32
- Activity ID Activity Name Orig. Dur'n Start Finish Project Summary and Milestones 1217 01-18-13 A 04-03-16 Summary 752 03-12-13 A 03-04-16 SM-1A18 Construction 737 03-12-13 A 02-12-16 SM-1A18P1 Concrete Structure 146 10-02-13 A 05-13-14 SM-1A18P2 Steel Structure 133 03-10-14 A 10-14-14 SM-1A18N2 Secondary Foundations (1st Flr) 76 03-13-14 A 06-18-14 SM-1A18S MEP & Interior Rough-In 204 05-22-14 03-12-15 SM-1A18U Interior Finishes 275 07-02-14 07-31-15 SM-1A18Q Enclosure 166 07-09-14 03-04-15 SM-1A18X12 Start-Up, Testing, Commissioning, Tuning 260 02-26-15 03-04-16 Milestones 491 04-18-14 03-25-16 SM-1E2C2 Complete VDC - MEP Coordination Level 2 0 04-18-14 SM-1E2C3 Complete VDC - MEP Coordination Level 3 0 05-02-14 SM-1A18P9 Acoustical Door Frame Delivery 0 05-14-14 SM-1A18P6 Enclosure Mock-Up Complete 0 06-03-14 SM-1A18P4 Slab on Grade Complete 0 06-18-14 SM-1A18P7 Deliver Exterior Glazing to Site 0 07-07-14 SM-1A18P5 Structural Steel @ Theater Primary Lid Complete 0 07-09-14 1071-8Q5 Precast Installed - Main Theater 0 07-31-14 SM-1A18P3 Structure Over Theater Complete 0 08-12-14 SM-1A18P10 Slab on Metal Deck at Theater Roof (Seq. 8) 0 09-15-14 SM-1A18P11 All Roofing Membranes Complete 0 12-31-14 SM-1A18P8 Main Switchgear Live 0 01-14-15 SM01-1006 Distribution Power - Lower Level 0 01-14-15 SM01-1007 Distribution Power - Level 1 0 01-14-15 SM01-1008 Distribution Power - Level 2 0 01-16-15 SM01-1009 Distribution Power - Level 3 0 01-21-15 SM01-1011 Fill / Flush CHW - Building 0 01-21-15 SM01-1012 Fill / Flush HHW - Building 0 01-21-15 SM01-1014 Energize Steam - Building 0 01-27-15 SM01-1000 Dust Free - Lower Level 0 02-25-15 SM01-1010 MDF L007 Switch Live 0 02-25-15 SM01-1016 BAS Programming Complete 0 02-25-15 SM-1A18Q1 Enclosure Complete 0 03-04-15 SM01-1015 Chlorinate Domestic Water - Building 0 03-13-15 SM-1A18Q13 MEP Theater Start Up 0 06-25-15 SM-1A18X10 Dust Free - Rehearsal 0 06-30-15 SM01-1001 Dust Free - Level 1 0 07-01-15 SM-1A18X9 Elevators Substantially Complete 0 07-27-15 SM01-1013 Fill / Flush Glycol - Building 0 09-08-15 SM01-1002 Dust Free - Level 2 0 09-09-15 SM01-1003 Dust Free - Level 3 0 09-11-15 SM-1A18X6 Auditorium Substantially Complete 0 10-02-15 SM-1A18X14 Test and Balance of MEP Systems Complete 0 12-09-15 SM-1A18X5 Commissioning Complete (KFI) 0 12-23-15 SM-1A5X1 Initial Substantial Completion (CO) 0 01-22-16 SM-1A18X3 Final Clean Complete 0 01-29-16 SM-1A5X4 Final Substantial Completion (Cx) 0 02-12-16* SM-1A18X22 Theater Commissioning Complete 0 03-04-16 SM-1A5X2 Final Completion 0 03-25-16* Contracts 1746 01-18-13 A 04-03-16 SM-1A18Q14 Project 0257002 - Earthwork & Piles 505 01-18-13 A 06-17-14 SM-1A18Q29 Project 0257017 - Site Services 1006 05-20-13 A 02-19-16 SM-1A18Q16 Project 0257004 - Conveying 1006 05-22-13 A 02-21-16 SM-1A18Q15 Project 0257003 - Concrete Foundations, Concrete Structure & Ste 559 05-28-13 A 11-23-14 SM-1A18Q17 Project 0257005 - Fireproofing 590 05-28-13 A 01-07-15 SM-1A18Q20 Project 0257008 - Roofing 561 10-01-13 A 02-13-15 SM-1A18Q19 Project 0257007 - Building Envelope 494 10-01-13 A 04-03-15 SM-1A18Q18 Project 0257006 - Site Utilities 726 10-01-13 A 09-19-15 SM-1A18Q21 Project 0257009 - Mechanical 887 10-01-13 A 01-22-16 SM-1A18Q22 Project 0257010 - Electrical 887 10-01-13 A 01-22-16 SM-1A18Q23 Project 0257011 - Fire Sprinkler System 887 10-01-13 A 01-22-16 SM-1A18Q28 Project 0257016 - Hardscapes 717 11-01-13 A 11-04-15 SM-1A18Q27 Project 0257015 - Landscaping 717 11-01-13 A 11-06-15 SM-1A18Q24 Project 0257012 - Interior General 849 11-01-13 A 02-28-16 SM-1A18Q25 Project 0257013 - Theatrical & Ac oustical Equipment 877 11-01-13 A 04-03-16 SM-1A18Q26 Project 0257014 - A/V Equipment 791 11-01-13 A 04-03-16 SM-1A18X24 Project 0257002 - Earthwork & Piles Substantial Completion 0 05-18-14* SM-1A18X36 Project 0257003 - Concrete Foundations, Concrete Structure & Ste 0 10-24-14* ar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun 2014 2015 2016 Construction Concrete Structure Steel Structure Secondary Foundations (1st Flr) MEP & Interior Rough-In Interior Finishes Enclosure Start-Up, Testing, Commissioning, Tuning 04-18-14, Complete VDC - MEP Coordination Level 2 05-02-14, Complete VDC - MEP Coordination Level 3 05-14-14, Ac oustical Door Frame Delivery 06-03-14, Enclosure Mock-Up Complete 06-18-14, Slab on Grade Complete 07-07-14, Deliver Exterior Glazing to Site 07-09-14, Structural Steel @ Theater Primary Lid Complete 07-31-14, Precast Installed - Main Theater 08-12-14, Structure Over Theater Complete 09-15-14, Slab on Metal Deck at Theater Roof (Seq. 8) 12-31-14, All R oofing Membranes Complete Main Switchgear Live 01-14-15 Distribution Power - Lower Level 01-14-15 Distribution Power - Level 1 01-14-15 Distribution Power - Level 2 01-16-15 Distribution Power - Level 3 01-21-15 Fill / Flush CHW - Building 01-21-15 Fill / Flush HHW - Building 01-21-15 Energize Steam - Building 01-27-15 Dust Free - Lower Level 02-25-15 MDF L007 Switch Live 02-25-15 BAS Programming Complete 02-25-15 Enclosure Complete 03-04-15 Chlorinate Domestic Water - Building 03-13-15 MEP Theater Start Up 06-25-15 Dust Free - Rehearsal 06-30-15 Dust Free - Level 1 07-01-15 Elevators Substantially Complete 07-27-15 Fill / Flush Glycol - Building 09-08-15 Dust Free - Level 2 09-09-15 Dust Free - Level 3 09-11-15 Auditorium Substantially Complete 10-02-15 Test and Balance of MEP Systems Complete 12-09-15 Commissioning Complete (KFI) 12-23-15 Initial Substantial Completion (CO) 01-22-16 Final Clean Complete 01-29-16 Final Substantial Completion (Cx) 02-12-16* Theater Commissioning Complete 03-04-16 Final Completion 03-25-16* Project 0257002 - Earthwork & Piles Project 0257017 - Site Services Project 0257004 - Conveying Project 0257003 - Concrete Foundations, Concrete Structure & Steel Structure Project 0257005 - Fireproofing Project 0257008 - Roofing Project 0257007 - Building Envelope Project 0257006 - Site Utilities Project 0257009 - Mechanical Project 0257010 - Electrical Project 0257011 - Fire Sprinkler System Project 0257016 - Hardscapes Project 0257015 - Landscaping Project 0257012 - Interior General Project 0257013 - Theatr Project 0257014 - A/V Eq 05-18-14*, Project 0257002 - Earthwork & Piles Substantial Completion 10-24-14*, Project 0257003 - Concrete Foundations, Concrete Structure & Steel Structure Substantial Completion 10030018-84Hancher Auditorium Replacement Facility 1 of 32 04-04-14 Milestone Summary Planned Work Progressed Work Critical Work Crew 1 Crew 2 Primary Milestone Hancher Auditorium Replacement - Construct New Facility University of Iowa Project Layout - Data Date: 04-02-14

Project SumProject Summary and Milestones · SM-1A5X1 Initial Substantial Completion (CO) 0 01-22-16 SM-1A18X3 Final Clean Complete 0 01-29-16 SM-1A5X4 Final Substantial Completion

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Project SumProject Summary and Milestones · SM-1A5X1 Initial Substantial Completion (CO) 0 01-22-16 SM-1A18X3 Final Clean Complete 0 01-29-16 SM-1A5X4 Final Substantial Completion

- Activity ID Activity Name Orig.Dur'n

Start Finish

Project SumProject Summary and Milestones 1217 01-18-13 A 04-03-16

SummarySummary 752 03-12-13 A 03-04-16

SM-1A18 Construction 737 03-12-13 A 02-12-16SM-1A18P1 Concrete Structure 146 10-02-13 A 05-13-14SM-1A18P2 Steel Structure 133 03-10-14 A 10-14-14SM-1A18N2 Secondary Foundations (1st Flr) 76 03-13-14 A 06-18-14SM-1A18S MEP & Interior Rough-In 204 05-22-14 03-12-15SM-1A18U Interior Finishes 275 07-02-14 07-31-15SM-1A18Q Enclosure 166 07-09-14 03-04-15SM-1A18X12 Start-Up, Testing, Commissioning, Tun ing 260 02-26-15 03-04-16MilestonesMilestones 491 04-18-14 03-25-16

SM-1E2C2 Complete VDC - MEP Coordination Level 2 0 04-18-14SM-1E2C3 Complete VDC - MEP Coordination Level 3 0 05-02-14SM-1A18P9 Acoustical Door Frame Delivery 0 05-14-14SM-1A18P6 Enclosure Mock-Up Complete 0 06-03-14SM-1A18P4 Slab on Grade Complete 0 06-18-14SM-1A18P7 Deliver Exterior Glazing to Site 0 07-07-14SM-1A18P5 Structural Steel @ Theater Primary Lid Complete 0 07-09-141071-8Q5 Precast Installed - Main Theater 0 07-31-14SM-1A18P3 Structure Over Theater Complete 0 08-12-14SM-1A18P10 Slab on Metal Deck at Theater Roof (Seq. 8) 0 09-15-14SM-1A18P11 All Roofing Membranes Complete 0 12-31-14SM-1A18P8 Main Switchgear Live 0 01-14-15SM01-1006 Distribution Power - Lower Level 0 01-14-15SM01-1007 Distribution Power - Level 1 0 01-14-15SM01-1008 Distribution Power - Level 2 0 01-16-15SM01-1009 Distribution Power - Level 3 0 01-21-15SM01-1011 Fill / Flush CHW - Building 0 01-21-15SM01-1012 Fill / Flush HHW - Building 0 01-21-15SM01-1014 Energize Steam - Building 0 01-27-15SM01-1000 Dust Free - Lower Level 0 02-25-15SM01-1010 MDF L007 Switch Live 0 02-25-15SM01-1016 BAS Programming Complete 0 02-25-15SM-1A18Q1 Enclosure Complete 0 03-04-15SM01-1015 Chlorinate Domestic Water - Building 0 03-13-15SM-1A18Q13 MEP Theater Start Up 0 06-25-15SM-1A18X10 Dust Free - Rehearsal 0 06-30-15SM01-1001 Dust Free - Level 1 0 07-01-15SM-1A18X9 Elevators Substantially Complete 0 07-27-15SM01-1013 Fill / Flush Glycol - Building 0 09-08-15SM01-1002 Dust Free - Level 2 0 09-09-15SM01-1003 Dust Free - Level 3 0 09-11-15SM-1A18X6 Auditorium Substantially Complete 0 10-02-15SM-1A18X14 Test and Balance of MEP Systems Complete 0 12-09-15SM-1A18X5 Commissioning Complete (KFI) 0 12-23-15SM-1A5X1 Initial Substantial Completion (CO) 0 01-22-16SM-1A18X3 Final Clean Complete 0 01-29-16SM-1A5X4 Final Substantial Completion (Cx) 0 02-12-16*SM-1A18X22 Theater Commissioning Complete 0 03-04-16SM-1A5X2 Final Completion 0 03-25-16*ContractsContracts 1746 01-18-13 A 04-03-16

SM-1A18Q14 Project 0257002 - Earthwork & Piles 505 01-18-13 A 06-17-14SM-1A18Q29 Project 0257017 - Site Services 1006 05-20-13 A 02-19-16SM-1A18Q16 Project 0257004 - Conveying 1006 05-22-13 A 02-21-16SM-1A18Q15 Project 0257003 - Concrete Foundations, Concrete Structure & Steel 559 05-28-13 A 11-23-14SM-1A18Q17 Project 0257005 - Fireproofing 590 05-28-13 A 01-07-15SM-1A18Q20 Project 0257008 - Roofing 561 10-01-13 A 02-13-15SM-1A18Q19 Project 0257007 - Building Envelope 494 10-01-13 A 04-03-15SM-1A18Q18 Project 0257006 - Site Utilities 726 10-01-13 A 09-19-15SM-1A18Q21 Project 0257009 - Mechanical 887 10-01-13 A 01-22-16SM-1A18Q22 Project 0257010 - Electrical 887 10-01-13 A 01-22-16SM-1A18Q23 Project 0257011 - Fire Sprinkler System 887 10-01-13 A 01-22-16SM-1A18Q28 Project 0257016 - Hardscapes 717 11-01-13 A 11-04-15SM-1A18Q27 Project 0257015 - Landscaping 717 11-01-13 A 11-06-15SM-1A18Q24 Project 0257012 - Interior General 849 11-01-13 A 02-28-16SM-1A18Q25 Project 0257013 - Theatrical & Ac oustical Equipment 877 11-01-13 A 04-03-16SM-1A18Q26 Project 0257014 - A/V Equipment 791 11-01-13 A 04-03-16SM-1A18X24 Project 0257002 - Earthwork & Piles Substantial Completion 0 05-18-14*SM-1A18X36 Project 0257003 - Concrete Foundations, Concrete Structure & Steel 0 10-24-14*

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2014 2015 2016

ConstructionConcrete Structure

Steel StructureSecondary Foundations (1st Flr)

MEP & Interior Rough-InInterior Finishes

EnclosureStart-Up, Testing, Commissioning, Tun ing

04-18-14, Complete VDC - MEP Coordination Level 205-02-14, Complete VDC - MEP Coordination Level 3

05-14-14, Acoustical Door Frame Delivery06-03-14, Enclosure Mock-Up Complete

06-18-14, Slab on Grade Complete07-07-14, Deliver Exterior Glazing to Site07-09-14, Structural Steel @ Theater Primary Lid Complete

07-31-14, Precast Installed - Main Theater08-12-14, Structure Over Theater Complete

09-15-14, Slab on Metal Deck at Theater Roof (Seq. 8)12-31-14, All Roofing Membranes Complete

Main Switchgear Live 01-14-15Distribution Power - Lower Level 01-14-15

Distribution Power - Level 1 01-14-15Distribution Power - Level 2 01-16-15

Distribution Power - Level 3 01-21-15Fill / Flush CHW - Building 01-21-15Fill / Flush HHW - Building 01-21-15

Energize Steam - Building 01-27-15Dust Free - Lower Level 02-25-15

MDF L007 Switch Live 02-25-15BAS Programming Complete 02-25-15

Enclosure Complete 03-04-15Chlorinate Domestic Water - Building 03-13-15

MEP Theater Start Up 06-25-15Dust Free - Rehearsal 06-30-15

Dust Free - Level 1 07-01-15Elevators Substantially Complete 07-27-15

Fill / Flush Glycol - Building 09-08-15Dust Free - Level 2 09-09-15Dust Free - Level 3 09-11-15

Auditorium Substantially Complete 10-02-15Test and Balance of MEP Systems Complete 12-09-15

Commissioning Complete (KFI) 12-23-15Initial Substantial Completion (CO) 01-22-16

Final Clean Complete 01-29-16Final Substantial Completion (Cx) 02-12-16*

Theater Commissioning Complete 03-04-16Final Completion 03-25-16*

Project 0257002 - Earthwork & PilesProject 0257017 - Site ServicesProject 0257004 - Conveying

Project 0257003 - Concrete Foundations, Concrete Structure & Steel StructureProject 0257005 - Fireproofing

Project 0257008 - RoofingProject 0257007 - Building Envelope

Project 0257006 - Site UtilitiesProject 0257009 - MechanicalProject 0257010 - ElectricalProject 0257011 - Fire Sprinkler System

Project 0257016 - HardscapesProject 0257015 - Landscaping

Project 0257012 - Interior GeneralProject 0257013 - TheatricaProject 0257014 - A/V Equip

05-18-14*, Project 0257002 - Earthwork & Piles Substantial Completion10-24-14*, Project 0257003 - Concrete Foundations, Concrete Structure & Steel Structure Substantial Completion

10030018-84Hancher Auditorium Replacement Facility 1 of 32 04-04-14

Milestone

Summary

Planned Work

Progressed Work

Critical Work

Crew 1

Crew 2

Primary Milestone

Hancher Auditorium Replacement - Construct New FacilityUniversity of Iowa

Project Layout - Data Date: 04-02-14

Page 2: Project SumProject Summary and Milestones · SM-1A5X1 Initial Substantial Completion (CO) 0 01-22-16 SM-1A18X3 Final Clean Complete 0 01-29-16 SM-1A5X4 Final Substantial Completion

- Activity ID Activity Name Orig.Dur'n

Start Finish

SM-1A18X38 Project 0257005 - Fireproofing Substantial Completion 0 12-08-14*SM-1A18X27 Project 0257008 - Roofing Substantial Completion 0 01-14-15*SM-1A18X26 Project 0257007 - Building Envelope Substantial Completion 0 03-04-15*SM-1A18X25 Project 0257006 - Site Utilities Substantial Completion 0 08-20-15*SM-1A18X35 Project 0257016 - Hardscapes Substantial Completion 0 10-05-15*SM-1A18X34 Project 0257015 - Landscaping Substantial Completion 0 10-07-15*SM-1A18X28 Project 0257009 - Mechanical Substantial Completion 0 12-23-15*SM-1A18X29 Project 0257010 - Electrical Substantial Completion 0 12-23-15*SM-1A18X30 Project 0257011 - Fire Sprinkler System Substantial Completion 0 12-23-15*SM-1A18X39 Project 0257017 - Site Services Substantial Completion 0 01-20-16*SM-1A18X37 Project 0257004 - Conveying Substantial Completion 0 01-22-16*SM-1A18X31 Project 0257012 - Interior General Substantial Completion 0 01-29-16SM-1A18X32 Project 0257013 - Theatrical & Ac oustical Equipment Substantial Com 0 03-04-16SM-1A18X33 Project 0257014 - A/V Equipment Substantial Completion 0 03-04-16PreconstructPreconstruction & Procurement 659 08-28-13 A 03-30-16

FoundationsFoundations & Structure 21 03-31-14 A 04-25-14

966 Pkg#17 Seq 59-66 South L2 10 03-31-14 A 04-16-14665 032000 - Rebar Level 1 Slab on Grade 10 04-03-14* 04-16-14675 032000 - Rebar SOMD Level 2 10 04-03-14* 04-16-14680 032000 - Rebar SOMD Level 3 10 04-03-14* 04-16-14685 032000 - Rebar SOMD Level 4 10 04-03-14* 04-16-14967 Pkg#18 Seq 67-71 South L3 Portion 1 10 04-03-14 04-16-14968 Pkg#19 Seq 72-75 South L3 Portion 2 10 04-03-14 04-16-14969 Pkg#20 Seq 76-77 ALL L4 10 04-03-14* 04-16-14970 Pkg#21 Seq 78-79 Roof South 10 04-03-14* 04-16-14971 Pkg#22 Seq 80-81 Perimeter Roof Framing 10 04-03-14* 04-16-14Q002-8P1E FRP Slab on Grade - Preparatory Meeting 0 04-08-14Q003-8P1E FRP Slab on Grade - Initial Inspection 0 04-25-14

ConveyingConveying 472 08-28-13 A 07-06-15

Q002-8R1 Elevators - Preparatory Meeting 0 06-13-14Q003-8R1 Elevators - Initial Inspection 0 10-21-14

Elevators 1Elevators 1,2,4,6 221 05-16-14 03-31-15

P001-5R1F7 Fab/Deliver - Basic Elevator Equipment 6 80 05-16-14 09-09-14P001-5R1F5 Fab/Deliver - Basic Elevator Equipment 4 80 06-27-14 10-21-14P001-5R1F1 Fab/Deliver - Basic Elevator Equipment 1 80 08-15-14 12-09-14P001-5R1F3 Fab/Deliver - Basic Elevator Equipment 2 80 08-15-14 12-09-14P001-5R1F6 Fab/Deliver - Cab, Signal & Entrances - Elevator 4 60 09-05-14 12-01-14P001-5R1F8 Fab/Deliver - Cab, Signal & Entrances - Elevator 6 60 10-09-14 01-06-15P001-5R1F2 Fab/Deliver - Cab, Signal & Entrances - Elevator 1 60 11-20-14 02-17-15P001-5R1F4 Fab/Deliver - Cab, Signal & Entrances - Elevator 2 60 01-07-15 03-31-15

Elevator 3Elevator 3 80 03-13-15 07-06-15

P002-5R1F2 Fab/Deliver - Cab, Signal & Entrances - Elevator 3 60 03-13-15 06-05-15P002-5R1F1 Fab/Deliver - Basic Elevator Equipment - Elevator 3 70 03-27-15 07-06-15

Elevator 5Elevator 5 85 10-13-14 02-12-15

P003-5R1F2 Fab/Deliver - Cab, Signal & Entrances - Elevator 5 60 10-13-14 01-08-15P003-5R1F1 Fab/Deliver - Basic Elevator Equipment - Elevator 5 70 11-03-14 02-12-15

Platform LifPlatform Lift 367 08-28-13 A 02-05-15

P004-5R1A1 Approve Submittals From Eng. - Platform Lift 10 08-28-13 A 04-09-14P004-5R1F1 Fab/Deliver - Basic Elevator Equipment - Platform Lift 50 11-24-14 02-05-15

FireproofingFireproofing 0 03-30-16 03-30-16

Q003-8N1C10 Fireproofing - Initial Inspection 0 03-30-16Building EnvBuilding Envelope 208 11-20-13 A 10-30-14

P000-5Q5ES Prepare Submittals - Stainless Steel Shingles 20 11-20-13 A 04-21-14P000-5Q2S Prepare Submittals - Glazing Systems 40 11-26-13 A 05-05-14P000-5Q2S1 Building Envelope Submittal Summary 40 11-26-13 A 05-05-14P000-5V1BA1 Approve Submittals - Mock Up 10 12-17-13 A 04-08-14P000-5V1BF1 Fab/Deliver - Mock Up 25 01-06-14 A 04-11-14P000-5Q3AA Approve Submittals From Eng. - Alum. Entrance Doors 15 02-12-14 A 04-23-14P000-5Q4DS Prepare Submittals - Special Soffits 15 04-03-14 04-23-14P000-5Q1S Prepare Submittals - Ext. Wall Backup Sy stem 20 04-03-14 04-30-14P000-5Q2A Approve Submittals From Eng. - Glazing Systems 40 04-03-14 05-29-14P000-5Q5EA Approve Submittals From Eng. - Stainless Steel Shingles 20 04-22-14 05-19-14P000-5Q4DA Approve Submittals From Eng. - Special Soffits 15 04-24-14 05-14-14P000-5Q3AF Fab/Deliver - Alum. Entrance Doors 40 04-24-14 06-19-14P000-5Q1A Approve Submittals From Eng. - Ext. Wall Backup Sys tem 40 05-01-14 06-26-14P000-5Q4DF Fab/Deliver - Special Soffits 45 05-15-14 07-18-14P000-5Q5EF Fab/Deliver - Stainless Steel Shingles 115 05-20-14 10-30-14P000-5Q2F Fab/Deliver - Glazing Systems 85 05-30-14 09-29-14

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2014 2015 2016

12-08-14*, Project 0257005 - Fireproofing Substantial CompletionProject 0257008 - Roofing Substantial Completion 01-14-15*

Project 0257007 - Building Envelope Substantial Completion 03-04-15*Project 0257006 - Site Utilities Substantial Completion 08-20-15*

Project 0257016 - Hardscapes Substantial Completion 10-05-15*Project 0257015 - Landscaping Substantial Completion 10-07-15*

Project 0257009 - Mechanical Substantial Completion 12-23-15*Project 0257010 - Electrical Substantial Completion 12-23-15*

Project 0257011 - Fire Sprinkler System Substantial Completion 12-23-15*Project 0257017 - Site Services Substantial Completion 01-20-16*

Project 0257004 - Conveying Substantial Completion 01-22-16*Project 0257012 - Interior General Substantial Completion 01-29-16

Project 0257013 - Theatrical & Acoustical Equipment Substantial Completion 03-04-16Project 0257014 - A/V Equipment Substant ial Completion 03-04-16

Pkg#17 Seq 59-66 South L2032000 - Rebar Level 1 Slab on Grade032000 - Rebar SOMD Level 2032000 - Rebar SOMD Level 3032000 - Rebar SOMD Level 4Pkg#18 Seq 67-71 South L3 Portion 1Pkg#19 Seq 72-75 South L3 Portion 2Pkg#20 Seq 76-77 ALL L4Pkg#21 Seq 78-79 Roof SouthPkg#22 Seq 80-81 Perimeter Roof Framing

04-08-14, FRP Slab on Grade - Preparatory Meeting04-25-14, FRP Slab on Grade - Initial Inspection

06-13-14, Elevators - Preparatory Meeting10-21-14, Elevators - Initial Inspection

Fab/Deliver - Basic Elevator Equipment 6Fab/Deliver - Basic Elevator Equipment 4

Fab/Deliver - Basic Elevator Equipment 1Fab/Deliver - Basic Elevator Equipment 2

Fab/Deliver - Cab, Signal & Entrances - Elevator 4Fab/Deliver - Cab, Signal & Entrances - Elevator 6

Fab/Deliver - Cab, Signal & Entrances - Elevator 1Fab/Deliver - Cab, Signal & Entrances - Elevator 2

Fab/Deliver - Cab, Signal & Entrances - Elevator 3Fab/Deliver - Basic Elevator Equipment - Elevator 3

Fab/Deliver - Cab, Signal & Entrances - Elevator 5Fab/Deliver - Basic Elevator Equipment - Elevator 5

Approve Submittals From Eng. - Platform LiftFab/Deliver - Basic Elevator Equipment - Platform Lift

Fireproofing - Initial Inspection 03-30-16

Prepare Submittals - Stainless Steel ShinglesPrepare Submittals - Glazing SystemsBuilding Envelope Submittal Summary

Approve Submittals - Mock UpFab/Deliver - Mock Up

Approve Submittals From Eng. - Alum. Entrance DoorsPrepare Submittals - Special Soffits

Prepare Submittals - Ext. Wall Backup Sy stemApprove Submittals From Eng. - Glazing Systems

Approve Submittals From Eng. - Stainless Steel ShinglesApprove Submittals From Eng. - Special Soffits

Fab/Deliver - Alum. Entrance DoorsApprove Submittals From Eng. - Ext. Wall Backup Sys tem

Fab/Deliver - Special SoffitsFab/Deliver - Stainless Steel Shingles

Fab/Deliver - Glazing Systems

10030018-84Hancher Auditorium Replacement Facility 2 of 32 04-04-14

Milestone

Summary

Planned Work

Progressed Work

Critical Work

Crew 1

Crew 2

Primary Milestone

Hancher Auditorium Replacement - Construct New FacilityUniversity of Iowa

Project Layout - Data Date: 04-02-14

Page 3: Project SumProject Summary and Milestones · SM-1A5X1 Initial Substantial Completion (CO) 0 01-22-16 SM-1A18X3 Final Clean Complete 0 01-29-16 SM-1A5X4 Final Substantial Completion

- Activity ID Activity Name Orig.Dur'n

Start Finish

P000-5Q1F Fab/Deliver - Ext. Wall Backup Sy stem 30 06-27-14 08-08-14Q002-8Q2 Glazing Systems - Preparatory Meeting 0 07-28-14Q003-8Q2 Glazing Systems - Initial Inspection 0 07-29-14Q002-8Q4D Special Soffits - Preparatory Meeting 0 08-27-14Q003-8Q4D Special Soffits - Initial Inspection 0 08-28-14Q002-8Q5E Stainless Steel Shingles - Preparatory Meeting 0 09-03-14Q003-8Q5E Stainless Steel Shingles - Initial Inspection 0 09-03-14Q002-8Q3A Alum. Entrance Doors - Preparatory Meeting 0 09-04-14Q003-8Q3A Alum. Entrance Doors - Initial Inspection 0 09-05-14

RoofingRoofing 87 04-03-14 08-06-14

P000-5Q5DF Fab/Deliver - Built Up Roof 20 04-03-14 04-30-14Q002-8Q5 Roof Systems - Preparatory Meeting 0 07-22-14Q003-8Q5 Roof Systems - Initial Inspection 0 08-06-14

MechanicalMechanical 120 03-05-14 A 09-22-14

P000-5S3A Approve Submittals From Eng. - Plumbing 10 03-05-14 A 04-09-14P000-5S4EA Approve Submittals From Eng. - HVAC Piping 10 03-05-14 A 04-09-14P000-5S4A Approve Submittals From Eng. - HVAC 10 03-06-14 A 04-09-14P000-5T1S1 Submittals - Mechanical/Plumbing 60 04-03-14 06-26-14P000-5S3F Fab/Deliver - Plumbing 60 04-07-14 06-30-14P000-5S4EF Fab/Deliver - HVAC Piping 60 04-07-14 06-30-14Q003-8T15 UG Utilities - Initial Inspection 0 04-10-14P000-5S4F Fab/Deliver - HVAC 60 05-22-14 08-15-14P000-5T1A Approve Submittals From Eng. - Mechanical Equipment 10 06-13-14 06-26-14Q002-8T1 Mechanical Equipment - Preparatory Meeting 0 06-19-14P000-5T1F Fab/Deliver - Mechanical Equipment 60 06-27-14 09-22-14P000-5T1S2 Fab/Deliver - Mechanical/Plumbing 60 06-27-14 09-22-14Q003-8T1 Mechanical Equipment - Initial Inspection 0 07-07-14Q002-8S3 Plumbing - Preparatory Meeting 0 07-11-14Q003-8S3 Plumbing - Initial Inspection 0 08-01-14Q003-8S4 HVAC - Initial Inspection 0 08-01-14Q003-8S4E HVAC Piping - Initial Inspection 0 08-01-14Q002-8U4B HVAC Finishes - Preparatory Meeting 0 08-28-14Q003-8U4B HVAC Finishes - Initial Inspection 0 09-15-14

ElectricalElectrical 287 03-10-14 A 05-20-15

P000-5S7A Approve Submittals From Eng. - Electrical 10 03-10-14 A 04-09-14P000-5V3CS Prepare Submittals - Site Lighting 15 04-03-14 04-23-14P000-5T1S3 Submittals - Electrical 60 04-03-14 06-26-14P000-5S7F Fab/Deliver - Electrical 60 04-10-14 07-03-14P000-5V3CA Approve Submittals - Site Lighting 10 04-24-14 05-07-14Q003-8S7 Electrical - Initial Inspection 0 05-22-14Q002-8T2 Electrical Equipment - Preparatory Meeting 0 05-29-14Q003-8T2 Electrical Equipment - Initial Inspection 0 06-13-14P000-5T2A Approve Submittals From Eng. - Electrical Equipment 10 06-13-14 06-26-14P000-5T2F Fab/Deliver - Electrical Equipment 60 06-27-14 09-22-14P000-5T1S4 Fab/Deliver - Electrical 60 06-27-14 09-22-14Q002-8U4D Electrical Finishes - Preparatory Meeting 0 09-24-14Q003-8U4D Electrical Finishes - Initial Inspection 0 10-15-14P000-5V3CF Fab/Deliver - Site Lighting 80 12-08-14 03-31-15Q002-8V3C Site Lighting - Preparatory Meeting 0 05-05-15Q003-8V3C Site Lighting - Initial Inspection 0 05-20-15

Fire SprinkleFire Sprinkler System 120 04-03-14 09-22-14

P000-5S5S Prepare Submittals - Fire Protection 15 04-03-14 04-23-14P000-5T1S5 Submittals - Fire Sprinkler System 60 04-03-14 06-26-14P000-5S5A Approve Submittals From Eng. - Fire Protection 10 04-24-14 05-07-14P000-5S5F Fab/Deliver - Fire Protection 60 05-08-14 08-01-14Q002-8S5 Fire Protection - Preparatory Meeting 0 05-29-14Q002-8T5 Fire Protection Equipment - Preparatory Meeting 0 05-29-14P000-5T5A Approve Submittals From Eng. - Fire Protection Equipment 10 06-13-14 06-26-14Q003-8S5 Fire Protection - Initial Inspection 0 06-16-14Q003-8T5 Fire Protection Equipment - Initial Inspection 0 06-19-14P000-5T5F Fab/Deliver - Fire Protection Equipment 60 06-27-14 09-22-14P000-5T1S6 Fab/Deliver - Fire Sprinkler System 60 06-27-14 09-22-14

Interior GeneInterior General 358 12-02-13 A 06-26-15

P000-5U9ES Prepare Submittals & Sample - Theater Seating 40 12-02-13 A 05-29-14P000-5S8S Prepare Submittals - Architectural Rough-In 15 12-02-13 A 04-23-14P000-5U2S Prepare Submittals - Wall Finishes 15 12-02-13 A 04-23-14P000-5U5S Prepare Submittals - Interior Doors & Windows 15 12-02-13 A 04-23-14P000-5U6S Prepare Submittals - Floor Finishes 15 12-02-13 A 04-23-14P000-5U6DS Prepare Submittals - Terrazzo Flooring 15 12-02-13 A 04-23-14

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2014 2015 2016

Fab/Deliver - Ext. Wall Backup System07-28-14, Glazing Systems - Preparatory Meeting07-29-14, Glazing Systems - Initial Inspection

08-27-14, Special Soffits - Preparatory Meeting08-28-14, Special Soffits - Initial Inspection

09-03-14, Stainless Steel Shingles - Preparatory Meeting09-03-14, Stainless Steel Shingles - Initial Inspection09-04-14, Alum. Entrance Doors - Preparatory Meeting09-05-14, Alum. Entrance Doors - In itial Inspection

Fab/Deliver - Built Up Roof07-22-14, Roof Systems - Preparatory Meeting

08-06-14, Roof Systems - Initial Inspection

Approve Submittals From Eng. - PlumbingApprove Submittals From Eng. - HVAC PipingApprove Submittals From Eng. - HVAC

Submittals - Mechanical/PlumbingFab/Deliver - PlumbingFab/Deliver - HVAC Piping

04-10-14, UG Utilities - Initial InspectionFab/Deliver - HVAC

Approve Submittals From Eng. - Mechanical Equipment06-19-14, Mechanical Equipment - Preparatory Meeting

Fab/Deliver - Mechanical EquipmentFab/Deliver - Mechanical/Plumbing

07-07-14, Mechanical Equipment - Initial Inspection07-11-14, Plumbing - Preparatory Meeting

08-01-14, Plumbing - Initial Inspection08-01-14, HVAC - Initial Inspection08-01-14, HVAC Piping - Initial Inspection

08-28-14, HVAC Finishes - Preparatory Meeting09-15-14, HVAC Finishes - Initial Inspection

Approve Submittals From Eng. - ElectricalPrepare Submittals - Site Lighting

Submittals - ElectricalFab/Deliver - Electrical

Approve Submittals - Site Lighting05-22-14, Electrical - Initial Inspection

05-29-14, Electrical Equipment - Preparatory Meeting06-13-14, Electrical Equipment - Initial Inspection

Approve Submittals From Eng. - Electrical EquipmentFab/Deliver - Electrical EquipmentFab/Deliver - Electrical09-24-14, Electrical Finishes - Preparatory Meeting

10-15-14, Electrical Finishes - Initial InspectionFab/Deliver - Site Lighting

Site Lighting - Preparatory Meeting 05-05-15Site Lighting - Initial Inspection 05-20-15

Prepare Submittals - Fire ProtectionSubmittals - Fire Sprinkler System

Approve Submittals From Eng. - Fire ProtectionFab/Deliver - Fire Protection

05-29-14, Fire Protection - Preparatory Meeting05-29-14, Fire Protection Equipment - Preparatory Meeting

Approve Submittals From Eng. - Fire Protection Equipment06-16-14, Fire Protection - Initial Inspection06-19-14, Fire Protection Equipment - Initial Inspection

Fab/Deliver - Fire Protection EquipmentFab/Deliver - Fire Sprinkler System

Prepare Submittals & Sample - Theater SeatingPrepare Submittals - Architectural Rough-InPrepare Submittals - Wall FinishesPrepare Submittals - Interior Doors & WindowsPrepare Submittals - Floor FinishesPrepare Submittals - Terrazzo Flooring

10030018-84Hancher Auditorium Replacement Facility 3 of 32 04-04-14

Milestone

Summary

Planned Work

Progressed Work

Critical Work

Crew 1

Crew 2

Primary Milestone

Hancher Auditorium Replacement - Construct New FacilityUniversity of Iowa

Project Layout - Data Date: 04-02-14

Page 4: Project SumProject Summary and Milestones · SM-1A5X1 Initial Substantial Completion (CO) 0 01-22-16 SM-1A18X3 Final Clean Complete 0 01-29-16 SM-1A5X4 Final Substantial Completion

