Vol. 5 No. 5 l September 1, 2009 India’s Project Database

Indian Edition: Annual Subscription Rates: Print Edition: Rs. 1950/-, Frequency: Fortnightly (1st & 15th of every month)

143143ProjectsProjects

Page 3: Project Reporter

Project Reporter • 1 • September 1, 2009

Highlights

www.ProjectReporter.co.in

Published by:ASAPP Media Pvt Ltd, A-303, Navbharat Estates, Zakaria Bunder Road, Sewri (West), Mumbai-400 015. Tel: 022-24193000. Fax: 022-2417 5734.

Editor-in-ChiefPratap Vijay PadodeE-mail: [email protected]

Sr.Manager Research & Web OperationsSandeep SharmaE-mail: [email protected]

Research AssistantNipa Kamat, Sunita Andhe

Sr. Vice President, MarketingKammal C. BhagtaniE-mail: [email protected]

Regional Manager, Sales & MktgRajendra SadhaleE-mail: [email protected]

Sales & MarketingMilind Joglekar, Sushma Patil

Production ManagerTarun Pal

Graphic DesignerYaswant Raj Mali

General Manager-Subscription & Circulation Rajeev Nambiar

Subscription & Circulation TeamPoonam Shewale, Subhash Bhogale, MithilaE-mail: [email protected]

Branch Offices• Delhi: Tel: 011-4131 5000/4656 1818• Bengaluru: Tel: 080-4157 1979• Pune: Tel: 020-2613 1949

Representative Offices • UAE: Ikan Media E-mail: [email protected]

Project information is being provided for the reference of readers. However, readers are cautioned to make inquiries and take their decisions on investment after consulting experts on the subject. Contact Information provided should not be treated as an invitation to solicit information from the respective company. PROJECT REPORTER bears no responsibility for any decision taken by readers on the basis of information provided herein.

All rights reserved. While all efforts are made to ensure that the information published is correct, Project Reporter hold no responsibility for any unlikely errors that might occur. Printed and Published by Pratap Padode on behalf of ASAPP Media Pvt Ltd, Published from A - 303, Navbharat Estate, Zakaria Bunder Road, Sewri (West), Mumbai - 400 015, and printed at Jayant Printery, 352/54, Girgaum Road, Murlidhar Temple Compound, Mumbai 400 002. Editor- Pratap Padode. Subject to Mumbai Jurisdiction only.

India’s Project DatabasePROJECT SNO.SECTOR

Airport . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (30, 55)

Greenfield airport planned at Sindhudurg . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30Modernisation of Aizawl Airport is proposed. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55Alumina . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (31)

Automobile / Automotive Components. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (1, 50)

Banking & Finance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (32)

Breweries/Distilleries. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (2)

Brewery unit at Gummidipoondi . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2Canal/Irrigation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (63)

Caustic Soda . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (64)

Cement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (3, 4)

2 MTPA greenfield cement plant in Assam . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3Cement plant with 1.5 MTPA capacity at Adityanagar . . . . . . . . . . . . . . . . . . . . . . . . . . 4Chemicals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (51, 65)

Setting up a greenfield chemicals project . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65Coke. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (5)

Lam Coke manufacturing plant planned . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5Construction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (33 to 37, 66 to 68)

Upgradation of Aizawl Civil Hospital . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67Drugs/Pharma . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (69)

Setting up a formulation plant at Sikkim . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69Education . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (6, 70)

IMU regional campus at Kochi . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61,500 Industrial Training Institutes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 70Engineering . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (56)

Entertainment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (7)

Farm Equipment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (52)

Food Park . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (8)

A mega food park will come up at Chikmagalore . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8Forging . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (53)

Healthcare. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (9)

Hospitality. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (10 to 14)

5 star hotel proposed in Guwahati . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11Human Resources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (15)

14 “innovation universities” in the country. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15Iron & Steel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (16)

5 MTPA greenfield integrated steel plant at Jagdalpur . . . . . . . . . . . . . . . . . . . . . . . . . 16IT Park . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (71)

Construction of IT Park for Ascendas. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71IT/Ites. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (72)

Bharti campus coming up on 2 acre . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72Material Handling System. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (73)

Oil & Gas. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (17, 38, 74, 75)

Gas pipeline from Changlang district to Doomdooma . . . . . . . . . . . . . . . . . . . . . . . . . 17Pharma . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (76)

Constructing a pharma unit Baddi. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 76Ports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (39, 57)

Deep draught Iron Ore berth at Paradip . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39Power. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (40 to 44, 54, 58, 59, 77 to 80)

3x30 MW Khoksar hydro power project in H.P. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42Railways . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (18, 19)

Real Estate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (20 to 22, 81 to 93)

Refinery. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (60)

15 MTPA refinery at Paradip . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60Renewable Energy. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (23)

Retail . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (94)

Roads/Highways . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (24, 25, 45 to 48, 95, 96)

110-km long four-lane road between Raipur and Bilaspur . . . . . . . . . . . . . . . . . . . . . . 25Construction of flyover at Kapurbawadi Junction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46SEZ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (26, 61)

Shopping Malls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (97 to 99)

Testing Labs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (27)

Township. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (28, 29, 100, 101)

Develop a township on 80 acre at Rajkot . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28Transport. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (49)

Mumbai Metro-II Project . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49Tyres . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (102)

Water Sector . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (62)

Focus: SEZ . . . . . . . . . . . . . . . . . . . . . . . . Pg 9-11

PROJECTS ARE CLASSIFIED AS FOLLOWS:

Conceptual / Planning Stage (1 to 29)

Contract Award (30 to 49)

Joint Venture (50 to 54)

Project Update / Commissioned Projects (55 to 62)

Under Implementation Stage (63 to 102)

Tenders / Bids (103 to 143)

Page 4: Project Reporter

Project Reporter • 2 • September 1, 2009

*Figures are approximate (Rs. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

*Figures are approximate (Rs. Crore)

Conceptual/Planning Stage

1 MarutiSuzuki India Ltd (MSIL)

The company is planning an R&D facility in Industrial Model Township at Rohtak. The Haryana Government has allotted 700 acre in this regard.

RohtakHaryana

1000.00 Puneet Dhawan, CCM, Gurgaon Plant, Old Palam Gurgaon Road, Gurgaon - 122015. T: 024-2346721, www.marutisuzuki.com

Automobile

2 AppolloDistilleriesPvt Ltd

An associate company of the Empee Group plans to set up a brewery unit at Gummidipoondi. The State Govern-ment has issued the letter of intent in this regard. The unit will come up on 50 acre and will have a capacity to make about 9 million cases of beer a year.

Gummidi-poondiTamil Nadu

150.00 Taniyachalam, General Manager, Empee Tower, No. 59, Harris Road, Pudupet, Chennai - 600 000. T: 044-28522510, 28413151, 28413161, 28413191, F: 28555163. (MP Purushothaman, Chairman)

Breweries/Distilleries

3 JaiprakashAssociatesLtd (JAL)

Plans to set up a 2 MTPA greenfield ce-ment plant in Assam. The project would be a JV with Assam Mineral Development Corporation (AMDC), a Government of Assam undertaking. The plant, when completed, will produce about 6,667 MT or about 1,33,334 bags of cement per day.

Assam 1050.00 Hari Kumar Vaid, President – Communi-cations and Company Secretary, Jaypee Vasant Continental, Vasant Vihar, New Delhi - 110057. T: 011-26140101 / 54099, F: 26151177, [email protected]

Cement

4 MangalamCement Ltd

The company plans to set up new cement plant with 1.5 MTPA capacity at Adity-anagar, Kota. The project also includes plans for setting up of a captive 17.5 MW thermal power plant within the same premises. The funding is planned through a mix of internal cash accruals, long term loan and debt. In this regard, the company has floated a tender and the contract will be awarded by September 2009. The proj-ect is expected to complete in 20 months.

KotaRajasthan

750.00 R C Gupta, President, Po. Adityanagar, Morak, Kota, Rajasthan - 326520. Tele Fax: 07459-232231, M: 09414188299, [email protected]

Cement

5 Austral Coke & Projects Ltd

The company plans to set up a Lam Coke manufacturing plant, which will have a capacity of 6,00,000 MTPA. The current capacity is 3,75,000 MTPA with expansion of 1,50,000 MTPA in the pipeline. With this expansion the total capacity will be 11,25,000 MTPA. The works will start in 2 months and will complete by Jan 2011.

Visakhapat-namAndhraPradesh

.. Anupam Jaiswal, Company Secretary, Block No 2, Diamond Chambers, 7th Floor, 4, Chowringhee Lane, Unit No 7 - I, Kolkata - 700016. T: 033-22521799, F: 22522134, (Rishi Raj Agarwal, MD)

Coke

6 IndianMaritimeUniversity(IMU)

IMU, a Central university constituted in 2008, has decided to open a regional campus at Kochi Port. This will be the fourth regional campus of IMU, which is headquartered in Chennai. The Cochin Port Trust Board at its next meeting will consider the allotment of 10 acre of land in Willingdon Island for setting up the Kochi campus of IMU. This campus will be ready by May 2010.

KochiKerala

.. G Satyananda Rao, Director - Finance, East Coast Road, Uthandi, Chennai - 600119. T: 044-24530343, 24530345, F: 24530342, [email protected] (Dr. P Vijayan, Vice Chancellor)

Education

7 SriKanteeravaStudios

The state run Sri Kanteerava Studios pro-poses to establish 150 film theatres in ‘B’ and ‘C’ centres of Karnataka with private sector and industry participation, in a bid to promote Kannada cinemas.

Karnataka 200.00 Girish Mattennavar, Chairman, Kanteer-ava Nagar, Nandhini Layout, Bangalore - 560096. T: 080-23370603, 23378611, [email protected]

Entertain-ment

8 Departmentof Food Pro-cessing and Technology, Governmentof Karnataka

A mega food park will come up at Chik-magalore with financial assistance from the state government to the tune of Rs 50 crore.

Chikmaga-loreKarnataka

50.00 R Suresh, Principal Secretary, Food Pro-cessing and Harvesting Technology de-partment, Room 541, Second Gate, 5th floor, MS Bldg, Bangalore, Karnataka. T: 22353938 22389874 M: 09844311616, [email protected]

Food Park

9 Vydehi Institute

The company is contemplating an expan-sion plan to double its patient-handling capacity from 1,150 beds in two years time. The Rs 100-crore multi-speciality hospital, in Whitefield, next to the Satya Sai Hospital, has 75 acre and the expan-sion will see the hospital develop into a Health City.

BangaloreKarnataka

200.00 D A Kalpaja, Director, 82 EPIP Area, Whitefield, Bangalore - 560066. T: 080-28412956, 28413381 - 5, [email protected].

Healthcare

Page 5: Project Reporter

Project Reporter • 3 • September 1, 2009

*Figures are approximate (Rs. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Conceptual/Planning Stage

10 IHHRHospitalityPvt. Ltd (ISTA Hotels)

Delhi-based IHHR Hospitality company plans expansion of the existing facility at Gachi Bowli. Designs are ready. The company plans to commence work on expansion by the end of the year. The expansion project envisages adding 137 new rooms, a couple of restaurants and conferencing facilities.

Gachi Bowli AndhraPradesh

90.00 Vandana K, Manager - PR, C-26, Qutub Institutional Area, New Delhi - 110016. T: 011-26568888, F: 26569999, M: 09810166456, [email protected]

Hospitality

11 DharampalSatyapal(DS) Group

The work for the proposed five star hotel in Guwahati is expected to start in 4 months, as the company is in possession of almost all the approvals and clear-ances. The project is a JV between DS Group and Guwahati Municipal Devel-opment Authority Ltd (GMDA). The soil testing is done and the blue print of the hotel is ready. The project will complete in 1 1/2 year.

GuwahatiAssam

.. Bhavna Sood, VP - Corporate Commu-nications & PR, A-85, Sector 2, Noida - 201301. T: 0120-4032200, 3083333, F: 2522592, [email protected], [email protected]

Hospitality

12 IHHRHospitality

The company is in the process of adding two more properties one with 210 rooms in Pune and another at Ahmedabad with 250 rooms.

AhmedabadGujarat

.. Vandana K, Manager - PR, C-26, Qutub Institutional Area, New Delhi - 110016. T: 011-26568888, F: 26569999, [email protected]

Hospitality

13 BPTP Delhi-based developer plans a five-star hotel at Sector 94 in Noida.This will be a 500-room luxury property.

NoidaUttarPradesh

.. Bhupesh Pandey, Manager - Corporate Communications Manager, 5th & 6th Floor DCM Building, 16 Barakhamba Road, Connaught Place, New Delhi - 110001. T: 011-43590000, F: 41513938, [email protected]

Hospitality

14 IrconInternationalLtd

Indian Railways plans to set up hotels and cottages at Rampurhat in Birbhum to at-tract tourists. IRCON International is most likely to undertake this project.

