DESCRIPTION COST (BZD) ROADS, STREETS, DRAINS & BRIDGES $58,355.00 $14,800,000 $53,420,001 $21,610,000 $21,500,000 $1,130,000 $78,773,980 $36,046,907 $2,500,000 $35,600,000 $75,100,000 $31,491,311 $8,642,098 $12,620,294 $7,294,658 14,381,723 $14,381,723 $5,060,432 $8,217,260 $33,340,000 $5,700,000 $1,500,000 $60,000,000 $4,706,700 December 2015 Report 22 Climate Resilient Infrastructure Project (CRIP) To enhance the resilience of road infrastructure against flood risk and impacts of climate change; and to improve the Borrower‟s capacity to respond promptly and effectively in an eligible crisis or emergency. 23 AMS 2013 Long Term Supervision of AMS Road Works- Corozal and Orange Walk Districts Supervision of AMS road works in the Corozal and Orange Walk districts Belize Municipal Development Project Improved access to basic municipal infrastructure and enhanced municipal management in selected town and city councils. 15 Sugar Belt Road Rehabilitation Project (Ph. III: Lot A: San Lazaro - August Pine Ridge Village; Ph. II of Blue Creek Road) Upgrade of 6.56 miles of road to chip seal surface dress. 20 Hopkins Road Upgrade Upgrade of 4.5 mls. of road from the Southern Highway to Hopkins Village to chip seal surface dress. 21 Rehabilitation of Hurricane Shelters Rehabilitation of 16 hurricane shelters INFRASTRUCTURE 17 Sugar Belt Road Rehabilitation Project (Phase III Lot 3B 2: Yo Creek Village to San Antonio Village) Upgrade of 3.7 miles of road to chip seal surface dress. 2 Corozal Border Crossing Reconstruction Project Improvement and rehabilitation of infrastructure at the Corozal Border 3 Completion of the Southern Highway (Dump to Jalacte) Upgrade of 20 miles of the Southern Highway from Dump (Ml. 14) to the Belize/Guatemala Border 1 San Ignacio/ Santa Elena Bypass Project Construction of a bypass road and new all-weather bridge across the Macal River to increase the efficiency of road transportation in and through San Ignacio and Santa Elena. The project also includes activities to determine the extent of vehicle overloading and the accompanying economic and financial impacts. 6 Support to Sustainable Urban Infrastructure Systems in Belize City Development of an operational manual for the Flood Mitigation Project, and socio- environmental management plans and engineering designs for civil works projects to be financed by the loan programme. 16 Sugar Belt Road Rehabilitation Project (Phase III Lot B: August Pine Ridge Village to Blue Creek Village) Upgrade of 13 miles of road to chip seal surface dress. 7 Fifth Road (Phillip S.W. Goldson Highway Upgrading) Project 13 Upgrade of the Phillip Goldson Highway between the Airport Junction and the Chetumal Street Roundabout (including the Haulover Bridge). 4 Natural Disaster Management - Bridge Rehabilitation, TS Arthur (Kendal & Mullins River Bridges) Reconstruction of the Kendal and Mullins River Bridges 5 Flood Mitigation Project Rehabilitation of drains and streets on Belize City's north side 9 Final Designs: George Price Highway Rehabilitation Project Finance the selection and contracting of consultants necessary for the final design of the George Price Highway Rehabilitation Sugar Belt Road Rehabilitation Project (Ph. II, Lot B: Orange Walk Town - San Upgrade of 15.94 miles of road to chip seal surface dress. 18 Sugar Belt Road Rehabilitation Project (Ph. III, Lot C: San Narciso - San Victor Village and Old Northern Highway - BSI Junction) Upgrade of 7.84 miles of road to chip seal surface dress. 12 10 Airport Link Road Construction of a new road, approximately 5 mls in length, connecting from the Western Highway (Ml 8.2) to the existing Airport Access Road 8 Belize City Southside Poverty Alleviation (Phase 2) MHDST is responsible for the social components: Land Reclamation; Improvement of Housing Units; Education, Training and Social Development; and Institutional Support, Audit and Supervision 11 Rehabilitation of the Hummingbird Highway Resurfacing of the Hummingbird Highway from Belmopan to Dangriga and the upgrade of 6 single-lane bridges to double-lane 19 Belize Road Safety Project Infrastructural improvements, education and awareness campaigns, enhancement of road accident emergency services, road safety management capacity building and enforcement activities focused along the George Price Highway from Belize City to Belmopan and thoroughfares including the Ring Road in Belmopan, targeting a reduction in deaths and serious injuries associated with road traffic accidents. Sugar Belt Road Rehabilitation Project (Ph. II, Lot A: Orange Walk Town - Blue Creek; Ph. 1 Orange Walk Town - San Lazaro) Upgrade of 8.5 miles of road pavement to chip seal surface dress. 14 PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 PROJECT DECEMBER 2015 GOVERNMENT OF BELIZE - MINISTRY OF ECONOMIC DEVELOPMENT

PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

DESCRIPTION COST

(BZD)

ROADS, STREETS, DRAINS & BRIDGES

$58,355.00

$14,800,000

$53,420,001

$21,610,000

$21,500,000

$1,130,000

$78,773,980

$36,046,907

$2,500,000

$35,600,000

$75,100,000

$31,491,311

$8,642,098

$12,620,294

$7,294,658

14,381,723 $14,381,723

$5,060,432

$8,217,260

$33,340,000

$5,700,000

$1,500,000

$60,000,000

$4,706,700

December 2015 Report

22 Climate Resilient Infrastructure Project

(CRIP)

To enhance the resilience of road infrastructure against flood risk and impacts of climate

change; and to improve the Borrower‟s capacity to respond promptly and effectively in an

eligible crisis or emergency.

23 AMS 2013 Long Term Supervision of

AMS Road Works- Corozal and Orange

Walk Districts

Supervision of AMS road works in the Corozal and Orange Walk districts

Belize Municipal Development Project Improved access to basic municipal infrastructure and enhanced municipal management in

selected town and city councils.

15 Sugar Belt Road Rehabilitation Project

(Ph. III: Lot A: San Lazaro - August Pine

Ridge Village; Ph. II of Blue Creek Road)

Upgrade of 6.56 miles of road to chip seal surface dress.

20 Hopkins Road Upgrade Upgrade of 4.5 mls. of road from the Southern Highway to Hopkins Village to chip seal

surface dress.

21 Rehabilitation of Hurricane Shelters Rehabilitation of 16 hurricane shelters

INFRASTRUCTURE

17 Sugar Belt Road Rehabilitation Project

(Phase III Lot 3B 2: Yo Creek Village to

San Antonio Village)

Upgrade of 3.7 miles of road to chip seal surface dress.

2 Corozal Border Crossing Reconstruction

Project

Improvement and rehabilitation of infrastructure at the Corozal Border

3 Completion of the Southern Highway

(Dump to Jalacte)

Upgrade of 20 miles of the Southern Highway from Dump (Ml. 14) to the Belize/Guatemala

Border

1 San Ignacio/ Santa Elena Bypass Project Construction of a bypass road and new all-weather bridge across the Macal River to

increase the efficiency of road transportation in and through San Ignacio and Santa Elena.

The project also includes activities to determine the extent of vehicle overloading and the

accompanying economic and financial impacts.

6 Support to Sustainable Urban

Infrastructure Systems in Belize City

Development of an operational manual for the Flood Mitigation Project, and socio-

environmental management plans and engineering designs for civil works projects to be

financed by the loan programme.

16 Sugar Belt Road Rehabilitation Project

(Phase III Lot B: August Pine Ridge

Village to Blue Creek Village)

Upgrade of 13 miles of road to chip seal surface dress.

7 Fifth Road (Phillip S.W. Goldson Highway

Upgrading) Project

13

Upgrade of the Phillip Goldson Highway between the Airport Junction and the Chetumal

Street Roundabout (including the Haulover Bridge).

4 Natural Disaster Management - Bridge

Rehabilitation, TS Arthur (Kendal &

Mullins River Bridges)

Reconstruction of the Kendal and Mullins River Bridges

5 Flood Mitigation Project Rehabilitation of drains and streets on Belize City's north side

9 Final Designs: George Price Highway

Rehabilitation Project

Finance the selection and contracting of consultants necessary for the final design of the

George Price Highway Rehabilitation

Sugar Belt Road Rehabilitation Project

(Ph. II, Lot B: Orange Walk Town - San

Upgrade of 15.94 miles of road to chip seal surface dress.

18 Sugar Belt Road Rehabilitation Project

(Ph. III, Lot C: San Narciso - San Victor

Village and Old Northern Highway - BSI

Junction)

Upgrade of 7.84 miles of road to chip seal surface dress.

12

10 Airport Link Road Construction of a new road, approximately 5 mls in length, connecting from the Western

Highway (Ml 8.2) to the existing Airport Access Road

8 Belize City Southside Poverty Alleviation

(Phase 2)

MHDST is responsible for the social components: Land Reclamation; Improvement of

Housing Units; Education, Training and Social Development; and Institutional Support,

Audit and Supervision

11 Rehabilitation of the Hummingbird

Highway

Resurfacing of the Hummingbird Highway from Belmopan to Dangriga and the upgrade of 6

single-lane bridges to double-lane

19 Belize Road Safety Project Infrastructural improvements, education and awareness campaigns, enhancement of road

accident emergency services, road safety management capacity building and enforcement

activities focused along the George Price Highway from Belize City to Belmopan and

thoroughfares including the Ring Road in Belmopan, targeting a reduction in deaths and

serious injuries associated with road traffic accidents.

Sugar Belt Road Rehabilitation Project

(Ph. II, Lot A: Orange Walk Town - Blue

Creek; Ph. 1 Orange Walk Town - San

Lazaro)

Upgrade of 8.5 miles of road pavement to chip seal surface dress.

14

PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016

PROJECT

DECEMBER 2015 GOVERNMENT OF BELIZE - MINISTRY OF ECONOMIC DEVELOPMENT

Page 2: PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

DESCRIPTION COST

(BZD)

December 2015 Report

INFRASTRUCTURE

PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016

PROJECT

$1,960,000

BUILDINGS & FACILITIES

$36,000,000

$2,325,987

$401,792

$844,063

$1,288,397

$2,272,664

$4,408,236

$2,653,912

$1,246,297

$3,016,544

$1,419,960

$3,215,063

$32,940,261

$7,766,000

$2,132,656

$11,625,000

$150,000

$86,000

$1,320,000

TRANSPORTATION & COMMUNICATION

$17,000,000

$352,000

$600,000

$200,000

$5,270,378

$3,750,000

SUB-TOTAL INFRASTRUCTURE 739,821,685

43 Ambergris Caye Water and Sewerage

Expansion - Social Vulnerability

Assessment for San Mateo - Belize

Consultancy services to assist BWS in conducting a social vulnerability assessment of the

San Mateo Community in Ambergris Caye

44 Solid Waste Master Plan for Tourist

Areas

Preparation of a master plan for solid waste management in tourist areas to improve

collection and final disposal of solid waste.

Preparation of detailed designs, bidding documents, cost estimates and technical

specifications for the proposed water and sewerage capital works on Ambergris Caye.

41 Testing a Prototype Caribbean Regional

Fund for Wastewater Management

(CReW) - Establishment of a Revolving

Fund for Financing Wastewater Projects

in Belize

Establishment of a revolving fund to support the GOB in financing waste water projects

42 Ambergris Caye Water and Sewerage

Expansion - Water Purveyor Valuation

and Transaction Advice

Consultancy services to support an independent valuation of Consolidated Water Belize,

Ltd and acquisition negotiations.

40 Detailed Designs - San Pedro, A.C.

Water and Sewerage Expansion Project

38 The Belize City Centre Multi-purpose

Sports Complex & Arena

Construction of the Belize City Centre Multi-purpose Sports Complex & Arena

39 Belize River Valley Water Supply Project Construction of a system to provide potable water to villagers of Bermudian Landing,

Double Head Cabbage, Flowers' Bank, Isabella Bank, Lemonal, St. Paul's Bank, Rancho

Dolores, Scotland Halfmoon, and Willows Bank in the Belize River Valley. Work will include

pipeline installation and storage tank construction.

Rehabilitation and upgrading of Carl Ramos Football Field

35 Dangriga Multipurpose Sporting Complex Rehabilitation and upgrading of Dangriga Multipurpose Sporting Complex

36 Toledo Union Football Field Rehabilitation and upgrading of Toledo Union Football Field

34 Carl Ramos Football Field

37 Punta Gorda Sports Complex Rehabilitation and upgrading of Punta Gorda Sports Complex

25 Marion Jones Stadium Upgrade of the Marion Jones Sports Complex

27 Belize Archives and Records Service

(BARS) Renovation and Construction

Project

Construction of a second storey on the front portion of the existing building and renovation

of the main entrance and research area.

24 Capacity-building to Support Preparation

of a National Transportation Master Plan

(NTMP)

Financial and technical support for the preparation of a comprehensive NTMP

26 Quality Assurance Laboratory (Belize

Bureau of Standards)

Construction of Laboratory/ Office for Belize Bureau of Standards

The Benque Viejo del Carmen Football

Complex

Feasibility study, architectural and engineering elements, costings for the Benque Viejo del

Carmen Football Complex and Facilities

Rehabilitation and upgrading of Victor Galvez Stadium

30 Santa Elena Football Field Rehabilitation and upgrading of Santa Elena Football Field

32

33 San Pedro Football Field Feasibility study, architectural and engineering elements, costing and operations

recommendations for the San Pedro Football Field and Facilities & Rehabilitation and

Upgrading of San Pedro Football Field

28 Construction of Punta Gorda Market Rehabilitation and extension of the Punta Gorda Town Market

29 Victor Galvez Stadium

To remove current dilapidated runway surface and replace with single seal 1/2" chip seal.

47 Dangriga Extension Project To construct an extension to the runway for Dangriga Pelican municipal airport

45 Belize City Municipal Airstrip Upgrade and

Rehabilitation Project

Expansion of the airport and construction of an office building for the Belize Airport

Authority, new exit road, and a 3,300-ft airstrip. The project will also include lighting to

accommodate night operations.

46 Placencia Airstrip Reconstruction Project

48 John Greif Airport Taxiway Project To construct a swale and culvert for the drainage system

50 Electrification of farms and villages in the

Banana Belt

Provision of grid electricity to farms and villages in the Banana Belt

49 Project to provide Electrification to

Marginalised and Depressed Rural and

Peri-Urban communities in Belize from

Renewable Energy Sources through Grid

Extension

Provision of electricity from renewable energy sources to residents in rural and peri-urban

areas through grid extension.

DECEMBER 2015 GOVERNMENT OF BELIZE - MINISTRY OF ECONOMIC DEVELOPMENT

Page 3: PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

DESCRIPTION COST

(BZD)

December 2015 Report

INFRASTRUCTURE

PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016

PROJECT

AGRICULTURE

$8,400,000

$4,000,000

$6,144,700

$11,006,436

$19,824,750

$113,863.36

$3,820,760

$3,693,726

$99,440

$912,398

$71,840

$2,200,000

507,000

$12,250,000

$1,250,000

$840,000

$265,718

TOURISM

$4,064,710

$189,000

$15,139,116

$850,000

63 Mesoamerica without Hunger

Programme: More effective institutional

frameworks to improve family agriculture,

and food and nutritional security

1. Strengthen political and institutional framework that is effective and operational for the

achievement of Food and Nutrition Security. 2. Enhance specific and effective

institutionalisation to improve conditions, livelihoods and family agriculture resilience.

64 Support to Banana Growers The support targets improved technical and agronomic practices, reduced environmental

impacts of the industry, and improved labour and social conditions of workers and their

households

61 Formulation of National Agriculture and

Food Policy

To prepare a final draft National Agriculture and Food Policy for Belize that provides a

framework for sustainable development of the sector and increased socio-economic

benefits to Belize

62 Economic Diversification of Micro Small

and Medium Enterprises in Northern

Belize (GCP/BZ/001/EC)

The overall objective is to reduce poverty and improve the living standards of the rural

population in the northern districts of Corozal and Orange Walk. Focus industries are

onion, honey and sheep and involves improvement of the value chain along the production

process.

58 BAM Technical Assistance Team To support the implementation of BAM 2012 and 2013

59 Agro-ecological Farming of Fruits and

Vegetables within the Selva Maya Region

(Cayo District)

To promote sustainable production of fruits and vegetables through the use of agro-

ecological practices that will reduce the harmful effects of synthetic fertilizers and pesticides

while protecting the natural forest in communities within the Selva Maya region

54 Belize National Sanitary Cattle Plan

(Cattle Sweep) Project

Testing of all cattle in the country for Brucellosis, Tuberculosis; implementation of a

surveillance plan for BSE ("Mad Cow" or "Foot and Mouth") Disease; and the development

of a National Livestock Registry for the exportation of cattle to Mexico and other countries.

56 Technological Innovation Strategy to

improve Productivity and Competitive-

ness of Product Chains in Central

America and the Dominican Republic

To support the development of value chain agricultural food products through innovative

technologies, to strengthen local systems that produce/multiply seeds, and to prepare and

disseminate information and strengthen organizations that transfer technology and provide

technical assistance.

55 Sugar Cane Replanting Scheme Establishment of a credit revolving fund in support of sugar cane replanting.

51

57 Capacity Strengthening of the Banana

Growers' Association (BGA)

Capacity strengthening activities include support to Sigatoka Management and training for

farmers and the BGA.

53 Aquaculture Project Assistance to the development of small-scale tilapia farming operations in Belize through

the production of high-quality fingerlings, promotion of the use of modern tilapia culture

technology among small farmers, and the drafting of a National Tilapia Aquaculture

Development Plan focused on the small-scale sub-sector.

