidentfor Finance

    System / Process Testing Methodology

    - Test the integration of the development

    - Ensure development against Functional

    Specifications

    User Acceptance Testing Methodology

    - Engages the users in testing the solution

    - Ensure development against BusinessRequirements

    Regression Testing Methodology

    - Re-tests the solution after fixing

    - Ensure nothing else was broken throughfixing

    Activities

    Create Test Plan &Procedures

    Create Deployment Plan

    Complete System and / orProcess Development

    Complete RequirementsTraceability Matrix

    Develop Service Level

    Agreement Update Project Schedule

    Page 26

    Planning Analysis,Design &Development

    Testing &Readiness

    Post GoLive

    ClosingProposalIdea

    Test Plan

    Analysis, Design & Development Phase - ActivitiesProject Management Life Cycle

  • 7/30/2019 Project Management PMLC Training Section 2

    27/56

    Office of the SeniorAssociate Vice Presidentfor Finance

    Page 27

    Test Procedures / Cases

    Planning Analysis,Design &Development

    Testing &Readiness

    Post GoLive

    ClosingProposalIdea

    Analysis, Design & Development Phase - ActivitiesProject Management Life Cycle

  • 7/30/2019 Project Management PMLC Training Section 2

    28/56

    Office of the SeniorAssociate Vice Presidentfor Finance

    Overall plan to deliver solution

    Cutover plan

    Back out plan

    Site preparation

    Transition support

    Training

    Page 28

    Planning Analysis,Design &Development

    Testing &Readiness

    Post GoLive

    ClosingProposalIdea

    Activities

    Create Test Plan &Procedures

    Create Deployment Plan

    Complete System and / orProcess Development

    Complete RequirementsTraceability Matrix

    Develop Service Level

    Agreement Update Project Schedule

    Analysis, Design & Development Phase - ActivitiesProject Management Life Cycle

  • 7/30/2019 Project Management PMLC Training Section 2

    29/56

    Office of the SeniorAssociate Vice Presidentfor Finance

    Page 29

    Planning Analysis,Design &Development

    Testing &Readiness

    Post GoLive

    ClosingProposalIdea

    Activities

    Create Test Plan &Procedures

    Create Deployment Plan

    Complete System and / orProcess Development

    Complete RequirementsTraceability Matrix

    Develop Service Level

    Agreement Update Project Schedule

    Analysis, Design & Development Phase - ActivitiesProject Management Life Cycle

  • 7/30/2019 Project Management PMLC Training Section 2

    30/56

    Office of the SeniorAssociate Vice Presidentfor Finance

    Page 30

    Planning Analysis,Design &Development

    Testing &Readiness

    Post GoLive

    ClosingProposalIdea

    Activities

    Create Test Plan &Procedures

    Create Deployment Plan

    Complete System and /or Process Development

    Complete RequirementsTraceability Matrix

    Develop Service Level

    Agreement Update Project Schedule

    Analysis, Design & Development Phase - ActivitiesProject Management Life Cycle

  • 7/30/2019 Project Management PMLC Training Section 2

    31/56

    Office of the SeniorAssociate Vice Presidentfor Finance

    Business Requirements Functional Specification Test Cases

    Page 31

    BR3.1 Adjustable slots capable of toastingboth bread and bagels

    FS98.1.2 Toaster slots expand between 1and 2

    FS98.2.5 Tension mechanism will holdtoaster slots together in order to securecontents during toasting

    TC131.9 - Placing toast & bagel into toasterslots. Verify slot size & tension

    TO

    TO

    Planning Analysis,Design &Development

    Testing &Readiness

    Post GoLive

    ClosingProposalIdea

    Activities

    Create Test Plan &Procedures

    Create Deployment Plan

    Complete System and / orProcess Development

    Complete RequirementsTraceabil ity Matrix

    Develop Service Level

    Agreement Update Project Schedule

    Analysis, Design & Development Phase - ActivitiesProject Management Life Cycle

  • 7/30/2019 Project Management PMLC Training Section 2

    32/56

    Office of the SeniorAssociate Vice Presidentfor Finance

    PlanningAnalysis,Design &

    Development

    Testing &Readiness

    Post GoLive

    ClosingProposalIdea

    1 Business Requirement

    Page 32

    Analysis, Design & Development Phase - ActivitiesProject Management Life Cycle

    1 Business RequirementBecomes

    2 Functional Requirements

    1 Business RequirementBecomes

    2 Functional RequirementsBecomes

    5 Test Cases

  • 7/30/2019 Project Management PMLC Training Section 2

    33/56

    Office of the SeniorAssociate Vice Presidentfor Finance

    Describes agreements betweencustomer and provider

    General support agreement

    Hardware support agreements

    Hardware performance

    agreement Disaster recovery agreement

    Analysis, Design & Development Phase - ActivitiesProject Management Life Cycle

    Page 33

    PlanningAnalysis,Design &

    Development

    Testing &Readiness

    Post GoLive

    ClosingProposalIdea

    Activities

    Create Test Plan &Procedures

    Create Deployment Plan

    Complete System and / orProcess Development

    Complete RequirementsTraceability Matrix

    Develop Service Level

    Agreement Update Project Schedule

  • 7/30/2019 Project Management PMLC Training Section 2

    34/56

    Office of the SeniorAssociate Vice Presidentfor Finance

    If Development Approved:

