    ARAVINTH KUMAR A

    13MM02

    Guided byDr.D.RAJENTHIRA KUMAR

    Review-408/08/14

  • 8/11/2019 Project Work - i ,Review 4

    2/14

    Design of a JIT periodic material supplysystem for the assembly lines of an industry.

    08/08/14 213MM02 ARAVINTH KUMAR A

  • 8/11/2019 Project Work - i ,Review 4

    3/14

    Objective:

    Creating an optimal routing.

    The minimization of the total material handlingand inventory holding cost.

    Developing a heuristic approach for route

    construction.

    08/08/14 313MM02 ARAVINTH KUMAR A

  • 8/11/2019 Project Work - i ,Review 4

    4/14

    VRPPD(Vehicle routing problem with pickupand delivery services).

    Can be grouped into:

    Delivery first, pickup second

    Mixed pickups and deliveries

    Simultaneous pickups and deliveries.

    08/08/14 413MM02 ARAVINTH KUMAR A

  • 8/11/2019 Project Work - i ,Review 4

    5/14

    Accidents due to Driver Error.

    Engaging of vehicles due to poor routing.

    Lengthier travelling time and distance. Delay in delivery and earlier pickup due to

    communication problem.

    Total material handling and Inventory holdingcost is high.

    08/08/14 513MM02 ARAVINTH KUMAR A

  • 8/11/2019 Project Work - i ,Review 4

    6/14

    July Aug Sep Oct Nov Dec

    Study of literaturesurvey

    Identification of

    vehicle routingproblem in a company

    Collection of dataand development ofalgorithm

    Software analysis anda model route for thesupply

    Results anddocumentation

    08/08/14 13MM02 ARAVINTH KUMAR A 6

  • 8/11/2019 Project Work - i ,Review 4

    7/14

    Author

    Name

    Title of the

    Journal

    Ideology Used Outcomes

    Kumar CS ,Panneerselvam R

    Literature reviewof JIT KANBANsystem ;

    Int J Adv ManufTechnol32:393408

    Blockingmechanismscoupled with the

    buffer capacities,and measureof performance.

    Materialrequirements,handling and

    supply usingkanbanmechanism .

    Catay B A new saving-based ant

    algorithm for theVRP SPD ;ExpertSyst Appl37:68096817

    Minimization oftravelling

    distance throughproper schedulingbased on antcolony algorithm.

    Demand ,supply ,Minimal and

    maximal routefindings andoptimalconstructionprocess.

    08/08/14 713MM02 ARAVINTH KUMAR A

  • 8/11/2019 Project Work - i ,Review 4

    8/14

    AuthorName

    Title of theJournal

    Ideology Used Outcomes

    VaidyanathanBS, Matson JO,Miller DM

    A capacitatedvehicle routingproblem for just-in-time delivery ;IIE Trans31:10831092

    The quantity to bedelivered at eachof the demandnodes is afunction of theroute taken by thevehicle assignedto serve that node.

    Integration of pullproductionControl. Optimalroute planningwithout increasingtransportation costbased on aschedule.

    Domingo R,

    Alvarez R, PenaMM, Calvo R

    Materials flow

    improvement in alean assemblyline: a case study;Assem Autom27:141147

    The sequence of

    operations wasdefined andalternativeroutings weredetermined.

    Finding consistent

    Station demand,timing of pick upand deliveryneither late norearly.

    08/08/14 813MM02 ARAVINTH KUMAR A

  • 8/11/2019 Project Work - i ,Review 4

    9/14

    Author

    Name

    Title of the

    Journal

    Ideology Used Outcomes

    Alvarez R, CalvoR, Pena MM,Domingo R

    Redesigning anassembly linethrough LM tools ;Int J Adv ManufTechnol43:949958

    To reduce lead time& excessive stocksand improvematerialflow within themanufacturingsystem.

    The use of VSMand the effectiveutilization ofKanban and Milkrun techniques.Also DtD ,LR.

    Boysen N, Bock S Scheduling JITpart

    supply formixed-modelassembly lines ;Eur J Oper Res211:1525

    Scheduling JIT partsupply to a

    Mixed-Modelassembly line byusing dynamicprogramming.

    Interfacebetween logistics

    and assemblyoperations.Scheduling JITsupply fromhoist to nodes.

    08/08/14 913MM02 ARAVINTH KUMAR A

  • 8/11/2019 Project Work - i ,Review 4

    10/14

    Author

    Name

    Title of the Journal Ideology Used Outcomes

    Nemoto T,Hayashi K,Hashimoto M

    Milk-run logisticsby Japaneseautomobilemanufacturers in

    Thailand;Proc Soc BehavSci 2:59805989

    JIT externalmilkrunapplications of theToyota automobile

    assembly factorieslocated inThailand.

    Supply chainsinvolved inexternal milk runand the nearest

    possible routeconstruction.

    Nagy G, Salhi S Heuristicalgorithms forsingle and multipledepot VRP withpickups anddeliveries;Eur J Oper Res162:126141

    Possibilities ofpickups anddelivery serviceswith optimalroutings.

    How to supplythe goods insimultaneous,mixed and oneline pickups anddelivery.

    08/08/14 1013MM02 ARAVINTH KUMAR A

  • 8/11/2019 Project Work - i ,Review 4

    11/14

    Author

    Name

    Title of the

    Journal

    Ideology Used Outcomes

    Junior ML, FilhoMG

    Variations of thekanban system:literature reviewand classification;Int J Prod Econ125:1321

    Variations of theKanban systemsdevelopedto overcome theproblems.

    Use of adaptiveKanban,decentralizedreactive Kanban,ande-Kanban.

    Eksioglu B, VuralAV, Reisman A

    The vehiclerouting problem: a

    taxonomic review;Comput Ind Eng57:14721483

    Milk-run materialsupply systems

    among thefacilities thatunderlies theexternal milk-runsystems hasdifferent types.

    Different kinds ofrouting approach

    for internal andexternal milk runsystems from thereviewers.

    08/08/14 1113MM02 ARAVINTH KUMAR A

  • 8/11/2019 Project Work - i ,Review 4

    12/14

    Identify the problem

    Study of literature surveyrelated to the problem

    Collection of possible ideas relevant tothe assembly line routing

    Assigning indices and

    parameters

    Assumptions of Time constraintsand service period considerations

    08/08/14 1213MM02 ARAVINTH KUMAR A

  • 8/11/2019 Project Work - i ,Review 4

    13/14

    Creating a model formulationand route construction algorithm

    Pilot application run with theassumed value using a software

    Real time routing and datacollections from the Industry

    Interpretation of real time datas

    and creating a new algorithm

    Results andConclusions

    08/08/14 1313MM02 ARAVINTH KUMAR A

  • 8/11/2019 Project Work - i ,Review 4

    14/14

    SKM feeds and pharma.

    Micro lab

    Ashok Leyland

    Rane (Madras).

    08/08/14 1413MM02 ARAVINTH KUMAR A