BirbhumDistrictWest Bengal

.. A K Gupta, Metro Railway Service Building (4th Floor), 56, C.R. Avenue, Kolkata - 700012. T: 033-22254860, 22254858,22254859, F: 22254860

Hospitality

15 Ministry of HumanResourceDevelop-ment,Governmentof India

The human resource development (HRD) ministry plans to set up 14 “innovation uni-versities” in the country from 2010 to build “disciplinary focusses” and push research and development. of the areas identified are health, environment, new technologies for power plants, etc. Some of the areas identified are health, environment, new technologies for power plants, etc.

Nationwide .. Shastri Bhawan, New Delhi-110115. T: 011-23383936, F: 23381355.

HumanResources

16 Tata Steel The company is in the process of acquir-ing land for its 5 MTPA greenfield inte-grated steel plant at Jagdalpur in Bastar district by mid-2010. Nearly 70 per cent of land has been acquired already. The capacity in the first phase will be 2 MTPA. MoU with the Chhattisgarh Government was signed on June 04, 2005. Iron ore is likely to be sourced from Bailadila mines.

BastarChhattisgarh

10000.00 Prabhat Sharma, Media Manager, Jam-shedpur, Jharkhand. T: 0657-2425216, 2431142, F: 2425182, M: 09234510689, [email protected]

Iron & Steel

17 Oil India Ltd (OIL)

The Arunachal Pradesh government has cleared proposal for laying a gas pipeline from Changlang district in Arunachal Pradesh to Doomdooma in Tinsukia, As-sam. The work has not yet started.

ChanglangDistrictArunachalPradesh

20.00 I Bharali, Group GM, Plot No. 19, Flim City, Sector 16A, Noida - 201301. T: 0120-2488333 - 2488347, F: 2488310, (Harihar Sharma, Dy. Chief Engineer, [email protected])

Oil & Gas

18 IrconInternationalLtd

The company has been entrusted with the job of laying railways tracks between Sevak Road and Sikkim.

Sikkim 2000.00 Yogesh Mishra, Regional Marketing Manager, Plot No. C-4, District Centre, Saket, New Delhi - 110017. T: 011-29565666, 26530474, F: 26522000, [email protected].

Railways

19 SouthernRailways

Plans doubling of 170 km Villupuram-Tiru-chi section in Tamil Nadu.

Tiruchi Tamil Nadu

900.00 H Q Office, Park Town, Chennai-600003, Tamil Nadu. T: 044-25355305, 25352830, [email protected]

Railways

Page 6: Project Reporter

Project Reporter • 4 • September 1, 2009

*Figures are approximate (Rs. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Conceptual/Planning Stage

20 Atul Builders The company plans to develop ‘Orbit Avenue’ a business complex at Malad (West). This complex will comprise a G+5 storey block having spaces for offices. Land is rceently acquired and works shall start by April 2010 and complete by June 2011.

MumbaiMaharashtra

.. P Suresh, Marketing Executive, Trade Avenue, 5th Floor, Suren Road, Off And-heri-Kurla Road, Andheri - East, Mumbai - 400093. T: 022-26836357 - 59, F: 2683432, [email protected]

Real Estate

21 ParvatiResourcesPvt Ltd

The company is developing a commercial complex PGE Centre at Jessore Road. The complex comprises of a building with G+5 floors providing spaces for offices. Completion by: December 2010

KolkataWest Bengal

.. Narendra, Parvati Resources Pvt Ltd, C/o The Raymond Shop, Poddar Court, 18 Rabindranath Sarani, Kolkata, West Bengal. M: 09830067817.

Real Estate

22 Rajat Group The company plans to construct ‘Rajat Flora’ a residential complex at Naren-drapur Godia Main Road. The project comprises G+7 storied 2 residential blocks having 92 flats of 2/3 bhk and ame-nities like healthclub, garden area and car parking will be provided. Architects: Mukul Mitra, Shelters, Kolkata, T: 033-22268384. The construction is to complete by Dec10.

KolkataWest Bengal

.. Anup Bhattacharya, Project Manager, Shanthiniketan, 8, Camac Street, 5th Floor, Suite 3, Kolkata - 700017. T: 033-22828038, 30528084, F: 22823154, [email protected], www.rajathomes.com

Real Estate

23 West Bengal GreenEnergy Cor-poration Ltd (WBGECL)

The state’s nodal renewable energy agency has sought Expression of Interest (EoIs) from private players for developing a total of 50 megawatt (MW) of renewable energy.

West Bengal .. S P Ghanchowdhary, MD, Bikalpa Shakti Bhavan, Plot No. J-1/10, EP & GP Block, Sector-V, Salt Lake Electronics Complex, Kolkata - 700091. T: 033-23575038, 23575348

RenewableEnergy

24 Roads & HighwaysDept,ArunachalPradesh

The trans-Arunachal Pradesh Highway project is likely to get a boost with the Cabinet Committee on Infrastructure giv-ing its nod for the bidding of two projects to develop two-lane highways of 718 km at an estimated cost of Rs 3,341.75 crore. The two projects - Potin-Pangin (407 km, estimated cost of Rs 1909.25 crore) and Nachipu-Hoj Road (311 km, Rs 1432.5 crore) - will be bid out on design-build-fi-nance-operate-transfer (annuity) basis.

ArunachalPradesh

3341.75 Bora Ete, Chief Engineer, Roads & Highways Dept, Eastern Zone, PWD, Itanagar - 791111, Arunachal Pradesh. T: 0360-2212427, F: 2212428, M: 09436895181.

Roads/Highways

25 Public Works Department(PWD),GovernmentofChhattisgarh

The Chhattisgarh Government plans to build a 110-km long four-lane road between Raipur and Bilaspur on Public Private Partnership (PPP) basis. Con-sultancy bids are invited for conducting feasibility report. This will be finalised in 1 1/2 month.

RaipurChhattisgarh

600.00 A K Mandham, Supritendent Engineer, NH Circle, Sirpur Bhawan, Civil Line, Beh. Akashwani Bhawan, Raipur, Chat-tisgarh. T: 0771-2428743, 2428181, senhcir_ryp@rediffmail,com

Roads/Highways

26 Tanla Mobile Pvt Ltd

The company is a wholly owned subsid-iary of Tanla Solutions Ltd. The company has applied to the Development Commis-sioner, SEZ, Hyderabad for approval as a SEZ Unit and plans to develop innovative mobile applications, products and services for mobile handset manufacturers and in-dependent software vendors with a focus on business applications, and media & entertainment. The company aims to com-mence operations in October 2009.

HyderabadAndhraPradesh

Amit Gupta, Director - Finance, Tanla Technology Centre, Hi-tech City Road, Madhapur, Hyderabad - 500081. T: 040-40099999, [email protected], www.tanlasolutions.com ([email protected])

SEZ

27 Intertek Plc UK-based testing and inspection service provider plans to set up testing labora-tories in Gurgaon for food and footwear products.

GurgaonHaryana

10.00 Madhumita Guha, Manager - Marketing, E-20 Block B1, Mohan Coprative In-dustrial Area, Mathura Road, New Delhi - 110044. T: 41595460, F: 41595475

Testing Labs

28 GandhiRealty India Pvt ltd

The company plans to develop a township on 80 acre at Rajkot. The work is to start by September 2009 and complete by June 2011. Architects: Mehboob Litewala, De-signers Collaborative. M: 09824009327.

RajkotGujarat

.. Sandeep Dave, Marketing Manager, “Solitaire”, 150 Feet Ring Road, Amin Marg Junction, Rajkot, Gujarat - 360005. T: 0281-2570415, M: 09376586668, [email protected]

Township

Page 7: Project Reporter

Project Reporter • 5 • September 1, 2009

*Figures are approximate (Rs. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Conceptual/Planning Stage

29 West Bengal InformationTechnology (IT)Department

The department has acquired 1,600 acre in Kolkata, close to Vedic Village, to build an IT township. Out of this, 600 acre will be commercial space for IT companies. The work will start in 3-4 months and complete in 3 years. Akash Nirman is the private sector partner involved in this project.

KolkataWest Bengal

.. Mriganka Sekhar Kar, Officer on Spe-cial Duty, Department of Information Technology, 4, Camac Street, 7th Floor, Kolkata - 700016. T: 033-22821955, F: 22821944, [email protected]

Township

Contract Award (Sno. 30 to 49)

30 IRBInfrastructureDevelopers

Bagged an order from MIDC to build a greenfield airport at Sindhudurg on design-build-finance-operate basis. The proposal was approved way back in 2008 by the Central Government. The construc-tion period is 18 months and the conces-sion period is 95 years. The construction work is expected to begin in 4 months.

SindhudurgMaharashtra

150.00 Dhananjay Joshi, COO, IRB Complex, Chandivli Farm, Chandivli Village, Andheri (East), Mumbai - 400072. T: 022-66404220, F: 66751024, [email protected] (V D Mhaiskar, Chairman)

Airport

31 HindustanDorr Oliver Ltd (HDO)

Bagged an order from Utkal Alumina International Ltd for supply, erection and commissioning of Lime Handling Package Project at Doraguda on lumpsum turnkey basis for their upcoming Greenfield Alumina Refinery of capacity 1.4 MTPA in Orissa. The works are likely to start in 2-3 months and complete in 18 months.

RayagadaDistrictOrissa

39.50 Dorrr - Oliver House, Chakala, Andheri (East), Mumbai - 400099. T: 022- 28359400, F: 28365659, [email protected],(E Sudhir Reddy, CMD).

Alumina

32 HCL Infosystems

Bagged order from State Bank of India and associated banks to install and service ATMs. The installation will be over a six-month period, whereas the mainte-nance and service contract is spread over seven years.

Nationwide 40.00 E-4,5 & 6, Sector 11, Noida - 201301. T: 0120-2526518/19, 2520977, F: 2550923, [email protected]

Banking & Finance

33 UnityInfraprojectsLtd

The company has received a contract from CPWD, New Delhi pertaining to the Redevelopment Scheme of Dev Nagar in New Delhi. The scope of work includes construction of 400 Nos Type - III Quar-ters (4 Blocks S+9 / 144 Nos and 8 Blocks S+8 / 256 Nos.) including Internal water supply, sanitary installations and internal electrical works. The work will start in a month’s time and complete by August 2011.

New Delhi Delhi

72.00 Vinay Digrajkar, CCM, 1252, Pushpanjali Aprtments, Old Prabhadevi Road Prab-hadevi, Mumbai - 400025. T: 022-66665500, F: 66665599, [email protected],(Kishore A Avarsekar, CMD)

Construction

34 ConsolidatedConstructionConsortiumLtd (CCCL)

The company has bagged contract to construct an office building called Rajiv Gandhi Urja Bhavan for Oil and Natural Gas Corporation Ltd. The project entails construction of 10.63-lakh sq.ft. office building of two basements and ground plus five floors in New Delhi. The comple-tion is expected in 18 months.

New Delhi Delhi

431.00 K Nellaiappan, Manager - Business Development, No 5, Second Link Street, CIT Colony, Mylapore, Chennai - 600004. T: 044-23454527, 23469300, F: 24990225, [email protected]

Construction

35 ConsolidatedConstructionConsortiumLtd (CCCL)

The company is executing contract of Delhi Jal Board for constructing Keshopur Sewerage Treatment Plant at Delhi. The works have started and complete within a year.

Delhi 25.75 K Nellaiappan, Manager - Business Development, No 5, Second Link Street, CIT Colony, Mylapore, Chennai - 600004. T: 044-23454527, 23469300, F: 24990225, [email protected]

Construction

36 McNallyBharatEngineeringCompany Ltd

Bagged order for design, engineering, manufacturing, supply, erection, testing and commissioning of Balance of Plant on EPC basis including Civil works for 1 x 270 MW Coal Based Power Project of Ideal Energy Projects Ltd (IEPL) near vil-lage Bela at Nagpur.

NagpurMaharashtra

414.00 P K Chandra, Sr. VP - Projects, Mangoe Lane, 7th Floor, Kolkata - 700001. T: 033-65500725-39, 22138905-08, F: 22480340, [email protected](S Srinivash Singh, MD)

Construction

Page 8: Project Reporter

Project Reporter • 6 • September 1, 2009

*Figures are approximate (Rs. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Contract Award

37 HindustanConstructionCompany Ltd

The company has received a Letter of Acceptance from Vidharbha Irrigation Development Corporation Ltd, Nagpur, for execution of detail design, construction, procurement, erection, testing, commis-sioning, two years operation and mainte-nance after commissioning of 4 x 6 MW hydel scheme including civil, mechanical, electromechanical, electrical & allied works with peripheral area development at Gosikhurd, Tq. Pauni. the completion period is 36 months.

