Management Of Change(Covers SHEM-09/SHEM-06 & OIMS-3.1/OIMS-7.1)
Issue No.:12 Date: September 2013
Rev. No.:1 Date: May 2014
Next Review Date: September 2018
Page 90 of 99
Form-08A: CONSTRUCTION BUTLIST ITEMS (CONTRACTOR) Initiator: PSSR team leader and Members, as applicable
DCR / AF No.: DCR Title : SEP-U71-U-BFW-01 DEAERATOR & CHEMICAL INJECTION
AREA: □ KOP □ UOD □ LDPE □ Poly-Cat □ Finishing □ Packaging □ Logistics □√ General (SEP)
SHEM /(Discipline) : [ ] 07.01 | M = Mechanical (Includes Rotating equipment) [ ] 07.02 | M = PSV [ ] 07.03 | A = Analyzer [ ] 07.03 | E = Electrical [ ] 07.03 | I = Instrument [ ] 07.03 = H | HVAC [ ] 07.04 | F = Fixed Equipment (Tanks, Pres. vessels) [ ] 07.05 | P = Piping [ ] 07.07 | H = Hoses[ ] 07.09 | C = Cathodic Protection [ ] 08.06 | L = Lifting, M = Mobile [ ] 11. 03 | ER = Emergency Response
Notes: (1) It is preferable to prepare separate but list for each discipline (2) “YES" But list items must be completed before project start-up. (3) "NO" But list items can be done after project start up. (4) Construction items from PSSR checklist shall be included in But List. (5) DCR cannot be closed before area owner sign-off for "NO” but list completion or waiver.
PSSR ITEM
SHEM Discip-line
DESCRIPTION(Provide clear description of but-list items. Attach
separate sheets, if necessary)
INITIATOR(But-List
identifying Person)
TYPE(Y or N)see notes
STATUSC-Completed,
NR- Not Required,W - Waived)
ACCEPTANCE(Sign off By Discipline Initiator)
1
07.01 MUY-FAN-10A – Lube oil system - Access not available for Filter 52 AA/B & other valve’s operation at Lube oil skid
SUNIL / PRADEEP
N
C SUNIL / PRADEEP
2
07.01 M
UY-FAN-10A – Turbine side - Clutch base jackbolts fouls with shims – to be elevated/raise the position to avoid the fouling.
SUNIL / PRADEEP
Y
SUNIL / PRADEEP
407.01 M
UY-FAN-10A – Turbine side – Gear box - jackbolts fouls with shims – to be elevated/raise the position to avoid the fouling.
SUNIL / PRADEEP
NSUNIL / PRADEEP
5
07.01 M
UY-FAN-10A – Turbine side – Gear box – foundation bolts are small in length – to be replaced with standard.
SUNIL / PRADEEP
Y
C SUNIL / PRADEEP
607.01 M WILLIS
7
07.01 M SUNIL / PRADEEP
8
07.01 M C SUNIL / PRADEEP
9
07.01 M SUNIL / PRADEEP
10
07.03 M SUNIL / PRADEEP
11
07.01 M SUNIL / PRADEEP
1207.01 M C SUNIL / PRADEEP
1307.01 M SUNIL / PRADEEP
14
07.01 M SUNIL / PRADEEP
15
07.01 M SUNIL / PRADEEP
1607.01 M C SUNIL / PRADEEP
Management Of Change(Covers SHEM-09/SHEM-06 & OIMS-3.1/OIMS-7.1)
Issue No.:12 Date: September 2013
Rev. No.:1 Date: May 2014
Next Review Date: September 2018
Page 91 of 99
17
07.01 M C SUNIL / PRADEEP
18
07.01 M SUNIL / PRADEEP
19
07.01 M SUNIL / PRADEEP
2007.01 M SUNIL / PRADEEP
2107.02 M SUNIL / PRADEEP
22
07.01 M C SUNIL / PRADEEP
23
07.01 M CKemya punch
SUNIL / PRADEEP
24
07.01 M C SUNIL / PRADEEP
25
07.01 M SUNIL / PRADEEP
26
07.01 Civil Benzamine
27
07.01
Civil Benzamine
2807.01
Civil Benzamine
29
07.01
M Benzamine
3007.01
Civil Benzamine
31
07.01
M
Fadi
32
07.01
M
SUNIL / PRADEEP
33
07.01
M
SUNIL / PRADEEP
34
07.01
M
SUNIL / PRADEEP
35
07.01
M
SUNIL / PRADEEP
Note: It is the Responsibility of Construction Engineer for Capital projects or Maintenance Field Change coordinator for expense projects for getting the entire "NO" But list items completed from the Contractor.
Management Of Change(Covers SHEM-09/SHEM-06 & OIMS-3.1/OIMS-7.1)
Issue No.:12 Date: September 2013
Rev. No.:1 Date: May 2014
Next Review Date: September 2018
Page 92 of 99
KEMYA ASSIGNED ENGINEERE &PM Project Engineer (Capital Projects)
( Sign after but list items are identified and listed)
PSSR TEAM LEADER("YES" but list items shall be completed
before Start-Up)
PSSR TEAM LEADER orAREA MOC COORDINATOR
( "NO" but list items are completed or waived )
Name: Name: Name: Name:
Sign: Sign: Sign: Sign:
Date: Date: Date: Date:
Page _____ of _____