60 Regional Project for Implementing

National Biosafety Frameworks in the

Caribbean Sub-Region

To implement effective, operable, transparent and sustainable National Biosafety

Frameworks which cater for national and regional needs, deliver global benefits and are

compliant with the Cartagena Protocol on Biosafety in 12 Caribbean countries.

65 AMS 2012: Sugar Industry Management

Information System Phase Two

This project gives continuity to the SIMIS Phase One. To be done through a Frame Work

Contract and a Supply Contract.

70 Belize City House of Culture and

Downtown Rejuvenation Project

Rejuvenation of Belize City's cultural heritage and identity, starting with downtown

residences/ buildings.

71 Support for the Implementation of

National Sustainable Tourism Master Plan

Increased institutional capacity of the Ministry of Tourism, Culture and Civil Aviation in its

ability to effectively coordinate the implementation of the National Sustainable Tourism

Master Plan 2030.

69 Restoration of Goldson House Restoration and conversion of the national leader's former Belmopan residence to a

museum/exhibit

66 Strategic Planning to Strengthen

Agricultural Trade and Food Safety

Assessment of the existing National Agricultural Statistical System and Agricultural Market

Information System; and development of a National Food Safety Policy, Committee,

guidelines and draft Bill.

67 AMS 2012 - Mid Term Evaluation Mid Term Evaluation of all AMS Projects

Agriculture Services Programme Strengthening of the core public agricultural services that provide access to applied

production technology corresponding to market opportunities, while reducing the risks

derived from threats to plant and animal health and food safety.

52 Food Security Programme - ALBA

(Integrated Farming Systems)

Promotion of integrated farming systems in Central, Northern, and Southern Belize;

purchase of machinery for GOB; establishment of irrigation infrastructure at Central Farm;

expansion of seedling facilities, and upgrade of the Biscayne Agriculture Facility.

68 Making Tourism Benefit Communities

Adjacent to Archaeological Sites

Improving access to product standards and safety at selected tourism sites.

DECEMBER 2015 GOVERNMENT OF BELIZE - MINISTRY OF ECONOMIC DEVELOPMENT

Page 4: PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

DESCRIPTION COST

(BZD)

December 2015 Report

INFRASTRUCTURE

PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016

PROJECT

BUSINESS & MARKET DEVELOPMENT

$20,000,000

$779,442

$12,083,200

$1,136,113

$1,187,500

$2,028,363

$577,694

$874,221

$830,000

$810,000

$1,713,500

$21,000,000

$5,600,000

$29,578,000

$8,243,940

$1,446,000

$1,000,000

$34,357

$100,000

89 A Practical Approach to Long Term

Lionfish Control - Developing Belize's

National Exploitation Strategy

Project will carry out a six month campaign to increase the local exploitation of lionfish;

conduct census techniques workshop; determine lionfish density and population; establish a

mechanism for lionfish management; and create a National Lionfish Exploitation Strategy

90 Educational Awareness within South

Water Caye Marine Reserve

This project will build community awareness through school lectures and hands-on training

on visits to the marine reserve.

85 Solid Waste Management Project Improve solid waste management practices along the Western Corridor; reduce

environmental pollution and enhance the image of Belize in the eco-tourism market;

strengthen overall Central Government capacity to improve solid waste management

countrywide through the institutional strengthening of the SWaMA.

87 Enabling Activities for the Preparation of

Belize's Third National Communication to

the UNFCCC

This project will support Belize in preparing its Third National Communication to the

Conference of the Parties to the United Nations Framework Convention on Climate Change

(UNFCCC).

86 Enhancing Belize's Resilience to Adapt to

the Effects of Climate Change

The project will enhance Belize's resilience to effects of climate change through

interventions in the water sector and establishment of governance structures for climate

change.

88 Managed Access and Catch Shares Pilot

Project

Support to sustainable fisheries and the economic development of Belize's fishery sector

81 Support for Trade and Tax Policy Reform This project will involve institutional strengthening for the Belize Tax Administration;

analysis of the economic consequences of tax reforms for Belize; and dissemination,

discussion and validating of reform proposals.

82 Establishing the Gaming and Lotteries

Commission

The objective is to regulate and internationalize gaming in Belize

To revise the Draft National Export Strategy (NES) 2008-2012 based on a review of the

current economic and socio-political situation in Belize and to prepare a Five-Year Action

Programme including the provision of training to exporters from priority sectors, business

support organizations and other stakeholders.

76 Mayan House of Cacao & Chocolate

Museum: More efficient market driven

productive and competitive SMEs

Establishment of a Mayan House of Cacao & Chocolate Museum in Toledo.

77 Establishment of the Belize Competition

Authority

The project will develop policies, legal, institutional and administrative framework for a fair

Competition Regime in Belize. The project was developed given Belize‟s commitments

under the Economic Partnership Agreement (EPA) and CARICOM.

72 DFC Line of Credit Funds provided to DFC for on lending in priority areas - student loans, SMEs, low-income

housing, agriculture and industrial credit, and microfinance.

73 Strengthening and Capacity-building of

the Newly-established Belize Coalition of

Service Providers

To build the capacity of the newly-established BCSP to serve as an umbrella organization

for the development of the services sector

74 Belize Rural Finance Programme Support and strengthening of financial services that target poor farmers and small rural

communities

75 Belize Botanic Gardens (BBG): More

efficient market driven productive &

competitive SMEs

Improving the quality of life of rural households in the Cayo district by developing capacity

to find or create employment in gardening and other horticultural areas

83 Seventh Consolidated Line of Credit to

the DFC

To facilitate productive private sector/ MSME development; support energy efficiency/

renewable energy financing; promote home ownership for low and middle income; develop

Belize's human capital by providing student loans for vocational, technical and academic

professionals.

84 Promoting Sustainable Natural Resources-

Based Livelihoods in Belize

Support for social mobilization, facilitation and community co-management of natural

resources; development of community-based sustainable livelihoods of non-timber forest

products in and around selected protected areas; support for innovative models of green

livelihoods of fishing communities through mariculture development; and community led

monitoring and knowledge dissemination.

79 Entrepreneurial Development in Central

America and the Dominican Republic

To promote and strengthen entrepreneurship in Central America and the Dominican

Republic with the purpose of establishing new micro, small, and medium enterprises

(MSMEs); and to develop and strengthen businesses in the MSME sector.

80 Strengthening the Institutional

Architecture for Investment Attraction,

Export Promotion and Small and Medium-

Sized Enterprises (SME) Development in

Belize

The ultimate goal is to foster sustainable economic growth and enhance competitiveness in

Belize. The general objective is to improve the enabling environment for business

development, trade and integration. The specific objective is to strengthen the institutional

framework and the necessary capabilities of BELTRAIDE to support investment attraction.

78 Strengthening the Capacity of Belize

Trade and Investment Development

Service

DECEMBER 2015 GOVERNMENT OF BELIZE - MINISTRY OF ECONOMIC DEVELOPMENT

Page 5: PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

DESCRIPTION COST

(BZD)

December 2015 Report

INFRASTRUCTURE

PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016

PROJECT

$518,000

$18,171,200

$882,426

$4,109,942

$1,039,208

$2,030,000

$153,400

$2,654,000

$14,620,000

$4,016,400

$320,000

$860,000

$800,000

EDUCATION

$5,740,000

$20,200,000

$2,664,322

$1,205,033

98 Capacity Building for the Strategic

Planning and Management of Natural

Resources in Belize

This project will strengthen institutional and technical capacities for improved monitoring

and assessment, natural resource evaluation and impact assessment, and resource

mobilization.

92 Management and Protection of Key

Biodiversity Areas in Belize

This project will strengthen natural resource management and biodiversity conservation in

key biodiversity areas of Belize

93 Strengthening the Financial Sustainability

of the National Protected Areas System

To strengthen the financial sustainability of Belize's National Protected Areas System to

foster a functional and effective system of PAS that is managed to maximize social, cultural

and economic contributions while ensuring ecosystems goods and services are maintained.

Belize Chemical and Waste Management

Project

Institutional Strengthening (IS) Project -

Phase VII, Belize Ozone Programme

95 Building Support for an Effective National

Protected Areas System

Co-financing support from PACT for additional activities under the Strengthening National

Capacities Project (support for the marine protected network).

96 Strengthening of existing institutional management systems with emphasis on Belize's

National Chemical Management Framework and Legislation

97 To continue strengthening the capacity of the MFFSD to contribute to the sustainable

elimination of the consumption and production of all ODS, in accordance with Belize's

commitments as a Party to the Montreal Protocol and its respective amendments

99 Belize Marine Conservation and Climate

Adaptation Project

To implement priority ecosystem-based marine conservation and climate adaptation

measures to strengthen the climate resilience of the Belize Barrier Reef System

101 Mainstreaming Biodiversity, Ecosystem

Services and Coastal Resilience in

Tourism Development

Studies as part of the feasibility analysis of the STP II in Corozal, Punta Gorda, the

Chiquibul Reserve Complex and Caye Caulker; and strengthened local capacity for

mainstreaming natural capital in the planning, development, and management of Belize's

tourism sector.

100 Energy for Sustainable Development in

Caribbean Buildings

The project consists of “a mix of policy and demonstration” interventions which aim to: (a)

Increase the use of renewable energy and energy efficiency (RE&EE) technologies in

buildings; (b) Address barriers to the expansion of RE&EE markets within the region; (c)

Increase knowledge and awareness of sustainable energy use in public, residential, and

commercial buildings; and (d) Build capacity for assessing building energy use and

implementing and monitoring the outcomes of appropriate RE&EE interventions.

104 Sector-wide reform activities aimed at enhancing learning outcomes at all levels. Activities

include strengthening of the regulatory framework, development of a National Human

Resource Strategy, sector Disaster Risk Management Plan, and the rationalisation and

diversification of the Secondary Curriculum.

107 AMS 2012 Education and Training

Improvement (Construction of Pre-school

Building)

102 Assessment of the Potential for

Distributed Generation using Renewable

Energy and Energy Efficiency

Support for the preparation of the Energy Efficiency Strategy of the National Energy Policy;

technical assistance to the GOB in developing a baseline of consumption patterns and

areas of opportunity for EE measures in public buildings, industry, the residential sector,

and SMEs, etc.; (iii) exploration into alternatives for renewable energies in addition to what

other donors are already exploring; and (iv) training and dissemination of findings.

103 Official Development Assistance

Cooperation- Korea's Overseas

Development Assistance

Overseas Development Assistance partnership between the governments of Belize and the

Republic of Korea in which Korea has provided Belize with financial support in the form of a

grant to be utilized by the Ministry of Energy, Science & Technology and Public Utilities in

Institutional strengthening, IT Equipment upgrade, Public Relations campaign and for the

organisation of national Technology and Innovation Forums.

Construction of 3 Pre-school Buildings (Trial Farm and San Jose {OW}, and San Pedro

{Czl}).

105 Education Quality Improvement Program To support the Government of Belize in improving the quality of primary education, and the

governance of the Belize education system

106 AMS 2012 Grant Call for Proposals for

Education and Training Improvement -

Teacher Training

Activities include Teacher Training in Early Childhood and Secondary Education

Education Sector Reform Project

(Including Development of a Disaster

Risk Management (DRM) Plan for the

Education Sector)

91 National Biodiversity Planning to support

the Implementation of the Convention on

Biological Diversity (CBD) 2011-2020

Strategic Plan

This project integrates Belize‟s obligations under the CBD into its national development and

sectoral planning frameworks through a renewed and participative „biodiversity planning‟

and strategizing process in a manner that is in line with the global guidance contained in the

CBD‟s Strategic Plan for 2011-2020.

94 Strengthening National Capacities for the

Operationalization, Consolidation and the

Sustainability of the National Protected

Areas System

Development of effective legal, financial, and institutional capacities to ensure sustainability

of the existing NPAS

DECEMBER 2015 GOVERNMENT OF BELIZE - MINISTRY OF ECONOMIC DEVELOPMENT

Page 6: PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

DESCRIPTION COST

(BZD)

December 2015 Report

INFRASTRUCTURE

PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016

PROJECT

$649,741

$509,847

$1,700,000

$370,000

$5,992,288

$1,200,000

$1,400,000

$11,041,564

$6,463,452

$228,000

$2,585,338

$1,875,000

$450,000

POVERTY AND SOCIAL PROTECTION

$14,713,000

$34,896,000

$13,881,292

SUB-TOTAL SOCIAL PROTECTION 127,764,878

GOVERNANCE

$450,000

$2,265,778

$6,137,500126 Technical Assistance to BRDP II Provide support for the successful implementation of BRDP II.

124 Computerization of Drivers‟ Licensing

System

To improve and upgrade the Department of Transport's National Drivers' Licensing System

125 CARICOM Law Revision Project Revision of 11 pieces of primary legislation and 6 subsidiary laws related to the CARICOM

Single Market and Economy (CSME), and a general revision of the substantive laws.

122 Belize Social Investment Fund II Loan To improve living conditions and enhanced social capital in poor and vulnerable

communities through the provision of basic infrastructure.

123 Basic Needs Trust Fund 7th Programme To improve basic infrastructure and services and increase the potential for economic

activity through skills training, capacity building and institutional development support.

110 Monitoring System for School Leadership

and Education Quality

Development and pilot of a prototype for a new Education Management Information System

(EMIS) and institutional strengthening of the MOE.

108 Equipment for Georgetown Technical

High School and ITVETs

Provision of state of the art equipment necessary for practical training in programme areas

offered by the respective institutions.

109 Introduction of Caribbean Vocational

Qualifications in ITVETs

Capacity-building for Ministry of Education (ETES) personnel and the development of a

road map for implementing the Caribbean Vocational Qualifications in Belize

113 Salud Mesoamerica Initiative II - Belize The Belize program will consist of three individual operations which are designed to

contribute to the reduction of maternal, infant and child mortality in the poorest districts of

Belize (Corozal, Orange Walk and Cayo) through interventions that strengthen primary

health care services within the framework of the MHI 2015 initiative.

114 Molecular Epidemiology and Drug

Resistance Surveillance of Human

Immunodeficiency Virus in the

Mesoamerican Region

Seeks to determine HIV subtypes in the Mesoamerican region and sensitivity to the

antiretroviral drugs currently available. Samples are sent to Instituto Nacional de

Enfermedades Respiratorias de Mexico. (TC)

111 Control & Prevention of HIV/AIDS To strengthen the national response to controlling and preventing the spread of HIV/AIDS in

Belize

112 Improving Children‟s Health and Nutrition

in Local Mayan Communities in Toledo

The project will support innovative programs which directly respond to the needs of the

poorest and most vulnerable groups in society; provide rapid, demonstrable, and

sustainable benefits; and build capacity, participation and empowerment of civil society,

local communities and NGOs.

121 Youth and Community Transformation

Project - Southside Belize City

The project aims to reduce the vulnerability of children and youth to crime and gang

membership in the Collet, Lake Independence, Pickstock and Port Loyola divisions of Belize

City; and will provide services to enhance literacy and adaptive life skills, support conflict

mediation, and improve inter-linkages and the sharing of best practices among participating

agencies working in those communities.

115 Accelerating the Pace: Reaching

Marginalized and Vulnerable Populations

with Critical Services

Improvement of Belize's National response to HIV by improving the health services

available to persons living with and affected by HIV. It will also work towards the expansion

of treatment and prevention of HIV and other STIs.

118 Strengthening of the Prevention and

Control of Dengue and Malaria in Belize

The overall objective is to contribute to broad-based rural economic growth and to the

reduction in the incidence of poverty in the rural communities of Belize.

119 Contribution Agreement with PAHO for

Vector Control

Country-wide Vector Control by PAHO and the Ministry of Health. Includes the procurement

of equipment and public awareness campaign.

120 Expansion of the Independence Polyclinic Construction of a new wing to house Clinical Support Services and create optimal and

functional flow at the Independence Polyclinic. The aim is to strengthen the primary care

services offered at the Polyclinic and increase access to quality health care.

116 Strengthening of Critical Maternal and

Neonatal Services in Belize

Improvement of the quality of health care services targeting the most vulnerable population,

pregnant women and neonates, through improved access to services (including laboratory,

blood bank, and medical equipment).

117 Elimination of Malaria in Mesoamerica

and the Hispaniola Island

Further strengthening of the country's malaria surveillance system to guide decision-making

and implementation of interventions towards malaria elimination and effective

documentation of relevant indicators; strengthen malaria diagnosis, treatment, and follow-

up in both public & private sectors; update, implement, and evaluate national vector borne

disease strategies to include reorientation of malaria efforts towards elimination.

DECEMBER 2015 GOVERNMENT OF BELIZE - MINISTRY OF ECONOMIC DEVELOPMENT

Page 7: PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

DESCRIPTION COST

(BZD)

December 2015 Report

INFRASTRUCTURE

PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016

PROJECT

$250,200

$392,000

$2,200,000

$857,500

SECURITY & CIVIL RIGHTS

$10,000,000

$625,000

$60,000,000

$200,000

$1,450,000

$791,280

$300,000

$390,170

SUB-TOTAL PUBLIC ADMINISTRATION 86,309,428

1,208,736,352

137 Infosegura Project The Infosegura project will support national data collection efforts by complementing

existing interventions that aim to strengthen crime and justice data platforms in Belize. The

project will bring together various actors in the justice system to systematize and synergize

crime and justice data collection and analysis at the national level.

138 Action Plan for C and D Countries (2015) Flexible financing made available to support the Government of Belize in activities related

to project identification, preparation, and execution; capacity building and monitoring and

evaluation.

134 Establishment of a Crime Observatory in

Belize

Needs assessment, design, and establishment of an observatory for the analysis and

subsequent use of crime and violence data in the development of public policies targeting

public safety and national security issues in the country.