BhandaraDistrictMaharashtra

228.79 Sandeep Sawant, DGM - Media Rela-tions, LBS Marg, Vikhroli (W), Mumbai 400083. T: 022- 25775959, F: 25777568, M: 9833992874, [email protected](Ajit Gulabchand, CMD)

Construction

38 Larsen and Toubro (L&T)

The company has outbid Hyundai, Sam-sung and NPCC to win two major offshore platform contracts from ONGC.The order is for the Bombay High North (BHN) pro-cess platform and living quarters project, with an additional order for supply of three process gas compression modules to be installed in the same complex. The completion period is 33 months.

MumbaiMaharashtra

5300.00 D Chatterjee, Manager - PR, L & T Bhaktawar, Ground Floor, Nariman Point, Mumbai - 400021. T: 022-66585100, F: 66585146, M: 9833368337, [email protected]

Oil & Gas

39 GammonInfrastructureProjects Ltd

The company in consortium with Noble Group Ltd and MMTC Ltd has been awarded a project for development of deep draught Iron Ore berth at Paradip by the Paradip Port Trust. The project envisages construction and equipping of a berth handling an annual throughput of 10 MT. The concession period is 30 years, including a construction period of 3 years.

ParadipOrissa

505.00 Satish Chandran, Company Secretary, Gammon House, Veer Savarkar Marg, P O Box No 9129, Prabhadevi, Mumbai-400025. T: 022- 6661400, F: 67444025. (R L Telang, VP - Marketing)

Ports

40 McNallyBharatEngineeringCompany Ltd

Bagged an order for supply and installa-tion for Ash handling Package of 3 x 250 MW NTPC Bongaigaon TPP. The comple-tion period is 31 months.

Assam 81.93 P K Chandra, Sr. VP - Projects, Mangoe Lane, 7th Floor, Kolkata - 700001. T: 033-65500725-39, 22138905-08, F: 22480340, [email protected](S Srinivash Singh, MD)

Power

41 McNallyBharatEngineeringCompany Ltd

Bagged order for supply and installation of Water Pre-treatment Plant package for Barh Super Thermal Power Project, Stage II (2x660 MW) of NTPC. The completion period is 42 months.

Bihar .. P K Chandra, Sr. VP - Projects, Mangoe Lane, 7th Floor, Kolkata - 700001. T: 033-65500725-39, 22138905-08, F: 22480340, [email protected](S Srinivash Singh, MD)

Power

42 DCM Shriram InfrastructureLtd

The company is undertaking construction of 3x30 MW Khoksar hydro power project on Chandra river in Lahaul & Spiti District in Himachal Pradesh.The preliminary works have started and completion is expected in 2013.

Lahaul & SpitidistrictHimachalPradesh

373.66 A K Awasthi, CEO, 5th Floor, Kanchen-junga Building, 18 Barakhamba Road, New Delhi - 110001. T: 011-23316801, F: 23318072, [email protected]

Power

43 ICSA (India) Bagged order from MP Poorv Kshetra Vidyut Vitaran Co. Ltd for supply of material, survey, erection & commis-sioning including testing of new three phase 11 kv lines, three phase L.T. lines on A.B.Cables, 11/0.4 kv distribution transformer substations and extension of service lines under Rajiv Gandhi Grameen Vidyutikaran Yojna.

MadhyaPradesh

133.92 Ravindranath Reddy – GM-Finance and Accounts, Plot No.12, Software Units Layout, Cyberabad, Hyderabad - 500081. T: 040-23115619, 23114923, F: 23114921, [email protected]

Power

44 McNallyBharatEngineeringCompany Ltd

Bagged order for ex-works supply of pre-treatment plant package for Mauda Super Thermal Power Project (2x500 MW) for NTPC Ltd in Noida, UP. The completion period is 28 months.

NoidaUttarPradesh

15.44 P K Chandra, Sr. VP - Projects, Mangoe Lane, 7th Floor, Kolkata - 700001. T: 033-65500725-39, 22138905-08, F: 22480340, [email protected](S Srinivash Singh, MD)

Power

Page 9: Project Reporter

Project Reporter • 7 • September 1, 2009

*Figures are approximate (Rs. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Contract Award

45 C&C Con-structions Ltd

The company in JV with BSCPL Infra-structure Ltd has received an order for a Dedicated Freight Corridor from New Kardwadiya to New Ganj Khwaja in Bihar. This work is of 105 kms on the Mughal-Sone section of the Eastern Corridor and is to complete within 36 months. The construction has started.

Bihar 781.00 M R Arora, Sr. Manager - Projects, Plot No. 70, Sector 32, Gurgaon, Haryana - 122001. T: 0124-4536666, F: 4536799, [email protected]

Roads/Highways

46 NagarjunaConstructionCompany Ltd

The company has bagged order from Maharashtra State Road Development Corporation (MSRDC) for construction of flyover at Kapurbawadi Junction. The construction work has started and will complete in 16 months.

Maharashtra 79.00 P L Murari, Head - Corp Comm, 41, Nagarjuna Hills, Hyderabad - 500082, Andhra Pradesh. T: 040-23255200, 23351753, F: 23350214, M: 09392387281, [email protected]

Roads/Highways

47 PBAInfrastructureLtd

Bagged a contract from Nagpur Sical Gupta Road Terminal Ltd. The contract includes Construction of Roads, Paved areas and Drains in NSGRTL, site in Mihan, Nagpur. The work has started and will complete in 8 months.

NagpurMaharashtra

459.24 Sunil Wadhawan, Project Manager, 611/3, V.N.Purav Marg, Chembur, Mumbai - 400071. T: 022-67978200, 67973767, F: 25229699, [email protected], www.pbail.com

Roads/Highways

48 PBA InfrastructureLtd

The company has bagged a contract from Mumbai Metropolitan region Development Authority (MMRDA) for Concretization of 30 m. internal roads in ‘G’ block of BKC (phase-2). The work has started and will complete in June 2010.

MumbaiMaharashtra

43.03 Sunil Wadhawan, Project Manager, 611/3, V.N.Purav Marg, Chembur, Mumbai - 400071. T: 022-67978200, 67973767, F: 25229699, [email protected], www.pbail.com

Roads/Highways

49 RelianceInfrastructureLtd

The company has bagged Mumbai Metro-II Project from MMRDA covering 32 km and 27 stations en-route. The financial closure is to be achieved within 9 months of signing of concession agreement. The concession period is of 35 years and can be extended for another 10 years. The project is scheduled to be operational by 2015.

MumbaiMaharashtra

.. Sudhir Hoshing, CEO, Reliance Energy Center, Santa Cruz (East), Mumbai - 400055. T: 022-26154284, 30099999, F: 26160437, [email protected] (Yuvraj Mehta, M: 9350188469, [email protected])

Transport

Joint Venture (Sno. 50 to 54)

50 MagnaSeating(US based) / Krishna group

The companies have teamed up in a 50:50 joint venture to make complete seating systems from a new plant at Chakan near Pune.

PuneMaharashtra

.. Magna International - India Liaison Office, 101 Kane Plaza, Mind Space, Malad West, Mumbai 400 064.T: 022-42190800.

AutomotiveComponents

51 KanoriaChemicalsIndustries(KCI)

The company through its subsidiary Pipri Ltd, has floated a JV named Minerva Flavour & Fragrance (P) Ltd with Solutex of Spain. The JVC is setting up a unit in Visakhapatnam to process essential citrus oils for functional, nutraceutical elements and ingredients for the cosmetic, pharma-ceutical, beverage and food industries.

Visakhapat-namAndhraPradesh

25.00 Shailendra Kumar, Project Manager, Indra Prakash, 21 Barakhamba Road, New Delhi - 110001. T: 011-43579200, F: 23717203, 23355824, [email protected]

Chemicals

52 RatnagiriImpex Pvt Ltd

Bangalore-based importers and distribu-tors of farm equipment, is planning to set up a JV with Italy-based Oleo-Mac, makers of garden equipment and may set up unit to manufacture a variety of agriculture machinery in Bangalore. The company currently imports machinery from Oleo-Mac and markets in India. The company has recently setup a retail outlet in Davanagere, Karnataka.

BangaloreKarnataka

.. Natraj, Manager - Business Develop-ment, Annapurna House, 1/1G, 7th Cross, New Guddadha Halli, Mysore Road, Bangalore - 560026. T: 080-26753601 / 02, 32710162 / 246, F: 26751658, [email protected], www.ratnagiriimpex.com.

FarmEquipment

53 HeavyEngineeringCorporation(HEC) / BHEL

The proposed 50:50 foundry and forging joint venture of HEC & BHEL is likely to be incorporated and become operational during this fiscal. The plant includes steel melting shop, press and other allied units.

Jharkhand .. R Misra, Director Finance, P.O: Dhurwa, Ranchi - 834004. T: 0651-2401249, 2401372, F: 2401571, [email protected]

Forging

Page 10: Project Reporter

Project Reporter • 8 • September 1, 2009

*Figures are approximate (Rs. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

page 12�

Joint Venture

54 NHPC Ltd A joint venture led by NHPC will develop the 1,500-MW Tipaimukh hydropower project in the north-eastern state of Ma-nipur. NHPC Ltd, Satluj Jal Vidyut Nigam (SJVN) and the state government of Ma-nipur will form a joint venture to develop this project.

Manipur 8138.00 Jatindernath Maggo, Chief - Corporate Comm., NHPC office Complex, Sector 33, Faridabad - 121003. T: 0129- 2277790, [email protected]

Power

Project Update / Commissioned Project (Sno. 55 to 62)

55 AirportAuthority of India

The modernisation of Aizawl Airport is pro-posed so as to launch cargo services on a commercial basis.The new facility along with other modernisation projects, such as the extension of the runway is planned. A new Instrument Landing System (ILS) will be installed at the airport soon to facilitate landing of aircraft.

AizawlMizoram

.. Piyush Joshi, Director (Planning), Rajiv Gandhi Bhawan, Safdarjung Airport, New Delhi - 110003. T: 011- 24610517, 24632950

Airport

56 KometPrecisionTools India Pvt Ltd

The company is a wholly-owned subsid-iary of Komet Group of Germany. The company has recently opened an 88,000 sq. ft. facility to house the latest manufac-turing technologies in precision engineer-ing at Attibele in Bangalore. The facility includes manufacturing unit, training centre and the company’s office.

BangaloreKarnataka

20.00 Tommy Thomas, Sr. Manager - Projects, 121/B, Bommasandra Industrial Area, Bangalore - 560099. T: 080-40445300, F: 27834495, [email protected]

Engineering

57 SicalLogistics Ltd

The company is a provider of multi-modal integrated solutions for the logistics of bulk and containerised cargo, has signed a memorandum of understanding with Japan’s Mitsui O.S.K. Lines Ltd (MOL) to form a joint venture that will operate the automotives management yard at Ennore Port, near Chennai. Ennore Port will invest Rs 110 crore for creating a multi-purpose berth to handle export cars. Nissan-Renault, which has decided to export its cars from Ennore, has commit-ted to export 90,000 cars in 2010-11 and gradually increase it to 1.80 lakh from the fourth year. The terminal will be a quarter km long, with a berth of 12 metres deep. A stack yard will be created to park 1.40 lakh cars at the port.

EnnoreTamil Nadu

.. Richa Tilokani, CCM, 4th Floor, Spic House, 88, Mount Road, Guindy, Chen-nai – 600032. T: 044-42118611, ext: 270, F: 42118620, [email protected]

Ports

58 RelianceInfrastructureLtd

The company is the EPC contractor for 1,200 MW of Haryana Power Corporation Ltd in Hisar. The project will be executed in 2 phases with 600 MW each. The work is simultaneously going on both the phases. 80 % work of Phase-1 is done and completion is likely by December 2009. The Phase-II will complete by March 2010.

HisarHaryana

4297.00 P K Majumdar, Project Director, Reliance Energy Tower, A-2, Sector - 24 Noida Ut-tar Pradesh- 201301. T: 0120- 3068038, 3918000, F: 3918307, M: 09313118201.

Power

59 RelianceInfrastructureLtd

The company is the EPC contractor for 2x250 MW Parichha Thermal Power Station of Uttar Pradesh Rajya Vidyut Ut-padan Nigam. The scope of work includes balance of plant, civil and structural works. The work has started.

UttarPradesh

.. B K Gupta, DGM, Shakti Bhawan Extension, 14-Ashok Marg, Lucknow - 226001, Uttar Pradesh. T. 0522-2288337, 2287870. F: 2287844, M: 09415900802, [email protected], [email protected]

Power

60 Indian Oil CorporationLtd (IOCL)

The company is setting up 15 MTPA re-finery at Paradip. The activities like detail engineering, procurement of long lead items and material requisition preparation for other items have started and the civil construction of the plant will start in De-cember 2009. The project is progressing well and will be completed by March 2012.