- Activity ID Activity Name Orig.Dur'n

Start Finish

P000-5U7S Prepare Submittals - Stair Finishes 15 12-02-13 A 04-23-14P000-5S2S Prepare Submittals - Stairs 20 12-02-13 A 04-30-14P000-5S8CS Prepare Submittals - Interior Misc. Metals 20 12-02-13 A 04-30-14P000-5U5ES Prepare Submittals - Interior Glass & Glazing 20 12-02-13 A 04-30-14P000-5U7AS Prepare Submittals - Grand Staircase Finishes 20 12-02-13 A 04-30-14P000-5U6A Approve Submittals - Floor Finishes 10 12-05-13 A 05-07-14P000-5U2A Approve Submittals - Wall Finis hes 10 12-10-13 A 05-07-14P000-5U5A Approve Submittals - Interior Doors & Windows 10 12-18-13 A 05-07-14P000-5U5EA Approve Submittals - Interior Glass & Glazing 10 01-03-14 A 05-14-14P000-5P3A Approve Submittals From Eng. - Masonry Structure 20 01-07-14 A 04-21-14P000-5U3A Approve Submittals - Ceiling Finishes 10 01-09-14 A 04-16-14P000-5S2A Approve Submittals From Eng. - Stairs 10 01-13-14 A 04-16-14P000-5U6DA Approve Submittals - Terrazzo Flooring 10 02-21-14 A 05-07-14P000-5U9EA Approve Submittals & Sample From Eng. - Theater Seating 10 02-24-14 A 06-12-14P000-5U7F1 Fab/Deliver - Glass Railings for Stair/Balconies 35 04-03-14 05-21-14Q003-8S8 Architectural Rough-In - Initial Inspection 0 04-07-14Q002-8P3 Masonry Structure - Preparatory Meeting 0 04-08-14P000-5S2F Fab/Deliver - Stairs 30 04-17-14 05-29-14Q003-8P3 Masonry Structure - Initial Inspection 0 04-21-14P000-5P3F Fab/Deliver - Masonry Structure 15 04-22-14 05-12-14P000-5U7A Approve Submittals - Stair Finishes 10 04-24-14 05-07-14P000-5S8A Approve Submittals From Eng. - Architectural Rough-In 15 04-24-14 05-14-14P000-5S8CA Approve Submittals From Eng. - Interior Misc. Metals 10 05-01-14 05-14-14P000-5U7AA Approve Submittals - Grand Staircase Finishes 10 05-01-14 05-14-14P000-5U6DF Fab/Deliver - Terrazzo Flooring 30 05-08-14 06-19-14P000-5S8F Fab/Deliver - Architectural Rough-In 15 05-15-14 06-05-14P000-5U2F Fab/Deliver - Wall Finishes 30 05-20-14 07-01-14P000-5U5F Fab/Deliver - Interior Doors & Windows 80 06-11-14 10-02-14P000-5S8CF Fab/Deliver - Interior Misc. Metals 15 06-13-14 07-03-14Q002-8U2 Wall Finishes - Preparatory Meeting 0 06-17-14Q002-8S2 Stairs - Preparatory Meeting 0 06-19-14Q002-8S8C Interior Misc. Metals - Preparatory Meeting 0 07-03-14Q003-8S2 Stairs - Initial Inspection 0 07-07-14P000-5U3F Fab/Deliver - Ceiling Finishes 40 07-07-14 08-29-14Q003-8S8C Interior Misc. Metals - Initial Inspection 0 07-08-14Q003-8U2 Wall Finishes - Initial Inspec tion 0 07-09-14P000-5Q6EF Fab/Deliver - Face Brick 30 07-24-14 09-04-14Q002-8U3 Ceiling Finishes - Preparatory Meeting 0 08-15-14Q002-8Q1E Face Brick - Preparatory Meeting 0 08-20-14Q003-8U3 Ceiling Finishes - Initial Inspection 0 09-03-14Q003-8Q1E Face Brick - Initial Inspection 0 09-05-14P000-5U6F Fab/Deliver - Floor Finishes 20 09-10-14 10-07-14P000-5U5EF Fab/Deliver - Interior Glass & Glazing 40 10-06-14 12-02-14Q002-8U6 Floor Finishes - Preparatory Meeting 0 10-07-14Q002-8U5 Interior Doors & Windows - Preparatory Meeting 0 10-08-14Q003-8U6 Floor Finishes - Initial Inspection 0 10-23-14Q003-8U5 Interior Doors & Windows - Initial Inspection 0 10-29-14P000-5U7F Fab/Deliver - Stair Finishes 30 12-02-14 01-14-15P000-5U7AF Fab/Deliver - Grand Staircase Finishes 40 12-22-14 02-17-15Q002-8U7 Stair Finishes - Preparatory Meeting 0 12-30-14P000-5U9EF Fab/Deliver - Theater Seating 120 01-08-15 06-25-15Q003-8U7 Stair Finishes - Initial Inspection 0 01-15-15Q002-8U6D Terrazzo Flooring - Preparatory Meeting 0 02-03-15Q002-8U7A Grand Staircase Finishes - Preparatory Meeting 0 02-03-15Q003-8U6D Terrazzo Flooring - Initial Inspection 0 02-18-15Q003-8U7A Grand Staircase Finishes - Initial Inspection 0 02-18-15Q002-8U9E Theater Seating - Preparatory Meeting 0 06-11-15Q003-8U9E Theater Seating - Initial Inspection 0 06-26-15

Theatrical & Theatrical & Acoustical Equipment 506 04-03-14 03-30-16

P000-5T7HS Prepare Submittals - Rigging Components & Theater Equipment 20 04-03-14 04-30-14P000-5U9CS Prepare Submittals - Theater Finishes 20 04-03-14 04-30-14P000-5T7HA Approve Submittals From Eng. - Rigging Components & Theater Equip 10 05-01-14 05-14-14P000-5U9CA Approve Submittals - Theater Finishes 10 05-01-14 05-14-14P000-5T7HF Fab/Deliver - Rigging Components & Theater Equipment 60 05-15-14 08-08-14Q002-8T7H Rigging Components & Theater Equipment - Preparatory Meeting 0 08-28-14Q003-8T7H Rigging Components & Theater Equipment - Initial Inspection 0 09-26-14Q002-8U9C Theater Finishes - Preparatory Meeting 0 06-11-15Q003-8U9C Theater Finishes - Initial Inspection 0 06-26-15P000-5U9CF Fab/Deliver - Theater Finishes 120 10-09-15 03-30-16

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2014 2015 2016

Prepare Submittals - Stair FinishesPrepare Submittals - StairsPrepare Submittals - Interior Misc. MetalsPrepare Submittals - Interior Glass & GlazingPrepare Submittals - Grand Staircase Finishes

Approve Submittals - Floor FinishesApprove Submittals - Wall FinishesApprove Submittals - Interior Doors & Windows

Approve Submittals - Interior Glass & GlazingApprove Submittals From Eng. - Masonry Structure

Approve Submittals - Ceiling FinishesApprove Submittals From Eng. - Stairs

Approve Submittals - Terrazzo FlooringApprove Submittals & Sample From Eng. - Theater Seating

Fab/Deliver - Glass Railings for Stair/Balconies04-07-14, Architectural Rough-In - Initial Inspection04-08-14, Masonry Structure - Preparatory Meeting

Fab/Deliver - Stairs04-21-14, Masonry Structure - Initial Inspection

Fab/Deliver - Masonry StructureApprove Submittals - Stair Finishes

Approve Submittals From Eng. - Architectural Rough-InApprove Submittals From Eng. - Interior Misc. MetalsApprove Submittals - Grand Staircase Finishes

Fab/Deliver - Terrazzo FlooringFab/Deliver - Architectural Rough-In

Fab/Deliver - Wall FinishesFab/Deliver - Interior Doors & Windows

Fab/Deliver - Interior Misc. Metals06-17-14, Wall Finishes - Preparatory Meeting06-19-14, Stairs - Preparatory Meeting

07-03-14, Interior Misc. Metals - Preparatory Meeting07-07-14, Stairs - Initial Inspection

Fab/Deliver - Ceiling Finishes07-08-14, Interior Misc. Metals - Initial Inspection07-09-14, Wall Finishes - Initial Inspec tion

Fab/Deliver - Face Brick08-15-14, Ceiling Finishes - Preparatory Meeting

08-20-14, Face Brick - Preparatory Meeting09-03-14, Ceiling Finishes - Initial Inspection09-05-14, Face Brick - Initial Inspection

Fab/Deliver - Floor FinishesFab/Deliver - Interior Glass & Glazing

10-07-14, Floor Finishes - Preparatory Meeting10-08-14, Interior Doors & Windows - Preparatory Meeting

10-23-14, Floor Finishes - Initial Inspection10-29-14, Interior Doors & Windows - Initial Inspection

Fab/Deliver - Stair FinishesFab/Deliver - Grand Staircase Finishes

12-30-14, Stair Finishes - Preparatory MeetingFab/Deliver - Theater Seating

Stair Finishes - Initial Inspection 01-15-15Terrazzo Flooring - Preparatory Meeting 02-03-15

Grand Staircase Finishes - Preparatory Meeting 02-03-15Terrazzo Flooring - Initial Inspection 02-18-15

Grand Staircase Finishes - Initial Inspection 02-18-15Theater Seating - Preparatory Meeting 06-11-15

Theater Seating - Initial Inspection 06-26-15

Prepare Submittals - Rigging Components & Theater EquipmentPrepare Submittals - Theater Finishes

Approve Submittals From Eng. - Rigging Components & Theater EquipmentApprove Submittals - Theater Finishes

Fab/Deliver - Rigging Components & Theater Equipment08-28-14, Rigging Components & Theater Equipment - Preparatory Meeting

09-26-14, Rigging Components & Theater Equipment - Initial InspectionTheater Finishes - Preparatory Meeting 06-11-15

Theater Finishes - Initial Inspection 06-26-15Fab/Deliver - Theater Finishes

10030018-84Hancher Auditorium Replacement Facility 4 of 32 04-04-14

Milestone

Summary

Planned Work

Progressed Work

Critical Work

Crew 1

Crew 2

Primary Milestone

Hancher Auditorium Replacement - Construct New FacilityUniversity of Iowa

Project Layout - Data Date: 04-02-14

Page 5: Project SumProject Summary and Milestones · SM-1A5X1 Initial Substantial Completion (CO) 0 01-22-16 SM-1A18X3 Final Clean Complete 0 01-29-16 SM-1A5X4 Final Substantial Completion

- Activity ID Activity Name Orig.Dur'n

Start Finish

A/V EquipmeA/V Equipment 506 04-03-14 03-30-16

Q002-8S7F A/V Equipment - Preparatory Meeting 0 04-03-14Q003-8S7F A/V Equipment - Initial Inspection 0 04-03-14P000-5U9CS1 Prepare Submittals - A/V Equipment 20 04-03-14 04-30-14P000-5U9CA1 Approve Submittals - A/V Equipment 10 05-01-14 05-14-14P000-5U9CF1 Fab/Deliver - A/V Equipment 120 10-09-15 03-30-16

LandscapingLandscaping 250 12-09-13 A 04-10-15

P000-5V5A Approve Submittals - Landscape 10 12-09-13 A 04-16-14P000-5V5F Fab/Deliver - Landscape 20 04-17-14 05-14-14P000-5V3BS Prepare Submittals - Site Furnishings 15 04-28-14 05-16-14P000-5V3BA Approve Submittals - Site Furnishings 10 05-19-14 06-02-14P000-5V3BF Fab/Deliver - Site Furnishings 30 06-03-14 07-15-14Q002-8V5 Landscape - Preparatory Meeting 0 03-27-15Q003-8V5 Landscape - Initial Inspection 0 04-10-15

HardscapesHardscapes 347 04-28-14 09-09-15

P000-5V1BS Prepare Submittals - Concrete Paving 15 04-28-14 05-16-14P000-5V2S Prepare Submittals - Hardscape 15 04-28-14 05-16-14P000-5V1BA Approve Submittals - Concrete Paving 10 05-19-14 06-02-14P000-5V2A Approve Submittals - Hardscape 10 05-19-14 06-02-14Q002-8V1 Roads and Parking Lots - Preparatory Meeting 0 03-17-15Q002-8V2 Hardscape - Preparatory Meeting 0 03-20-15Q003-8V1 Roads and Parking Lots - Initial Inspection 0 04-01-15Q003-8V2 Hardscape - Initial Inspection 0 04-10-15Q002-8V3B Site Furnishings - Preparatory Meeting 0 08-24-15Q003-8V3B Site Furnishings - Initial Inspection 0 09-09-15ProcurementProcurement 25 03-31-14 A 05-02-14

Rough-InRough-In 25 03-31-14 A 05-02-14

VDC MEP CVDC MEP Coordination 25 03-31-14 A 05-02-14

P000-5S7 VDC MEP Coordination - Second Floor 15 03-31-14 A 04-18-14P000-5S8 VDC MEP Coordination - Third Floor 10 04-21-14 05-02-14

External CoExternal Considerations 401 08-30-14 03-30-16

Hawkeye HomHawkeye Home Football Dates 448 08-30-14 11-21-15

H001-1A3A2 VS Northern Iowa 0 08-30-14*H002-1A3A2 VS Ball State 0 09-06-14*H003-1A3A2 VS Iowa State 0 09-13-14*H004-1A3A2 VS Indiana 0 10-11-14*H005-1A3A2 VS Northwestern 0 11-01-14*H006-1A3A2 VS Wisconsin 0 11-22-14*H007-1A3A2 VS Nebraska 0 11-28-14*H001-1A3A3 VS Illinois State 0 09-05-15*H002-1A3A3 VS Pittsburgh 0 09-19-15*H003-1A3A3 VS North Texas 0 09-26-15*H004-1A3A3 VS Illinois 0 10-10-15*H005-1A3A3 VS Maryland 0 10-31-15*H006-1A3A3 VS Minnesota 0 11-14-15*H007-1A3A3 VS Purdue 0 11-21-15*City of Iowa CCity of Iowa City Construction 254 04-01-15 03-30-16

U000-7V2 Park Street & Bridge Construction - by City - Apr il Start, Complete 201 254 04-01-15* 03-30-16

Temporary Temporary Construction 199 08-28-14 06-10-15

General TempGeneral Temporary Enclosures 20 08-28-14 09-25-14

C2-8M85 Build/Erect Temp Enclosure 20 08-28-14 09-25-14Temporary ExTemporary Expansion Joint 40 04-15-15 06-10-15

C2-8M86 Pour Fill at Temp. Expansion 5 04-15-15* 04-21-15C2-8M87 Enclosure Work at Temp. Expansion 15 04-22-15 05-12-15C2-8M88 Complete Finishes at Temp. Expansion 20 05-13-15 06-10-15

SiteSite 424 03-05-13 A 11-07-14

Site Prep, ExcSite Prep, Excavation 307 03-05-13 A 05-14-14

1000-8M Site Prep, Excavation & Backfill Summary 111 03-05-13 A 05-06-141000-8M3D2 SWPPP Monitoring 307 03-12-13 A 05-14-14C2-8M79 Backfill Walls - Seq. 3 15 03-24-14 A 04-16-141000-8L7C3 Grade Old Hancher Area 5 03-26-14 A 04-09-14C2-8M62 Grade Site 20 04-17-14 05-14-14UtilitiesUtilities 173 03-06-14 A 11-07-14

S000-8M54 Storm Sewer MH#19 Intake 19A,19B,19C,19D (Road Closure) 3 03-06-14 A 04-14-14S000-8M5 Utilities Summary 116 03-07-14 A 08-01-14S000-8M84 Phase C&D West Parking Lot 38 03-10-14 A 04-30-14

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2014 2015 2016

04-03-14, A/V Equipment - Preparatory Meeting04-03-14, A/V Equipment - Init ial Inspection

Prepare Submittals - A/V EquipmentApprove Submittals - A/V Equipment

Fab/Deliver - A/V Equipment

Approve Submittals - LandscapeFab/Deliver - LandscapePrepare Submittals - Site Furnishings

Approve Submittals - Site FurnishingsFab/Deliver - Site Furnishings

Landscape - Preparatory Meeting 03-27-15Landscape - Initial Inspection 04-10-15

Prepare Submittals - Concrete PavingPrepare Submittals - Hardscape

Approve Submittals - Concrete PavingApprove Submittals - Hardscape

Roads and Parking Lots - Preparatory Meeting 03-17-15Hardscape - Preparatory Meeting 03-20-15

Roads and Parking Lots - Initial Inspection 04-01-15Hardscape - Initial Inspection 04-10-15

Site Furnishings - Preparatory Meeting 08-24-15Site Furnishings - Initial Inspection 09-09-15

VDC MEP Coordination - Second FloorVDC MEP Coordination - Third Floor

08-30-14*, VS Northern Iowa09-06-14*, VS Ball State

09-13-14*, VS Iowa State10-11-14*, VS Indiana

11-01-14*, VS Northwestern11-22-14*, VS Wisconsin

11-28-14*, VS NebraskaVS Illinois State 09-05-15*

VS Pittsburgh 09-19-15*VS North Texas 09-26-15*

VS Illinois 10-10-15*VS Maryland 10-31-15*

VS Minnesota 11-14-15*VS Purdue 11-21-15*

Park Street & Bridge Construction - by City - Apr il Start, Complete 2017

Build/Erect Temp Enclosure

Pour Fill at Temp. ExpansionEnclosure Work at Temp. Expansion

Complete Finishes at Temp. Expansion

Site Prep, Excavation & Backfill SummarySWPPP Monitoring

Backfill Walls - Seq. 3Grade Old Hancher Area

Grade Site

Storm Sewer MH#19 Intake 19A,19B,19C,19D (Road Closure)Utilities Summary

Phase C&D West Parking Lot

10030018-84Hancher Auditorium Replacement Facility 5 of 32 04-04-14

Milestone

Summary

Planned Work

Progressed Work

Critical Work

Crew 1

Crew 2

Primary Milestone

Hancher Auditorium Replacement - Construct New FacilityUniversity of Iowa

Project Layout - Data Date: 04-02-14

Page 6: Project SumProject Summary and Milestones · SM-1A5X1 Initial Substantial Completion (CO) 0 01-22-16 SM-1A18X3 Final Clean Complete 0 01-29-16 SM-1A5X4 Final Substantial Completion

- Activity ID Activity Name Orig.Dur'n

Start Finish

S000-8M150 Steam Vault #1 Finishes 20 03-25-14 A 04-21-14S000-8M64 Steam Vault #2 9 03-25-14 A 04-07-14S000-8M72 12" Water 50+00-54+20 Plus Fire Hydrant 5 03-26-14 A 04-03-14S000-8M70 Steam 90+00-93+80 20 03-26-14 A 04-28-14S000-8M80 Chilled Water 86+20-87+00 5 04-03-14 04-09-14S000-8M74 Steam Vault #3 9 04-03-14 04-15-14S000-8M90 Electrical Vault #5 10 04-03-14 04-16-14S000-8M88 Steam 93+80-97+50 17 04-03-14 04-25-14S000-8M160 Steam Vault #2 Finishes 20 04-08-14 05-05-14S000-8M76 12" Water 54+20-Building (Road Closure) 5 04-09-14 04-15-14S000-8M86 Chilled Water 87+00-Building 5 04-10-14 04-16-14S000-8M82 Electrical Vault #6 10 04-10-14 04-23-14S000-8M170 Steam Vault #3 Finishes 20 04-16-14 05-13-14S000-8M130 Storm Sewer Intake 30 1 04-17-14 04-17-14S000-8M102 Sanitary Sewer MH#3-Building 3 04-17-14 04-21-14S000-8M92 Sanitary Sewer MH3-2-1 & Tie in building out of #1 5 04-17-14 04-23-14S000-8M115 Storm Sewer MH#27,28 5 04-17-14 04-23-14S000-8M116 Storm Sewer MH#26,25,23, 22, Scour Box 5 04-17-14 04-23-14S000-8M140 Storm Sewer MH 11-Building (Road Closure) 5 04-17-14 04-23-14S000-8M94 Electrical Vault #4 10 04-17-14 04-30-14S000-8M52 Storm Sewer Northwest Intake #1,#2,#3, MH #4,#5,#6, 6A 5 04-24-14 04-30-14S000-8M87 8 Cell Electric 32+00-34+40 10 04-24-14 05-07-14S000-8M100 Electrical Vault #3 10 04-24-14 05-07-14S000-8M81 4" Electric Cell 80+20-83+52 15 04-24-14 05-14-14S000-8M98 Steam 99+20-Building 10 04-28-14 05-09-14S000-8M96 Steam 10+00-11+36 (Cross Temp Road, Two Crews) 15 04-28-14 05-16-14S000-8M55 Storm Sewer Northeast MH#8-Intake #7,7A, Intake #6 5 05-01-14 05-07-14S000-8M103 Fiber Optic Vault #1 10 05-01-14 05-14-14S000-8M119 Fiber Optic Directional Bore Existing Vault to Vault 1 10 05-01-14 05-14-14S000-8M114 Electrical Vault #2 10 05-05-14 05-16-14S000-8M91 Storm Sewer Intake #17A.B.C to Building 5 05-06-14 05-12-14S000-8M93 8 Cell Electric 29+70-32+00 10 05-08-14 05-21-14S000-8M118 Phase J (Riverside & Park) 5 05-12-14* 05-16-14S000-8M104 Steam 97+80-99+20 10 05-12-14 05-23-14S000-8M105 Fiber Optic 3 Cell 25 05-15-14 06-19-14S000-8M97 8 Cell Electric 26+50-29+70 10 05-22-14 06-05-14S000-8M120 Fiber Optic Vault #2 10 05-22-14 06-05-14S000-8M107 Phase E,F,G (Demo & Boring Elec & Water ) 15 06-02-14* 06-20-14S000-8M101 8 Cell Electric 24+50-26+50 10 06-06-14 06-19-14S000-8M106 Water Fire Hydrant on Park Rd 5 06-16-14 06-20-14S000-8M108 12" Water Phase E,F,G 3+80-7+ 00 plus hydrant 5 06-16-14 06-20-14S000-8M110 Phase E,F,G Storm Sewer MH#18-17,16-13 5 06-16-14 06-20-14S000-8M111 Phase E,F,G 8 Cell Electric 22+50-24+50 20 06-20-14 07-18-14S000-8M109 Storm Sewer MH#18-Intake #36 #770, Intake #35 5 06-23-14 06-27-14S000-8M112 Phase E.F.G Drain Tile & Sub Grade Prep 5 07-07-14 07-11-14S000-8M113 Phase E,F,G Concrete Paving 15 07-14-14 08-01-14*S000-8M58 Storm Sewer Intake 10-10A-Detention Pond (Road Closure) 5 10-27-14 10-31-14S000-8M59 Storm Sewer East MH#10-9-8 5 10-27-14 10-31-14S000-8M83 Storm Sewer MH#11-10 Water Quality Unit 5 11-03-14 11-07-14

Core StructCore Structure 403 10-01-13 A 05-13-15

FoundationsFoundations 403 10-01-13 A 05-13-15

PitsPits 0 05-13-15 05-13-15

Orchestra POrchestra Pit 0 05-13-15 05-13-15

1171-8R5 As-Built of Orchestra Pit & Storage 0 05-13-15Concrete WaConcrete Walls 152 10-01-13 A 05-16-14

Stage Core Stage Core Walls 152 10-01-13 A 05-16-14

1000-8P2B Stage Core Walls Summary 89 10-01-13 A 05-16-147240 FRP So. Stage Core Walls Lift 5 (lifts 6-7) 25 03-14-14 A 04-16-147250 FRP So. Stage Core Walls Lift 6 (lifts 8-10) 26 04-11-14 05-16-14

Auditorium Auditorium Core Walls 25 03-17-14 A 04-18-14

7540 FRP No. Audtorium Core Walls Lift 5 (lift 6) 15 03-17-14 A 04-07-147550 FRP No. Audtorium Core Walls Lift 6 (lift 7) 15 03-31-14 A 04-18-14

Basement WBasement Walls 52 12-23-13 A 04-24-14

8020 FRP Shear Wall FOH Seq 4 52 12-23-13 A 04-24-14StructureStructure 79 04-17-14 08-07-14

Stage StructStage Structure 79 04-17-14 08-07-14

1000-8P4B Stage Structure Summary (incl Precast) 79 04-17-14 08-07-14

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2014 2015 2016

Steam Vault #1 FinishesSteam Vault #2

12" Water 50+00-54+20 Plus Fire HydrantSteam 90+00-93+80

Chilled Water 86+20-87+00Steam Vault #3Electrical Vault #5

Steam 93+80-97+50Steam Vault #2 Finishes

12" Water 54+20-Building (Road Closure)Chilled Water 87+00-Building

Electrical Vault #6Steam Vault #3 Finishes

Storm Sewer Intake 30Sanitary Sewer MH#3-BuildingSanitary Sewer MH3-2-1 & Tie in building out of #1Storm Sewer MH#27,28Storm Sewer MH#26,25,23, 22, Scour BoxStorm Sewer MH 11-Building (Road Closure)

Electrical Vault #4Storm Sewer Northwest Intake #1,#2,#3, MH #4,#5,#6, 6A

8 Cell Electric 32+00-34+40Electrical Vault #3

4" Electric Cell 80+20-83+52Steam 99+20-Building

Steam 10+00-11+36 (Cross Temp Road, Two Crews)Storm Sewer Northeast MH#8-Intake #7,7A, Intake #6

Fiber Optic Vault #1Fiber Optic Directional Bore Existing Vault to Vault 1Electrical Vault #2

Storm Sewer Intake #17A.B.C to Building8 Cell Electric 29+70-32+00

Phase J (Riverside & Park)Steam 97+80-99+20

Fiber Optic 3 Cell8 Cell Electric 26+50-29+70Fiber Optic Vault #2

Phase E,F,G (Demo & Boring Elec & Water )8 Cell Electric 24+50-26+50Water Fire Hydrant on Park Rd12" Water Phase E,F,G 3+80-7+00 plus hydrantPhase E,F,G Storm Sewer MH#18-17,16-13

Phase E,F,G 8 Cell Electric 22+50-24+50Storm Sewer MH#18-Intake #36 #770, Intake #35

Phase E.F.G Drain Tile & Sub Gr ade PrepPhase E,F,G Concrete Paving

Storm Sewer Intake 10-10A-Detention Pond (Road Closure)Storm Sewer East MH#10-9-8

Storm Sewer MH#11-10 Water Quality Unit

As-Built of Orchestra Pit & Storage 05-13-15

Stage Core Walls SummaryFRP So. Stage Core Walls Lif t 5 (lif ts 6-7)

FRP So. Stage Core Walls Lif t 6 (lifts 8-10)

FRP No. Audtorium Core Walls Lift 5 (lift 6)FRP No. Audtorium Core Walls Lift 6 (lift 7)

FRP Shear Wall FO H Seq 4

Stage Structure Summary (incl Precast)

10030018-84Hancher Auditorium Replacement Facility 6 of 32 04-04-14

Milestone

Summary

Planned Work

Progressed Work

Critical Work

Crew 1

Crew 2

Primary Milestone

Hancher Auditorium Replacement - Construct New FacilityUniversity of Iowa

Project Layout - Data Date: 04-02-14

Page 7: Project SumProject Summary and Milestones · SM-1A5X1 Initial Substantial Completion (CO) 0 01-22-16 SM-1A18X3 Final Clean Complete 0 01-29-16 SM-1A5X4 Final Substantial Completion

- Activity ID Activity Name Orig.Dur'n

Start Finish

Secondary Secondary Structure 179 02-14-14 A 10-24-14

Mass Piling &Mass Piling & Mat Foundations 79 02-26-14 A 06-18-14

Upper ExcavUpper Excavation & Backfill 26 03-28-14 A 05-06-14

C2-8M84 Excavate & Backfill Pile Caps & Frost Walls Summary 26 03-28-14 A 05-06-14C2-8M83 Excavate & Backfill Pile Caps & Frost Walls - Seq. 4 5 03-31-14 A 04-09-14C2-8M59 Excavate & Backfill Pile Caps & Frost Walls - Seq. 1 5 04-10-14 04-16-14C2-8M81 Excavate & Backfill Pile Caps & Frost Walls - Seq. 2 5 04-22-14 04-28-14C2-8M82 Excavate & Backfill Pile Caps & Frost Walls - Seq. 3 5 04-30-14 05-06-14

Upper PilesUpper Piles 39 02-26-14 A 04-22-14

1101-8N1C1 Deliver Ph 2 H-Pile 20 02-26-14 A 04-14-141000-8N1C1 Piling - Phase 2 Summary 25 03-12-14 A 04-14-141101-8N1C3 H-Pile Ph 2 Seq 2 8 04-03-14 04-14-141101-8N1C4 H-Pile Ph 2 Seq 3 6 04-15-14 04-22-14

Upper Pile CUpper Pile Caps 32 03-24-14 A 05-06-14

1001-8N1D Upper Pile Caps Summary 32 03-24-14 A 05-06-1410530 Pile Caps 1st Floor Seq 4 10 03-25-14 A 04-04-1410500 Pile Caps 1st Floor Seq 1 11 03-28-14 A 04-14-1410510 Pile Caps 1st Floor Seq 2 10 04-15-14 04-28-1410520 Pile Caps 1st Floor Seq 3 10 04-23-14 05-06-14

Frost WallsFrost Walls 29 04-02-14 A 05-13-14

10999 Frost Walls 27 04-02-14 A 05-13-1411030 Frost Walls Seq 4 10 04-03-14 04-16-1411000 Frost Walls Seq 1 10 04-10-14 04-23-1411010 Frost Walls Seq 2 10 04-22-14 05-05-1411020 Frost Walls Seq 3 10 04-30-14 05-13-14

Upper UG UtUpper UG Utilities 38 04-03-14 05-27-14

1000-8M5 Upper UG Utilities 38 04-03-14 05-27-14MPC-254 Underground - Lower Level East 15 04-04-14 04-24-14MPC-255 Underground - Lower Level North 10 04-25-14 05-08-14MPC-256 Underground - Lower Level West 15 05-06-14 05-27-14

Upper Slab oUpper Slab on Grade 39 04-24-14 06-18-14

1000-8P1E Upper Slab on Grade Summary 39 04-24-14 06-18-1412530 Slab On Grade 1st Floor East 9 04-25-14 05-07-1412540 Slab On Grade 1st Floor North East 10 05-02-14 05-15-1412550 Slab On Grade 1st Floor North 10 05-09-14 05-22-1412500 Slab On Grade 1st Floor North West 10 05-16-14 05-30-1412510 Slab On Grade 1st Floor West 11 05-28-14 06-11-1412520 Slab On Grade 1st Floor South 11 06-04-14 06-18-14StructureStructure 179 02-14-14 A 10-24-14

Steel and DeSteel and Decking 179 02-14-14 A 10-14-14

1011-8P4B Steel and Decking Summary 179 02-14-14 A 10-14-1413010 Stl/Deck 1st Fl FOH South (Seq 2-3) 19 03-10-14 A 04-09-1413000 Stl/Deck 1st Flr BOH North (Seq 1) 20 03-21-14 A 04-16-149515 Stl/Deck Aud. Overbuild ( Seq 8-15) 26 03-24-14 A 04-23-149000 Stl/Deck - 1st Floor Stage (Seq 4-5) 22 04-18-14 05-14-149520 Stl/Deck Aud Tier 1 Balconies (Seq 16-20) 28 04-24-14 05-28-149530 Stl/Deck Aud Tier 2 Balconies (Seq 21-24) 28 05-01-14 06-04-149700 Stl/Deck Aud Tier 2 Balconies (Seq 25-27) 16 05-12-14 06-03-1413015 Stl/Deck East L2 & L3 (Seq 43-45) 32 05-12-14 06-25-149555 Stl/Deck Remaining Aud (Seq 28-29) 24 05-14-14 06-17-149020 Stl/Deck - Fly Loft Stage BOS Cap (Seq 30-31) 34 05-20-14 07-08-1413017 Stl/Deck NE L2 & L3 (Seq 46-48) 32 05-23-14 07-09-149560 Roof Trusses (Seq 32-35) 25 06-04-14 07-09-1413020 Stl/Deck North L2 & L3 (Seq 49-51) 29 06-09-14 07-18-1413030 Stl/Deck NW L2 & L3 (Seq 52-54) 30 06-18-14 07-31-149565 Stl. Aud. Hanging Steel (Seq 36-39) 30 06-19-14 07-31-1413035 Stl/Deck West L2 & L3 (Seq 55-56) 28 06-27-14 08-07-1413040 Stl/Deck Rehersal (Seq 57-58) 28 07-07-14 08-13-149580 Stl/Deck Aud Roof Overbuild (Seq 40-42) 26 07-08-14 08-12-149030 Erect Steel Roof Trusses - Stage Roof 0 07-09-1413050 Stl/Deck South L2 (Seq 59-66) 38 07-15-14 09-05-1414240 Stl/Deck So Roof & Perm. Roof (Seq 80-81) 33 07-16-14 08-29-1414250 Erect Grand Stair & Frame 43 07-29-14 09-26-1413060 Stl/Deck South L3 Portions 1&2 (Seq 67-75) 38 08-05-14 09-26-1413070 Stl/Deck South ALL L4 (Seq 76-77) 27 08-27-14 10-03-1413080 Stl/Deck So Roof & Perm. Roof (Seq 78-79) 29 09-04-14 10-14-14

Precast & SuPrecast & Suspended Slab 30 06-26-14 08-07-14

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2014 2015 2016

Excavate & Backfill Pile Caps & Frost Walls SummaryExcavate & Backfill Pile Caps & Frost Walls - Seq. 4

Excavate & Backfill Pile Caps & Frost Walls - Seq. 1Excavate & Backfill Pile Caps & Frost Walls - Seq. 2

Excavate & Backfill Pile Caps & Frost Walls - Seq. 3

Deliver Ph 2 H-PilePiling - Phase 2 SummaryH-Pile Ph 2 Seq 2

H-Pile Ph 2 Seq 3

Upper Pile Caps SummaryPile Caps 1st Floor Seq 4

Pile Caps 1st Floor Seq 1Pile Caps 1st Floor Seq 2

Pile Caps 1st Floor Seq 3

Frost WallsFrost Walls Seq 4

Frost Walls Seq 1Frost Walls Seq 2

Frost Walls Seq 3

Upper UG UtilitiesUnderground - Lower Level East

Underground - Lower Level NorthUnderground - Lower Level West

Upper Slab on Grade SummarySlab On Grade 1st Floor East

Slab On Grade 1st Floor North EastSlab On Grade 1st Floor North

Slab On Grade 1st Floor North WestSlab On Grade 1st Floor West

Slab On Grade 1st Floor South

Steel and Decking SummaryStl/Deck 1st Fl FOH South (Seq 2-3)

Stl/Deck 1st Flr BOH North (Seq 1)Stl/Deck Aud. Overbuild (Seq 8-15)

Stl/Deck - 1st Floor Stage (Seq 4-5)Stl/Deck Aud Tier 1 Balconies (Seq 16-20)

Stl/Deck Aud Tier 2 Balconies (Seq 21-24)Stl/Deck Aud Tier 2 Balconies (Seq 25-27)

Stl/Deck East L2 & L3 (Seq 43-45)Stl/Deck Remaining Aud (Seq 28-29)

Stl/Deck - Fly Loft Stage BOS Cap (Seq 30-31)Stl/Deck NE L2 & L3 (Seq 46-48)Roof Trusses (Seq 32-35)

Stl/Deck North L2 & L3 (Seq 49-51)Stl/Deck NW L2 & L3 (Seq 52-54)Stl. Aud. Hanging Steel (Seq 36-39)

Stl/Deck West L2 & L3 (Seq 55-56)Stl/Deck Rehersal (Seq 57-58)Stl/Deck Aud Roof Overbuild (Seq 40-42)

07-09-14, Erect Steel Roof Trusses - Stage RoofStl/Deck South L2 (Seq 59-66)

Stl/Deck So Roof & Perm. Roof (Seq 80-81)Erect Grand Stair & FrameStl/Deck South L3 Portions 1&2 (Seq 67-75)

Stl/Deck South ALL L4 (Seq 76-77)Stl/Deck So Roof & Perm. Roof (Seq 78-79)

10030018-84Hancher Auditorium Replacement Facility 7 of 32 04-04-14

Milestone

Summary

Planned Work

Progressed Work

Critical Work

Crew 1

Crew 2

Primary Milestone

Hancher Auditorium Replacement - Construct New FacilityUniversity of Iowa

Project Layout - Data Date: 04-02-14

Page 8: Project SumProject Summary and Milestones · SM-1A5X1 Initial Substantial Completion (CO) 0 01-22-16 SM-1A18X3 Final Clean Complete 0 01-29-16 SM-1A5X4 Final Substantial Completion

- Activity ID Activity Name Orig.Dur'n

Start Finish

9570 Erect Precast 25 06-26-14 07-31-149040 Precast & Topping - Stage Roof 0 07-18-149575 FRP Precast Topping & Sus. Slab 15 07-18-14 08-07-14

Slab on MetaSlab on Metal Deck 161 03-07-14 A 10-24-14

1000-8P4F Slab on Metal Deck Summary 136 03-07-14 A 09-15-1414010 FRP SOM Deck 1st Floor (FOH South) 6 04-10-14 04-17-1414000 FRP SOM Deck 1st Floor (BOH North) 6 04-17-14 04-24-1414230 FRP SOM Auditorium Overbuild 15 04-24-14 05-14-14APS-001 IL Direct Bur ial - Overbuild 5 04-28-14 05-02-149010 FRP SOM 1st Floor Stage 13 05-14-14 06-02-149540 Balcony Stadia - Auditorium Tier 1 20 05-28-14 06-25-14APS-002 IL Direct Bur ial - Tier 1 Balcony 5 05-30-14 06-06-1414100 FRP SOM Deck East L2 15 06-17-14 07-08-149550 Balcony Stadia - Auditorium Tier 2 20 06-25-14 07-24-1414160 FRP SOM Deck East L3 15 06-26-14 07-17-1414110 FRP SOM Deck NE L2 15 07-10-14 07-30-1414170 FRP SOM Deck NE L3 15 07-17-14 08-06-14APS-003 IL Direct Bur ial - Tier 2 Balcony 5 07-17-14 07-24-1414120 FRP SOM Deck North L2 15 07-24-14 08-13-1414180 FRP SOM Deck North L3 15 07-31-14 08-20-1414130 FRP SOM Deck NW L2 15 08-07-14 08-27-1414190 FRP SOM Deck NW L3 15 08-14-14 09-04-1414140 FRP SOM Deck West L2 15 08-21-14 09-11-1414200 FRP SOM Deck West L3 15 08-28-14 09-18-1414090 FRP SOM Deck Seq 8 (Roof) 10 09-02-14 09-15-1414040 FRP SOM Deck Seq 3 (Rehersal West) 12 09-05-14 09-22-1414150 FRP SOM Deck South L2 25 09-12-14 10-16-1414210 FRP SOM Deck South L3 20 09-29-14 10-24-1414220 FRP SOM Deck L4 15 10-06-14 10-24-14

EnclosureEnclosure 261 02-24-14 A 03-04-15

Mock-UpMock-Up 71 02-24-14 A 06-03-14

1000-8Q1 Construct Mock Up 48 02-24-14 A 05-19-14AWS-810 Install Studs and Sheathing Mock Up 5 04-01-14 A 04-07-141000-8Q6 OPN Review Studs & Sheathing - Mock-Up 5 04-01-14 A 04-07-14AWS-806 Concrete Cure - 28 Calendar Days 20 04-01-14 A 04-28-14AWS-830 Install Air Barrier & Spray Foam - Mock-Up 2 04-08-14 04-09-14AWS-842 Wood Soffit Hangers - Mock-Up 1 04-10-14 04-10-14AWS-831 SS Panel Clips and Track Arrive on Site for Mock Up (Need Shops by 0 04-14-14*AWS-834 SS Panel, CW, and Skylight Material Arrive on Site for Mock Up 0 04-14-14*AWS-832 Install Clips and Track - Mock-Up 6 04-14-14 04-21-14AWS-835 Install Curtain Wall - Mock-Up 10 04-14-14 04-25-141000-8Q5 TT Review - Mock-Up 1 04-22-14 04-22-14AWS-833 Install Insulation & Portion of Spray Foam - Mock-Up 3 04-23-14 04-25-14AWS-844 CMU Wall at Brick - Mock-Up 2 04-28-14 04-29-14AWS-900 WJE Air & Water Test - Mock-Up 2 04-28-14 04-29-14AWS-850 Install Unit Skylight - Mock-Up 3 04-28-14 04-30-14TKR-1000 Roofing Install - Mock-Up 3 04-29-14 05-01-14AWS-840 Install Metal Panels - Mock-Up 10 04-30-14 05-13-14AWS-841 Finish Cap of Parapet - Mock-Up 2 05-14-14 05-15-14AWS-843 Wood Soffit Planks - Mock-Up 2 05-14-14 05-15-14AWS-845 Brick Veneer - Mock -Up 2 05-14-14 05-15-14TKR-1001 Roof Ballast - Mock-Up 1 05-16-14 05-16-14ICL-1000 Landscape Edging - Mock-Up 1 05-19-14 05-19-141000-8Q4 Mock-Up Final Approval 10 05-20-14 06-03-14Metal PanelsMetal Panels 171 07-01-14 03-04-15