135 Prevention of Violence that affects

Children, Adolescents and Youth in

Central America

The Project aims at 3 critical results: 1. The formulation & revision of comprehensive

citizen security policies; 2. The development & implementation of plans and institutional

capacities to improve social prevention of violence that affects youth and women at

primary, secondary and tertiary levels; 3. South-South and triangular cooperation,

adaptation of best practices and creative and innovative approaches to citizen security, with

emphasis on vulnerable groups.

136 Prevention of Violence against Children

and Adolescents

This Project is a component of a wider initiative: Joint Program- Strengthening the

Resilience of Southside Belize City to Enhance Citizen Security and Development

which aims to strengthen the resilience of the vulnerable populations and communities in

Southside Belize City to combat multiple dimensions of insecurity through a harmonized

and concerted effort of the entire UN system in country.

131 Community Action for Public Safety Strengthening of national public safety governance and community action in crime

prevention

132 Strengthening protection and promotion

of women's rights and women's social and

economic empowerment

Strengthening Q'eqchi Maya Women's Access to and control of Economic Resources

through sustainable Agriculture, Business Development and Marketing

133 Belize Integral Security Programme Investments in infrastructure and equipment for Belizean national security institutions,

including the rehabilitation of existing buildings, new civil works and the provision of

equipment for the Belize Police Department, Belize Defence Force, Belize Coast Guard and

National Forensic Science Services.

129 Implementation of the Emerging and

Sustainable Cities Initiative (ESCI) in

Belize City

Diagnosis and preparation of an action plan to address critical environmental, urban and

fiscal/ governance challenges; pre-investment studies for prioritised interventions; and a

system to monitor the results and impact of the plan.

130 Strengthening the Capacity of the Ministry

of Economic Development to implement

the Public Sector Investment Programme

(PSIP)

Detailed analysis of the PSIP process and subsequent design, construction, pilot and

installation of a functioning web-based management information system (MIS) for the PSIP.

127 Technical Assistance to the Ministry of

Labour, Local Government, Rural

Development and NEMO

Assistance to the Ministry in establishing an Area Development Group that supports/

promotes economic growth through an Area Development Plan.

128 Customs ASYCUDA World Support The Support Contract is adapted to the regional requirements with more agility, to

consolidate the operation of the ASYCUDA system, to facilitate the processes of integration

and interchange for the Customs operations at the regional level and, as a consequence,

support the on-going processes of economic integration at the regional level.

DECEMBER 2015 GOVERNMENT OF BELIZE - MINISTRY OF ECONOMIC DEVELOPMENT

Page 8: PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

ONGOING PROJECTS

ROADS, STREETS, DRAINS & BRIDGES

CDB L 49,438,000 - 4,427,938 4,383,519 24,707,419 24,730,581

GOB C 8,917,000 211,318 154,435 114,678 2,541,414 6,375,586

TOTAL $58,355.00

CABEI L 12,400,000 504,160 - - 11,944,916 455,084

GOB C 2,400,000 13,265 - - 520,241 1,879,759

TOTAL $14,800,000

KFAED L 9,600,001 537,227 482,303 - 11,029,230 (1,429,229)

OFID L 23,400,000 - - - 20,991,084 2,408,916

CABEI L 9,000,000 2,148,910 2,246,749 379,102 23,820,310 (14,820,310)

GOB C 11,420,000 167,600 184,520 52,678 4,400,320 7,019,680

TOTAL $53,420,001

CDB L 17,600,000 441,291 640,971 1,394,676 13,786,328 3,813,672

GOB C 4,010,000 92,291 114,708 70,849 1,361,925 2,648,075

TOTAL $21,610,000

IADB L 20,000,000 2,071,580 1,748,998 1,271,010 13,854,196 6,145,804

GOB C 1,500,000 40,200 189,652 107,456 879,572 620,428

TOTAL $21,500,000

IADB G 900,000 71,381 - 900,000 -

GOB C 230,000 63,636 - 268,496 (38,496)

TOTAL $1,130,000

CDB L 59,438,000 - - 59,438,000

CDB G 222,000 - - 222,000

CDF G 4,545,980 - - 4,545,980

GOB C 14,568,000 - - 14,568,000

TOTAL $78,773,980

The contract for civil works on Section A has been awarded.

Procurement of the supervision consultant is ongoing.

MOWT7 Fifth Road (Phillip S.W. Goldson

Highway Upgrading) Project

All activities have been completed. MOWT

3 Completion of the Southern Highway

(Dump to Jalacte)

All road works and bridges are 100% complete. Expenditure

figures to be clarified.

4 Work is ongoing on girders for the Mullins River Bridge. The

construction is 60% complete.

MOWT

MOWT

MOWT

Natural Disaster Management -

Bridge Rehabilitation, TS Arthur

(Kendal & Mullins River Bridges)

Civil works for parks, Juliet Soberanis St., Loop Road, Link Road,

Bill Lindo Canal, Douglas Jones and Northside Canals are

complete. Contracts for Albert Hoy St. and Maheia's Canal works

have been extended to 4th and 5th February 2016, respectively. The

rehabilitation of existing canals in Belama Phase III was added to

the procurement plan. The contract has been signed and works are

ongoing.

5 Flood Mitigation Project

6 Support to Sustainable Urban

Infrastructure Systems in Belize City

EXPENDITURE

FOR QUARTER

ENDING

30/06/2015

EXECUTING

AGENCYL/G

MOWT

MOWT2

INFRASTRUCTURE

PROJECT UPDATE

TOTAL

EXPENDITURE

TO QUARTER

ENDING

31/12/2015

FUNDING

AGENCY

Corozal Border Crossing

Reconstruction Project

All contracted works 100% complete. The defects liability period

runs to May 2016 and retention payments are pending to

contractors.

BALANCE

EXPENDITURE

FOR QUARTER

ENDING

31/12/2015

PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016

1

PROJECT COST

(BZD)

Lot 1 - Loma Luz Boulevard from Western Highway: complete; Lot 2 -

New Macal Bridge: construction of 2 abutments and the intermediate

piers underway: 40% complete; Lot 3 - Branch Mouth Road to

Joseph Andrews Drive: complete; Lot 4 - Joseph Andrews Drive

including Benque Road: complete.

Due to substantial savings, the PEU is proposing to implement 4

additional lots. The proposal should be presented to the CDB Loan

Committee for approval in January 2016.

EXPENDITURE

FOR QUARTER

ENDING

30/09/2015

San Ignacio/ Santa Elena Bypass

Project

DECEMBER 2015 GOVERNMENT OF BELIZE - MINISTRY OF ECONOMIC DEVELOPMENT 1 of 15

Page 9: PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

ONGOING PROJECTS

EXPENDITURE

FOR QUARTER

ENDING

30/06/2015

EXECUTING

AGENCYL/G

INFRASTRUCTURE

PROJECT UPDATE

TOTAL

EXPENDITURE

TO QUARTER

ENDING

31/12/2015

FUNDING

AGENCY BALANCE

EXPENDITURE

FOR QUARTER

ENDING

31/12/2015

PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016

PROJECT COST

(BZD)

EXPENDITURE

FOR QUARTER

ENDING

30/09/2015

OFID L 14,140,000 484,410 2,069,534 2,028,433 7,523,283 6,616,717

GOB C 9,040,328 309,705 1,351,111 1,330,834 4,871,901 4,168,427

OFID L 7,860,000 7,860,000

GOB C 5,006,579 358,952 102,923 4,704,543 302,036

TOTAL $36,046,907

IADB G 2,000,000 - - 13,500 13,500 1,986,500

GOB C 500,000 23,465 175,224 79,034 277,722 222,278

TOTAL $2,500,000

OFID L 23,560,000 - 23,560,000

GOB C 12,040,000 - 12,040,000

TOTAL $35,600,000

OFID L 27,000,000 27,000,000.00

KFAED L 24,000,000 24,000,000.00

GOB C 24,100,000 24,100,000.00

TOTAL $75,100,000

WB L 30,000,000 809,384 1,003,889 1,269,365 21,135,642 8,864,358

GOB/LGA C 1,491,311 13,309 - 45,017 720,846 770,465

TOTAL $31,491,311

EU/AMS MOWT G 8,642,098 - - - 7,466,136 1,175,962

TOTAL $8,642,098

EU/AMS MOWT G 12,620,294 - - - 5,425,671 7,194,622

TOTAL $12,620,294

EU/AMS MOWT G 7,294,658 265,329 - 193,562 5,847,814 1,446,844

TOTAL $7,294,658

EU/AMS MOWT G 14,381,723 1,030,619 1,393,081 1,250,402 5,106,384 9,275,339

TOTAL $14,381,723

MOWT

SIF12

16

MOWT

MOWT

Sugar Belt Road Rehabilitation

Project (Ph. II, Lot B: Orange Walk

Town - San Estevan - Progresso)

The education, training and social development component

(including housing and land reclamation) has been reassigned to

MOWT. Expenditure to be confirmed.

As a prerequisite to possible re-launch, the design drawings, bill of

quantities, technical specifications and engineering estimates were

reviewed. Since the estimates for project completion exceed the

remaining grant resources, GoB will need to identify funds to

complete the project.

MHDST

Lot 2 - Central American Boulevard rehabilitation complete. Lot 1 -

Dredging and lining of Prisoner Creek, Lakeview and Trenchtown

canals and associated streets: contract awarded in February 2015

with a 15-month expected duration. Update on progress pending.

Works are on schedule but will be reduced by 2 km as a flood-prone

section of the road will require extensive and costly hydrological and

geotechnical studies to complete the design. Additional works

requested by MoW will extend the project by approximately 3

months.

Belize Municipal Development

Project

Airport Link Road The project was approved in December 2015. The Project Execution

Unit is about to commence the procurement process for the Design

Consultant.

MOWT

14

15

Sugar Belt Road Rehabilitation

Project (Ph. II, Lot A: Orange Walk

Town - Blue Creek; Ph. 1 Orange

Walk Town - San Lazaro)

The infrastructure component is still moving slowly but the Technical

Assistance Component is complete. Counterpart quarter and

cumulative expenditures are to be confirmed.

8 Belize City Southside Poverty

Alleviation (Phase 2)

9 Final Designs: George Price Highway

Rehabilitation Project

The Design Consultant was engaged in December 2015 and

contracts for the Supervision Consultant, Project Officer and

Financial Specialist have been signed. Office furniture and

equipment have also been procured.

Project is in the defects liability period. The NAO has settled

exchange rate losses incurred by the Contractor.

Sugar Belt Road Rehabilitation

Project (Ph. III: Lot A: San Lazaro -

August Pine Ridge Village; Ph. II of

Blue Creek Road)

The contractor has a few remaining items and remedial work to

complete before provisional acceptance can be granted. The NAO

and MoW continue to monitor the project and will recommend a way

forward if progress continues to be limited in the beginning of 2016.

Sugar Belt Road Rehabilitation

Project (Phase III Lot B: August Pine

Ridge Village to Blue Creek Village)

13

10

11 Rehabilitation of the Hummingbird

Highway

A contract has been signed for Lot 1 - Belmopan Roundabout to

Sibun Bridge and Lot 4 (Alta Vista Factory to Dangriga Entrance).

Preliminary survey works have commenced and earthworks will

begin in February 2016.

DECEMBER 2015 GOVERNMENT OF BELIZE - MINISTRY OF ECONOMIC DEVELOPMENT 2 of 15

Page 10: PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

ONGOING PROJECTS

EXPENDITURE

FOR QUARTER

ENDING

30/06/2015

EXECUTING

AGENCYL/G

INFRASTRUCTURE

PROJECT UPDATE

TOTAL

EXPENDITURE

TO QUARTER

ENDING

31/12/2015

FUNDING

AGENCY BALANCE

EXPENDITURE

FOR QUARTER

ENDING

31/12/2015

PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016

PROJECT COST

(BZD)

EXPENDITURE

FOR QUARTER

ENDING

30/09/2015

EU/AMS MOWT G 5,060,432 550,905 565,701 - 1,620,576 3,439,856

TOTAL $5,060,432

EU/AMS MOWT G 8,217,260 1,298,535 267,016 - 6,668,224 1,549,036

TOTAL $8,217,260

CDB L 28,690,000 2,918,680 2,257,754 2,382,938 12,894,091 15,795,909

GOB C 4,650,000 945,528 256,429 152,585 2,818,519 1,831,481

TOTAL $33,340,000

EU/BRDP II MOWT

(AMS/PEU)

G 5,700,000 2,339,043 - - 4,068,217 1,631,783

TOTAL $5,700,000

EU NEMO G 1,500,000 - 296,631 - 1,409,804 90,196

TOTAL $1,500,000

IBRD SIF L 60,000,000 200,326 - 816,766 59,183,234

TOTAL $60,000,000

EU MOWT G 4,706,700 844,683 - 844,683 3,862,017

TOTAL $4,706,700

G 1,592,000 - - - - 1,592,000

C 368,000 - - - - 368,000

TOTAL $1,960,000

BUILDINGS & FACILITIES

GOV G 2,000,000 - - - 2,000,000 -

ROC L 10,000,000 - - - 5,000,000 5,000,000

GOB C 18,000,000 158,443 - 16,293,657 1,706,343

U 6,000,000 - - - - 6,000,000

TOTAL $36,000,000

The PSC has been established but project inception activities were

delayed due to administrative changes associated with the recent

General Elections. Activities should resume in the first quarter of

2016.

IADB PPD OPM

Supervision on-going. Expenditure update is pending.

The Ministry responsible for sports is pursuing funds necessary to

complete the project.

MOECYS

23

17

24 Capacity-building to Support

Preparation of a National

Transportation Master Plan (NTMP)

Component 1: Lots 1 - 3 completed; and Lots 4A and 4B - 85% and

50% complete, respectively. Component 3: 85% complete; a

training package is being procured to strengthen the capacity of the

enforcement team. Component 4: 96% complete - Cohort 2

completed the Basic Life Support and Medical First Responders

Training in November 2015.

19

Rehabilitation of Hurricane Shelters21

22 Climate Resilient Infrastructure

Project (CRIP)

18

Insurances and Performance Guarantees have expired and the EU

has expressed in writing that no further payments shall be made

until updated Insurances and Performance Guarantees are

presented along with payment requests.

20 Hopkins Road Upgrade

Belize Road Safety Project MEDP

Technical and expenditure updates needed.

The NAO is preparing the program documents necessary for the

EU's financial audit.

Inaccurate survey information used in the drawings had the road

going in the wrong direction. As a result of the re-design, some

items in the BOQs were underestimated or missing. The GOB has

allocated additional funds to complete the project; and paving of

0.5km of road through Yo Creek Village has been added to the

scope.

Sugar Belt Road Rehabilitation

Project (Phase III Lot 3B 2: Yo Creek

Village to San Antonio Village)

The project is currently in the 12-month defects liability period which

will end by April 2016. The NAO has settled exchange rate losses

incurred by the Contractor.

Sugar Belt Road Rehabilitation

Project (Ph. III, Lot C: San Narciso -

San Victor Village and Old Northern

Highway - BSI Junction)

25

AMS 2013 Long Term Supervision of

AMS Road Works- Corozal and

Orange Walk Districts

Marion Jones Stadium

DECEMBER 2015 GOVERNMENT OF BELIZE - MINISTRY OF ECONOMIC DEVELOPMENT 3 of 15

Page 11: PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

ONGOING PROJECTS

EXPENDITURE

FOR QUARTER

ENDING

30/06/2015

EXECUTING

AGENCYL/G

INFRASTRUCTURE

PROJECT UPDATE

TOTAL

EXPENDITURE

TO QUARTER

ENDING

31/12/2015

FUNDING

AGENCY BALANCE

EXPENDITURE

FOR QUARTER

ENDING

31/12/2015

PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016

PROJECT COST

(BZD)

EXPENDITURE

FOR QUARTER

ENDING

30/09/2015

EU TAT, MOWT

PEU

G 2,325,987 119,691 156,363 99,100 607,752 1,718,235

TOTAL $2,325,987

GOB BARS C 401,792 109,354 256,581 20,373 386,309 15,483

TOTAL $401,792

EU TAT, MOW

PEU

G 844,063 252,490 81,135 102,696 593,901 250,162

TOTAL $844,063

GOV/PC BIL L 1,288,397 131,747 1,227,337 61,060

TOTAL $1,288,397

GOV/PC BIL L 2,272,664 192,825 2,068,201 204,463

TOTAL $2,272,664

GOV/PC BIL L 3,786,111 1,088,764 3,265,355 520,755

TOTAL $3,786,111

GOV/PC BIL L 4,408,236 653,208 2,652,694 1,755,542

TOTAL $4,408,236

GOV/PC BIL L 2,653,912 711,505 1,523,532 1,130,380

TOTAL $2,653,912

GOV/PC BIL L 1,246,297 388,051 1,012,491 233,807

TOTAL $1,246,297

GOV/PC BIL L 3,016,544 252,982 622,194 2,394,350

TOTAL $3,016,544

GOV/PC BIL L 1,419,960 380,072 972,300 447,660

TOTAL $1,419,960

GOV/PC BIL L 3,215,063 - 3,215,063

TOTAL $3,215,063

GOV/PC BIL L 32,940,261 3,917,858 8,955,744 23,984,518

TOTAL $32,940,261

WATER & SANITATION

CDB L 6,959,000 564,266 6,536,952 422,048

GOB C 807,000 261,800 545,200

TOTAL $7,766,000

Project completed; the balance represents retention payment.

Details of progress pending.

Details of progress pending.

Details of progress pending.

Contract signed for the construction phase in September 2016.

Figure reflects expected cost of the construction only.

Details of progress pending.

