The Palmerston Regional Hospital project is jointly funded by the Australian and Northern Territory Governments DEPARTMENT OF INFRASTRUCTURE, PLANNING AND LOGISTICS Project Status Report Date: Friday, 2 December 2016 The Project Construction of a two level, one hundred and sixteen bed hospital. Current Status Works carried out this week (external): Formwork construction to level two, Arcade and Ward link bridges. External and internal blockwork walls to building four. Structural steel erection to building one roof. Internal works: Erecting firewalls to building four. Electrical cable trays to level one of building three. Electrical rough in to level one of building one. Wet and dry fire services to building four. Mechanical duct work to level one of buildings one and two. First fix hot and cold water pipe installation to level one of building three. Fire hydrant ring main to level one of building four. Plumbing stack work to level one of building three. Medical gas pipe works to level one of building one. On site subcontractors: Project Plumbing carrying out works to: 1. First fix hot and cold water pipes to level one of building three. 2. Fire Hydrant Ring Main to level one of building four. 3. Plumbing stack work to level one of building three.

Project Status Report - Homepage - Department of ... Palmerston Regional Hospital project is jointly funded by the Australian and Northern Territory Governments DEPARTMENT OF INFRASTRUCTURE,

Embed Size (px)

Citation preview

The Palmerston Regional Hospital project is jointly funded by the Australian and Northern Territory

Governments

DEPARTMENT OF INFRASTRUCTURE, PLANNING AND LOGISTICS

Project Status Report

Date: Friday, 2 December 2016

The Project

Construction of a two level, one hundred and sixteen bed hospital.

Current Status

Works carried out this week (external):

Formwork construction to level two, Arcade and Ward link bridges.

External and internal blockwork walls to building four.

Structural steel erection to building one roof.

Internal works:

Erecting firewalls to building four.

Electrical cable trays to level one of building three.

Electrical rough in to level one of building one.

Wet and dry fire services to building four.

Mechanical duct work to level one of buildings one and two.

First fix hot and cold water pipe installation to level one of building three.

Fire hydrant ring main to level one of building four.

Plumbing stack work to level one of building three.

Medical gas pipe works to level one of building one.

On site subcontractors:

Project Plumbing carrying out works to:

1. First fix hot and cold water pipes to level one of building three.

2. Fire Hydrant Ring Main to level one of building four.

3. Plumbing stack work to level one of building three.

The Palmerston Regional Hospital project is jointly funded by the Australian and Northern Territory

Governments

DEPARTMENT OF INFRASTRUCTURE, PLANNING AND LOGISTICS

NT Proform P/L –Carrying out formwork construction to level two, Arcade and Ward link bridges; and stripping out formwork to completed suspended slabs to buildings five and six.

Intract Australia – Erecting fire walls to building four.

Rob O’Keefe P/L – Carrying out blockwork to building four.

Contract Fire Services Pty Ltd – Wet and dry fire services to building four.

MMC – Structural steel erection to building one roof area.

Nilsens – Install cable trays to building three; and first fix electrical rough in to level one of building one.

Airducter – Mechanical ductwork to level one of buildings one and two; install medical gas pipes to level one of building one.

Man hours worked on site for the week 21 November 2016 to 25 November 2016 were 7727.

This week there was a total of 20 Indigenous employees working on the site.

OHS Incidents:

Nil.

Environmental Controls:

Head works road construction progressing and monitored.

Commencement of wet season environmental controls and storm water management.

Works for the forthcoming week:

Blockwork construction to building four by Rob O’Keefe.

Internal first fix works to buildings one, two, three and four by Project Plumbing, Intract Australia, Control Fire Services Pty Ltd, Nilsens and AirDucter.

Erection of roof structural steel by MMC.

Installation of vapour barriers, bulk insulation and roof cladding to buildings one and two by Halikos Roofing.

The Palmerston Regional Hospital project is jointly funded by the Australian and Northern Territory

Governments

DEPARTMENT OF INFRASTRUCTURE, PLANNING AND LOGISTICS

Future Trade Packages pending award:

Ceiling and partitions.

External glazing.

CSSD

Patient lifters

Façade cladding

Resilient finishes

Current trade packages awarded to local firms:

Bulk excavation & site clearing Allan King & Sons

Boundary fencing & gates Totem Fencing P/L

Footings & columns C & V Concrete P/L

Site survey & set out works Bennett & Bennett P/L

Quantity surveying services QS Services P/L

Early works hydraulic services Project Plumbing P/L

Tower crane High Rise & Rigging P/L

Reinforcement supply One Steel Darwin P/L

Site surveillance camera Intech NT

Genset fuel supply Mini Tankers P/L

Formwork NT Pro Form P/L

Concrete supply HB Concrete Darwin P/L

Concrete place C & V Concreters NT P/L

Reinforcement fix Reo Fast NT P/L

Concrete pumping Darwin Concrete Pumping P/L

Early works electrical Nilsen NT

Site accommodation NT Link P/L

Rubbish removal VEOLIA Environmental Darwin

Civil early works - stormwater Allan King & Sons P/L

Traffic control Core Staff NT P/L

Scaffold NT Scaffold

The Palmerston Regional Hospital project is jointly funded by the Australian and Northern Territory

Governments

DEPARTMENT OF INFRASTRUCTURE, PLANNING AND LOGISTICS

Site amenities cleaning &

consumable

Corestaff NT & Shemrock Chemicals

Structural steel roofing MMC P/L

Block work supply HB Blocks & Pavers

Lifts Otis Lifts Darwin

Block laying (Early works) Rob O’Keeffe P/L

Electrical Services Nilson NT

Fire Walls Intract Australia

Fire Protection, Wet & Dry Control Fire Services P/L

Mechanical Services Airducter Pty Ltd

Hydraulic Services Project Plumbing Pty Ltd

Metal Roof Sheeting Halikos Roofing P/L

Nurse Call and Security System Security and Technology Services (NT) Pty Ltd

Communications AJ Communications Pty Ltd

The Palmerston Regional Hospital project is jointly funded by the Australian and Northern Territory

Governments

DEPARTMENT OF INFRASTRUCTURE, PLANNING AND LOGISTICS

ERECTED STRUCTURAL STEEL COLUMNS AND RAFTERS TO BUILDING ONE

INSTALLED ROOF PURLINS TO BUILDING ONE

The Palmerston Regional Hospital project is jointly funded by the Australian and Northern Territory

Governments

DEPARTMENT OF INFRASTRUCTURE, PLANNING AND LOGISTICS

BLOCKWORK TO PARAPHET WALL OF HOSPITAL ARCADE

COREFILL TO PARAPHET WALL OF HOSPITAL ARCADE

The Palmerston Regional Hospital project is jointly funded by the Australian and Northern Territory

Governments

DEPARTMENT OF INFRASTRUCTURE, PLANNING AND LOGISTICS

POURING OF STAIRS AND LANDING TO STAIR SIX

INSTALLED MEDICAL GAS PIPE WORK

The Palmerston Regional Hospital project is jointly funded by the Australian and Northern Territory

Governments

DEPARTMENT OF INFRASTRUCTURE, PLANNING AND LOGISTICS

FIRST FIX SERVICES TO LEVEL ONE BUILDING THREE (LEARNING & DEVELOPMENT WING)

INSTALLED COLD WATER RING MAIN TO MAIN ENTRY

The Palmerston Regional Hospital project is jointly funded by the Australian and Northern Territory

Governments

DEPARTMENT OF INFRASTRUCTURE, PLANNING AND LOGISTICS

ROOF SHEETING TO BUILDING TWO (BACK OF HOUSE)