3
Management Of Change (Covers SHEM-09/SHEM-06 & OIMS- 3.1/OIMS-7.1) Issue No.:12 Date: September 2013 Rev. No.:1 Date: May 2014 Next Review Date: September 2018 Page 90 of 99 Form-08A: CONSTRUCTION BUTLIST ITEMS (CONTRACTOR) Initiator: PSSR team leader and Members, as applicable DCR / AF No.: DCR Title : SEP-U71-U-BFW-01 DEAERATOR & CHEMICAL INJECTION AREA: □ KOP □ UOD □ LDPE □ Poly-Cat □ Finishing □ Packaging □ Logistics □√ General (SEP) SHEM /(Discipline) : [ ] 07.01 | M = Mechanical (Includes Rotating equipment) [ ] 07.02 | M = PSV [ ] 07.03 | A = Analyzer [ ] 07.03 | E = Electrical [ ] 07.03 | I = Instrument [ ] 07.03 = H | HVAC [ ] 07.04 | F = Fixed Equipment (Tanks, Pres. vessels) [ ] 07.05 | P = Piping [ ] 07.07 | H = Hoses Notes: (1) It is preferable to prepare separate but list for each discipline (2) “YES" But list items must be completed before project start-up. (3) "NO" But list items can be done after project start up. (4) Construction items from PSSR checklist shall be included in But List. (5) DCR cannot be closed before area owner sign-off for "NO” but list completion or waiver. PSSR ITEM SHEM Discip -line DESCRIPTION (Provide clear description of but- list items. Attach separate sheets, if necessary) INITIATOR (But-List identifyi ng Person) TYPE (Y or N) see notes STATUS C-Completed, NR- Not Required, W - Waived) ACCEPTANCE (Sign off By Discipline Initiator) 1 07. 01 M UY-FAN-10A – Lube oil system - Access not available for Filter 52 AA/B & other valve’s operation at Lube oil skid SUNIL / PRADEEP N C SUNIL / PRADEEP 2 07. 01 M UY-FAN-10A – Turbine side - Clutch base jackbolts fouls with shims – to be elevated/raise the position to avoid the fouling. SUNIL / PRADEEP Y SUNIL / PRADEEP 4 07. 01 M UY-FAN-10A – Turbine side – Gear box - jackbolts fouls with shims – to be elevated/raise the position to avoid SUNIL / PRADEEP N SUNIL / PRADEEP 5 07. 01 M UY-FAN-10A – Turbine side – Gear box – foundation bolts are small in length – to be replaced with standard. SUNIL / PRADEEP Y C SUNIL / PRADEEP 6 07. 01 M WILLIS 7 07. 01 M SUNIL / PRADEEP 8 07. 01 M C SUNIL / PRADEEP 9 07. 01 M SUNIL / PRADEEP 10 07. 03 M SUNIL / PRADEEP 11 07. 01 M SUNIL / PRADEEP 12 07. 01 M C SUNIL / PRADEEP 13 07. 01 M SUNIL / PRADEEP

PSSR .doc

Embed Size (px)

Citation preview

Page 1: PSSR  .doc

Management Of Change(Covers SHEM-09/SHEM-06 & OIMS-3.1/OIMS-7.1)

Issue No.:12 Date: September 2013

Rev. No.:1 Date: May 2014

Next Review Date: September 2018

Page 90 of 99

Form-08A: CONSTRUCTION BUTLIST ITEMS (CONTRACTOR) Initiator: PSSR team leader and Members, as applicable

DCR / AF No.: DCR Title : SEP-U71-U-BFW-01 DEAERATOR & CHEMICAL INJECTION

AREA: □ KOP □ UOD □ LDPE □ Poly-Cat □ Finishing □ Packaging □ Logistics □√ General (SEP)

SHEM /(Discipline) : [ ] 07.01 | M = Mechanical (Includes Rotating equipment) [ ] 07.02 | M = PSV [ ] 07.03 | A = Analyzer [ ] 07.03 | E = Electrical [ ] 07.03 | I = Instrument [ ] 07.03 = H | HVAC [ ] 07.04 | F = Fixed Equipment (Tanks, Pres. vessels) [ ] 07.05 | P = Piping [ ] 07.07 | H = Hoses[ ] 07.09 | C = Cathodic Protection [ ] 08.06 | L = Lifting, M = Mobile [ ] 11. 03 | ER = Emergency Response

Notes: (1) It is preferable to prepare separate but list for each discipline (2) “YES" But list items must be completed before project start-up. (3) "NO" But list items can be done after project start up. (4) Construction items from PSSR checklist shall be included in But List. (5) DCR cannot be closed before area owner sign-off for "NO” but list completion or waiver.

