8/11/2019 Project Work - i ,Review 4
1/14
ARAVINTH KUMAR A
13MM02
Guided byDr.D.RAJENTHIRA KUMAR
Review-408/08/14
8/11/2019 Project Work - i ,Review 4
2/14
Design of a JIT periodic material supplysystem for the assembly lines of an industry.
08/08/14 213MM02 ARAVINTH KUMAR A
8/11/2019 Project Work - i ,Review 4
3/14
Objective:
Creating an optimal routing.
The minimization of the total material handlingand inventory holding cost.
Developing a heuristic approach for route
construction.
08/08/14 313MM02 ARAVINTH KUMAR A
8/11/2019 Project Work - i ,Review 4
4/14
VRPPD(Vehicle routing problem with pickupand delivery services).
Can be grouped into:
Delivery first, pickup second
Mixed pickups and deliveries
Simultaneous pickups and deliveries.
08/08/14 413MM02 ARAVINTH KUMAR A
8/11/2019 Project Work - i ,Review 4
5/14
Accidents due to Driver Error.
Engaging of vehicles due to poor routing.
Lengthier travelling time and distance. Delay in delivery and earlier pickup due to
communication problem.
Total material handling and Inventory holdingcost is high.
08/08/14 513MM02 ARAVINTH KUMAR A
8/11/2019 Project Work - i ,Review 4
6/14
July Aug Sep Oct Nov Dec
Study of literaturesurvey
Identification of
vehicle routingproblem in a company
Collection of dataand development ofalgorithm
Software analysis anda model route for thesupply
Results anddocumentation
08/08/14 13MM02 ARAVINTH KUMAR A 6
8/11/2019 Project Work - i ,Review 4
7/14
Author
Name
Title of the
Journal
Ideology Used Outcomes
Kumar CS ,Panneerselvam R
Literature reviewof JIT KANBANsystem ;
Int J Adv ManufTechnol32:393408
Blockingmechanismscoupled with the
buffer capacities,and measureof performance.
Materialrequirements,handling and
supply usingkanbanmechanism .
Catay B A new saving-based ant
algorithm for theVRP SPD ;ExpertSyst Appl37:68096817
Minimization oftravelling
distance throughproper schedulingbased on antcolony algorithm.
Demand ,supply ,Minimal and
maximal routefindings andoptimalconstructionprocess.
08/08/14 713MM02 ARAVINTH KUMAR A
8/11/2019 Project Work - i ,Review 4
8/14
AuthorName
Title of theJournal
Ideology Used Outcomes
VaidyanathanBS, Matson JO,Miller DM
A capacitatedvehicle routingproblem for just-in-time delivery ;IIE Trans31:10831092
The quantity to bedelivered at eachof the demandnodes is afunction of theroute taken by thevehicle assignedto serve that node.
Integration of pullproductionControl. Optimalroute planningwithout increasingtransportation costbased on aschedule.
Domingo R,
Alvarez R, PenaMM, Calvo R
Materials flow
improvement in alean assemblyline: a case study;Assem Autom27:141147
The sequence of
operations wasdefined andalternativeroutings weredetermined.
Finding consistent
Station demand,timing of pick upand deliveryneither late norearly.
08/08/14 813MM02 ARAVINTH KUMAR A
8/11/2019 Project Work - i ,Review 4
9/14
Author
Name
Title of the
Journal
Ideology Used Outcomes
Alvarez R, CalvoR, Pena MM,Domingo R
Redesigning anassembly linethrough LM tools ;Int J Adv ManufTechnol43:949958
To reduce lead time& excessive stocksand improvematerialflow within themanufacturingsystem.
The use of VSMand the effectiveutilization ofKanban and Milkrun techniques.Also DtD ,LR.
Boysen N, Bock S Scheduling JITpart
supply formixed-modelassembly lines ;Eur J Oper Res211:1525
Scheduling JIT partsupply to a
Mixed-Modelassembly line byusing dynamicprogramming.
Interfacebetween logistics
and assemblyoperations.Scheduling JITsupply fromhoist to nodes.
08/08/14 913MM02 ARAVINTH KUMAR A
8/11/2019 Project Work - i ,Review 4
10/14
Author
Name
Title of the Journal Ideology Used Outcomes
Nemoto T,Hayashi K,Hashimoto M
Milk-run logisticsby Japaneseautomobilemanufacturers in
Thailand;Proc Soc BehavSci 2:59805989
JIT externalmilkrunapplications of theToyota automobile
assembly factorieslocated inThailand.
Supply chainsinvolved inexternal milk runand the nearest
possible routeconstruction.
Nagy G, Salhi S Heuristicalgorithms forsingle and multipledepot VRP withpickups anddeliveries;Eur J Oper Res162:126141
Possibilities ofpickups anddelivery serviceswith optimalroutings.
How to supplythe goods insimultaneous,mixed and oneline pickups anddelivery.
08/08/14 1013MM02 ARAVINTH KUMAR A
8/11/2019 Project Work - i ,Review 4
11/14
Author
Name
Title of the
Journal
Ideology Used Outcomes
Junior ML, FilhoMG
Variations of thekanban system:literature reviewand classification;Int J Prod Econ125:1321
Variations of theKanban systemsdevelopedto overcome theproblems.
Use of adaptiveKanban,decentralizedreactive Kanban,ande-Kanban.
Eksioglu B, VuralAV, Reisman A
The vehiclerouting problem: a
taxonomic review;Comput Ind Eng57:14721483
Milk-run materialsupply systems
among thefacilities thatunderlies theexternal milk-runsystems hasdifferent types.
Different kinds ofrouting approach
for internal andexternal milk runsystems from thereviewers.
08/08/14 1113MM02 ARAVINTH KUMAR A
8/11/2019 Project Work - i ,Review 4
12/14
Identify the problem
Study of literature surveyrelated to the problem
Collection of possible ideas relevant tothe assembly line routing
Assigning indices and
parameters
Assumptions of Time constraintsand service period considerations
08/08/14 1213MM02 ARAVINTH KUMAR A
8/11/2019 Project Work - i ,Review 4
13/14
Creating a model formulationand route construction algorithm
Pilot application run with theassumed value using a software
Real time routing and datacollections from the Industry
Interpretation of real time datas
and creating a new algorithm
Results andConclusions
08/08/14 1313MM02 ARAVINTH KUMAR A
8/11/2019 Project Work - i ,Review 4
14/14
SKM feeds and pharma.
Micro lab
Ashok Leyland
Rane (Madras).
08/08/14 1413MM02 ARAVINTH KUMAR A