Studs & SheStuds & Sheathing 124 07-01-14 12-26-14

AWS-999 Metal Studs and Sheathing Begin Work 0 07-01-14* 07-01-14AWS-1041 Studs and Sheathing - 6A1 East 14 07-09-14 07-28-14AWS-1000 Studs and Sheathing - 1A NE 4 08-07-14 08-12-14AWS-1100 Studs and Sheathing - 1C NE 4 08-07-14 08-12-14AWS-1046 Studs and Sheating - 6B1 East 6 08-13-14 08-20-14AWS-1051 Studs and Sheathing - 1B NE 5 08-21-14 08-27-14AWS-1250 Studs and Sheathing - 2D + 2E North 5 08-21-14 08-27-14AWS-1150 Studs and Sheathing - 2A North 2 08-28-14 08-29-14AWS-1200 Studs and Sheathing - 2B + 2C North 3 09-02-14 09-04-14AWS-1350 Studs and Sheathing - 2H NW 3 09-05-14 09-09-14AWS-1300 Studs and Sheating - 2F + 2G North 5 09-05-14 09-11-14AWS-1450 Studs and Sheating - 3A + 3B NW 8 09-10-14 09-19-14

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2014 2015 2016

Erect Precast07-18-14, Precast & Topping - Stage Roof

FRP Precast Topping & Sus. Slab

Slab on Metal Deck SummaryFRP SOM Deck 1st Floor (FOH South)

FRP SOM Deck 1st Floor (BOH North)FRP SOM Auditorium Overbuild

IL Direct Bur ial - OverbuildFRP SOM 1st Floor Stage

Balcony Stadia - Auditorium Tier 1IL Direct Bur ial - Tier 1 Balcony

FRP SOM Deck East L2Balcony Stadia - Auditorium Tier 2

FRP SOM Deck East L3FRP SOM Deck NE L2

FRP SOM Deck NE L3IL Direct Bur ial - Tier 2 Balcony

FRP SOM Deck North L2FRP SOM Deck North L3

FRP SOM Deck NW L2FRP SOM Deck NW L3

FRP SOM Deck West L2FRP SOM Deck West L3

FRP SOM Deck Seq 8 (Roof)FRP SOM Deck Seq 3 (Rehersal West)

FRP SOM Deck South L2FRP SOM Deck South L3FRP SOM Deck L4

Construct Mock UpInstall Studs and Sheathing Mock UpOPN Review Studs & Sheathing - Mock-Up

Concrete Cure - 28 Calendar DaysInstall Air Barrier & Spray Foam - Mock-UpWood Soffit Hangers - Mock-Up

4-14-14* SS Panel Clips and Track Arrive on Site for Mock Up (Need Shops by 3/14)4-14-14* SS Panel, CW, and Skylight Material Arrive on Site for Mock Up

Install Clips and Track - Mock-UpInstall Curtain Wall - Mock-Up

TT Review - Mock-UpInstall Insulation & Portion of Spray Foam - Mock-UpCMU Wall at Brick - Mock-UpWJE Air & Water Test - Mock-UpInstall Unit Skylight - Mock-UpRoofing Install - Mock-Up

Install Metal Panels - Mock-UpFinish Cap of Parapet - Mock-UpWood Soffit Planks - Mock-UpBrick Veneer - Mock -UpRoof Ballast - Mock-UpLandscape Edging - Mock-Up

Mock-Up Final Approval

Metal Studs and Sheathing Begin WorkStuds and Sheathing - 6A1 East

Studs and Sheathing - 1A NEStuds and Sheathing - 1C NE

Studs and Sheating - 6B1 EastStuds and Sheathing - 1B NEStuds and Sheathing - 2D + 2E NorthStuds and Sheathing - 2A North

Studs and Sheathing - 2B + 2C NorthStuds and Sheathing - 2H NWStuds and Sheating - 2F + 2G North

Studs and Sheating - 3A + 3B NW

10030018-84Hancher Auditorium Replacement Facility 8 of 32 04-04-14

Milestone

Summary

Planned Work

Progressed Work

Critical Work

Crew 1

Crew 2

Primary Milestone

Hancher Auditorium Replacement - Construct New FacilityUniversity of Iowa

Project Layout - Data Date: 04-02-14

Page 9: Project SumProject Summary and Milestones · SM-1A5X1 Initial Substantial Completion (CO) 0 01-22-16 SM-1A18X3 Final Clean Complete 0 01-29-16 SM-1A5X4 Final Substantial Completion

- Activity ID Activity Name Orig.Dur'n

Start Finish

AWS-1400 Studs and Sheathing - 2I NW 3 09-12-14 09-16-14AWS-2150 Studs and Sheathing - 8D East 16 09-16-14 10-07-14AWS-1500 Studs and Sheathing - 4A Rehearsal Eas t 4 09-23-14 09-26-14AWS-1550 Studs and Sheathing - 4B Rehearsal North 4 09-23-14 09-26-14AWS-1600 Studs and Sheathing - 4C + 4D Rehearsal South & West 8 09-29-14 10-08-14AWS-1650 Studs and Sheathing - 5A + 5B West 17 09-29-14 10-21-14AWS-2250 Studs and Sheathing - 8B + 8C South & West 14 10-08-14 10-27-14AWS-1700 Studs and Sheathing - 5C West 17 10-09-14 10-31-14AWS-1850 Studs and Sheating - 6A2 East 12 10-22-14 11-06-14AWS-2200 Studs and Sheathing - 8A North 14 10-28-14 11-14-14AWS-1900 Studs and Sheathing - 6B2 East 18 11-03-14 11-26-14AWS-1950 Studs and Sheathing - 7D1 East 8 11-07-14 11-18-14AWS-2050 Studs and Sheathing - 7B West 13 11-19-14 12-09-14AWS-2350 Corrugated Panel Studs Sheating, Air Barrier 5 12-01-14 12-05-14AWS-2000 Studs and Sheathing - 7A North 7 12-01-14 12-09-14AWS-2300 ACM Studs and Sheathing 10 12-01-14 12-12-14AWS-2100 Studs and Sheathing 7C + 7D2 South & East 12 12-10-14 12-26-14

Air BarrierAir Barrier 108 07-29-14 12-31-14

AWS-1042 Air Barrier - 6A1 East 4 07-29-14 08-01-14AWS-1010 Air Barrier - 1A NE 2 08-13-14 08-14-14AWS-1110 Air Barrier - 1C NE 3 08-13-14 08-15-14AWS-1047 Air Barrier - 6B1 East 2 08-21-14 08-22-14AWS-1060 Air Barrier - 1B NE 3 08-28-14 09-02-14AWS-1260 Air Barrier - 2D + 2E North 3 08-28-14 09-02-14AWS-1160 Air Barrier - 2A North 2 09-02-14 09-03-14AWS-1210 Air Barrier - 2B + 2C North 3 09-05-14 09-09-14AWS-1360 Air Barrier - 2H NW 2 09-10-14 09-11-14AWS-1310 Air Barrier - 2F + 2G North 2 09-12-14 09-15-14AWS-1410 Air Barrier - 2I NW 2 09-17-14 09-18-14AWS-1460 Air Barrier - 3A + 3B NW 5 09-26-14 10-02-14AWS-1560 Air Barrier - 4B Rehearsal North 2 09-29-14 09-30-14AWS-1510 Air Barrier - 4A Rehear sal East 3 09-29-14 10-01-14AWS-2160 Air Barrier - 8D East 8 10-08-14 10-17-14AWS-1610 Air Barrier - 4C + 4D Rehearsal South & West 5 10-09-14 10-15-14AWS-1660 Air Barrier - 5A + 5B Wes t 5 10-22-14 10-28-14AWS-2260 Air Barrier - 8B + 8C South & West 8 10-28-14 11-06-14AWS-1710 Air Barrier - 5C West 6 11-03-14 11-10-14AWS-1860 Air Barrier - 6A2 East 5 11-07-14 11-13-14AWS-2210 Air Barrier - 8A North 8 11-17-14 11-26-14AWS-1960 Air Barrier - 7D1 East 3 11-19-14 11-21-14AWS-1910 Air Barrier - 6B2 East 5 12-01-14 12-05-14AWS-2010 Air Barrier - 7A North 4 12-10-14 12-15-14AWS-2060 Air Barrier - 7B West 4 12-10-14 12-15-14AWS-2310 ACM Air Barrier 5 12-15-14 12-19-14AWS-2110 Air Barrier - 7C + 7D2 South & East 3 12-29-14 12-31-14

Clips & TrackClips & Tracks 113 08-04-14 01-14-15

AWS-1043 Clips and Track - 6A1 East 12 08-04-14 08-19-14AWS-1020 Clips and Track - 1A NE 6 08-15-14 08-22-14AWS-1120 Clips and Track - 1C NE 7 08-18-14 08-26-14AWS-1048 Clips and Track - 6B1 East 6 08-25-14 09-02-14AWS-1070 Clips and Track - 1B NE 7 09-03-14 09-11-14AWS-1270 Clips and Track - 2D + 2E Nor th 10 09-03-14 09-16-14AWS-1170 Clips and Track - 2A North 7 09-04-14 09-12-14AWS-1220 Clips and Track - 2B + 2C Nor th 7 09-10-14 09-18-14AWS-1370 Clips and Track - 2H NW 6 09-12-14 09-19-14AWS-1320 Clips and Track - 2F + 2G North 7 09-16-14 09-24-14AWS-1420 Clips and Track - 2I NW 5 09-19-14 09-25-14AWS-1570 Clips and Track - 4B Rehearsal Nor th 6 10-01-14 10-08-14AWS-1520 Clips and Track - 4A Rehearsal East 8 10-02-14 10-13-14AWS-1470 Clips and Track - 3A + 3B NW 12 10-03-14 10-20-14AWS-1620 Clips and Track - 4C + 4D Rehearsal South & Wes t 14 10-16-14 11-04-14AWS-2170 Clips and Track - 8D East 21 10-20-14 11-17-14AWS-1670 Clips and Track - 5A + 5B West 11 10-29-14 11-12-14AWS-2270 Clips and Track - 8B + 8C South & West 21 11-07-14 12-09-14AWS-1720 Clips and Track - 5C West 16 11-11-14 12-04-14AWS-1870 Clips and Track - 6A2 East 13 11-14-14 12-04-14AWS-1970 Clips and Track - 7D1 East 7 11-24-14 12-04-14AWS-2220 Clips and Track - 8A North 20 12-01-14 12-29-14AWS-1920 Clips and Track - 6B2 East 15 12-08-14 12-29-14

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2014 2015 2016

Studs and Sheathing - 2I NWStuds and Sheathing - 8D East

Studs and Sheathing - 4A Rehearsal Eas tStuds and Sheathing - 4B Rehearsal North

Studs and Sheathing - 4C + 4D Rehearsal South & WestStuds and Sheathing - 5A + 5B West

Studs and Sheathing - 8B + 8C South & WestStuds and Sheathing - 5C West

Studs and Sheating - 6A2 EastStuds and Sheathing - 8A North

Studs and Sheathing - 6B2 EastStuds and Sheathing - 7D1 East

Studs and Sheathing - 7B WestCorrugated Panel Studs Sheating, Air BarrierStuds and Sheathing - 7A NorthACM Studs and Sheathing

Studs and Sheathing 7C + 7D2 South & East

Air Barrier - 6A1 EastAir Barrier - 1A NEAir Barrier - 1C NE

Air Barrier - 6B1 EastAir Barrier - 1B NEAir Barrier - 2D + 2E NorthAir Barrier - 2A North

Air Barrier - 2B + 2C NorthAir Barrier - 2H NWAir Barrier - 2F + 2G NorthAir Barrier - 2I NW

Air Barrier - 3A + 3B NWAir Barrier - 4B Rehearsal NorthAir Barrier - 4A Rehearsal East

Air Barrier - 8D EastAir Barrier - 4C + 4D Rehearsal South & West

Air Barrier - 5A + 5B Wes tAir Barrier - 8B + 8C South & WestAir Barrier - 5C WestAir Barrier - 6A2 East

Air Barrier - 8A NorthAir Barrier - 7D1 East

Air Barrier - 6B2 EastAir Barrier - 7A NorthAir Barrier - 7B WestACM Air Barrier

Air Barrier - 7C + 7D2 South & East

Clips and Track - 6A1 EastClips and Tr ack - 1A NEClips and Track - 1C NE

Clips and Track - 6B1 EastClips and Track - 1B NE

Clips and Track - 2D + 2E NorthClips and Track - 2A North

Clips and Tr ack - 2B + 2C Nor thClips and Tr ack - 2H NW

Clips and Tr ack - 2F + 2G NorthClips and Tr ack - 2I NW

Clips and Track - 4B Rehearsal NorthClips and Tr ack - 4A Rehearsal East

Clips and Track - 3A + 3B NWClips and Track - 4C + 4D Rehearsal South & Wes t

Clips and Track - 8D EastClips and Track - 5A + 5B West

Clips and Track - 8B + 8C South & WestClips and Tr ack - 5C WestClips and Tr ack - 6A2 EastClips and Tr ack - 7D1 East

Clips and Track - 8A NorthClips and Track - 6B2 East

10030018-84Hancher Auditorium Replacement Facility 9 of 32 04-04-14

Milestone

Summary

Planned Work

Progressed Work

Critical Work

Crew 1

Crew 2

Primary Milestone

Hancher Auditorium Replacement - Construct New FacilityUniversity of Iowa

Project Layout - Data Date: 04-02-14

Page 10: Project SumProject Summary and Milestones · SM-1A5X1 Initial Substantial Completion (CO) 0 01-22-16 SM-1A18X3 Final Clean Complete 0 01-29-16 SM-1A5X4 Final Substantial Completion

- Activity ID Activity Name Orig.Dur'n

Start Finish

AWS-2020 Clips and Track - 7A North 9 12-16-14 12-29-14AWS-2070 Clips and Track - 7B West 11 12-16-14 12-31-14AWS-2320 ACM Clips and Track 11 12-22-14 01-07-15AWS-2120 Clips and Track - 7C + 7D2 South & East 9 01-02-15 01-14-15

InsulationInsulation 105 08-20-14 01-20-15

AWS-1044 Insulation - 6A1 East 5 08-20-14 08-26-14AWS-1030 Insulation - 1A NE 3 08-25-14 08-27-14AWS-1130 Insulation - 1C NE 4 08-27-14 09-02-14AWS-1049 Insulation - 6B1 East 3 09-03-14 09-05-14AWS-1080 Insulation - 1B NE 3 09-12-14 09-16-14AWS-1180 Insulation - 2A North 3 09-15-14 09-17-14AWS-1280 Insualtion - 2D + 2E North 5 09-17-14 09-23-14AWS-1230 Insulation - 2B + 2C North 4 09-19-14 09-24-14AWS-1380 Insulation - 2H NW 3 09-22-14 09-24-14AWS-1330 Insulation - 2F + 2G North 4 09-25-14 09-30-14AWS-1430 Insulation - 2I NW 3 09-26-14 09-30-14AWS-1580 Insulation - 4B Rehearsal North 3 10-09-14 10-13-14AWS-1530 Insulation - 4A Rehearsal East 4 10-14-14 10-17-14AWS-1480 Insulation - 3A + 3B NW 6 10-21-14 10-28-14AWS-1630 Insulation - 4C + 4D Rehearsal South & West 7 11-05-14 11-13-14AWS-1680 Insulation - 5A + 5B West 5 11-13-14 11-19-14AWS-2180 Insulation - 8D East 10 11-18-14 12-03-14AWS-1980 Insulation - 7D1 East 3 12-05-14 12-09-14AWS-1880 Insulation - 6A2 East 5 12-05-14 12-11-14AWS-1730 Insulation - 5C West 7 12-05-14 12-15-14AWS-2280 Insulation - 8B + 8C South & West 10 12-10-14 12-23-14AWS-2030 Insulation - 7A North 5 12-30-14 01-06-15AWS-1930 Insulation - 6B2 East 6 12-30-14 01-07-15AWS-2230 Insulation - 8A North 10 12-30-14 01-13-15AWS-2080 Insulation - 7B West 5 01-02-15 01-08-15AWS-2330 ACM Insulation 6 01-08-15 01-15-15AWS-2130 Insulation - 7C + 7D2 South & East 4 01-15-15 01-20-15

Panels & CoPanels & Copings 171 07-01-14 03-04-15

AWS-998 Stainless Steel Panel Layout 80 07-01-14 10-22-14AWS-1045 Panels and Copings - 6A1 East 18 08-27-14 09-22-14AWS-1040 Panels and Copings - 1A NE 11 08-28-14 09-12-14AWS-1140 Panels and Copings - 1C NE 12 09-03-14 09-18-14AWS-1050 Panels and Copings - 6B1 East 10 09-08-14 09-19-14AWS-1190 Panels and Copings - 2A North 12 09-18-14 10-03-14AWS-1090 Panels and Copings - 1B NE 12 09-22-14 10-07-14AWS-1290 Panels and Copings - 2D + 2E North 18 09-24-14 10-17-14AWS-1240 Panels and Copings - 2B + 2C North 11 09-25-14 10-09-14AWS-1440 Panels and Copings - 2I NW 8 10-01-14 10-10-14AWS-1390 Panels and Copings - 2H NW 11 10-06-14 10-20-14AWS-1340 Panels and Copings - 2F + 2G North 12 10-08-14 10-23-14AWS-1590 Panels and Copings - 4B Rehearsal North 10 10-14-14 10-27-14AWS-1540 Panels and Copings - 4A Rehearsal East 14 10-24-14 11-12-14AWS-1490 Panels and Copings - 3A + 3B NW 20 10-29-14 11-25-14AWS-1640 Panels and Copings - 4C + 4D Rehearsal South & West 25 11-14-14 12-22-14AWS-1690 Panels and Copings - 5A + 5B Wes t 20 11-20-14 12-19-14AWS-2190 Panels and Copings - 8D East 37 12-04-14 01-27-15AWS-2360 Corrugated Panel Insulation and Panel Install 5 12-08-14 12-12-14AWS-1990 Panels and Copings - 7D1 East 12 12-10-14 12-26-14AWS-2290 Panels and Copings - 8B + 8C South & West 38 12-10-14 02-03-15AWS-1890 Panels and Copings - 6A2 East 22 12-12-14 01-14-15AWS-1740 Panels and Copings - 5C West 28 12-16-14 01-26-15AWS-2040 Panels and Copings - 7A North 16 01-07-15 01-28-15AWS-1940 Panels and Copings - 6B2 East 25 01-08-15 02-11-15AWS-2240 Panels and Copings - 8A North 36 01-14-15 03-04-15AWS-2090 Panels and Copings - 7B West 19 01-15-15 02-10-15AWS-2340 ACM Panel Install 21 01-16-15 02-13-15AWS-2140 Panels and Copings - 7C + 7D2 South & East 16 01-27-15 02-17-15GlazingGlazing 158 07-01-14 02-13-15

AWS-2708 Curtain Wall Layout 50 07-01-14 09-10-14AWS-2710 CW 1A Install - East 41 07-29-14 09-24-14AWS-2730 CW 1B Install - East 25 08-21-14 09-25-14AWS-2740 CW 2A Install - North 3 09-05-14 09-09-14AWS-2750 CW 2B Install - North 4 09-10-14 09-15-14AWS-2760 CW 2C Install - North 6 09-16-14 09-23-14

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2014 2015 2016

Clips and Track - 7A NorthClips and Tr ack - 7B West

ACM Clips and Trac kClips and Track - 7C + 7D2 South & East

Insulation - 6A1 EastInsulation - 1A NE

Insulation - 1C NEInsulation - 6B1 East

Insulation - 1B NEInsulation - 2A North

Insualtion - 2D + 2E NorthInsulation - 2B + 2C NorthInsulation - 2H NW

Insulation - 2F + 2G NorthInsulation - 2I NW

Insulation - 4B Rehearsal NorthInsulation - 4A Rehearsal East

Insulation - 3A + 3B NWInsulation - 4C + 4D Rehearsal South & West

Insulation - 5A + 5B WestInsulation - 8D East

Insulation - 7D1 EastInsulation - 6A2 EastInsulation - 5C West

Insulation - 8B + 8C South & WestInsulation - 7A NorthInsulation - 6B2 East

Insulation - 8A NorthInsulation - 7B West

ACM InsulationInsulation - 7C + 7D2 South & East

Stainless Steel Panel LayoutPanels and Copings - 6A1 East

Panels and Copings - 1A NEPanels and Copings - 1C NEPanels and Copings - 6B1 East

Panels and Copings - 2A NorthPanels and Copings - 1B NE

Panels and Copings - 2D + 2E NorthPanels and Copings - 2B + 2C NorthPanels and Copings - 2I NW

Panels and Copings - 2H NWPanels and Copings - 2F + 2G NorthPanels and Copings - 4B Rehearsal North

Panels and Copings - 4A Rehearsal EastPanels and Copings - 3A + 3B NW

Panels and Copings - 4C + 4D Rehearsal South & WestPanels and Copings - 5A + 5B Wes t

Panels and Copings - 8D EastCorrugated Panel Insulation and Panel Install

Panels and Copings - 7D1 EastPanels and Copings - 8B + 8C South & West

Panels and Copings - 6A2 EastPanels and Copings - 5C West

Panels and Copings - 7A NorthPanels and Copings - 6B2 East

Panels and Copings - 8A NorthPanels and Copings - 7B West

ACM Panel InstallPanels and Copings - 7C + 7D2 South & East

Curtain Wall LayoutCW 1A Install - EastCW 1B Install - East

CW 2A Install - NorthCW 2B Install - North

CW 2C Install - North

10030018-84Hancher Auditorium Replacement Facility 10 of 32 04-04-14

Milestone

Summary

Planned Work

Progressed Work

Critical Work

Crew 1

Crew 2

Primary Milestone

Hancher Auditorium Replacement - Construct New FacilityUniversity of Iowa

Project Layout - Data Date: 04-02-14

Page 11: Project SumProject Summary and Milestones · SM-1A5X1 Initial Substantial Completion (CO) 0 01-22-16 SM-1A18X3 Final Clean Complete 0 01-29-16 SM-1A5X4 Final Substantial Completion

- Activity ID Activity Name Orig.Dur'n

Start Finish

AWS-2770 CW 3 Install - West 9 09-26-14 10-08-14AWS-2771 CW 4 Install - Rehearsal 19 09-29-14 10-23-14AWS-2780 CW 5A Install - West 68 10-22-14 01-29-15AWS-2790 CW 5B Install - West 46 11-03-14 01-09-15AWS-2800 CW 1C Install - East 15 11-07-14 12-01-14AWS-2810 CW 1D Install - East 29 12-02-14 01-13-15AWS-2820 CW 7A Install - West 19 01-12-15 02-05-15AWS-2830 CW 7B Install - East 23 01-14-15 02-13-15BrickBrick 3 09-05-14 09-09-14

HM-1140 Exterior Brick BOH 3 09-05-14 09-09-14Soffits/MiscSoffits/Misc 127 08-28-14 02-27-15

MEP in SoffitMEP in Soffits 40 10-17-14 12-15-14

MPC-181 Fin Tube Ins tall - Lvl 2 South 15 10-17-14 11-06-14DVE-2471 Ext. Soffit Electrical Install - Lvl 2 South 15 10-17-14 11-06-14MPC-305 Fin Tube Ins tall - Lvl 3 West 10 10-20-14 10-31-14DVE-2474 Ext. Soffit Electrical Install - Lvl 3 West 10 10-20-14 10-31-14MPC-179 Fin Tube Ins tall - Lvl 2 East 10 10-30-14 11-12-14DVE-2472 Ext. Soffit Electrical Install - Lvl 2 East 15 10-30-14 11-19-14MPC-304 Fin Tube Ins tall - Lvl 3 South 15 11-21-14 12-15-14DVE-2542 Ext. Soffit Electrical Install - Lvl 3 South 15 11-21-14 12-15-14MPC-180 Fin Tube Ins tall - Lvl 3 East 10 11-25-14 12-10-14DVE-2532 Ext. Soffit Electrical Install - Lvl 3 East 10 11-25-14 12-10-14

SoffitsSoffits 127 08-28-14 02-27-15

AWS-2401 Wd. Sof. North L3 Studs and Sheathing 1 08-28-14 08-28-14AWS-2552 Wd. Sof. North Lvl 3 Air Barrier 1 08-29-14 08-29-14WBCI-1500 Wd. Sof. North Lvl 3 Wood Soffit Hangers 1 09-02-14 09-02-14AWS-2553 Wd. Sof. North Lvl 3 Insulation 1 09-03-14 09-03-14AWS-2380 Wd. Sof. North L2 Studs and Sheathing 5 09-12-14 09-18-14AWS-2489 Wd. Sof. North L2 Air Barrier 5 09-19-14 09-25-14WBCI-1505 Wd. Sof. North L2 Wood Soffit Hangers 2 09-26-14 09-29-14AWS-2390 Wd. Sof. Rehearsal Room Studs and Sheathing 2 09-29-14 09-30-14AWS-2490 Wd. Sof. North L2 Insulation 2 09-30-14 10-01-14AWS-2500 Wd. Sof. Rehearsal Room Air Barrier 1 10-01-14 10-01-14WBCI-1510 Wd. Sof. Rehearsal Room Wood Soffit Hangers 1 10-02-14 10-02-14AWS-2510 Wd. Sof. Rehearsal Room Insulation 1 10-03-14 10-03-14AWS-2480 Wd. Sof. East Lvl 5 Studs and Sheathing 4 10-08-14 10-13-14AWS-2690 Wd. Sof. East Lvl 5 Air Barrier 1 10-14-14 10-14-14WBCI-1515 Wd. Sof. East Lvl 5 Wood Soffit Hangers 1 10-15-14 10-15-14AWS-2700 Wd. Sof. East Lvl 5 Insulation 2 10-16-14 10-17-14AWS-2400 Wd. Sof. West Lvl 2 Studs and Sheathing 21 10-22-14 11-19-14AWS-2420 Wd. Sof. West Lvl 3 Studs and Sheathing 10 11-03-14 11-14-14AWS-2570 Wd. Sof. West Lvl 3 Air Barrier 3 11-17-14 11-19-14WBCI-1520 Wd. Sof. West Lvl 3 Wood Soffit Hangers 1 11-20-14 11-20-14AWS-2520 Wd. Sof West Lvl 2 Air Barr ier 7 11-20-14 12-02-14AWS-2410 Wd. Sof. East Lvl 2 Studs and Sheathing 13 11-20-14 12-10-14AWS-2580 Wd. Sof. West Lvl 3 Insulation 4 11-21-14 11-26-14WBCI-1525 Wd. Sof West Lvl 2 Wood Soffit Hangers 2 12-03-14 12-04-14AWS-2540 Wd. Sof. West Lvl 2 Insulation 10 12-05-14 12-18-14AWS-2440 Wd. Sof. North Lvl 4 Studs and Sheathing 4 12-11-14 12-16-14AWS-2550 Wd. Sof. East Lvl 2 Air Barrier 4 12-11-14 12-16-14AWS-2430 Wd. Sof. East Lvl 3 Studs and Sheathing 30 12-11-14 01-23-15AWS-2610 Wd. Sof. North Lvl 4 Air Barrier 1 12-17-14 12-17-14AWS-2450 Wd. Sof West Lvl 4 Studs and Sheathing 2 12-17-14 12-18-14WBCI-1530 Wd. Sof. East Lvl 2 Wood Soffit Hangers 2 12-17-14 12-18-14WBCI-1535 Wd. Sof. North Lvl 4 Wood Soffit Hangers 1 12-18-14 12-18-14AWS-2630 Wd. Sof. West Lvl 4 Air Barrier 1 12-19-14 12-19-14AWS-2620 Wd. Sof. North Lvl 4 Insulation 2 12-19-14 12-22-14AWS-2551 Wd. Sof. East Lvl 2 Insulation 5 12-19-14 12-26-14WBCI-1540 Wd. Sof. West Lvl 4 Wood Soffit Hangers 1 12-22-14 12-22-14AWS-2640 Wd. Sof. West Lvl 4 Insulation 1 12-23-14 12-23-14AWS-2460 Wd. Sof. East Lvl 4 Studs and Sheathing 3 12-29-14 12-31-14AWS-2650 Wd. Sof. East Lvl 4 Air Barrier 1 01-02-15 01-02-15WBCI-1545 Wd. Sof. East Lvl 4 Wood Soffit Hangers 1 01-05-15 01-05-15AWS-2660 Wd. Sof. East Lvl 4 Insulation 1 01-06-15 01-06-15AWS-2470 Wd. Sof. West Lvl 5 Studs and Sheathing 5 01-26-15 01-30-15AWS-2590 Wd. Sof. East Lvl 3 Air Barrier 10 01-26-15 02-06-15AWS-2670 Wd. Sof. West Lvl 5 Air Barrier 2 02-02-15 02-03-15WBCI-1555 Wd. Sof. West Lvl 5 Wood Soffit Hangers 1 02-04-15 02-04-15AWS-2680 Wd. Sof. West Lvl 5 Insulation 2 02-05-15 02-06-15

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2014 2015 2016

CW 3 Install - WestCW 4 Install - Rehearsal

CW 5A Install - WestCW 5B Install - West

CW 1C Install - EastCW 1D Install - East

CW 7A Install - WestCW 7B Install - East

Exterior Brick BOH

Fin Tube Ins tall - Lvl 2 SouthExt. Soffit Electrical Install - Lvl 2 South

Fin Tube Ins ta ll - Lvl 3 WestExt. Soffit Electrical Install - Lvl 3 West

Fin Tube Ins tall - Lvl 2 EastExt. Soffit Electrical Install - Lvl 2 East

Fin Tube Ins tall - Lvl 3 SouthExt. Soffit Electrical Install - Lvl 3 South

Fin Tube Ins tall - Lvl 3 EastExt. Soffit Electrical Install - Lvl 3 East

Wd. Sof. North L3 Studs and SheathingWd. Sof. North Lvl 3 Air BarrierWd. Sof. North Lvl 3 Wood Soffit HangersWd. Sof. North Lvl 3 Insulation

Wd. Sof. North L2 Studs and SheathingWd. Sof. North L2 Air BarrierWd. Sof. North L2 Wood Soffit HangersWd. Sof. Rehearsal Room Studs and SheathingWd. Sof. North L2 InsulationWd. Sof. Rehearsal Room Air BarrierWd. Sof. Rehearsal Room Wood Soffit HangersWd. Sof. Rehearsal Room Insulation

Wd. Sof. East Lvl 5 Studs and SheathingWd. Sof. East Lvl 5 Air BarrierWd. Sof. East Lvl 5 Wood Soffit HangersWd. Sof. East Lvl 5 Insulation

Wd. Sof. West Lvl 2 Studs and SheathingWd. Sof. West Lvl 3 Studs and Sheathing

Wd. Sof. West Lvl 3 Air BarrierWd. Sof. West Lvl 3 Wood Soffit Hangers

Wd. Sof West Lvl 2 Air Barr ierWd. Sof. East Lvl 2 Studs and Sheathing

Wd. Sof. West Lvl 3 InsulationWd. Sof West Lvl 2 Wood Soffit Hangers

Wd. Sof. West Lvl 2 InsulationWd. Sof. North Lvl 4 Studs and SheathingWd. Sof. East Lvl 2 Air Barrier

Wd. Sof. East Lvl 3 Studs and SheathingWd. Sof. North Lvl 4 Air Bar rierWd. Sof West Lvl 4 Studs and SheathingWd. Sof. East Lvl 2 Wood Soffit HangersWd. Sof. North Lvl 4 Wood Soffit HangersWd. Sof. West Lvl 4 Air BarrierWd. Sof. North Lvl 4 InsulationWd. Sof. East Lvl 2 Insulation

Wd. Sof. West Lvl 4 Wood Soffit HangersWd. Sof. West Lvl 4 Insulation

Wd. Sof. East Lvl 4 Studs and SheathingWd. Sof. East Lvl 4 Air Barrier

Wd. Sof. East Lvl 4 Wood Soffit HangersWd. Sof. East Lvl 4 Insulation

Wd. Sof. West Lvl 5 Studs and SheathingWd. Sof. East Lvl 3 Air BarrierWd. Sof. West Lvl 5 Air Barrier

Wd. Sof. West Lvl 5 Wood Soffit HangersWd. Sof. West Lvl 5 Insulation

10030018-84Hancher Auditorium Replacement Facility 11 of 32 04-04-14

Milestone

Summary

Planned Work

Progressed Work

Critical Work

Crew 1

Crew 2

Primary Milestone

Hancher Auditorium Replacement - Construct New FacilityUniversity of Iowa

Project Layout - Data Date: 04-02-14

Page 12: Project SumProject Summary and Milestones · SM-1A5X1 Initial Substantial Completion (CO) 0 01-22-16 SM-1A18X3 Final Clean Complete 0 01-29-16 SM-1A5X4 Final Substantial Completion

- Activity ID Activity Name Orig.Dur'n

Start Finish

WBCI-1550 Wd. Sof. East Lvl 3 Wood Soffit Hangers 2 02-09-15 02-10-15AWS-2600 Wd. Sof. East Lvl 3 Insulation 13 02-11-15 02-27-15

Exterior WooExterior Wood Ceiling 35 11-07-14 12-30-14

ART-2245 Exterior Wood Ceilings - FOH Level 2 20 11-07-14 12-08-14ART-2250 Exterior Wood Ceilings - FOH Level 3 10 12-16-14 12-30-14

Glass HandrGlass Handrails 40 11-26-14 02-04-15

AWS-5500 Ext. Glass Railings - North 10 11-26-14 12-12-14AWS-5510 Ext. Glass Railings - East 15 12-15-14 01-09-15AWS-5520 Ext. Glass Railings - West 15 01-12-15 02-04-15SkylightsSkylights 32 10-27-14 12-11-14

AWS-2870 Install Skylight 3 Curb 10 10-27-14 11-07-14AWS-2880 Install Skylight 3 Framing and Glass 10 11-10-14 11-21-14AWS-2900 Install Skylight 4 Curb 5 11-24-14 12-02-14AWS-2910 Install Skylight 4 Framing and Glass 7 12-03-14 12-11-14RoofingRoofing 111 08-06-14 01-14-15

TKR-003 Fluid-Applied Roof L2 S1 2 08-06-14 08-07-14TKR-004 Fluid-Applied Roof L3 S1 6 08-15-14 08-22-14TKR-005 Fluid-Applied Roof L3 S2 5 09-05-14 09-11-14TKR-018 PVC Roof North 17 09-16-14 10-08-14TKR-006 Fluid-Applied Roof L3 S3 10 09-19-14 10-02-14TKR-001 PVC Roof L3 S5 10 09-23-14 10-06-14TKR-002 PVC Roof L3 S2 10 10-07-14 10-20-14TKR-020 PVC Roof South 17 10-09-14 10-31-14TKR-007 Fluid-Applied Roof L2 S5/6 6 10-21-14 10-28-14TKR-016 Fluid-Applied Roof L3 S5 10 10-21-14 11-03-14TKR-013 PVC Roof L4 S3 5 10-27-14 10-31-14TKR-009 Fluid-Applied Roof Flood Test L2 S1&5 4 10-29-14 11-03-14TKR-017 Fluid-Applied Roof Flood Test L3 S1-5 5 11-04-14 11-10-14TKR-019 Fluid-Applied Roof Ballast L3 S1-5 15 11-11-14 12-03-14TKR-008 Fluid-Applied Roof L2 S7 8 11-14-14 11-25-14TKR-027 Fluid-Applied Roof L4 S1&5 8 11-24-14 12-05-14TKR-026 Fluid-Applied Roof L4 S6&7 10 11-24-14 12-09-14TKR-021 Fluid-Applied Roof L3 S6 12 11-24-14 12-11-14TKR-010 Fluid-Applied Roof Flood Test L2 S6&7 4 11-26-14 12-03-14TKR-014 Fluid-Applied Roof Ballast L2 S6 3 12-04-14 12-08-14TKR-011 Fluid-Applied Roof Pavers L2 S6 4 12-04-14 12-09-14TKR-030 Fluid-Applied Roof Flood Test L4 S1&5 4 12-08-14 12-11-14TKR-015 Fluid-Applied Roof Ballast L2 S7 3 12-09-14 12-11-14TKR-028 Fluid-Applied Roof Flood Test L4 S6&7 4 12-10-14 12-15-14TKR-012 Fluid-Applied Roof Pavers L2 S7 8 12-10-14 12-19-14TKR-031 Fluid-Applied Roof Ballast L4 S1&5 4 12-12-14 12-17-14TKR-022 Fluid-Applied Roof L3 S7 9 12-12-14 12-24-14TKR-029 Fluid-Applied Roof Ballast Lvl 4 S6&7 5 12-16-14 12-22-14TKR-023 Fluid-Applied Roof Flood Test L3 S6&7 4 12-26-14 12-31-14TKR-024 Fluid-Applied Roof Ballast L3 S6 5 01-02-15 01-08-15TKR-025 Fluid-Applied Roof Ballast L3 S7 4 01-09-15 01-14-15

ElevatorsElevators 303 05-16-14 07-27-15

Elevator 1Elevator 1 155 08-15-14 03-26-15

OKE-E11 Set Machines top of Hoistways - E1 5 08-15-14 08-21-141006-8R23 Install Elevator 1 56 01-08-15 03-26-15OKE-E12 Install Car & Counterweight Guide Rails - E1 10 01-09-15 01-22-15OKE-E13 Install Car Sling, Platform & Cables - E1 8 01-23-15 02-03-15OKE-E14 Install Hoistway Entrances - E1 10 02-04-15 02-17-15OKE-E15 Cabs, Fixtures & Wiring - E1 10 02-18-15 03-03-15OKE-E16 Start Up & Adjusting - E1 10 03-04-15 03-17-15OKE-E17 Testing & Inspections - E1 7 03-18-15 03-26-15Elevator 2Elevator 2 185 08-15-14 05-07-15

OKE-E21 Set Machines top of Hoistways - E2 5 08-15-14 08-21-141006-8R22 Install Elevator 2 56 02-19-15 05-07-15OKE-E22 Install Car & Counterweight Guide Rails - E2 10 02-20-15 03-05-15OKE-E23 Install Car Sling, Platform & Cables - E2 8 03-06-15 03-17-15OKE-E24 Install Hoistway Entrances - E2 10 03-18-15 03-31-15OKE-E25 Cabs, Fixtures & Wiring - E2 10 04-01-15 04-14-15OKE-E26 Start Up & Adjusting - E2 10 04-15-15 04-28-15OKE-E27 Testing & Inspections - E2 7 04-29-15 05-07-15Elevator 3Elevator 3 86 03-26-15 07-27-15

1006-8R21 Install Elevator 3 86 03-26-15 07-27-15OKE-E31 Set Machine in Lower Level - E3 5 03-27-15 04-02-15

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2014 2015 2016

Wd. Sof. East Lvl 3 Wood Soffit HangersWd. Sof. East Lvl 3 Insulation

Exterior Wood Ceilings - FOH Level 2Exterior Wood Ceilings - FOH Level 3

Ext. Glass Railings - NorthExt. Glass Railings - East

Ext. Glass Railings - West

Install Skylight 3 CurbInstall Skylight 3 Framing and Glass

Install Skylight 4 CurbInstall Skylight 4 Framing and Glass

Fluid-Applied Roof L2 S1Fluid-Applied Roof L3 S1

Fluid-Applied Roof L3 S2PVC Roof North

Fluid-Applied Roof L3 S3PVC Roof L3 S5

PVC Roof L3 S2PVC Roof South

Fluid-Applied Roof L2 S5/6Fluid-Applied Roof L3 S5

PVC Roof L4 S3Fluid-Applied Roof Flood Test L2 S1&5

Fluid-Applied Roof Flood Test L3 S1-5Fluid-Applied Roof Ballast L3 S1-5

Fluid-Applied Roof L2 S7Fluid-Applied Roof L4 S1&5Fluid-Applied Roof L4 S6&7Fluid-Applied Roof L3 S6

