PROJECT PRE-FEASIBILITY REPORT
Of
PROPOSED EXPANSION PROJECT For
SYNTHETIC ORGANIC CHEMICALS MANUFACTURING UNIT
At
Plot No. 1088/B Lamdapura road,
Village: Manjusar, Ta: Savli,
Dist: Vadodara, Gujarat
Project proponent
Project
Project:
CHAPT EXE The pro Table 1
PARTIC
NAME OUNIT OCCUPPRODUC
LOCATINATUREPROJEC
t Prefeasib
Proposed ex
TER – 1
ECUTIV
oject is sum
1.1: Project
CULARS DET
OF THE M/s
IER Mr. CTS
S.No
Ex1. 2. 3. 4. 5. 6 7. 8.
9. 1011Pr4. 5. 6. Pr7. 8. 9. 10TO*N24
ON PlotE OF CT
Prosim
bility Repo
xpansion pro
VE SUM
marized in
t Summary
TAILS
. Universal Este
Vishwas R. Go
o.
Name of
xisting Produc Methyl An Ethyl Sali Ethyl Ben Amyl Sali Benzyl Sa
Menthyle Amyl Ace Or any oth
of organg Octyl Met0. Octyl Sali1. Octyl Hydroposed produ Homosala Cosmetic Ethyl metroposed produ Octocryle Benzophe Benzophe0. AvobenzoOTAL Note: The comp4/07/2015 for mant No. 1088/B, laposed Expansiilar category of
ort
oject for man
MMARY
the below t
y
er Ltd.
ole, Mr. Mukesh
Products
cts* nithranilate* cylate*
nzoate* cylate* alicylate* Salicylate*
etate* her type of chee esters* thoxycinnamatecylate
droxystearate ucts ate emmolients thoxyCinnamateucts (Repackinene enone-3 enone -4 one
pany has obtainnufacturing of theamdapura road,on Project for I
f products i.e. sy
nufacturing o
Y
able:
h D.Patel, Mr. D
micals in categ
e
e ng & Reselling
ed consolidatedese products as w, Village: Manjuncrease in exisynthetic organic
of Synthetic O
Dushyant D. Pat
ExisQuan
ory
)
consent & Autwell, but is not mausar, Ta: Savli, sting productionc chemicals
Organic Che
tel
Proposed QuaQuantity
sting ntity After
1.5 1.25 1.6 3.0 8.0 0.5 2.0
--
8 6 2
- - -
- - - -
16 thorization (CC&anufacturing themDist: Vadodaran quantities and
micals
antity of Produ in MT / Month
r Phase-I Af
NIL
125
5
10
140 &A) no. H 3831m anymore.
a, Gujarat d adding new p
1
uction h
fter Phase-II
NIL
200
5
10
215 5 valid up to
products in the
1
Project
Project:
RESOURResourc
Land
Building
Raw-ma
Water
Power
Fuel
Man-powPOLLUTParamet
Wastewa
Air Emis
t Prefeasib
Proposed ex
RCES ce type Req
Exis369
150
aterials As g
Exis4.6
125
Agrokg/d
wer 35 TION POTENTIter
Exiater Indu
KLDDomKLD
ssions •
bility Repo
xpansion pro
quirement sting
94.48 m2
00.00 m2
given in section
sting KLD
5 KVA
o waste-500 day
IAL & MITIGAT
sting ustrial: 0.60 D mestic: 1.20 D
Non IBR Boiler 1 no.
ort
oject for man
After Phase3694.48 m2
1500.00 m2
n 3.5 - Raw Mat
After Phase29.0 KLD
250 KVA
Agro waste-kg/day Diesel-50 LP50
TION MEASURPoten
After PhaseIndustrial: 7Domestic: 2
• TFH – 2 N6 lakh k.cand 1 of 1kcal/hrs.
• D.G. Set KVA 1 no
nufacturing o
e-I Aft 369
150
terial for finishe
e-I Aft37
250
-8000
PH
Agrkg/dDie55
RES ntial e-I Aft.0 KLD 2.0KLD
IndDom
Nos. 1 of cal/hrs 10 lakh
125 os.
• T6ak
• DK
of Synthetic O
ter Phase-II 94.48 m2
00.00 m2
ed products.
ter Phase-II KLD
0 KVA
ro waste-8000 day
esel-50 LPH
ter Phase-II ustrial: 10.0 KLmestic: 2.2KLD
TFH – 2 Nos. 1 6 lakh k.cal/hrs and 1 of 10 lakhkcal/hrs. D.G. Set 125 KVA 1 nos.
Organic Che
Source
No additexpansioOnly slighinfrastrucThe raw Local/ Inimported Fresh wabore well of supply Sourced f1 D.G. Sas StandbLocal Sup
To be em
Mitigatio
LD D
• The dodisposedsoak pit
• In exiswastewatreated purpose
• After wastewaTreated sent to evaporat
of h
• In existiBoiler isused as
• For proBoiler wThermic kcal/hrs capacitieKVA cap
• Agro waTFH
• Cyclone TFH as A
• Diesel wSet.
• There isfrom theproposed
• Raw Ma
micals
tional land is n project. ht modification cture will be don materials are
ndian market a from foreign co
ater is sourced and same will for the additionfrom MGVCL et 125 KVA wiby arrangemenppliers.
mployed from loc
n Measures
omestic effluend off through system.
sting operatioater is treatedwater is used .
proposed ater will be tre
effluent from CETP of EIC
ted in evoporatng operations s installed. Ag fuel in non IBRposed expanswill be repla Fluid heater
and 10laes and one D.Gpacities will be iaste will be us
separator will bAPCD. will be used as
s no process e existing pland expansion pro
aterials& Produc
2
required for
in the existing ne. e available in and are also ountries. from in-house be the source nal quantity.
ill be installed t.
cal area
nt is/will be septic tank/
on Industrial in ETP and for gardning
expansion eated in ETP.
ETP will be CL or will be ion unit. one non IBR gro waste is
R Boiler sion non IBR ced by two
rs of 6 lakh akh kcal/hrs G. Set of 125 nstalled.
sed as fuel in
be attached to
s fuel in D.G.
gas emission nt as well as oject. cts are/will be
2
Project
Project:
Hazardosolid was
Noise
t Prefeasib
Proposed ex
ous & ste
• E(C0
• DR2M
• S(C0
• U5
• DC(3N
Non• F
M Exp
Insi<80
bility Repo
xpansion pro
ETP Waste Cat. 34.3) :
0.04MT/Month Distillation Residue (Cat. 20.3): 3.36 MT/Yr Spent Carbon Cat.35.3 ):
0.05 MT/Month Used Oil (Cat. 5.1): 1.2KL/Yr Discarded Containers 33.3): 120
Nos./Month
n Haz.Waste Fly ash: 13 MT/yr.
pected levels
ide the plant: 0 dB(A)
ort
oject for man
• ETP Was34.3) : 5.5Month
• DistillationResidue (20.3): 80M
• Spent Ca(Cat.35.3 MT/ Yr
• Used Oil (5.1): 2 KL
• DiscardedContainer(33.3): 98Nos./yr
• Inorganic waste (28MT/yr
• Spent sol(20.2): 21
Non Haz.Wa• Fly ash: 2
MT/yr. Expected le
Inside the pdB(A)
nufacturing o
ste (Cat. 5MT/
n (Cat. MT/Yr
rbon ): 0.1
(Cat. L/Yr d rs /Bags
870
process 8.1): 97
vent 0MT/yr. aste
220
• E3M
• DR2
• S(M
• U5
• DC(N
• InwM
• S(2
Non• F
2
vels
lant: <80
Exp
InsdB(
of Synthetic O
ETP Waste (Ca34.3) : 8.5 MT/ Month Distillation Residue (Cat. 20.3): 125 MT/Y
Spent Carbon Cat.35.3 ): 0.1
MT/Month Used Oil (Cat. 5.1): 2.5 KL/Yr Discarded Containers/Bag33.3): 15210
Nos./yr norganic procewaste (28.1): 15MT/yr Spent solvent 20.2): 325 MT/yn Haz.Waste Fly ash: 220MT/yr.
pected levels
ide the plant: <(A)
Organic Che
stored inarea to p
• Good maintain
• Regular carried expansio
t.
Yr
s
ss 55
yr.
• ETP wtransport
• Distillatiostorage, by coNECL/G
• Spent ctransportincinerat
• Used transportregistere
• Discardestorage, selling to
• Fly ashmanufac
• In-organstorage, TSDF
• Spent sactual us
80
• The mgeneratioequipme
• Anti vibbellows applicab
• Acousticbe provid
• Ear plug• Regular
shall be
micals
n properly desprevent any volahousekeeping
ned in the plant. VOC monito
out afteron.
waste: Collectirtation, disposalon residue: transportation ommon incEPIL.
carbon: Collectrtation and tor. oil: Collectio
rtation, disposaed re-refiners. ed Containers transportationo registered re-h to be socturer ic process was transportation
solvent will besers.
major sourceson in plant
ent machinary abration pads
is provideble. c Enclosure to ded. and Ear muff a maintenancedone.
3
igned storage atilities is/will be . oring will be r proposed
ion, storage, l at TSDF.
Collection, and disposal inerator at
tion, storage, disposal by
on, storage, l by selling to
s: Collection, , disposal by refiners. old to brick
ste: Collection, n, disposal at
e sold to the
s of noise t area are and TFH.
and flexible ed wherever
D.G. Set will
are provided. e lubrication
3
Project
Project:
CHAPTINTR 2.1 I 2.1.1 ID
M/s. Unin the coin the CLamdap
The unitHydroxyvalid umanufacAnnexu
Now, thcategory
Table 2S. No.
Na
Existing1. Me2. Eth3. Eth4. Am5. Be6 Me7. Am8. Or
org9. Oc10.