    Decision to proceed to the Testing & ReadinessPhase

    Determination of artifacts required, participantsrequired and/or action items for next phase

    Meeting minutes with decisions made

    Gate Review Approval Document

    If Development Rejected:

    If project cancelled, proceed to Closing Phase Address development issues and re-review

    Meeting minutes with decisions made

    Page 34

    Activities

    Create Test Plan &Procedures

    Create Deployment Plan

    Complete System and / orProcess Development

    Complete RequirementsTraceability Matrix

    Develop Service Level

    Agreement Update Project Schedule

    DevGate

    PlanningAnalysis,Design &

    Development

    Testing &Readiness

    Post GoLive

    ClosingProposalIdea

    Analysis, Design & Development Phase Gate ReviewProject Management Life Cycle

  • 7/30/2019 Project Management PMLC Training Section 2

    35/56

    Office of the SeniorAssociate Vice Presidentfor Finance

    Analysis,Design , Development,Testing & Readiness

    Page 35

    PMLC LiteProject Management Life Cycle

    PMLC Lite

    Can be iterative development & test

    PlanningPost Go

    LiveClosingProposalIdea

    ~With Executive Sponsor Approval~

  • 7/30/2019 Project Management PMLC Training Section 2

    36/56

    Office of the SeniorAssociate Vice Presidentfor Finance

    Testing & Readiness Phase - ProcessProject Management Life Cycle

    Page 36

    Activities

    Execute Test Plan &

    Procedures

    Compile Test Results

    Track Issues to Resolution

    Begin Execution ofDeployment Plan

    Update Project Schedule

    Yes

    No

    Close or delaythe project,

    Complete openissues

    Input

    Gate Review

    Project Manager

    GOLIVE?

    GOLIVE

    PlanningAnalysis,Design &

    Development

    Testing &Readiness

    Post GoLive

    ClosingProposalIdea

  • 7/30/2019 Project Management PMLC Training Section 2

    37/56

    Office of the SeniorAssociate Vice President

    for Finance

    Ensuring SystemReady for Test

    UAT Coordination

    Facilitation /Monitoring of

    Testing Efforts

    Gathering ofTesting Results

    Activities

    Execute Test Plan &

    Procedures

    Compile Test Results

    Track Issues to Resolution

    Begin Execution ofDeployment Plan

    Update Project Schedule

    Page 37

    Testing & Readiness Phase - ProcessProject Management Life Cycle

    PlanningAnalysis,Design &

    Development

    Testing &Readiness

    Post GoLive

    ClosingProposalIdea

  • 7/30/2019 Project Management PMLC Training Section 2

    38/56

    Office of the SeniorAssociate Vice President

    for Finance

    Activities

    Execute Test Plan &

    Procedures

    Compile Test Results

    Track Issues to Resolution

    Begin Execution ofDeployment Plan

    Update Project Schedule

    Page 38

    Testing & Readiness Phase - ProcessProject Management Life Cycle

    PlanningAnalysis,Design &

    Development

    Testing &Readiness

    Post GoLive

    ClosingProposalIdea

  • 7/30/2019 Project Management PMLC Training Section 2

    39/56

    Office of the SeniorAssociate Vice President

    for Finance

    Activities

    Execute Test Plan &

    Procedures

    Compile Test Results

    Track Issues to Resolution

    Begin Execution ofDeployment Plan

    Update Project Schedule

    Page 39

    Testing & Readiness Phase - ProcessProject Management Life Cycle

    PlanningAnalysis,Design &

    Development

    Testing &Readiness

    Post GoLive

    ClosingProposalIdea

  • 7/30/2019 Project Management PMLC Training Section 2

    40/56

    Office of the SeniorAssociate Vice President

    for Finance

    Page 40

    Testing & Readiness Phase - ProcessProject Management Life Cycle

    PlanningAnalysis,Design &

    Development

    Testing &Readiness

    Post GoLive

    ClosingProposalIdea

    Activities

    Execute Test Plan &

    Procedures

    Compile Test Results

    Track Issues to Resolution

    Begin Execution ofDeployment Plan

    Update Project Schedule

  • 7/30/2019 Project Management PMLC Training Section 2

    41/56

    Office of the SeniorAssociate Vice President

    for Finance

    Have essential support and userpersonnel been trained?

