Project background & overview
• Location, distances• Average wind speed, wind direction• Limits (area, MW, height, depth, etc)• Installed MW• Production• Investment cost• etc
Turbine layout (2 layouts?)
• Technology (turbines, fundations)• Micro siting• Wake and other losses• Production• etc
Cable layout
• Technology (AC, DC?)
• Internal grid• Total cable lenght• Dimensions• etc
• Substation (s)• Interconnection to shore
Economics – Key figures
• Inputs• Assumptions• Results (Key Figures: NPV, IRR, COEL etc)
• Risks• etc
OPTIONAL Project time schedule (and organisation)
• Only construction phase included• Separate between different activities such as wind turbines,
fundations, cables, etc
SWAT analysis
StrengthsExamples:Special expertis, reputaion, cost advantages, technology advantages, etc
WeaknessesExamples:Limited service facilities, marketing deficiencies, management and staff problems, etc
OpportunitiesExamples:New technology, lack of dominant competition, new markets or services, etc
ThreatsExamples:New or increaased competition, insurance plan, adverse demographic changes, adverse govt. Polices, economic slowdown, etc
INTERNAL
EXTERNAL