The project is approximately 98% complete with remaining activities

including minor electrical works, work on the stairs, and installation

of a motor for the lift included as part of the project. The building

should be officially inaugurated during the first quarter of 2016.

The project is 100% complete and is in the 12-month defects liability

period ending on 26 November 2016.

The Belize City Centre Multi-purpose

Sports Complex & Arena

32

33

34

35

36

37

Dangriga Multipurpose Sporting

Complex

Toledo Union Football Field

Punta Gorda Sports Complex

Details of progress pending.

Construction of Punta Gorda Market

Santa Elena Football Field

Isidoro Beaton Football Field and

Facility

Victor Galvez Stadium

The Benque Viejo del Carmen

Football Complex

San Pedro Football Field

Carl Ramos Football Field

The project is 85% complete- structural works including the floor,

walls and roof have been completed. Finishing works are pending.

Given delays experienced, the project will not meet the expected

completion date of 23rd January, 2016.

26

27 Belize Archives and Records Service

(BARS) Renovation and Construction

Project

Updates pending. BWS39 Belize River Valley Water Supply

Project

38

29

30

31

28

Quality Assurance Laboratory (Belize

Bureau of Standards)

Details of progress pending.

Details of progress pending.

Design completed and construction contract signed in August, 2015.

The project will start in January 2016.

DECEMBER 2015 GOVERNMENT OF BELIZE - MINISTRY OF ECONOMIC DEVELOPMENT 4 of 15

Page 12: PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

ONGOING PROJECTS

EXPENDITURE

FOR QUARTER

ENDING

30/06/2015

EXECUTING

AGENCYL/G

INFRASTRUCTURE

PROJECT UPDATE

TOTAL

EXPENDITURE

TO QUARTER

ENDING

31/12/2015

FUNDING

AGENCY BALANCE

EXPENDITURE

FOR QUARTER

ENDING

31/12/2015

PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016

PROJECT COST

(BZD)

EXPENDITURE

FOR QUARTER

ENDING

30/09/2015

CDB L 1,440,000 140,000 - 117,730 394,833 1,045,167

CDB G 182,804 45,700 - 137,103 182,803 1

GIZ G 255,752 - - - 251,752 4,000

BWS C 254,100 100,143 153,957

TOTAL $2,132,656

IADB/GEF G 1,025,000 414,000 611,000

IADB/GEF G 10,000,000 4,520,600 5,479,400

GOB C 600,000 573,600 26,400

TOTAL $11,625,000

CDB BWS G 150,000 - - - 150,000

TOTAL $150,000

CDB BWS G 86,000 - - - 86,000

TOTAL $86,000

IADB G 1,200,000 110,015 143,019 323,334 576,367 623,633

GOB C 120,000 28,123 26,583 31,553 86,169 33,831

TOTAL $1,320,000

TRANSPORTATION & COMMUNICATION

BSSB MOTCA L 17,000,000 1,258,188 1,322,007 682,318 10,068,207 6,931,793

TOTAL $17,000,000

BAA BAA C 352,000 - - - 124,600 227,400

TOTAL $352,000

BAA BAA C 600,000 - - 74,640 74,640 525,360

TOTAL $600,000

BAA BAA C 200,000 75,825 75,825 124,175

TOTAL $200,000

47 Mobilization of contract begun but was delayed due to General

Elections 2015.

Testing a Prototype Caribbean

Regional Fund for Wastewater

Management (CReW) -

Establishment of a Revolving Fund

for Financing Wastewater Projects in

Belize

Updates pending.

Counterpart expenditure updates pending.BWS

Updates pending.MOF

40 Detailed Designs - San Pedro, A.C.

Water and Sewerage Expansion

Project

41

Ambergris Caye Water and

Sewerage Expansion - Water

Purveyor Valuation and Transaction

Advice

Ambergris Caye Water and

Sewerage Expansion - Social

Vulnerability Assessment for San

Mateo - Belize

43

42

Feasibility studies: scheduling of deliverables has been changed to

meet the requirements for preparing the POD.

Lot 2 Construction supervision ongoing to March 2016.

44

Dangriga Extension Project

Solid Waste Master Plan for Tourist

Areas

45 Belize City Municipal Airstrip

Upgrade and Rehabilitation Project

Placencia Airstrip Reconstruction

Project: Single seal 1/2 " chip seal

48

46

John Greif Airport Taxiway Project

SWaMA

Updates pending.

Phase I complete. Phase II activities have not yet commenced.

Project scope to be clarified.

DECEMBER 2015 GOVERNMENT OF BELIZE - MINISTRY OF ECONOMIC DEVELOPMENT 5 of 15

Page 13: PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

ONGOING PROJECTS

EXPENDITURE

FOR QUARTER

ENDING

30/06/2015

EXECUTING

AGENCYL/G

INFRASTRUCTURE

PROJECT UPDATE

TOTAL

EXPENDITURE

TO QUARTER

ENDING

31/12/2015

FUNDING

AGENCY BALANCE

EXPENDITURE

FOR QUARTER

ENDING

31/12/2015

PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016

PROJECT COST

(BZD)

EXPENDITURE

FOR QUARTER

ENDING

30/09/2015

ELECTRICITY

EU G 3,952,783 - - - 1,461,725 2,491,058

GOB C 1,317,595 - - - 244,002 1,073,593

TOTAL $5,270,378

EU/BSP BEL, NAO G 3,750,000 - - - 2,484,524 1,265,476

TOTAL $3,750,000

SUB-TOTAL INFRASTRUCTURE 739,821,685 20,614,702 22,918,380 25,825,496 300,853,782 438,967,903

AGRICULTURE

IADB L 7,400,000 - 7,400,000 -

GOB C 1,000,000 - 1,429,602 (429,602)

TOTAL $8,400,000

GOV/ALBA MOAFF G 4,000,000 4,000,000

TOTAL $4,000,000

Taiwan ICDF G 5,000,000 78,525 160,127 101,577 1,539,054 3,460,946

GOB C 1,144,700 1,144,700

TOTAL $6,144,700

EU G 5,500,000 - - - 5,465,872 34,128

OIRSA C 359,713 21,583 - - 337,119 22,594

BLPA C 2,001,800 120,057 - - 1,875,290 126,510

GOB C 3,144,923 188,566 - - 2,945,411 199,512

TOTAL $11,006,436

EU/AMS DFC G 19,824,750 493,618 70,386 5,415,110 14,409,640

TOTAL $19,824,750

BEL

MOAFF

MOAFF, BAHA

ECONOMIC SERVICES

Electrification of farms and villages in

the Banana Belt

Project to Provide Electrification to

Marginalised and Depressed Rural

and Peri-Urban communities in

Belize from Renewable Energy

Sources through Grid Extension

Aquaculture Project

A comprehensive report from BEL is expected January 29th 2016

DFC and LICU disbursed 23 and 8 loans, respectively, for replanting

and ratoon maintenance totalling $36,200.00. The $500,000.00 loan

to LICU has been fully disbursed to farmers. The Farmer Education

Campaign is complete.

Sweep 3 has identified more untested animals than Sweeps 1 and

2; and new farms. Final Audit Verification is on-going, after which

final payments may be requested. The Grant will conclude on 3

January 2016. Figures represent amounts disbursed, not

expenditure.

Updates to be sought from BEL.

51

50

Agriculture Services Programme

Belize National Sanitary Cattle Plan

(Cattle Sweep) Project

Sugar Cane Replanting Scheme

Food Security Programme - ALBA

(Integrated Farming Systems)

52

55

53

54

49

Progress and expenditure updates pending.

Project closed in September 2015. Excess expenditure from

counterpart resources reflects unbudgeted taxes on consultants'

contracts and variation orders for construction works.

A short term expert in tilapia feed conducted a 2-week mission in

November. Activities included assisting hatchery staff in analysing

the composition of alternative feed prepared and providing

recommendations for future preparation; and field visits to collect

tilapia data and determine whether experiments may be conducted

at the farm. Analysis of a sample of the feed revealed a satisfactory

protein content of 31%. Expenditure figures to be reviewed and

updated.

MOAFF, TTM

DECEMBER 2015 GOVERNMENT OF BELIZE - MINISTRY OF ECONOMIC DEVELOPMENT 6 of 15

Page 14: PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

ONGOING PROJECTS

EXPENDITURE

FOR QUARTER

ENDING

30/06/2015

EXECUTING

AGENCYL/G

INFRASTRUCTURE

PROJECT UPDATE

TOTAL

EXPENDITURE

TO QUARTER

ENDING

31/12/2015

FUNDING

AGENCY BALANCE

EXPENDITURE

FOR QUARTER

ENDING

31/12/2015

PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016

PROJECT COST

(BZD)

EXPENDITURE

FOR QUARTER

ENDING

30/09/2015

IADB MOAFF G 113,863 113,863

TOTAL $113,863.36

EU/BSP MOAFF PEU G 3,820,760 2,059,670 - - 2,059,700 1,761,060

TOTAL $3,820,760

EU/BSP NAO G 3,693,726 - - 540,442 2,195,155 1,498,571

TOTAL $3,693,726

GIZ G 70,000 57,661 12,339

GOB C 17,440 16,200 1,240

Beneficiaries C 12,000 12,000

TOTAL $99,440

GEF G 412,398 17,905 20,581 38,486 373,912

GOB C 500,000 500,000

TOTAL $912,398

FAO MOAFF G 71,840 71,840 -

TOTAL $71,840

EU G 1,760,000 - 93,304 - 790,935 969,065

FAO TCP G 440,000 - - 440,000

TOTAL $2,200,000

MEX - FAO MOAFF G 480,000 - - 480,000

C 27,000 27,000

TOTAL 507,000

EU NAO G 12,250,000 - 106,777 - 106,777 12,143,223

TOTAL $12,250,000

EU AMS 2012 SIRDI, MOAFF G 1,250,000 - - 339,478 339,478 910,522

TOTAL $1,250,000

MOAFF, FAO Formerly AMS 2012 - Grant Call for Proposals - Facilitation of

efficient market-driven productive and competitive SMEs. The

project office has been established and activities are progressing

without delays.

Budget reported as exhausted but details on progress with the

Policy are pending.

BAHA, MOAFF

61

Regional Project for Implementing

National Biosafety Frameworks in the

Caribbean Sub-Region

57

58

Formulation of National Agriculture

and Food Policy

60

Technological Innovation Strategy to

improve Productivity and

Competitiveness of Product Chains

in Central America and the

Dominican Republic

59

Economic Diversification of Micro

Small and Medium Enterprises in

Northern Belize (GCP/BZ/001/EC)

62

64

65 AMS 2012: Sugar Industry

Management Information System

Phase Two

Mesoamerica without Hunger

Programme: More effective

institutional frameworks to improve

family agriculture, and food and

nutritional security

63

Support to Banana Growers

Agro-ecological Farming of Fruits

and Vegetables within the Selva

Maya Region (Cayo District)

Capacity Strengthening of the

Banana Growers' Association (BGA)

56

BAM Technical Assistance Team

Progress updates pending.

Progress and expenditure updates pending.

Progress and expenditure updates pending.

Legal expert has finalised the outline of the BGA Strategy and will

provide advice on geographical indications for food products

legislation for Belize. A one-year extension is to be requested to

allow the TAT to be functional in 2017.

Contracts signed for the Supply and Installation of Aviation

Communication Equipment; BGA Training Programme; BGA

Branding and Communication; Organic Amendments, Fertiliser &

Liming Amendments; and Preparation of BGA Strategy.

Procurement processes continue for the Guidance Positioning

System; Construction of Apron and Workers' Dressing Room;

Supply of Mini Excavators and Trailer; and Equipment supply for the

Sigatoka Mixing Station.

MOAFF

Updates pending.

Farmers continued negotiations to obtain the pre-financing

guarantee and are receiving training in Grant Management.

A status assessment was carried out on seven schools' feeding

programmes. Three first-stage and three second-stage schools were

supported in the implementation of their sustainable school feeding

programmes. The FAO Project Principal will be in Belize in March

2016 to launch the project.

DECEMBER 2015 GOVERNMENT OF BELIZE - MINISTRY OF ECONOMIC DEVELOPMENT 7 of 15

Page 15: PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

ONGOING PROJECTS

EXPENDITURE

FOR QUARTER

ENDING

30/06/2015

EXECUTING

AGENCYL/G

INFRASTRUCTURE

PROJECT UPDATE

TOTAL

EXPENDITURE

TO QUARTER

ENDING

31/12/2015

FUNDING

AGENCY BALANCE

EXPENDITURE

FOR QUARTER

ENDING

31/12/2015

PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016

PROJECT COST

(BZD)

EXPENDITURE

FOR QUARTER

ENDING

30/09/2015

IADB G 700,000 - - - - 700,000

GOB C 140,000 - - - - 140,000

TOTAL $840,000

EU NAO G 265,718 139,057 139,057 126,661

TOTAL $265,718

TOURISM

EU G 2,750,000 161,402 - 2,133,449 616,551

BTB/ NICH C 1,314,710 77,146 - 1,019,742 294,968

TOTAL $4,064,710

GOB/ NICH NICH C 189,000 44,810 98,312 90,688

TOTAL $189,000

ICDF L 10,600,000 - 6,451 69,031 75,482 10,524,518

GOB/BTB C 4,539,116 - - 325,482 325,482 4,213,634

TOTAL $15,139,116

IADB G 650,000 95,137 72,962 76,728 266,362 383,638

GOB C 200,000 2,400 5,929 15,578 63,891 136,109

TOTAL $850,000

BUSINESS & MARKET DEVELOPMENT

CDB DFC L 20,000,000 547,428 19,747,428 252,572

TOTAL $20,000,000

CARTFund G 555,812 21,680 - - 555,812 -

GOB C 223,630 45,353 45,353 178,277

TOTAL $779,442

IFAD L 6,000,200 78,579 4,287,303 1,712,897

CABEI L 3,811,600 32,837 3,069,829 741,771

GOB C 1,463,600 65,002 1,365,206 98,394

CU C 807,800 5,595 209,530 598,270

TOTAL $12,083,200

EU/BRDP II G 908,890 - - - 1,122,468 (213,578)

duPlooy's C 125,000 - - - 197,776 (72,776)

BBG C 102,223 - - - 193,220 (90,997)

TOTAL $1,136,113

Project began but encountered some delays. All project staff

engaged except the Historical Curator/ Museum Specialist. Designs

and contracts being completed for the restoration of Belize House

and the rejuvenation of the Downtown area.

69 Restoration of Goldson House

67 AMS 2012 - Mid Term Evaluation

68 Making Tourism Benefit

Communities Adjacent to

Archaeological Sites

BTB First draft of final verification received by BBG. Submission of

request for final payment expected by end of January 2016.

Technical Cooperation Agreement signed December 22, 2015. First

disbursement is contingent on the MNRA's designating persons as

authorised representatives with respect to the execution of the grant

and providing a timetable for the use of the resources.

66 Strategic Planning to Strengthen

Agricultural Trade and Food Safety

Belize Botanic Gardens (BBG): More

efficient market driven productive &

competitive SMEs

Strengthening and Capacity-building

of the Newly-established Belize

Coalition of Service Providers

74

Updates pending.

Support for the Implementation of

National Sustainable Tourism Master

Plan

71

70 Belize City House of Culture and

Downtown Rejuvenation Project

Belize Rural Finance Programme

75

73 DFT

72 DFC Line of Credit

MOTCA

BBG

BCUL strategic plan completed. Training delivered to the Board,

committees, management and staff in internal controls, credit and

human resource management, operations and marketing. Of the

$2,750,000 DFC approved to the CUs, $2,250,000 has been

disbursed. Recruitment of new members should resume with the

transition to the newly-developed M&E software. Expenditure

figures to be confirmed.

Grant activities completed on schedule. First draft of final verification

received by BBG. Submission of the request for final payment

expected by end of January 2016.

Updates pending.

MOTCA

MNRA

Details of progress pending.

MEDP, BCUL

PPDU has been established. Institutional assessment ongoing and

on track. Legal framework and policy also underway. Elaboration of

PPP policy activity has been cancelled due to policy decision.

Project completed. Grant funds fully exhausted.

DECEMBER 2015 GOVERNMENT OF BELIZE - MINISTRY OF ECONOMIC DEVELOPMENT 8 of 15

Page 16: PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

ONGOING PROJECTS

EXPENDITURE

FOR QUARTER

ENDING

30/06/2015

EXECUTING

AGENCYL/G

INFRASTRUCTURE

PROJECT UPDATE

TOTAL

EXPENDITURE

TO QUARTER

ENDING

31/12/2015

FUNDING

AGENCY BALANCE

EXPENDITURE

FOR QUARTER

ENDING

31/12/2015

PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016

PROJECT COST

(BZD)

EXPENDITURE

FOR QUARTER

ENDING

30/09/2015

EU/BRDP II G 1,000,000 - - - 917,760 82,240

TCGA/others C 187,500 - - - 50,000 137,500

TOTAL $1,187,500

EU DFT G 2,028,363 862,396 - 862,396 1,165,967

TOTAL $2,028,363

CDB

(CARTFund)

G 447,006 - 447,006

BELTRAIDE G 130,688 - 130,688

TOTAL $577,694

CENPROMYPE G 779,221 - 779,221

GOB C 95,000 - 95,000

TOTAL $874,221

IADB G 650,000 . - 650,000

GOB C 180,000 - 180,000

TOTAL $830,000

IADB IADB G 810,000 109,334 700,666

TOTAL $810,000

GOB MOT C 1,713,500 5,000 5,000 1,708,500

TOTAL $1,713,500

CDB DFC L 21,000,000 - 2,860,000 9,360,000 11,640,000

TOTAL $21,000,000

ENVIRONMENT AND NATURAL RESOURCE MANAGEMENT

JSDF BEST G 5,600,000 296,301 1,450,043 4,149,957

TOTAL $5,600,000

IADB L 22,300,000 825,596 795,843 63,357 21,896,762 403,238

OFID L 6,520,000 740,337 68,786 - 6,520,000 -

GOB C 758,000 4,113 2,739 - 757,613 387

TOTAL $29,578,000

EU G 7,540,000 7,364,512 175,488

GOB C 703,940 703,940

TOTAL $8,243,940

Updates pending.