    Is site / hardware / software

    ready for Go Live?

    Have we communicated thepending changes tostakeholders?

    Do we have a cutover and backout plan?

    Activities

    Execute Test Plan &

    Procedures

    Compile Test Results

    Track Issues to Resolution

    Begin Execution o fDeployment Plan

    Update Project Schedule

    Page 41

    Testing & Readiness Phase - ProcessProject Management Life Cycle

    PlanningAnalysis,Design &

    Development

    Testing &Readiness

    Post GoLive

    ClosingProposalIdea

  • 7/30/2019 Project Management PMLC Training Section 2

    42/56

    Office of the SeniorAssociate Vice President

    for Finance

    Activities

    Execute Test Plan &

    Procedures

    Compile Test Results

    Track Issues to Resolution

    Begin Execution o fDeployment Plan

    Update Project Schedule

    Page 42

    Testing & Readiness Phase - ProcessProject Management Life Cycle

    PlanningAnalysis,Design &

    Development

    Testing &Readiness

    Post GoLive

    ClosingProposalIdea

  • 7/30/2019 Project Management PMLC Training Section 2

    43/56

    Office of the SeniorAssociate Vice President

    for Finance

    Testing & Readiness Phase Gate ReviewProject Management Life Cycle

    If Testing & Readiness Approved:

    Decision to GO LIVE with solution.

    Determination of artifacts required, participantsrequired and/or action items for next phase

    Meeting minutes with decisions made Gate Review Approval Document

    If Testing & Readiness Rejected:

    If project cancelled, proceed to Closing Phase

    Address open issues and re-review

    Meeting minutes with decisions made

    Page 43

    GOLIVE

    PlanningAnalysis,Design &

    Development

    Testing &Readiness

    Post GoLive

    ClosingProposalIdea

    Activities

    Execute Test Plan &

    Procedures

    Compile Test Results

    Track Issues to Resolution

    Begin Execution ofDeployment Plan

    Update Project Schedule

    P t G Li Ph P

  • 7/30/2019 Project Management PMLC Training Section 2

    44/56

    Office of the SeniorAssociate Vice President

    for Finance

    Post Go Live Phase - ProcessProject Management Life Cycle

    Page 44

    Activities

    Monitor Post Go LiveActivity

    Complete DeploymentActions

    Prepare Transition Plan

    Yes

    No

    Resolve open Issues

    Input

    Gate Review

    Project Manager

    Move toClose

    Project?

    PostGate

    PlanningAnalysis,Design &

    DevelopmentTesting &Readiness

    Post GoLive

    ClosingProposalIdea

    P t G Li Ph P

  • 7/30/2019 Project Management PMLC Training Section 2

    45/56

    Office of the SeniorAssociate Vice President

    for Finance

    Page 45

    Activities

    Monitor Post Go LiveActiv ity

    Complete DeploymentActions

    Prepare Transition Plan

    PlanningAnalysis,Design &

    DevelopmentTesting &Readiness

    Post GoLive

    ClosingProposalIdea

    Post Go Live Phase - ProcessProject Management Life Cycle

    Provide support after system /process changes deployed

    Document, track and monitorissues and resolutions

    Escalate as necessary

    P t G Li Ph P

  • 7/30/2019 Project Management PMLC Training Section 2

    46/56

    Office of the SeniorAssociate Vice President

    for Finance

    Page 46

    Activities

    Monitor Post Go LiveActivity

    Complete DeploymentActions

    Prepare Transition Plan

    Planning

    Analysis,

    Design &Development

    Testing &Readiness

    Post GoLive

    ClosingProposalIdea

    Post Go Live Phase - ProcessProject Management Life Cycle

    Complete user andadministrator training

    Ensure all user andadministrator documentationis complete and accessible

    Close any issues remainingfrom Go Live

    P t G Li Ph P

  • 7/30/2019 Project Management PMLC Training Section 2

    47/56

    Office of the SeniorAssociate Vice President

    for Finance

    Page 47

    Activities

    Monitor Post Go LiveActivity

    Complete DeploymentActions

    Prepare Transit ion Plan

    Planning

    Analysis,

    Design &Development

    Testing &Readiness

    Post GoLive

    ClosingProposalIdea

    Post Go Live Phase - ProcessProject Management Life Cycle

    P t G Li Ph G t R i

  • 7/30/2019 Project Management PMLC Training Section 2

    48/56

    Office of the Senior

    Associate Vice Presidentfor Finance

    Post Go Live Phase Gate ReviewProject Management Life Cycle

    If Decision to Move to Closing Approved:

    Project Transition Plan approved, projectmoves to closing phase

    Determination of artifacts required,participants required and/or action items fornext phase