Oc
11.
Oc
Propose4. Ho5. Co6. Eth
t Prefeasib
Proposed ex
TER – 2 RODUC
DENTIFIC
DENTIFICA
iversal Esterommercial prCosmetics inpura road, Ta
t is engagedystearate. Thp to 24/07cturing only
ure-1.
e company y of products
2.1: List of ame of Produc
g Products* ethyl Anithranilahyl Salicylate* hyl Benzoate* myl Salicylate* enzyl Salicylate*enthyle Salicylamyl Acetate* r any other typegange esters* ctyl Methoxycinctyl Salicylate
ctyl Hydroxystea
ed products omosalate osmetic emmolihyl methoxyCin
bility Repo
xpansion pro
CTION
CATION OF
ATION OF T
r Ltd. is a Limroduction of ndustry at itsa.: Savli, Dist
d in manufache company 7/2015 for m
above given
has planneds. The list wis
Products cts
ate*
* ate*
e of chemicals in
namate
arate
ents nnamate
ort
oject for man
N OF TH
F THE PRO
THE PROJE
mited compaPersonal cars manufactut.: Vadodara.
cturing of (1has obtained
manufacturinn three prod
d to increasse products a
n category of
nufacturing o
HE PRO
OJECT AN
ECT
any which ware ingredienturing facility . The compa
) Octyl Methd consolidate
ng of 11 vaducts. The e
e its existingand its produ
Exist
of Synthetic O
OJECT
ND PROJE
as establishets, used in valocated at ny is a small
hoxycinnamaed consent &arious produexisting cons
g capacity auction capaci
ProposQ
ting Quantity
1.51.251.63.08.00.52.0
--
86
2
---
Organic Che
ECT PROP
ed in 1994.Tarious types Plot No. 10l scale chem
ate, (2) Octy& Authorizatiucts but present to oper
and add newity are given
sed Quantity oQuantity in MT
After Pha
5 5 6 0 0 5 0 -
8 6
2
- - -
micals
PONENT
The companyof formulatio88/B, Village
micals manufa
yl Salicylate ion (CC&A) esently the rate-CCA is
w products inin table belo
of Production / Month
ase-I Af
NIL
125
5
4
y is engagedons, primarilye: Manjusaracturing unit.
and (3)Octyno. H 38315company isattached as
n the similarow:
fter Phase-II
NIL
200
5
4
d y , .
l 5 s s
r
Project
Project:
Propose7. Oc8. Be9. Be10.
Av
TOTAL *Note: Tthese pro
2.1.2 P
The coprofessEnviron Below i
Mr.Vish
Mr.Vishin the CBefore after Te
Mr. Mu
Mr. Muindustry
Table 2
Sr. No. 1.
2.
3.
2.2 The profalls unSeptemindustriEnviron
t Prefeasib
Proposed ex
ed products (Rctocrylene enzophenone-3enzophenone -4vobenzone
he company hasoducts as well, bu
PROJECT P
ompany is sionally quanment are fu
s a brief pro
hwas Gole
hwas Gole hChemicals ireturning to
echnical and
kesh Patel
kesh Patel y. He is in a
2.2: Addres
Name of DMr. Vishw
Mr. Muke
Dushyan
NATURE
oposed expnder item
mber 2006 al area/est
nmental Cle
bility Repo
xpansion pro
Repacking & R
4
s obtained consout is not manufac
PROPONEN
a Limitedalified; they ully complie
ofile of the m
(Director)
has done hndustry. Heo India, he d Marketing
(Director)
is a Chema strategic a
sses of Dire
Directors was R. Gole
esh D.Patel
t D. Patel
OF THE P
pansion prono 5(f) i.e(as amendtate; it is
earance from
ort
oject for man
Reselling)
olidated consent &turing them anym
NT
d firm and take every
ed with.
manageme
is graduatioe has workewas Directo
g aspects in
mical Engineadvisory role
ectors
Addre4, Ka
93, U
3& 4
PROJECT
oject involvee. syntheticded timely).
to be tream EIAA (Mo
nufacturing o
& Authorization (more.
directorsy step to e
nt team.
on in Chemed for over or (R&D) w the compa
eer with ovee in the com
esses ant Flats 7, S
Urmi Society
, Aakashwan
es the prodc organic c Since, the
ated as CaoEF).
of Synthetic O
----
16(CC&A) no. H 38
of the coensure that
mistry. He ha25 years w
with a leadinany.
er 40 yearsmpany.
Suvanapuri S
. Productivity
n Hsg. Comp
uction of sychemicals e project isategory A
Organic Che
- - - -
6 8315 valid up to 2
ompany areall safety
as around 4with renowneng US com
s of experie
Soc. Jetalpur
y Road, Vado
plex. Gotri Se
ynthetic orgas per thes not locateand needs
micals
10
140 24/07/2015 for m
e well edumeasure to
45 years of ed companpany. He m
ence in the
r Road, Vado
odara 7.
evasi Road,
ganic cheme EIA notifed within as to obtain
5
10
215 manufacturing of
ucated ando Plant and
experienceies in USA
mainly looks
Chemicals
odara 5.
Vadodara
micals whichfication, 14any notifiedn the prior
5
d d
e . s
s
h 4 d r
Project
Project:
2.3 The prothe prorange hless supthat the 2.4 As per as expCosmet 2.5 The proindirect locally f
t Prefeasib
Proposed ex
NEED OF
oducts are uducts are u
having a gopply of the
e company p
EXPORT
market survport market tics industry
EMPLOYM
oposed expemployme
from the ne
bility Repo
xpansion pro
PROJECT
used in varuser friendlyood demandproduct agaproposed to
POSSIBIL
vey by the due to its
y
MENT GEN
pansion proent to few parby areas.
ort
oject for man
T & DEMA
rious types y confirmind in the maainst its demo have this p
LITY
company, ts applicatio
NERATION
oject will prpersons. Th.
nufacturing o
AND-SUPP
of formulatg with inter
arket& as pemand, to ovproject.
these propoon in vario
N DUE TO
rovide direce man-pow
of Synthetic O
PLY GAP
tions, primarnational ster market svercome thi
osed producous types o
O PROPOS
ct employmwer required
Organic Che
arily in the Ctandards. Tsurvey by this shortage
cts are havof formulat
SED PROJ
ent opportud for the pro
micals
Cosmetics iThe proposehe company& to get be
ing a dometions, prima
JECT
unityto20 poject will be
6
industry. Aled productsy there is aenefit out of
estic as welarily in the
ersons ande employed
6
l s a f
l e
d d
Project
Project:
CHAPT
PRO 3.1
3.1.1 T
The prmanufaOrganic
3.1.2 L
M/s. UnSavli, D Savli is Developlocated (Vaishnthis villaincludinarts & c The siteState oDistrict.from stand MuBarodainclude
t Prefeasib
Proposed ex
TER – 3
OJECT D
TYPE & L
TYPE
roposed practuring of nc Chemicals
LOCATION
niversal EstDist: Vadoda
a village pment Corp
in this vilnava), Patelage is tobang the K. J. commerce c
e is approxf Gujarat, a. It is locateate capital,
umbai pass , which petrochem
bility Repo
xpansion pro
DESCR
LOCATION
roject is annew range os.
N
ers Ltd. is lara.
near Vadoporation celage near , Brahmin a
acco. Savli iInstitute of
colleges and
ximately 17after Ahmaded on the b Gandhinagthrough Va
is theicals, engin
ort
oject for man
RIPTIO
N OF PROJ
n expansioof products
ocated at P
odara, Gujanters is vethe Mahisa
and Raj putis also becof Engineerind a homeop
.92 kms SSdabad and Sbanks of thgar. Both t
adodara. It ie larges
neering, che
nufacturing o
ON
JECT
on for incrfalling in th
Plot No.108
arat in Wesery near toagar River.ts, Muslims oming an eng and Tecpathic medic
SW from VaSurat. It is the Vishwamhe railway s also the h
st univeremicals,pha
of Synthetic O
rease in ehe similar ca
8/B, Village
stern India it; the bra. The popualso are pa
educational hnology. Incal college.
adodara - tthe adminismitri river, s
line and nahome of thersity in armaceutica
Organic Che
xisting proategory of p
e: Manjusar
. One of anch of Saulation in Sart of the vilhub with a addition to
the third larstrative headsoutheast oational high
e Maharaja Gujarat.
als, plastics
micals
oduction caproducts, i.e
r, Lamdapur
the Gujaraantram temSavli comprlage. The m
an educationo this colleg
rgest city indquarters o
of Ahmadabhway conneSayajirao U
Major and Forex.
7
apacity ande. Synthetic
ra road, Ta
t Industriample is also
rises Baniamain crop ofnal campus
ge there are
n the Indianof Vadodaraad, 139 km
ecting DelhUniversity of
industries
7
d c
:
l o a f s e
n a m
i f s
Project
Project:
Figure
t Prefeasib
Proposed ex
3.1: Projec
bility Repo
xpansion pro
ct Site
ort
oject for man
nufacturing oof Synthetic OOrganic Chemicals 8
8
Project
Project:
Figure
t Prefeasib
Proposed ex
3.2: Satelli
bility Repo
xpansion pro
ite Image o
ort
oject for man
of the Proje
nufacturing o
ect Site
of Synthetic OOrganic Chemicals 99
Project
Project:
Figure
Table 3
S. No. 1. 2. 3. 4.
t Prefeasib
Proposed ex
3.3: Proje
3.1: Area St
DescrTotal Built-uGreenOpen
bility Repo
xpansion pro
ct Site layo
tatement
ription Plot Area up area nbelt area Area
ort
oject for man
out
nufacturing oof Synthetic OOrganic Chemicals
Approx
10
x. Area (m2)3694.481500.00600.00
1594.48
0
Project
Project:
3.2 The prostudy frequiremavailabproposeHence o Some m
•
•
•
. 3.3 The tota
3.4 It is notand rawand octsections MoreovAvoben
t Prefeasib
Proposed ex
DETAILS
oposed expfor site selment of theility is veryed project. only existin
more benefi
Site is very
Proximity to
Availability
SIZE & MA
al magnitud
PROJECT
teworthy thaw-material fotyl salicylates.
ver, some onzone) are o
bility Repo
xpansion pro
OF THE A
pansion is tlection has
e proposed y helpful to
These togg site is con
ts of the ex
y well conne
o Raw Mate
of power fr
AGNITUD
de of operat
T DESCRIP
at the compfor manuface. Details o
of the prodonly to be p
ort
oject for man
ALTERNAT
to be carries been conexpansion
o avoid insgether justifnsidered for
xisting site a
ected by roa
erial supplie
rom MGVCL
E OF OPE
tion after pro
PTION WIT
pany is propcturing of itsof both exis
ucts (viz. Opurchased, r
nufacturing o
TIVE SITE
ed out in thnducted. Thproject. Fu
stallation offy the use r the propos
are shown b
ad.
ers
L.