ParadipOrissa

.. V K Mittal, GM - Project, 3079 / 3, JB Tito Marg, Sadiq Nagar, New Delhi - 110049. T: 011-26260000, 24360443, www.iocl.com

Refinery

Page 11: Project Reporter

Project Reporter • 9 • September 1, 2009

West BengalWest Bengal is the 13th largest state in terms of area in

India with a total geographical area of 88,752 sq km. It is located at the centre of the eastern region of India and is bordered by Bihar and Jharkhand on the west; Orissa on the south; and Sikkim on the north. It is the fourth most populous state in the country. Its capital, Kolkata, is one of the largest cities in India. The state’s Gross State Domestic Product (GSDP) grew an impressive 8.94 per cent between 1999-2000 and 2005-2006 to reach US$ 47.85 billion. The tertiary sector, has been the fastest growing, driven by growth in sub-sectors like Banking, Real estate and hotels (having 66 per cent share in tertiary sector with a CAGR of 16 per cent). Secondary sector is driven by construction (comprising of one-third share in sector and CAGR of 18 per cent between 2001-2005). Investment of roughly US$ 50 billion had come to the state in manufacturing sector as on March 31, 2007. The State is the favourite destination for the Steel Industry. The state has more than US$ 22.2 billion worth investments in the pipeline. The Net State Domestic Product of West Bengal for FY2008-09 including all the sectors was 7.6 per cent. West Bengal has a well-developed network of railways, roadways, airports and seaports. It has latest and modern telecom network as well as reliable power supply system. In order to upgrade and fully develop such infrastructural facilities, the Government of West Bengal (GoWB) is undertaking many such projects to attract greater investment despite the recent Singur and Nandigram Fiasco which has forced the government to rethink on land acquisition issues for major projects.

Industrial FactsAccording to the data of the National Sample Survey (2005-

06) it has been found that both in respect of the number of working units (27.53 lakh) and generation of employment in this units (54.93 lakh), West Bengal ranks first amongst all the States. 216 industrial units in the organized large and medium scale sectors with a realised investment of Rs 4,205 crore has commenced production in 2008 with generation of 20,409 direct employment and 37,392 indirect employment. The GoWB also plans to setup a petroleum, chemicals and petrochemicals investment region at Nayachar in Purba Medinipur district at an investment of about Rs 93,180 crore.

TransportThe plan outlay of the Public Works and Public Works

(Roads) Department is Rs 763.40 crore for FY2009-10. This will be used for comprehensive development of roads and bridges. In regard to improvement of public transport, steps have been taken to purchase 400 new buses for the State Transport Corporations in the current year. In addition, the Calcutta Tramways Company (CTC) has started a scheme of introducing modern tram cars based on improved self-reliant technology. Moreover, after completion of the concreting works of 28.1 km. of tram-lines at a cost of Rs 101.0 crore, concreting works of the remaining important stretch of tram-lines at a cost of Rs 19.5 crore has been started during the last FY. This apart, a Centre-State combined project, namely, the East-West Metro Corridor Project has also been launched.

PowerIn the FY2008-09, electricity production commenced at 2

units (800 MW) of Sagardighi Thermal Power Project, 1 unit (300 MW) of DPL and1 unit (210 MW) of Bakreswar Thermal Power Project. As per CEA report on 31st July 2009, the installed capacity of power utilities in West Bengal was 7941.69 MW. The power supply position for the period April - June 2009 was 8455 Million Units (MU) against the requirement of 8,722 MU registering a deficit of 267 MU i.e. 3.1 percent deficit.

Rural ElectrificationIn the case of Rural Electrification, out of 37,910 villages,

electricity has reached 37,606 villages (99.2 per cent) till February 28, 2009. The State Government has now set a deadline for completing the important task of providing electricity to each household of every village within the 11th Plan Period (2007-2012).

Information TechnologyWest Bengal continues to be the major base for information

technology (IT) and software companies. At present, total export earning of IT companies located in Software technology Park (STP) is Rs 2000 crore. Presently, 180 IT and 55 ITes companies are operating in Kolkata providing employment to 35,000 professionals. West Bengal is on a fast track IT highway and is poised to become one of the top three States in India by 2010 to contribute 15 to 20 per cent of the country’s total IT revenue.

Agro FactsThe Net State Domestic Product of West Bengal from

agriculture and allied activities in FY2008-09 was 4.4 per cent. The total agricultural land distributed in this State (upto 15th January, 2009) is 11.26 lakh acre. The total net irrigated area as a proportion of the total net agricultural area in the State has increased steadily from 32 per cent in 1977-78 to nearly 72 per cent in 2008-09. The GoWB has accorded top priority to development of food processing industries. To this end, along with the setting up of 5 special processing zones, efforts have also been made to construct 12 food parks, with due emphasis on internal markets. The GoWB has proposed to enhance the plan outlay for the Department of Food Processing Industries and Horticulture from Rs 32.35 cr in FY2008-09 to Rs 39.30 cr in FY2009-10.

Focus: West Bengal

Page 12: Project Reporter

Project Reporter • 10 • September 1, 2009

Irrigation ProjectsTeesta Irrigation Project was approved by the Planning

Commission in 1975 at an estimated cost of Rs 69.72 crore which has now escalated to Rs 2,988.61 crore. The cumulative expenditure incurred on the project upto the end of March, 2009 is Rs1,153.43 crore. The budget allocation provided by GoWB during 2009-10 is Rs 237.19 crore. The Central Loan Assistance/Grant released for Teesta Project is Rs 152.924 crore so far. The project is approved as a National Project and is eligible for 90 per cent Central Grant. The completion is expected by March, 2015. Subarnarekha Project with a cost of Rs 1,615.23 crore is also included under the Accelerated Irrigation Benefit Programme (AIBP), for which under the general funding pattern, 75 per cent of expenditure will have to be borne by the State Government and 25 per cent by the Central Government. So far, the State Government has already spent Rs 38.70 crore and earmarked an additional sum of Rs 21.50 crore for implementation of the project.

Drainage SchemesThe Detailed Project Report for the Kaliaghai- Kapaleswari

Basin Drainage Scheme at an estimated cost of Rs 780 crore has already been submitted to the Central Government for inclusion in the Centre- State joint project. Similar reports are being prepared for the Ghatal and the Kandi Master Plan for drainage. In addition, works on drainage scheme for a part of Lower Damodar Area and Ghia-Kunti Basin have been taken up at the initiative of the State Government. After completion of reclamation works on an important stretch (24.9 km) of Ichamati river by the State Government with expenditure of nearly Rs 24 crore, for reclamation of remaining stretches in the districts of North 24-Parganas and Nadia at the State’s own expenditure, permission has been sought from the Central Government due to proximity to border areas for starting of works.

FisheriesIn the sphere of fisheries, the State’s total fish production

has increased from 14.71 lakh metric tonne in 2008-09 to 15.0 lakh metric tonne, which is more than the internal requirement (13.46 lakh metric tonne) of the State. The plan outlay of the Department of Fisheries is raised from Rs 75.42 crore in the FY2008-09 to Rs 93.42 crore in FY2009-10.

Dairy ProductsIn the sector of animal resource development, the total milk

production in the State has increased from 40.77 lakh metric tonne in 2007-08 to an estimated quantity of 41.95 lakh metric tonne, which is about 72 per cent of the State’s requirement. The plan outlay for the Department of Animal Resources Development for FY2009-10 is Rs 73.18 crore.

The State of West Bengal has immense potential to grow and attract large investment from not only domestic players but also the foreign ones. It would be great if the economic agenda is given top priority by the ruling and the opposition class and all the stakeholders are taken into the fold before deciding on the major projects.

� Sandeep Sharma

Opportunities in West BengalRailway Coach Factory at Kachrapara-Halisahar

The Railway Minister has announced during the Railway Budget for 2009-10 for setting up of a new factory at Kanchrapara-Halisahar Railway complex with annual capacity of 500 EMU/MEMU and Metro coaches per annum in Joint Venture/Public-Private Partnership mode.

Bio-mass power plant in W.B.Astonfield Renewable Resources Ltd and AREVA

Renewable have joined hands to implement 100 MW of biomass power plants across India at an estimated cost of Rs 550 -630 cr. The first plant will be set up in the State of West Bengal. The work is likely to start in the last quarter of 2009.

Paper mill in West Midnapore DistrictEmami Paper Mills Ltd has signed an agreement with

West Bengal Industrial Development Corporation (WBIDC) for setting up a 600 tpd paper mill spread on 2,000 acre in West Midnapore district. The project cost is estimated at Rs 2,200 crore. The plant will be located in the paper park being set up by the GoWB at Kulti Kuri near Jhargram, West Midnapore.

470 room hotel coming up in KolkataITC Ltd is investing Rs 1,000 crore to build a new 470-

room hotel spread over 1.2 million sq ft, adjacent to its existing hotel in Kolkata on the Eastern Metropolitan Bypass.

Forged Steel unit at HaldiaSinosteel India is implementing a 5 MTPA cold forged

steel roll manufacturing unit spread on 30 acre at Haldia in West Bengal. The work has started and completion is expected by December 2011.

Tata’s Eden Court Township ProjectTata Housing Development Corporation is executing

Phase I of Eden Court, its integrated township project spread over 50 acre at Rajarhat near Kolkata. The residential complex is likely to be spread over five acre and will have three towers with two and three bedroom apartments. Two of these towers will have G+18 floors. Tata Housing has acquired land for the project from the WBIDC. Shapoorji Pallonji & Co is the contractor for the project, which is scheduled to be completed by 2011.

500 MW Thermal Power Plant at RanigunjHimachal Pradesh has entered into an agreement with

Kolkata-based Eastern Mineral and Trading Agency (EMTA) for setting up a 500-MW thermal power plant at Ranigunj in West Bengal. The plant will generate 3,504 million units annually and the estimated cost of the project is Rs.2,345 crore. The project is expected to complete in 4 years.

Focus: West Bengal

Page 13: Project Reporter

Project Reporter • 11 • September 1, 2009

Focus: West Bengal

Bengal Engineering and Science University (Besu)

Details: Plans to setup a new campus at Salt Lake, Kolkata. Land not yet acquired for these project. The work will start in 6 months.Location: Kolkata West BengalBudget (Rs crore): 450.00Contact: Dr. B Banerjee, Registrar, P.O. Botanic Garden, Howrah, West Bengal - 711103. T: 033-26684561 - 63, F: 26682916. M: 09433014171.

Cognizant Technology Solutions

Details: The construction work on a new tech complex located at Bantala has started. This complex will be executed in 6 phases and will be spread on 20 acre. The Phase-I entails development of about 5 lakh sq ft of office space within 6 months.Location: Kolkata West BengalBudget (Rs crore): 200.00Contact: Satadru Sinha, Manager - Infrastructure, Techno Complex, Plot GN-34/3, Sector- V, Salt Lake Electronic Complex, Kolkata - 700091. T: 033-44021100, 23573211, 23573213, F: 23573591.

Dhunseri Tea & Industries Ltd

Details: Developing Dhunseri IT Park on 6 acre at Bantala in Kolkata. The project comprises twin towers with a built-up area of 7.19 lakh sq ft and 7,000 professionals will be hired. The work will start by October 2009 and complete by December 2011.Location: Kolkata West BengalBudget (Rs crore): 130.00Contact: K K Tibrewalla, Senior Vice President (D & P), Dhunseri House, 4A, Woodburn Park, Kolkata - 700020. T: 033-22801950 (6 lines), F: 22878995, [email protected], www.dhunseritea.com

Government of West Bengal (GoWB)

Details: GoWB has plans to set up a cargo airport with an air cargo complex in Purulia. The site for this project identified is an aban-doned airstrip of the second world war. The Government is planning to float a global tender in this regard.Location: Purulia West BengalContact: B K Sadhu, Assistant Traffic & Transportation Engineer, Directorate of Transportation Planning & Traffic Engineering, Block-II Writers’ Buildings (Top Floor), Kolkata, West Bengal. T: 033-22254798, 22145455

IVRCL Infrastructures & Projects Ltd

Details: The company is constructing an IT Park, Phase - I (Incubation centre) at Durgapur for West Bengal Electronics Industry Development Corporation Ltd. The project is nearing completion and will be ready in 3-4 months.Location: Durgapur West BengalBudget (Rs crore): 11.01Contact: Y Bhattarcharya, Sr Manager (Projects), M 22 / 3 RT, Vijayanagar Colony, Hyderabad - 500057. T: 040-30931111, 23343678 / 3550, F: 23345004(E Sudhir Reddy, CMD)

Jai Balaji Group

Details: Plans for setting up a 5 MTPA integrated Steel Plant, 3 MTPA Cement Plant and 1215 MW Power Plant at Purulia. West Bengal Industrial Development Corporation Ltd (WBIDC) has handed over possession of 748.97 acre of land in Purulia District for this project.Location: Purulia West BengalBudget (Rs crore): 5000 (Phase-1)

Contact: C Patnaik, GM (Projects), 5, Bentinck Street, Kolkata-700001, West Bengal. T: 033-22313661, 22489808, ext: 725, F: 22430021.

