Transcript
Page 1: PROPOSED ESB SUBSTATION - Amazon Web Services... · 2019. 11. 12. · with ESB Drawing / Document: DCC - 150916 - CHU of Duct Locations / Cable Trench Layout to be agreed with ESB

Glenveagh Homes Limited

A-PA041Proposed ESB Substation

Revisions:Status of Drawing:

Job No. Rev. Dwg No. Scale Date

Job Title

Drawing Title

21:50/1:200@ A1 1840

1840 Castleknock Apartments

4 St. Catherine's Lane West, Dublin 8 Tel (01) 4534240

D E B L A C A M A N D M E A G H E R A R C H I T E C T S

Fax (01) 4737959 Email [email protected] www.deblacamandmeagher.com

Drawn By: Checked By:

Do not scale from this drawing.All dimensions to be taken from Architect's drawings.

Discrepencies to be referred to the Architect for clarification.

The copyright of this drawing is vested in the Architects.This drawings may not be copied or reproduced without written consent.

Client: Design Team:

Quantity Surveyor

Structural Engineer

Services EngineerDesign Review:Design Review 1. 00/00/00 Stage of Work

Drawn By: Reviewed By:- -- -Design Review 2. 00/00/00 Stage of Work

PLANNING APPLICATIONPURPOSES ONLY

Rev 1. Alteration of site plan to facilitate future cycle lane

27.09.19

KE SN

PROPOSED ESB SUBSTATION

N

B A

C DE

B A

C DE

4000

3500

ESB Substation in Accordance with ESBDrawing / Document:DCC - 150916 - CHU

Position of Duct Locations / Cable Trench Layout to be agreed with ESB

ESB approvedsubstation

equipment accessdoors

Cable duct ways 125mm diameter ductwith long radius bend

1000

2 1 5 1 4 5 1 0 3

Finished Internal

Finished Internal

2465

4378

4935

2715

4378

2715

4378

02A-PA041

P L A NScale 1.50

P L A N O F E S B S U B S T A T I O N

+60.10

3250

3250

3600

bikes

bikes

50 52 54

3600

enter/

exit6

1

fire tender

+61.25

+61.50 +61.25

+61.12

exit

Visitor

+61.50

+61.50

+60.80 +60.10

23

18

visitor /drop-off

101515

2024

2530

3538

3943

47

55

60

61

65

70

71

75

80

5720

Vis

itor

Vis

itor

Visitor

3250

Vis

itor

onewayone

way

twowaytwo

way

18

fire tender

fire tender

substation

bikes

bins

bikes

bikes

bins

gathering space

playgroundgathering space

gathering space

44 49

3300

2550

58

82

+61.50

1750

+61.50

playground

5105

BLOCK ABLOCK B

BLOCK DBLOCK C BLOCK E

L O C A T I O N O F E S B S U B S T A T I O N

01A-PA041

P L A NScale 1.500

P L A N O F S I T E W I T H E S B S U B S T A T I O N

49352465

2715

2485

32 41

Ground Level

4935

2715

2 41

4378

2715

Ground Level

04A-PA041

E L E V A T I O NScale 1.50

F R O N T A N D R E A R E L E V A T I O N S O F E S B S U B S T A T I O N

05A-PA041

E L E V A T I O NScale 1.50

S I D E E L E V A T I O N S O F E S B S U B S T A T I O N

3500

2615

2715

4378

ESB Substation in Accordance with ESBDrawing / Document:DCC - 150916 - CHU

Ground Level

Cavity Wall 215mm blockwork and brick outer leaf

215

100 min.

103

Finished Internal

Fini

shed

Inte

rnal

03A-PA041 Scale 1.50

S E C T I O N O F E S B S U B S T A T I O N

MATERIAL LEGEND

1. Selected Brick2. Asphalt roof covering on concerete roof to approved ESB details 3. Galvinised door to approved ESB design details- powerdecoated finish to match metal cladding in scheme4. uPVC rainwater goods to same colour finish as scheme rainwater goods

NOTEESB substation to be comply with approved ESB substation design details in accordance with ESB Drawing /document DCC -150916 -CHU

R02 issued

for SHD

27.09.19

Rev 2. further annotation added, path and raised entry extended northern boundary

Recommended