Fluid-Applied Roof Flood Test L2 S6&7Fluid-Applied Roof Ballast L2 S6Fluid-Applied Roof Pavers L2 S6Fluid-Applied Roof Flood Test L4 S1&5Fluid-Applied Roof Ballast L2 S7Fluid-Applied Roof Flood Test L4 S6&7Fluid-Applied Roof Pavers L2 S7

Fluid-Applied Roof Ballast L4 S1&5Fluid-Applied Roof L3 S7

Fluid-Applied Roof Ballast Lvl 4 S6&7Fluid-Applied Roof Flood Test L3 S6&7

Fluid-Applied Roof Ballast L3 S6Fluid-Applied Roof Ballast L3 S7

Set Machines top of Hoistways - E1Install Elevator 1

Install Car & Counterweight Guide Rails - E1Install Car Sling, Platform & Cables - E1

Install Hoistway Entrances - E1Cabs, Fixtures & Wiring - E1

Start Up & Adjusting - E1Testing & Inspections - E1

Set Machines top of Hoistways - E2Install Elevator 2

Install Car & Counterweight Guide Rails - E2Install Car Sling, Platform & Cables - E2

Install Hoistway Entrances - E2Cabs, Fixtures & Wiring - E2

Start Up & Adjusting - E2Testing & Inspections - E2

Install Elevator 3Set Machine in Lower Level - E3

10030018-84Hancher Auditorium Replacement Facility 12 of 32 04-04-14

Milestone

Summary

Planned Work

Progressed Work

Critical Work

Crew 1

Crew 2

Primary Milestone

Hancher Auditorium Replacement - Construct New FacilityUniversity of Iowa

Project Layout - Data Date: 04-02-14

Page 13: Project SumProject Summary and Milestones · SM-1A5X1 Initial Substantial Completion (CO) 0 01-22-16 SM-1A18X3 Final Clean Complete 0 01-29-16 SM-1A5X4 Final Substantial Completion

- Activity ID Activity Name Orig.Dur'n

Start Finish

OKE-E32 Install Car & Counterweight Guide Rails - E3 20 04-03-15 04-30-15OKE-E33 Install Car Sling, Platform & Cables - E3 10 05-01-15 05-14-15OKE-E34 Install Hoistway Entrances - E3 15 05-15-15 06-05-15OKE-E35 Cabs, Fixtures & Wiring - E3 15 06-08-15 06-26-15OKE-E36 Start Up & Adjusting - E3 10 06-29-15 07-13-15OKE-E37 Testing & Inspections - E3 10 07-14-15 07-27-15Elevator 4Elevator 4 135 06-27-14 01-09-15

OKE-E41 Set Machines top of Hoistways - E4 5 06-27-14 07-07-141006-8R20 Install Elevator 4 56 10-20-14 01-09-15OKE-E42 Install Car & Counterweight Guide Rails - E4 10 10-21-14 11-03-14OKE-E43 Install Car Sling, Platform & Cables - E4 8 11-04-14 11-13-14OKE-E44 Install Hoistway Entrances - E4 10 11-14-14 12-01-14OKE-E45 Cabs, Fixtures & Wiring - E4 10 12-02-14 12-15-14OKE-E46 Start Up & Adjusting - E4 10 12-16-14 12-30-14OKE-E47 Testing & Inspections - E4 7 12-31-14 01-09-15Elevator 5Elevator 5 71 10-31-14 02-12-15

1006-8R19 Install Elevator 5 71 10-31-14 02-12-15OKE-E51 Set Hydraulic Power Unit & Piping - E5 5 11-03-14 11-07-14OKE-E52 Set Car Guide Rails - E5 10 11-10-14 11-21-14OKE-E511 Set Hydraulic Jacks - E5 5 11-24-14 12-02-14OKE-E53 Car Sling & Platform - E5 10 12-03-14 12-16-14OKE-E54 Freight Enclosure & Car Gates - E5 15 12-17-14 01-08-15OKE-E55 Bi-Parting Freight Doors & Wiring - E5 15 01-09-15 01-29-15OKE-E56 Start Up & Adjusting - E5 5 01-30-15 02-05-15OKE-E57 Testing & Inspections - E5 5 02-06-15 02-12-15Elevator 6Elevator 6 188 05-16-14 02-12-15

OKE-E61 Set Machines top of Hoistways - E6 5 05-16-14 05-22-141006-8R18 Install Elevator 6 56 11-21-14 02-12-15OKE-E62 Install Car & Counterweight Guide Rails - E6 10 11-24-14 12-09-14OKE-E63 Install Car Sling, Platform & Cables - E6 8 12-10-14 12-19-14OKE-E64 Install Hoistway Entrances - E6 10 12-22-14 01-06-15OKE-E65 Cabs, Fixtures & Wiring - E6 10 01-07-15 01-20-15OKE-E66 Start Up & Adjusting - E6 10 01-21-15 02-03-15OKE-E67 Testing & Inspections - E6 7 02-04-15 02-12-15Platform LiftPlatform Lift 16 02-05-15 02-26-15

1007-8R13 Install Platform Lift 16 02-05-15 02-26-15OKE-SL1 Install Lift - Platform Lift 10 02-06-15 02-19-15OKE-SL2 Testing & Inspections - Platform Lift 5 02-20-15 02-26-15

MEP EquipmMEP Equipment 18 05-27-14 06-19-14

1L90-8T2 Set Trans for mer - Lower Level BOH 5 05-27-14* 06-02-141000-8S7 Permanent Power to Gear and Energized 0 06-19-14

Interior BuiInterior Build Out 366 04-04-14 09-11-15

Transformer VTransformer Vault 6 05-15-14 05-22-14

DVE-1503 U.I. Pull Wire - Vault 2 05-15-14 05-16-14DVE-1504 U.I. Terminate Wire - Vault 4 05-19-14 05-22-14Priority RoomPriority Rooms 347 04-10-14 08-20-15

L001 UtilitiesL001 Utilities Room 223 04-10-14 02-25-15

MPC-013 Mechanical Hangers - Utilities Rm L001 10 04-10-14 04-23-14MPC-001 Housekeeping Pads - Utilities Rm L001 5 05-30-14 06-05-14MPC-021 Duct Install - Utilities Rm L001 1 06-06-14 06-06-14MPC-028 Insulate Duct - Utilities Rm L001 1 06-09-14 06-09-14MPC-042 HCWS/R - Utilities Rm L001 20 06-09-14 07-07-14MPC-049 LPSS/R - Utilities Rm L001 20 06-09-14 07-07-14DVE-801 Electrical Equipment Install - Rm L001 5 06-13-14 06-19-14DVE-802 Conduit Install - Rm L001 20 06-20-14 07-18-14JCI-010 BAS Conduit - Utilities Rm L001 20 06-20-14 07-18-14MPC-035 Condensate - Utilities Rm L001 3 07-08-14 07-10-14MPC-053 HVAC Piping Insulation - Utilities Rm L001 15 07-08-14 07-28-14DVE-813 Fire Alarm Rough-In - Rm L001 3 07-21-14 07-23-14DVE-803 Pull Wire - Rm L001 20 07-21-14 08-15-14JCI-030 BAS Wiring - Utilities Rm L001 20 07-21-14 08-15-14DVE-814 Fire Alarm Device - Rm L001 2 07-24-14 07-25-14MPC-060 HVAC Labeling/Tags - Utilities Rm L001 3 07-29-14 07-31-14DVE-804 Terminate Wire - Rm L001 20 08-18-14 09-15-14JCI-050 BAS Programming - Utilities Rm L001 6 01-15-15 01-22-15JCI-088 BAS Point to Point Checkout - Utilities Rm L001 14 01-23-15 02-11-15MPC-067 Start-UP Pre Function Checkout - Utilities Rm L001 10 02-12-15 02-25-15

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2014 2015 2016

Install Car & Counterweight Guide Rails - E3Install Car Sling, Platform & Cables - E3

Install Hoistway Entrances - E3Cabs, Fixtures & Wiring - E3

Start Up & Adjusting - E3Testing & Inspections - E3

Set Machines top of Hoistways - E4Install Elevator 4

Install Car & Counterweight Guide Rails - E4Install Car Sling, Platform & Cables - E4

Install Hoistway Entrances - E4Cabs, Fixtures & Wiring - E4

Start Up & Adjusting - E4Testing & Inspections - E4

Install Elevator 5Set Hydraulic Power Unit & Piping - E5

Set Car Guide Rails - E5Set Hydraulic Jacks - E5

Car Sling & Platform - E5Freight Enclosure & Car Gates - E5

Bi-Parting Freight Doors & Wiring - E5Start Up & Adjusting - E5Testing & Inspections - E5

Set Machines top of Hoistways - E6Install Elevator 6

Install Car & Counterweight Guide Rails - E6Install Car Sling, Platform & Cables - E6

Install Hoistway Entrances - E6Cabs, Fixtures & Wiring - E6

Start Up & Adjusting - E6Testing & Inspections - E6

Install Platform LiftInstall Lift - Platform Lift

Testing & Inspections - Platform Lift

Set Trans former - Lower Level BOH06-19-14, Permanent Power to Gear and Energized

U.I. Pull Wire - VaultU.I. Terminate Wire - Vault

Mechanical Hangers - Utilities Rm L001Housekeeping Pads - Utilities Rm L001Duct Install - Utilities Rm L001Insulate Duct - Utilities Rm L001

HCWS/R - Utilities Rm L001LPSS/R - Utilities Rm L001

Electrical Equipment Install - Rm L001Conduit Install - Rm L001BAS Conduit - Utilities Rm L001

Condensate - Utilities Rm L001HVAC Piping Insulation - Utilities Rm L001

Fire Alarm Rough-In - Rm L001Pull Wire - Rm L001BAS Wiring - Utilities Rm L001

Fire Alarm Device - Rm L001HVAC Labeling/Tags - Utilities Rm L001

Terminate Wire - Rm L001BAS Programming - Utilities Rm L001

BAS Point to Point Checkout - Utilities Rm L001Start-UP Pre Function Checkout - Utilities Rm L001

10030018-84Hancher Auditorium Replacement Facility 13 of 32 04-04-14

Milestone

Summary

Planned Work

Progressed Work

Critical Work

Crew 1

Crew 2

Primary Milestone

Hancher Auditorium Replacement - Construct New FacilityUniversity of Iowa

Project Layout - Data Date: 04-02-14

Page 14: Project SumProject Summary and Milestones · SM-1A5X1 Initial Substantial Completion (CO) 0 01-22-16 SM-1A18X3 Final Clean Complete 0 01-29-16 SM-1A5X4 Final Substantial Completion

- Activity ID Activity Name Orig.Dur'n

Start Finish

L007 MDF RoL007 MDF Room 135 09-05-14 03-18-15

JCI-018 BAS Conduit - MDF Rm L007 2 09-05-14 09-08-14DVE-2512 Electrical Equipment Install - MDF Rm L007 5 09-05-14 09-11-14JCI-038 BAS Wiring - MDF Rm L007 1 09-09-14 09-09-14DVE-2482 Conduit Install - MDF Rm L007 5 09-12-14 09-18-14DVE-2492 Pull Wire - MDF Rm L007 5 09-19-14 09-25-14DVE-2502 Terminate Wire - MDF Rm L007 5 09-26-14 10-02-14JCI-057 BAS Programming - MDF Rm L007 1 01-15-15 01-15-15DVE-2522 U.I. Pull & Terminate Wire - Telecom 10 02-26-15 03-11-15JCI-076 Build Graphics - Entire Building 15 02-26-15 03-18-15

L330 MechanL330 Mechanical Room 193 04-17-14 01-21-15

MPC-014 Mechanical Hangers - Mech Rm L330 20 04-17-14 05-14-14MPC-036 Condensate - Mech Rm L330 5 06-04-14 06-10-14MPC-043 HCWS/R - Mech Rm L330 25 06-04-14 07-09-14MPC-050 LPSS/R - Mech Rm L330 25 06-04-14 07-09-14DVE-901 Electrical Equipment Install - Rm L330 5 06-13-14 06-19-14MPC-022 Duct Install - Mech Rm L330 10 06-13-14 06-26-14DVE-902 Conduit Install - Rm L330 5 06-20-14 06-26-14JCI-009 BAS Conduit - Mech Rm L330 10 06-20-14 07-03-14DVE-913 Fire Alarm Rough-In - Rm L330 5 06-27-14 07-03-14MPC-002 Housekeeping Pads - Mech Rm L330 5 06-27-14 07-03-14MPC-029 Insulate Duct - Mech Rm L330 5 06-27-14 07-03-14DVE-903 Pull Wire - Rm L330 25 06-27-14 08-01-14DVE-914 Fire Alarm Device - Rm L330 5 07-07-14 07-11-14MPC-007 AHU Installation - Mech Rm L330 5 07-07-14 07-11-14JCI-029 BAS Wiring - Mech Rm L330 10 07-07-14 07-18-14MPC-054 HVAC Piping Insulation - Mech Rm L330 15 07-10-14 07-30-14JCI-087 BAS Point to Point Checkout - Mech Rm L330 14 07-21-14 08-07-14MPC-061 HVAC Labeling/Tags - Mech Rm L330 3 07-31-14 08-04-14DVE-904 Terminate Wire - Rm L330 20 08-04-14 08-29-14MPC-068 Start-UP Pre Function Checkout - Mech Rm L330 10 08-08-14 08-21-14JCI-049 BAS Programming - Mech Rm L330 5 01-15-15 01-21-15

1021 Electric1021 Electrical Room 45 10-30-14 01-06-15

DVE-1801 Electrical Equipment Install - Rm 1021 FOH 1 10 10-30-14 11-12-14DVE-1802 Conduit Install - Rm 1021 15 11-13-14 12-05-14DVE-1803 Pull Wire - Rm 1021 10 12-08-14 12-19-14DVE-1804 Terminate Wire - Rm 1021 10 12-22-14 01-06-15

1318 Electric1318 Electrical Room 105 09-19-14 02-18-15

DVE-1701 Electrical Equipment Install - Rm 1318 BOH 1 30 09-19-14 10-30-14DVE-1702 Conduit Install - Rm 1318 25 10-31-14 12-08-14DVE-1703 Pull Wire - Rm 1318 25 12-09-14 01-14-15DVE-1704 Terminate Wire - Rm 1318 25 01-15-15 02-18-15

1345 Electric1345 Electrical Room 25 08-04-14 09-08-14

DVE-1601 Electrical Equipment Install - Rm 1345 BOH 1 5 08-04-14 08-08-14DVE-1602 Conduit Install - Rm 1345 10 08-11-14 08-22-14DVE-1603 Pull Wire - Rm 1345 5 08-25-14 08-29-14DVE-1604 Terminate Wire - Rm 1345 5 09-02-14 09-08-14

2028 Electric2028 Electrical Room 45 09-02-14 11-03-14

DVE-2101 Electrical Equipment Install - Rm 2028 BOH 2 10 09-02-14 09-15-14DVE-2102 Conduit Install - Rm 2028 15 09-16-14 10-06-14DVE-2103 Pull Wire - Rm 2028 10 10-07-14 10-20-14DVE-2104 Terminate Wire - Rm 2028 10 10-21-14 11-03-14

2108 Mechan2108 Mechanical Room 208 09-05-14 06-30-15

MPC-016 Mechanical Hangers - Mech Rm 2206 5 09-05-14 09-11-14DVE-1101 Electrical Equipment Install - Rm 2206 Rehearsal 2 10-10-14 10-13-14MPC-038 Condensate - Mech Rm 2206 3 10-10-14 10-14-14MPC-024 Duct Install - Mech Rm 2206 10 10-10-14 10-23-14MPC-045 HCWS/R - Mech Rm 2206 10 10-10-14 10-23-14DVE-1102 Conduit Install - Rm 2206 3 10-14-14 10-16-14JCI-012 BAS Conduit - Mech Rm 2206 10 10-14-14 10-27-14DVE-1113 Fire Alarm Rough-In - Rm 2206 1 10-17-14 10-17-14DVE-1103 Pull Wire - Rm 2206 3 10-17-14 10-21-14DVE-1114 Fire Alarm Device - Rm 2206 1 10-20-14 10-20-14DVE-1104 Terminate Wire - Rm 2206 2 10-22-14 10-23-14MPC-004 Housekeeping Pads - Mech Rm 2206 2 10-24-14 10-27-14MPC-031 Insulate Duct - Mech Rm 2206 5 10-24-14 10-30-14MPC-056 HVAC Piping Insulation - Mech Rm 2206 8 10-24-14 11-04-14MPC-009 AHU Installation - Mech Rm 2206 5 10-28-14 11-03-14

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2014 2015 2016

BAS Conduit - MDF Rm L007Electrical Equipment Install - MDF Rm L007

BAS Wiring - MDF Rm L007Conduit Install - MDF Rm L007

Pull Wire - MDF Rm L007Terminate Wire - MDF Rm L007

BAS Programming - MDF Rm L007U.I. Pull & Terminate Wire - Telecom

Build Graphics - Entire Building

Mechanical Hangers - Mech Rm L330Condensate - Mech Rm L330

HCWS/R - Mech Rm L330LPSS/R - Mech Rm L330

Electrical Equipment Install - Rm L330Duct Install - Mech Rm L330Conduit Install - Rm L330

BAS Conduit - Mech Rm L330Fire Alarm Rough-In - Rm L330Housekeeping Pads - Mech Rm L330Insulate Duct - Mech Rm L330

Pull Wire - Rm L330Fire Alarm Device - Rm L330AHU Installation - Mech Rm L330

BAS Wiring - Mech Rm L330HVAC Piping Insulation - Mech Rm L330

BAS Point to Point Checkout - Mech Rm L330HVAC Labeling/Tags - Mech Rm L330

Terminate Wire - Rm L330Start-UP Pre Function Checkout - Mech Rm L330

BAS Programming - Mech Rm L330

Electrical Equipment Install - Rm 1021 FOH 1Conduit Install - Rm 1021

Pull Wire - Rm 1021Terminate Wire - Rm 1021

Electrical Equipment Install - Rm 1318 BOH 1Conduit Install - Rm 1318

Pull Wire - Rm 1318Terminate Wire - Rm 1318

Electrical Equipment Install - Rm 1345 BOH 1Conduit Install - Rm 1345

Pull Wire - Rm 1345Terminate Wire - Rm 1345

Electrical Equipment Install - Rm 2028 BOH 2Conduit Install - Rm 2028

Pull Wire - Rm 2028Terminate Wire - Rm 2028

Mechanical Hangers - Mech Rm 2206Electrical Equipment Install - Rm 2206 RehearsalCondensate - Mech Rm 2206

Duct Install - Mech Rm 2206HCWS/R - Mech Rm 2206

Conduit Install - Rm 2206BAS Conduit - Mech Rm 2206

Fire Alarm Rough-In - Rm 2206Pull Wire - Rm 2206Fire Alarm Device - Rm 2206Terminate Wire - Rm 2206Housekeeping Pads - Mech Rm 2206Insulate Duct - Mech Rm 2206

HVAC Piping Insulation - Mech Rm 2206AHU Installation - Mech Rm 2206

10030018-84Hancher Auditorium Replacement Facility 14 of 32 04-04-14

Milestone

Summary

Planned Work

Progressed Work

Critical Work

Crew 1

Crew 2

Primary Milestone

Hancher Auditorium Replacement - Construct New FacilityUniversity of Iowa

Project Layout - Data Date: 04-02-14

Page 15: Project SumProject Summary and Milestones · SM-1A5X1 Initial Substantial Completion (CO) 0 01-22-16 SM-1A18X3 Final Clean Complete 0 01-29-16 SM-1A5X4 Final Substantial Completion

- Activity ID Activity Name Orig.Dur'n

Start Finish

JCI-032 BAS Wiring - Mech Rm 2206 10 10-28-14 11-10-14MPC-063 HVAC Labeling/Tags - Mech Rm 2206 3 11-05-14 11-07-14JCI-090 BAS Point to Point Checkout - Mech Rm 2206 5 11-11-14 11-17-14MPC-070 Start-UP Pre Function Checkout - Mech Rm 2206 10 11-18-14 12-03-14JCI-052 BAS Programming - Mech Rm 2206 3 01-19-15 01-21-15APS-027 Rack R99 - AV Closet 2205A 18 06-05-15 06-30-15

2300 Mechan2300 Mechanical Room 102 08-28-14 01-23-15

MPC-015 Mechanical Hangers - Mech Rm 2300 13 08-28-14 09-16-14QCC-1010 Fluid Applied Flooring - BOH Level 2 (2300) 5 09-05-14 09-11-14MPC-020 Install Plenums - Mech Rm 2300 5 09-16-14 09-22-14MPC-037 Condensate - Mech Rm 2300 5 09-19-14 09-25-14DVE-1001 Electrical Equipment Install - Rm 2300 BOH 2 10 09-19-14 10-02-14MPC-051 LPSS/R - Mech Rm 2300 10 09-19-14 10-02-14MPC-023 Duct Install - Mech Rm 2300 15 09-19-14 10-09-14MPC-044 HCWS/R - Mech Rm 2300 20 09-19-14 10-16-14DVE-1002 Conduit Install - Rm 2300 10 10-03-14 10-16-14MPC-003 Housekeeping Pads - Mech Rm 2300 5 10-10-14 10-16-14MPC-030 Insulate Duct - Mech Rm 2300 15 10-10-14 10-30-14DVE-1013 Fire Alarm Rough-In - Rm 2300 5 10-17-14 10-23-14MPC-008 AHU Installation - Mech Rm 2300 10 10-17-14 10-30-14MPC-055 HVAC Piping Insulation - Mech Rm 2300 15 10-17-14 11-06-14JCI-011 BAS Conduit - Mech Rm 2300 15 10-17-14 11-06-14DVE-1003 Pull Wire - Rm 2300 25 10-17-14 11-20-14DVE-1014 Fire Alarm Device - Rm 2300 5 10-24-14 10-30-14MPC-062 HVAC Labeling/Tags - Mech Rm 2300 5 11-07-14 11-13-14JCI-031 BAS Wiring - Mech Rm 2300 15 11-07-14 12-01-14DVE-1004 Terminate Wire - Rm 2300 15 11-21-14 12-15-14JCI-089 BAS Point to Point Checkout - Mech Rm 2300 14 12-02-14 12-19-14MPC-069 Start-UP Pre Function Checkout - Mech Rm 2300 10 12-22-14 01-06-15JCI-051 BAS Programming - Mech Rm 2300 5 01-19-15 01-23-15

2328 Mechan2328 Mechanical Space 130 07-17-14 01-21-15

MPC-017 Mechanical Hangers - Mech Space 2328 5 07-17-14 07-23-14DVE-1201 Electrical Equipment Install - Rm 2328 BOH 2 3 09-09-14 09-11-14MPC-039 Condensate - Mech Space 2328 5 09-09-14 09-15-14MPC-025 Duct Install - Mech Space 2328 10 09-09-14 09-22-14MPC-046 HCWS/R - Mech Space 2328 15 09-09-14 09-29-14DVE-1202 Conduit Install - Rm 2328 3 09-12-14 09-16-14JCI-013 BAS Conduit - Mech Space 2328 10 09-12-14 09-25-14DVE-1213 Fire Alarm Rough-In - Rm 2328 1 09-17-14 09-17-14DVE-1203 Pull Wire - Rm 2328 3 09-17-14 09-19-14DVE-1214 Fire Alarm Device - Rm 2328 1 09-18-14 09-18-14DVE-1204 Terminate Wire - Rm 2328 2 09-22-14 09-23-14MPC-032 Insulate Duct - Mech Space 2328 5 09-23-14 09-29-14MPC-010 AHU Installation - Mech Space 2328 10 09-23-14 10-06-14JCI-033 BAS Wiring - Mech Space 2328 5 09-26-14 10-02-14MPC-057 HVAC Piping Insulation - Mech Space 2328 8 09-30-14 10-09-14JCI-091 BAS Point to Point Checkout - Mech Space 2328 5 10-03-14 10-09-14MPC-064 HVAC Labeling/Tags - Mech Space 2328 3 10-10-14 10-14-14MPC-071 Start-UP Pre Function Checkout - Mech Space 2328 10 10-10-14 10-23-14JCI-053 BAS Programming - Mech Space 2328 3 01-19-15 01-21-15

2336-MZ Sho2336-MZ Shop AHU Room 130 07-17-14 01-21-15

MPC-018 Mechanical Hangers - Shop AHU 2336-MZ 5 07-17-14 07-23-14MPC-040 Condensate - Shop AHU 2336-MZ 2 09-09-14 09-10-14DVE-1301 Electrical Equipment Install - Rm 2336 BOH 2 3 09-09-14 09-11-14MPC-047 HCWS/R - Shop AHU 2336-MZ 8 09-09-14 09-18-14MPC-026 Duct Install - Shop AHU 2336-MZ 15 09-09-14 09-29-14DVE-1302 Conduit Install - Rm 2336 5 09-12-14 09-18-14JCI-014 BAS Conduit - Shop AHU 2336-MZ 10 09-12-14 09-25-14DVE-1303 Pull Wire - Rm 2336 3 09-19-14 09-23-14DVE-1313 Fire Alarm Rough-In - Rm 2336 3 09-19-14 09-23-14MPC-058 HVAC Piping Insulation - Shop AHU 2336-MZ 3 09-19-14 09-23-14MPC-065 HVAC Labeling/Tags - Shop AHU 2336-MZ 2 09-24-14 09-25-14DVE-1304 Terminate Wire - Rm 2336 3 09-24-14 09-26-14DVE-1314 Fire Alarm Device - Rm 2336 3 09-24-14 09-26-14JCI-034 BAS Wiring - Shop AHU 2336-MZ 5 09-26-14 10-02-14MPC-005 Housekeeping Pads - Shop AHU 2336-MZ 4 09-30-14 10-03-14MPC-033 Insulate Duct - Shop AHU 2336-MZ 5 09-30-14 10-06-14MPC-011 AHU Installation - Shop AHU 2336-MZ 4 10-06-14 10-09-14JCI-092 BAS Point to Point Checkout - Shop AHU 2336-MZ 5 10-10-14 10-16-14

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2014 2015 2016

BAS Wiring - Mech Rm 2206HVAC Labeling/Tags - Mech Rm 2206

BAS Point to Point Checkout - Mech Rm 2206Start-UP Pre Function Checkout - Mech Rm 2206

BAS Programming - Mech Rm 2206Rack R99 - AV Closet 2205A

Mechanical Hangers - Mech Rm 2300Fluid Applied F looring - BOH Level 2 (2300)

Install Plenums - Mech Rm 2300Condensate - Mech Rm 2300

Electrical Equipment Install - Rm 2300 BOH 2LPSS/R - Mech Rm 2300

Duct Install - Mech Rm 2300HCWS/R - Mech Rm 2300Conduit Install - Rm 2300Housekeeping Pads - Mech Rm 2300

Insulate Duct - Mech Rm 2300Fire Alarm Rough-In - Rm 2300

AHU Installation - Mech Rm 2300HVAC Piping Insulation - Mech Rm 2300BAS Conduit - Mech Rm 2300

Pull Wire - Rm 2300Fire Alarm Device - Rm 2300

HVAC Labeling/Tags - Mech Rm 2300BAS Wiring - Mech Rm 2300

Terminate Wire - Rm 2300BAS Point to Point Checkout - Mech Rm 2300

Start-UP Pre Function Checkout - Mech Rm 2300BAS Programming - Mech Rm 2300

Mechanical Hangers - Mech Space 2328Electrical Equipment Install - Rm 2328 BOH 2Condensate - Mech Space 2328

Duct Install - Mech Space 2328HCWS/R - Mech Space 2328

Conduit Install - Rm 2328BAS Conduit - Mech Space 2328

Fire Alarm Rough-In - Rm 2328Pull Wire - Rm 2328Fire Alarm Device - Rm 2328

Terminate Wire - Rm 2328Insulate Duct - Mech Space 2328

AHU Installation - Mech Space 2328BAS Wiring - Mech Space 2328

HVAC Piping Insulation - Mech Space 2328BAS Point to Point Checkout - Mech Space 2328

HVAC Labeling/Tags - Mech Space 2328Start-UP Pre Function Checkout - Mech Space 2328

BAS Programming - Mech Space 2328

Mechanical Hangers - Shop AHU 2336-MZCondensate - Shop AHU 2336-MZElectrical Equipment Install - Rm 2336 BOH 2

HCWS/R - Shop AHU 2336-MZDuct Install - Shop AHU 2336-MZ

Conduit Install - Rm 2336BAS Conduit - Shop AHU 2336-MZ

Pull Wire - Rm 2336Fire Alarm Rough-In - Rm 2336HVAC Piping Insulation - Shop AHU 2336-MZHVAC Labeling/Tags - Shop AHU 2336-MZTerminate Wire - Rm 2336Fire Alarm Device - Rm 2336

BAS Wiring - Shop AHU 2336-MZHousekeeping Pads - Shop AHU 2336-MZInsulate Duct - Shop AHU 2336-MZAHU Installation - Shop AHU 2336-MZ

BAS Point to Point Checkout - Shop AHU 2336-MZ

10030018-84Hancher Auditorium Replacement Facility 15 of 32 04-04-14

Milestone

Summary

Planned Work

Progressed Work

Critical Work

Crew 1

Crew 2

Primary Milestone

Hancher Auditorium Replacement - Construct New FacilityUniversity of Iowa

Project Layout - Data Date: 04-02-14

Page 16: Project SumProject Summary and Milestones · SM-1A5X1 Initial Substantial Completion (CO) 0 01-22-16 SM-1A18X3 Final Clean Complete 0 01-29-16 SM-1A5X4 Final Substantial Completion

- Activity ID Activity Name Orig.Dur'n

Start Finish

MPC-072 Start-UP Pre Function Checkout - Shop AHU 2336-MZ 8 10-17-14 10-28-14JCI-054 BAS Programming - Shop AHU 2336-MZ 3 01-19-15 01-21-15

2411A Amp R2411A Amp Room 247 09-02-14 08-20-15

DVE-2001 Electrical Equipment Install - Rm 2411A BOH 2 10 09-02-14 09-15-14DVE-2002 Conduit Install - Rm 2411A 10 09-16-14 09-29-14DVE-2003 Pull Wire - Rm 2411A 5 09-30-14 10-06-14DVE-2004 Terminate Wire - Rm 2411A 5 10-07-14 10-13-14APS-009 Rack A99 - Amp Room 2411A 24 07-20-15 08-20-15

2413 Electric2413 Electrical Room 65 09-02-14 12-03-14

DVE-1901 Electrical Equipment Install - Rm 2413 BOH 2 20 09-02-14 09-29-14DVE-1902 Conduit Install - Rm 2413 25 09-30-14 11-03-14DVE-1903 Pull Wire - Rm 2413 10 11-04-14 11-17-14DVE-1904 Terminate Wire - Rm 2413 10 11-18-14 12-03-14

2750A Dimm2750A Dimmer Room 70 09-24-14 01-05-15

DVE-2201 Electrical Equipment Install - Rm 2750A BOH 2.5 15 09-24-14 10-14-14DVE-2202 Conduit Install - Rm 2750A 20 10-15-14 11-11-14DVE-2203 Pull Wire - Rm 2750A 15 11-12-14 12-04-14DVE-2204 Terminate Wire - Rm 2750A 20 12-05-14 01-05-15

3011 Mechan3011 Mechanical Room 93 10-06-14 02-17-15

MPC-019 Mechanical Hangers - Mech Rm 3011 10 10-06-14 10-17-14QCC-1020 Fluid Applied Flooring - FOH Level 3 (3011) 5 12-08-14 12-12-14DVE-1401 Electrical Equipment Install - Rm 3011 FOH 3 3 12-15-14 12-17-14MPC-027 Duct Install - Mech Rm 3011 10 12-15-14 12-29-14DVE-1402 Conduit Install - Rm 3011 4 12-18-14 12-23-14JCI-015 BAS Conduit - Mech Rm 3011 10 12-18-14 01-02-15DVE-1413 Fire Alarm Rough-In - Rm 3011 2 12-24-14 12-26-14DVE-1403 Pull Wire - Rm 3011 4 12-24-14 12-30-14DVE-1414 Fire Alarm Device - Rm 3011 2 12-29-14 12-30-14MPC-041 Condensate - Mech Rm 3011 3 12-30-14 01-02-15MPC-006 Housekeeping Pads - Mech Rm 3011 4 12-30-14 01-05-15MPC-034 Insulate Duct - Mech Rm 3011 5 12-30-14 01-06-15MPC-048 HCWS/R - Mech Rm 3011 10 12-30-14 01-13-15DVE-1404 Terminate Wire - Rm 3011 3 12-31-14 01-05-15JCI-035 BAS Wiring - Mech Rm 3011 10 01-05-15 01-16-15MPC-012 AHU Installation - Mech Rm 3011 6 01-06-15 01-13-15MPC-052 LPSS/R - Mech Rm 3011 10 01-14-15 01-27-15JCI-055 BAS Programming - Mech Rm 3011 3 01-28-15 01-30-15JCI-093 BAS Point to Point Checkout - Mech Rm 3011 5 01-28-15 02-03-15MPC-059 HVAC Piping Insulation - Mech Rm 3011 10 01-28-15 02-10-15MPC-073 Start-UP Pre Function Checkout - Mech Rm 3011 10 02-04-15 02-17-15MPC-066 HVAC Labeling/Tags - Mech Rm 3011 4 02-11-15 02-16-15

3023 Electric3023 Electrical Room 20 12-16-14 01-14-15

DVE-2401 Electrical Equipment Install - Rm 3023 FOH 3 5 12-16-14 12-22-14DVE-2402 Conduit Install - Rm 3023 6 12-23-14 12-31-14DVE-2403 Pull Wire - Rm 3023 4 01-02-15 01-07-15DVE-2404 Terminate Wire - Rm 3023 5 01-08-15 01-14-15

3342 Electric3342 Electrical Room 32 12-16-14 01-30-15

DVE-2301 Electrical Equipment Install - Rm 3342 FOH 3 8 12-16-14 12-26-14DVE-2302 Conduit Install - Rm 3342 12 12-29-14 01-14-15DVE-2303 Pull Wire - Rm 3342 7 01-15-15 01-23-15DVE-2304 Terminate Wire - Rm 3342 5 01-26-15 01-30-15Lower LevelLower Level 327 04-04-14 07-17-15

MPC-106 Mechanical Hangers - Lower Level 15 04-04-14 04-24-14MO-0030 Track Clips - Lower Level 10 04-07-14 04-18-14HM-1010 CMU - FOH Priority Lower Level 6 04-18-14 04-25-14RPF-001 Fireproofing - Lower Level Under Theater (Spraying bot. 1st Flr) 6 04-18-14 04-25-14RPF-002 Fireproofing - Lower Level FOH (Spraying bot. 1st Flr) 6 05-22-14 05-30-14MO-1000 Wall Fr aming - Lower Level 15 05-22-14 06-12-14DI-0000 Install HM Frames - Lower Level 16 05-22-14 06-13-14WBCI-1110 Seal Penetrations - Lower Level 21 05-22-14 06-20-14DVE-001 Conduit Rough-In - Lower Level 25 05-22-14 06-26-14HM-1000 CMU - BOH Priority Lower Level 5 05-28-14 06-03-14RPF-003 Fireproofing - Lower Level BOH (Spraying bot. 1st Flr) 6 05-28-14 06-04-14MPC-082 Duct Main Install - FOH Lower Level 10 05-30-14 06-12-14MPC-226 Gravity Piping - Lower Level 10 05-30-14 06-12-14MPC-130 CWS/R - Lower Level 20 05-30-14 06-26-14MPC-138 HWS/R - Lower Level 20 05-30-14 06-26-14JCI-001 BAS Conduit - Lower Level 20 05-30-14 06-26-14

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2014 2015 2016

Start-UP Pre Function Checkout - Shop AHU 2336-MZBAS Programming - Shop AHU 2336-MZ

Electrical Equipment Install - Rm 2411A BOH 2Conduit Install - Rm 2411A

Pull Wire - Rm 2411ATerminate Wire - Rm 2411A

Rack A99 - Amp Room 2411A

Electrical Equipment Install - Rm 2413 BOH 2Conduit Install - Rm 2413

Pull Wire - Rm 2413Terminate Wire - Rm 2413

Electrical Equipment Install - Rm 2750A BOH 2.5Conduit Install - Rm 2750A

Pull Wire - Rm 2750ATerminate Wire - Rm 2750A

Mechanical Hangers - Mech Rm 3011Fluid Applied F looring - FOH Level 3 (3011)

Electrical Equipment Install - Rm 3011 FOH 3Duct Install - Mech Rm 3011

Conduit Install - Rm 3011BAS Conduit - Mech Rm 3011

Fire Alarm Rough-In - Rm 3011Pull Wire - Rm 3011Fire Alarm Device - Rm 3011Condensate - Mech Rm 3011Housekeeping Pads - Mech Rm 3011Insulate Duct - Mech Rm 3011

HCWS/R - Mech Rm 3011Terminate Wire - Rm 3011

BAS Wiring - Mech Rm 3011AHU Installation - Mech Rm 3011

LPSS/R - Mech Rm 3011BAS Programming - Mech Rm 3011

BAS Point to Point Checkout - Mech Rm 3011HVAC Piping Insulation - Mech Rm 3011

Start-UP Pre Function Checkout - Mech Rm 3011HVAC Labeling/Tags - Mech Rm 3011

Electrical Equipment Install - Rm 3023 FOH 3Conduit Install - Rm 3023

Pull Wire - Rm 3023Terminate Wire - Rm 3023

Electrical Equipment Install - Rm 3342 FOH 3Conduit Install - Rm 3342

Pull Wire - Rm 3342Terminate Wire - Rm 3342

Mechanical Hangers - Lower LevelTrack Clips - Lower Level

CMU - FOH Priority Lower LevelFireproofing - Lower Level Under Theater (Spraying bot. 1st Flr)

Fireproofing - Lower Level FOH (Spraying bot. 1st Flr)Wall Fr aming - Lower LevelInstall HM Frames - Lower Level

Seal Penetrations - Lower LevelConduit Rough-In - Lower Level

CMU - BOH Priority Lower LevelFireproofing - Lower Level BOH (Spraying bot. 1st Flr)

Duct Main Install - FOH Lower LevelGravity Piping - Lower Level

CWS/R - Lower LevelHWS/R - Lower LevelBAS Conduit - Lower Level

10030018-84Hancher Auditorium Replacement Facility 16 of 32 04-04-14

Milestone

Summary

Planned Work

Progressed Work

Critical Work

Crew 1

Crew 2

Primary Milestone

Hancher Auditorium Replacement - Construct New FacilityUniversity of Iowa

Project Layout - Data Date: 04-02-14

Page 17: Project SumProject Summary and Milestones · SM-1A5X1 Initial Substantial Completion (CO) 0 01-22-16 SM-1A18X3 Final Clean Complete 0 01-29-16 SM-1A5X4 Final Substantial Completion