ERATION
oposed exp
TH PROC
posing chans existing 2 ting and pro
Octocrylenerepacked an
of Synthetic O
E
he existing he presentrther the exf many infof existing
sed project.
below.
pansion will
ESS DETA
nge in procenos. of prooposed pro
e, Benzophnd sold out.
Organic Che
industrial pt land is axisting infrafrastructure g premises .
be 2400 M
AILS
ess in termsoducts, viz. ocess are p
enone-3, B.
micals
plot. So noadequate toastructure &
& machinfor propos
T/A.
s of changeoctylmetho
provided in s
Benzopheno
11
o alternativeo cater the& machineryery for the
sed project
e of catalystoxycinamatesubsequent
one -4, and
1
e e y e .
t e t
d
Project
Project:
3.4.1 E
3.4.1.1
3.4.1.1.
3.4.1.1. Into an is heatepress. Recove
3.4.1.1.
t Prefeasib
Proposed ex
Existing Pr
OCTYL ME
.1 Chemica
.2 Manufact
S.S. Reacted to 190 CMother liq
ered 2-ethyl
.3 Material B
bility Repo
xpansion pro
oducts Sce
ETHOXYCI
l Reaction
turing Proce
tor para Ani0 - 200C0 fouor is disthexyl aceta
Balance
ort
oject for man
enario
NAMATE (
ess
sic Aldehydor 48 hours.tilled undeate is recyc
nufacturing o
EXISTING
de, catalyst . Then massr high vac
cled in the n
of Synthetic O
PROCESS
& 2-ethyl hs is cooled
cuum to geext batch.
Organic Che
)
exyl acetateto 70C0 -80et 98% oc
micals
e are charg0C0& filter thctyl methox
12
ged. & masshrough filterxycinamate
2
s r .
Project
Project:
3.4.1.1
3.4.1.1.
3.4.1.1. Into anchargedfilter thmethox
3.4.1.1.
t Prefeasib
Proposed ex
OCTYL ME
.1 Chemica
.2 Manufact
n S.S. Read. & mass ishrough filtexycinamate.
.3 Material B
bility Repo
xpansion pro
ETHOXYCI
l Reaction
turing Proce
ctor para As heated tor press. MRecovered
Balance
ort
oject for man
NAMATE (
ess
Anisic Alde 190 C0 - 20
Mother liquod 2-ethyl he
nufacturing o
PROPOSE
ehyde, inor00C0 for 48or is distillxyl acetate
of Synthetic O
D PROCES
rganic catal8 hours. Theed under is recycled
Organic Che
SS)
lyst & 2-eten mass is chigh vacuu in the next
micals
thyl hexyl acooled to 7um to get t batch.
13
acetate are0C0 -80C0&98% octy
3
e & l
Project
Project:
3.4.1.2
3.4.1.2.
3.4.1.2. Into a gare charaise tedistillati
3.4.1.2.
t Prefeasib
Proposed ex
OCTYL SA
.1 Chemica
.2 Manufac
glass lined rarged. & maemp, to 150on tank. Cr
.3 Material B
bility Repo
xpansion pro
ALICYLATE
l Reaction
cturing Proc
reactor saliass is slowl0°c for 8 horude is distil
Balance
ort
oject for man
E (EXISTING
cess
cylic acid (1ly heated to
ours & samplled under h
nufacturing o
G PROCES
1100 kgs), o 120°c & hple is givenhigh vacuum
of Synthetic O
SS)
catalyst (60hold for 3 hn to check Gm to get 99%
Organic Che
0 kgs) 2-ethours. ApplyG.C. Then % octyl salic
micals
hyl hexanol y low vacuucrude is tracylate.
14
(1140 kgs)um & slowlyansferred to
4
) y o
Project
Project:
3.4.1.2
3.4.1.2.
3.4.1.2. Into a gslowly hgiven tovacuum
3.4.1.2.
t Prefeasib
Proposed ex
OCTYL SA
.1 Chemica
.2 Manufact
glass lined rheated to 1o check GC
m to get 99%
.3 Material B
bility Repo
xpansion pro
ALICYLATE
l Reaction
turing Proce
reactor met20C0& hold
C. Then cru% octyl salic
Balance
ort
oject for man
E (PROPOS
ess
thyl salicylad for 3 hourude is transcylate.
nufacturing o
SED PROCE
te, catalyst rs. Slowly rasferred to d
of Synthetic O
ESS)
and 2-ethyaise temp, tdistillation ta
Organic Che
yl hexanol ato 150 C0 foank. Crude
micals
are chargedor 8 hours &is distilled
15
d. & mass is& sample isunder high
5
s s h
Project
Project:
3.4.1.3 3.4.1.3.
3.4.1.3. Into a g180 C0 the reac2-ethyl
3.4.1.3.
t Prefeasib
Proposed ex
OCTYL HY
.1 Chemica
.2 Manufact
glass line refor 24 hou
ction & slowhexanol is <
.3 Material B
bility Repo
xpansion pro
YDROXYST
l Reaction
turing Proce
eactor 12HArs & water
wly apply va<2.0% stop
Balance
ort
oject for man
TEARATE
ess
AS, catalysis removed
acuum & thep the vacuum
nufacturing o
sts& 2-ethyd. Check theen under him and heat
of Synthetic O
l hexanol ae acid valuegh vacuum. Cool down
Organic Che
are chargede. If the ac
m remove 2-n to 80®c &
micals
d. & mass isid value is ethyl hexan
& filter produ
16
s heated to<1.5% stop
nol. If GC ofuct.
6
o p f
Project
Project:
3.4.2 3.4.2.1
3.4.2.1.
3.4.2.1. Into an heated down to99% pu
3.4.2.1.
t Prefeasib
Proposed ex
Proposed
HOMOSAL
.1 Chemica
.2 Manufact
S.S. Reactto 180˚C fo
o 80˚C & trurity & color
.3 Material B
bility Repo
xpansion pro
Products S
LATE
l Reaction
turing Proce
tor methyl sor 24 hoursransfer crudrless produc
Balance
ort
oject for man
Scenario
ess
salicylate, cs & check Gde to distillact.
nufacturing o
catalyst & hGC. If methyation unit. C
of Synthetic O
homo Menthyl salicylateCrude is dis
Organic Che
hyl alcohole is <1.5% sstilled in Co
micals
are chargestop the reaolumn distill
17
ed& mass isaction. Cooation to get
7
s l t
Project
Project:
3.4.2.2
3.4.2.2.
3.4.2.2. Into (20chargedtemp. <check ucatalystpurity ounit. 3.4.2.2.
t Prefeasib
Proposed ex
ETHYLE M
.1 Chemica
.2 Manufact
00 ltr) glassd. Mass is c< 30°C. Reunreacted pt. Organic a
of ethyl met
.3 Material B
bility Repo
xpansion pro
METHOXYC
l Reaction
turing Proce
s lined reacooled to 1action mixt
p-anisic aldeand water lathoxycinnam
Balance
ort
oject for man
CINNAMAT
ess
actor paraan0°C. 16 kgsture is keptehyde whicayer is sepamate. Wate
nufacturing o
E
nisic aldehys catalyst ist stirring arch is <1.0%arated. Org
er layer is ta
of Synthetic O
yde (40 kgs added oveound 30°C
%. 25% acetganic layer iaken for dis
Organic Che
s), & ethyl er the periofor 3 hour
tic acid is ais taken forstillation in
micals
acetate (1od of 2 hours. Sample added to ner distillation distillation/e
18
120kgs) arers. Keepingis taken to
eutralize theto get 98%
evaporation
8
e g o e
% n
Project
Project:
3.4.2.3
3.4.2.3.
3.4.2.3. Into (2030°C. Rwhich isminor lofrom filtobtaine 3.4.2.3.
t Prefeasib
Proposed ex
Cosmetic
.1 Chemica
.2 Manufact
00 ltr) glass Reaction ms sent to Eoss occurretration unit
ed.
.3 Material B
bility Repo
xpansion pro
Emollients
l Reaction
turing Proce
lined reactixture is ke
ETP. Then ed. Sample
where proc
Balance
ort
oject for man
s
ess
tor carboxylept stirring it is taken is taken to cess waste
nufacturing o
ic acid, alcoaround 30°into high vacheck for G is separate
of Synthetic O
ohol & cata°C for 3 hoaccum dist
GC and cooled. Finally
Organic Che
alyst are chaours. Aqueoillation. Alcled down. T98% pure
micals
arged. Keepous layer iscohol is sepThen mixturcosmetic e
19
ping temp.<s separatedparated andre is passedmollients is
9
< d d d s
Project
Project:
3.5 The rawalso imp Table 3
3.5.1 Hazardhandlin
Table 3
Raw Ma
Raw MaP-Anisi2-EthylMethyl 2-Ethyl12 H.S
Octyl Methox
Octyl S
Octyl H
Homos
Ethyl methox
t Prefeasib
Proposed ex
RAW MAT
w materials ported.