Kolkata Port Trust (KoPT)

Details: The port trust plans to build a container terminal at Diamond Harbour, 40 km off Kolkata. Total capacity for container handling would be 1.6 million twenty-foot equivalent units (TEU). The proposed terminal, with six jetties – four for handling ocean-going vessels and two for barges, was to come up over 125 acre to be provided by agencies such as Defence Ministry (43 acre), private landowners (40 acre), Directorate of Lighthouses (24 acre), West Bengal PWD and Fisheries Departments (together 15 acre) and the Railways (2.5 acre). As of now, the Defence Ministry has declined to part with the land.Location: Kolkata West BengalBudget (Rs crore): 1250.00Contact: A K Mukhopadhyay, Officer on Special Duty, Kolkata Port Trust, 15, Strand Road, Kolkata, West Bengal - 700001. T: 033-22302045, F: 22204901, M: 09836298617, [email protected]

Ministry of Water Resources, Government of India

Details: The Farakka Barrage Project scope includes repair of unlined canal banks, construction of road bridges and cross-drainage works across the feeder canal; special repairs and improvement of rail-cum-road bridge at Farakka Barrage and canal head regulator. The Farakka Barrage constructed in 1975 with the prime objective of preservation of Kolkata Port and for increasing the navigation depth of the Bhagirathi – Hooghly waterway, has a 2225 m long barrage across Ganga with a canal head regulator to divert 40,000 cusec of water through a feeder canal for inland navigation to maintain Kolkata Port. The work is on and will complete in 16-18 months.Location: West BengalBudget (Rs crore): 350.00Contact: Chaurasia, Engineer, P.O. Farakka Barrage, District Murshidabad, West Bengal - 742212. T: 03485–253284, 253644, F: 253608, (Hirwa Tigga, Sr. Administrative Officer)

PHED, Government of West Bengal

Details: The contract for construction of two sewerage lifting station in action area IIIB of New Town Kolkata Project is awarded to S & C Constructions (Kolkata). The work has not yet started due to land acquistion problems. The project is expected to complete in 15 months.Location: Kolkata West BengalContact: Soman Ganguly Executive Engineer, Bappa Sarkar, Suprintendent Engineer, Water Supply Circle, PHE Directorate, CF 162, Sector-1, Salt Lake City, Kolkata - 700064. T: 033-23211627, 22486111, F: 22486769.

WEBEL

Details: Plans development of an IT SEZ at Kalyani on 100 acre near Kolkata on Public Private Partnership (PPP) basis. Mahindra Lifespace, Raheja group, & Paharpur Cooling Towers are in the fray. The IT park is expected to be operational in five years from the zero date. So far, the contract is not yet awarded to any bidder.Location: Kolkata West BengalBudget (Rs crore): 5,000Contact: Shamul Roy, General Manager, WEBEL Bhavan, Block, EP & GP, Sector -V, Salt Lake Electronics Complex, Bidhannagar, Kolkata 700091, West Bengal. T: 033-23578188, 23571704/06, 23577565, F: 23571711.

Opportunities in West Bengal

Page 14: Project Reporter

Project Reporter • 12 • September 1, 2009

*Figures are approximate (Rs. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Project Update / Commissioned Project

61 GujaratIndustrialDevelopmentCorporation(GIDC)

Gujarat Vittal Innovation City (GVIC), a mult-product SEZ being jointly promoted by GIDC, Government of Gujarat and EMPI Vittal Centre Corporation Consortia. The SEZ falls under Delhi Mumbai Indus-trial Corridor (DMIC). Korea Land Corpo-ration (KLC), a wholly owned Government of Korea enterprise, inked an agreement recently to establish Korea industrial park/technology zone in GVIC entailing an investment of Rs. 7,000 crore.

Valsad DistrictGujarat

.. 1) Pankaj Saran, EMPI, M: 09810128765, 2) Nayan Rawal, Advisor - SEZ Project, Udyog Bhawan, Block 345, Sector - 11, Gandhinagar,Gujarat - 382017. T: 079-23250705, F: 23250634 / 637.

SEZ

62 ChennaiMetropolitanWater Supply andSewerageBoard(Metrowater).

Plans for setting up the second desalina-tion plant to the south of Chennai with capacity of 100 million litres a day to convert seawater into freshwater to meet the city’s drinking water needs. Contract will be awarded in 2 months for this proj-ect. The companies in the fray are L&T in partnership with Acciona S.A., Spain; VA Tech Wabag along with IDE, Israel; IVRCL, Hyderabad and Befesa, Spain; the Chennai-based Consolidated Construc-tion Consortium, with Cobra, Spain and Lanco, Hyderabad; Triveni Engineering, Delhi, with Cadagua, Spain, and Afcons; BGR, Chennai, and Inima, Spain; and a partnership of Aquatech System, Pune and Tecton.

ChennaiTamil Nadu

.. Pandiah Rajan, Chief Engineer, No.1, Pumping Station Road, Chennai - 600002. T: 044-28451300, F: 28458181, [email protected]

Water Sector

Project Under Implementation Stage (Sno. 63 to 102)

63 NagarjunaConstructionCompany Ltd

Bagged order for construction of gravity canal and related works on right bank of river Pranahita. The construction has started and will complete in 46 months

Visakhapat-namAndhraPradesh

418.00 P L Murari, Head - Corporate Communi-cations, 41, Nagarjuna Hills, Hyderabad - 500082, Andhra Pradesh. T: 040-23255200, 23351753, F: 23350214

Canal/Irrigation

64 JayshreeChemicalsLtd

Karnataka-based SK Bangur Group company is undertaking expansion and modernisation of its caustic soda plant located near Ganjam in south Orissa. The site works has started. The old structures are demolished and a new building is un-der construction. The project is expected to complete by October 2010.

GanjamDistrictOrissa

150.00 R S Chowdhary, President - Works, H/O Chattrapur, Jayshree, Ganjam, Orissa - 761025. T: 06811-254319, 254329 / 25, M: 09437068170, D K Maheshwari, (Executive Director)

Caustic Soda

65 KanoriaChemicalsIndustries(KCI)

Setting up a greenfield chemicals project for producing 1.05 lakh tonnes of formal-dehyde and 5,600 tonnes of hexamine a year. The project is to be commissioned by July 2010.

Visakhapat-namAndhraPradesh

78.70 Shailendra Kumar, Project Manager, Indra Prakash, 21 Barakhamba Road, New Delhi - 110001. T: 011-43579200, F: 23717203, 23355824, [email protected]

Chemicals

66 PBA Infra-structure Ltd

Bagged contract from MIDC for Rajiv Gandhi Infotech Park Phase III at Hin-jawadi. The scope of the work includes construction of concrete and asphalted road, retaining wall, gulters, CD works and providing streetlight (Balance work within SEZ). The work has started and will complete by October 2009.

PuneMaharashtra

28.98 Sunil Wadhawan, Project Manager, 611/3, V.N.Purav Marg, Chembur, Mumbai - 400071. T: 022-67978200, 67973767, F: 25229699, [email protected], www.pbail.com

Construction

67 Tantia Con-structions Ltd

The company has bagged contract for upgradation and strengthening of Aizawl Civil Hospital, Mizoram and upgradation and strengthening of Champhai Civil Hos-pital, Mizoram. The construction work has started and will complete in 14 months for both the projects.

Mizoram 42.33 Milan Nath, Executive-Business Devel-opment, Y6, Block EP, Sector V, Salt Lake City, Kolkata - 700091. T: 033- 23577651, 2, F: 23577656. [email protected],(I P Tantia, CMD)

Construction

68 ConsolidatedConstructionConsortiumLtd (CCCL)

The company is undertaking contract for constructing BSNL Chennai Telephones Administrative Building located at Greams Road in Chennai. The works have started and will complete in 17 months.

ChennaiTamil Nadu

171.92 K Nellaiappan, Manager - Business Development, No 5, Second Link Street, CIT Colony, Mylapore, Chennai - 600004. T: 044-23454527, 23469300, F: 24990225, [email protected]

Construction

Page 15: Project Reporter

Project Reporter • 13 • September 1, 2009

*Figures are approximate (Rs. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Project Under Implementation Stage

69 UnichemLaboratories

The company is setting up a formulation plant at Sikkim. The construction has already started and will complete in 2 months. The plant capacity would be 750 mn tablets and 250 mn capsules per shift.

Sikkim 30.00 Vilas R Kashalkar, GM (Projects), Bhavan, Prabhat Estate, Off S.V.Road, Jogeshwari West, Mumbai 400102. T: 022- 66888333. F: 2678 8665. [email protected]

Drugs/Pharma

70 Ministry of Labour and Employment,Govt of India

The work on setting up 1,500 Industrial Training Institutes and 5,000 Skill Devel-opment Centres has been initiated in the public private partnership (PPP) mode.

Nationwide .. Prabhat Chandra Chaturvedi, Secretary, Shram Shakti Bhawan, New Delhi. T: 011-23718730, 23710265, F: 23718730

Education

71 ConsolidatedConstructionConsortiumLtd (CCCL)

The company is constructing an IT Park for Ascendas Mahindra Industrial Park Ltd near Chennai. The civil works have started and will complete within 7 months. Architects: Team 3, Singapore and Bharat Associates, Chennai.

ChennaiTamil Nadu

15.03 K Nellaiappan, Manager - Business Development, No 5, Second Link Street, CIT Colony, Mylapore, Chennai - 600004. T: 044-23454527, 23469300, F: 24990225, [email protected]

IT Park

72 Bharti Airtel Ltd

Setting up a Bharti campus on 2 acre in Bhubaneswar. The Bharti campus with a total built-up area of 70,000 sq ft would offer centralised office space for carrying out the company’s operations in telecom, direct to home (DTH) and insurance services in Orissa. The construction work has already started and will complete by the year end.

Bhu-baneswarOrissa

.. Sunil Mittal, Chairman, Aravali Crescent, 1, Nelson Mandela Road, Vasant Kunj, Phase II, New Delhi - 110070. T: 011-46666100, 42666500, F: 41666137, www.airtel.in.

IT/Ites

73 EleconEngineeringCompany Ltd

The company is executing an order from Mundra Port & Special Economic Zone Ltd, Ahmedabad for material handling sys-tem for West Port, Mundra Project. The work has already started and is expected to complete in 12-18 months.

MundraGujarat

120.00 Paresh Shukla, Company Secretary, Post Box No 6, Anand Sojitra Road, Val-labh Vidyanagar, Gujarat - 388120. T: 02692-237016 / 7, 230122, F: 236457, [email protected]

MaterialHandlingSystem

74 Oil and Natural Gas Corporation

The company has started drilling op-erations in the Kerala - Konkan basin. ONGC had identified the area as Cochin Offshore, which is 70 nautical miles from the Cochin coast. The company plans to carry out exploration activities to a depth of 6,500 metre. In the first phase, drilling operations will be carried out to a depth of 2,080 metres and this process is expected to be completed within a month.

Kerala .. D.K. Pande, Director (Exploration), Je-evan Bharti, Tower II, 124 Indira Chowk, New Delhi-110001. T: 011-23310156-58

Oil & Gas

75 MahanagarGas Ltd

The company is a joint venture of Gail (In-dia), the BG Group and the Maharashtra Government. The company has plans to set up 20 compressed natural gas outlets in Mumbai this fiscal.

MumbaiMaharashtra

70.00 Neera Asthana, Chief Manager-Corp Comm, Block G- 33, Bandra KurlaComplex, Bandra (East), Mumbai - 400051. T: 022-66785000, F: 26540092

Oil & Gas

76 Ranbaxy Ltd The company is constructing a pharma unit Baddi. The new facility, meant to aug-ment Ranbaxy’s production capacity to serve domestic business, is to come up by December 2009.

BaddiChandigarh

40.00 Santosh Kumar, Supervisor, Plot 90, Sector 32, Gurgaon -122001 (Haryana). T: 0172-2570056, 2271687, 0124- 4135000, F: 4135001.

Pharma

77 NagarjunaConstructionCompany Ltd

The company has bagged order from Maharashtra State Electricity Distribution Co Ltd for electrical works in Pandharpur. The work has started at Kothapur zone in Pandharpur. The completion is expected in 20 months.

PandharpurMaharashtra

168.00 P L Murari, Head - Corporate Communi-cations, 41, Nagarjuna Hills, Hyderabad - 500082, Andhra Pradesh. T: 040-23255200, 23351753, F: 23350214, M: 09392387281, [email protected]

Power

78 Jindal India ThermalPower Ltd

Setting up 2x600 MW/600 MW + 10% Coal based Sub-Critical Thermal Power Plant at Angul in Orissa. The coal will be sourced from Mandakini Coal Block, Tal-char, Orissa and Coal linkage from MCL Coalfields, Talchar is provided. Water will be sourced from Brahmani River. The work has started and BHEL is supplying the main plant package.