PSSR ITEM

SHEM Discip-line

DESCRIPTION(Provide clear description of but-list items. Attach

separate sheets, if necessary)

INITIATOR(But-List

identifying Person)

TYPE(Y or N)see notes

STATUSC-Completed,

NR- Not Required,W - Waived)

ACCEPTANCE(Sign off By Discipline Initiator)

1

07.01 MUY-FAN-10A – Lube oil system - Access not available for Filter 52 AA/B & other valve’s operation at Lube oil skid

SUNIL / PRADEEP

N

C SUNIL / PRADEEP

2

07.01 M

UY-FAN-10A – Turbine side - Clutch base jackbolts fouls with shims – to be elevated/raise the position to avoid the fouling.

SUNIL / PRADEEP

Y

SUNIL / PRADEEP

407.01 M

UY-FAN-10A – Turbine side – Gear box - jackbolts fouls with shims – to be elevated/raise the position to avoid the fouling.

SUNIL / PRADEEP

NSUNIL / PRADEEP

5

07.01 M

UY-FAN-10A – Turbine side – Gear box – foundation bolts are small in length – to be replaced with standard.

SUNIL / PRADEEP

Y

C SUNIL / PRADEEP

607.01 M WILLIS

7

07.01 M SUNIL / PRADEEP

8

07.01 M C SUNIL / PRADEEP

9

07.01 M SUNIL / PRADEEP

10

07.03 M SUNIL / PRADEEP

11

07.01 M SUNIL / PRADEEP

1207.01 M C SUNIL / PRADEEP

1307.01 M SUNIL / PRADEEP

14

07.01 M SUNIL / PRADEEP

15

07.01 M SUNIL / PRADEEP

1607.01 M C SUNIL / PRADEEP

Page 2: PSSR  .doc

Management Of Change(Covers SHEM-09/SHEM-06 & OIMS-3.1/OIMS-7.1)

Issue No.:12 Date: September 2013

Rev. No.:1 Date: May 2014

Next Review Date: September 2018

Page 91 of 99

17

07.01 M C SUNIL / PRADEEP

18

07.01 M SUNIL / PRADEEP

19

07.01 M SUNIL / PRADEEP

2007.01 M SUNIL / PRADEEP

2107.02 M SUNIL / PRADEEP

22

07.01 M C SUNIL / PRADEEP

23

07.01 M CKemya punch

SUNIL / PRADEEP

24

07.01 M C SUNIL / PRADEEP

25

07.01 M SUNIL / PRADEEP

26

07.01 Civil Benzamine

27

07.01

Civil Benzamine

2807.01

Civil Benzamine

29

07.01

M Benzamine

3007.01

Civil Benzamine

31

07.01

M

Fadi

32

07.01

M

SUNIL / PRADEEP

33

07.01

M

SUNIL / PRADEEP

34

07.01

M

SUNIL / PRADEEP

35

07.01

M

SUNIL / PRADEEP

Note: It is the Responsibility of Construction Engineer for Capital projects or Maintenance Field Change coordinator for expense projects for getting the entire "NO" But list items completed from the Contractor.

Page 3: PSSR  .doc

Management Of Change(Covers SHEM-09/SHEM-06 & OIMS-3.1/OIMS-7.1)

Issue No.:12 Date: September 2013

Rev. No.:1 Date: May 2014

Next Review Date: September 2018

Page 92 of 99

KEMYA ASSIGNED ENGINEERE &PM Project Engineer (Capital Projects)

( Sign after but list items are identified and listed)

PSSR TEAM LEADER("YES" but list items shall be completed

before Start-Up)

PSSR TEAM LEADER orAREA MOC COORDINATOR

( "NO" but list items are completed or waived )

Name: Name: Name: Name:

Sign: Sign: Sign: Sign:

Date: Date: Date: Date:

Page _____ of _____