    Meeting minutes with decisions made

    If Decision to Move to Closing Rejected:

    Address deployment issues and re-review

    Meeting minutes with decisions made

    Page 48

    Activities

    Monitor Post Go LiveActivity

    Complete DeploymentActions

    Prepare Transition Plan

    PostGate

    Planning

    Analysis,

    Design &Development

    Testing &Readiness

    Post GoLive

    ClosingProposalIdea

    PMLC Lit

  • 7/30/2019 Project Management PMLC Training Section 2

    49/56

    Office of the Senior

    Associate Vice Presidentfor Finance

    Post Go Live & ClosingAnalysis,Design &

    Development

    Testing &Readiness

    Page 49

    PMLC LiteProject Management Life Cycle

    PMLC Lite

    Move to closing afterGo Live.

    PlanningProposalIdea

    ~With Executive Sponsor Approval~

    Cl i Ph P

  • 7/30/2019 Project Management PMLC Training Section 2

    50/56

    Office of the Senior

    Associate Vice Presidentfor Finance

    Closing Phase - ProcessProject Management Life Cycle

    Page 50

    Activities

    System/Process SupportHanded to Operations

    Project Lessons Learned

    Project Financial Review

    Archive Project Artifacts

    Yes

    No

    Resolve open Issues

    Input

    Gate Review

    Project Manager

    CloseProject?

    Planning

    Analysis,

    Design &Development

    Testing &Readiness

    Post GoLive

    ClosingProposalIdea

    CloseGate

    Cl i Ph P

  • 7/30/2019 Project Management PMLC Training Section 2

    51/56

    Office of the Senior

    Associate Vice Presidentfor Finance

    Page 51

    Planning

    Analysis,

    Design &Development

    Testing &Readiness Post GoLiveClosingProposalIdea

    Closing Phase - ProcessProject Management Life Cycle

    Activities

    System/Process SupportHanded to Operations

    Project Lessons Learned

    Project Financial Review

    Archive Project Artifacts

    Transition process / systemsupport to operation group

    Hand off open project issues

    Notify stakeholders of thetransition

    Closing Phase Process

  • 7/30/2019 Project Management PMLC Training Section 2

    52/56

    Office of the Senior

    Associate Vice Presidentfor Finance

    Page 52

    Planning

    Analysis,

    Design &Development

    Testing &Readiness Post GoLive ClosingProposalIdea

    Closing Phase - ProcessProject Management Life Cycle

    Activities

    System/Process SupportHanded to Operations

    Project Lessons Learned

    Project Financial Review

    Archive Project Artifacts Facilitate Project Team &

    Stakeholder Meeting

    Document lessons learned byproject phase

    Closing Phase Process

  • 7/30/2019 Project Management PMLC Training Section 2

    53/56

    Office of the Senior

    Associate Vice Presidentfor Finance

    Page 53

    Planning

    Analysis,

    Design &Development

    Testing &Readiness Post GoLive ClosingProposalIdea

    Closing Phase - ProcessProject Management Life Cycle

    Activities

    System/Process SupportHanded to Operations

    Project Lessons Learned

    Project Financial Review

    Archive Project Artifacts Compare initial project budget

    with actual expenditures

    Assess benefits achieved

    $

    Closing Phase Process

  • 7/30/2019 Project Management PMLC Training Section 2

    54/56

    Office of the Senior

    Associate Vice Presidentfor Finance

    Page 54

    Planning

    Analysis,

    Design &Development

    Testing &Readiness Post GoLive ClosingProposalIdea

    Closing Phase - ProcessProject Management Life Cycle

    Activities

    System/Process SupportHanded to Operations

    Project Lessons Learned

    Project Financial Review

    Archive Project Ar tifacts

    Organize and file all projectartifacts

    Communicate archiving

    location to stakeholders

    Closing Phase Process

  • 7/30/2019 Project Management PMLC Training Section 2

    55/56

    Office of the Senior

    Associate Vice Presidentfor Finance

    Activities

    System/Process SupportHanded to Operations

    Project Lessons Learned

    Project Financial Review

    Archive Project Artifacts

    If Decision to Close Project Approved:

    Close the project

    Meeting minutes with decisions made

    If Decision to Close Project Rejected:

    Address open issues and re-review

    Meeting minutes with decisions made

    Page 55

    Planning

    Analysis,

    Design &Development

    Testing &Readiness Post GoLive ClosingProposalIdea

    CloseGate

    Closing Phase - ProcessProject Management Life Cycle

    Project Closed

  • 7/30/2019 Project Management PMLC Training Section 2

    56/56

    Project ClosedProject Management Life Cycle

    PlanningAnalysis,Design &

    Development

    Testing &Readiness

    Post GoLive

    ClosingProposalIdea