- Activity ID Activity Name Orig.Dur'n

Start Finish

MPC-192 In-Wall Plumbing - Lower Level 25 05-30-14 07-03-14MPC-220 Domestic Piping - Lower Level 38 05-30-14 07-23-14DVE-002 In-Wall Electrical - Lower Level 45 05-30-14 08-01-14ART-3210 Acoustic Finish AF-1 Clgs Lower Level (FOH) 10 06-02-14 06-13-14HM-1020 CMU - Lower Level 13 06-04-14 06-20-14MPC-212 OH Plumbing Piping - Lower Level 20 06-06-14 07-03-14MPC-081 Duct Main Install - BOH Lower Level 15 06-11-14 07-01-14TSS-0001 Sprinkler Mains - Lower Level 9 06-13-14 06-25-14MPC-122 Condensate - Lower Level 10 06-13-14 06-26-14ART-2510 Acoustic Finish AF-1 Clgs - Lower Level (east) 15 06-16-14 07-07-14TSS-0002 Sprinkler Branch Lines - Lower Level 24 06-20-14 07-24-14MPC-098 Duct Branch Install - Lower Level 15 06-23-14 07-14-14MPC-148 HVAC Pressure Testing - Lower Level 3 06-27-14 07-01-14DVE-008 Security Rough-In - Lower Level 5 06-27-14 07-03-14DVE-010 Telecom Rough-In - Lower Level 5 06-27-14 07-03-14DVE-013 Fire Alarm Rough-In - Lower Level 10 06-27-14 07-11-14DVE-012 Install Cable Tray - Lower Level 20 06-27-14 07-25-14JCI-021 BAS Wiring - Lower Level 20 06-27-14 07-25-14DVE-003 Pull Wire - Lower Level 30 06-27-14 08-08-14MPC-114 Duct Air Leakage Testing - Lower Level 10 07-02-14 07-16-14MPC-155 HVAC Piping Insulation - Lower Level 15 07-02-14 07-23-14MO-3000 Gyp Board - Lower Level 32 07-02-14 08-15-14ART-2520 Acoustic Finish AF-1 Clgs - Lower Level (west) 15 07-08-14 07-28-14MO-2000 Wall Insulation - Lower Level 15 07-14-14 08-01-14MPC-162 HVAC Labeling/Tags - Lower Level 8 07-18-14 07-29-14MO-6000 Ceiling Framing - Lower Level 5 07-22-14 07-28-14MPC-205 Plumbing Pressure Testing - Lower Level 15 07-24-14 08-13-14TSS-0003 Sprinkler Testing - Lower Level 1 07-25-14 07-25-14JCI-079 BAS Point to Point Checkout - Lower Level 10 07-28-14 08-08-14ART-3205 Acoustic Finish AF-1 Clgs - Lower Level (BOH) 10 07-29-14 08-11-14MPC-083 Duct Main Install - Partier Lower Level 25 07-29-14 09-02-14MO-5000 Tape & Sand - Lower Level 18 07-30-14 08-22-14WBCI-2210 Install Stair XST-05 - BOH 10 08-04-14 08-15-14DVE-004 Terminate Wire - Lower Level 30 08-11-14 09-22-14PNT-1000 Paint - Lower Level 18 08-12-14 09-05-14MPC-233 Plumbing Insulation - Lower Level 20 08-14-14 09-11-14ART-3015 Acoustic Wall Panels - Lower Level FOH 10 08-29-14 09-12-14ART-2000 Acoustic Ceiling Grid - Lower Level 10 09-02-14 09-15-14AWS-5040 Interior Glazing - Lower Level 5 09-04-14 09-10-14MPC-240 Plumbing Labeling/Tags - Lower Level 10 09-05-14 09-18-14MPC-171 HVAC Trim - Lower Level 3 09-15-14 09-17-14ART-3005 Acoustic Wall Panels - Lower Level East 10 09-15-14 09-26-14DVE-006 Electrical Trim - Lower Level 20 09-23-14 10-20-14DVE-007 Power to Equipment - Lower Level 30 09-23-14 11-03-14ART-3010 Acoustic Wall Panels - Lower Level West 10 09-29-14 10-10-14TSS-0004 Sprinkler Finishes - Lower Level 4 10-09-14 10-14-14DVE-009 Security Trim - Lower Level 5 10-09-14 10-15-14DVE-011 Telecom Trim - Lower Level 5 10-09-14 10-15-14DVE-014 Fire Alarm Device - Lower Level 5 10-09-14 10-15-14ART-2125 Acoustic Ceiling Tile - Lower Level 10 10-09-14 10-22-14DVE-005 Install Fixtures - Lower Level 20 10-09-14 11-05-14ART-3000 Acoustic Wall Panels - Lower Level BOH 10 10-13-14 10-24-14QCC-1000 Fluid Applied Flooring - Lower Level (L008,L008A) 5 10-21-14 10-27-14QM-1010 Ceramic Tile Floors - Lower Level 1 10-23-14 10-23-14DI-1000 Install Doors & Hardware - Lower Level 16 10-23-14 11-13-14QM-1000 Ceramic Tile Walls - Lower Level 1 10-24-14 10-24-14MPC-198 Plumbing Fixtures - Lower Level 22 10-24-14 11-24-14GL1000 Food Service Equipment - Lower Level 8 10-28-14 11-06-14JCI-041 BAS Programming - Lower Level 6 01-15-15 01-22-15APS-029 Rack X98 - LL Sound Maint. L152 12 07-01-15 07-17-15Back of HousBack of House 264 06-17-14 06-30-15

1st Floor1st Floor 158 06-17-14 01-30-15

MPC-107 Mechanical Hangers - BOH Lvl 1 17 06-17-14 07-10-14MO-0005 Track Clips - BOH Lvl 1 17 06-17-14 07-10-14RPF-101 Fireproofing - BOH Lvl 1 (Spraying bot. 2nd Flr) 12 07-11-14 07-28-14MO-1005 Wall Fr aming - BOH Lvl 1 17 07-21-14 08-12-14HM-1070 CMU - BOH Lvl 1 17 07-23-14 08-14-14WBCI-1080 Seal Penetrations - BOH Lvl 1 17 07-23-14 08-14-14DI-0005 Install HM Frames BOH Level 1 14 07-24-14 08-12-14

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2014 2015 2016

In-Wall Plumbing - Lower LevelDomestic Piping - Lower Level

In-Wall Electrical - Lower LevelAcoustic Finish AF-1 Clgs Lower Level (FOH)

CMU - Lower LevelOH Plumbing Piping - Lower LevelDuct Main Install - BOH Lower Level

Sprinkler Mains - Lower LevelCondensate - Lower Level

Acoustic Finish AF-1 Clgs - Lower Level (east)Sprinkler Branch Lines - Lower Level

Duct Branch Install - Lower LevelHVAC Pressure Testing - Lower LevelSecurity Rough-In - Lower LevelTelecom Rough-In - Lower Level

Fire Alarm Rough-In - Lower LevelInstall Cable Tray - Lower LevelBAS Wiring - Lower Level

Pull Wire - Lower LevelDuct Air Leakage Testing - Lower Level

HVAC Piping Insulation - Lower LevelGyp Board - Lower Level

Acoustic Finish AF-1 Clgs - Lower Level (west)Wall Insulat ion - Lower Level

HVAC Labeling/Tags - Lower LevelCeiling Framing - Lower Level

Plumbing Pressure Testing - Lower LevelSprinkler Testing - Lower Level

BAS Point to Point Checkout - Lower LevelAcoustic Finish AF-1 Clgs - Lower Level (BOH)

Duct Main Install - Partier Lower LevelTape & Sand - Lower Level

Install Stair XST-05 - BOHTerminate Wire - Lower Level

Paint - Lower LevelPlumbing Insulation - Lower LevelAcoustic Wall Panels - Lower Level FOHAcoustic Ceiling Grid - Lower Level

Interior Glazing - Lower LevelPlumbing Labeling/Tags - Lower LevelHVAC Trim - Lower Level

Acoustic Wall Panels - Lower Level EastElectrical Trim - Lower Level

Power to Equipment - Lower LevelAcoustic Wall Panels - Lower Level WestSprinkler Finishes - Lower LevelSecurity Trim - Lower LevelTelecom Trim - Lower LevelFire Alarm Device - Lower Level

Acoustic Ceiling Tile - Lower LevelInstall Fixtures - Lower Level

Acoustic Wall Panels - Lower Level BOHFluid Applied Flooring - Lower Level (L008,L008A)

Ceramic Tile F loors - Lower LevelInstall Doors & Hardware - Lower Level

Ceramic Tile Walls - Lower LevelPlumbing Fixtures - Lower Level

Food Service Equipment - Lower LevelBAS Programming - Lower Level

Rack X98 - LL Sound Maint. L152

Mechanical Hangers - BOH Lvl 1Track Clips - BOH Lvl 1

Fireproofing - BOH Lvl 1 (Spraying bot. 2nd Flr)Wall Fr aming - BOH Lvl 1CMU - BOH Lvl 1Seal Penetrations - BOH Lvl 1Install HM Frames BOH Level 1

10030018-84Hancher Auditorium Replacement Facility 17 of 32 04-04-14

Milestone

Summary

Planned Work

Progressed Work

Critical Work

Crew 1

Crew 2

Primary Milestone

Hancher Auditorium Replacement - Construct New FacilityUniversity of Iowa

Project Layout - Data Date: 04-02-14

Page 18: Project SumProject Summary and Milestones · SM-1A5X1 Initial Substantial Completion (CO) 0 01-22-16 SM-1A18X3 Final Clean Complete 0 01-29-16 SM-1A5X4 Final Substantial Completion

- Activity ID Activity Name Orig.Dur'n

Start Finish

MPC-146 LPSS/R - BOH Lvl 1 15 07-28-14 08-15-14MPC-131 CWS/R - BOH Lvl 1 20 07-28-14 08-22-14MPC-139 HWS/R - BOH Lvl 1 20 07-28-14 08-22-14MPC-213 OH Plumbing Piping - BOH Lvl 1 20 07-28-14 08-22-14JCI-002 BAS Conduit - BOH Lvl 1 20 07-28-14 08-22-14MPC-086 Duct Main Install - BOH Lvl 1 30 07-28-14 09-08-14MPC-193 In-Wall Plumbing - BOH Lvl 1 30 07-28-14 09-08-14MPC-227 Gravity Piping - BOH Lvl 1 30 07-28-14 09-08-14DVE-101 Conduit Rough-In - BOH Lvl 1 40 07-28-14 09-22-14MPC-221 Domestic Piping - BOH Lvl 1 45 07-28-14 09-29-14ART-2600 Acoustic Finish AF-1 Clgs - BOH Lvl 1 10 07-29-14 08-11-14DVE-102 In-Wall Electrical - BOH Lvl 1 20 07-30-14 08-26-14MPC-123 Condensate - BOH Lvl 1 3 08-04-14 08-06-14MO-2005 Wall Insulation - BOH Lvl 1 17 08-15-14 09-09-14WBCI-2215 Install Stair XST-04 - BOH 10 08-18-14 08-29-14TSS-0009 Sprinkler Mains - BOH Lvl 1 18 08-20-14 09-15-14MPC-149 HVAC Pressure Testing - BOH Lvl 1 8 08-25-14 09-04-14MPC-099 Duct Branch Install - BOH Lvl 1 20 08-25-14 09-22-14JCI-022 BAS Wiring - BOH Lvl 1 25 08-25-14 09-29-14TSS-0010 Sprinkler Branch Lines - BOH Lvl 1 36 08-27-14 10-16-14MPC-156 HVAC Piping Insulation - BOH Lvl 1 15 09-05-14 09-25-14MPC-115 Duct Air Leakage Testing - BO H Lvl 1 10 09-09-14 09-22-14MO-3005 Gyp Board - BOH Lvl 1 43 09-12-14 11-11-14MO-6005 Ceiling Framing - BOH Lvl 1 10 09-19-14 10-02-14DVE-108 Security Rough-In - BOH Lvl 1 5 09-23-14 09-29-14DVE-110 Telecom Rough-In - BOH Lvl 1 5 09-23-14 09-29-14MPC-163 HVAC Labeling/Tags - BOH Lvl 1 8 09-23-14 10-02-14DVE-113 Fire Alarm Rough-In - BOH Lvl 1 10 09-23-14 10-06-14DVE-103 Pull Wire - BOH Lvl 1 18 09-23-14 10-16-14DVE-112 Install Cable Tray - BOH Lvl 1 20 09-23-14 10-20-14JCI-080 BAS Point to Point Checkout - BOH Lvl 1 7 09-30-14 10-08-14MPC-206 Plumbing Pressure Testing - BOH Lvl 1 15 09-30-14 10-20-14DD-1000 Overhead Coiling Doors BOH 1 1 10-02-14 10-02-14MO-5005 Tape & Sand - BOH Lvl 1 27 10-13-14 11-18-14TSS-0011 Sprinkler Testing - BOH Lvl 1 2 10-17-14 10-20-14DVE-104 Terminate Wire - BOH Lvl 1 30 10-17-14 12-01-14MPC-234 Plumbing Insulation - BOH Lvl 1 20 10-21-14 11-17-14PNT-1010 Paint - BOH Lvl 1 27 10-31-14 12-10-14MPC-241 Plumbing Labeling/Tags - BOH Lvl 1 10 11-11-14 11-24-14WBCI-9015 Casework - BOH Lvl 1 15 11-25-14 12-17-14ART-2005 Acoustic Ceiling Grid - BOH Lvl 1 20 11-25-14 12-24-14DVE-107 Power to Equipment - BOH Lvl 1 30 12-02-14 01-14-15DVE-106 Electrical Trim - BOH Lvl 1 40 12-02-14 01-28-15ART-3020 Acoustic Wall Panels - BOH Lvl 1 5 12-04-14 12-10-14AWS-5050 Interior Glazing - BOH Level 1 5 12-04-14 12-10-14WBCI-3115 Seal Concrete Floors - BOH Lvl 1 5 12-11-14 12-17-14WBCI-3040 Carpet Tile - BOH Lvl 1 5 12-11-14 12-17-14APS-005 Wire Pull - BOH LL & L1 6 12-11-14 12-18-14WBCI-9030 Shelving - BOH Lvl 1 10 12-11-14 12-24-14WBCI-3150 Polish Concrete Floors - BOH Lvl 1 10 12-11-14 12-24-14WBCI-3160 VCT Flooring - BOH Lvl 1 10 12-11-14 12-24-14DI-1010 Install Doors & Hardware - BOH Level 1 14 12-18-14 01-08-15WBCI-6010 Wood Trim - BOH Lvl 1 15 12-18-14 01-09-15QM-1030 Ceramic Tile Floors - BOH Level 1 2 12-23-14 12-24-14QM-1020 Ceramic Tile Walls - BOH Lvl 1 4 12-26-14 12-31-14MPC-199 Plumbing Fixtures - BOH Lvl 1 10 01-02-15 01-15-15TSS-0012 Sprinkler Finishes - BOH Lvl 1 4 01-05-15 01-08-15DVE-109 Security Trim - BOH Lvl 1 5 01-05-15 01-09-15DVE-111 Telecom Trim - BOH Lvl 1 5 01-05-15 01-09-15DVE-114 Fire Alarm Device - BOH Lvl 1 5 01-05-15 01-09-15MPC-172 HVAC Trim - BOH Lvl 1 7 01-05-15 01-13-15ART-2085 Acoustic Ceiling Tile - BOH Lvl 1 20 01-05-15 01-30-15DVE-105 Install Fixtures - BOH Lvl 1 10 01-12-15 01-23-15JCI-042 BAS Programming - BOH Lvl 1 5 01-20-15 01-26-15

2nd Floor2nd Floor 256 06-27-14 06-30-15

MPC-108 Mechanical Hangers - BOH Lvl 2 28 06-27-14 08-06-14MO-0010 Track Clips - BOH Lvl 2 28 06-27-14 08-06-14RPF-201 Fireproofing - BOH Lvl 2(Spraying bot. 3rd Flr) 15 08-07-14 08-27-14MO-1010 Wall Fr aming - BOH Lvl 2 26 08-18-14 09-23-14JCI-003 BAS Conduit - BOH Lvl 2 25 08-25-14 09-29-14

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2014 2015 2016

LPSS/R - BOH Lvl 1CWS/R - BOH Lvl 1HWS/R - BOH Lvl 1OH Plumbing Piping - BOH Lvl 1BAS Conduit - BOH Lvl 1

Duct Main Install - BOH Lvl 1In-Wall Plumbing - BOH Lvl 1Gravity Piping - BOH Lvl 1

Conduit Rough-In - BOH Lvl 1Domestic Piping - BOH Lvl 1

Acoustic Finish AF-1 Clgs - BOH Lvl 1In-Wall Electrical - BOH Lvl 1

Condensate - BOH Lvl 1Wall Insulat ion - BOH Lvl 1

Install Stair XST-04 - BOHSprinkler Mains - BOH Lvl 1

HVAC Pressure Testing - BOH Lvl 1Duct Branch Install - BOH Lvl 1

BAS Wiring - BOH Lvl 1Sprinkler Branch Lines - BOH Lvl 1

HVAC Piping Insulation - BOH Lvl 1Duct Air Leakage Testing - BOH Lvl 1

Gyp Board - BOH Lvl 1Ceiling Framing - BOH Lvl 1

Security Rough-In - BOH Lvl 1Telecom Rough-In - BOH Lvl 1HVAC Labeling/Tags - BOH Lvl 1Fire Alarm Rough-In - BOH Lvl 1

Pull Wire - BOH Lvl 1Install Cable Tray - BOH Lvl 1

BAS Point to Point Checkout - BOH Lvl 1Plumbing Pressure Testing - BOH Lvl 1

Overhead Coiling Doors BOH 1Tape & Sand - BOH Lvl 1

Sprinkler Testing - BOH Lvl 1Terminate Wire - BOH Lvl 1

Plumbing Insulation - BOH Lvl 1Paint - BOH Lvl 1

Plumbing Labeling/Tags - BOH Lvl 1Casework - BOH Lvl 1

Acoustic Ceiling Grid - BOH Lvl 1Power to Equipment - BOH Lvl 1

Electrical Trim - BOH Lvl 1Acoustic Wall Panels - BOH Lvl 1Interior Glazing - BOH Level 1

Seal Concrete Floors - BOH Lvl 1Carpet Tile - BOH Lvl 1Wire Pull - BOH LL & L1

Shelving - BOH Lvl 1Polish Concrete Floors - BOH Lvl 1VCT Flooring - BOH Lvl 1

Install Doors & Hardware - BOH Level 1Wood Trim - BOH Lvl 1

Ceramic Tile Floors - BOH Level 1Ceramic Tile Walls - BOH Lvl 1

Plumbing Fixtures - BOH Lvl 1Sprinkler Finishes - BOH Lvl 1

Security Trim - BOH Lvl 1Telecom Trim - BOH Lvl 1

Fire Alarm Device - BOH Lvl 1HVAC Trim - BOH Lvl 1

Acoustic Ceiling Tile - BO H Lvl 1Install Fixtures - BOH Lvl 1

BAS Programming - BOH Lvl 1

Mechanical Hangers - BOH Lvl 2Track Clips - BOH Lvl 2

Fireproofing - BOH Lvl 2(Spraying bot. 3rd Flr)Wall Framing - BOH Lvl 2

BAS Conduit - BOH Lvl 2

10030018-84Hancher Auditorium Replacement Facility 18 of 32 04-04-14

Milestone

Summary

Planned Work

Progressed Work

Critical Work

Crew 1

Crew 2

Primary Milestone

Hancher Auditorium Replacement - Construct New FacilityUniversity of Iowa

Project Layout - Data Date: 04-02-14

Page 19: Project SumProject Summary and Milestones · SM-1A5X1 Initial Substantial Completion (CO) 0 01-22-16 SM-1A18X3 Final Clean Complete 0 01-29-16 SM-1A5X4 Final Substantial Completion

- Activity ID Activity Name Orig.Dur'n

Start Finish

MPC-087 Duct Main Install - BOH Lvl 2 30 08-25-14 10-06-14DVE-301 Conduit Rough-In - BOH Lvl 2 35 08-25-14 10-13-14MPC-214 OH Plumbing Piping - BOH Lvl 2 20 08-26-14 09-23-14HM-1060 CMU - BOH Lvl 2 4 08-28-14 09-03-14ART-3225 Acoustic Finish AF-1&2 Clgs - BOH Lvl 2 5 08-28-14 09-04-14WBCI-1085 Seal Penetrations - BOH Lvl 2 18 08-28-14 09-23-14DVE-302 In-Wall Electrical - BOH Lvl 2 20 09-03-14 09-30-14MPC-194 In-Wall Plumbing - BOH Lvl 2 20 09-03-14 09-30-14MO-2010 Wall Insulation - BOH Lvl 2 18 09-05-14 09-30-14MPC-124 Condensate - BOH Lvl 2 6 09-10-14 09-17-14MPC-132 CWS/R - BOH Lvl 2 10 09-10-14 09-23-14DI-0010 Install HM Frames BOH Level 2 10 09-10-14 09-23-14MPC-140 HWS/R - BOH Lvl 2 25 09-10-14 10-14-14MPC-222 Domestic Piping - BOH Lvl 2 17 09-19-14 10-13-14MPC-228 Gravity Piping - BOH Lvl 2 35 09-19-14 11-06-14MO-6010 Ceiling Framing - BOH Lvl 2 14 09-26-14 10-15-14MPC-100 Duct Branch Install - BOH Lvl 2 20 09-30-14 10-27-14JCI-023 BAS Wiring - BOH Lvl 2 35 09-30-14 11-17-14TSS-0013 Sprinkler Mains - BOH Lvl 2 4 10-07-14 10-10-14MPC-116 Duct Air Leakage Testing - BO H Lvl 2 5 10-07-14 10-13-14DVE-308 Security Rough-In - BOH Lvl 2 5 10-14-14 10-20-14DVE-313 Fire Alarm Rough-In - BOH Lvl 2 5 10-14-14 10-20-14MPC-207 Plumbing Pressure Testing - BOH Lvl 2 10 10-14-14 10-27-14DVE-310 Telecom Rough-In - BOH Lvl 2 11 10-14-14 10-28-14DVE-303 Pull Wire - BOH Lvl 2 17 10-14-14 11-05-14TSS-0014 Sprinkler Branch Lines - BOH Lvl 2 21 10-14-14 11-11-14MO-3010 Gyp Board - BOH Lvl 2 52 10-14-14 12-29-14MPC-150 HVAC Pressure Testing - BOH Lvl 2 10 10-15-14 10-28-14DVE-312 Install Cable Tray - BOH Lvl 2 6 10-20-14 10-27-14MPC-157 HVAC Piping Insulation - BOH Lvl 2 15 10-29-14 11-18-14MPC-235 Plumbing Insulation - BOH Lvl 2 20 11-04-14 12-03-14TSS-0015 Sprinkler Testing - BOH Lvl 2 1 11-12-14 11-12-14MO-5010 Tape & Sand - BOH Lvl 2 36 11-12-14 01-06-15JCI-081 BAS Point to Point Checkout - BOH Lvl 2 7 11-18-14 11-26-14MPC-164 HVAC Labeling/Tags - BOH Lvl 2 12 11-19-14 12-08-14DVE-304 Terminate Wire - BOH Lvl 2 12 11-20-14 12-09-14PNT-1015 Paint - BOH Lvl 2 36 11-20-14 01-14-15MPC-242 Plumbing Labeling/Tags - BOH Lvl 2 10 11-25-14 12-10-14ART-2015 Acoustic Ceiling Grid - BOH Lvl 2 20 12-23-14 01-21-15DI-1030 Install Doors & Hardware - BOH Level 2 10 12-31-14 01-14-15WBCI-9025 Casework - BOH Lvl 2 15 12-31-14 01-21-15DVE-306 Electrical Trim - BOH Lvl 2 30 12-31-14 02-11-15DVE-307 Power to Equipment - BOH Lvl 2 15 01-05-15 01-23-15AWS-5060 Interior Glazing - BOH Level 2 7 01-09-15 01-19-15ART-3030 Acoustic Wall Panels - BOH Lvl 2 5 01-13-15 01-19-15WBCI-3125 Seal Concrete Floors - BOH Lvl 2 5 01-15-15 01-21-15WBCI-3050 Carpet Tile - BOH Lvl 2 5 01-15-15 01-21-15APS-006 Wire Pull - BOH Lvl 2 6 01-15-15 01-22-15WBCI-9035 Shelving - BOH Lvl 2 10 01-15-15 01-28-15WBCI-3155 Polish Concrete Floors - BOH Lvl 2 10 01-15-15 01-28-15WBCI-3165 VCT Flooring - BOH Lvl 2 10 01-15-15 01-28-15QM-1060 Ceramic Tile Floors - BOH Level 2 5 01-22-15 01-28-15WBCI-6025 Wood Trim - BOH Lvl 2 15 01-22-15 02-11-15APS-007 Plug Boxes - BOH 3 01-23-15 01-27-15JCI-043 BAS Programming - BOH Lvl 2 5 01-27-15 02-02-15APS-010 70v Speakers - BOH 20 01-28-15 02-24-15DVE-314 Fire Alarm Device - BOH Lvl 2 3 01-29-15 02-02-15QM-1050 Ceramic Tile Walls - BOH Lvl 2 3 01-29-15 02-02-15DVE-309 Security Trim - BOH Lvl 2 5 01-29-15 02-04-15DVE-311 Telecom Trim - BOH Lvl 2 5 01-29-15 02-04-15TSS-0016 Sprinkler Finishes - BOH Lvl 2 7 01-29-15 02-06-15MPC-173 HVAC Trim - BOH Lvl 2 10 01-29-15 02-11-15DVE-305 Install Fixtures - BOH Lvl 2 20 01-29-15 02-25-15ART-2090 Acoustic Ceiling Tile - BOH Lvl 2 20 01-29-15 02-25-15MPC-200 Plumbing Fixtures - BOH Lvl 2 18 02-03-15 02-26-15TSI-007 Paint Frame - Scene Shop 20 02-26-15 03-25-15TSI-009 Gantry Cranes - Scene Shop & Rehearsal 15 03-26-15 04-15-15APS-030 Displays - BOH 3 06-26-15 06-30-15Front of HousFront of House/ Lobby 362 04-10-14 09-11-15

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2014 2015 2016

Duct Main Install - BOH Lvl 2Conduit Rough-In - BOH Lvl 2

OH Plumbing Piping - BOH Lvl 2CMU - BOH Lvl 2Acoustic Finish AF-1&2 Clgs - BOH Lvl 2

Seal Penetrations - BOH Lvl 2In-Wall Electrical - BOH Lvl 2In-Wall Plumbing - BOH Lvl 2Wall Insulation - BOH Lvl 2

Condensate - BOH Lvl 2CWS/R - BOH Lvl 2Install HM Frames BOH Level 2

HWS/R - BOH Lvl 2Domestic Piping - BOH Lvl 2

Gravity Piping - BOH Lvl 2Ceiling Framing - BOH Lvl 2

Duct Branch Install - BOH Lvl 2BAS Wiring - BOH Lvl 2

Sprinkler Mains - BOH Lvl 2Duct Air Leakage Testing - BO H Lvl 2

Security Rough-In - BOH Lvl 2Fire Alarm Rough-In - BOH Lvl 2

Plumbing Pressure Testing - BOH Lvl 2Telecom Rough-In - BOH Lvl 2

Pull Wire - BOH Lvl 2Sprinkler Branch Lines - BOH Lvl 2

Gyp Board - BOH Lvl 2HVAC Pressure Testing - BOH Lvl 2Install Cable Tray - BOH Lvl 2

HVAC Piping Insulation - BOH Lvl 2Plumbing Insulation - BOH Lvl 2

Sprinkler Testing - BOH Lvl 2Tape & Sand - BOH Lvl 2

BAS Point to Point Checkout - BOH Lvl 2HVAC Labeling/Tags - BOH Lvl 2Terminate Wire - BOH Lvl 2

Paint - BOH Lvl 2Plumbing Labeling/Tags - BOH Lvl 2

Acoustic Ceiling Grid - BOH Lvl 2Install Doors & Hardware - BOH Level 2

Casework - BOH Lvl 2Electrical Trim - BOH Lvl 2

Power to Equipment - BOH Lvl 2Interior Glazing - BOH Level 2

Acoustic Wall Panels - BOH Lvl 2Seal Concrete Floors - BOH Lvl 2

Carpet Tile - BOH Lvl 2Wire Pull - BOH Lvl 2Shelving - BOH Lvl 2

Polish Concrete Floors - BOH Lvl 2VCT Flooring - BOH Lvl 2

Ceramic Tile F loors - BOH Level 2Wood Trim - BOH Lvl 2

Plug Boxes - BOHBAS Programming - BOH Lvl 2

70v Speakers - BOHFire Alarm Device - BO H Lvl 2

Ceramic Tile Walls - BOH Lvl 2Security Trim - BOH Lvl 2Telecom Trim - BOH Lvl 2

Sprinkler Finishes - BOH Lvl 2HVAC Trim - BOH Lvl 2

Install Fixtures - BOH Lvl 2Acoustic Ceiling Tile - BOH Lvl 2

Plumbing Fixtures - BOH Lvl 2Paint Frame - Scene Shop

Gantry Cranes - Scene Shop & RehearsalDisplays - BOH

10030018-84Hancher Auditorium Replacement Facility 19 of 32 04-04-14

Milestone

Summary

Planned Work

Progressed Work

Critical Work

Crew 1

Crew 2

Primary Milestone

Hancher Auditorium Replacement - Construct New FacilityUniversity of Iowa

Project Layout - Data Date: 04-02-14

Page 20: Project SumProject Summary and Milestones · SM-1A5X1 Initial Substantial Completion (CO) 0 01-22-16 SM-1A18X3 Final Clean Complete 0 01-29-16 SM-1A5X4 Final Substantial Completion

- Activity ID Activity Name Orig.Dur'n

Start Finish

1st Flr1st Flr 317 04-10-14 07-09-15

MPC-182 Radiant Floor Install - FOH Lvl 1 20 04-10-14 05-07-14MPC-109 Mechanical Hangers - FOH Lvl 1 30 08-21-14 10-02-14MO-0015 Track Clips - FOH Lvl 1 30 08-21-14 10-02-14WBCI-1010 Topping Slab - FOH Lvl 1 5 09-12-14 09-18-14RPF-102 Fireproofing - FOH Lvl 1 (Spraying bot. 2nd Flr) 12 10-08-14 10-23-14MO-1015 Wall Fr aming - FOH Lvl 1 20 10-16-14 11-12-14HM-1090 CMU - FOH Lvl 1 5 10-22-14 10-28-14WBCI-1090 Seal Penetrations - FOH Lvl 1 20 10-22-14 11-18-14DVE-202 In-Wall Electrical - FOH Lvl 1 15 10-23-14 11-12-14MPC-088 Duct Main Install - FOH Lvl 1 15 10-23-14 11-12-14MPC-133 CWS/R - FOH Lvl 1 20 10-23-14 11-19-14MPC-141 HWS/R - FOH Lvl 1 20 10-23-14 11-19-14MPC-195 In-Wall Plumbing - FOH Lvl 1 20 10-23-14 11-19-14MPC-215 OH Plumbing Piping - FOH Lvl 1 20 10-23-14 11-19-14JCI-004 BAS Conduit - FOH Lvl 1 20 10-23-14 11-19-14MPC-229 Gravity Piping - FOH Lvl 1 23 10-23-14 11-24-14DVE-201 Conduit Rough-In - FOH Lvl 1 25 10-23-14 11-26-14MPC-223 Domestic Piping - FOH Lvl 1 40 10-23-14 12-19-14ART-3200 Acoustic Finish AF-1 Clgs - FOH Lvl 1 10 10-24-14 11-06-14MO-2015 Wall Insulation - FOH Lvl 1 18 10-27-14 11-19-14MPC-125 Condensate - FOH Lvl 1 7 10-30-14 11-07-14DI-0015 Install HM Frames FOH Level 1 5 11-06-14 11-12-14TSS-0021 Sprinkler Mains - FOH Lvl 1 6 11-10-14 11-17-14MPC-101 Duct Branch Install - FOH Lvl 1 10 11-10-14 11-21-14MO-7000 Lathing - FOH Lvl 1 10 11-13-14 11-26-14MO-6015 Ceiling Framing - FOH Lvl 1 12 11-13-14 12-02-14MPC-117 Duct Air Leakage Testing - FO H Lvl 1 15 11-13-14 12-05-14TSS-0022 Sprinkler Branch Lines - FOH Lvl 1 36 11-17-14 01-09-15MPC-151 HVAC Pressure Testing - FOH Lvl 1 10 11-20-14 12-05-14JCI-024 BAS Wiring - FOH Lvl 1 25 11-20-14 12-29-14DVE-212 Install Cable Tray - FOH Lvl 1 4 12-01-14 12-04-14DVE-213 Fire Alarm Rough-In - FOH Lvl 1 5 12-01-14 12-05-14DVE-208 Security Rough-In - FOH Lvl 1 10 12-01-14 12-12-14DVE-210 Telecom Rough-In - FOH Lvl 1 10 12-01-14 12-12-14DVE-203 Pull Wire - FOH Lvl 1 15 12-01-14 12-19-14DD-1010 Overhead Coiling Doors FOH 1 1 12-02-14 12-02-14MPC-158 HVAC Piping Insulation - FOH Lvl 1 15 12-08-14 12-29-14MO-3015 Gyp Board - FOH Lvl 1 40 12-15-14 02-10-15DVE-204 Terminate Wire - FOH Lvl 1 5 12-22-14 12-29-14MPC-165 HVAC Labeling/Tags - FOH Lvl 1 10 12-22-14 01-06-15MPC-208 Plumbing Pressure Testing - FOH Lvl 1 15 12-22-14 01-13-15JCI-082 BAS Point to Point Checkout - FOH Lvl 1 14 12-30-14 01-19-15TSS-0023 Sprinkler Testing - FOH Lvl 1 1 01-12-15 01-12-15MPC-236 Plumbing Insulation - FOH Lvl 1 20 01-14-15 02-10-15DVE-207 Power to Equipment - FOH Lvl 1 10 01-16-15 01-29-15MO-5015 Tape & Sand - FOH Lvl 1 23 01-16-15 02-17-15MO-4030 GRG - FOH Lvl 1 10 01-28-15 02-10-15JCI-044 BAS Programming - FOH Lvl 1 8 01-30-15 02-10-15MPC-243 Plumbing Labeling/Tags - FOH Lvl 1 11 02-03-15 02-17-15MO-7105 Plaster - FOH Lvl 1 26 02-11-15 03-18-15QM-1040 Ceramic Tile Walls - FOH Lvl 1 8 02-18-15 02-27-15HM-1100 Stone Veneer - FOH Lvl 1 13 02-18-15 03-06-15GRZ-001 Terrazzo Floor w/Stairs - FOH Lvl 1 85 02-18-15 06-17-15PNT-1020 Paint - FOH Lvl 1 23 03-04-15 04-03-15AWS-5070 Interior Glazing - FOH Level 1 (area 1) 10 03-25-15 04-07-15DVE-206 Electrical Trim - FOH Lvl 1 10 03-30-15 04-10-15ART-3025 Acoustic Wall Panels - FOH Lvl 1 10 03-30-15 04-10-15ART-1000 Acoustic Paneling - FOH Lvl 1 10 03-30-15 04-10-15AWS-5075 Interior Glazing - FOH Level 1 (area 2) 10 04-02-15 04-15-15AWS-5000 Glass Handrail - FOH Level 1 1 04-06-15 04-06-15WBCI-3065 Carpet Tile - FOH Lvl 1 2 04-06-15 04-07-15WBCI-9000 Walk-Off Mats - FOH Lvl 1 2 04-06-15 04-07-15WBCI-3130 Seal Concrete Floors - FOH Lvl 1 2 04-06-15 04-07-15WBCI-3060 Carpet - FOH Lvl 1 5 04-06-15 04-10-15DI-1020 Install Doors & Hardware - FOH Level 1 5 04-08-15 04-14-15DVE-211 Telecom Trim - FOH Lvl 1 5 04-09-15 04-15-15ART-2010 Acoustic Ceiling Grid - FOH Lvl 1 5 04-09-15 04-15-15DVE-209 Security Trim - FOH Lvl 1 10 04-09-15 04-22-15AWS-5080 Interior Glazing - FOH Level 1 (area 3) 10 04-09-15 04-22-15

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2014 2015 2016

Radiant Floor Install - FOH Lvl 1Mechanical Hangers - FOH Lvl 1Track Clips - FOH Lvl 1

Topping Slab - FOH Lvl 1Fireproofing - FOH Lvl 1 (Spraying bot. 2nd Flr)

Wall Framing - FOH Lvl 1CMU - FOH Lvl 1

Seal Penetrations - FOH Lvl 1In-Wall Electrical - FOH Lvl 1Duct Main Install - FOH Lvl 1

CWS/R - FOH Lvl 1HWS/R - FOH Lvl 1In-Wall Plumbing - FOH Lvl 1OH Plumbing Piping - FOH Lvl 1BAS Conduit - FOH Lvl 1

Gravity Piping - FOH Lvl 1Conduit Rough-In - FOH Lvl 1

Domestic Piping - FOH Lvl 1Acoustic Finish AF-1 Clgs - FOH Lvl 1

Wall Insulat ion - FOH Lvl 1Condensate - FOH Lvl 1

Install HM Frames FOH Level 1Sprinkler Mains - FOH Lvl 1Duct Branch Install - FOH Lvl 1

Lathing - FOH Lvl 1Ceiling Framing - FOH Lvl 1Duct Air Leakage Testing - FO H Lvl 1

Sprinkler Branch Lines - FOH Lvl 1HVAC Pressure Testing - FOH Lvl 1

BAS Wiring - FOH Lvl 1Install Cable Tray - FOH Lvl 1Fire Alarm Rough-In - FOH Lvl 1

Security Rough-In - FOH Lvl 1Telecom Rough-In - FOH Lvl 1

Pull Wire - FOH Lvl 1Overhead Coiling Doors FOH 1

HVAC Piping Insulation - FOH Lvl 1Gyp Board - FOH Lvl 1

Terminate Wire - FOH Lvl 1HVAC Labeling/Tags - FOH Lvl 1

Plumbing Pressure Testing - FOH Lvl 1BAS Point to Point Checkout - FOH Lvl 1

Sprinkler Testing - FOH Lvl 1Plumbing Insulation - FOH Lvl 1Power to Equipment - FOH Lvl 1

Tape & Sand - FOH Lvl 1GRG - FOH Lvl 1

BAS Programming - FOH Lvl 1Plumbing Labeling/Tags - FOH Lvl 1

Plaster - FOH Lvl 1Ceramic Tile Walls - FOH Lvl 1

Stone Veneer - FOH Lvl 1Terrazzo Floor w/Stairs - FOH Lvl 1

Paint - FOH Lvl 1Interior Glazing - FOH Level 1 (area 1)

Electrical Trim - FOH Lvl 1Acoustic Wall Panels - FOH Lvl 1

Acoustic Paneling - FOH Lvl 1Interior Glazing - FOH Level 1 (area 2)

Glass Handrail - FOH Level 1Carpet Tile - FOH Lvl 1

Walk-Off Mats - FO H Lvl 1Seal Concrete Floors - FOH Lvl 1

Carpet - FOH Lvl 1Install Doors & Hardware - FOH Level 1

Telecom Trim - FOH Lvl 1Acoustic Ceiling Grid - FOH Lvl 1

Security Trim - FOH Lvl 1Interior Glazing - FOH Level 1 (area 3)

10030018-84Hancher Auditorium Replacement Facility 20 of 32 04-04-14

Milestone

Summary

Planned Work

Progressed Work

Critical Work

Crew 1

Crew 2

Primary Milestone

Hancher Auditorium Replacement - Construct New FacilityUniversity of Iowa

Project Layout - Data Date: 04-02-14

Page 21: Project SumProject Summary and Milestones · SM-1A5X1 Initial Substantial Completion (CO) 0 01-22-16 SM-1A18X3 Final Clean Complete 0 01-29-16 SM-1A5X4 Final Substantial Completion