Solid Waste Management Project

Technical and expenditure updates needed.

TCGA

Project completed; expenditure information pending.

Project completed; expenditure information pending.

Updates pending.

BELTRAIDE

81

Seventh Consolidated Line of Credit

to the DFC

85

83

84

MEDP

Establishing the Gaming and

Lotteries Commission

Promoting Sustainable Natural

Resources-Based Livelihoods in

Belize

Project activities are ongoing and 75% complete.

Draft legislation is still pending review by the Solicitor General.

Implementation of four sub-projects will commence and a further 2

projects have been approved for financing. Community meetings

continue with targeted groups.

Project completed; expenditure information pending.

San Pedro and Caye Caulker dump sites works continue and are

last pending activities.

BELTRAIDE

SWaMA

76

82

80

86

78

Enhancing Belize's Resilience to

Adapt to the Effects of Climate

Change

Strengthening the Institutional

Architecture for Investment

Attraction, Export Promotion and

Small and Medium-Sized Enterprises

(SME) Development in Belize

Strengthening the Capacity of Belize

Trade and Investment Development

Service

79 Entrepreneurial Development in

Central America and the Dominican

Republic

Establishment of the Belize

Competition Authority

Mayan House of Cacao & Chocolate

Museum: More efficient market

driven productive and competitive

SMEs

Support for Trade and Tax Policy

Reform

77

BELTRAIDE

Contract has been concluded. Expenditure verification started on

October 16, 2015. Submission of draft Expenditure Verification

report expected within the first quarter of 2016.

DECEMBER 2015 GOVERNMENT OF BELIZE - MINISTRY OF ECONOMIC DEVELOPMENT 9 of 15

Page 17: PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

ONGOING PROJECTS

EXPENDITURE

FOR QUARTER

ENDING

30/06/2015

EXECUTING

AGENCYL/G

INFRASTRUCTURE

PROJECT UPDATE

TOTAL

EXPENDITURE

TO QUARTER

ENDING

31/12/2015

FUNDING

AGENCY BALANCE

EXPENDITURE

FOR QUARTER

ENDING

31/12/2015

PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016

PROJECT COST

(BZD)

EXPENDITURE

FOR QUARTER

ENDING

30/09/2015

UNDP/GEF G 1,038,000 30,027 178,016 67,755 946,423 91,577

GOB C 408,000 3,003 10,312 11,310 247,961 160,039

TOTAL $1,446,000

EnvDF MFFSD G 1,000,000 45,000 50,000 50,000 850,000 150,000

TOTAL $1,000,000

MARFund MFFSD G 34,357 - 6,634 6,634 27,723

TOTAL $34,357

CaMPAM MFFSD G 100,000 100,000

TOTAL $100,000

GEF/UNDP G 470,000 17,133 18,518 171,460 447,458 22,542

GOB C 48,000 - - 48,000

TOTAL $518,000

GEF/WB G 12,171,200 367,663 530,449 60,329 1,129,101 11,042,099

GOB C 6,000,000 57,231 19,077 19,077 95,385 5,904,615

TOTAL $18,171,200

OAK/PACT/GIZ

/Selva Maya

G 260,000 117,190 142,810

GOB C 622,426 57,596 564,830

TOTAL $882,426

OAK/

PACT/UNDP/

APAMO/ GEF

G 3,894,942 - 3,964,384 (69,442)

GOB C 215,000 - 499,882 (284,882)

TOTAL $4,109,942

OAK/UNDP/

SNC.PAS

G 400,000 395,761 4,239

GOB C 639,208 1,502,640 (863,432)

TOTAL $1,039,208

GEF/UNDP MFFSD G 2,030,000 862,908 25,034 283,408 1,171,350 858,650

TOTAL $2,030,000

UNEP MFFSD G 153,400 29,575 13,051 67,609 85,791

TOTAL $153,400

Institutional Strengthening (IS)

Project - Phase VII, Belize Ozone

Programme

93 Strengthening the Financial

Sustainability of the National

Protected Areas System

87

90 Educational Awareness within South

Water Caye Marine Reserve

94

97

95

96

92

A Practical Approach to Long Term

Lionfish Control - Developing Belize's

National Exploitation Strategy

Belize Chemical and Waste

Management Project

Updates pending.

Burrell Boom dumpsite closed and transfer station built. The

development of a legal and institutional framework for chemicals

management; and regulations for rural solid waste management and

industrial chemicals are on track.

Progress and expenditure updates pending.

Training for new staff ongoing with later phases to be

determined;and the roll out of managed access and zonation

scheme with proposed launch is expected in June 2016.

Updates on project financing (budget and expenditure) and

progress pending.

Updates on project financing (budget and expenditure) and

progress pending.

Fifth National Biodiversity report completed; National Targets,

principles and main priorities of the strategy are also completed.

NBSAP update is ongoing.

KBAs supported training to promote a REDD+ training plan;

Communications expert post advertised unsuccessfully; and one of

six management plans is complete. Activities continue.

MFFSD

MFFSD

MFFSD

(Forestry)

Strengthening National Capacities for

the Operationalization, Consolidation

and the Sustainability of the National

Protected Areas System

91 National Biodiversity Planning to

support the Implementation of the

Convention on Biological Diversity

(CBD) 2011-2020 Strategic Plan

Building Support for an Effective

National Protected Areas System

MFFSD

Progress and expenditure updates pending.

MFFSD

Project expected to last until June 2016. Equipment purchase

ongoing. Initial biologists' training conducted.

89

Management and Protection of Key

Biodiversity Areas in Belize

MFFSD

(NCCO)

Project closed 31 December 2015. No update provided on final

outputs.

88 Managed Access and Catch Shares

Pilot Project

Enabling Activities for the

Preparation of Belize's Third National

Communication to the UNFCCC

DECEMBER 2015 GOVERNMENT OF BELIZE - MINISTRY OF ECONOMIC DEVELOPMENT 10 of 15

Page 18: PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

ONGOING PROJECTS

EXPENDITURE

FOR QUARTER

ENDING

30/06/2015

EXECUTING

AGENCYL/G

INFRASTRUCTURE

PROJECT UPDATE

TOTAL

EXPENDITURE

TO QUARTER

ENDING

31/12/2015

FUNDING

AGENCY BALANCE

EXPENDITURE

FOR QUARTER

ENDING

31/12/2015

PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016

PROJECT COST

(BZD)

EXPENDITURE

FOR QUARTER

ENDING

30/09/2015

GEF/UNDP G 1,774,000 16,334 18,477 104,412 139,222 1,634,778

GOB C 880,000 - - 880,000

TOTAL $2,654,000

AF G 11,060,000 54,251 54,251 11,005,749

GOB C 3,560,000 1,445,850 1,445,850 2,114,150

TOTAL $14,620,000

GEF G 1,986,400

DFC C 1,600,000

UNEP C 50,000

MPSEPU C 270,000

CBA C 70,000

BTB C 40,000

TOTAL $4,016,400

IADB G 220,000 38,690 268,752 (48,752)

GOB C 100,000 53,750 46,250

TOTAL $320,000

IADB MPSEPU G 860,000 860,000

TOTAL $860,000

KOICA MPSEPU G 800,000 800,000

TOTAL $800,000

SUB-TOTAL ECONOMIC SERVICES 254,840,361 8,794,269 5,589,913 3,046,451 129,754,013 125,086,349

EDUCATION

CDB G 4,000,000 111,013 243,982 82,203 1,150,846 2,849,154

GOB C 1,560,000 46,806 49,653 38,284 637,890 922,110

CDB G 180,000 - - 180,000

TOTAL $5,740,000

Progress and expenditure updates pending.

MOECYS104

Belize Marine Conservation and

Climate Adaptation Project

98

102

103

Capacity Building for the Strategic

Planning and Management of Natural

Resources in Belize

Assessment of the Potential for

Distributed Generation using

Renewable Energy and Energy

Efficiency

Official Development Assistance

Cooperation- Korea's Overseas

Development Assistance

Development of a Disaster Risk

Management (DRM) Plan for the

Education Sector

Progress and expenditure updates pending.

4,016,400 Progress and expenditure updates pending.Energy for Sustainable Development

in Caribbean Buildings

Education Sector Reform Project

MFFSD IT equipment for the DOE has been procured. Procurement process

initiated for the Natural Resource Valuation consultancy was

unsuccessful.

MFFSD

MPSEPU

(1) Strengthened Governance: Issues prevail with the

Communication Strategy re: changes to the Education and Training

Act; the scope of the Strengthening System Leadership consultancy

is being redefined since GOB hsd addressed some activities; the

second mission report of the HR Development Strategy consultancy

has been submitted; and work on the recently awarded DRM Plan

will begin in January, 2016. (2) Enhanced Quality and Relevance:

the draft NQF has been submitted and is being reviewed. (3)

Increased Access: activities completed. (4) Project Mgmt. Services:

all project activities should end in December 2016.

Expenditure report is outstanding. The PMU is not yet fully-staffed

but activities including the KAP Survey are on track.

101 Mainstreaming Biodiversity,

Ecosystem Services and Coastal

Resilience in Tourism Development

MOTCA Project is closed and final report is pending. Clarification to be

sought on the quantum of the IADB allocation.

99

100

DECEMBER 2015 GOVERNMENT OF BELIZE - MINISTRY OF ECONOMIC DEVELOPMENT 11 of 15

Page 19: PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

ONGOING PROJECTS

EXPENDITURE

FOR QUARTER

ENDING

30/06/2015

EXECUTING

AGENCYL/G

INFRASTRUCTURE

PROJECT UPDATE

TOTAL

EXPENDITURE

TO QUARTER

ENDING

31/12/2015

FUNDING

AGENCY BALANCE

EXPENDITURE

FOR QUARTER

ENDING

31/12/2015

PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016

PROJECT COST

(BZD)

EXPENDITURE

FOR QUARTER

ENDING

30/09/2015

IADB L 20,000,000 2,874,077 1,288,301 54,848 5,350,401 14,649,599

GOB C 200,000 16,447 16,447 16,447 73,233 126,767

TOTAL $20,200,000

EU/AMS MOECYS G 2,664,322 930,754 - 930,754 1,733,568

TOTAL $2,664,322

EU/AMS MOECYS G 1,205,033 1,052,196 - - 1,052,196 152,837

TOTAL $1,205,033

EU/BSP

(BAM 2012)

MOECYS, NAO G 649,741 290,132 - - 481,146 168,595

TOTAL $649,741

EU/BSP

(BAM 2012)

MOECYS, NAO G 509,847 - - - 197,632 312,215

TOTAL $509,847

IADB G 1,500,000 - 95,332 1,404,668

GOB C 200,000 200,000

TOTAL $1,700,000

HEALTH

CDB G 300,000 273,213 26,787

NAC C 70,000 70,000 -

TOTAL $370,000

WB MOH PMU G 5,992,288 825,293 766,253 1,137,821 4,254,461 1,737,827

TOTAL $5,992,288

IADB G 600,000 18,394 16,800 41,266 76,460 523,540

GOB C 600,000 - 12,156 12,156 24,312 575,688

TOTAL $1,200,000

Official project launch scheduled for mid-February, 2016.

105

106

107

108

111

112

109 Introduction of Caribbean Vocational

Qualifications in ITVETs

MOECYS

110 Monitoring System for School

Leadership and Education Quality

IADB

AMS 2012 Grant Call for Proposals

for Education and Training

Improvement - Teacher Training

Equipment for Georgetown Technical

High School and ITVETs

The prototype for the EMIS has been developed, piloted and

validated. A contract for activities related to the institutional

strengthening of the MOEYS will be awarded shortly. Counterpart

expenditure required.

The TVET Communication Strategy and Implementation

Consultancy is expected to be signed in January 2016. The contract

for the CVQ Assessment and Verification consultancy has been

awarded and training was conducted for 28 Assessors, 17 Verifiers

and 13 Auditors.

The High School should be fully equipped by May 2016. The school

board is investing in additional storage space and a full-time store-

room manager to oversee the equipment.

Project is ongoing. Activities pending in December 2015 included

training for Community Health Workers and activities related to the

primary school initiatives (fish-rearing). Work ongoing on the Exit

Survey for the project.

Project is closed. Findings and recommendations generated from

the consultations held as part of the review of legislation concerning

people living with HIV/AIDS (PLWHA) were received but these have

not been forwarded to the Solicitor General pending wider

consultations. Remaining grant resources are to be returned to the

CDB.

The Trial Farm contract is expected to be signed on 29th January,

2016 and works should commence in March, 2016. San Pedro and

San Jose Preschool tenders were launched on 30th October and

13th November, 2015, respectively. Contracts should be signed by

15th and 19th February, 2016.

Teacher training activities conducted as scheduled; procure-ment

process for the marketing campaign consultancy has been

relaunched; and the data collection by enumerators consultancy is

also being advertised. The Project Officer should be engaged in

January 2016.

The project is ongoing and should end in 2017. MOH PMU

NAC

Improving Children’s Health and

Nutrition in Local Mayan

Communities in Toledo

Control & Prevention of HIV/AIDS

Education Quality Improvement

Program

AMS 2012 Education and Training

Improvement (Construction of Pre-

school Building)

113 Salud Mesoamerica Initiative II -

Belize

DECEMBER 2015 GOVERNMENT OF BELIZE - MINISTRY OF ECONOMIC DEVELOPMENT 12 of 15

Page 20: PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

ONGOING PROJECTS

EXPENDITURE

FOR QUARTER

ENDING

30/06/2015

EXECUTING

AGENCYL/G

INFRASTRUCTURE

PROJECT UPDATE

TOTAL

EXPENDITURE

TO QUARTER

ENDING

31/12/2015

FUNDING

AGENCY BALANCE

EXPENDITURE

FOR QUARTER

ENDING

31/12/2015

PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016

PROJECT COST

(BZD)

EXPENDITURE

FOR QUARTER

ENDING

30/09/2015

MHI 2015 MOH G 1,400,000 1,400,000

TOTAL $1,400,000

GF UNDP, NAC G 11,041,564 10,849,150 192,414

TOTAL $11,041,564

EU G 5,263,452 5,263,452 -

GOB C 1,200,000 177,620 1,013,984 186,016

TOTAL $6,463,452

GF MOH G 228,000 1,216 27,431 13,702 74,371 153,629

TOTAL $228,000

EU G 2,280,344 629,828 1,650,516

PAHO G 127,476 127,476

GOB C 177,518 177,518

TOTAL $2,585,338

EU NAO G 1,875,000 208,680 - 1,772,692 102,308

TOTAL $1,875,000

BNE G 250,000 165,000 165,000 85,000

MOH C 100,000 100,000 -

Village Council C 100,000 100,000 -

TOTAL $450,000

POVERTY AND SOCIAL PROTECTION

CDB L 10,400,000 83,531 113,165 118,005 314,702 10,085,298

CDB G 210,000 - - - 210,000

GOB C 4,103,000 177,605 22,663 21,886 334,311 3,768,689

TOTAL $14,713,000

CDB L 30,000,000 433,938 868,330 706,921 15,655,683 14,344,317

GOB C 4,896,000 22,721 45,309 38,640 1,143,912 3,752,088

TOTAL $34,896,000

CDB/BNTF VII L 12,183,502 3,168 23,985 114,854 247,205 11,936,297

GOB C 1,697,790 - - - - 1,697,790

TOTAL $13,881,292

SUB-TOTAL SOCIAL PROTECTION 127,764,878 6,507,837 4,425,228 2,397,033 52,332,165 75,432,712

Project is ongoing but the completion date has been extended to

2016.

SIF

SIF

The community infrastructure component is delayed, but should see

progress by February 2016. The transformation programs will be

fully implemented starting January 2016. The grant funds will

support employability enhancement through the Ministry of

Education, and plans are being made to finalize those

arrangements.

Expenditure and progress updates pending.

Strengthening of the Prevention and

Control of Dengue and Malaria in

Belize

Expansion of the Independence

Polyclinic

120

119

PAHO

Project closed in December 2015.

121

MOH PMU

MHDSTYouth and Community

Transformation Project - Southside

Belize City

The programme is ongoing and scheduled for completion by end

March 2017.

Belize Social Investment Fund II

Loan

The project designs are being prepared and are on-schedule.

Counterpart expenditure figures pending.

Basic Needs Trust Fund 7th

Programme

116 PAHO Project scheduled for completion in January 2016. Progress and

expenditure updates pending.

Progress and expenditure updates pending.

Project is scheduled to end by 31st January 2016. Training and

major purchases completed. Expenditure updates and additional

clarifications pending.

123

122

Expenditure and technical updates pending.