AngulOrissa

.. AK Sehdev, Jt President (Projects), Plot no. 12, Sector B-1, Local Shopping Complex, Vasant Kunj, Delhi 110070. T: 011-26139256-65, 26122063,F: 26121734, [email protected], [email protected]

Power

Page 16: Project Reporter

Project Reporter • 14 • September 1, 2009

*Figures are approximate (Rs. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Project Under Implementation Stage

79 NeyveliLigniteCorporationLtd

Setting up 2x500 MW project at Tuticorin. This greenfield project is being developed by a joint venture of NLC & TNEB. The work has started and is divided into two phases. The phase-1 will complete by March 2012 and phase-2 will complete by August 2012. L&T got the contract for set-ting up Coal Handling Plant as part of this project. BHEL is supplying the equipment.

Tuticorin Tamil Nadu

4099.54 S RajaGopal, CEO - Projects, Block - 1, Neyveli - 607 801, Cuddalore District, Tamilnadu. T & F : 04142- 252205, F: 252645, M: 09443369327, [email protected], (A R Ansari, CMD, [email protected])

Power

80 UP Rajya Vidyut UtpadanNigam(UPRVUNL) Ltd

Setting up Stage D, 2x500 MW Anpara Thermal Power Project at Obra under the expansion project. L&T has been awarded the contract to set up Coal Handling Plant at Anpara, UP. The project is to complete in 31 months. Mitsubishi Corpn, Japan are the equipment suppliers.

SonebhadraDistrictUttarPradesh

.. Shree Ram, Chief G, Anpara Thermal Power station, Village Anpara, Obra, Sonebhadra, Uttar Pradesh. T: 05446-272201, M: 09415901096.

Power

81 Infinity InfotechParks Ltd

Highland Greens is a residential complex being developed at Kalapahar. Project comprises a complex having 76 residen-tial apartments of 2/3 bhk and all basic amenities will be provided. Construction to complete by December 2010.

KamrupAssam

.. Indira Banerjee, Manager Marketing, Plot A3, Block GP, Sector V, Salt Lake, Electronics Complex, Kolkata - 700091. T: 033-23573686, F: 23573687, www.infinityitpark.com

Real Estate

82 DLF Ltd Constructing ‘Capital Green’a residential complex at Shivaji Marg in West Delhi. This 38 acre development will be imple-mented in phases and comprises of 26 storied, 10 towers with spacious apart-ments. The completion is expected by December 2010.

New Delhi Delhi

.. S Dhar, Manager Marketing, DLF Cen-tre, Sansad Marg, Parliament Street, Delhi - 110001. T: 011-42102030 / 65, www.dlf.in

Real Estate

83 BPTP Ltd The company is developing ‘Centra One’ a commercial complex at Sector 6 in Gurgaon on 4 acre. The project comprises a G+14 storey tower having spaces for shops and corporate offices. The project is likely to complete by December 2011.

GurgaonHaryana

.. S Kohli, Asst. Manager - Marketing, DCM Building, 5/6 floor, 16 Barakhamba Road, Connaught Place, Delhi - 110001. T: 011-41517459 / 60, F: 41513938, [email protected]

Real Estate

84 BPTP Ltd The company is constructing ‘Fortune Towers’ at Sector 37 D and comprises of a residential tower with G+14 storey having spacious flats and all modern amenities provided. The completion is likely by May 2011.

GurgaonHaryana

.. S Kohli, Asst. Manager - Marketing, DCM Building, 5/6 floor, 16 Barakhamba Road, Connaught Place, Delhi - 110001. T: 011-41517459 / 60, F: 41513938, [email protected]

Real Estate

85 ParsvnathDevelopersLtd

Parsvnath Passion is a luxurious project of the company coming up at Bantalab which will be constructed over 12 acre. Complex will have G+7 storied 13 blocks having 480 apartments of 2/3 bhk and all modern amenities will be provided. Architects: Grid Architects. Completion by: June 2010

JammuJammu & Kashmir

.. Mukesh Dy. Manager-Marketing, B-111, 1st Floor, South Block, Bahu Plaza, Jammu. T: 0191-2474074, M: 09906905021.

Real Estate

86 BhandariAssociates

Nea’ is a unique and promising concept in living located Off Baner Road. It compris-es development of 168 residential flats of 1/2 bhk and amenities like multi purpose hall, party lawn, childrens play area, land-scape garden with lawn will be provided. The project is to complete by December 2010. Rate per sq ft.: Rs. 2150 onwards.

PuneMaharashtra

.. Sagar Bhandari, Director, 102, Kumar Vastu, Range Hills, Pune – 411020. T: 020-25512111 / 12, F: 25512113, M: 09766625820.

Real Estate

87 AishwarayamVentures

Developing ‘Aishwarayam’, a residential complex at Akurdi in Pune. The project comprises 12 storied, 5 towers having 2/3 bhk apartments and amenities like swim-ming pool, party lawn, gym, multi purpose hall, amphitheater, bonfire & barbeque area will be provided. The construction to complete by December 2010.

PuneMaharashtra

.. Victor, Survey No. 142 / 4, CTS No. 5102, Near Khandoba Mandir, Akurdi, Pune, Maharastra. T: 020-32325555 / 6666 / 7777, M: 9822900066, [email protected]

Real Estate

Page 17: Project Reporter

Project Reporter • 15 • September 1, 2009

*Figures are approximate (Rs. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Project Under Implementation Stage

88 SumangalDwelling and Projects Pvt Ltd

A residential complex called ‘Iris’ is com-ing up at Baner. The project houses 11 storied, 2 towers having 132 apartments of 2/3 bhk and amenities like party lawn and gazebo, club house, swimming pool will be provided. The construction is ex-pected to complete by January 2010.

PuneMaharashtra

.. Atul Joshi, Marketing Head, 3, Godavari, Kanchan Galli, Off Law College Road, Pune - 411004. T: 020-25458113/4, www.skyi.com

Real Estate

89 EcoDevelopers

Periwinkle is a new residential bungalow scheme of the company being developed at Mhasa in Karjat over 38 acre. Project will comprise development of 200 bunga-lows in varying sizes. Amenities like gar-den and car parking area will be provided. Project to complete by December 2010

ThaneMaharashtra

.. Sandeep Parkar, Manager - Busi-ness Development, 501, Lotus Plaza, Gokhale Road, Opp. Titan Showroom, Thane (West), Maharashtra - 400601. T: 022-25338181, M: 9930809057, [email protected]

Real Estate

90 SanjeevaniDevelopers

The company is developing a residential cum commercial complex ‘Kalpavriksha’ at Karve Nagar in Pune. This complex will house 9 corporate offices, 6 residential apartments and showroom. Architects: Pandit Joshi & Associates, Narayan Peth, Pune - 411030. T: 020 - 24450899. The construction is to complete by March 2010.

PuneMaharashtra

.. Sanjay Deshpande, Director, 101, Sujal, 100’ Riverside DP Road, Patwardhan Baug, Pune - 411052. T: 020-25434021, F: 25454757, M: 9822037109, [email protected]

Real Estate

91 SpaceAssociates

The company is constructing ‘Ashly Towers’ a residential cum complex at Mira Road (East). The project comprises residential blocks having 300 flats of 2/3 bhk spacious apartments. Architects: R J Ashar Architectural and Structural, T: 022-26836210, 26842455. The construction is to complete by December 2011.

MumbaiMaharashtra

.. Narendra Jha, Marketing Manager, 4 Gokul Heights, Opp Cambridge School, Thakur Complex, Kandivali East, Mum-bai - 400101. T: 022-28546320 / 21 / 23, [email protected]

Real Estate

92 GowthamHousing Pvt Ltd

Constructing ‘Gowtham Flora’ at KK Pu-dur. Project comprises of residential block of G+4 floors, total 12 flats with all modern amenities. Construction to complete by December 2009.

MaduraiTamil Nadu

.. S R Shrinivas, Manager, 95A, Race Course, Coimbatore, Tamil Nadu - 641018. T: 0422-2217361 / 2215323, M: 09942009450, [email protected]

Real Estate

93 GardeniaIndia Ltd

Developing ‘Gardenia Glamour’ a resi-dential complex having 7 towers of 14 floors each with 650 flats of varying sizes. Construction underway and to complete by December 2010.

Ghazi-abad Uttar Pradesh

.. Abhishek, Executive - Marketing, C-10, Sector 18, Vasundhara, Ghaziabad, Uttar Pradesh. T: 0120-4133375, www.gardeniaindia.com

Real Estate

94 MafatlalIndustries Ltd (MIL)

Arvind Mafatlal Group company is plan-ning to open 50 showrooms in 2009 across India. The company is planning to open 10 showrooms in Maharashtra, 5 in Gujarat, 20 in Kerala, 5 in Tamil Nadu, 5 in Bihar and another 5 in Kolkata. Currently the company has 200 retail showrooms, and 6,000 retail outlets in both full-fledged and franchisee showrooms.

Nationwide 6.00 R R Patel, Company Secretary, Mafatlal House, 5th Floor, H. T. Parekh Marg, Backbay Reclamation, Mumbai – 400020. T: 022-40083636, F: 66345154, [email protected](H A Mafatlal, VCMD)

Retail

95 NagarjunaConstructionCompany Ltd

Bagged order from BDA, Bangalore, for construction of 2 Flyovers one at Kalyan-nagar Junction and other at Veeran-napalya Junction. Also constructing a Grade Separator with flyover & Underpass for cross road at Hennur Junction. The completion is expected in 16-18 months.

BangaloreKarnataka

132.00 P L Murari, Head - Corp Comm, 41, Nagarjuna Hills, Hyderabad - 500082, Andhra Pradesh. T: 040-23255200, 23351753, F: 23350214, M: 09392387281, [email protected]

Roads/Highways

Page 18: Project Reporter

Project Reporter • 16 • September 1, 2009

*Figures are approximate (Rs. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Project Under Implementation Stage

96 GMR Group A consortium of GMR and NAPC has bagged order for the first phase of Outer Ring Road in Chennai. the consortium will design, build, finance, operate and trans-fer the project involving the construction of a 30-km, four-lane highway with a large median. The total length of the Outer Ring Road (ORR) is about 62 km with work on the first phase to be taken up early next year.The ORR is to start at Vandalur, about 30 km south of Chennai on National Highway 45, or the Grand Southern Trunk Road.

ChennaiTamil Nadu

1,100.00 Arun Bhagat, Group Head-Corpo-rate Communications & Head-Talent Management, ‘D’ Block, 11th floor, IBC Knowledge Park, 4/1 Bannerghatta Road, Bangalore - 560029. T: 080-40432000, F: 40432678, www.gm-rgroup.in

Roads/Highways

97 GandhiRealty India Pvt ltd

Constructing ‘Crystal Mall’ a shopping zone being developed on 2 acre at Ka-lawad Road. Project comprises a double basement + G + 3 storey block provid-ing spaces for retail outlets, a 3 screen multiplex, gaming zone, food court, 400 car parking space. Architects: Mehboob Litewala, Designers Collaborative. M: 09824009327. Completion by November 2009.

RajkotGujarat

.. Sandeep Dave, Marketing Manager, “Solitaire”, 150 Feet Ring Road, Amin Marg Junction, Rajkot, Gujarat - 360005. T: 0281-2570415, M: 09376586668, [email protected]

ShoppingMalls

98 Puri Con-structions Pvt Ltd

Developing a shopping mall ‘Aspiro Mall’ at Sector 81 in Faridabad on 3.8 acre. It comprises 3-screen multiplex and shops. Architects: R Corp. Completion by De-cember 2009

FaridabadHaryana

.. Sohail Anwar, Sr Marketing Executive, 1208-1210, Surya Kiran building, 19 K G Marg, Connaught Place, New Delhi-110001. T: 011-436363, M: 09958427766, [email protected]

ShoppingMalls

99 Soman Sun Citi Builders & Developers

Big World is a Shopping complex, being developed over an carpet area of 6,000 sq. ft, by the company at Birla College Road in Kalyan (West). Project comprises a G+5 storey block providing spaces for retail outlets and food court. Acrhitects: Decon Consultants, Kalyan (West). Completion by December 2011

ThaneMaharashtra

.. Akansha Vargan, Office Incharge, Chikan Ghar, Birla College-Khadakpada Road, Opp. Bohriwadi Bus Stop, Near Siddhivinayak Marriage Hall, Kalyan (West), Thane, Maharashtra. T: 0251-2314575 / 76, M: 9850000787.(Kishore Soman, Director)

ShoppingMalls

100 RashmiHousing Pvt Ltd

The company is developing a township named ‘Rashmi Residency’ in Sunderna-gar. The project comprises G+3 storey, 10 buildings having 125 flats and 300 individual bungalows. The construction is to complete by May 2010.

Sunder-nanagarGujarat

.. F Khan, Senior Executive - Sales, B/125, Opp. Railway Station, Shanti Shopping Centre, Mira Road - East, Mumbai. T: 022-28128809, 28119777, [email protected]

Township

101 MaxheightsTownship & Projects Pvt Ltd

The company is developing ‘Metro View’ at Sector 35 spread on 23 acre. It would have 13 storied, 14 towers with 2 - 4 bhk spacious flats and amenities like club-house and garden will be provided. The construction is to complete by April 2012.