3.2(a): List
HAZARDO
ous chemicg & transpo
3.2(b): Stor
aterial/ finished
aterial ic Aldehyde lHexylacetateSalicylate
lHexanol .A.
Product
xycinnamate
Salicylate
HydroxyStear
salate
xyCinnamate
bility Repo
xpansion pro
TERIAL FO
for the pro
of Raw Ma
OUS CHEMI
cals are/willort of Hazar
rage, Hand
d goods
e
Nam
P-An2-EthCata
SalicMeth2-EthCata
rate 12 H2-EthCata
MethHomCata
e
P-AnEthylCataAceti
ort
oject for man
OR FINISH
oposed rang
aterials
ICAL STOR
l be used ardous Chem
ling & Tran
Source
Local/ImLocal/Im
me of Raw M
nisic Aldehydhyl Hexylacelyst
cylic acid hyl Salicylatehyl Hexanollyst
.S.A. hyl Hexanollyst
hyl Salicylateo Menthyl Allyst
nisic Aldehydl Acetate lyst ic acid (25%
nufacturing o
HED PROD
ge of produ
RAGE & HA
as raw matemicals are gi
nsport of H
CAS
Local 123-1Local 103-0
ported 119-3ported 104-7Local 106-1
Material
de etate
e
e lcohol
de
)
of Synthetic O
DUCTS
cts will be i
ANDLING
erial in the iven in table
Hazardous C
No
1-5 09-3 36-8 76-7 4-9
ReExisting
4.03712.470.004
3.474
4.4230.001
1.50.84
0.0001
Organic Che
indigenousl
manufactue 3.2(b).
Chemicals
Means ofstorage
DrumsDrumsDrumsDrumsDrums
equirement (g After Ph77 14
4-31
541 0
---
----
micals
y available
ring proces
f e
Means of transport
s Truck s Truck s Truck s Truck s Truck
(MT/Month) hase I Aft63.07
194.95 8.03
Or -
80.13 92.15 0.02
Or 93.75 52.5
0.0063 Or
77.38 97.62 0.060
And 3.64
10.91 0.91 3.18
20
and will be
ss. Storage
Max. Qty. stored MT
5 10 10 15 5
ter Phase II100.92311.9312.84
-128.41147.44
0.04
150.0084.000.10
123.81156.19
0.1
3.6410.910.913.18
0
e
,
Project
Project:
Raw Ma
Homo Ethyl AAcetic ProductOctyl MOctyl SOctyl HHomosEthyl m
3.6 The ma 3.6.1 Total exwill be carried
3.6.2 Some a Table 3 Sr. No.Existin1 2 3 4 5 6 7 8 9 10 11 12 13. Propos1 2 3 4 5
t Prefeasib
Proposed ex
aterial/ finished
Menthyl AlcoAcetate acid ts MethoxycinnaSalicylate HydroxyStearsalate methoxyCinna
RESOURC
ajor resourc
LAND & B
xisting plot required forout. Land P
EQUIPMEN
additional eq
3.3: List of
. Equipmng
Glass liSS 316 SS 316 SS 316 SS 316 SS 316 SS 316 SS 316 SS 316 SS 316 AdvancNutche Non IBR
sed additionVacuumSS 316 SS 316 ThermicDeep Fr
bility Repo
xpansion pro
d goods
ohol
amate
rate
amate
CE OPTIM
es for the p
UILDING R
area is 369r proposed Possession
NTS
quipment w
Equipmen
ments
ne Reactor (Reactor (3 KDistillation VDistillation VReactor (1.5Reactor (2 K(1 KL) Reactor (4 KReactor (5 KReactor (6 K
ced ContinuoFilter
R Boiler nal
m pumps Reactor (5 KReactor (6 K
c fluid heaterreezer Chillin
ort
oject for man
Source
ppppp
MIZATION
proposed pr
REQUIREM
94.48 m2andproject expDocument
will be neede
ts
(3 KL) KL) Vessel (800LVessel (2 KL5 KL) KL)
KL) KL ) KL)
ous Distillatio
KL ) KL) r (6& 10lakh.ng Unit
nufacturing o
CAS
Local 79-20Local 141-7Local 64-19
roduct 5466-roduct 118-6roduct 29710roduct 118-5roduct 5466-
& AVAILA
roject are/w
ENT
d total constpansion. Miis attached
ed for the p
L) )
n Unit
k.cal/hrs.)
of Synthetic O
No
0-9 78-6 9-7
-77-3 60-5 0-25-6 56-9 -77-3
ABILITY
ill be raw-m
tructed areanor constru as Annexu
roposed ex
Organic Che
Means ofstorage
DrumsDrumsDrums
DrumsDrumsDrumsDrumsDrums
materials, wa
a is 650.44 uction and fure-2.
xpansion.
micals
f e
Means of transport
s Truck s Truck s Truck
s Truck s Truck s Truck s Truck s Truck
ater, man-p
m2. No addfabrication w
21
Max. Qty. stored MT
5 5
10
10 10 10 10 2
ower, etc.
ditional landwork will be
No
1211221111111
122121
1
d e
Project
Project:
3.6.3 Total po250 kVA In exist8000 kgfuel in D Table 3
Sr. No.
Power1
Fuel 1
3.6.4 For exisfrom in be 29.0well. The catTable 3 Table 3
S.No.
1. 2. 3. 4. 5. 6. 7. 8. 9.
t Prefeasib
Proposed ex
POWER A
ower requirA, sourced
ing 500 kg/g/day Agro D.G. Set.
3.4: Details
Particulars
r Power Requiremen
Fuel & it’s consumption
WATER RE
sting projechouse, bor
0 KLD after
tegory wise3.5
3.5: Catego
Particula
Domesti Gardenin Industria Process Boiler Cooling ( washing Sub-Tota Grand To
bility Repo
xpansion pro
ND FUEL R
ement for efrom Madhy
/day Agro wwaste will
of Power &
RequiremExistingScenario
nt 125 kVA
n Agro was500 kg/d
EQUIREME
ct, water is rre well. Totaphase l and
e bifurcation
ory-wise Wa
ars
c ng al
(Make-up)
al: Industriaotal
ort
oject for man
REQUIREM
existing projya Gujarat V
waste is usebe used in
& Fuel
ment g o
P
2
ste @ ay
A8D
ENT
required for al fresh watd 37.0 KLD
n of the wa
ater Requi
al
nufacturing o
MENT
ject is 125 kVij Compan
ed as fuel foproposed T
Phase I
250 kVA
Agro waste @8000 kg/dayDiesel@ 50 L
domestic, pter requiremafter phase
ater require
rement (in
Existin
of Synthetic O
kVA and aftny Ltd. (MG
or non IBR Thermic flui
Phas
250
@
LPH
Agro8000DiesLPH
process andment for exie II which w
ment is giv
KL/D)
Reqng scenario
1.40.0
0.21.02.00.03.24.6
Organic Che
ter proposeVCL)
boiler. Afteid heaters.
se II
kVA
o waste @ 0 kg/day el@ 50
d utility purpisting projec
will be sourc
ven in the W
quirement (Ko After Pha40
200026
micals
ed expansio
er proposedDiesel will
Source
Madhya GuCompany L(MGVCL.) Local Suppl
pose, whichct is 4.6KLDced from in
Water Balan
KLD) ase I Aft
2.5 1.5
3.1 NIL
20.4 1.5
25.0 29.0
22
n it will be -
d expansionbe used as
ujarat Vij td
liers.
h is sourcedD which wilhouse bore
nce Data in
ter Phase II2.82.0
5.0NIL
25.22.0032.237.0
2
-
n s
d l
e
n
Project
Project:
3.6.5 The totproject The maSkilled Table 3
Phase
ExistinDuring
Phase During
Phase During
3.7
3.7.1 The cat Table 3
S.No.
1. 2. 3. 4. 5. 6. 7. 8.
t Prefeasib
Proposed ex
MAN-POW
tal number additional 2an-power reas well as u
3.6: Man Po
of project
ng operations
I operations
II operations
QUANTITY
WASTE WA
tegory wise
3.7:Categor
Particu
Domes Indust Proces Cooling Boiler ( Washin Sub-To Grand
bility Repo
xpansion pro
WER REQUI
of man po20 persons equired forunskilled lab
ower Requ
Type Labou
ManaSkilledUn-sk
ManaSkilledUn-sk
ManaSkilledUn-sk
Y OF WAS
ATER GEN
bifurcation
ry-wise Wa
ulars
stic trial ss water g (Blow down(Blow down) ng otal: IndustrTotal
ort
oject for man
IREMENT
ower for exwill be requ
r the projecbour will be
irement
of ur
gerial d killed
gerial d killed
gerial d killed
STE TO B
NERATION
of the wast
astewater G
n)
rial
nufacturing o
xisting projeuired. Hencect is/ will b employed
GeneralM
353
353
355
E GENERA
& MANAG
te water ge
Generation
Existing S
of Synthetic O
ect is 35 pe the total me employedfor the proje
No.1st S
ATED
EMENT
neration is
(in KL/D)
WasteScenario
1.2
0.20.20.2NIL0.61.8
Organic Che
persons, forman-power d locally froect.
. of workersShift
M
...35
...67
...68
given in Ta
e Water GeneAfter Pha
micals
r proposedwill be 55 om the nea
s 2nd Shift
M
... 3 5
... 6 7
... 6 8
ble 3.7.
eration ase I Aft
2.0
3.1 2.4 NIL 1.5 7.0 9.0
23
expansion
arby areas
3rd ShiftM
...35
...67
...68
ter Phase II2.2
5.03.0NIL2.0
10.012.2
3
n
.