115

114

Contribution Agreement with PAHO

for Vector Control

Molecular Epidemiology and Drug

Resistance Surveillance of Human

Immunodeficiency Virus in the

Mesoamerican Region

Accelerating the Pace: Reaching

Marginalized and Vulnerable

Populations with Critical Services

Strengthening of Critical Maternal

and Neonatal Services in Belize

Elimination of Malaria in

Mesoamerica and the Hispaniola

Island

118

117

DECEMBER 2015 GOVERNMENT OF BELIZE - MINISTRY OF ECONOMIC DEVELOPMENT 13 of 15

Page 21: PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

ONGOING PROJECTS

EXPENDITURE

FOR QUARTER

ENDING

30/06/2015

EXECUTING

AGENCYL/G

INFRASTRUCTURE

PROJECT UPDATE

TOTAL

EXPENDITURE

TO QUARTER

ENDING

31/12/2015

FUNDING

AGENCY BALANCE

EXPENDITURE

FOR QUARTER

ENDING

31/12/2015

PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016

PROJECT COST

(BZD)

EXPENDITURE

FOR QUARTER

ENDING

30/09/2015

GOVERNANCE

GOB MOWT C2 450,000 450,000

TOTAL $450,000

GOB AGM/MFA C 2,265,778 200,140 - 1,248,504 1,017,274

TOTAL $2,265,778

EU/BRDP II NAO G 6,137,500 - 590,180 - 5,509,606 627,895

TOTAL $6,137,500

EU/BRDP II MLLGRD G 250,200 - 346,484 (96,284)

TOTAL $250,200

GOB CED C 392,000 - 392,000

TOTAL $392,000

IADB IADB G 2,200,000 - - 31,343 36,494 2,163,506

TOTAL $2,200,000

CDF G 677,500 - - - - 677,500

GOB C 180,000 - 2,676 - 2,676 177,324

TOTAL $857,500

SECURITY & CIVIL RIGHTS

IADB MHD, OPM L 10,000,000 966,555 1,142,308 1,316,925 9,745,650 254,350

TOTAL $10,000,000

EU SATIIM G 625,000 - - - 244,002 380,998

TOTAL $625,000

CABEI MNS L 60,000,000 - - 60,000,000

TOTAL $60,000,000

Technical and expenditure updates needed.

Community Action for Public Safety

Customs ASYCUDA World Support

Technical Assistance to the Ministry

of Labour, Local Government, Rural

Development and NEMO

All project activities have been completed. The PMU is still

operational as final audits and other compliance activities are being

undertaken.

Expenditure information to be clarified.

PUBLIC ADMINISTRATION

Project is on-going. Construction of the Belize Bureau of Standards

(BBS) Laboratory is in progress. Figures represent disbursements

and not expenditure.

CARICOM Law Revision Project

130

Comp. 1: Project preparation, diagnostic, prioritisation and

development of the action plan are 22% complete. Comp. 1 and 2:

Pre-investment studies and activities towards the establishment and

implementation of the monitoring system should begin in

September, 2016.

Updates pending.

Progress update pending.

Project Coordinator has been identified. Procurement processes

have been delayed but progress in this regard is expected in the first

quarter of 2016.

MEDP

132 Strengthening protection and

promotion of women's rights and

women's social and economic

empowerment

131

133 Belize Integral Security Programme

Updates pending.

Computerization of Drivers’ Licensing

System

124

Work continues towards the establishment of the Project Execution

Unit.

125

Strengthening the Capacity of the

Ministry of Economic Development to

implement the Public Sector

Investment Programme (PSIP)

129 Implementation of the Emerging and

Sustainable Cities Initiative (ESCI) in

Belize City

128

Technical Assistance to BRDP II

127

126

DECEMBER 2015 GOVERNMENT OF BELIZE - MINISTRY OF ECONOMIC DEVELOPMENT 14 of 15

Page 22: PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

ONGOING PROJECTS

EXPENDITURE

FOR QUARTER

ENDING

30/06/2015

EXECUTING

AGENCYL/G

INFRASTRUCTURE

PROJECT UPDATE

TOTAL

EXPENDITURE

TO QUARTER

ENDING

31/12/2015

FUNDING

AGENCY BALANCE

EXPENDITURE

FOR QUARTER

ENDING

31/12/2015

PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016

PROJECT COST

(BZD)

EXPENDITURE

FOR QUARTER

ENDING

30/09/2015

IADB MNS G 200,000 18,584 40,500 20,250 97,918 102,082

TOTAL $200,000

UNDP/GOS RESTORE

BELIZE, MNS

G 1,450,000 - 2,500 51,515 54,015 1,395,985

TOTAL $1,450,000

UNICEF RESTORE

BELIZE

G 791,280 90,203 79,513 454,839 336,441

TOTAL $791,280

USAID/UNDP MNS, MHD G 300,000 - 2,400 32,000 34,400 265,600

TOTAL $300,000

IADB IADB G 390,170 92,797 240,582 149,588

TOTAL $390,170

SUB-TOTAL PUBLIC ADMINISTRATION 86,309,428 985,139 2,070,906 1,531,546 18,015,169 68,294,259

TOTALS 1,208,736,352 36,901,947 35,004,427 32,800,527 500,955,130 707,781,223

138 Action Plan for C and D Countries

(2015)

Pending project identification (42%), capacity building (50%) and

other activities related to project preparation/execution (25%) should

be completed by July 2016.

Project implementation is moving slowly, but several components

are scheduled for execution in 2016.

135 Prevention of Violence that affects

Children, Adolescents and Youth in

Central America

Project implementation is ongoing.

134 Establishment of a Crime

Observatory in Belize

The National Crime Observatory is to be launched in June 2016.

137 Infosegura Project

Prevention of Violence against

Children and Adolescents

136 The project has completed its second year and is progressing as

scheduled.

DECEMBER 2015 GOVERNMENT OF BELIZE - MINISTRY OF ECONOMIC DEVELOPMENT 15 of 15

Page 23: PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

Expenditure to December 2015 by Funding Type and Sector

Totals by Funding

Type (BZD)

% of Total

Ongoing PSIP

Total

Expenditure to

December 2015

Expenditure as

% of Total

Ongoing PSIP

to 2015/16

Loans 747,987,749 61.9 310,473,549 25.7

Grants 278,209,585 23.0 129,308,702 10.7

Counterpart 176,089,019 14.6 61,172,878 5.1

Cap II 450,000 0.0 - -

Unidentified 6,000,000 0.5 - -

Total Ongoing PSIP 1,208,736,352 100.0 500,955,130 41.4 -

Totals by Sector

(BZD)

% of Total

Ongoing PSIP

Total

Expenditure to

December 2015

Expenditure as

% of Total

Ongoing PSIP

to 2015/16

Infrastructure 739,821,685 61.2 300,853,782 24.9

Economic Services 254,840,361 21.1 129,754,013 10.7

Social Protection 127,764,878 10.6 52,332,165 4.3

Public Administration 86,309,428 7.1 18,015,169 1.5

Total Ongoing PSIP 1,208,736,352 100.0 500,955,130 41.4

ANALYSIS OF THE PSIP TO DECEMBER 2015

Total Expenditure by Funding Type to December 2015

Loans Grants Counterpart Cap II Unidentified

Total Expenditure by Sector to December 2015

Infrastructure Economic Services Social Protection Public Administration

DECEMBER 2015 GOVERNMENT OF BELIZE - MINISTRY OF ECONOMIC DEVELOPMENT 1 of 4

Page 24: PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

Ongoing PSIP by Funding Type and Sector

Totals by Sector % of Ongoing

PSIP

Totals by Sector % of Funding

Type Total

Totals by Sector % of Funding

Type Total

Totals by

Sector

% of Funding

Type Total

Totals by

Sector

% of Funding

Type Total

Infrastructure 507,772,447 42.0 103,155,534 8.5 122,893,705 10.2 - - 6,000,000 0.5 739,821,685.48

Economic Services 97,631,800 8.1 121,755,334 10.1 35,453,228 2.9 - - - - 254,840,361.43

Social Protection 72,583,502 6.0 40,277,067 3.3 14,904,308 1.2 - - - - 127,764,877.51

Public Administration 70,000,000 5.8 13,021,650 1.1 2,837,778 0.2 450,000 0.0 - - 86,309,428.00

Totals 747,987,749 61.9 278,209,585 23.0 176,089,019 14.6 450,000 0.0 6,000,000 0.5 1,208,736,352.42

Counterpart Cap II UnidentifiedLoans Grant

42.0

8.1

6.0

5.8

Ongoing PSIP 2015/16 by Sector

Infrastructure Economic Services Social Protection Public Administration

62%

23%

15%

0% 0%

Ongoing PSIP 2015/16 by Funding Type

Loans Grant Counterpart Cap II Unidentified

DECEMBER 2015 GOVERNMENT OF BELIZE - MINISTRY OF ECONOMIC DEVELOPMENT 2 of 4

Page 25: PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

Ongoing PSIP by Funding Agency and Sector

BZD % of Ongoing

PSIP

BZD % of Ongoing

PSIP

BZD % of Ongoing

PSIP

BZD % of Ongoing

PSIP

BZD % of Ongoing

PSIP

CABEI 85,211,600 7.0 21,400,000 1.8 3,811,600 0.3 - 0.0 60,000,000 5.0 85,211,600

CDB 220,073,804 18.2 163,983,804 13.6 41,000,000 3.4 15,090,000 1.2 - 0.0 220,073,804

EU 156,945,330 13.0 78,995,998 6.5 57,648,481 4.8 13,288,151 1.1 7,012,700 0.6 156,945,330

IADB 105,311,033 8.7 36,717,000 3.0 33,703,863 2.8 22,100,000 1.8 12,790,170 1.1 105,311,033

WB 35,992,288 3.0 30,000,000 2.5 - 0.0 5,992,288 0.5 - 0.0 35,992,288

OFID 102,480,000 8.5 95,960,000 7.9 6,520,000 0.5 - 0.0 - 0.0

GOV/PC 56,247,446 4.7 56,247,446 4.7 - 0.0 - 0.0 - 0.0

GOB 162,799,057 13.5 121,119,605 10.0 23,757,367 2.0 14,634,308 1.2 3,287,778 0.3 162,799,057

Other* 283,675,794 23.5 135,397,833 11.2 88,399,051 7.3 56,660,130 4.7 3,218,780 0.3 283,675,794

Totals 1,208,736,352 100.0 739,821,685 61.2 254,840,361 21.1 127,764,878 10.6 86,309,428 7.1 1,208,736,352

Public AdministrationTotal Funding by Agency Infrastructure Economic Services Social Protection

- 50 100 150 200 250 300

CABEI

CDB

EU

IADB

WB

OFID

GOV/PC

GOB

Other*

Millions

Ongoing PSIP by Funding Agency 2015/16

-

20,000

40,000

60,000

80,000

100,000

120,000

140,000

160,000

180,000

CABEI CDB EU IADB WB OFID GOV/PC GOB Other*

Tho

usa

nd

s

Ongoing PSIP by Funding Agency and Sector 2015/16

Infrastructure Economic Services Social Protection Public Administration

DECEMBER 2015 GOVERNMENT OF BELIZE - MINISTRY OF ECONOMIC DEVELOPMENT 3 of 4

Page 26: PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

Ongoing PSIP by Funding Agency and Funding Type

Total by Funding

Type

% of Ongoing

PSIP

Total by Funding

Type

% of Ongoing

PSIP

Total by Funding

Type

% of Ongoing

PSIP

Total by

Funding Type

% of Ongoing

PSIP

Total by

Funding Type

% of Ongoing

PSIP

CABEI 85,211,600 7.0 - - - - - - - - 85,211,600

CDB 214,965,000 17.8 5,108,804 0.4 - - - - - - 220,073,804

EU - - 156,320,330 12.9 - - - - - - 156,320,330

IADB 79,700,000 6.6 14,586,033 1.2 - - - - - - 94,286,033

WB 30,000,000 2.5 5,992,288 0.5 - - - - - - 35,992,288

OFID 102,480,000 8.5 - - - - - - - -

GOV/PC 56,247,446 4.7 - - - - - - - -

GOB - - - - 162,349,057 13.4 450,000 0.0 - - 162,799,057

Other* 179,383,703 14.8 96,202,130 8.0 13,739,961 1.1 - - 6,000,000 0.5 295,325,794

Totals 747,987,749 61.9 278,209,585 23.0 176,089,019 14.6 450,000 0.0 6,000,000 0.5 1,208,736,352

Total Ongoing PSIP 1,208,736,352 1,050,008,907

Other* includes: APAMO; BBG; BLPA,BWSL; CaMPAM; CARTFund; CDI; CENPROMYPE; CU; EnvDF; FAO; GEF; GIZ; GOS; GOV; IFAD; KFAED; MarFUND; OAK; OIRSA; PACT; ROC; Taiwan ICDF; TCGA; UK; UNDP;

UNEP; USAID

Loans Grants Counterpart CapII Unidentified

-

50

100

150

200

250

CABEI CDB EU IADB WB OFID GOV/PC GOB Other*

Mill

ion

s

Ongoing PSIP by Funding Agency and Funding Type 2015/16

Loans Grants Counterpart CapII Unidentified

DECEMBER 2015 GOVERNMENT OF BELIZE - MINISTRY OF ECONOMIC DEVELOPMENT 4 of 4

Page 27: PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

1 Upgrade of George Price Highway IADB/MOWT To substantially improve the road connectivity within Belize's main districts

and with Central America by rehabilitating the GPH road infrastructure

between miles 47.9 in Belmopan and 67.3 in Santa Elena to national

standards, decreasing travel time and costs, reducing road fatalities and

injuries, and ensuring road accessibility by improving the climate change

resilience of the corridor.

57,056,000 Loan proposal has been drafted and awaits approval. (Note: EU CIF

contribution = €5.0 mn.)

2 Remate Road (Corozal Town Bypass) EU/AMS Upgrade of sugar roads The EU and GoB have agreed to use the funds to "top-up" the on-

going works contracts. Remate Road construction will no longer be

financed by the EU.

3 Northern Highway (Buena Vista Village) to Caledonia EU/AMS Upgrade of sugar roads

4 Guinea Grass Road EU/AMS Upgrade of sugar roads

5 Upgrade of Cowpen Road EU/BSP Four miles of gravel road including two crossings to be upgraded to paved

standard. The MOW PEU is responsible for road design, work supervision,

and future road maintenance.

5,000,000 Given the fall in the Euro, only the segment of road measuring 2.65 km

and leading from the Southern Highway through San Juan and

Cowpen Village to Farm 1 will be done. The EU has approved the

award of the contract. All parties must sign by February 18th 2016.

6 Completion of the Southern Highway (Dump to Jalacte) Ph.

II

CABEI/MOWT Works will include the completion of approximately 1.9 km of international

standard paved road along with the construction of a bridge.

10,000,000 Presented Feasibility Study and other documents for CABEI's review.

7 AMS 2010 - Road Maintenance EU/MOWT

(AMS/PEU)

Maintenance plan for all roads in Belize required by the EU to ensure projects'

sustainability

MoW provided a report on the road network maintenance system

currently in place, however the NAO requested more comprehensive

information. The revised report is pending.

8 Upgrade of Hopkins Village Road (Ph. II) EU BAM 2013/

NAO

Phase II consists of two segments: Hopkins Road North (1.6km) which will run

from the end of the Hopkins Main Road to the Cemetery near Hopkins

Harbour Development; and Hopkins Road South (1.55km). GoB is responsible

for road design, work supervision and future road maintenance.

= The contract has been awarded and will be signed January 8th 2016.

The MoW is discussing with Hopkins Main Village Road designer how

the village water supply system designs could be incorporated. The

MoW will also lead the discussions with other utility companies.

9 Project Preparation Studies for the Rehabilitation of the

Caracol Road

IADB Technical, economic, environmental and social studies necessary to

determine the most suitable option for upgrading and rehabilitating the

Caracol Road given available resources.

1,500,000 Technical cooperation being formalised.

10 Rehabilitation of the Caracol Road IADB/GOB Rehabilitation of drainage, culverts and bridges to improve the road and

enhance access to tourist and archaeological attractions in the area, improve

security, and contribute to the maintenance of ecosystem services associated

with the road.

30,000,000 TC signed between the GOB and IADB for consultancy services in

respect of studies that will inform the feasibility and preliminary details

(including cost estimates) of the project.

PIPELINE PROJECTS TO DECEMBER 2015

INFRASTRUCTURE

PROJECT FUNDING/

EXECUTING

AGENCY

PROJECT DESCRIPTION/ REMARKSNO PROJECTED COST

(BZD)

PROGRESS UPDATE

ROADS, STREETS, DRAINS & BRIDGES

DECEMBER 2015 PIPELINE 1

Page 28: PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

PIPELINE PROJECTS TO DECEMBER 2015

INFRASTRUCTURE

PROJECT FUNDING/

EXECUTING

AGENCY

PROJECT DESCRIPTION/ REMARKSNO PROJECTED COST

(BZD)

PROGRESS UPDATE

11 Ministry of Foreign Affairs Building ROC/ MFA Construction of a building for the Ministry of Foreign Affairs. 3,000,000 Action pending.

12 Establishment of a Corrective Training Facility in August

Pine Ridge

GOB/MNS Refurbishment of the former Douglas D'Silva Forest Station for use as a

corrective facility for petty offenders, as an alternative to the Belize Central

Prison.

Update required

13 Improved Market Facilities (AMS 2013) EU Activities will target rehabilitation of Orange Walk wholesale market for

agricultural products and Corozal new market for retail and wholesale

activities.

2,500,000 The OW Town Board has commenced design for the rehabilitation of

existing market. Corozal Town Board has indicated that they do not

need a new market.

14 Gardenia/Biscayne Water Network Expansion SIF/BWS Expansion of the water distribution network from Mexico Creek to Gardenia

and Biscayne Villages.

999,408 Contract signed in June 2015 and works should be completed in June

2016. Need to confirm BWS' contribution, if any; and standardise the

presentation of SIF Projects in the PSIP Report.

15 Construction of Village Water Systems EU BAM 2013/NAO Construction of rural water systems in Hopkins, Alta Vista, Hummingbird,

Middlesex, and Pomona.