SonipatHaryana

.. Dinesh, Manager - Marketing, SD 65, Tower Apartments, Pitampura, New Delhi - 110034. T: 011-27314646, [email protected]

Township

102 TVSSrichakra Ltd (TVS Group Co.)

The company has recently started manufacturing tubes from its new plant at Pantnagar. It expects to commence tyre manufacturing from September 2009 as part of the Phase I plan, the facility would have a manufacturing capacity of 300,000 tubes and tyres by March 2010.

PantnagarUttarakhand

.. K Swami, Plant Head, TVS Building, 7-B, Westneli Street Madurai 625001. Tamil Nadu T: 0452-2420461, F: 2531591, 2420266, M: 9639017125.

Tyres

Page 19: Project Reporter

Project Reporter • 17 • September 1, 2009

Tenders/Bids

103 | Karnataka Neeravari Nigam Ltd

Details: KNNL/HBP/R&R Dn/TND/09-10/-3: E-tender for raising and improvement to Jalalpur-Tai bai road including C.D. works 0.00 to 2.40 km. Tenders are invited from contractors (Class I and category III and above) having experience in similar work in KNNL or under state government undertaking.Submission Date: 05/10/2009Location: Belgaum KarnatakaTender value (Rs): 123,00,000.00Contact: Executive Engineer, HP, R & R Division, Athani. Dist. Belgaum, Karnataka. T: 91-8289-285031, www.knnlindia.comCategory: Canal/Dam/Irrigation

104 | Karnataka Neeravari Nigam Ltd

Details: KNNL/HBP/R&R Dn/TND/09-10/-3: E-tender for raising and improvement to Bhiradi-Malwad road including C.D. works 0.00 to 3.00 km. Tenders are invited from contractors (Class I and category III and above) having experience in similar work in KNNL or under state government undertaking.Submission Date: 05/10/2009Location: Bhiradi KarnatakaTender value (Rs): 244,00,000.00Contact: Executive Engineer, HP, R & R Division, Athani. Dist. Belgaum, Karnataka. T: 91-8289-285031, www.knnlindia.comCategory: Canal/Dam/Irrigation

105 | Karnataka Neeravari Nigam Ltd

Details: KNNL/HBP/R&R Dn/TND/09-10/-3: E-tender for raising and improvement to Chinchali-Dharana road including C.D. works 0.00 to 3.00 km. Tenders are invited from contractors (Class I and category III and above) having experience in similar work in KNNL or under state government undertaking.Submission Date: 05/10/2009Location: Chinchali KarnatakaTender value (Rs): 243,00,000.00Contact: Executive Engineer, HP, R & R Division, Athani. Dist. Belgaum, Karnataka. T: 91-8289-285031, www.knnlindia.comCategory: Canal/Dam/Irrigation

106 | Karnataka Neeravari Nigam Ltd

Details: KNNL/R&R Division/TND/09-10/04: E-tender for providing grade II and grade III metelling and asphalting for internal colony roads of Halyal village extension no.1. Tenders are invited from the contractors (class I and III contractors) having experience in similar work in KNNL or under tate government undertaking.Submission Date: 24/09/2009Location: Halyal KarnatakaTender value (Rs): 30,00,000.00Contact: Executive Engineer,HP, R & R Division, Athani. Dist. Belgaum, Karnataka T: 08373-267071., www.knnlindia.comCategory: Roads/Road over Bridge/Bridges/Flyovers/Highways

107 | National Highways

Details: 10CENH 2009-10: E-tender for construction of approach road bridge at ch 5/287 km of NH-23 near Chainpal in lieu of existing level crossing at ch 490/600 km between station Budhapank and Taclher. Completion period: 18 months. Submission Date: 10/09/2009Location: Bhubaneshwar OrissaTender value (Rs): 16,43,29,000.00Contact: Chief Engineer NH, Bhubaneswar, Orissa T: 0674-2401677, www.tendersorissa.gov.inCategory: Roads/Road over Bridge/Bridges/Flyovers/Highways

108 | Gujarat Water Supply & Sewerage Board

Details: E-tender for Providing arrangement for drawing 180 mld water supply from Tappar reservoir consisting of 30mld x 6 no

submerged C.F.pumps &11.20km 1118mm/8.8 thick & 3.1 km 813 mm / 7.1mm thick M.S.pipe line work. Completion time: 6 monthsSubmission Date: 10/09/2009Location: Tappar GujaratTender value (Rs): 246,000,000Contact: Superintending Engineer, 301, GNFC Infotower, Bodakdev, Ahmedabad- 380 054, Gujarat. T:91-26857316/17/18. F:91-79 26857321. [email protected] www.gwssb.nprocure.comCategory: Water sector

109 | Karnataka Neeravari Nigam Ltd

Details: KNNL/R&R Division/TND/09-10/04: E-tender for mini water supply scheme to Halyal village extension no.1. Tenders are invited from the contractors (class I and III contractors) having experience in similar work in KNNL or under tate government undertaking.Submission Date: 24/09/2009Location: Halyal KarnatakaTender value (Rs): 9,00,000.00Contact: Executive Engineer,HP, R & R Division, Athani. Dist. Belgaum, Karnataka T: 08373-267071., www.knnlindia.comCategory: Water Sector

110 | State Urban Development Agency, Raipur

Details: Expression of interest for advisory and other services from concept to commissioning stage of integrated municipal solid waste management systems to be established at mission cities Raipur and Bhilai-Durg in Chattisgarh.Submission Date: 08/09/2009Location: Raipur ChattisgarhContact: CEO (SUDA), A-3, Anand Vihar, Anand Nagar, Raipur-492001, Chattisgarh. T: 0771-4040415Category: Architects/Interior Work/Consultancy

111 | Government of Orissa

Details: PMU-WB-20/2009-22662: Prequalification are invited for Two-lane concrete pavement with paved shoulder for Joda - Bamberi section of expressway - II in the state of Orissa on DBFOT basis.Submission Date: 16/09/2009Location: Joda OrissaContact: Chief Engineer, World Bank Project, Orissa, World Bank Project, Orissa, Office of the Engineer-in-Chief (Civil), Orissa, Nirman Soudha, Keshari Nagar, Unit-V, Bhubaneswar-751001, Orissa. T: 91-674-2396783. F: 91-674-2391476. [email protected]: Roads/Road over Bridge/Bridges/Flyovers/Highways

112 | National Highway Authority of India

Details: Request for qualification for design, engineering, construction, development, finance, operation & maintenance of the six laning of NH-4 from Kagal (km 592.240) to Satara (km 725.00) in Maharashtra.Submission Date: 07/09/2009Location: Satara MaharashtraTender value (Rs): 1,103,00,00,000.00Contact: CGM (Tech) NHAI, G-5 & 6 Sector - 10 Dwarka, New Delhi Delhi. T: 91-11-25074100 Extn: 1314, E-mail: [email protected]: Roads/Road over Bridge/Bridges/Flyovers/Highways

113 | Municipal Administration & Urban Development Department

Details: 155/MD/HMR/2009 DT 16.07.09: Request for qualification for development of Hyderabad Metro Rail (MRTS) Project.Submission Date: 07/09/2009Location: Hyderabad Andhra PradeshTender value (Rs): 121,320,000,000Contact: Principal Secretary to Government, Metro Rail Bhavan, Saifabad, Hyderabad-500004, Andhra Pradesh T: 91- 40-2338 8580 / 81, F: 91-40-23388582.Category: Transport

Page 20: Project Reporter

Project Reporter • 18 • September 1, 2009

Tenders/Bids

114 | Eastern Coalfields Ltd (ECL)Details: ECL/HQ/GM/C/Env/EOI/33/435: Design and execution of martyr memorial/monument at ECL HQ/Sanctoria PO/Disergarh Dist/Burdwan Pin/ 713333. Tenders are invited from reputed bonafide and resourceful architects sculptors and other competent agencies having required qualification experience / track record of actually undertaken and completing similar nature of job ie design and construction of memorial monument etc in govt / semi govt / pses / private sectors.Submission Date: 07/09/2009Location: West Bengal BurdwanTender value (Rs): 50,00,000Contact: S.N Singh, General Manager-EE, Admin and PR, Sanctoria Dishergarh Burdwan PIN-713333, West Bengal. T: 91-341-2523585Category: Architects/Interior Work/Consultancy

115 | National Mineral Development Corporation Ltd

Details: GM-Contracts-and-Steel-EPCMSP-III-Kirand: Providing consultancy for engineering contract procurement services project management and construction management services for installation of screening plant-III. (project management service)Submission Date: 14/09/2009Location: Kirandul Madhya PradeshTender value (Rs): 25,00,00,000Contact: Khanij Bhavan, 10-3-311/A, Masab Tank,Hyderabad- 500028 , Andhra Pradesh. T: 91-40-23538762. F: 91-40-23538711. [email protected]: Architects/Interior Work/Consultancy

116 | Steel Authority of India Ltd

Details: SP/PUR/PC/KANGRA/SPU-01/1440: Geotechnical investiga-tion and area survey work for setting up of steel processing unit of SAIL / Durgapur Steel Plant’ at Kandrori, Kangra, Himachal Pradesh.Submission Date: 08/09/2009Location: Durgapur West BengalContact: A B Biswas, Sr Mgr (MM) Project Purchase, SAIL, Durgapur Steel Plant, Section, 2nd floor, Ispat Bhawan, Durgapur-713203, West Bengal. M : 99320 02322. T: 91-343-257-4322. F: 91-258-3668. [email protected]: Architects/Interior Work/Consultancy

117 | Tehri Hydro Development Corporation Ltd

Details: 17/C&MM/KHEP/THDC/2009-10: Supply of ordinary portland cement grade-43 confirming to: 8112 with latest amendments in 50 kg. packing in HDPE/ jute bags.Submission Date: 10/09/2009Location: Tehri Garhwal UttaranchalTender value (Rs): 1,54,00,000Contact: Shri Ramu Ji, Koteshwar Dam Project Koteshwarpuram, Tehri Uttarachal, Tehri Garhwal, Uttaranchal. T: 91-1378-231534. Category: Building Material/Cement/Equipment

118 | Government of Madhya Pradesh

Details: 01/2009-10 dt 14.07.2008: Restructuring and modernisation works of Karoli and Dalda Sagara tank & its canal system. Completion time : 12 months (including rainy season and irrigation period). Bidders from India should, however, be registered with the Govern-ment of Madhya Pradesh/ WRD or other state governments/govern-ment of India, or state/central government undertakings.Submission Date: 10/09/2009Location: Karoli Madhya PradeshTender value (Rs): 5,430,000Contact: Chief Engineer, Narmada Tapti Basin, Indore, Madhya Pradesh T: 07392- 244225Category: Canal/Dam/Irrigation

119 | Northeast Frontier Railway

Details: LMG/33/02: Construction of 10 units (5 block) type-II (SS)

qtrs as per plan no.R/09/2007 at Km.118/0 in Manu-Agartala section. Completion period: 365 days.Submission Date: 08/09/2009Location: Agartala AssamTender value (Rs): 74,31,766.00Contact: Lumding, AssamCategory: Construction

120 | Northern Railway

Details: 152/153-W/Dy.CE©UMB: Misc civil works including stone pitching on embankment slopes, construction of toe/retaining wall, supplying and fixing of safety boards, road work, bridge work and other misc. building work over entire section between Abohar & Fazilka in connection with Abohar - Fazilka new BG Railway line. Period of completion: 6 months.Submission Date: 08/09/2009Location: Abohar HaryanaTender value (Rs): 422,33,000.00Contact: Dy Chief Engineer, Northern Railway, Ambala Cantt., Haryana T: 0171-2611203Category: Construction

121 | Jungle Lodges and Resorts Ltd

Details: Development works at Sangam (Mekedatu), near Kanakapu-ra comprising of construction of hotel complex, renovation of restaura-nt, landscape works, softscape, garden lighting, fencing work, parking area development and allied works. Completion time: 15 monthsSubmission Date: 15/09/2009Location: Bangalore KarnatakaTender value (Rs): 39,500,000Contact: Managing Director, 2nd Floor, Shrungar Complex, M.G. Road, Bangalore-560001, Karnataka T: 080-22111401, F: 2211 1405Category: Construction

122 | Madhya Pradesh Chief Engineer Public Health Engineering

Department, Gwalior

Details: 19/1/8/09: Construction work of new platform in place of old damaged platform as per Unisef designSubmission Date: 10/09/2009Location: Morena Madhya PradeshContact: Chief Engineer, Public Health Engineering Depart (PHED), Gwalior Zone, Gwalior, Madhya Pradesh. T:91-751-4031502. F-0751-2365438. [email protected]: Construction