- Activity ID Activity Name Orig.Dur'n

Start Finish

WBCI-6040 Wood Trim - FOH Lvl 1 5 04-13-15 04-17-15MPC-174 HVAC Trim - FOH Lvl 1 20 04-13-15 05-08-15APS-011 Wire Pull - FOH Lvl 1 6 04-20-15 04-27-15ART-2200 Wood Ceilings - FOH Lvl 1 (section 1) 10 04-27-15 05-08-15APS-012 Wire Pull - FOH L2 & L3 6 04-28-15 05-05-15ART-2205 Wood Ceilings - FOH Lvl 1 (section 2) 10 05-04-15 05-15-15APS-013 Plug Boxes - FOH 3 05-06-15 05-08-15ART-2210 Wood Ceilings - FOH Lvl 1 (section 3) 10 05-11-15 05-22-15APS-014 70v Speakers - FOH 25 05-11-15 06-15-15ART-2215 Wood Ceilings - FOH Lvl 1 (section 4) 10 05-18-15 06-01-15GL1010 Food Service Equipment - FOH Lvl 1 3 05-20-15 05-22-15MPC-201 Plumbing Fixtures - FOH Lvl 1 20 05-20-15 06-17-15TSS-0024 Sprinkler Finishes - FOH Lvl 1 4 05-27-15 06-01-15DVE-214 Fire Alarm Device - FOH Lvl 1 3 05-29-15 06-02-15ART-2110 Acoustic Ceiling Tile - FOH Lvl 1 5 05-29-15 06-04-15DVE-205 Install Fixtures - FOH Lvl 1 20 05-29-15 06-25-15WBCI-9005 Casework - FOH Lvl 1 10 06-18-15 07-01-15APS-031 Displays - FOH 9 06-26-15 07-09-15

2nd Flr2nd Flr 267 08-21-14 09-09-15

MPC-183 Radiant Floor Install - FOH Lvl 2 20 08-21-14 09-18-14MPC-110 Mechanical Hangers - FOH Lvl 2 20 08-28-14 09-25-14MO-0020 Track Clips - FOH Lvl 2 20 08-28-14 09-25-14WBCI-1020 Topping Slab - FOH Lvl 2 (pour 1) 5 09-19-14 09-25-14WBCI-1025 Topping Slab - FOH Lvl 2 (pour 2) 5 09-26-14 10-02-14WBCI-1030 Topping Slab - FOH Lvl 2 (pour 3) 5 10-03-14 10-09-14WBCI-1035 Topping Slab - FOH Lvl 2 (pour 4) 5 10-10-14 10-16-14RPF-202 Fireproofing - FOH Lvl 2 (Spraying bot. 3rd Flr) 15 10-16-14 11-05-14MO-1020 Wall Fr aming - FOH Lvl 2 18 10-30-14 11-24-14WBCI-1100 Seal Penetrations - FOH Lvl 2 18 10-30-14 11-24-14MO-2020 Wall Insulation - FOH Lvl 2 18 11-06-14 12-03-14MPC-089 Duct Main Install - FOH Lvl 2 20 11-06-14 12-05-14MPC-216 OH Plumbing Piping - FOH Lvl 2 20 11-06-14 12-05-14ART-3230 Acoustic Finish AF-1&2 Clgs - FOH Lvl 2 5 11-07-14 11-13-14MPC-196 In-Wall Plumbing - FOH Lvl 2 17 11-07-14 12-03-14DVE-402 In-Wall Electrical - FOH Lvl 2 15 11-11-14 12-03-14JCI-005 BAS Conduit - FOH Lvl 2 20 11-11-14 12-10-14DVE-401 Conduit Rough-In - FOH Lvl 2 30 11-11-14 12-24-14MPC-126 Condensate - FOH Lvl 2 10 11-13-14 11-26-14MPC-134 CWS/R - FOH Lvl 2 10 11-13-14 11-26-14MPC-142 HWS/R - FOH Lvl 2 10 11-13-14 11-26-14MPC-147 LPSS/R - FOH Lvl 2 15 11-13-14 12-05-14DI-0020 Install HM Frames FOH Level 2 3 11-20-14 11-24-14MPC-224 Domestic Piping - FOH Lvl 2 26 11-26-14 01-06-15MPC-230 Gravity Piping - FOH Lvl 2 33 11-26-14 01-15-15MPC-102 Duct Branch Install - FOH Lvl 2 10 12-01-14 12-12-14MO-6020 Ceiling Framing - FOH Lvl 2 6 12-03-14 12-10-14TSS-0029 Sprinkler Mains - FOH Lvl 2 4 12-08-14 12-11-14MPC-118 Duct Air Leakage Testing - FO H Lvl 2 5 12-08-14 12-12-14MPC-152 HVAC Pressure Testing - FOH Lvl 2 7 12-08-14 12-16-14JCI-025 BAS Wiring - FOH Lvl 2 30 12-11-14 01-23-15MPC-159 HVAC Piping Insulation - FOH Lvl 2 15 12-18-14 01-09-15TSS-0030 Sprinkler Branch Lines - FOH Lvl 2 21 12-23-14 01-22-15DVE-408 Security Rough-In - FOH Lvl 2 5 12-26-14 01-02-15DVE-412 Install Cable Tray - FOH Lvl 2 5 12-26-14 01-02-15DVE-410 Telecom Rough-In - FOH Lvl 2 10 12-26-14 01-09-15DVE-413 Fire Alarm Rough-In - FOH Lvl 2 10 12-26-14 01-09-15DVE-403 Pull Wire - FOH Lvl 2 15 12-26-14 01-16-15MPC-166 HVAC Labeling/Tags - FOH Lvl 2 8 01-06-15 01-15-15MPC-209 Plumbing Pressure Testing - FOH Lvl 2 10 01-07-15 01-20-15DVE-404 Terminate Wire - FOH Lvl 2 10 01-19-15 01-30-15TSS-0031 Sprinkler Testing - FOH Lvl 2 1 01-23-15 01-23-15JCI-083 BAS Point to Point Checkout - FOH Lvl 2 14 01-26-15 02-12-15MO-3020 Gyp Board - FOH Lvl 2 20 01-28-15 02-24-15DVE-407 Power to Equipment - FOH Lvl 2 10 02-02-15 02-13-15MPC-237 Plumbing Insulation - FOH Lvl 2 2 02-11-15 02-12-15MO-4035 GRG - FOH Lvl 2 10 02-11-15 02-24-15MPC-244 Plumbing Labeling/Tags - FOH Lvl 2 10 02-13-15 02-26-15JCI-045 BAS Programming - FOH Lvl 2 8 02-17-15 02-26-15MO-5020 Tape & Sand - FOH Lvl 2 11 02-17-15 03-03-15QM-1080 Ceramic Tile Floors - FOH Level 2 1 02-25-15 02-25-15

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2014 2015 2016

Wood Trim - FOH Lvl 1HVAC Trim - FOH Lvl 1

Wire Pull - FOH Lvl 1Wood Ceilings - FOH Lvl 1 (section 1)

Wire Pull - FOH L2 & L3Wood Ceilings - FOH Lvl 1 (section 2)

Plug Boxes - FOHWood Ceilings - FOH Lvl 1 (section 3)

70v Speakers - FOHWood Ceilings - FOH Lvl 1 (section 4)

Food Service Equipment - FOH Lvl 1Plumbing Fixtures - FOH Lvl 1

Sprinkler Finishes - FOH Lvl 1Fire Alarm Device - FO H Lvl 1

Acoustic Ceiling Tile - FOH Lvl 1Install Fixtures - FOH Lvl 1

Casework - FOH Lvl 1Displays - FOH

Radiant Floor Install - FOH Lvl 2Mechanical Hangers - FOH Lvl 2Track Clips - FOH Lvl 2Topping Slab - FOH Lvl 2 (pour 1)

Topping Slab - FOH Lvl 2 (pour 2)Topping Slab - FOH Lvl 2 (pour 3)

Topping Slab - FOH Lvl 2 (pour 4)Fireproofing - FOH Lvl 2 (Spraying bot. 3rd Flr)

Wall Fr aming - FOH Lvl 2Seal Penetrations - FOH Lvl 2

Wall Insulat ion - FOH Lvl 2Duct Main Install - FOH Lvl 2OH Plumbing Piping - FOH Lvl 2

Acoustic Finish AF-1&2 Clgs - FOH Lvl 2In-Wall Plumbing - FOH Lvl 2In-Wall Electrical - FOH Lvl 2

BAS Conduit - FOH Lvl 2Conduit Rough-In - FOH Lvl 2

Condensate - FOH Lvl 2CWS/R - FOH Lvl 2HWS/R - FOH Lvl 2

LPSS/R - FOH Lvl 2Install HM Frames FOH Level 2

Domestic Piping - FOH Lvl 2Gravity Piping - FOH Lvl 2

Duct Branch Install - FOH Lvl 2Ceiling Framing - FOH Lvl 2Sprinkler Mains - FOH Lvl 2Duct Air Leakage Testing - FO H Lvl 2HVAC Pressure Testing - FOH Lvl 2

BAS Wiring - FOH Lvl 2HVAC Piping Insulation - FOH Lvl 2

Sprinkler Branch Lines - FOH Lvl 2Security Rough-In - FOH Lvl 2Install Cable Tray - FOH Lvl 2

Telecom Rough-In - FOH Lvl 2Fire Alarm Rough-In - FOH Lvl 2

Pull Wire - FOH Lvl 2HVAC Labeling/Tags - FOH Lvl 2

Plumbing Pressure Testing - FOH Lvl 2Terminate Wire - FOH Lvl 2Sprinkler Testing - FOH Lvl 2

BAS Point to Point Checkout - FOH Lvl 2Gyp Board - FOH Lvl 2

Power to Equipment - FOH Lvl 2Plumbing Insulation - FOH Lvl 2

GRG - FOH Lvl 2Plumbing Labeling/Tags - FOH Lvl 2

BAS Programming - FOH Lvl 2Tape & Sand - FOH Lvl 2

Ceramic Tile F loors - FOH Level 2

10030018-84Hancher Auditorium Replacement Facility 21 of 32 04-04-14

Milestone

Summary

Planned Work

Progressed Work

Critical Work

Crew 1

Crew 2

Primary Milestone

Hancher Auditorium Replacement - Construct New FacilityUniversity of Iowa

Project Layout - Data Date: 04-02-14

Page 22: Project SumProject Summary and Milestones · SM-1A5X1 Initial Substantial Completion (CO) 0 01-22-16 SM-1A18X3 Final Clean Complete 0 01-29-16 SM-1A5X4 Final Substantial Completion

- Activity ID Activity Name Orig.Dur'n

Start Finish

MO-7110 Plaster - FOH Lvl 2 20 02-25-15 03-24-15HM-1110 Stone Veneer - FOH Lvl 2 20 03-04-15 03-31-15PNT-1025 Paint - FOH Lvl 2 11 03-30-15 04-13-15DVE-406 Electrical Trim - FOH Lvl 2 20 04-06-15 05-01-15ART-3035 Acoustic Wall Panels - FOH Lvl 2 5 04-10-15 04-16-15ART-1010 Acoustic Paneling - FOH Lvl 2 10 04-13-15 04-24-15WBCI-3135 Seal Concrete Floors - FOH Lvl 2 2 04-14-15 04-15-15WBCI-3170 VCT Flooring - FOH Lvl 2 2 04-14-15 04-15-15WBCI-3070 Carpet - FOH Lvl 2 5 04-14-15 04-20-15AWS-5005 Glass Handrail - FOH Level 2 (area 1) 10 04-14-15 04-27-15AWS-5085 Interior Glazing - FOH Level 2 17 04-16-15 05-08-15WBCI-6045 Wood Trim - FOH Lvl 2 5 04-21-15 04-27-15AWS-5010 Glass Handrail - FOH Level 2 (area 2) 10 04-21-15 05-04-15DVE-409 Security Trim - FOH Lvl 2 5 04-22-15 04-28-15DVE-411 Telecom Trim - FOH Lvl 2 5 04-22-15 04-28-15ART-2020 Acoustic Ceiling Grid - FOH Lvl 2 5 04-22-15 04-28-15GRZ-002 Terrazzo Floor w/Stairs - FOH Lvl 2 60 04-22-15 07-16-15AWS-5015 Glass Handrail - FOH Level 2 (area 3) 10 04-28-15 05-11-15AWS-5020 Glass Handrail - FOH Level 2 (area 4) 10 05-05-15 05-18-15AWS-5025 Glass Handrail - FOH Level 2 (area 5) 10 05-12-15 05-26-15AWS-5030 Glass Handrail - FOH Level 2 (area 6) 11 05-19-15 06-03-15QM-1070 Ceramic Tile Walls - FOH Lvl 2 7 06-04-15 06-12-15MPC-202 Plumbing Fixtures - FOH Lvl 2 27 06-15-15 07-22-15ART-2220 Wood Ceilings - FOH Lvl 2 (section 1) 10 07-06-15 07-17-15ART-2225 Wood Ceilings - FOH Lvl 2 (section 2) 10 07-13-15 07-24-15MPC-175 HVAC Trim - FOH Lvl 2 20 07-13-15 08-07-15GL1020 Food Service Equipment - FOH Lvl 2 7 07-17-15 07-27-15ART-2230 Wood Ceilings - FOH Lvl 2 (section 3) 10 07-20-15 07-31-15ART-2235 Wood Ceilings - FOH Lvl 2 (section 4) 10 07-27-15 08-07-15WBCI-9010 Casework - FOH Lvl 2 10 07-27-15 08-07-15DI-1040 Install Doors & Hardware - FOH Level 2 3 07-28-15 07-30-15TSS-0032 Sprinkler Finishes - FOH Lvl 2 7 07-30-15 08-07-15DVE-414 Fire Alarm Device - FOH Lvl 2 5 08-05-15 08-11-15ART-2115 Acoustic Ceiling Tile - FOH Lvl 2 5 08-05-15 08-11-15DVE-405 Install Fixtures - FOH Lvl 2 25 08-05-15 09-09-15

3rd Flr3rd Flr 249 09-19-14 09-11-15

MPC-184 Radiant Floor Install - FOH Lvl 3 15 09-19-14 10-09-14MPC-111 Mechanical Hangers - FOH Lvl 3 8 10-06-14 10-15-14MO-0025 Track Clips - FOH Lvl 3 8 10-06-14 10-15-14RPF-302 Fireproofing - FOH Lvl 3 (Spraying bot. Roof) 14 10-16-14 11-04-14WBCI-1040 Topping Slab Level 3 (pour 1) 5 10-27-14 10-31-14HM-1120 CMU Level 3 FOH 4 11-03-14 11-06-14WBCI-1045 Topping Slab Level 3 (pour 2) 5 11-03-14 11-07-14WBCI-1050 Topping Slab Level 3 (pour 3) 5 11-10-14 11-14-14WBCI-1105 Seal Penetrations - FOH Lvl 3 17 11-11-14 12-05-14ART-3235 Acoustic Finish AF-1&2 Clgs - FOH Lvl 3 5 11-14-14 11-20-14WBCI-1055 Topping Slab Level 3 (pour 4) 5 11-17-14 11-21-14MO-1025 Wall Fr aming - FOH Lvl 3 9 11-21-14 12-05-14MO-2025 Wall Insulation - FOH Lvl 3 18 11-24-14 12-19-14DVE-502 In-Wall Electrical - FOH Lvl 3 10 12-02-14 12-15-14MPC-135 CWS/R - FOH Lvl 3 10 12-02-14 12-15-14MPC-143 HWS/R - FOH Lvl 3 10 12-02-14 12-15-14MPC-197 In-Wall Plumbing - FOH Lvl 3 14 12-02-14 12-19-14MPC-090 Duct Main Install - FOH Lvl 3 20 12-02-14 12-30-14MPC-217 OH Plumbing Piping - FOH Lvl 3 20 12-02-14 12-30-14DI-0025 Install HM Frames FOH Level 3 3 12-03-14 12-05-14MPC-127 Condensate - FOH Lvl 3 10 12-09-14 12-22-14MPC-153 HVAC Pressure Testing - FOH Lvl 3 2 12-17-14 12-18-14MPC-225 Domestic Piping - FOH Lvl 3 19 12-17-14 01-14-15JCI-006 BAS Conduit - FOH Lvl 3 7 12-22-14 12-31-14DVE-501 Conduit Rough-In - FOH Lvl 3 10 12-22-14 01-06-15MO-6025 Ceiling Framing - FOH Lvl 3 8 12-23-14 01-05-15MPC-103 Duct Branch Install - FOH Lvl 3 15 12-23-14 01-14-15MPC-231 Gravity Piping - FOH Lvl 3 26 12-23-14 01-29-15TSS-0025 Sprinkler Mains - FOH Lvl 3 2 12-31-14 01-02-15MPC-119 Duct Air Leakage Testing - FO H Lvl 3 5 12-31-14 01-07-15MPC-160 HVAC Piping Insulation - FOH Lvl 3 15 12-31-14 01-21-15DVE-508 Security Rough-In - FOH Lvl 3 3 01-07-15 01-09-15DVE-510 Telecom Rough-In - FOH Lvl 3 3 01-09-15 01-13-15DVE-513 Fire Alarm Rough-In - FOH Lvl 3 3 01-09-15 01-13-15

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2014 2015 2016

Plaster - FOH Lvl 2Stone Veneer - FOH Lvl 2

Paint - FOH Lvl 2Electrical Trim - FOH Lvl 2

Acoustic Wall Panels - FOH Lvl 2Acoustic Paneling - FOH Lvl 2

Seal Concrete Floors - FOH Lvl 2VCT Flooring - FOH Lvl 2

Carpet - FOH Lvl 2Glass Handrail - FOH Level 2 (area 1)

Interior Glazing - FOH Level 2Wood Trim - FOH Lvl 2

Glass Handrail - FOH Level 2 (area 2)Security Trim - FOH Lvl 2Telecom Trim - FOH Lvl 2

Acoustic Ceiling Grid - FOH Lvl 2Terrazzo Floor w/Stairs - FOH Lvl 2

Glass Handrail - FOH Level 2 (area 3)Glass Handrail - FOH Level 2 (area 4)

Glass Handrail - FOH Level 2 (area 5)Glass Handrail - FOH Level 2 (area 6)

Ceramic Tile Walls - FOH Lvl 2Plumbing Fixtures - FOH Lvl 2

Wood Ceilings - FOH Lvl 2 (section 1)Wood Ceilings - FOH Lvl 2 (section 2)

HVAC Trim - FOH Lvl 2Food Service Equipment - FOH Lvl 2Wood Ceilings - FOH Lvl 2 (section 3)

Wood Ceilings - FOH Lvl 2 (section 4)Casework - FOH Lvl 2

Install Doors & Hardware - FOH Level 2Sprinkler Finishes - FOH Lvl 2

Fire Alarm Device - FOH Lvl 2Acoustic Ceiling Tile - FO H Lvl 2

Install Fixtures - FOH Lvl 2

Radiant Floor Install - FOH Lvl 3Mechanical Hangers - FOH Lvl 3Track Clips - FOH Lvl 3

Fireproofing - FOH Lvl 3 (Spraying bot. Roof)Topping Slab Level 3 (pour 1)

CMU Level 3 FOHTopping Slab Level 3 (pour 2)

Topping Slab Level 3 (pour 3)Seal Penetrations - FOH Lvl 3

Acoustic Finish AF-1&2 Clgs - FOH Lvl 3Topping Slab Level 3 (pour 4)

Wall Framing - FOH Lvl 3Wall Insulation - FOH Lvl 3

In-Wall Electrical - FOH Lvl 3CWS/R - FOH Lvl 3HWS/R - FOH Lvl 3In-Wall Plumbing - FOH Lvl 3

Duct Main Install - FOH Lvl 3OH Plumbing Piping - FOH Lvl 3

Install HM Frames FOH Level 3Condensate - FOH Lvl 3

HVAC Pressure Testing - FOH Lvl 3Domestic Piping - FOH Lvl 3

BAS Conduit - FOH Lvl 3Conduit Rough-In - FOH Lvl 3Ceiling Framing - FOH Lvl 3

Duct Branch Install - FOH Lvl 3Gravity Piping - FOH Lvl 3

Sprinkler Mains - FOH Lvl 3Duct Air Leakage Testing - FO H Lvl 3

HVAC Piping Insulation - FOH Lvl 3Security Rough-In - FOH Lvl 3Telecom Rough-In - FOH Lvl 3

Fire Alarm Rough-In - FOH Lvl 3

10030018-84Hancher Auditorium Replacement Facility 22 of 32 04-04-14

Milestone

Summary

Planned Work

Progressed Work

Critical Work

Crew 1

Crew 2

Primary Milestone

Hancher Auditorium Replacement - Construct New FacilityUniversity of Iowa

Project Layout - Data Date: 04-02-14

Page 23: Project SumProject Summary and Milestones · SM-1A5X1 Initial Substantial Completion (CO) 0 01-22-16 SM-1A18X3 Final Clean Complete 0 01-29-16 SM-1A5X4 Final Substantial Completion

- Activity ID Activity Name Orig.Dur'n

Start Finish

DVE-503 Pull Wire - FOH Lvl 3 5 01-15-15 01-21-15MPC-210 Plumbing Pressure Testing - FOH Lvl 3 8 01-15-15 01-26-15TSS-0026 Sprinkler Branch Lines - FOH Lvl 3 11 01-15-15 01-29-15MPC-167 HVAC Labeling/Tags - FOH Lvl 3 4 01-22-15 01-27-15JCI-026 BAS Wiring - FOH Lvl 3 8 01-23-15 02-03-15DVE-504 Terminate Wire - FOH Lvl 3 5 01-28-15 02-03-15TSS-0027 Sprinkler Testing - FOH Lvl 3 1 01-30-15 01-30-15JCI-084 BAS Point to Point Checkout - FOH Lvl 3 10 02-04-15 02-17-15DVE-507 Power to Equipment - FOH Lvl 3 5 02-11-15 02-17-15MO-3025 Gyp Board - FOH Lvl 3 14 02-12-15 03-03-15MPC-238 Plumbing Insulation - FOH Lvl 3 20 02-13-15 03-12-15JCI-046 BAS Programming - FOH Lvl 3 5 02-24-15 03-02-15MO-5025 Tape & Sand - FOH Lvl 3 9 02-26-15 03-10-15MPC-245 Plumbing Labeling/Tags - FOH Lvl 3 6 03-12-15 03-19-15MPC-252 Chlorination Testing - Whole Building 10 03-13-15 03-26-15HM-1130 Stone Veneer - FOH Lvl 3 7 04-01-15 04-09-15PNT-1030 Paint - FOH Lvl 3 9 04-07-15 04-17-15ART-3040 Acoustic Wall Panels - FOH Lvl 3 5 04-16-15 04-22-15WBCI-3140 Seal Concrete Floors - FOH Lvl 3 2 04-20-15 04-21-15WBCI-3175 VCT Flooring - FOH Lvl 3 2 04-20-15 04-21-15WBCI-6050 Wood Trim - FOH Lvl 3 5 04-22-15 04-28-15DVE-509 Security Trim - FOH Lvl 3 3 04-29-15 05-01-15DVE-511 Telecom Trim - FOH Lvl 3 5 04-29-15 05-05-15ART-2025 Acoustic Ceiling Grid - FOH Lvl 3 5 04-29-15 05-05-15AWS-5090 Interior Glazing - FOH Level 3 16 04-29-15 05-20-15DVE-506 Electrical Trim - FOH Lvl 3 5 05-04-15 05-08-15AWS-5035 Glass Handrail - FOH Level 3 17 05-28-15 06-19-15GRZ-003 Terrazzo Floor - FOH Lvl 3 10 07-10-15 07-23-15MPC-203 Plumbing Fixtures - FOH Lvl 3 15 07-13-15 07-31-15QM-1090 Ceramic Tile Walls - FOH Lvl 3 5 07-24-15 07-30-15MPC-176 HVAC Trim - FOH Lvl 3 20 07-27-15 08-21-15GL1030 Food Service Equipment - FOH Lvl 3 3 07-28-15 07-30-15DI-1050 Install Doors & Hardware - FOH Level 3 3 07-31-15 08-04-15ART-2240 Wood Ceilings - FOH Lvl 3 15 08-03-15 08-21-15WBCI-9020 Casework - FOH Lvl 3 10 08-10-15 08-21-15TSS-0028 Sprinkler Finishes - FOH Lvl 3 3 08-19-15 08-21-15DVE-514 Fire Alarm Device - FOH Lvl 3 2 08-21-15 08-24-15ART-2120 Acoustic Ceiling Tile - FOH Lvl 3 5 08-21-15 08-27-15DVE-505 Install Fixtures - FOH Lvl 3 8 09-01-15 09-11-15RehearsalRehearsal 118 09-05-14 02-23-15

MO-0035 Track Clips - Rehearsal 2 09-05-14 09-08-14MPC-113 Mechanical Hangers - Rehearsal 5 09-05-14 09-11-14RPF-R01 Fireproofing - Rehearsal 10 09-23-14 10-06-14MO-1030 Wall Fr aming - Rehearsal Hall 8 09-30-14 10-09-14HM-1150 CMU - Rehersal 15 09-30-14 10-20-14WBCI-1115 Seal Penetrations - Rehearsal 15 09-30-14 10-20-14DI-0030 Install HM Frames Rehersal 5 10-03-14 10-09-14JCI-007 BAS Conduit - Rehearsal 3 10-07-14 10-09-14MPC-137 CWS/R - Rehearsal 5 10-07-14 10-13-14MPC-145 HWS/R - Rehearsal 5 10-07-14 10-13-14MPC-218 OH Plumbing Piping - Rehearsal 20 10-07-14 11-03-14MPC-096 Duct Main Install - Rehearsal 1 25 10-07-14 11-10-14DVE-701 Conduit Rough-In - Rehearsal 30 10-07-14 11-17-14JCI-027 BAS Wiring - Rehearsal 2 10-10-14 10-13-14MPC-129 Condensate - Rehearsal 2 10-14-14 10-15-14MPC-270 HVAC Pressure Testing - Rehearsal 4 10-14-14 10-17-14MPC-271 HVAC Piping Insulation - Rehearsal 6 10-20-14 10-27-14MPC-097 Duct Main Install - Rehearsal 2 25 10-21-14 11-24-14MPC-272 HVAC Labeling/Tags - Rehearsal 2 10-31-14 11-03-14TSS-0017 Sprinkler Mains - Rehearsal 2 11-11-14 11-12-14MPC-121 Duct Air Leakage Testing - Rehearsal 10 11-11-14 11-24-14TSS-0018 Sprinkler Branch Lines - Rehearsal 7 11-13-14 11-21-14DVE-710 Telecom Rough-In - Rehearsal 1 11-18-14 11-18-14DVE-708 Security Rough-In - Rehearsal 3 11-18-14 11-20-14DVE-713 Fire Alarm Rough-In - Rehears al 3 11-18-14 11-20-14DVE-703 Pull Wire - Rehearsal 15 11-18-14 12-10-14DVE-702 In-Wall Electrical - Rehearsal 20 11-18-14 12-17-14MO-6030 Ceiling Framing - Rehearsal 3 11-20-14 11-24-14MO-2030 Wall Insulation - Rehearsal 18 11-20-14 12-17-14TSS-0019 Sprinkler Testing - Rehearsal 1 11-24-14 11-24-14

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2014 2015 2016

Pull Wire - FOH Lvl 3Plumbing Pressure Testing - FOH Lvl 3

Sprinkler Branch Lines - FOH Lvl 3HVAC Labeling/Tags - FOH Lvl 3

BAS Wiring - FOH Lvl 3Terminate Wire - FOH Lvl 3

Sprinkler Testing - FOH Lvl 3BAS Point to Point Checkout - FOH Lvl 3

Power to Equipment - FOH Lvl 3Gyp Board - FOH Lvl 3

Plumbing Insulation - FOH Lvl 3BAS Programming - FOH Lvl 3

Tape & Sand - FOH Lvl 3Plumbing Labeling/Tags - FOH Lvl 3

Chlorination Testing - Whole BuildingStone Veneer - FOH Lvl 3

Paint - FOH Lvl 3Acoustic Wall Panels - FOH Lvl 3Seal Concrete Floors - FOH Lvl 3

VCT Flooring - FOH Lvl 3Wood Trim - FOH Lvl 3Security Trim - FOH Lvl 3Telecom Trim - FOH Lvl 3

Acoustic Ceiling Grid - FOH Lvl 3Interior Glazing - FOH Level 3

Electrical Trim - FOH Lvl 3Glass Handrail - FOH Level 3

Terrazzo Floor - FOH Lvl 3Plumbing Fixtures - FOH Lvl 3

Ceramic Tile Walls - FOH Lvl 3HVAC Trim - FOH Lvl 3

Food Service Equipment - FOH Lvl 3Install Doors & Hardware - FOH Level 3

Wood Ceilings - FOH Lvl 3Casework - FOH Lvl 3

Sprinkler Finishes - FOH Lvl 3Fire Alarm Device - FO H Lvl 3

Acoustic Ceiling Tile - FOH Lvl 3Install Fixtures - FOH Lvl 3

Track Clips - RehearsalMechanical Hangers - Rehearsal

Fireproofing - RehearsalWall Framing - Rehearsal Hall

CMU - RehersalSeal Penetrations - Rehearsal

Install HM Frames RehersalBAS Conduit - RehearsalCWS/R - RehearsalHWS/R - Rehearsal

OH Plumbing Piping - RehearsalDuct Main Install - Rehearsal 1

Conduit Rough-In - RehearsalBAS Wiring - RehearsalCondensate - RehearsalHVAC Pressure Testing - Rehearsal

HVAC Piping Insulation - RehearsalDuct Main Install - Rehearsal 2

HVAC Labeling/Tags - RehearsalSprinkler Mains - Rehearsal

Duct Air Leakage Testing - Rehears alSprinkler Branch Lines - Rehearsal

Telecom Rough-In - RehearsalSecurity Rough-In - RehearsalFire Alarm Rough-In - Rehearsal

Pull Wire - RehearsalIn-Wall Electrical - Rehearsal

Ceiling Framing - RehearsalWall Insulat ion - Rehearsal

Sprinkler Testing - Rehearsal

10030018-84Hancher Auditorium Replacement Facility 23 of 32 04-04-14

Milestone

Summary

Planned Work

Progressed Work

Critical Work

Crew 1

Crew 2

Primary Milestone

Hancher Auditorium Replacement - Construct New FacilityUniversity of Iowa

Project Layout - Data Date: 04-02-14

Page 24: Project SumProject Summary and Milestones · SM-1A5X1 Initial Substantial Completion (CO) 0 01-22-16 SM-1A18X3 Final Clean Complete 0 01-29-16 SM-1A5X4 Final Substantial Completion

- Activity ID Activity Name Orig.Dur'n

Start Finish

JCI-085 BAS Point to Point Checkout - Rehearsal 3 11-25-14 12-01-14MO-3030 Gyp Board - Rehearsal Hall 14 12-05-14 12-24-14MO-5030 Tape & Sand - Rehearsal Hall 9 12-17-14 12-30-14DVE-704 Terminate Wire - Rehearsal 10 12-18-14 01-02-15MO-7100 Plaster - Rehearsal Hall 3 12-26-14 12-30-14PNT-1005 Paint - Rehearsal Hall 6 12-31-14 01-08-15APS-034 Wire Pull - Rehearsal 18 12-31-14 01-26-15DVE-707 Power to Equipment - Rehearsal 10 01-05-15 01-16-15ART-3065 Acoustic Wall Panels - Rehersal 10 01-06-15 01-19-15ART-2035 Acoustic Ceiling Grid - Rehersal 5 01-09-15 01-15-15TSI-005 Adjustable Acoustics Rough-In - Rehearsal 8 01-09-15 01-20-15DVE-706 Electrical Trim - Rehearsal 10 01-09-15 01-22-15TSS-0020 Sprinkler Finishes - Rehearsal 2 01-20-15 01-21-15DVE-709 Security Trim - Rehear sal 3 01-20-15 01-22-15DVE-714 Fire Alarm Device - Rehearsal 3 01-20-15 01-22-15DVE-711 Telecom Trim - Rehearsa l 5 01-20-15 01-26-15ART-2130 Acoustic Ceiling Tile - Rehersal 5 01-20-15 01-26-15MPC-178 HVAC Trim - Rehearsal 10 01-20-15 02-02-15DVE-705 Install Fixtures - Rehearsal 25 01-20-15 02-23-15TSI-006 Tension Grid - Rehearsal 15 01-21-15 02-10-15APS-004 Plug Boxes - Rehearsal 4 01-27-15 01-30-15APS-008 Misc. Trimout - Rehearsal 6 01-27-15 02-03-15PKH-1100 Wood Flooring - Rehersal (1200) 10 01-27-15 02-09-15DI-1070 Install Doors & Hardware - Rehersal 5 02-10-15 02-16-15

Main TheatMain Theater / Auditorium 382 04-03-14 10-02-15

1L71-8S8B2 Rigging Components Coordination Meetings (1 every two weeks) 100 04-03-14 08-22-141171-8X Theater Complete 0 10-02-151171-8X7 Pretest All Equipment, Controls and Lights Before Theater Commissio 0 10-02-15Interior AuditoInterior Auditor ium Construction 357 05-08-14 10-02-15

HM-1030 CMU - Theater Lvl 1 15 05-08-14 05-29-14WBCI-1000 Topping Slab Level 1 West Ramp 3 05-15-14 05-19-14WBCI-1005 Topping Slab Level 1 East Ramp 3 05-15-14 05-19-14MO-1040 Wall Fr aming - Theater Lvl 1 26 05-20-14 06-25-14WBCI-1060 Seal Penetrations - Theater Lvl 1 10 05-22-14 06-05-14HM-1040 CMU - Theater Lvl 2 11 05-30-14 06-13-14WBCI-1065 Seal Penetrations - Theater Lvl 2 10 06-02-14 06-13-14HM-1050 CMU - Theater Lvl 3 7 06-16-14 06-24-14WBCI-1070 Seal Penetrations - Theater Lvl 3 10 06-17-14 06-30-14MO-7005 Lathing - Theater Lvl 1 9 06-20-14 07-02-14HM-1080 CMU - Theater Lvl 4 7 06-25-14 07-03-14ART-3215 Acoustic Finish AF-1 Clgs - Under Tier 1 10 06-25-14 07-10-14WBCI-1075 Seal Penetrations - Theater Lvl 4 10 06-26-14 07-10-14MO-1045 Wall Fr aming - Theater Lvl 2 15 06-26-14 07-17-14MO-2035 Wall Insulation - Theater Lvl 1 26 06-26-14 08-01-14MO-6050 Ceiling Framing - Under Tier 1 Balcony 8 07-10-14 07-22-14MO-7010 Lathing - Theater Lvl 2 10 07-11-14 07-24-14MO-1050 Wall Fr aming - Theater Lvl 3 28 07-18-14 08-26-14ART-3220 Acoustic Finish AF-1 Clgs - Under Tier 2 10 07-24-14 08-07-14MO-2040 Wall Insulation - Theater Lvl 2 15 08-04-14 08-22-14MO-6055 Ceiling Framing - Under Tier 2 Balcony 10 08-07-14 08-21-14C2-8M75 Erect Scaffolding - Theater 15 08-08-14 08-28-14MO-7015 Lathing - Theater Lvl 3 10 08-20-14 09-03-14MO-6035 Ceiling Framing - Theater Lvl 3 10 08-27-14 09-10-14MO-1055 Wall Fr aming - Theater Lvl 4 13 08-27-14 09-15-14MO-2045 Wall Insulation - Theater Lvl 3 28 08-27-14 10-06-14PNT-1110 Paint Ceiling - Theater 5 08-29-14 09-05-14TSS-0005 Sprinkler Mains - Theater 10 08-29-14 09-12-14DVE-601 Conduit Rough-In - Theater 45 08-29-14 10-31-14C2-8M76 Scaffolding In-Use - Theater 164 08-29-14 04-22-151380-8P4B1 Erect Catwalk System - Theater 5 09-08-14 09-12-14WBCI-2230 Install Tech Stairs - Theater 5 09-08-14 09-12-14TSS-0006 Sprinkler Branch Lines - Theater 42 09-08-14 11-04-14MO-7020 Lathing - Theater Lvl 4 10 09-09-14 09-22-14TSI-001 Flying Houst Lights - Theater 10 09-15-14 09-26-14WBCI-4000 Frame Balconies - Theater 30 09-16-14 10-27-14MO-4500 Spray-Applied Plaster - Theater Lvl 1 5 09-26-14 10-02-14MO-4515 Shaping Spray Foam - Theater Lvl 1 5 09-26-14 10-02-14WBCI-6000 Wood Trim Under GFRG - Theater 8 09-26-14 10-07-14WBCI-4130 Balcony Fronts - Theater 15 09-26-14 10-16-14

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2014 2015 2016

BAS Point to Point Checkout - RehearsalGyp Board - Rehearsal Hall

Tape & Sand - Rehearsal HallTerminate Wire - Rehearsal

Plaster - Rehearsal HallPaint - Rehearsal Hall

Wire Pull - RehearsalPower to Equipment - RehearsalAcoustic Wall Panels - RehersalAcoustic Ceiling Grid - Rehersal

Adjustable Acoustics Rough-In - RehearsalElectrical Trim - RehearsalSprinkler Finishes - Rehearsal

Security Trim - RehearsalFire Alarm Device - Rehearsal

Telecom Trim - RehearsalAcoustic Ceiling Tile - Rehersal

HVAC Trim - RehearsalInstall Fixtures - Rehearsal

Tension Grid - RehearsalPlug Boxes - Rehearsal

Misc. Trimout - RehearsalWood Flooring - Rehersal (1200)Install Doors & Hardware - Rehersal

Rigging Components Coordination Meetings (1 every two weeks)Theater Complete 10-02-15

Pretest All Equipment, Controls and Lights Before Theater Commissioning - Theater 10-02-15

CMU - Theater Lvl 1Topping Slab Level 1 West RampTopping Slab Level 1 East Ramp

Wall Fr aming - Theater Lvl 1Seal Penetrations - Theater Lvl 1

CMU - Theater Lvl 2Seal Penetrations - Theater Lvl 2

CMU - Theater Lvl 3Seal Penetrations - Theater Lvl 3Lathing - Theater Lvl 1CMU - Theater Lvl 4

Acoustic Finish AF-1 Clgs - Under Tier 1Seal Penetrations - Theater Lvl 4

Wall Framing - Theater Lvl 2Wall Insulat ion - Theater Lvl 1

Ceiling Framing - Under Tier 1 BalconyLathing - Theater Lvl 2

Wall Framing - Theater Lvl 3Acoustic Finish AF-1 Clgs - Under Tier 2

Wall Insulat ion - Theater Lvl 2Ceiling Framing - Under Tier 2 Balcony

Erect Scaffolding - TheaterLathing - Theater Lvl 3

Ceiling Framing - Theater Lvl 3Wall Fr aming - Theater Lvl 4

Wall Insulat ion - Theater Lvl 3Paint Ceiling - Theater

Sprinkler Mains - TheaterConduit Rough-In - Theater

Scaffolding In-Use - TheaterErect Catwalk System - TheaterInstall Tech Stairs - Theater

Sprinkler Branch Lines - TheaterLathing - Theater Lvl 4Flying Houst Lights - Theater

Frame Balconies - TheaterSpray-Applied Plaster - Theater Lvl 1Shaping Spray Foam - Theater Lvl 1

Wood Trim Under G FRG - TheaterBalcony Fronts - Theater

10030018-84Hancher Auditorium Replacement Facility 24 of 32 04-04-14

Milestone

Summary

Planned Work

Progressed Work

Critical Work

Crew 1

Crew 2

Primary Milestone

Hancher Auditorium Replacement - Construct New FacilityUniversity of Iowa

Project Layout - Data Date: 04-02-14

Page 25: Project SumProject Summary and Milestones · SM-1A5X1 Initial Substantial Completion (CO) 0 01-22-16 SM-1A18X3 Final Clean Complete 0 01-29-16 SM-1A5X4 Final Substantial Completion

