Mt. Rushmore Road Reconstruction

Public safety (vehicular & pedestrian) Worker safety Maintenance of traffic flow Business access Maintenance of utility services

Embed Size (px)

Citation preview

Mt. Rushmore Road Reconstruction

Public safety (vehicular & pedestrian)

Worker safety

Maintenance of traffic flow

Business access

Maintenance of utility services

Traffic Control Goals

2014 Preparatory Work Construction Sequence – Phase 1

Southbound lanes of Mt. Rushmore Road from Highland Park Drive to Flormann Street

Construction Sequence – Phase 2A

Traffic Control – Phase 2A

Southbound lanes of Mt. Rushmore Road from Tower Road Bridge to Highland Park Drive

Construction Sequence – 2B

Northbound Lanes of Mt. Rushmore Road from Tower Road Bridge to Highland Park Drive

Construction Sequence – Phase 3A

Northbound Lanes of Mt. Rushmore Road from Highland Park Drive to Flormann Street

Construction Sequence – Phase 3B

Traffic Control – Phase 3B

Tower Road Bridge Construction Sequence – Phase 4

Center Lanes & Median of Mt. Rushmore Road from Tower Road Bridge to Flormann Street

Construction Sequence – Phase 5

Traffic Control – Phase 5