Project
Project:
Fig-3.4
Fig-3.4
t Prefeasib
Proposed ex
(a): Water
(b): Water
bility Repo
xpansion pro
r Balance D
Balance D
ort
oject for man
Diagram (in
iagram (in
nufacturing o
n KLD) for E
KLD) for P
of Synthetic O
Existing Sc
Phase - I
Organic Che
cenario
micals 24
4
Project
Project:
Fig-3.4
3.7.2 The ten Table 3
Sr. No.
1. 2. 3. 4. 5. 6.
3.7.3 In existand thegardeni
After prsystemmainten
t Prefeasib
Proposed ex
(c): Water
WASTE WA
ntative wast
3.8: Charac
. pH SuspeChemiBiocheOil & GTotal D
WASTE WA
ting operatioe industrial ing.
roposed ex. For the nance and m
bility Repo
xpansion pro
Balance D
ATER CHA
ewater cha
cteristics o
Parameter
nded Solids cal Oxygen D
emical OxygeGrease Dissolved So
ATER TRE
ons, the doeffluent is
xpansion theindustrial
modification
ort
oject for man
iagram (in
ARACTERIS
racteristic o
f Wastewa
r
(SS) Demand (COen Demand (
olids (TDS)
EATMENT &
omestic effluprovided p
e domestic effluent f
ns will be m
nufacturing o
KLD) for P
STICS
of effluent is
ter
OD) (BOD)
& DISPOSA
uent is dispprimary trea
effluent wifrom the pade in the e
of Synthetic O
Phase – II
s given belo
Untre
AL
posed throuatment and
ill be disposproposed pexisting ETP
Organic Che
ow in Table
Charaeated Efflue
6.0-8200-40
800-100250-30
<140000-5000
ugh septic td the treate
sed throughproduction P.
micals
No. 3.8.
acteristics ent Treat8.5 00 00 00 10 00
tank/ soaksed effluent
h septic tanactivities,
25
ed Effluent6-8
<100<250<100<10
<2100
s pit systemis used for
nk/ soak pitnecessary
5
m r
t y
Project
Project:
The efflcollectio
After nebottom the primand theevapora The salTSDF s ETP Sc Fig-3.5
Fig-3.5
t Prefeasib
Proposed ex
luent cominon cum neu
eutralizationof the prim
mary settlinge effluent fration unit.
ts/ residue site.
cheme:
(a): Existin
(b): Propo
bility Repo
xpansion pro
ng from the utralization t
n, the effluemary settlingg tank will brom this ta
from evapo
ng ETP flow
osed ETP fl
ort
oject for man
process, wtank and ne
ent will be pg tank will bbe passed tnk will eith
oration unit
w diagram
low diagram
nufacturing o
washing andeutralization
pumped out be diverted through mixer be sent
along with E
m
of Synthetic O
d cooling town will be car
to the priminto the slu
x bed filter ato CETP o
ETP primar
Organic Che
wer blow doried out.
mary settlingudge dryingand diverteof EICL or
ry sludge w
micals
own will div
g tank; sludgg bed. The d into the hwill be eva
ill be dispos
26
erted to the
ge from theoverflow of
holding tankaporated in
sed through
6
e
e f k n
h
Project
Project:
3.7.4
3.7.4.1 There is
3.7.4.2 In existboiler. CFor proof 6 lakAdditioncase ofemissio Table 3
Partic
ExistinNon IB
PropoThermheaterone of k.cal/hof 10 lakcal/hrD.G. SKVA (S
PropoThermheaterone of k.cal/hof 10 lakcal/hrD.G. SKVA (S
3.7.4.3 Minor qemissio
t Prefeasib
Proposed ex
AIR EMISS
Process
s/will be no
2 Utility Em
ting scenarCyclone sepposed expa
kh k.cal/hrs&nally a D.Gf power faons and con
3.9: Details
ulars
ng scenarioBR boiler.
osed Scenarmic fluid r 2 No.- 6 lakh rs and one akh rs.
Set 125 Stand by)
osed Scenarmic fluid r 2 No.- 6 lakh rs and one akh rs.
Set 125 Stand by)
3 Fugitive
quantity of ons are also
bility Repo
xpansion pro
SIONS & CO
Emission
process em
mission
io, the comparator is pansion IBR &10 lakh k.c. Set of 12
ailure and Dntrol measu
of Utility E
Fuel
o Agro waste
rio for PhaseAgro waste
Diesel
rio for PhaseAgro waste
Diesel
Emission
fugitive emo likely to oc
ort
oject for man
ONTROL
n
missions fro
mpany has orovided as aboiler will bcal/hrs. Agr5 KVA will
Diesel will ures are men
Emission
Fuel
e 500 K
e I e 8000
50 LP
e II e 8000
50 LP
missions wilccur from st
nufacturing o
omthe manu
one non IBair pollution
be replaced ro waste wilbe installedsed as fuelntioned in th
Quantity
Kg/day
0 Kg/day
PH
0 Kg/day
PH
l occur durtorage area
of Synthetic O
ufacturing a
BR boiler. An control me by two thel be used ad as standbl in the D.Ghe below ta
ring handlin.
Organic Che
ctivities.
Agro waste easure with rmic fluid h
as fuel in theby unit and
G. Set. The dable no. 3.9.
APCD
Cyclone separator
Cyclone separator
…
Cyclone separator
…
ng of the ra
micals
is used asthe boiler. eaters havie thermic fluwill be util
details rega.
EmissNorms
PM<15SO2< 1NOx<
PM<15SO2< 1NOx<
PM<15SO2< 1NOx<
PM<15SO2< 1NOx<
PM<15SO2< 1NOx<
aw materia
27
s fuel in the
ng capacityuid heatersized only inarding utility
sion s
50 mg/Nm3 100 ppm 50 ppm
50 mg/Nm3 100 ppm 50 ppm
50 mg/Nm3 100 ppm 50 ppm
50 mg/Nm3 100 ppm 50 ppm
50 mg/Nm3 100 ppm 50 ppm
als. Fugitive
7
e
y . n y
e
Project
Project:
Followin
•
• •
• • •
3.7.5 Hazardused oiof the h
Table 3
Type o& CateETP W(Cat. 3
Distillatresidue(Cat.36
Spent c(Cat 35
In orgaproces(Cat. 2
Used O(Cat. 5
DiscardContainbags (Cat. 3
Spent s(Cat. 2
t Prefeasib
Proposed ex
ng measure
Raw Materunder goodRaw MaterThe fugitiveand handlinRegular moHazardous Good hous
HAZARDO
ous wastesl Company
hazardous w
3.10: Detail
of waste egory
S
Waste 4.3)
E
tion e 6.4)
P
carbon 5.3)
P
anic s waste 8.1)
P
Oil .1)
M
ded ners/
3.3)
Rs
solvent 0.2)
P
bility Repo
xpansion pro
es will be pr
rials & Prodd storage coials & Produe emissionsng. onitoring is/w chemicals ekeeping w
OUS/NON-H
s generatedhas provide
waste and it
s of Hazard
Source
ETP
Process
Process
Process
Maintenance
Raw materiastorage
Process
ort
oject for man
racticed to r
ducts are/wonditions to ucts are/wils in terms
will be doneare/will be
will be maint
HAZARDOU
is in the foed adequatts managem
dous Wast
Existing
0.04 MT/Mont
3.36 MT/
0.05 MT/Mont
....
e 1.2 KL/Y
l 120 Nos/Mon
....
nufacturing o
reduce the f
will be storeprevent anl be stored of handling
e of piping astored as ptained in the
US WASTE
orm of ETP te storage ament is give
te Generati
After
th 5.5 MT/M
/Yr 80 MT
th 0.1 MT/M
97 MT
r 2.0 KL
nth 9870
210 M
of Synthetic O
fugitive emi
ed in propey volatilitiesin closed co
g losses wi
and fittings per standarde plant.
MANAGEM
waste, Distarea for propn in below t
ion & Dispo
Phase l A
Month 8 M
T/Yr 12
Month 0 M
T/Yr 15
L/Yr 2
Nos./Yr 15
MT/Yr 32
Organic Che
issions:
erly designas ontainers ll get reduc
for checkind criteria.
MENT
tillation residper storagetable 3.10
osal
After Phase l
.5 MT/Month
25 MT/Yr
.1 MT/Month
55 MT/Yr
.5 KL/Yr
5210 Nos./Y
25MT/Yr
micals
ated storag
ced by prop
g of any lea
due, spent of wastes.
ll Dispos
Collectiotransportdisposal site. Collectiotransportand disincineratNECL/GCollectiotransportand disincineratCollectiotransportdisposal site. Collectiotransportdisposal to regisrefiners.
Yr Collectiotransportdisposal to regisrefiners. Spent sto the ac
28
e area and
per storage
akages.
carbon andThe details
al Method
on, storage, tation and
to TSDF
on, storage, tation sposal by tion at EPIL.
on, storage, tation sposal by tion on, storage, tation and
to TSDF
on, storage, tation,
by selling stered re-
on, storage, tation,
by selling stered re-
solvent sell ctual users.