- Activity ID Activity Name Orig.Dur'n

Start Finish

WBCI-3235 Balcony Railings - Theater 15 09-26-14 10-16-14MO-7115 Plaster Granite & Block Walls - Theater Lvl 1 16 09-26-14 10-17-14TSI-002 Theater Rigging - Theater 6 09-29-14 10-06-14MO-4505 Spray-Applied Plaster - Theater Lvl 2 5 10-03-14 10-09-14MO-4525 Shaping Spray Foam - Theater Lvl 2 5 10-03-14 10-09-14MO-4040 GRG - Theater Lvl 1 10 10-03-14 10-16-14DVE-2200 Balcony Fronts - Electrical Rough-In 10 10-03-14 10-16-14MO-2050 Wall Insulation - Theater Lvl 4 13 10-07-14 10-23-14MO-4510 Spray-Applied Plaster - Theater Lvl 3 5 10-10-14 10-16-14MO-4530 Shaping Spray Foam - Theater Lvl 3 5 10-10-14 10-16-14MO-6070 Frame Curtain Pockets - L3.5 Theater 28 10-13-14 11-19-14MO-4520 Spray-Applied Plaster - Theater Lvl 4 5 10-17-14 10-23-14MO-4045 GRG - Theater Lvl 2 10 10-17-14 10-30-14MO-4050 GRG - Theater Lvl 3 22 10-17-14 11-17-14MO-7120 Plaster Granite & Block Walls - Theater Lvl 2 16 10-20-14 11-10-14MO-4535 Diffusive Acoustical Shapes - South Wall Parterre Level 16 10-20-14 11-10-14DVE-608 Security Rough-In - Theater 3 11-03-14 11-05-14DVE-610 Telecom Rough-In - Theater 5 11-03-14 11-07-14DVE-613 Fire Alarm Rough-In - Theater 10 11-03-14 11-14-14DVE-603 Pull Wire - Theater 20 11-03-14 12-02-14DVE-602 In-Wall Electrical - Theater 25 11-03-14 12-09-14TSS-0007 Sprinkler Testing - Theater 2 11-05-14 11-06-14MO-4540 Diffusive Acoustical Shapes - South Wall Balcony 1 16 11-11-14 12-04-14MO-7125 Plaster Granite & Block Walls - Theater Lvl 3 26 11-11-14 12-18-14MO-3040 Gyp Board - Theater Lvl 1 26 11-18-14 12-26-14JCI-086 BAS Point to Point Checkout - Theater 16 12-08-14 12-30-14DVE-604 Terminate Wire - Theater 20 12-10-14 01-08-15MO-5040 Tape & Sand - Theater Lvl 1 15 12-12-14 01-05-15MO-7130 Plaster Granite & Block Walls - Theater Lvl 4 18 12-19-14 01-15-15MO-4545 Diffusive Acoustical Shapes - South Wall Balcony 2 26 12-19-14 01-27-15MO-3045 Gyp Board - Theater Lvl 2 24 12-29-14 01-30-15PNT-1035 Paint - Theater Lvl 1 11 12-30-14 01-14-15TSI-013 Adjustable Acoustics Rough-In - Theater Lvl 1 5 01-06-15 01-12-15ART-3045 Acoustic Wall Panels - Theater (area 1) 10 01-12-15 01-23-15TSI-015 CWT Rigging - Theater 60 01-13-15 04-06-15WBCI-6015 Wood Trim - Theater Lvl 1 5 01-15-15 01-21-15MO-5045 Tape & Sand - Theater Lvl 2 11 01-23-15 02-06-15PNT-1040 Paint - Theater Lvl 2 11 01-30-15 02-13-15MO-3050 Gyp Board - Theater Lvl 3 27 02-02-15 03-10-15TSI-011 Adjustable Acoustics Rough-In - Theater Lvl 2 5 02-09-15 02-13-15ART-3050 Acoustic Wall Panels - Theater (area 2) 10 02-09-15 02-20-15MO-5050 Tape & Sand - Theater Lvl 3 23 02-13-15 03-17-15WBCI-6030 Wood Trim - Theater Lvl 2 5 02-16-15 02-20-15MO-3055 Gyp Board - Theater Lvl 4 22 03-11-15 04-09-15TSI-010 Adjustable Acoustics Rough-In - Theater Lvl 3 10 03-18-15 03-31-15MO-5055 Tape & Sand - Theater Lvl 4 23 03-18-15 04-17-15PNT-1045 Paint - Theater Lvl 3 11 03-19-15 04-02-15DVE-606 Electrical Trim - Theater 40 03-19-15 05-13-15DVE-605 Install Fixtures - Theater 60 03-26-15 06-18-15WBCI-6035 Wood Trim - Theater Lvl 3 5 04-03-15 04-09-15APS-015 Wire Pull - Auditorium L3,L4 & Grid 15 04-03-15 04-23-15ART-3055 Acoustic Wall Panels - Theater (area 3) 10 04-06-15 04-17-15WBCI-3240 Handrails in Aisles - Theater 20 04-16-15 05-13-15PNT-1050 Paint - Theater Lvl 4 11 04-22-15 05-06-15C2-8M77 Remove Scaffolding - Theater 15 04-23-15 05-13-15APS-016 Wire Pull - Auditorium LL, L1 & L2 25 04-24-15 05-29-15DVE-611 Telecom Trim - Theater 5 05-04-15 05-08-15WBCI-3145 Seal Concrete Floors - Theater 10 05-04-15 05-15-15DVE-609 Security Trim - Theater 3 05-06-15 05-08-15APS-018 PTZ Camera Mount Face of Balcony 1 2 05-07-15 05-08-15APS-020 Box 1 Fill Loudspeakers - Orchestra Level 2 05-07-15 05-08-15DVE-614 Fire Alarm Device - Theater 3 05-07-15 05-11-15APS-019 Under Balcony Fill - Orchestra Level 4 05-07-15 05-12-15WBCI-6055 Wood Trim - Theater Lvl 4 5 05-07-15 05-13-15TSS-0008 Sprinkler Finishes - Theater 10 05-07-15 05-20-15ART-3060 Acoustic Wall Panels - Theater (area 4) 10 05-08-15 05-21-15APS-023 Box 2 Fill Loudspeakers - Tier 1 2 05-11-15 05-12-15APS-025 Over Balcony Fill - Tier 2 2 05-13-15 05-14-15APS-022 Under Balcony Fill - Tier 1 4 05-13-15 05-18-15WBCI-3075 Carpet - Theater 10 05-14-15 05-28-15

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2014 2015 2016

Balcony Railings - TheaterPlaster Granite & Block Walls - Theater Lvl 1

Theater Rigging - TheaterSpray-Applied Plaster - Theater Lvl 2Shaping Spray Foam - Theater Lvl 2

GRG - Theater Lvl 1Balcony Fronts - Electrical Rough-In

Wall Insulat ion - Theater Lvl 4Spray-Applied Plaster - Theater Lvl 3Shaping Spray Foam - Theater Lvl 3

Frame Curtain Pockets - L3.5 TheaterSpray-Applied Plaster - Theater Lvl 4

GRG - Theater Lvl 2GRG - Theater Lvl 3

Plaster Granite & Block Walls - Theater Lvl 2Diffusive Acoustical Shapes - South Wall Parterre Level

Security Rough-In - TheaterTelecom Rough-In - Theater

Fire Alarm Rough-In - TheaterPull Wire - Theater

In-Wall Electrical - TheaterSprinkler Testing - Theater

Diffusive Acoustical Shapes - South Wall Balcony 1Plaster Granite & Block Walls - Theater Lvl 3

Gyp Board - Theater Lvl 1BAS Point to Point Checkout - Theater

Terminate Wire - TheaterTape & Sand - Theater Lvl 1

Plaster Granite & Block Walls - Theater Lvl 4Diffusive Acoustical Shapes - South Wall Balcony 2Gyp Board - Theater Lvl 2

Paint - Theater Lvl 1Adjustable Acoustics Rough-In - Theater Lvl 1

Acoustic Wall Panels - Theater (area 1)CWT Rigging - Theater

Wood Trim - Theater Lvl 1Tape & Sand - Theater Lvl 2

Paint - Theater Lvl 2Gyp Board - Theater Lvl 3

Adjustable Acoustics Rough-In - Theater Lvl 2Acoustic Wall Panels - Theater (area 2)

Tape & Sand - Theater Lvl 3Wood Trim - Theater Lvl 2

Gyp Board - Theater Lvl 4Adjustable Acoustics Rough-In - Theater Lvl 3

Tape & Sand - Theater Lvl 4Paint - Theater Lvl 3

Electrical Trim - TheaterInstall Fixtures - TheaterWood Trim - Theater Lvl 3

Wire Pull - Auditorium L3,L4 & GridAcoustic Wall Panels - Theater (area 3)

Handrails in Aisles - TheaterPaint - Theater Lvl 4

Remove Scaffolding - TheaterWire Pull - Auditorium LL, L1 & L2

Telecom Trim - TheaterSeal Concrete Floors - Theater

Security Trim - TheaterPTZ Camera Mount Face of Balcony 1

Box 1 Fill Loudspeakers - Orchestra LevelFire Alarm Device - Theater

Under Balcony Fill - Orchestra LevelWood Trim - Theater Lvl 4

Sprinkler Finishes - TheaterAcoustic Wall Panels - Theater (area 4)

Box 2 Fill Loudspeakers - Tier 1Over Balcony Fill - Tier 2

Under Balcony Fill - Tier 1Carpet - Theater

10030018-84Hancher Auditorium Replacement Facility 25 of 32 04-04-14

Milestone

Summary

Planned Work

Progressed Work

Critical Work

Crew 1

Crew 2

Primary Milestone

Hancher Auditorium Replacement - Construct New FacilityUniversity of Iowa

Project Layout - Data Date: 04-02-14

Page 26: Project SumProject Summary and Milestones · SM-1A5X1 Initial Substantial Completion (CO) 0 01-22-16 SM-1A18X3 Final Clean Complete 0 01-29-16 SM-1A5X4 Final Substantial Completion

- Activity ID Activity Name Orig.Dur'n

Start Finish

TSI-016 Pit Lift - Theater 20 05-14-15 06-11-15WBCI-4140 Drill Seating Anchors - Theater 20 05-18-15 06-15-15APS-024 Box 3/4 Fill Loudspeakers - Catwalk 2 05-19-15 05-20-15APS-026 Front Fill Speakers - Stage Lip & Pit Lift 10 05-21-15 06-04-15APS-017 Plug Boxes - Auditor ium 16 05-22-15 06-15-15APS-028 Surface Mounted Induction Loop Wiring - Under Lift Platforms 5 06-05-15 06-11-15PKH-1000 Wood Flooring - Stage (1325) 15 06-05-15 06-25-15TSI-017 Pit Lift Controls - Theater 10 06-12-15 06-25-151171-8U Dust Free - Theater, South Rooms & Theater Stairwells 0 06-25-15WBCI-4135 Temp Stairs at Ramps - Theater 1 06-26-15 06-26-15TSI-020 Fire Curtain - Theater 15 06-26-15 07-17-15WBCI-2300 Seating - Theater 40 06-26-15 08-21-15TSI-021 Adjustable Proscenium - Theater 15 07-20-15 08-07-15TSI-022 Seat Wagons - Theater 20 08-03-15 08-28-151171-8U9 Diffusers Under Seats - Theater 10 08-17-15 08-28-15APS-032 Portable Systems Testing 20 08-21-15 09-18-15TSI-023 Chain Motor Assembly - Theater 10 08-31-15 09-14-15TSI-024 Orchestra Enclosures - Theater 10 09-08-15 09-21-15APS-033 Winch Mounted Speakers & Screens 15 09-14-15 10-02-15TSI-026 Theatrical Platforms - Theater 5 09-15-15 09-21-15TSI-028 Portable Dance Floor Delivery - Theater 1 09-22-15 09-22-15TSI-027 Curtain Install - Theater 5 09-22-15 09-28-15Auditorium AAuditorium Att ic 104 07-18-14 12-15-14

MPC-191 Mechanical Hangers - Theater Above Precast 4 07-18-14 07-23-14RPF-301 Fireproofing - Theater (Spraying bot Main Roof) 17 09-26-14 10-20-14MPC-258 Duct Main Install - Theater 4 10 10-21-14 11-03-14MPC-219 OH Plumbing Piping/Dom - Theater Above Precast 20 10-21-14 11-17-14MPC-095 Duct Main Install - Theater 5 10 11-04-14 11-17-14MPC-211 Plumbing Pressure Testing - Theater Above Precast 3 11-18-14 11-20-14MPC-239 Plumbing Insulation - Theater Above Prec ast 15 11-21-14 12-15-14East StairwelEast Stairwell & Surrounding Rooms 294 05-15-14 07-13-15

Levels 1&1.6Levels 1&1.6 (1325-1,1325-1A,1100-4,1560A,1560,XST06) 292 05-15-14 07-09-15

DI-0040 Install HM Frames - East Lvls 1&1.6 3 05-15-14 05-19-14WBCI-2225 Install Stair XST-06 10 07-07-14 07-18-14WBCI-2245 Pour Pan Stairs XST-06 2 07-21-14 07-22-14MO-4015 GRG - East Lvls 1&1.6 5 11-24-14 12-02-14MO-1095 Wall Fr aming - East Lvls 1&1.6 5 11-24-14 12-02-14DVE-2416 In-Wall Electrical - East Lvls 1&1.6 5 12-03-14 12-09-14MO-3085 Gyp Board - East Lvls 1&1.6 8 12-10-14 12-19-14MO-5090 Tape & Sand - East Lvls 1&1.6 6 12-18-14 12-26-14PNT-1060 Paint - East Lvls 1&1.6 4 12-26-14 12-31-14TSS-0034 Sprinkler Finishes - East Lvls 1&1.6 3 12-29-14 12-31-14WBCI-4125 Wood Fiber Acoustic Wall System - East Lvls 1&1.6 3 12-31-14 01-05-15ART-2055 Acoustic Ceiling Grid - East Lvls 1&1.6 1 01-02-15 01-02-15WBCI-3205 Soundlock Handrails - East Lvls 1&1.6 2 01-02-15 01-05-15TSI-1001 Curtain Hardware - East Lvls 1&1.6 2 01-02-15 01-05-15MPC-261 HVAC Trim - East Lvls 1&1.6 3 01-06-15 01-08-15DVE-2418 Electrical/Telecom/FA/Security Trim - East Lvls 1&1.6 3 01-14-15 01-16-15WBCI-2255 Stairwell Handrails XST-06 5 01-15-15 01-21-15ART-2100 Acoustic Ceiling Tile - East Lvls 1&1.6 1 01-16-15 01-16-15DVE-2417 Install Fixtures - East Lvls 1&1.6 3 01-16-15 01-20-15DI-1073 Install Doors & Hardware - East Lvls 1&1.6 3 01-23-15 01-27-15WBCI-3085 Seal Concrete Floors - East Lvls 1&1.6 2 01-28-15 01-29-15WBCI-4010 3/4" Wood Veneer - East Lvls 1&1.6 2 01-30-15 02-02-15WBCI-3005 Carpet - East Lvls 1&1.6 2 02-13-15 02-16-15TSI-106 Acoustical Curtains - East Lvls 1&1.6 1 07-01-15 07-01-15WBCI-4055 Fabric Wrapped Wall Panels - East Lvls 1&1.6 1 07-09-15 07-09-15

Levels 2&2.5Levels 2&2.5 (2411,2411A,2560,2325-1) 290 05-20-14 07-10-15

DI-0045 Install HM Frames - East Lvls 2&2.5 3 05-20-14 05-22-14MO-4020 GRG - East Lvls 2&2.5 5 12-03-14 12-09-14MO-1100 Wall Fr aming - East Lvls 2&2.5 5 12-03-14 12-09-14DVE-2419 In-Wall Electrical - East Lvls 2&2.5 5 12-10-14 12-16-14MO-3090 Gyp Board - East Lvls 2&2.5 8 12-22-14 01-02-15MO-5095 Tape & Sand - East Lvls 2&2.5 6 12-29-14 01-06-15PNT-1070 Paint - East Lvls 2&2.5 4 01-06-15 01-09-15TSS-0035 Sprinkler Finishes - East Lvls 2&2.5 3 01-07-15 01-09-15MPC-262 HVAC Trim - East Lvls 2&2.5 3 01-09-15 01-13-15WBCI-4095 Wood Fiber Acoustic Wall System - East Lvls 2&2.5 3 01-09-15 01-13-15ART-2060 Acoustic Ceiling Grid - East Lvls 2&2.5 1 01-12-15 01-12-15

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2014 2015 2016

Pit Lift - TheaterDrill Seating Anchors - Theater

Box 3/4 Fill Loudspeakers - CatwalkFront Fill Speakers - Stage Lip & Pit Lift

Plug Boxes - Auditor iumSurface Mounted Induction Loop Wiring - Under Lift Platforms

Wood Flooring - Stage (1325)Pit Lift Controls - Theater

Dust Free - Theater, South Rooms & Theater Stairwells 06-25-15Temp Stairs at Ramps - Theater

Fire Curtain - TheaterSeating - Theater

Adjustable Proscenium - TheaterSeat Wagons - Theater

Diffusers Under Seats - TheaterPortable Systems Testing

Chain Motor Assembly - TheaterOrchestra Enclosures - Theater

Winch Mounted Speakers & ScreensTheatrical Platforms - Theater

Portable Dance Floor Delivery - TheaterCurtain Install - Theater

Mechanical Hangers - Theater Above PrecastFireproofing - Theater (Spraying bot Main Roof)

Duct Main Install - Theater 4OH Plumbing Piping/Dom - Theater Above PrecastDuct Main Install - Theater 5Plumbing Pressure Testing - Theater Above Precast

Plumbing Insulation - Theater Above Precast

Install HM Frames - East Lvls 1&1.6Install Stair XST-06Pour Pan Stairs XST-06

GRG - East Lvls 1&1.6Wall Framing - East Lvls 1&1.6

In-Wall Electrical - East Lvls 1&1.6Gyp Board - East Lvls 1&1.6

Tape & Sand - East Lvls 1&1.6Paint - East Lvls 1&1.6Sprinkler Finishes - East Lvls 1&1.6

Wood Fiber Acoustic Wall System - East Lvls 1&1.6Acoustic Ceiling Grid - East Lvls 1&1.6Soundlock Handrails - East Lvls 1&1.6

Curtain Hardware - East Lvls 1&1.6HVAC Trim - East Lvls 1&1.6

Electrical/Telecom/FA/Security Trim - East Lvls 1&1.6Stairwell Handrails XST-06

Acoustic Ceiling Tile - East Lvls 1&1.6Install Fixtures - East Lvls 1&1.6

Install Doors & Hardware - East Lvls 1&1.6Seal Concrete Floors - East Lvls 1&1.6

3/4" Wood Veneer - East Lvls 1&1.6Carpet - East Lvls 1&1.6

Acoustical Curtains - East Lvls 1&1.6Fabric Wrapped Wall Panels - East Lvls 1&1.6

Install HM Frames - East Lvls 2&2.5GRG - East Lvls 2&2.5Wall Fr aming - East Lvls 2&2.5

In-Wall Electrical - East Lvls 2&2.5Gyp Board - East Lvls 2&2.5Tape & Sand - East Lvls 2&2.5

Paint - East Lvls 2&2.5Sprinkler Finishes - East Lvls 2&2.5

HVAC Trim - East Lvls 2&2.5Wood Fiber Acoustic Wall System - East Lvls 2&2.5

Acoustic Ceiling Grid - East Lvls 2&2.5

10030018-84Hancher Auditorium Replacement Facility 26 of 32 04-04-14

Milestone

Summary

Planned Work

Progressed Work

Critical Work

Crew 1

Crew 2

Primary Milestone

Hancher Auditorium Replacement - Construct New FacilityUniversity of Iowa

Project Layout - Data Date: 04-02-14

Page 27: Project SumProject Summary and Milestones · SM-1A5X1 Initial Substantial Completion (CO) 0 01-22-16 SM-1A18X3 Final Clean Complete 0 01-29-16 SM-1A5X4 Final Substantial Completion

- Activity ID Activity Name Orig.Dur'n

Start Finish

WBCI-3210 Soundlock Handrails - East Lvls 2&2.5 2 01-12-15 01-13-15TSI-1002 Curtain Hardware - East Lvls 2&2.5 2 01-12-15 01-13-15ART-2105 Acoustic Ceiling Tile - East Lvls 2&2.5 1 01-19-15 01-19-15DVE-2421 Electrical/Telecom/FA/Security Trim - East Lvls 2&2.5 3 01-19-15 01-21-15DVE-2420 Install Fixtures - East Lvls 2&2.5 3 01-21-15 01-23-15DI-1074 Install Doors & Hardware - East Lvls 2&2.5 3 01-28-15 01-30-15WBCI-3095 Seal Concrete Floors - East Lvls 2&2.5 2 02-02-15 02-03-15WBCI-4015 3/4" Wood Veneer - East Lvls 2&2.5 2 02-03-15 02-04-15WBCI-3015 Carpet - East Lvls 2&2.5 2 02-17-15 02-18-15TSI-102 Acoustical Curtains - East Lvls 2&2.5 1 07-02-15 07-02-15WBCI-4060 Fabric Wrapped Wall Panels - East Lvls 2&2.5 1 07-10-15 07-10-15

Level 3 (2325Level 3 (2325-1,3342A,3342,2861) 288 05-23-14 07-13-15

DI-0035 Install HM Frames - East Lvl 3 3 05-23-14 05-28-14MO-4025 GRG - East Lvl 3 5 12-10-14 12-16-14MO-1090 Wall Fr aming - East Lvl 3 5 12-17-14 12-23-14DVE-2422 In-Wall Electrical - East Lvl 3 5 12-22-14 12-29-14MO-3095 Gyp Board - East Lvl 3 8 01-05-15 01-14-15MO-5100 Tape & Sand - East Lvl 3 6 01-09-15 01-16-15PNT-1075 Paint - East Lvl 3 4 01-16-15 01-21-15TSS-0036 Sprinkler Finishes - East Lvl 3 3 01-19-15 01-21-15MPC-263 HVAC Trim - East Lvl 3 3 01-19-15 01-21-15WBCI-4100 Wood Fiber Acoustic Wall System - East Lvl 3 3 01-21-15 01-23-15ART-2030 Acoustic Ceiling Grid - East Lvl 3 1 01-22-15 01-22-15WBCI-3215 Soundlock Handrails - East Lvl 3 2 01-22-15 01-23-15TSI-1000 Curtain Hardware - East Lvl 3 2 01-22-15 01-23-15DVE-2424 Electrical/Telecom/FA/Security Trim - East Lvl 3 3 01-22-15 01-26-15ART-2095 Acoustic Ceiling Tile - East Lvl 3 1 01-23-15 01-23-15DVE-2423 Install Fixtures - East Lvl 3 3 01-26-15 01-28-15DI-1075 Install Doors & Hardware - East Lvl 3 3 02-02-15 02-04-15WBCI-4005 3/4" Wood Veneer - East Lvl 3 2 02-05-15 02-06-15WBCI-3105 Seal Concrete Floors - East Lvl 3 2 02-05-15 02-06-15WBCI-3025 Carpet - East Lvl 3 2 02-19-15 02-20-15TSI-101 Acoustical Curtains - East Lvl 3 1 07-06-15 07-06-15WBCI-4050 Fabric Wrapped Wall Panels - East Lvl 3 1 07-13-15 07-13-15West StairweWest Stairwell & Surrounding Rooms 283 05-20-14 06-30-15

Levels 1&1.6Levels 1&1.6 (XST03,1325-2,1325A,1100-3,1550,1550A) 281 05-20-14 06-26-15

DI-0070 Install HM Frames - West Lvls 1&1.6 3 05-20-14 05-22-14WBCI-2220 Install Stair XST-03 10 07-21-14 08-01-14WBCI-2240 Pour Pan Stairs XST-03 2 08-04-14 08-05-14MO-4000 GRG - West Lvls 1&1.6 5 08-06-14 08-12-14MO-1080 Wall Fr aming - West Lvls 1&1.6 5 08-06-14 08-12-14DVE-2411 In-Wall Electrical - West Lvls 1&1.6 5 08-11-14 08-15-14MO-3075 Gyp Board - West Lvls 1&1.6 8 09-16-14 09-25-14MO-5075 Tape & Sand - West Lvls 1&1.6 6 09-22-14 09-29-14PNT-1055 Paint - West Lvls 1&1.6 4 09-29-14 10-02-14DVE-2415 Install Fixtures - West Lvls 1&1.6 3 09-30-14 10-02-14TSS-0033 Sprinkler Finishes - West Lvls 1&1.6 3 09-30-14 10-02-14MPC-260 HVAC Trim - West Lvls 1&1.6 3 09-30-14 10-02-14WBCI-4030 3/4" Wood Veneer - Wes t Lvls 1&1.6 2 10-02-14 10-03-14DVE-2412 Electrical/Telecom/FA/Security Trim - West Lvls 1&1.6 3 10-02-14 10-06-14WBCI-4120 Wood Fiber Acoustic Wall System - West Lvls 1&1.6 3 10-02-14 10-06-14ART-2070 Acoustic Ceiling Grid - West Lvls 1&1.6 1 10-03-14 10-03-14WBCI-3200 Soundlock Handrails - West Lvls 1&1.6 2 10-03-14 10-06-14TSI-1004 Curtain Hardware - West Lvls 1&1.6 2 10-03-14 10-06-14DI-1072 Install Doors & Hardware - West Lvls 1&1.6 3 10-03-14 10-07-14ART-2160 Acoustic Ceiling Tile - West Lvls 1&1.6 1 10-06-14 10-06-14WBCI-3080 Seal Concrete Floors - West Lvls 1&1.6 2 10-08-14 10-09-14WBCI-3000 Carpet - West Lvls 1&1.6 2 10-08-14 10-09-14WBCI-2250 Stairwell Handrails XST-03 5 10-27-14 10-31-14TSI-100 Acoustical Curtains - West Lvls 1&1.6 1 06-26-15 06-26-15WBCI-4085 Fabric Wrapped Wall Panels - Wes t Lvls 1&1.6 1 06-26-15 06-26-15

Levels 2&2.5Levels 2&2.5 (2550,2550A,2552,2325-2,2750,2750A) 279 05-23-14 06-29-15

DI-0075 Install HM Frames - West Lvls 2&2.5 3 05-23-14 05-28-14MO-4005 GRG - West Lvls 2&2.5 5 08-13-14 08-19-14MO-1085 Wall Fr aming - West Lvls 2&2.5 5 08-13-14 08-19-14DVE-2425 In-Wall Electrical - West Lvls 2&2.5 5 08-18-14 08-22-14MO-3080 Gyp Board - West Lvls 2&2.5 8 09-26-14 10-07-14MO-5080 Tape & Sand - West Lvls 2&2.5 6 10-02-14 10-09-14PNT-1080 Paint - West Lvls 2&2.5 4 10-09-14 10-14-14

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2014 2015 2016

Soundlock Handrails - East Lvls 2&2.5Curtain Hardware - East Lvls 2&2.5Acoustic Ceiling Tile - East Lvls 2&2.5

Electrical/Telecom/FA/Security Trim - East Lvls 2&2.5Install Fixtures - East Lvls 2&2.5

Install Doors & Hardware - East Lvls 2&2.5Seal Concrete Floors - East Lvls 2&2.5

3/4" Wood Veneer - East Lvls 2&2.5Carpet - East Lvls 2&2.5

Acoustical Curtains - East Lvls 2&2.5Fabric Wrapped Wall Panels - East Lvls 2&2.5

Install HM Frames - East Lvl 3GRG - East Lvl 3

Wall Framing - East Lvl 3In-Wall Electrical - East Lvl 3

Gyp Board - East Lvl 3Tape & Sand - East Lvl 3

Paint - East Lvl 3Sprinkler Finishes - East Lvl 3

HVAC Trim - East Lvl 3Wood Fiber Acoustic Wall System - East Lvl 3

Acoustic Ceiling Grid - East Lvl 3Soundlock Handrails - East Lvl 3

Curtain Hardware - East Lvl 3Electrical/Telecom/FA/Security Trim - East Lvl 3

Acoustic Ceiling Tile - East Lvl 3Install Fixtures - East Lvl 3

Install Doors & Hardware - East Lvl 33/4" Wood Veneer - East Lvl 3

Seal Concrete Floors - East Lvl 3Carpet - East Lvl 3

Acoustical Curtains - East Lvl 3Fabric Wrapped Wall Panels - East Lvl 3

Install HM Frames - West Lvls 1&1.6Install Stair XST-03Pour Pan Stairs XST-03

GRG - West Lvls 1&1.6Wall Fr aming - West Lvls 1&1.6In-Wall Electrical - West Lvls 1&1.6

Gyp Board - West Lvls 1&1.6Tape & Sand - West Lvls 1&1.6Paint - West Lvls 1&1.6Install Fixtures - West Lvls 1&1.6Sprinkler Finishes - West Lvls 1&1.6HVAC Trim - West Lvls 1&1.63/4" Wood Veneer - Wes t Lvls 1&1.6Electrical/Telecom/FA/Security Trim - West Lvls 1&1.6Wood Fiber Acoustic Wall System - West Lvls 1&1.6

Acoustic Ceiling Grid - West Lvls 1&1.6Soundlock Handrails - West Lvls 1&1.6Curtain Hardware - West Lvls 1&1.6Install Doors & Hardware - West Lvls 1&1.6Acoustic Ceiling Tile - West Lvls 1&1.6Seal Concrete Floors - West Lvls 1&1.6Carpet - West Lvls 1&1.6

Stairwell Handrails XST-03Acoustical Curtains - West Lvls 1&1.6

Fabric Wrapped Wall Panels - Wes t Lvls 1&1.6

Install HM Frames - West Lvls 2&2.5GRG - West Lvls 2&2.5Wall Fr aming - West Lvls 2&2.5In-Wall Electrical - West Lvls 2&2.5

Gyp Board - West Lvls 2&2.5Tape & Sand - West Lvls 2&2.5

Paint - West Lvls 2&2.5

10030018-84Hancher Auditorium Replacement Facility 27 of 32 04-04-14

Milestone

Summary

Planned Work

Progressed Work

Critical Work

Crew 1

Crew 2

Primary Milestone

Hancher Auditorium Replacement - Construct New FacilityUniversity of Iowa

Project Layout - Data Date: 04-02-14

Page 28: Project SumProject Summary and Milestones · SM-1A5X1 Initial Substantial Completion (CO) 0 01-22-16 SM-1A18X3 Final Clean Complete 0 01-29-16 SM-1A5X4 Final Substantial Completion

- Activity ID Activity Name Orig.Dur'n

Start Finish

DVE-2426 Install Fixtures - West Lvls 2&2.5 3 10-10-14 10-14-14TSS-0037 Sprinkler Finishes - West Lvls 2&2.5 3 10-10-14 10-14-14MPC-264 HVAC Trim - West Lvls 2&2.5 3 10-10-14 10-14-14WBCI-4035 3/4" Wood Veneer - Wes t Lvls 2&2.5 2 10-14-14 10-15-14DVE-2427 Electrical/Telecom/FA/Security Trim - West Lvls 2&2.5 3 10-14-14 10-16-14WBCI-4105 Wood Fiber Acoustic Wall System - West Lvls 2&2.5 3 10-14-14 10-16-14ART-2075 Acoustic Ceiling Grid - West Lvls 2&2.5 1 10-15-14 10-15-14WBCI-3220 Soundlock Handrails - West Lvls 2&2.5 2 10-15-14 10-16-14TSI-1005 Curtain Hardware - West Lvls 2&2.5 2 10-15-14 10-16-14DI-1076 Install Doors & Hardware - West Lvls 2&2.5 3 10-15-14 10-17-14ART-2165 Acoustic Ceiling Tile - West Lvls 2&2.5 1 10-16-14 10-16-14WBCI-3100 Seal Concrete Floors - West Lvls 2&2.5 2 10-20-14 10-21-14WBCI-3020 Carpet - West Lvls 2&2.5 2 10-20-14 10-21-14TSI-104 Acoustical Curtains - West Lvls 2&2.5 1 06-29-15 06-29-15WBCI-4090 Fabric Wrapped Wall Panels - Wes t Lvls 2&2.5 1 06-29-15 06-29-15

Level 3 (2325Level 3 (2325-2,2852) 277 05-29-14 06-30-15

DI-0065 Install HM Frames - West Lvl 3 3 05-29-14 06-02-14MO-4010 GRG - West Lvl 3 5 08-20-14 08-26-14MO-1075 Wall Fr aming - West Lvl 3 5 08-20-14 08-26-14DVE-2428 In-Wall Electrical - West Lvl 3 5 08-25-14 08-29-14MO-3100 Gyp Board - West Lvl 3 8 10-08-14 10-17-14MO-5085 Tape & Sand - West Lvl 3 6 10-14-14 10-21-14PNT-1085 Paint - West Lvl 3 4 10-21-14 10-24-14DVE-2429 Install Fixtures - West Lvl 3 3 10-22-14 10-24-14TSS-0038 Sprinkler Finishes - West Lvl 3 3 10-22-14 10-24-14MPC-265 HVAC Trim - West Lvl 3 3 10-22-14 10-24-14WBCI-4025 3/4" Wood Veneer - Wes t Lvl 3 2 10-24-14 10-27-14DVE-2430 Electrical/Telecom/FA/Security Trim - West Lvl 3 3 10-24-14 10-28-14WBCI-4110 Wood Fiber Acoustic Wall System - West Lvl 3 3 10-24-14 10-28-14ART-2080 Acoustic Ceiling Grid - West Lvl 3 1 10-27-14 10-27-14WBCI-3225 Soundlock Handrails - West Lvl 3 2 10-27-14 10-28-14TSI-1003 Curtain Hardware - West Lvl 3 2 10-27-14 10-28-14DI-1077 Install Doors & Hardware - West Lvl 3 3 10-27-14 10-29-14ART-2155 Acoustic Ceiling Tile - West Lvl 3 1 10-28-14 10-28-14WBCI-3110 Seal Concrete Floors - West Lvl 3 2 10-30-14 10-31-14WBCI-3030 Carpet - West Lvl 3 2 10-30-14 10-31-14TSI-105 Acoustical Curtains - West Lvl 3 1 06-30-15 06-30-15WBCI-4080 Fabric Wrapped Wall Panels - Wes t Lvl 3 1 06-30-15 06-30-15South RoomsSouth Rooms & Entrances - Auditorium 282 05-28-14 07-08-15

Levels 1.1-1.Levels 1.1-1.6 282 05-28-14 07-08-15

MPC-112 Mechanical Hangers - Theater South Rooms Lvl 1.6 2 05-28-14 05-30-14MPC-266 Mechanical Hangers - Theater South Rooms Lvl 1.1 2 05-28-14 05-30-14WBCI-1015 Topping Slab - Theater South Rooms Lvl 1.1 13 06-25-14 07-15-14JCI-97 BAS Conduit - Theater South Rooms Lvl 1.6 5 08-08-14 08-14-14MPC-091 Duct Main/Branch Install - Theater South Rooms Lvl 1.6 10 08-08-14 08-21-14DVE-2431 Conduit Rough-In - Theater South Rooms Lvl 1.6 10 08-08-14 08-21-14MPC-144 HWS/R - Theater South Rooms Lvl 1.6 2 08-12-14 08-13-14MPC-136 CWS/R - Theater South Rooms Lvl 1.6 3 08-12-14 08-14-14JCI-98 BAS Wiring - Theater South Rooms Lvl 1.6 2 08-15-14 08-18-14MPC-273 Condensate - Theater South Rooms Lvl 1.6 3 08-15-14 08-19-14TSS-0039 Sprinkler Branch Lines - Theater South Rooms Lvl 1.6 5 08-18-14 08-22-14MPC-154 HVAC & Duct Testing - Theater South Rooms Lvl 1.6 1 08-20-14 08-20-14MPC-161 HVAC Piping Insulation - Theater South Rooms Lvl 1.6 2 08-21-14 08-22-14DVE-2433 Security Rough-In - Theater South Rooms Lvl 1.6 2 08-22-14 08-25-14DVE-2434 Telecom Rough-In - Theater South Rooms Lvl 1.6 2 08-22-14 08-25-14DVE-2435 Fire Alarm Rough-In - Theater South Rooms Lvl 1.6 2 08-22-14 08-25-14DVE-2432 Pull Wire - Theater South Rooms Lvl 1.6 5 08-22-14 08-28-14MPC-168 HVAC Labeling/Tags - Theater South Rooms Lvl 1.6 2 08-25-14 08-26-14DI-0050 Install HM Frames - Theater South Rooms Lvl 1.1 5 08-27-14 09-03-14MO-1060 Wall Fr aming - Theater South Rooms Lvl 1.1 5 08-27-14 09-03-14WBCI-1120 Seal Penetrations - Theater South Rooms Lvl 1.1 5 08-27-14 09-03-14MO-6040 Ceiling Framing - Theater South Rooms Lvl 1.6 5 08-29-14 09-05-14DVE-2437 Terminate Wire - Theater South Rooms Lvl 1.6 5 08-29-14 09-05-14DVE-2436 In-Wall Electrical - Theater South Rooms Lvl 1.1 10 09-02-14 09-15-14MO-2055 Wall Insulation - Theater South Rooms Lvl 1.1 5 09-04-14 09-10-14MO-6060 Ceiling Finish - Theater South Rooms Lvl 1.6 5 09-08-14 09-12-14JCI-008 BAS Conduit - Theater South Rooms Lvl 1.1 5 09-15-14 09-19-14MPC-092 Duct Main/Branch Install - Theater South Rooms Lvl 1.1 10 09-15-14 09-26-14DVE-2442 Conduit Rough-In - Theater South Rooms Lvl 1.1 10 09-15-14 09-26-14

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2014 2015 2016

Install Fixtures - West Lvls 2&2.5Sprinkler Finishes - West Lvls 2&2.5HVAC Trim - West Lvls 2&2.53/4" Wood Veneer - Wes t Lvls 2&2.5Electrical/Telecom/FA/Security Trim - West Lvls 2&2.5Wood Fiber Acoustic Wall System - West Lvls 2&2.5Acoustic Ceiling Grid - West Lvls 2&2.5Soundlock Handrails - West Lvls 2&2.5Curtain Hardware - West Lvls 2&2.5Install Doors & Hardware - West Lvls 2&2.5Acoustic Ceiling Tile - West Lvls 2&2.5

Seal Concrete Floors - West Lvls 2&2.5Carpet - West Lvls 2&2.5

Acoustical Curtains - West Lvls 2&2.5Fabric Wrapped Wall Panels - Wes t Lvls 2&2.5

Install HM Frames - West Lvl 3GRG - West Lvl 3Wall Framing - West Lvl 3In-Wall Electrical - West Lvl 3

Gyp Board - West Lvl 3Tape & Sand - West Lvl 3Paint - West Lvl 3Install Fixtures - West Lvl 3Sprinkler Finishes - West Lvl 3HVAC Trim - West Lvl 33/4" Wood Veneer - Wes t Lvl 3Electrical/Telecom/FA/Security Trim - West Lvl 3Wood Fiber Acoustic Wall System - West Lvl 3Acoustic Ceiling Grid - West Lvl 3Soundlock Handrails - West Lvl 3Curtain Hardware - West Lvl 3Install Doors & Hardware - West Lvl 3Acoustic Ceiling Tile - West Lvl 3Seal Concrete Floors - West Lvl 3Carpet - West Lvl 3

Acoustical Curtains - West Lvl 3Fabric Wrapped Wall Panels - Wes t Lvl 3

Mechanical Hangers - Theater South Rooms Lvl 1.6Mechanical Hangers - Theater South Rooms Lvl 1.1

Topping Slab - Theater South Rooms Lvl 1.1BAS Conduit - Theater South Rooms Lvl 1.6

Duct Main/Branch Install - Theater South Rooms Lvl 1.6Conduit Rough-In - Theater South Rooms Lvl 1.6

HWS/R - Theater South Rooms Lvl 1.6CWS/R - Theater South Rooms Lvl 1.6BAS Wiring - Theater South Rooms Lvl 1.6Condensate - Theater South Rooms Lvl 1.6Sprinkler Branch Lines - Theater South Rooms Lvl 1.6

HVAC & Duct Testing - Theater South Rooms Lvl 1.6HVAC Piping Insulation - Theater South Rooms Lvl 1.6Security Rough-In - Theater South Rooms Lvl 1.6Telecom Rough-In - Theater South Rooms Lvl 1.6Fire Alarm Rough-In - Theater South Rooms Lvl 1.6Pull Wire - Theater South Rooms Lvl 1.6

