Glenveagh Homes Limited
A-PA041Proposed ESB Substation
Revisions:Status of Drawing:
Job No. Rev. Dwg No. Scale Date
Job Title
Drawing Title
21:50/1:200@ A1 1840
1840 Castleknock Apartments
4 St. Catherine's Lane West, Dublin 8 Tel (01) 4534240
D E B L A C A M A N D M E A G H E R A R C H I T E C T S
Fax (01) 4737959 Email [email protected] www.deblacamandmeagher.com
Drawn By: Checked By:
Do not scale from this drawing.All dimensions to be taken from Architect's drawings.
Discrepencies to be referred to the Architect for clarification.
The copyright of this drawing is vested in the Architects.This drawings may not be copied or reproduced without written consent.
Client: Design Team:
Quantity Surveyor
Structural Engineer
Services EngineerDesign Review:Design Review 1. 00/00/00 Stage of Work
Drawn By: Reviewed By:- -- -Design Review 2. 00/00/00 Stage of Work
PLANNING APPLICATIONPURPOSES ONLY
Rev 1. Alteration of site plan to facilitate future cycle lane
27.09.19
KE SN
PROPOSED ESB SUBSTATION
N
B A
C DE
B A
C DE
4000
3500
ESB Substation in Accordance with ESBDrawing / Document:DCC - 150916 - CHU
Position of Duct Locations / Cable Trench Layout to be agreed with ESB
ESB approvedsubstation
equipment accessdoors
Cable duct ways 125mm diameter ductwith long radius bend
1000
2 1 5 1 4 5 1 0 3
Finished Internal
Finished Internal
2465
4378
4935
2715
4378
2715
4378
02A-PA041
P L A NScale 1.50
P L A N O F E S B S U B S T A T I O N
+60.10
3250
3250
3600
bikes
bikes
50 52 54
3600
enter/
exit6
1
fire tender
+61.25
+61.50 +61.25
+61.12
exit
Visitor
+61.50
+61.50
+60.80 +60.10
23
18
visitor /drop-off
101515
2024
2530
3538
3943
47
55
60
61
65
70
71
75
80
5720
Vis
itor
Vis
itor
Visitor
3250
Vis
itor
onewayone
way
twowaytwo
way
18
fire tender
fire tender
substation
bikes
bins
bikes
bikes
bins
gathering space
playgroundgathering space
gathering space
44 49
3300
2550
58
82
+61.50
1750
+61.50
playground
5105
BLOCK ABLOCK B
BLOCK DBLOCK C BLOCK E
L O C A T I O N O F E S B S U B S T A T I O N
01A-PA041
P L A NScale 1.500
P L A N O F S I T E W I T H E S B S U B S T A T I O N
49352465
2715
2485
32 41
Ground Level
4935
2715
2 41
4378
2715
Ground Level
04A-PA041
E L E V A T I O NScale 1.50
F R O N T A N D R E A R E L E V A T I O N S O F E S B S U B S T A T I O N
05A-PA041
E L E V A T I O NScale 1.50
S I D E E L E V A T I O N S O F E S B S U B S T A T I O N
3500
2615
2715
4378
ESB Substation in Accordance with ESBDrawing / Document:DCC - 150916 - CHU
Ground Level
Cavity Wall 215mm blockwork and brick outer leaf
215
100 min.
103
Finished Internal
Fini
shed
Inte
rnal
03A-PA041 Scale 1.50
S E C T I O N O F E S B S U B S T A T I O N
MATERIAL LEGEND
1. Selected Brick2. Asphalt roof covering on concerete roof to approved ESB details 3. Galvinised door to approved ESB design details- powerdecoated finish to match metal cladding in scheme4. uPVC rainwater goods to same colour finish as scheme rainwater goods
NOTEESB substation to be comply with approved ESB substation design details in accordance with ESB Drawing /document DCC -150916 -CHU
R02 issued
for SHD
27.09.19
Rev 2. further annotation added, path and raised entry extended northern boundary