8
d
e
d s
Project
Project:
3.7.6 There icomprewithin pgenerat
The co
3.7.7 The foll
• Theperi
• Theburnburn
• Gogare
• Thethe
• The• Fire• Eme• Fire• Wor 3.7.8 E The compollutioenvironresponsresponslegislati
t Prefeasib
Proposed ex
NOISE AN
is/will be nessors, TFHplant. The etor. No offe
ontrol measuEar Plugs aAnti vibratioAcoustic EnRegular ma
HEALTH A
owing key s
e industry isiodical med
e industry hnol, dettol, ns, eye injuggles, Glovprovided to
e industry isindustry.
e industry hae buckets arergency ala
e extinguishrk place mo
ENVIRONM
mpany has n control ement in acsibilities of sible for maive requirem
bility Repo
xpansion pro
D ODOUR
no major acH & pumpsequipments nsive odour
ures to be tand Ear muon pads andnclosure to aintenance
AND SAFET
safety meas
s responsibical examinhas providetincture iodries and ees, Gum b
o the workers taking all
as providedre provided arm will be iers will be i
onitoring wil
MENTAL HE
an environequipment,
ccordance wregulating
aintaining thment.
ort
oject for man
CONTROL
ctivities due. However,resulting in
r is/will be g
aken for redffs are provd flexible beD.G. Set w& lubricatio
TY MEASU
sures shall
ble for healnation of its ed first aiddine, eyes aelectrical shooots, Helmrs. precautiona
d good lightito withstannstalled forinstalled whl be done o
EALTH & S
ment cell in emissionswith the mothe safety
he records o
nufacturing o
L
e to which Noise leve
n noise gengenerated fr
duction in nvided to the ellows is pro
will be providon shall be d
RES
be impleme
lth and safeemployees box conta
and eardropocks.
mets, Skin C
ary measur
ing and vennd the fire orr the commuherever necon regular b
SAFETY CE
n order to kes from theonitoring pr
measures of all data,
of Synthetic O
noise wouel generatio
neration is/wrom the pro
noise levels workers in
ovided wheded. done.
ented in the
ety of the w and the he
aining cottops. This is t
Cream, Ear
res to contr
ntilation arrar explosion unication focessary. asis.
ELL
eep a closee sources rogram. Th
inside thedocuments
Organic Che
uld be genon would bwill be Air cocess.
are as beloUtility Sectrever applic
e proposed
workers. Thealth recordon, bandagto cure the
plugs, Face
rol the haza
angements. condition.r the emerg
e watch on tand the q
he cell is ae plant cam and inform
micals
nerated othbe limited tocompressor
ow: tion. cable.
project:
he industrys are mainte, soframyinjuries fro
e Masks, a
ardous asso
gency condi
the performquality of slso entruste
mpus. The mation in line
29
er than Airo 80 dB(A)and Diese
y is doing atained. cine tubesm chemica
and clothing
ociated with
ition.
mance of thesurroundinged with thecell is alsoe within the
9
r ) l
a
, l
g
h
e g e o e
Project
Project:
3.7.9 P The comnot posrecogni
Table 3
Compo
Drinkin
Waste
Air-amb
Stack m
Noise m
t Prefeasib
Proposed ex
POST PRO
mpany hasssible to ezed/approv
3.11: Post P
onents
ng water
water
bient
monitoring
monitoring
bility Repo
xpansion pro
OJECT MON
developedestablish sved agencie
Project Mo
Param
IS-105
BOD,
SPM,
SPM, dB (A)
ort
oject for man
NITORING
d in-house fsuch facilities. The prop
nitoring Pl
meters
500:1991
COD, pH, TS
SOx, NOx. V
SO2, NOx
)
nufacturing o
PLAN
facilities for es, the sa
posed post-
an
SS, TDS
VOC
of Synthetic O
r monitoringame will b-project mon
Frequencyhouse mon
--
Daily (At all ETP) --
--
--
Organic Che
g certain cobe done bynitoring plan
of in nitoring
stages of
micals
omponents. y appointinn is given b
Frequency party monit
Once in a m
Once in a m(treated andQuarterly
Quarterly
Once in a m
30
Where it isng externaelow:
of third toring
month
month d untreated)
month
0
s l
Project
Project:
CHAPT
SITE 4.1 C The IndVadodais very availab
4.2 L 4.2.1 L The pro 4.2.2 L It is a outside
4.2.3 L The plo 4.3 The topeasternresidenmodernRoad. TeasternVilas Pafortified
t Prefeasib
Proposed ex
TER – 4
E ANAL
CONNECT
dustry is locara. This pro
well connele nearby th
LAND FOR
LAND FORM
oposed expa
LAND USE
non-agriculnotified ind
LAND OWN
ot is owned
TOPOGRA
pography ofn regions. Ttial comple
n buildings. The eastern
n region alsalace and t city of Vad
bility Repo
xpansion pro
LYSIS
TIVITY
cated at Plooposed expected by nhe project s
RM, LAND
M
ansion is to
PATTERN
tural land adustrial area
NERSHIP
by the com
APHY
f VadodaraThe westernexes, railwa
The businn region hoo contains he General
dodara.
ort
oject for man
ot No. 1088/pansion pronational higite.
D USE & LA
o be carried
and develoa.
pany. Land
a is divided n region of tay station,
ness districtouses bazasome of th Post Office
nufacturing o
/B, Lamdapoject will be hway and
AND OWN
out in the e
ped industr
ownership
into two dithe city pos
shopping t centers aars, various
he landmarke. The easte
of Synthetic O
pura road, Vaccommodrailway. Ef
NERSHIP
existing indu
rial facility
document
istinct regiossesses a n
malls, muat Alkapuri, s shrines aks such as ern bank of
Organic Che
Village: Mandated in thefficient tran
ustrial facilit
at existing
is attached
ons, viz. wenumber of eultiplexes, b
Old Padraand various
Nyay Mandf river Vishv
micals
njusar, Ta: e existing sinsport facili
ty.
industrial u
as Annexu
estern regioeducational business da Road and
shanty buidir, Mandvivamitri also
31
Savli, Dist.te. The siteties will be
unit located
ure-2.
ons and theinstitutionsistricts andd R C Duttildings. The and Laxmhouses the
1
: e e
d
e ,
d t e i
e
Project
Project:
4.4 The sal Table 4 ParticuCo-ordVillage Taluka/DistrictNearesNearesNeares
Neares
State/ NProtectCRZ apSeismiNote: A
4.5 E The ploinfrastru 4.6 C The clithroughdivided summeSeptem
The TaIMD, Va
t Prefeasib
Proposed ex
SALIENT
ient feature
4.1: Salient
ulars inates
/ Tehsil t st Water bodst Highway st Railway sta
st Airport/ Air
National bordted Area/ Sapplicability city
All the above
EXISTING
ot is locateducture is de
CLIMATE
mate is chhout the yea
into four ser season mber. The po
able 4.2 indadodara pu
bility Repo
xpansion pro
FEATURE
es of the pro
t Features o
y
ation & Railw
rbase
ders anctuaries
e mentioned d
INFRAST
d in villageeveloped by
& METER
haracterizedar, heavy sseasons. Tfrom Marcost-monsoo
icates the blished by I
ort
oject for man
ES
oject site are
of the Proje
way line
distances are
TRUCTURE
e: Manjusary the compa
ROLOGY
d by oppresouth–west The cold seh to May.
on season c
summary oIMD.
nufacturing o
e given in th
ect Site
DetailsCenter: ManjusaSavli VadodaMahi RiState hiSamlayaVadodaVadodaAhmedaNone wNo No Seismic
e the aerial d
E
r outside noany itself.
essive summonsoon
eason from The south
constitutes t
of meteorolo
of Synthetic O
he table be
22°28'02.92ar
ara ver≈ 9.37 kmghway ≈ 1.1a railway sta
ara Railway Sara Airport ≈ abad Airport
within 10 kms
c Zone – III (distance from
otified indus
mmer damprainfall and Decemberh-west mothe months
ogical patte
Organic Che
low:
2"N, 73°12'22
m (NW) 6 km (W)
ation ≈ 10.10 Station ≈ 17.915.34 km (SS≈ 89.00 km
(Moderate) m the project
strial area.
pness in thd a mild winr to Februansoon seaof October
ern at the n
micals
2.43"E
(ENE) 92 km SSW SE) (NW)
site.
The entire
he atmosphnter. The yary is followason is fro
and Novem
nearest obs
32
e necessary
here nearlyyear can bewed by them June to
mber.
servatory of
2
y
y e e o
f
Project
Project:
Table 4
LocationAerial DHeight oMonth
JanuaryFebruaryMarch April May June July August SeptembOctober NovembDecembSeasonaPeriod
SummerWinter MonsoonPost monsoonAnnual Tor MeanNote: Wmonsoon
(Source: B
4.6.1. The sumdecreasdecreasrain to twith thetemperatempera
t Prefeasib
Proposed ex
4.2: Summa
n: At the PhysicDist from Projeof installation:
Tem
Maxy 30.3y 33.0
37.140.240.937.132.731.5
ber 33.2 36.0er 34.3er 31.4al Average Val
Tem
AvgMax
r 39.4031.56
n 33.62
n 35.15Total
n 34.80
Winter: Decemben: October & NoBook “Climatolog
TEMPERA
mmer seasoses during ses during tthe area. Te mean daature recordature as 30
bility Repo
xpansion pro
ary of Mete
cs Department,ct Site: Approx 34 m above Mmperature
(oC)
x. Min. 3 12.0 0 13.8 1 18.4 2 22.9 9 26.5 1 27.0 7 25.7 5 25.0 2 24.3 0 21.3 3 16.7 4 13.4 lues mperature
(oC)
g. x.
Avg. Min.
0 22.60 56 13.06 62 25.50 8
5 19.00 60 20.60 7
er, January & Fovember gical tables of O
ATURE
on from Mamonsoons
the winter. The winter maily maximded at 12.0.3oC and m
ort
oject for man
eorological
MS Universityx.16 Km SSW SL,
RelativeHumidity
(%Mor. Eve
67 3361 2553 2053 2064 2776 5188 7290 7486 6372 4464 4170 40
Relative Humidity
(%) Avg. Mor.
Avg. Eve.