HVAC Labeling/Tags - Theater South Rooms Lvl 1.6Install HM Frames - Theater South Rooms Lvl 1.1Wall Framing - Theater South Rooms Lvl 1.1Seal Penetrations - Theater South Rooms Lvl 1.1Ceiling Framing - Theater South Rooms Lvl 1.6Terminate Wire - Theater South Rooms Lvl 1.6

In-Wall Electrical - Theater South Rooms Lvl 1.1Wall Insulat ion - Theater South Rooms Lvl 1.1Ceiling Finish - Theater South Rooms Lvl 1.6

BAS Conduit - Theater South Rooms Lvl 1.1Duct Main/Branch Install - Theater South Rooms Lvl 1.1Conduit Rough-In - Theater South Rooms Lvl 1.1

10030018-84Hancher Auditorium Replacement Facility 28 of 32 04-04-14

Milestone

Summary

Planned Work

Progressed Work

Critical Work

Crew 1

Crew 2

Primary Milestone

Hancher Auditorium Replacement - Construct New FacilityUniversity of Iowa

Project Layout - Data Date: 04-02-14

Page 29: Project SumProject Summary and Milestones · SM-1A5X1 Initial Substantial Completion (CO) 0 01-22-16 SM-1A18X3 Final Clean Complete 0 01-29-16 SM-1A5X4 Final Substantial Completion

- Activity ID Activity Name Orig.Dur'n

Start Finish

JCI-028 BAS Wiring - Theater South Rooms Lvl 1.1 2 09-22-14 09-23-14MPC-268 HWS/R - Theater South Rooms Lvl 1.1 2 09-29-14 09-30-14MPC-267 CWS/R - Theater South Rooms Lvl 1.1 3 09-29-14 10-01-14DVE-2443 Pull Wire - Theater South Rooms Lvl 1.1 5 09-29-14 10-03-14MPC-275 HVAC & Duct Testing - Theater South Rooms Lvl 1.1 1 10-02-14 10-02-14MPC-128 Condensate - Theater South Rooms Lvl 1.1 3 10-02-14 10-06-14MPC-269 HVAC Piping Insulation - Theater South Rooms Lvl 1.1 2 10-03-14 10-06-14DVE-2444 Terminate Wire - Theater South Rooms Lvl 1.1 5 10-06-14 10-10-14MPC-274 HVAC Labeling/Tags - Theater South Rooms Lvl 1.1 1 10-07-14 10-07-14MO-3060 Gyp Board - Theater South Rooms Lvl 1.1 5 10-20-14 10-24-14MO-5060 Tape & Sand - Theater South Rooms Lvl 1.1 6 10-27-14 11-03-14PNT-1065 Paint - Theater South Rooms Lvl 1.1 4 11-04-14 11-07-14ART-2045 Acoustic Ceiling Grid - Theater South Rooms Lvl 1.1 5 11-10-14 11-14-14MPC-177 HVAC Trim - Theater South Rooms Lvl 1.1 2 11-17-14 11-18-14TSS-0040 Sprinkler Finishes - Theater South Rooms Lvl 1.1 2 11-17-14 11-18-14DVE-2440 Security Trim - Theater South Rooms Lvl 1.1 3 11-17-14 11-19-14DVE-2441 Fire Alarm Device - Theater South Rooms Lvl 1.1 3 11-17-14 11-19-14DVE-2439 Install Fixtures - Theater South Rooms Lvl 1.1 10 11-17-14 12-02-14ART-2140 Acoustic Ceiling Tile - Theater South Rooms Lvl 1.1 5 11-24-14 12-02-14DVE-2438 Electrical Trim - Theater South Rooms Lvl 1.1 5 12-03-14 12-09-14DI-1079 Install Doors & Hardware - Theater South Rooms Lvl 1.1 5 12-03-14 12-09-14WBCI-4040 3/4" Wood Veneer - Theater South Rooms Lvl 1.1 10 12-03-14 12-16-14WBCI-6005 Wood Trim - Theater South Rooms Lvl 1.1 10 12-03-14 12-16-14AWS-5045 Install Glazing - Theater South Rooms Lvl 1.1 10 12-03-14 12-16-14WBCI-3035 Carpet - Theater South Rooms Lvl 1.1 10 12-17-14 12-31-14APS-021 Rack A97 & A98 - Sound Control 1100B-1 18 05-11-15 06-04-15WBCI-4075 Fabric Wrapped Wall Panels - Theater South Rooms Lvl 1.1 5 07-01-15 07-08-15

Levels 2-2.5Levels 2-2.5 259 06-25-14 07-02-15

MPC-278 Mechanical Hangers - Theater South Rooms Lvl 2.5 2 06-25-14 06-27-14MPC-279 Mechanical Hangers - Theater South Rooms Lvl 2 2 06-25-14 06-27-14JCI-99 BAS Conduit - Theater South Rooms Lvl 2.5 5 09-29-14 10-03-14MPC-280 Duct Main/Branch Install - Theater South Rooms Lvl 2.5 10 09-29-14 10-10-14DVE-2449 Conduit Rough-In - Theater South Rooms Lvl 2.5 10 09-29-14 10-10-14MPC-281 HWS/R - Theater South Rooms Lvl 2.5 2 10-01-14 10-02-14MPC-282 CWS/R - Theater South Rooms Lvl 2.5 3 10-01-14 10-03-14JCI-100 BAS Wiring - Theater South Rooms Lvl 2.5 2 10-06-14 10-07-14MPC-283 Condensate - Theater South Rooms Lvl 2.5 3 10-06-14 10-08-14DI-0055 Install HM Frames - Theater South Rooms Lvl 2 5 10-06-14 10-10-14MO-1065 Wall Fr aming - Theater South Rooms Lvl 2 5 10-06-14 10-10-14WBCI-1125 Seal Penetrations - Theater South Rooms Lvl 2 5 10-06-14 10-10-14TSS-0042 Sprinkler Branch Lines - Theater South Rooms Lvl 2.5 5 10-07-14 10-13-14MPC-284 HVAC & Duct Testing - Theater South Rooms Lvl 2.5 1 10-09-14 10-09-14MPC-285 HVAC Piping Insulation - Theater South Rooms Lvl 2.5 2 10-10-14 10-13-14DVE-2450 Security Rough-In - Theater South Rooms Lvl 2.5 2 10-13-14 10-14-14DVE-2451 Telecom Rough-In - Theater South Rooms Lvl 2.5 2 10-13-14 10-14-14DVE-2452 Fire Alarm Rough-In - Theater South Rooms Lvl 2.5 2 10-13-14 10-14-14MO-2060 Wall Insulation - Theater South Rooms Lvl 2 5 10-13-14 10-17-14DVE-2453 Pull Wire - Theater South Rooms Lvl 2.5 5 10-13-14 10-17-14DVE-2454 In-Wall Electrical - Theater South Rooms Lvl 2 10 10-13-14 10-24-14MPC-286 HVAC Labeling/Tags - Theater South Rooms Lvl 2.5 2 10-14-14 10-15-14MO-6045 Ceiling Framing - Theater South Rooms Lvl 2.5 5 10-20-14 10-24-14DVE-2455 Terminate Wire - Theater South Rooms Lvl 2.5 5 10-20-14 10-24-14MO-6065 Ceiling Finish - Theater South Rooms Lvl 2.5 5 10-27-14 10-31-14JCI-101 BAS Conduit - Theater South Rooms Lvl 2 5 11-03-14 11-07-14MPC-287 Duct Main/Branch Install - Theater South Rooms Lvl 2 10 11-03-14 11-14-14DVE-2456 Conduit Rough-In - Theater South Rooms Lvl 2 10 11-03-14 11-14-14JCI-102 BAS Wiring - Theater South Rooms Lvl 2 2 11-10-14 11-11-14MO-3065 Gyp Board - Theater South Rooms Lvl 2 5 11-12-14 11-18-14MPC-288 HWS/R - Theater South Rooms Lvl 2 2 11-17-14 11-18-14MPC-289 CWS/R - Theater South Rooms Lvl 2 3 11-17-14 11-19-14DVE-2457 Pull Wire - Theater South Rooms Lvl 2 5 11-17-14 11-21-14MO-5065 Tape & Sand - Theater South Rooms Lvl 2 6 11-19-14 11-26-14MPC-290 HVAC & Duct Testing - Theater South Rooms Lvl 2 1 11-20-14 11-20-14MPC-291 Condensate - Theater South Rooms Lvl 2 3 11-20-14 11-24-14MPC-292 HVAC Piping Insulation - Theater South Rooms Lvl 2 2 11-21-14 11-24-14DVE-2458 Terminate Wire - Theater South Rooms Lvl 2 5 11-24-14 12-02-14MPC-293 HVAC Labeling/Tags - Theater South Rooms Lvl 2 1 11-25-14 11-25-14PNT-1100 Paint - Theater South Rooms Lvl 2 4 12-01-14 12-04-14ART-2050 Acoustic Ceiling Grid - Theater South Rooms Lvl 2 5 12-05-14 12-11-14MPC-294 HVAC Trim - Theater South Rooms Lvl 2 2 12-12-14 12-15-14

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2014 2015 2016

BAS Wiring - Theater South Rooms Lvl 1.1HWS/R - Theater South Rooms Lvl 1.1CWS/R - Theater South Rooms Lvl 1.1Pull Wire - Theater South Rooms Lvl 1.1HVAC & Duct Testing - Theater South Rooms Lvl 1.1Condensate - Theater South Rooms Lvl 1.1HVAC Piping Insulation - Theater South Rooms Lvl 1.1Terminate Wire - Theater South Rooms Lvl 1.1

HVAC Labeling/Tags - Theater South Rooms Lvl 1.1Gyp Board - Theater South Rooms Lvl 1.1

Tape & Sand - Theater South Rooms Lvl 1.1Paint - Theater South Rooms Lvl 1.1

Acoustic Ceiling Grid - Theater South Rooms Lvl 1.1HVAC Trim - Theater South Rooms Lvl 1.1Sprinkler Finishes - Theater South Rooms Lvl 1.1Security Trim - Theater South Rooms Lvl 1.1Fire Alarm Device - Theater South Rooms Lvl 1.1

Install Fixtures - Theater South Rooms Lvl 1.1Acoustic Ceiling Tile - Theater South Rooms Lvl 1.1

Electrical Trim - Theater South Rooms Lvl 1.1Install Doors & Hardware - Theater South Rooms Lvl 1.1

3/4" Wood Veneer - Theater South Rooms Lvl 1.1Wood Trim - Theater South Rooms Lvl 1.1Install Glazing - Theater South Rooms Lvl 1.1

Carpet - Theater South Rooms Lvl 1.1Rack A97 & A98 - Sound Control 1100B- 1

Fabric Wrapped Wall Panels - Theater South Rooms Lvl 1.1

Mechanical Hangers - Theater South Rooms Lvl 2.5Mechanical Hangers - Theater South Rooms Lvl 2

BAS Conduit - Theater South Rooms Lvl 2.5Duct Main/Branch Install - Theater South Rooms Lvl 2.5Conduit Rough-In - Theater South Rooms Lvl 2.5

HWS/R - Theater South Rooms Lvl 2.5CWS/R - Theater South Rooms Lvl 2.5BAS Wiring - Theater South Rooms Lvl 2.5Condensate - Theater South Rooms Lvl 2.5Install HM Frames - Theater South Rooms Lvl 2Wall Fr aming - Theater South Rooms Lvl 2Seal Penetrations - Theater South Rooms Lvl 2Sprinkler Branch Lines - Theater South Rooms Lvl 2.5

HVAC & Duct Testing - Theater South Rooms Lvl 2.5HVAC Piping Insulation - Theater South Rooms Lvl 2.5Security Rough-In - Theater South Rooms Lvl 2.5Telecom Rough-In - Theater South Rooms Lvl 2.5Fire Alarm Rough-In - Theater South Rooms Lvl 2.5Wall Insulat ion - Theater South Rooms Lvl 2Pull Wire - Theater South Rooms Lvl 2.5

In-Wall Electrical - Theater South Rooms Lvl 2HVAC Labeling/Tags - Theater South Rooms Lvl 2.5

Ceiling Framing - Theater South Rooms Lvl 2.5Terminate Wire - Theater South Rooms Lvl 2.5

Ceiling Finish - Theater South Rooms Lvl 2.5BAS Conduit - Theater South Rooms Lvl 2

Duct Main/Branch Install - Theater South Rooms Lvl 2Conduit Rough-In - Theater South Rooms Lvl 2

BAS Wiring - Theater South Rooms Lvl 2Gyp Board - Theater South Rooms Lvl 2HWS/R - Theater South Rooms Lvl 2CWS/R - Theater South Rooms Lvl 2Pull Wire - Theater South Rooms Lvl 2

Tape & Sand - Theater South Rooms Lvl 2HVAC & Duct Testing - Theater South Rooms Lvl 2Condensate - Theater South Rooms Lvl 2HVAC Piping Insulation - Theater South Rooms Lvl 2

Terminate Wire - Theater South Rooms Lvl 2HVAC Labeling/Tags - Theater South Rooms Lvl 2

Paint - Theater South Rooms Lvl 2Acoustic Ceiling Grid - Theater South Rooms Lvl 2HVAC Trim - Theater South Rooms Lvl 2

10030018-84Hancher Auditorium Replacement Facility 29 of 32 04-04-14

Milestone

Summary

Planned Work

Progressed Work

Critical Work

Crew 1

Crew 2

Primary Milestone

Hancher Auditorium Replacement - Construct New FacilityUniversity of Iowa

Project Layout - Data Date: 04-02-14

Page 30: Project SumProject Summary and Milestones · SM-1A5X1 Initial Substantial Completion (CO) 0 01-22-16 SM-1A18X3 Final Clean Complete 0 01-29-16 SM-1A5X4 Final Substantial Completion

- Activity ID Activity Name Orig.Dur'n

Start Finish

TSS-0043 Sprinkler Finishes - Theater South Rooms Lvl 2 2 12-12-14 12-15-14DVE-2459 Security Trim - Theater South Rooms Lvl 2 3 12-12-14 12-16-14DVE-2460 Fire Alarm Device - Theater South Rooms Lvl 2 3 12-12-14 12-16-14DVE-2461 Install Fixtures - Theater South Rooms Lvl 2 10 12-12-14 12-26-14ART-2145 Acoustic Ceiling Tile - Theater South Rooms Lvl 2 5 12-19-14 12-26-14DVE-2462 Electrical Trim - Theater South Rooms Lvl 2 5 12-29-14 01-05-15DI-1080 Install Doors & Hardware - Theater South Rooms Lvl 2 5 12-29-14 01-05-15AWS-5055 Install Glazing - Theater South Rooms Lvl 2 5 12-29-14 01-05-15WBCI-3120 Seal Concrete Floors - Theater South Rooms Lvl 2 5 01-06-15 01-12-15WBCI-2260 Stainless Steel Guardrail - Theater South Rooms Lvl 2 10 01-06-15 01-19-15WBCI-3045 Carpet - Theater South Rooms Lvl 2 10 01-06-15 01-19-15WBCI-4070 Fabric Wrapped Wall Panels - Theater South Rooms Lvl 2 5 06-26-15 07-02-15

Level 3.5-4Level 3.5-4 145 07-18-14 02-12-15

MPC-295 Mechanical Hangers - Theater South Rooms Lvl 3.5 2 07-18-14 07-21-14JCI-103 BAS Conduit - Theater South Rooms Lvl 3.5 5 11-17-14 11-21-14DI-0060 Install HM Frames - Theater South Rooms Lvl 3.5 5 11-17-14 11-21-14MO-1070 Wall Fr aming - Theater South Rooms Lvl 3.5 5 11-17-14 11-21-14MPC-296 Duct Main/Branch Install - Theater South Rooms Lvl 3.5 10 11-17-14 12-02-14DVE-2463 In-Wall Electrical - Theater South Rooms Lvl 3.5 10 11-17-14 12-02-14DVE-2464 Conduit Rough-In - Theater South Rooms Lvl 3.5 10 11-17-14 12-02-14JCI-104 BAS Wiring - Theater South Rooms Lvl 3.5 2 11-24-14 11-25-14MO-2065 Wall Insulation - Theater South Rooms Lvl 3.5 5 11-24-14 12-02-14MPC-297 HWS/R - Theater South Rooms Lvl 3.5 2 12-03-14 12-04-14MPC-298 CWS/R - Theater South Rooms Lvl 3.5 3 12-03-14 12-05-14MO-3070 Gyp Board - Theater South Rooms Lvl 3.5 5 12-03-14 12-09-14WBCI-1130 Seal Penetrations - Theater South Rooms Lvl 3.5 5 12-03-14 12-09-14DVE-2465 Pull Wire - Theater South Rooms Lvl 3.5 5 12-03-14 12-09-14MPC-299 HVAC & Duct Testing - Theater South Rooms Lvl 3.5 1 12-08-14 12-08-14MPC-300 Condensate - Theater South Rooms Lvl 3.5 3 12-08-14 12-10-14MPC-301 HVAC Piping Insulation - Theater South Rooms Lvl 3.5 2 12-09-14 12-10-14DVE-2466 Terminate Wire - Theater South Rooms Lvl 3.5 5 12-10-14 12-16-14MO-5070 Tape & Sand - Theater South Rooms Lvl 3.5 6 12-10-14 12-17-14MPC-302 HVAC Labeling/Tags - Theater South Rooms Lvl 3.5 1 12-11-14 12-11-14PNT-1105 Paint - Theater South Rooms Lvl 3.5 4 12-18-14 12-23-14ART-2065 Acoustic Ceiling Grid - Theater South Rooms Lvl 3.5 5 12-24-14 12-31-14MPC-303 HVAC Trim - Theater South Rooms Lvl 3.5 2 01-02-15 01-05-15TSS-0044 Sprinkler Finishes - Theater South Rooms Lvl 3.5 2 01-02-15 01-05-15DVE-2467 Security Trim - Theater South Rooms Lvl 3.5 3 01-02-15 01-06-15DVE-2468 Fire Alarm Device - Theater South Rooms Lvl 3.5 3 01-02-15 01-06-15DVE-2469 Install Fixtures - Theater South Rooms Lvl 3.5 10 01-02-15 01-15-15ART-2150 Acoustic Ceiling Tile - Theater South Rooms Lvl 3.5 5 01-09-15 01-15-15DVE-2470 Electrical Trim - Theater South Rooms Lvl 3.5 5 01-16-15 01-22-15DI-1081 Install Doors & Hardware - Theater South Rooms Lvl 3.5 5 01-16-15 01-22-15WBCI-4045 3/4" Wood Veneer - Theater South Rooms Lvl 3.5 10 01-16-15 01-29-15WBCI-6020 Wood Trim - Theater South Rooms Lvl 3.5 10 01-16-15 01-29-15AWS-5065 Install Glazing - Theater South Rooms Lvl 3.5 10 01-16-15 01-29-15WBCI-3055 Carpet - Theater South Rooms Lvl 3.5 10 01-30-15 02-12-15StageStage 260 07-07-14 07-14-15

HM-1160 CMU - Stage 10 07-07-14 07-18-14MO-1035 Wall Fr aming - Stage 5 12-24-14 12-31-14DVE-2446 In-Wall Electrical - Stage 5 12-30-14 01-06-15MPC-277 In-Wall Plumbing - Stage 5 01-02-15 01-08-15MO-3035 Gyp Board - Stage 8 01-15-15 01-26-15MO-5035 Tape & Sand - Stage 6 01-21-15 01-28-15PNT-1090 Paint - Stage 4 01-28-15 02-02-15DVE-2447 Install Fixtures - Stage 3 01-29-15 02-02-15TSS-0041 Sprinkler Finishes - Stage 3 01-29-15 02-02-15MPC-276 HVAC Trim - Stage 3 01-29-15 02-02-15DVE-2448 Electrical/Telecom/FA/Security Trim - Stage 3 02-02-15 02-04-15WBCI-4115 Wood Fiber Acoustic Wall System - Stage 3 02-02-15 02-04-15ART-2040 Acoustic Ceiling Grid - Stage 1 02-03-15 02-03-15WBCI-3230 Soundlock Handrails - Stage 2 02-03-15 02-04-15TSI-1006 Curtain Hardware - Stage 2 02-03-15 02-04-15ART-2135 Acoustic Ceiling Tile - Stage 1 02-04-15 02-04-15DI-1078 Install Doors & Hardware - Stage 3 02-05-15 02-09-15WBCI-4020 3/4" Wood Veneer - Stage 2 02-09-15 02-10-15WBCI-3090 Seal Concrete Floors - Stage 2 02-10-15 02-11-15WBCI-3010 Carpet - Stage 2 02-23-15 02-24-15TSI-1007 Acoustical Curtains - Stage 1 07-07-15 07-07-15

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2014 2015 2016

Sprinkler Finishes - Theater South Rooms Lvl 2Security Trim - Theater South Rooms Lvl 2Fire Alarm Device - Theater South Rooms Lvl 2

Install Fixtures - Theater South Rooms Lvl 2Acoustic Ceiling Tile - Theater South Rooms Lvl 2

Electrical Trim - Theater South Rooms Lvl 2Install Doors & Hardware - Theater South Rooms Lvl 2Install Glazing - Theater South Rooms Lvl 2

Seal Concrete Floors - Theater South Rooms Lvl 2Stainless Steel Guardrail - Theater South Rooms Lvl 2

Carpet - Theater South Rooms Lvl 2Fabric Wrapped Wall Panels - Theater South Rooms Lvl 2

Mechanical Hangers - Theater South Rooms Lvl 3.5BAS Conduit - Theater South Rooms Lvl 3.5Install HM Frames - Theater South Rooms Lvl 3.5Wall Framing - Theater South Rooms Lvl 3.5

Duct Main/Branch Install - Theater South Rooms Lvl 3.5In-Wall Electrical - Theater South Rooms Lvl 3.5Conduit Rough-In - Theater South Rooms Lvl 3.5

BAS Wiring - Theater South Rooms Lvl 3.5Wall Insulat ion - Theater South Rooms Lvl 3.5HWS/R - Theater South Rooms Lvl 3.5CWS/R - Theater South Rooms Lvl 3.5Gyp Board - Theater South Rooms Lvl 3.5Seal Penetrations - Theater South Rooms Lvl 3.5Pull Wire - Theater South Rooms Lvl 3.5HVAC & Duct Testing - Theater South Rooms Lvl 3.5Condensate - Theater South Rooms Lvl 3.5HVAC Piping Insulation - Theater South Rooms Lvl 3.5

Terminate Wire - Theater South Rooms Lvl 3.5Tape & Sand - Theater South Rooms Lvl 3.5

HVAC Labeling/Tags - Theater South Rooms Lvl 3.5Paint - Theater South Rooms Lvl 3.5

Acoustic Ceiling Grid - Theater South Rooms Lvl 3.5HVAC Trim - Theater South Rooms Lvl 3.5

Sprinkler Finishes - Theater South Rooms Lvl 3.5Security Trim - Theater South Rooms Lvl 3.5

Fire Alarm Device - Theater South Rooms Lvl 3.5Install Fixtures - Theater South Rooms Lvl 3.5

Acoustic Ceiling Tile - Theater South Rooms Lvl 3.5Electrical Trim - Theater South Rooms Lvl 3.5

Install Doors & Hardware - Theater South Rooms Lvl 3.53/4" Wood Veneer - Theater South Rooms Lvl 3.5

Wood Trim - Theater South Rooms Lvl 3.5Install Glazing - Theater South Rooms Lvl 3.5

Carpet - Theater South Rooms Lvl 3.5

CMU - StageWall Fr aming - Stage

In-Wall Electrical - StageIn-Wall Plumbing - Stage

Gyp Board - StageTape & Sand - Stage

Paint - StageInstall Fixtures - Stage

Sprinkler Finishes - StageHVAC Trim - Stage

Electrical/Telecom/FA/Security Trim - StageWood Fiber Acoustic Wall System - Stage

Acoustic Ceiling Grid - StageSoundlock Handrails - Stage

Curtain Hardware - StageAcoustic Ceiling Tile - Stage

Install Doors & Hardware - Stage3/4" Wood Veneer - Stage

Seal Concrete Floors - StageCarpet - Stage

Acoustical Curtains - Stage

10030018-84Hancher Auditorium Replacement Facility 30 of 32 04-04-14

Milestone

Summary

Planned Work

Progressed Work

Critical Work

Crew 1

Crew 2

Primary Milestone

Hancher Auditorium Replacement - Construct New FacilityUniversity of Iowa

Project Layout - Data Date: 04-02-14

Page 31: Project SumProject Summary and Milestones · SM-1A5X1 Initial Substantial Completion (CO) 0 01-22-16 SM-1A18X3 Final Clean Complete 0 01-29-16 SM-1A5X4 Final Substantial Completion

- Activity ID Activity Name Orig.Dur'n

Start Finish

WBCI-4065 Fabric Wrapped Wall Panels - Stage 1 07-14-15 07-14-15

Site ImprovSite Improvements 348 05-27-14 10-07-15

C2-8M74 Road Closed E Levitts Building 48 05-27-14* 08-01-14C2-8M73 Install New Road 20 07-08-14 08-04-14*ST-8V Roads and Parking Lots 85 04-01-15 07-30-150S00-0001 Remove Laydown & Parking Areas East 10 04-06-15* 04-17-150S00-0033 Generator Wall 11 04-06-15* 04-20-150S00-0007 Silt Fence East 4 04-16-15 04-21-150S00-0002 Rough Grading East 12 04-20-15 05-05-150S00-0034 Northeast Retaining Wall 11 04-21-15 05-05-150S00-0008 Dig Bio-Cell East 5 05-06-15 05-12-150S00-0035 Dumpster Wall 7 05-06-15 05-14-150S00-0003 Topsoil East 14 05-08-15 05-28-150S00-0016 Bio-Cell Soil 7 05-13-15 05-21-150S00-0036 North Lot 8" Paving 6 05-15-15 05-22-15ST-8V20 Exterior Lighting 30 05-20-15 07-01-150S00-0012 Install Sleeves Northwest 1 05-22-15 05-22-150S00-0037 NW Walk/Steps 8 05-26-15 06-04-150S00-0038 Stoops - All (start & finish before any sidewalk ) 12 05-26-15 06-10-150S00-0009 Rough Grading West 2 05-29-15 06-01-150S00-0004 Rough Grading North 5 05-29-15 06-04-150S00-0010 Topsoil West 6 06-02-15 06-09-150S00-0005 Topsoil North 9 06-05-15 06-17-150S00-0039 East Lane 11 06-05-15 06-19-150S00-0040 Riverside & Park Intersection (Coord w/city - Weekend Work) 2 06-11-15 06-12-150S00-0011 Scour Boxes 5 06-11-15 06-17-150S00-0013 Irrigation West Corner 2 06-18-15 06-19-150S00-0006 Rough Grading South 10 06-18-15 07-01-150S00-0041 West Drop-Off Area 5 06-22-15 06-26-150S00-0014 Install Sleeves East 1 06-26-15 06-26-150S00-0044 East Sidewalks 3 06-29-15 07-01-150S00-0042 Large Steps 8 06-29-15 07-09-150S00-0043 PCC Bench Footings 2 07-10-15 07-13-150S00-0045 Landscape Wall 25 07-14-15 08-17-150S00-0015 Install Sleeves South 1 08-17-15 08-17-150S00-0022 Plantings - East Outside of Lane 5 08-17-15* 08-21-150S00-0027 Trees - All 5 08-17-15* 08-21-150S00-0046 South Sidewalks (Coord w/snowmelt) 15 08-18-15 09-08-15MPC-789 Install Snowmelt 15 08-18-15 09-08-150S00-0023 Plantings - West/Northwest 5 08-24-15 08-28-150S00-0028 Plantings - North 5 08-24-15 08-28-150S00-0024 Rock Bed - All 5 08-31-15 09-04-150S00-0029 Plantings - Misc 5 08-31-15 09-04-150S00-0017 Topsoil South 8 09-02-15 09-14-150S00-0018 Irrigation East 2 09-08-15 09-09-150S00-0025 Plantings - East Inside 5 09-08-15 09-14-150S00-0047 Cast Benches 2 09-09-15 09-10-150S00-0019 Irrigation South 3 09-10-15 09-14-150S00-0048 Handrails 10 09-11-15 09-24-150S00-0020 Drip Lines East 2 09-15-15 09-16-150S00-0026 Plantings - South 10 09-15-15 09-28-150S00-0030 Plantings (Before Seeding) & Bio-Cell East 5 09-23-15 09-29-150S00-0050 Site Furnishings 3 09-25-15 09-29-150S00-0032 Sod by 9/30 6 09-28-15 10-05-15*0S00-0031 Seed by 9/30 8 09-28-15 10-07-15*0S00-0049 Hancher Sign 4 09-30-15 10-05-150S00-0021 Drip Lines South 2 10-06-15 10-07-15

CommissioCommissioning & Construction Close-Out 308 12-31-14 03-16-16

Theater CommTheater Commissiong 300 12-31-14 03-04-16

PC-CX4G2 Initial HVAC - Joseph 5 12-31-14 01-07-151171-8X44 Theatrical Lift Load Test 2 08-27-15 08-28-15PC-CX4G1 Theater Tuning - Joseph 30 01-11-16 02-19-161172-8U4E11 Dimmer Controls Commissioning - Theater Area 40 01-11-16 03-04-16PC-CX4G3 Theater Tuning - Jonathan 30 01-18-16 02-26-16PC-CX13 Theater Commissioning - Millie 30 01-25-16 03-04-16Test & BalancTest & Balance 216 02-25-15 12-31-15

1171-8X10 TAB Summary 201 02-25-15 12-09-15TB1-001 Test & Balance - Lower Level 7 02-26-15 03-06-15

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2014 2015 2016

Fabric Wrapped Wall Panels - Stage

Road Closed E Levitts BuildingInstall New Road

Roads and Parking LotsRemove Laydown & Parking Areas East

Generator WallSilt Fence East

Rough Grading EastNortheast Retaining Wall

Dig Bio-Cell EastDumpster Wall

Topsoil EastBio-Cell Soil

North Lot 8" PavingExterior Lighting

Install Sleeves NorthwestNW Walk/Steps

Stoops - All (start & finish before any sidewalk )Rough Grading WestRough Grading North

Topsoil WestTopsoil North

East LaneRiverside & Park Intersection (Coord w/city - Weekend Work)

Scour BoxesIrrigation West CornerRough Grading South

West Drop-Off AreaInstall Sleeves East

East SidewalksLarge Steps

PCC Bench FootingsLandscape Wall

Install Sleeves SouthPlantings - East Outside of Lane

Trees - AllSouth Sidewalks (Coord w/snowmelt)

Install SnowmeltPlantings - West/Northwest

Plantings - NorthRock Bed - All

Plantings - MiscTopsoil South

Irrigation EastPlantings - East Inside

Cast BenchesIrrigation South

HandrailsDrip Lines East

Plantings - SouthPlantings (Before Seeding) & Bio-Cell East

Site FurnishingsSod by 9/30

Seed by 9/30Hancher Sign

Drip Lines South

Initial HVAC - JosephTheatrical Lift Load Test

Theater Tuning - JosephDimmer Controls Commissioning - Theater Area

Theater Tuning - JonathanTheater Commissioning - Millie

TAB SummaryTest & Balance - Lower Level

10030018-84Hancher Auditorium Replacement Facility 31 of 32 04-04-14

Milestone

Summary

Planned Work

Progressed Work

Critical Work

Crew 1

Crew 2

Primary Milestone

Hancher Auditorium Replacement - Construct New FacilityUniversity of Iowa

Project Layout - Data Date: 04-02-14

Page 32: Project SumProject Summary and Milestones · SM-1A5X1 Initial Substantial Completion (CO) 0 01-22-16 SM-1A18X3 Final Clean Complete 0 01-29-16 SM-1A5X4 Final Substantial Completion

- Activity ID Activity Name Orig.Dur'n

Start Finish

TB1-006 Test & Balance - Rehearsal Hall 5 07-01-15 07-08-15TB1-005 Test & Balance - Theater 20 07-09-15 08-05-15TB1-002 Test & Balance - Level 1 22 09-14-15 10-13-15TB1-003 Test & Balance - Level 2 22 10-14-15 11-12-15TB1-004 Test & Balance - Level 3 17 11-13-15 12-09-15PC-CX16 Submit Preliminary Test & Balance Report 0 12-09-15TB1-008 Submit Final Test & Balance Report 0 12-31-15KFI FunctionaKFI Functional Testing 236 01-21-15 12-23-15

PC-CX11 Commissioning Summary 236 01-21-15 12-23-15KFI-038 Generator / ATS & EM Power KFI Functional Testing 5 01-22-15 01-28-15KFI-020 Structral Fin-Tube Functional Testing 5 03-02-15 03-06-15KFI-001 Domestic Hot Water Heat Exchanger Functional Checkout 2 03-19-15 03-20-15KFI-002 Water Treatment Functional Checkout 2 03-19-15 03-20-15KFI-003 Exhaust Systems Functional Checkout 3 03-19-15 03-23-15KFI-008 AHU-1 KFI Functional Testing 5 03-19-15 03-25-15KFI-024 Radiant Heating KFI Functional Testing 5 03-19-15 03-25-15KFI-033 EPMS KFI Functional Checkout 5 03-19-15 03-25-15KFI-029 Smoke Control KFI Functional Testing 1 06-26-15 06-26-15KFI-012 AHU-5 KFI Functional Testing 5 07-09-15 07-15-15KFI-011 AHU-4 KFI Functional Testing 10 08-06-15 08-19-15KFI-013 AHU-6 KFI Functional Testing 10 08-20-15 09-02-15KFI-021 Snow Melt KFI Functional Checkout 1 09-09-15 09-09-15KFI-007 FCU KFI Functional Testing 5 09-14-15 09-18-15KFI-039 Lighting Control KFI Functional Testing 5 09-14-15 09-18-15KFI-037 Day-Lighting & Occupancy Sensors KFI Functional Checkout 10 09-14-15 09-25-15KFI-014 AHU-7 KFI Functional Testing 5 10-14-15 10-20-15KFI-015 AHU-8 KFI Functional Testing 5 11-13-15 11-19-15KFI-009 AHU-2 KFI Functional Testing 5 12-10-15 12-16-15KFI-010 AHU-3 KFI Functional Testing 5 12-17-15 12-23-15Project CloseProject Closeout 293 01-12-15 03-04-16

1171-8X54 Elevator 4 Inspection for Construction Use 1 01-12-15 01-12-15PC-CX33 Generate Punchlist & Distribute - Enclosure 5 03-05-15 03-11-15PC-CX34 Complete Punchlist Items - Enclosure 20 03-12-15 04-08-15PC-CX17 Generate Punchlist & Distribute - Lower Level 5 03-17-15 03-23-15PC-CX18 Complete Punchlist Items - Lower Level 20 03-24-15 04-20-15PC-CX19 Generate Punchlist & Distribute - BOH Lvl 1 5 04-21-15 04-27-15PC-CX20 Complete Punchlist Items - BOH Lvl 1 20 04-28-15 05-26-15PC-CX29 Generate Punchlist & Distribute - Rehearsal 5 05-27-15 06-02-15PC-CX30 Complete Punchlist Items - Rehearsal 20 06-03-15 06-30-15PC-CX21 Generate Punchlist & Distribute - BOH Lvl 2 5 07-01-15 07-08-15PC-CX22 Complete Punchlist Items - BOH Lvl 2 20 07-09-15 08-05-15PC-CX23 Generate Punchlist & Distribute - FOH Lvl 1 5 08-06-15 08-12-15PC-CX24 Complete Punchlist Items - FOH Lvl 1 20 08-13-15 09-10-15PC-CX25 Generate Punchlist & Distribute - FOH Lvl 2 5 09-11-15 09-17-15PC-CX26 Complete Punchlist Items - FOH Lvl 2 20 09-18-15 10-15-15PC-CX35 Generate Punchlist & Distribute - Landscapes & Hardscapes 5 10-08-15 10-14-15PC-CX36 Complete Punchlist Items - Landscapes & Hardscapes 20 10-15-15 11-11-15PC-CX27 Generate Punchlist & Distribute - FOH Lvl 3 5 10-16-15 10-22-15PC-CX28 Complete Punchlist Items - FOH Lvl 3 20 10-23-15 11-19-15PC-CX31 Generate Punchlist & Distribute - Theater 5 11-20-15 11-30-15PC-CX32 Complete Punchlist Items - Theater 20 12-01-15 12-29-151171-8X84 Commissioning of all Doors & ADA Review 10 12-10-15 12-23-151171-8X34 Building Flush 10 12-24-15 01-08-161171-8X74 AHJ Fire Marshall Sign-Off 15 12-24-15 01-15-161171-8X12 User Training 50 12-24-15 03-04-16PC-CX2 Final Cleaning 20 01-04-16 01-29-161171-8X64 State Elevator Approval 5 01-18-16 01-22-16Move-In and PMove-In and Prep for Opening 80 11-20-15 03-16-16

PC-CY Furniture, Fixtures, & Equipment 80 11-20-15 03-16-16PC-CX3 University Move-In 20 02-18-16 03-16-16

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2014 2015 2016

Test & Balance - Rehearsal HallTest & Balance - Theater

Test & Balance - Level 1Test & Balance - Level 2

Test & Balance - Level 3Submit Preliminary Test & Balance Report 12-09-15

Submit Final Test & Balance Report 12-31-15

Commissioning SummaryGenerator / ATS & EM Power KFI Functional Testing

Structral Fin-Tube Functional TestingDomestic Hot Water Heat Exchanger Functional Checkout

Water Treatment Functional CheckoutExhaust Systems Functional Checkout

AHU-1 KFI Functional TestingRadiant Heating KFI Functional Testing

EPMS KFI Functional CheckoutSmoke Control KFI Functional Testing

AHU-5 KFI Functional TestingAHU-4 KFI Functional Testing

AHU-6 KFI Functional TestingSnow Melt KFI Functional Checkout

FCU KFI Functional TestingLighting Control KFI Functional Testing

Day-Lighting & Occupancy Sensors KFI Functional CheckoutAHU-7 KFI Functional Testing

AHU-8 KFI Functional TestingAHU-2 KFI Functional Testing

AHU-3 KFI Functional Testing

Elevator 4 Inspection for Construction UseGenerate Punchlist & Distribute - Enclosure

Complete Punchlist Items - EnclosureGenerate Punchlist & Distribute - Lower Level

Complete Punchlist Items - Lower LevelGenerate Punchlist & Distribute - BOH Lvl 1

Complete Punchlist Items - BOH Lvl 1Generate Punchlist & Distribute - Rehearsal

Complete Punchlist Items - RehearsalGenerate Punchlist & Distribute - BOH Lvl 2

Complete Punchlist Items - BOH Lvl 2Generate Punchlist & Distribute - FOH Lvl 1

Complete Punchlist Items - FOH Lvl 1Generate Punchlist & Distribute - FOH Lvl 2

Complete Punchlist Items - FOH Lvl 2Generate Punchlist & Distribute - Landscapes & Hardscapes

Complete Punchlist Items - Landscapes & HardscapesGenerate Punchlist & Distribute - FOH Lvl 3

Complete Punchlist Items - FOH Lvl 3Generate Punchlist & Distribute - Theater

Complete Punchlist Items - TheaterCommissioning of all Doors & ADA Review

Building FlushAHJ Fire Marshall Sign-Off

User TrainingFinal Cleaning

State Elevator Approval

Furniture, Fixtures, & EquipmentUniversity Move-In

10030018-84Hancher Auditorium Replacement Facility 32 of 32 04-04-14

Milestone

Summary

Planned Work

Progressed Work

Critical Work

Crew 1

Crew 2

Primary Milestone

Hancher Auditorium Replacement - Construct New FacilityUniversity of Iowa

Project Layout - Data Date: 04-02-14