123 | Military Engineer Services

Details: 84011/04/E8: Completion of incomplete work for provision of OTM accommodation for ad regt (phase -i) at Dehu road.(civil work). Project period: 60 weeks.Submission Date: 30/09/2009Location: Pune MaharashtraTender value (Rs): 3,00,00,000Contact: Chief Engineer, Pune zone, Dakshin Kaman marg, Pune-411001, Maharashtra. T: 91-20-26362267. F: 91-20-26362267. [email protected]: Construction

124 | Military Engineer Services

Details: IAFW-2162: Periodical services to certain bldgs in Navy Nagar and NAD colony area at Naval Station Karanja. Completion period: 6 months. Tenders are invited from enlisted contractors of MES and enlisted/unenlisted contractors working with other govt. departments meeting eligibility criteria for selection of contractors.Submission Date: 09/09/2009Location: Karanja MaharashtraTender value (Rs): 12,00,000.00Contact: Garrison Engineer (NW), Karanja, Maharashtra

Page 21: Project Reporter

Project Reporter • 19 • September 1, 2009

Tenders/Bids

Category: Construction

125 | Ordnance Factory

Details: OFBHANDARA-90190-PV-11: Design, fabrication, supply, erection & commissioning of self-supported chimney including foundation work for chimney and interconnection of ducting as per MPCB norms & as per specification attached.Submission Date: 04/09/2009Location: Bhandara MaharashtraContact: Sr. General Manager, Bhandara-441906,Maharashtra T: 07184-275745-48. F: 275242Category: Construction

126 | Shri Dudhaganga-Vedganga Sahakari Sakhar Karkhana Ltd

Details: Construction of (a) power house (civil & structural work) (b) turbine foundation. Time limit: 8 months. Tenders are invited from reputed and experienced contractors registered in Govt. department in appropriate class. Class of registration: II & above.Submission Date: 14/09/2009Location: Kolhapur MaharashtraTender value (Rs): 315,84,355.00Contact: The Managing Director, At: Bidri, Tal: Kagal, Dist. Kolhapur, Maharashtra. T: 91-2325-254922/254926. F: 91-2325-254972. [email protected]: Construction

127 | Shri Dudhaganga-Vedganga Sahakari Sakhar Karkhana Ltd

Details: Construction of (a) boiler foundation (b) ash bagasse carrying system. Time limit: 4 months. Tenders are invited from reputed and experienced contractors registered in Govt. department in appropriate class. Class of registration: II & above.Submission Date: 14/09/2009Location: Kolhapur MaharashtraTender value (Rs): 102,16,860.00Contact: The Managing Director, At: Bidri, Tal: Kagal, Dist. Kolhapur, Maharashtra. T: 91-2325-254922/254926. F: 91-2325-254972. [email protected]: Construction

128 | Jalandhar Improvement Trust

Details: TRC-17853: Construction of boundary wall around Shri Ram Vatika apartment 13.37 acre scheme. Time limit: 4 monthsSubmission Date: 18/09/2009Location: Jalandhar PunjabTender value (Rs): 15,30,000.00Contact: Er R K Talwar, Superintending Engineer, Jalandhar, Punjab T: 0715-2459824Category: Construction

129 | Department of Atomic Energy

Details: GSO/ACE©/CED/Tr-211/2009: Improvement works in existing park near Mini shopping center in DAE Township, Kalpakkam. Time allowed: 4 months. Tenders are invited from reputed and experienced civil engineering contractors with proven technical and financial capabilities, possessing the required knowledge in relevant field as required for these works and execution of similar nature of works, costing not less than 80 % of estimated cost under a single contract or two similar works each costing not less than 60 % of estimated cost or three similar works each costing not less than 40 % of estimated cost during past seven years and who are in the approved list of the appropriate class of CPWD, State PWD, Railways, MES, BHAVINI & DAE.Submission Date: 10/09/2009Location: Kalpakkam Tamil NaduTender value (Rs): 1626000Contact: Additional Chief Engineer ©, General Services Organisation, 17th Avenue, Kalpakkam-603102, Tamil Nadu. T: 44- 27480092.

Category: Construction

130 | Department of Atomic Energy

Details: GSO/ACE©/CED/Tr-210/2009: Providing road side kerb wall, pathway and development works at Northern side of ring road along the backwater area in DAE township, Kalpakkam. Time allowed: 6 months. Tenders are invited from reputed and experienced civil engineering contractors with proven technical and financial capabili-ties, possessing the required knowledge in relevant field as required for these works and execution of similar nature of works, costing not less than 80 % of estimated cost under a single contract or two similar works each costing not less than 60 % of estimated cost or three similar works each costing not less than 40 % of estimated cost during past seven years and who are in the approved list of the appropriate class of CPWD, State PWD, Railways, MES, BHAVINI & DAE.Submission Date: 10/09/2009Location: Kalpakkam Tamil NaduTender value (Rs): 2004000Contact: Additional Chief Engineer ©, General Services Organisation, 17th Avenue, Kalpakkam-603102, Tamil Nadu. T: 44- 27480092.Category: Construction

131 | Udangudi Power Corporation Ltd

Details: CEO/UPCL/SPEC.NO.2/2009-10: Site levelling and construction of compound wall for 2x800 MW Udangudi super critical thermal power project (A CDM Project ) at Udangudi in Tuticorin district Tamilnadu.Submission Date: 09/09/2009Location: Tuticorin Tamil NaduContact: President & CEO, 144 Anna Salai , TNEB Complex, Chennai 600002, Tamil Nadu. T: 91-44-28544306/28544304Category: Construction

132 | North Eastern Railway, Central Govt. Ministry/Department

Details: 20-2009-14: At BSB - Construction of type IV one unit,type V One unit and other miscellaneous development work in connection with RE of BBJ- GKP-BJU SectionSubmission Date: 08/09/2009Location: Varanasi Uttar PradeshTender value (Rs): 32,47,000.00Contact: M S Hashmi, Office of the DRM/Engineering, DRM Office, North Eastern Railway, Varanasi, Uttar Pradesh. T:91-542-2224808, [email protected]: Construction

133 | Damodar Valley Corporation

Details: MT/PH©-14(Tender)/2988: Construction of building to accommodate staff for overhauling. Tenders are invited from reputed, experienced and financially sound contractors having due credentials as sought for, working with CPWD/State PWD/NTPS/DVC/ SEB or any other PSU/ Govt./Semi Govt. organization/ any other reputed industrial organizations.Submission Date: 16/09/2009Location: Bankura West BengalTender value (Rs): 54,51,726.00Contact: The Sr. Divisional Engineer (Civil), Power House Civil Division, Mejia Thermal Power Station, P.O. MTPS, Dist. Bankura, Pin: 722183, West Bengal M: 91-9434746086Category: Construction

134 | Military Engineer Services

Details: T9016: Construction of hospital building and ancillaries at Bengdubi. Completion period: 3 months. Tenders are invited from eligible enlisted contractors of MES and enlisted / unenlisted contractors working with other govt. departments meeting eligibility criteria for selection of contractorsSubmission Date: 30/09/2009

Page 22: Project Reporter

Project Reporter • 20 • September 1, 2009

Tenders/Bids

Location: Siliguri West BengalTender value (Rs): 77,00,00,000.00Contact: Chief Engineer, Siliguri zone, Sevoke Road, PO: Salugara, Siliguri 08, West Bengal. T: 0353-2590225Category: Construction

135 | Mahanideshalaya Assam RiflesDetails: VIII.28028/Engr-2009/17(24)/HQ 5 Sector/1467: Providing of slaughter house and drainage and culvert for 42 Assam Rifles (Now 20 Assam Rifles) at Bn HQ Ghaspani. Tenders are invited from Assam Rifles approved contractor of appropriate categories.Submission Date: 05/09/2009Location: Sillong AssamTender value (Rs): 2872000Contact: Staff Officer 1 (Works), Directorate General Assam Rifles (PRO Cell), Shillong-793011, AssamCategory: Drainage

136 | Department of Atomic Energy

Details: GSO/ACE©/CED/Tr-209/2009: Augmentation of sewage disposal system by providing RCC hume pipes of np2 class (S&S) for main gravity sewer line along the central corridor at Anupuram Township. Time allowed: 6 months. Tenders are invited from reputed and experienced civil engineering contractors with proven technical and financial capabilities, possessing the required knowledge in relevant field as required for these works and execution of similar nature of works, costing not less than 80 % of estimated cost under a single contract or two similar works each costing not less than 60 % of estimated cost or three similar works each costing not less than 40 % of estimated cost during past seven years and who are in the approved list of the appropriate class of CPWD, State PWD, Railways, MES, BHAVINI & DAE.Submission Date: 10/09/2009Location: Chennai Tamil NaduTender value (Rs): 7118000Contact: Additional Chief Engineer ©, General Services Organisation, 17th Avenue, Kalpakkam-603102, Tamil Nadu. T: 44- 27480092.Category: Pipes

137 | National Mineral Development Corporation Ltd

Details: BIOM-Kdl-CompCivil-6370-2009: Laying of sewer lines from new type III qtrs(204units) near football ground of Prakash Vidyalaya,Kirandul to Oxidation Pond.Submission Date: 07/09/2009Location: Kirandul Andhra PradeshTender value (Rs): 30,25,000.00Contact: K L N Rao, Khanij Bhavan, 10-3-311/A Masab Tank, Hyderabad, Andhra Pradesh. T: 91-40-23538762. F:91-40-23538711. Category: Plumbing/Drainage/Sanitary Works

138 | Rajasthan Renewable Energy Corporation Ltd.

Details: F4(42)/2009-10/01: Design, manufacture, installation, testing and commissioning of 1 no. 9.4KW wind-solar hybrid (6.4 kw) power plant at Jaisalmer military station, Sangar army area, Jaisalmer.Submission Date: 08/09/2009Location: Jaipur RajasthanContact: General Manager (D), E-166, Yudhishtar Marg, C Scheme, Jaipur, Rajasthan. T: 91-141-2225859/2228198. F: 91-141-2226028. [email protected]: Power

139 | Military Engineer Services

Details: Provision of guard rest room & guard posts on range road for security personnel at ITR-Chandipur. Eligibilty Criteria: For other

contractors- Meeting enlistment criteria of MES with regard to having satisfactorily completed requisite value works,annual turnover,working capital, fixed assets etc. No recovery outstanding in Govt.Deptt. Completion of period: 12 months.Submission Date: 22/09/2009Location: Chandipur DelhiTender value (Rs): 8,200,000Contact: Chief Engineer ( R&D ), Probyn Road, Delhi-54, New Delhi, Delhi. T: 011- 23816670. F: 23816670,Category: Residential/Commercial Buildings

140 | Public Works Department

Details: 22/09-10: Higher Education Department - Renovation of MCRV hostel for ladies attached to Govt. Maharaja’s College, Ernakulam. Time of completion: 6 months.Submission Date: 24/09/2009Location: Ernakulam KeralaTender value (Rs): 24,50,000.00Contact: Superintending Engineer, Buildings & Local Works, Central Circle, Thrissur, Kerala T: 0487-2423342Category: Residential/Commercial Buildings

141 | Public Works Department

Details: 21/09-10: Higher Education Department - Renovation of old pavalion in Maharaja’s college ground, Ernakulam. Time of comple-tion: 6 months.Submission Date: 24/09/2009Location: Ernakulam KeralaTender value (Rs): 22,00,000.00Contact: Superintending Engineer, Buildings & Local Works, Central Circle, Thrissur, Kerala T: 0487-2423342Category: Residential/Commercial Buildings

142 | Northern Coalfields LtdDetails: PRHQCR24-5-232: Repair and maintenance of B, C and D type quarters and welfare buildings at Amlohri Project.Submission Date: 09/09/2009Location: Singrauli Madhya PradeshTender value (Rs): 65,44,954.00Contact: Head quarter, Singrauli, Madhya Pradesh-486889. T: 91-7805-255355. F: 91-7805-266640. [email protected]: Residential/Commercial Buildings

143 | Government of Rajasthan

Details: 1/2009-10: Conservation, restoration & development work at Shergarh town in Baran. Time of completion: 18 months.Submission Date: 14/09/2009Location: Jaipur RajasthanTender value (Rs): 150,00,000.00Contact: Director, Archaeology & Museums Dept., Jaipur, Rajasthan T: 0141-5182954, 26122733Category: Residential/Commercial Buildings

All rights reserved. While all efforts are made to ensure that the information published is correct, Project Reporter hold no responsibility for any unlikely errors that might occur. Printed and Published by Pratap Padode on behalf of ASAPP Media Pvt Ltd, A - 303, Navbharat Estate, Zakaria Bunder Road, Sewri (West), Mumbai - 400 015, and printed at Jayant Printery, 352/54, Girgaum Road, Murlidhar Temple Compound, Mumbai 400 002. Editor- Pratap Padode. Subject to Mumbai Jurisdiction only.