56.66 22.33 66.00 32.66 85.00 65.00
68.00 42.50 70.00 43.00
ebruary, Summ
Observatories in
arch to May, increasesThe south-
months are um temper0oC. Janua
mean daily m
nufacturing o
l Data at ne
, Vadodara Guj
e y )
Cloud Co(Okt
e. Mor. E3 1.1 5 0.9 0 1.1 0 1.1 7 1.7 1 4.5 2 6.5 4 6.7 3 4.3 4 1.5 1 1.3 0 1.3
Cloud Cove
(Oktas
Avg. Mor.
Avg
Eve1.30 1.01.10 1.15.50 5.0
1.40 1.32.70 2.5
mer: March, Apr
n India (1951 - 1
y is a one os slightly du-west monsgenerally p
rature recory is the co
minimum tem
of Synthetic O
earest IMD
jarat ( Lat: N 22
over tas)
MeanS
(kEve.
1.1 0.9 1.2 1.2 0.7 3.4 6.4 6.5 4.0 1.4 1.3 1.3
er s)
Mean WSpe
(mg.
e. 3 50 37 7
5 30 5
ril & May, Mons
1980)” published
f continuouuring the poon from Jpleasant. Morded at 40oldest montmperature o
Organic Che
Station –V
2o18’, Long: E 7
n Wind Speed km/Hr)
PreWind
4.0 4.1 4.2 4.8 8.7
10.3 8.4 7.1 5.1 3.0 3.0 3.6
ind eed
m/s)
Avg. PDDirecti
5.90 NW,S3.90 7.72 S
3.00 CA
5.50 S
soon: June, July
d by IMD)
s increase post-monsoune to Sep
May is gener0.9oC and th with the observed as
micals
Vadodara
73o15’)
e-dominant d Direction
R
NE CALM CALM
NW SW SW SW SW SW
CALM CALM
NE
DW ion
Total R
SW NE SW
ALM
SW
y, August & Sep
in temperaon season tember brinrally the homean dailymean daily
s 12.0oC.
33
Rainfall (mm)
1.2 0.6 2.2 0.9 4.4
146.8 297.6 284.7 141.7 22.0 16.2 4.4
Rainfall (mm)
2.50 2.06
217.70
19.10 922.70
ptember, Post
tures whichand again
ngs copiousottest monthy minimumy maximum
3
h n s h m m
Project
Project:
4.6.2. The climcoastlingeneralfor restaround
4.6.3. During Cloud cmostly c
4.6.4. About 9June toobserve
4.6.5. The anand moseason season slightly
4.7 S The infr
4.7.1 E As per are give
t Prefeasib
Proposed ex
HUMIDITY
mate of thene. Humiditylly exceedint of the yea20-70%.
CLOUD CO
the South-cover decreclear.
RAINFALL
95% of the o Septembeed from the
WIND PAT
nual resultaonsoon, the experience experiencemoderate d
SOCIAL IN
rastructure
EDUCATIO
census 200en below.
bility Repo
xpansion pro
e region is y is usuallyng 85%. Huar i.e. the p
OVER
-west monseases durin
L
annual raier, July bedata is 922
TTERN
ant vector fe winds bloe a changee calm windduring winte
NFRASTR
available in
ONAL FACI
01, Out of 1
ort
oject for man
characterizy high durinumidity decperiod of De
soon monthg the post
nfall is receing the mo
2.70 mm.
for wind dirow mostly fe in directiods. The winer and post
RUCTURE
n the study a
LITIES
136 villages
nufacturing o
zed by a hg the monsreases gradecember to
hs, the skiemonsoon m
eived durinonth with h
rection showfrom the sen, with the d speed is monsoon s
area denote
s, all villages
of Synthetic O
umid summsoon monthdually durin
o April, the
es are usuamonths. In t
ng the southhighest rain
ws winds bea i.e. the winds blowhigh during
seasons.
es the econ
s have edu
Organic Che
mer becaushs, with aveng the post-average re
ally heavilythe rest of
hwest monfall. The av
blowing fromNW or SW
wing from Ng monsoon
omic well-b
cational fac
micals
se of the clerage relativ-monsoon m
elative humi
y clouded othe year th
soon seasoverage ann
m SW. DuriW direction. NE. The posand summe
being of the
cilities, deta
34
loseness tove humiditymonths andidity ranges
or overcasthe skies are
on i.e. fromnual rainfal
ng summerThe winter
st-monsooner seasons
region.
ails of which
4
o y d s
. e
m l
r r n ,
h
Project
Project:
Table 4
Sr.No 1. 2. 3. 4. 5.
(Source: P
4.7.2 As per c
Table 4
Sr.No.1 2 3 4 5 6 7
(Source: P
t Prefeasib
Proposed ex
4.3: Details
ParticularPrimary SMiddle ScSecondarySenior SeCollege
Primary Census
MEDICAL
census 200
4.4: Details
ParticulaDispensaPrimary HPrimary HAllopathicAllopathicMaternity Communi
Primary Census
bility Repo
xpansion pro
of Educat
rs Schools chools y School
econdary Sch
s Abstract – Cen
FACILITIES
01, Details o
of Medica
rs ries Health CenteHealth sub cec Hospital c dispensary and Child wty Health Wo
s Abstract – Cen
ort
oject for man
ional facili
hool
nsus of India, 20
S
of medical f
al facilities
ers entre
welfare Centreorkers nsus of India, 20
nufacturing o
ties
001)
facilities ava
e
001)
of Synthetic O
ailable in the
Organic Che
Observed v
e study area
Observed v
micals
values in Sa
a are given
values in Sa
35
avli Taluka131
02371
below.
avli Taluka57
4311
1111
5
Project
Project:
CHAPTPLA 5.1 The prolargest are/will reductiofacilitiesdisposa 5.2 As per of study Table 5
Sr. No1 2 3 4 5 6 7 8
(Source: P
5.3 A The tota 5.4 A This is land or So ther 5.5 A 5.5.1 D As per c
t Prefeasib
Proposed ex
TER – 5 ANNING
PLANNIN
oposed procity in the be sourced
on in transs like internal sites etc.
POPULAT
census 200y area withi
5.1: Distrib
o. PTNAMMFFS
Primary Census
AREA STA
al area of th
ASSESME
an expansbuilding is
re will be no
AMENITIE
DRINKING W
census 200
bility Repo
xpansion pro
G BRIE
G CONCE
oject is locaIndian Sta
d locally. RMportation cnal roads,
TION PRO
01, the avern Savli Talu
ution of po
Particulars Total PopulatNo. of HouseAvg. househoMale populatMale populatFemale popuFemale popuSex ratio s Abstract – Cen
ATEMENT
he plot is 36
NT OF INF
ion project required fo
o demand of
S/FACILIT
WATER FA
01 following
ort
oject for man
EF
EPT
ated at Maate of GujaM cost as most. The rewater supp
OJECTION
rage houseuka is prese
opulation
tion eholds old size (perstion tion (in %) ulation ulation (in %)
nsus of India, 20
694.48m2 ou
FRASTRU
which is toor the propof major cha
TIES
ACILITIES
drinking fa
nufacturing o
anjusar, Savarat, after Amany input segion is weply, arrange
hold size isented below
son)
)
001)
ut of which
CTURE D
o be develoosed projecnge in phys
cilities are a
of Synthetic O
vli. The neAhmedabadsuppliers aell planned ements for
s around 5 pw.
constructed
EMAND (P
oped in thect except fesical infrastr
available in
Organic Che
arest city id and Surat.re located nwith all th
r power, st
persons. Th
Observed
d area of the
PHYSICAL
existing prew installatioructure and
study regio
micals
s Vadodara. Major rawnearby whice basic infreetlights, s
he demogra
values in Sa
e plant is 65
L & SOCIA
remises. Noons and mo social infra
on.
36
a- the thirdw materialsch will bringfrastructurasolid waste
aphic profile
avli Taluka23792946963
5.07125292
52.66112637
47.34899
50.44m2
AL)
o additionaodificationsastructure.
6
d s g l
e
e
l .
Project
Project:
Table 5
Sr. No1 2 3 4 5 6 7 8 9 10
(Source: P
5.5.2 As per c 5.5.3 As per and tele Table 5
Sr. No1 2 3 4
(Source: P
5.5.4 T As per Taluka railway;is 100%
5.5.5 A As per foot pat
t Prefeasib
Proposed ex
5.2: Drinkin
o. ParticulaTap Well wateTank watTube weHand pumRiver waCanal Lakes Spring Other dri
Primary Census
POWER SU
census 200
COMMUNI
census 200ephone con
5.3: Commu
o. ParticulaPost OfficPost andTelephonCommerc
Primary Census
TRANSPOR
census 200and most
; railway line% electrificat
APPROAC
census 200th.
bility Repo
xpansion pro
ng Water Fa
ars
er ter ll water mp ter
nking water s Abstract – Cen
UPPLY FAC
01, all the vi
CATION&
01, Distributnnections in
unication &
ars ce telegraph of
ne connectiocial Bank
s Abstract – Cen
RT FACILIT
01, Bus serpreferable e is availabtion in the a
H TO VILLA
01, 109 villa
ort
oject for man
acilities
sources nsus of India, 20
CILITIES
llages have
BANKING
tion of facili the study a
& Banking
ffice n
nsus of India, 20
TIES
rvice is avamode of t
ble in 4 villagarea.
AGES
ages have p
nufacturing o
001)
e power sup
FACILITIES
ities such aarea are illu
Facilities
001)
ailable in allransport in ges. 136villa
paved road
of Synthetic O
pply facilities
S
as post officstrated in ta
the villagethe region
ages are co
d, 98 village
Organic Che
Observed v
s in the stud
ce, post & teable below.