5,221,500 Design and Supervision contract to be signed January 7, 2016. Draft

designs are due by March 22nd, while community Village Council and

Water Board meetings will commence in January 2016. Alta Vista,

Hummingbird, Middlesex, and Pomona projects will be implemented

through BAM 2013 Programme Estimate estimated to start in March

2016. The Hopkins system will be combined with Hopkins Main Street

Upgrade. Preliminary estimates indicate a financing gap which will be

confirmed or otherwise in the detailed estimates due in March 2016.

16 San Pedro Water and Sewerage Expansion (Ph. 1) CDB/BWS Expansion of water and sewerage facilities on San Pedro. Preparation

ongoing.

40,000,000 Preparation of detailed designs is ongoing.

17 Integrated Water and Sanitation Programme for the

Placencia Peninsula

IADB/ GEF

(CReW)/ GOB

The programme will increase Placencia and Seine Bight residents' access to

sanitation services through the development of a sewage collection and

treatment system on the Placencia Peninsula.

22,000,000 Approximately 98% of approved IADB financing was cancelled at

GOB's request due to unforeseen delays and in recognition of the

need for further investigation before inception. CReW funding should

be made available once the project is re-initiated.

18 Development of an Irrigation and Drainage Master Plan for

the Agriculture Sector

CDB/FAO/MOAFF Grant financing proposed for the development of an Irrigation and Drainage

Master Plan for the Agriculture Sector.

622,468 Intervention was approved. Update required.

19 AMS 2013 Integrated Pest Management SIRDI A Direct Award to SIRDI will be used for the implementation of this

programme.

2,000,000 Awaiting proposal from SIRDI to implement five-year strategy

proposed by the consultant.

20 AMS 2013 Drainage improvements EU Drainage improvements through works contract. Implementation of drainage

works is expected to improve plant growth and yields by 20% to 40%. In order

to demonstrate this positive impact, the programme will construct primary

drains on pilot areas totalling approximately 600 acres.

5,000,000 The Drainage project was not deemed feasible by the NAO, MOAFF

and EU and will require further investigations. Alternative uses for the

funds are being discussed with industry stakeholders.

ECONOMIC SERVICES

BUILDINGS & FACILITIES

WATER & SANITATION

AGRICULTURE

DECEMBER 2015 PIPELINE 2

Page 29: PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

PIPELINE PROJECTS TO DECEMBER 2015

INFRASTRUCTURE

PROJECT FUNDING/

EXECUTING

AGENCY

PROJECT DESCRIPTION/ REMARKSNO PROJECTED COST

(BZD)

PROGRESS UPDATE

21 Support to Banana Growers EU BAM 2013,

NAO

Land clearing and preparation of banana farms Call for Proposal for land clearing and preparation to be launched at

the end of the first quarter of 2016.

22 Technical Assistance to University of Belize for Meristem

Production

EU BAM 2013,

NAO

Technical assistance to the University of Belize in developing protocols for the

production of banana meristems required by the Industry

Consultant held meetings with CARDI, ORISA, MOAFF, UB and BAHA

re: the banana, citrus and sugar industries. Initial key findings are: (i)

based on practices and demands of the banana and sugar Industries,

UB could produce several identified “high value-low volume” crops for

profitability & sustainability and (ii) the banana industry is perceived to

be content with existing TC arrangements. Final report is expected by

February 2016.

23 AMS 2013 Technical Assistance- Soil Nutrition EU AMS 2013 The consultant will assist SIRDI with soil nutrition for the Sugar Industry

24 AMS 2013 Technical Assistance- Geospatial Expert EU AMS 2013 A Geospatial Expert to provide advice on drainage methodology for the

Northern Districts. The study is a pre-requisite to the AMS 2013 Drainage

Improvements Project which is also in the pipeline.

25 TC - Mainstreaming Biodiversity, Ecosystem Services and

Coastal Resilience in Tourism Development

IDB/MOTCA The general objective of this operation is mainstreaming the economic value

of biodiversity and ecosystem services, including coastal resilience, into

tourism sector planning and investments, thereby contributing directly to the

implementation of the National Sustainable Tourism Master Plan (NSTMP) of

Belize.

700,000 Confirmation as to whether this intervention is the same as that

entered in the Ongoing Project Sheet, but with a different amount.

26 Sustainable Tourism Program II IDB/MOTCA Project aims to increase tourism employment, income and revenues through

increased overnight tourism expenditures in the selected destinations while

improving sector governance and creating enabling conditions for private

sector investment in overnight tourism.

30,000,000 Loan contract being formalised.

27 Reform of Belize's National Payments System

(Establishment of Inter-bank Payment System)

CDB/CBB Mechanism to facilitate real-time payments between banks and improve

financial intermediation. Identified during CDB's Strategy Preparation Mission

and proposed as part of the Bank's current assistance strategy to Belize

5,000,000 Update required

28 Credit Bureau Establishment CDB/CBB Identified during CDB's Strategy Preparation Mission and proposed as part of

the Bank's new assistance strategy to Belize. This intervention will improve

the quality of credit risk assessments.

5,000,000 Update required

29 Establishment of Export Credit/ Guarantee Regime CDB Identified during CDB's Strategy Preparation Mission and proposed as part of

the Bank's assistance strategy to Belize

500,000 Update required

Consultancies were launched using the Framework contract

procedures for an Agronomic Research, Integrated Pest Management

Consultant, Geomatic Engineer and Soil Nutrtion Expert.

TOURISM

BUSINESS & MARKET DEVELOPMENT

DECEMBER 2015 PIPELINE 3

Page 30: PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

PIPELINE PROJECTS TO DECEMBER 2015

INFRASTRUCTURE

PROJECT FUNDING/

EXECUTING

AGENCY

PROJECT DESCRIPTION/ REMARKSNO PROJECTED COST

(BZD)

PROGRESS UPDATE

30 BELTRAIDE's Technical Assistance Request for Trade and

Enterprise Development

ComSec/

BELTRAIDE

1.) Implementation of some recommendations of BPO and Medical Tourism

Strategies; 2.) Sectoral expertise to develop strategies in Sport Business

Tourism and the Creative Industries; 3.) Establishment of TORs for

BELTRAIDE's trade and export promotion unit and development of the

corresponding portfolio of services including procedural materials and training;

and (4) transformation of Belize into a commercial hub facilitating business

between the Caribbean and Latin America.

Update required

31 CFTC Support to enhance export competitiveness in Belize The Commonwealth Component 1 . Embedding the Belize National Export Strategy into the

country's policy and institutional framework to underpin its implementation.

Component 2 . Undertaking comprehensive supply and demand forecast for

higher value IT Enabled Service and designing a framework for quality

assurance across the industry.

Update required

32 Support to Foreign Direct Investment in the Caribbean IDB/CEDA/CAIPA The program aims to improve the Caribbean's position as a single destination

for FDI. Activities include the establishment of regional FDI data collection

and monitoring systems including an online map indicating key sectors and

investment opportunities by country; the preparation of profiles, catalogues

and benchmarking reports focused on sectors more likely to attract FDI

(tourism niches, renewable energy and outsourcing); and financing for

participating agencies to visit another region which has been successful in

attracting investment

1,800,000.00 Regional project signed in June 2014. The program is executed by the

Caribbean Export Development Agency (CEDA) on behalf of the

Caribbean Association of Investment Promotion Agencies (CAIPA).

Includes counterpart contributions from participating country entities

including BELTRAIDE (US 15,000.00).

33 Development of a National Investment Strategy and Policy

(NIPS)

To be determined This Project will have two components: (1) Development of a National

Investment Strategy and Policy for Belize; (2) Enhancement of Belize's

National Investment Promotion Agency, BELTRAIDE

To be determined A project proposal is being drafted by the Ministry of Trade and funding

is being sought. BELTRAIDE is working closely with the OPM and the

MOT's Investment Unit.

34 Expanding SME Access to Finance and Business

Development Services to Belize

IADB/MIF The objective of this project at the impact level is to strengthen the ecosystem

for SME finance by establishing a collaborative mechanism fostering linkages

between financial institutions and SME business development service

providers, effectively linking demand and supply with respect to financial

services. Components are: (1) Design of SBDC Belize Expansion Plan; (2)

implementation of SBDC Belize Expansion Plan; and (3) knowledge

management and strategic communication

920,000.00 This project should start April 2016

35 Belize Enterprise Innovation Institute (BEI2) To be determined This project has three components - (1) Design and Development of BEI2

(2) Implementation of BEI2 (3) Institutional Strengthening of the FMSS

9,120,000.00 The project charter has been shared with prospective funding

agencies.

DECEMBER 2015 PIPELINE 4

Page 31: PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

PIPELINE PROJECTS TO DECEMBER 2015

INFRASTRUCTURE

PROJECT FUNDING/

EXECUTING

AGENCY

PROJECT DESCRIPTION/ REMARKSNO PROJECTED COST

(BZD)

PROGRESS UPDATE

36 Solid Waste Management Programme II IADB Expansion of waste management infrastructure to areas of the country that

were not addressed under the SWMP. The programme aims to improve solid

waste management practices and reduce environmental pollution in the

emerging tourism destinations of northern and southern Belize.

21,000,000 The project is being prepared.

37 Reduction of Emissions through Forest Degradation and

Deforestation (REDD+)

WB Project will seek the establishment of a National Reference Scenario based

on historical emissions from deforestation and forest degradation. A

comprehensive REDD+ Strategy and a comprehensive framework for

measuring results will be developed.

Awaiting grant signature.

38 Energy Resilience for Climate Adaptation Project WB To enhance resilience of the energy system to adverse weather and climate

change impacts.

25,600,000 Update pending.

39 Solid Waste Study EU BAM 2013 This study will fill in the gaps of a National Waste Management Study for

Urban areas including Stann Creek and Toledo funded by the IADB and to be

implemented from June 2015. The BAM 2013 funds will concentrate on rural

villages in Stann Creek and Toledo.

Update pending.

40 Belize Education Sector Reform Programme II CDB Construction of 35 new schools and provision of 5,300 pre-primary to

secondary school spaces. Activities also include a review of the school

feeding program; implementation of an early stimulation and emergent

learning (ESEL) program; and development of a Schools’ Maintenance and

Policy, an early identification system (EIS) for at-risk children, and a public

education and communication strategy.

70,922,000 Loan approved by CDB's BOD in May 2015. The project launch is

scheduled for January 2016.

41 Primary School Sanitation Facilities and Public Education

Campaigns

EU BAM 2013 Primary schools targeted are Fabian Cayetano RC, Independence, May

Mopan, Bella Vista RC, Red Bank Christian School, San Isidro, San Juan

Government, San Juan Bosco, St Paul RC, Trio Government, and St

Alphonsus RC. - these schools chosen on basis of worst outbreaks of

communicable diseases and level of poverty.

2,520,000 Project estimated to start in March 2016

42 Principal/Instructor Professional Development EU BAM 2013 The training will result in a cadre of qualified technical vocational instructors

and teachers as well as strengthening the capacity of Belizean teacher

training institutions in TVET.

Update required

SOCIAL SERVICES

ENVIRONMENT & NATURAL RESOURCE MANAGEMENT

EDUCATION

DECEMBER 2015 PIPELINE 5

Page 32: PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

PIPELINE PROJECTS TO DECEMBER 2015

INFRASTRUCTURE

PROJECT FUNDING/

EXECUTING

AGENCY

PROJECT DESCRIPTION/ REMARKSNO PROJECTED COST

(BZD)

PROGRESS UPDATE

43 Evaluating alcohol policies in LIMCS: the International

Alcohol Control Study (IAC) in South America and the

Caribbean

International

Development

Research Centre

(IDRC) and MOH

Specific objectives of the research are to: 1. Measure alcohol consumption

and document policy relevant behaviour such as place and time of purchase,

prices paid and exposure and salience of marketing; 2. Analyse potential

effects of pricing policies, restrictions on hours of expenditure, marketing

restrictions and physical availability across different population groups; 3.

Evaluate impacts of differences and changes in alcohol policy on drinking

behaviour and policy related mediating variables.

Updates required.

44 Integration of Mental Health into Primary Care using the

Virtual Campus Platform: A Collaboration between

Caribbean countries and Canada

PAHO This project aims to enhance the capacity for early detection and

management of mental health problems in Primary Health Care networks by

using a combination of different training modalities.

Update required.

45 Harm to Others: New Cross-national Perspectives on

Gender, Alcohol, and Culture

National Institute on

Alcohol Abuse and

Alcoholism,

National Institutes

of Health. And

MOH

Survey will use the Harms to Others/GENACIS LITE questionnaire to assess

time-trends in alcohol consumption and alcohol-related problems; as well as

conducting analyses of alcohol’s harms to persons other than the drinker.

Update required

46 Improving prevention and treatment systems based on

primary health care for alcohol use problems in two

Caribbean countries- Guyana and Belize

Grand Challenges

Canada

The bi-country initiative will use integrated innovations in global mental health

to improve treatments and expand access to care in low- and middle-income

countries

1,565,121 Project was to run September 2012 to August 2015. Update required.

47 Amazon Malaria Initiative AMI/Ravreda

USAID/ PAHO

Prevention and control of Malaria in high risk communities in Belize Project is ongoing. Updates on cost and expenditure required.

48 The Reinforcement of the Services to Control Vector

Transmitted Diseases in Belize

EU The specific objective is to improve the quality of and access to health

services and infrastructure for the population of Belize, with an emphasis on

prevention, and targeting the rural population on the economy. Key activities

include improved equipment and vector control storage facilities for increased

mobility of vector field teams, training in the use and maintenance of

equipment (for implementation of required field work), community outreach

and awareness raising.

2,000,000 Project was to be submitted for approval to EU by 15th August 2013.

Confirm whether this is being financed by the Contribution Agreement

between PAHO and the EU.

HEALTH

DECEMBER 2015 PIPELINE 6

Page 33: PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

PIPELINE PROJECTS TO DECEMBER 2015

INFRASTRUCTURE

PROJECT FUNDING/

EXECUTING

AGENCY

PROJECT DESCRIPTION/ REMARKSNO PROJECTED COST

(BZD)

PROGRESS UPDATE

49 Improvement of Services for the Elimination of Malaria in

Latin American Countries

GF The project is focused on the elimination of Malaria in Central America. In this

regard, the project seeks to: 1. Strengthen Belize's malaria surveillance

system. 2. Strengthen malaria case diagnosis, treatment, and follow-up. 3.

Update, implement, monitor, and evaluate national vector-borne disease

strategies. 4.Strengthen implementation of Integrated Vector Management

(IVM) strategies. 5. Reinforce capacity in national malaria program

management, collaboration, and links with the health systems network.

1,998,200 Update required.

50 Refurbishment of the San Narciso Health Centre MOH Improvements to the physical infrastructure of the Health Centre to promote

quality outpatient services and enhance clinical management and disease

prevention; and improve the family and community health services targeting

women, children, and other vulnerable populations.

165,000 Project should have begun. Update required..

51 Upgrade of Health Facilities and Services EU BAM 2013 Activities will be implemented under a Programme Estimate (PE) jointly

managed by the MoH and NAO. The PE will be drafted for signature by May

2015. The MoH will provide two vehicles and support staff for the

implementation of the PE.

250,000 The following activities will be implemented through BAM 2013

Programme Estimate No. 1 estimated to start in March 2016:

Independence and Bella Vista Health Facilities construction-MoH is to

recruit a Building Supervisor; equipment for the facilities; and Health

Promotions Consultant and District Health Educator for

community/school sanitation awareness.52 New JSDF Grant (Proposed) WB/JSDF National level roll-out of community components with focus on obesity,

nutrition, non-communicable diseases; and alternative livelihoods in Corozal

This was presented during the December 2015 Supervision Mission of

the World Bank. Details and complementary financing are being

considered.

53 Youth and Community Transformation Project II CDB Expansion of programmes undertaken under the YCT to San Ignacio and

Dangriga.

1,500,000 Proposed Technical Assistance from the CDB. Assistance involves the

expansion of the existing PEU to include 2 Field Officers; continued

transformation programmes for at-risk in- and out-of-school youths;

enhancement of the psychosocial response through counsellor

training; among others. The appraisal report is expected to be finalised

for presentation at the March 2016 Board of Directors' meeting.

54 Design of a Supervision Framework for the DFC CDB/CBB Grant financing for services to strengthen the capacity for supervision in the

Central Bank (development of a framework to guide the Central Bank in

supervising the DFC).

100,000 Project was being actively considered 2013. Update required.

55 Institutional Strengthening - Ministry of Works CDB/MOWT Loan financing for consultancy services to assist with implementation

management of road maintenance and capital project planning.

1,000,000 Project under active consideration at the CDB as at March, 2013.

Update required.

POVERTY & SOCIAL PROTECTION

PUBLIC ADMINISTRATION

GOVERNANCE

DECEMBER 2015 PIPELINE 7

Page 34: PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

PIPELINE PROJECTS TO DECEMBER 2015

INFRASTRUCTURE

PROJECT FUNDING/

EXECUTING

AGENCY

PROJECT DESCRIPTION/ REMARKSNO PROJECTED COST

(BZD)

PROGRESS UPDATE

56 Housing Sector Policy and Implementation Strategy CDB/MOH Proposed consultancy services for the development of a sector study and

implementation strategy. GOB is reviewing previous studies and the draft

Terms of Reference. This project is under active consideration by the CDB.

200,000 Update required.

57 European Development Fund (11th Disbursement) EU Proposed grant funds for use in the energy, health and public financial

management

70,200,000 Multiannual Indicative Programme for 2014-2020 has been signed by

the GoB and the EU. EDF 11 covers Health, Energy and Public

Finance Management sectors. Activities are expected to begin in 2016.

Preparatory activities are being undertaken by the relevant ministries.