Observed v
es of the stun. Second onnected w
es mud road
micals
values in Sa
dy region.
elegraph of
values in Sa
udy region option for tith paved ro
d and 73 vi
37
vli Taluka 92936155
126403024
ffice, banks
avli Taluka937
7013
within Savltransport isoads. There
llages have
7
,
i s e
e
Project
Project:
CHAPT
PRO 6.1 The totThe tota 6.2 In the s 6.3 Maximuwill also 6.4 Existingproject 6.5 This proconnecthe proj
6.6 Drinking
6.7 Domestthroughafter ph
6.8 IndustriETP wiexplaine
t Prefeasib
Proposed ex
TER – 6
OPOSED
INDUSTR
al area of tal productio
RESIDEN
said proposa
GREENBE
um possibleo be consult
SOCIAL IN
g infrastructwhich is ve
CONNECT
oposed expted by natioject site.
DRINKING
g water is/w
SEWERAG
tic waste wh septic tanhase I and 2
INDUSTR
al effluent ill be will bed in Chapt
bility Repo
xpansion pro
D INFR
RIAL AREA
the plot is 3on capacity
TIAL ARE
al no Reside
ELT
e open landted for sele
NFRASTU
ture will beery low.
TIVITY
pansion projonal highwa
G WATER
will be sourc
GE SYSTE
water generank/Soak pit 2.2 KLD afte
RIAL WAST
generated e sent to Eter 03, Sect
ort
oject for man
RASTRU
A
3694.48 m2
will be 2580
EA
ential area
d is/will be action of spe
UCURE
e sufficient
ject will be ay and railw
MANAGE
ced from in
EM
ated from thsystem, wh
er phase II.
TE MANAG
after propoEICL/CETP tion 3.7.3 an
nufacturing o
UCTUR
2 out of whi0 MTA after
has been p
allotted for ecies for the
to accomm
accommodway. Efficien
EMENT
house bore
he existing hich is @ 1
GEMENT
osed projecor will be
nd 3.7.5.
of Synthetic O
RE
ich construcr proposed
proposed for
green belt e developme
modate the
ated in the nt transport
e well for the
and propos1.20KL/D fo
ct will be treevaporated
Organic Che
cted area oproject.
r workers a
developmeent of the g
existing loa
existing sitt facilities w
e proposed
sed projector existing p
eated in ETd in evapor
micals
of the plant
nd/or for sta
ent. If requirgreenbelt.
ad from the
te. The site will be availa
project.
is/will be dplant and @
TP, treated ration unit.
38
is 1500m2
aff.
red, experts
e proposed
is very welable nearby
disposed off@ 2.0 KL/D
water fromDetails are
8
.
s
d
l y
f D
m e
Project
Project:
6.9 Solid wand disarea for Table 6
Type owaste CategoETP W(Cat. 3
Distillatresidue(Cat.36
Spent c(Cat 35
In orgaproces(Cat. 2
Used O(Cat. 5
Discardcontainbags (Cat. 3
Spent s(Cat. 2
6.10 Total po250KVA
t Prefeasib
Proposed ex
SOLID WA
astes genecarded conr proper sto
6.1: Solid w
of & ory
So
Waste 4.3)
ET
tion e 6.4)
Pr
carbon 5.3)
Pr
anic s waste 8.1)
Pr
Oil .1)
M
ded ners/
3.3)
Rst
solvent 0.2)
Pr
POWER R
ower requireA, sourced f
bility Repo
xpansion pro
ASTE MAN
rated are intainers from
orage of was
waste gene
ource
TP
rocess
rocess
rocess
Maintenance
aw material torage
rocess
REQUIREM
ement for efrom Madhy
ort
oject for man
NAGEMEN
n the form om storage ostes. Details
ration and
Existing
0.04 MT/Month
3.36 MT/Y
0.05 MT/Month
....
1.2 KL/Yr
120 Nos/Mont
....
MENT & S
existing projya Gujarat V
nufacturing o
NT
of ETP wastf raw maters of solid w
disposal
After P
h 5.5 MT/
Yr 80 MT/Y
h 0.1 MT/Mo
97 MT/Y
2.0 KL/Y
h 9870 No
210 MT
OURCE O
ect is 125 KVij Compan
of Synthetic O
te, spent carials. Compaste genera
Phase l Af
/Month 8.5
Yr 12
nth 0.1 M
Yr 15
Yr 2.5
os/Yr 15
T/Yr 32
OF SUPPLY
KVA and aftny Ltd. (MGV
Organic Che
arbon, Distilany will proation are giv
fter Phase l
5 MT/Month
5 MT/Yr
1 T/Month
5 MT/Yr
5 KL/Yr
210Nos/Yr
5 MT/Yr
Y
ter proposeVCL)
micals
lation residovide adequven in table
l Dispos
Collectiotransportdisposal site. Collectiotransportand disincineratNECL/GCollectiotransportand disincineratCollectiotransportdisposal site. Collectiotransportdisposal to regisrefiners. Collectiotransportdisposal to regisrefiners. Spent sto the ac
ed expansio
39
ue, used oiuate storagee 6.1.
al Method
on, storage, tation and
to TSDF
on, storage, tation sposal by tion at EPIL.
on, storage, tation sposal by tion on, storage, tation and
to TSDF
on, storage, tation,
by selling stered re-
on, storage, tation,
by selling stered re-
solvent sell ctual users.
on it will be -
9
l e
-
Project
Project:
CHAPT
REH 7.1 The proany postudies
t Prefeasib
Proposed ex
TER – 7
HABILI
POLICY T
oposed proopulation is
or R&R act
bility Repo
xpansion pro
ITATIO
TO BE ADO
oject is to bproposed
tion study h
ort
oject for man
ON &RE
OPTED
be developefor the pr
has not bee
nufacturing o
ESETT
ed in the exroject. Thern proposed
of Synthetic O
TLEME
xisting premrefore, deta.
Organic Che
NT (R
mises.Hencailed Socia
micals
&R) PL
ce, no displal Impact A
40
LAN
acement ofAssessment
0
f t
Project
Project:
CHAPT
PRO 8.1 At presgetting 8.2 The comissues Green bwill be a Table 8
Sr. No.
1. 2. 3. 4 5.
6. 7. 8.
Table 8
Sr. No.
1.
2. 3. 4. 5. 6.
t Prefeasib
Proposed ex
TER – 8
OJECT
TIME SCH
sent we areall the statu
ESTIMAT
mpany hasand Envirobelt develoapproximate
8.1: Total C
. Purpose
Land Building Plant & MElectrificEnvironmETP Air polluSafety inChartereGreen bTOTAL
8.2: Recurr
. Purpos
EnvironAPCD eAir polluFees forEnv. Mo
Safety in Environ Green b Medical TOTAL
bility Repo
xpansion pro
SCHED
HEDULE O
e not propoutory permis
ED PROJE
made budonment Protpment is alely Rs. 668
Capital Cos
e
Machinery cation and Adment Protect
tion control dnstruments ed services/ elt developm
ring cost pr
e
ment Protectetc.) ution control r Common donitoring expnstruments mment & safet
belt maintena surveillance
ort
oject for man
DULE &
OF THE PR
osing any assion from r
ECT COST
dgetary provtection has lso conside.25 Lakhs.
st Projectio
dministrativetion (includin
device
Governmentment
rovision fo
tion (includin
device isposal facilienses
maintenancety training ance e
nufacturing o
& COST
ROJECT
additional prespective a
T
vision for thalso been
ered. The e
on
e set-up g ETP, APC
t fees
or EHS
ng ETP,
ties
e
of Synthetic O
T ESTI
production aauthorities.
he recurringconsidered
estimated pr
CaExisting
120.0080.00
300.005.00
CD etc.) 5.001.000.500.500.25
512.25
RecExisting
5.00
0.501.000.500.250.250.250.508.25
Organic Che
IMATE
at the site.
g expensesd in planninroject cost
apital Cost g Prop
addit000 10
000055 1
curring Costg Prop
addit0
00055505
micals
ES
It will star
for the envng the costafter propo
(Rs. in Lakhposed tional
0.00 20.00 00.00 10.00
20.00 3.00 1.00 1.00 1.00
56.00
t per annumposed tional 10.00
1.00 10.00
1.50 1.00 1.00 0.50 1.00
26.00
41
rt only after
vironmentat projectionosed project
hs) Total
120.00100.00400.0015.00
10.004.001.501.501.25
668.25
(in Lakhs)Total
15.00
1.5011.002.001.251.250.751.50
34.25
1
r
l . t
Project
Project:
CHAPT
ANA 9.1 M/s. UnVadodaCare InUniverscompan
Finally contribu
For thebenefit
t Prefeasib
Proposed ex
TER – 9
ALYSIS
FINANCIA
niversal Esara. Currentngredients isal has builny focuses o
in the daysuted to the e
proposed as Corpora
bility Repo
xpansion pro
S OF PR
AL & SOCI
sters Ltd. tly Universan India. Wit its reputaon providing
s of acute Dearning of F
project, theate Social R
ort
oject for man
ROPOS
IAL BENE
is located al Esters haith stringention as a pg quality pro
Deficit of FForeign Exc
e company Responsibilit
nufacturing o
SAL
EFITS
at Plot Nos become o
nt quality stapreferred suoducts to th
oreign Excchange in H
intends to ty.
of Synthetic O
. 1088/B, Vone of the leandards an
upplier to cohe Personal
hange in oHard Curren
donate 2%
Organic Che
Village: Maneading mannd good maompanies al Care indus
ur Country,cy.
% of the cap
micals
njusar, Ta: nufacturers anufacturingall over the stry.
, Universal
pital cost fo
42
Savli, Distof Personag practicesworld. The
Esters has
or the socia
2
: l ,
e
s
l
Annexure – 1: Existing CC&A
A1
A2
A3
A4
A5
Annexure – 2: Land Ownership Document
A6
A7
A8
A9
A10
A11
A12
A13
A14
A15
A16