58 Action Plan for C and D Countries (2016) IADB Flexible financing made available to support the Government of Belize in

activities related to project identification, preparation, and execution; capacity

building and monitoring and evaluation.

638,118 This intervention is expected to last 24 months (January 2016 to

December 2017).

435,394,576 *Pipeline projects fall into two categories: (1) financing approved and discussions to formalise scope underway; (2) scope defined and discussions to formalise financing are ongoing.

OTHER

HOUSING

TOTALS

DECEMBER 2015 PIPELINE 8

Page 35: PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

Economic Development MINISTRY OF FINANCE AND ECONOMIC DEVELOPMENT

PUBLIC SECTOR INVESTMENT PROGRAMME REPORT

PROPOSED* PROJECTS AS AT QUARTER ENDED 31ST DECEMBER, 2015

Policy and Planning Unit

1 Corozal/ Sarteneja Road Upgrade to paved standard 52,800,000

2 Paved Upgrading of the Manatee Road/

Coastal Road

GOK/MOWT The work comprises the widening and improvement of the horizontal

and vertical alignment to paved standard, replacement of drainage

structures and the replacement of three span reinforced concrete

bridges. An official request was sent to CABEI on 28/10/11. A package

containing Vol. 1 (feasibility study) and Vol. 2 (drawings) was handed

to CABEI along with the official letter. CABEI agreed to do the pre-

analysis and will contact MED for any updated data. The study was

conducted in 2000 by Beca International Consultants, Ltd.

50,000,000

2 Philip Goldson Highway From Corozal

border to Sandhill

Upgrade of the Philip Goldson Highway from Sandhill to Corozal

Border

54,000,000

4 Bullet Tree/ Spanish lookout Link Road Upgrade to paved standard

5 Lamanai Road Upgrade to all weather road

6 Joe Taylor Bridge Replacement of Bridge 10,000,000

7 Iguana Creek Completion of the Existing Bridge

8 Laguna Seca Bridge Replacement of Ferry with a single span bridge 10,000,000

9 Pueblo Nuevo Ferry Replacement of Ferry with a single span bridge 10,250,000

10 Branch Mouth Bridge Replacement of pedestrian cable bridge with a single span bridge

11 Calla Creek Bridge Replacement of pedestrian cable bridge with a single span bridge

12 Baking Pot Bridge Replacement of Ferry with a single span bridge

13 Shoulder Paving for George Price Hwy

from Belize City to Belmopan

CDB/GOB To retrofit the remaining shoulders of the George Price Hwy that were

not covered under the Road Safety Project

14,000,000

14 Dangriga Sports Centre BIL/GOB 2,074,326

15 Training and Research Institute for the

Public Service

Construction of a training and research centre for the Ministry of the

Public Service to conduct training for the entire Public Service; and to

provide the necessary furniture and equipment for the institution

16 MIS System for the DOT Development of a wide area net work that would house data collected

on the road transport sector and the computerized drivers' licensing

system

600,000

INFRASTRUCTURE

NO. PROJECT

FUNDING/

EXECUTING

AGENCY

PROJECT DESCRIPTION/REMARKSPROJECTED COST

(BZD)

ROADS, STREETS, DRAINS & BRIDGES

BUILDINGS & FACILITIES

DECEMBER 2015 PROPOSED 1

Page 36: PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

Economic Development MINISTRY OF FINANCE AND ECONOMIC DEVELOPMENT

PUBLIC SECTOR INVESTMENT PROGRAMME REPORT

PROPOSED* PROJECTS AS AT QUARTER ENDED 31ST DECEMBER, 2015

Policy and Planning Unit

INFRASTRUCTURE

NO. PROJECT

FUNDING/

EXECUTING

AGENCY

PROJECT DESCRIPTION/REMARKSPROJECTED COST

(BZD)

17 Belize City Centre Rehabilitation GOM,MOWT To retrofit the Belize City Centre. To date the contract for design has

been granted to Bricaire & Vanguardia Aplicada.

* Cost of project has

not been agreed.

18 Paving of the Coast Guard

Headquarters' Access Road

CABEI/MNS To upgrade to paved standard the 1370-foot access road to the

Headquarters from the George Price Highway in order to assure safe,

all-weather access to the facility by vehicles, boats, and trailers.

365,085

19 Coast Guard Multi-purpose Complex CABEI/MNS Construction of a 100'X50' building to house the Coast Guard's

Engineering Section (accommodating 4 boats and related equipment

and supplies), Logistics Stores, North and Central Sector

Headquarters, Classroom, Conference Room, and Medical Centre.

Land fills and piles will be required.

900,000

20 Coast Guard Marina CABEI/MNS Construction of a marina on the sea frontage of the Coast Guard

Headquarters to provide a sheltered harbour for vessels during heavy

seas. Work will include dredging and enclosure and expansion of the

existing jetty which will be used as one arm of the marina.

500,000

21 Acquisition of 2 Patrol Boats CABEI/MNS Acquisition of two 87' patrol boats to assist the Coast Guard in fulfilling

its mission to provide stability through maritime law enforcement patrol,

ensure safety at sea, and protect Belize's valuable marine environment

and resources. The boats will be used primarily for law enforcement,

defence, and search and rescue operations.

7,000,000

22 San Pedro Police Station Dormitory CABEI/MNS Addition of a dormitory to the San Pedro Police Station. The project is

on hold as the Ministry reviews and prioritises proposed interventions.

400,000

23 Central Office/Headquarters for the

Ministry of Education in Belize City

TBD Renovation/ Upgrade of a 3-storey steel frame building (St. Thomas

St.) to house the MOE's central agencies in Belize City.

24 Caye Caulker Sewerage System BWSL 6,000,000

25 Hopkins Water and Sewerage System BWSL 7,000,000

WATER & SANITATION

DECEMBER 2015 PROPOSED 2

Page 37: PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

Economic Development MINISTRY OF FINANCE AND ECONOMIC DEVELOPMENT

PUBLIC SECTOR INVESTMENT PROGRAMME REPORT

PROPOSED* PROJECTS AS AT QUARTER ENDED 31ST DECEMBER, 2015

Policy and Planning Unit

INFRASTRUCTURE

NO. PROJECT

FUNDING/

EXECUTING

AGENCY

PROJECT DESCRIPTION/REMARKSPROJECTED COST

(BZD)

26 Upgrade of Belmopan Water System BWSL, BMPCC 20,000,000

27 Water Treatment Systems BWSL 108,000,000

Upgrade of Municipal Airstrips BAA

San Pedro 2,500,000

Placencia 5,000,000

Caye Caulker 200,000

Other Airstrips 1,255,000

29 New Airstrip, Augustine Pine Ridge BAA 5,000,000

30 Basil Jones Airstrip Expansion BAA 0

31 International Bus Terminal 5,000,000

32 Belmopan Bus Terminal Refurbishment of the Belmopan Bus Terminal

33 Belize City bus Terminal Refurbishment of the Belize City Bus Terminal

34 Department of Transport Headquarters Construction of headquarters for the Department of Transport to house

the road transportation management team

35 Punta Gorda Bus terminal Construction of a new bus terminal in Punta Gorda

36 Benque Bus Terminal Construction of a new bus terminal in Benque Viejo

37 Orange Walk Bus Terminal Construction of a new bus terminal in Orange Walk

38 Citrus Greening Rehabilitation MNRA This project was included in the 2011/12 budget with proposed

financing from the Russian Federation. Final agreement did not include

financing for this activity.

1,000,000

39 Community Level Sustainable

Livelihood Project

CDB Proposed as part of the CDB's new assistance strategy to Belize 2,000,000

40 Agriculture Pilot Project CDB Proposed as part of the CDB's new assistance strategy to Belize 2,000,000

41 National Museum of Belize MOTC, BTB 6,000,000

42 Community Level Sustainable

Livelihood Project

CDB Proposed as part of the CDB's new assistance strategy to Belize 2,000,000

TRANSPORTATION & COMMUNICATION

ECONOMIC SERVICES

AGRICULTURE & AGROPROCESSING

TOURISM

28

DECEMBER 2015 PROPOSED 3

Page 38: PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

Economic Development MINISTRY OF FINANCE AND ECONOMIC DEVELOPMENT

PUBLIC SECTOR INVESTMENT PROGRAMME REPORT

PROPOSED* PROJECTS AS AT QUARTER ENDED 31ST DECEMBER, 2015

Policy and Planning Unit

INFRASTRUCTURE

NO. PROJECT

FUNDING/

EXECUTING

AGENCY

PROJECT DESCRIPTION/REMARKSPROJECTED COST

(BZD)

43 Sector Studies/Institutional

Strengthening - BELTRAIDE

CDB Identified during CDB's Strategy Preparation Mission and proposed as

part of the Bank's new assistance strategy to Belize

1,000,000

44 Export Credit/Guarantee Regime CDB Identified during CDB's Strategy Preparation Mission and proposed as

part of the Bank's new assistance strategy to Belize

10,000,000

45 Capacity Building Project (NCSA 3) UNDP/ GEF The project will target capacity building at individual, organizational,

and systemic levels to catalyse and sustain the integration of Rio

Convention priorities into Belize's national environment and

development frameworks. In particular, the project will: a) strengthen

individual and organizational capacities to develop and harmonize key

data and information needed to measure and assess global

environmental goods and services, as well as their proxy indicators; b)

strengthen targeted technical capabilities to undertake key

governmental functions needed to integrate "global environmental" data

and information into national environmental and development

programmes and plans); and c) strengthen individual and

organizational capacities to streamline the monitoring and adaptive

collaborative management of environmental programmes and plans.

1,540,000

46 Mainstreaming into Development Plans

Sound Management of Chemicals

(SMC) Priorities for Key Development

Sectors in Belize and Associated

Governance (2)

UNDP/ GEF 2,000,000

47 Green Buildings Project (Regional) UNDESA 1,000,000

48 Improved Policy and Planning for

Environmental Management

CDB Identified during CDB's Strategy Preparation Mission and technical

assistance proposed as part of the Bank's new assistance strategy to

Belize

500,000

49 Climate Change Adaptation CDB Identified during CDB's Strategy Preparation Mission and technical

assistance proposed as part of the Bank's new assistance strategy to

Belize

300,000

ENVIRONMENT & NATURAL RESOURCE MANAGEMENT

BUSINESS & MARKET DEVELOPMENT

DECEMBER 2015 PROPOSED 4

Page 39: PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

Economic Development MINISTRY OF FINANCE AND ECONOMIC DEVELOPMENT

PUBLIC SECTOR INVESTMENT PROGRAMME REPORT

PROPOSED* PROJECTS AS AT QUARTER ENDED 31ST DECEMBER, 2015

Policy and Planning Unit

INFRASTRUCTURE

NO. PROJECT

FUNDING/

EXECUTING

AGENCY

PROJECT DESCRIPTION/REMARKSPROJECTED COST

(BZD)

50 Broadcasting Legislation MPU/BBA The Belize Broadcasting Authority sought financing under the 2011/12

budget for the project but since only 1/5 of the requested amount was

approved, the agency is seeking external financial assistance. The

project is on hold as the BBA reviews a proposal submitted by Belize's

Cable TV Operators.

200,000

51 Belize Police Department Infrastructure

Reform

MNS, MOWT Construction, renovation, repairs of/to Police Stations and sub-stations

countrywide.

8,006,000

52 Regional Hurricane Shelters NEMO Proposed multi-use structures that will be able to house residents of

vulnerable communities in the event of hurricanes or floods.

25,000,000

53 Improved Disaster Risk Management

Capacity & Mainstreaming

CDB Identified during CDB's Strategy Preparation Mission and technical

assistance proposed as part of the Bank's new assistance strategy to

Belize

150,000

54 Community Action for Public Safety II IADB Evaluation of the CAPS Project is expected to reveal discernible

impact. A request for Technical Assistance for the preparation of a

second phase has been supported. This intervention is expected to

complement the achievements of the CAPS and focus primarily on

child protection and abuse.

55 Conscious Youth Development

Programme (CYDP) Building

Construction

Clearing of property on Mussell St. in Belize City and subsequent

construction of a building to house the CYDP. Work began but stalled

due to lack of funding.

1,274,058

391,290,411

SECURITY & CIVIL RIGHTS

PUBLIC ADMINISTRATION

GOVERNANCE

TOTALS

* Proposed projects include (1) those which have been identified but for which the scope has not been fully defined and financing sources are still being sought,

and (2) those for which potential financing has been identified but discussions to formalise project scope have not yet begun.To be updated.

DECEMBER 2015 PROPOSED 5

Page 40: PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

ACRONYMS

ACP Fish II Programme to Strengthen Fisheries Management in African, Caribbean and

Pacific Group of Countries

AF Adaptation Fund

AGM Attorney General's Ministry

ALBA Alternativa Bolivariana para las Américas (Bolivarian Alliance for the Peoples

of our Americas)

AMS Accompanying Measures for Sugar

APAMO Association of Protected Areas Management Organizations

ASYCUDA Automated System for Customs Data

BAA Belize Airport Authority

BAHA Belize Agricultural Health Authority

BAM Banana Accompanying Measures

BBG Belize Botanic Gardens

BBS Belize Bureau of Standards

BCGA Belize Citrus Growers' Association

BCUL Belize Credit Union League

BEL Belize Electricity Ltd.

BELTRAIDE Belize Trade & Investment Development Service

BEST Belize Enterprise for Sustainable Technology

BLPA Belize Livestock Producers' Association

BNE Belize Natural Energy Charitable Trust

BNTF Basic Needs Trust Fund

BRDP Belize Rural Development Programme

BSP Banana Support Programme

BSSB Belize Social Security Board

BTB Belize Tourism Board

BWS Belize Water Services, Ltd.

C Counterpart (Local) Contribution

C2 Capital II Expenditure

CABEI Central American Bank for Economic Integration

CaMPAM Caribbean Marine Protected Areas Management Network and Forum

CARTFund Caribbean Aid for Trade and Regional Integration Trust Fund

CBA Central Building Authority

CBB Central Bank of Belize

CDB Caribbean Development Bank

CED Customs and Excise Department

CENPROMYPE Center for the Promotion of Micro- and Small Enterprises

CGA Citrus Growers' Association

ComSec Commonwealth Secretariat

CReW Caribbean Regional Fund for Wastewater Management

CU Credit Union

DFC Development Finance Corporation

DFT Directorate of Foreign Trade

EU European Union

EDF European Development Fund

DECEMBER 2015 1

Page 41: PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

ACRONYMS

EnvDF Environmental Defense Fund

FAO Food and Agriculture Organisation of the United Nations

FD Forestry Department

G Grant

GEF Global Environmental Facility

GENACIS Gender, Alcohol and Culture: an International Study

GF Global Fund

GIZ Deutsche Gesellschaft für Internationale Zusammenarbeit (German Society for

International Cooperation)

GOB Government of Belize

GOM Government of Mexico

GOS Government of Spain

GOV Government of Venezuela

GOV/PC Government of Venezuela - PetroCaribe

GPMP Good Pesticide Management Practice

IADB Inter-American Development Bank

IBRD International Bank for Reconstruction and Development

ICDF International Cooperation and Development Fund

IDRM Integrated Disaster Risk Management System

IFAD International Fund for Agricultural Development

IICA Inter-American Institute for Cooperation on Agriculture

JSDF Japan Social Development Fund

KOICA Korea International Cooperation Agency

KFAED Kuwait Fund for Arab Economic Development

L Loan

LGA Local Government Agencies

MAR Fund Mesoamerican Reef Fund

MEDP Ministry of Economic Development and Petroleum

MFA Ministry of Foreign Affairs

MHD/ MHDST Ministry of Human Development, Social Transformation and Poverty Alleviation

MHI 2015 Mesoamerican Health Initiative 2015 (Mexico)

MLLGRD Ministry of Labour, Local Government, Rural Development, National Emergency

Management and Immigration

MNS Ministry of National Security

MOAFF Ministry of Agriculture, Forestry, Fisheries, the Environment and Sustainable Development

MOECYS Ministry of Education (Science and Technoology), Culture, Youth and Sports

MOF Ministry of Finance

MOH Ministry of Health

MOTCA Ministry of Tourism and Civil Aviation

MOWT/MOWTNEM Ministry of Works, Transport and National Emergency Management

MPSEPU Ministry of the Public Service, Energy and Public Utilities

NAC National AIDS Commission

NAO National Authorising Office

NCCO National Climate Change Office

NEMO National Emergency Management Organization

NICH National Institute for Culture and History

OAK Oak Foundation

OFID OPEC Fund for International Development

OIE World Organization for Animal Health

DECEMBER 2015 2

Page 42: PUBLIC SECTOR INVESTMENT PROGRAMME 2015 - 2016 … · Feasibility study, architectural and engineering elements, costings for the Benque Viejo del ... 64 Support to Banana Growers

ACRONYMS

OIRSA Organismo Internacional Regional de Sanidad Agropecuaria

(Regional International Organisation for Animal and Plant Health)

OPM Office of the Prime Minister

PACT Protected Areas Conservation Trust

PAHO Pan American Health Organisation

PEU Project Execution Unit

ROC Republic of China (Taiwan)

SATIIM Sarstoon Temash Institute for Indigenous Management

SIF Social Investment Fund

SIF II Second Loan to the Social Investment Fund

SIRDI Sugar Industry Research and Development Institute

SWaMA Solid Waste Management Authority

TAT Technical Assistance Team

TCGA Toledo Cacao Growers Association

TTM Taiwanese Technical Mission

U Unidentified (Funding )

UNCTAD United Nations Conference on Trade and Development

UNDP United Nations Development Programme

UNEP United Nations Environment Programme

UK United Kingdom

USAID United States Agency for International Development

WB World Bank

DECEMBER 2015 3